Closed Repair Requests: September 2005

See Also: All Closed Repair Requests at Kramer Middle School

September 2005 Summary

  • Urgent Requests
    9
    Average Time Elapsed: 792.9 Days
  • Routine Requests
    56
    Average Time Elapsed: 636.8 Days
  • Total Requests
    65

Detailed Reports

Urgent Repair Requests Completed in September 2005 (9)
Description Open Date Close Date Time Elapsed
FM-200226857 03 9/28/05 (Kramer) !!!VERY URGENT!!! Asbestos Assessment Required. 1st Floor/Room #101: Floor buckling, tile cracking, and coming away from the floor. 05/21/2004: Staff called in today to report the conditions of the floor; staff person tripped, and fell. Please respond, as the permit has been issued. THIS REQUEST IS PENDING ONE YEAR, AND TWO (2) MONTHS. Asbestos Code A - Clear for repairs on 03/12/03. Horne Engineering - Sharon Voss (RG 03/14/03) March 11, 2003 September 28, 2005 932 days
FM-200506776 05 9/28/05 (Kramer) Second floor, Room 209. Repair door and replace door closer on door. A student vandalized the door, a cost survey is needed because the parent is paying. Asbestos Code A - Clear for repairs on 06/16/05. DCPS Safety - Richard Gibson (RG) June 14, 2005 September 28, 2005 106 days
FM-200225766 03 9/28/05 Kramer Throughout - stairwell doors Locks and panic bars on corridor landing doors need to be repaired or replace. Child has been injured. Safety Hazard February 13, 2003 September 28, 2005 958 days
FM-200333854 03 9/28/05 (Kramer) !!!VERY URGENT!!! 1st Floor/Boys Bathroom: Restore electrical power to area; panel box is not a problem. (Bathroom is very dark) July 28, 2003 September 28, 2005 793 days
FM-200222702 /02 9/28/05 Kramer First floor - gym Reseal gym floor. Asbestos Code A - Clear for repairs on 12/17/02. DCPS Safety - Richard Gibson (RG) December 17, 2002 September 28, 2005 1,016 days
FM-200453418 04 9/28/05 (Kramer) !!!VERY URGENT!!! 1st, 2nd, & 3rd Floors in Back of Building. Restore lights to the above areas. August 26, 2004 September 28, 2005 398 days
FM-200221585 /02 9/28/05 (Kramer) !!!VERY URGENT!!! Basement/Kitchen: No gas to kitchen stove; when pushed to light pilot light, it goes out unless you hold it. (There are no gas fumes present.) November 25, 2002 September 28, 2005 1,038 days
FM-200337759 03 9/28/05 (Kramer) !!!VERY URGENT!!! !!!VANDALISM!!! Asbestos Assessment Required. 2nd Floor/Hallway lockers: Vandalized lockers, beginning with numbers #201. One section of lockers has been pulled from the wall; need to be secured. Please see custodian for locations. March 26, 2004: Staff (Jackson) has called in several times reference this request, please observe the very late date, and respond. Sincerely. Asbestos Code A - Clear for repairs on 03/31/04. Horne Engineering - Bjarne Smith (RG 04/02/04) September 17, 2003 September 28, 2005 742 days
FM-200213448 02 9/28/05 Kramer 1. Asbestos Assessment Reqd. 3rd Floor Room 313 2. Remove electric outlets from the floor [this area is going to become an office]. Asbestos Code A - Clear for repairs on 08/19/02. DCPS Safety - Leroy Minton Jr (RG 08/20/02) August 2, 2002 September 28, 2005 1,153 days

Routine Repair Requests Completed in September 2005 (56)
Description Open Date Close Date Time Elapsed
FM-200510028 05 9/20/05 Kramer Jr. High Fire Code Violation 2000 IFC 703.2.2 First Floor - Stairwell 1) Fire door hardware needs to be repaired. Asbestos Code A - Clear for repairs on 08/11/05. Tidewater - Henry Addison (RG 08/15/05) August 10, 2005 September 20, 2005 41 days
FM-200510017 05 9/20/05 Kramer Jr. High Fire Code Violation 2000 IFC 906.2 First Floor - Next to Rooms - 103,105,110, and 113. 1) Fire extinguisher cabinets are not properly maintained. ( painted shut ). Asbestos Code A - Clear for repairs on 08/11/05. Tidewater - Paul Berman (RG 08/15/05) August 10, 2005 September 20, 2005 41 days
FM-200510000 05 9/20/05 Kramer Jr. High Fire Code Violation 2000 IFC 703.2.2 Third Floor - Room 312 1) Self closing mechanism is broken. ( Door ) Asbestos Code A - Clear for repairs on 08/11/05. Tidewater - Paul Berman (RG 08/15/05) August 10, 2005 September 20, 2005 41 days
FM-200446341 04 9/28/05 Kramer Room 6 Install air conditioner - window unit. Window H 4' unit H 14" w 22". April 5, 2004 September 28, 2005 541 days
FM-200446256 04 9/28/05 parts are needed to repair bobcat mower and trcator,s to get ready for grass cuting season to start soon. April 1, 2004 September 28, 2005 545 days
FM-200446039 04 9/28/05 Kramer Middle Room #105 Asbestos assessment required Repair or replace window A/C unit. Frame size 26 1/2 X 17 BTU 24000 Volts 230 Amps Amps Unit will not run. Replacement on site to be installed Asbestos Code A - Clear for repairs on 04/06/04. Horne Engineering - Edward Rodriguez (RG 04/07/04) March 29, 2004 September 28, 2005 548 days
FM-200445362 04 9/28/05 parts are needed to do repair,s in all grounds shops March 15, 2004 September 28, 2005 562 days
FM-200445178 04 9/28/05 parts needed to repair 3930 tractor for grass cuting March 10, 2004 September 28, 2005 567 days
FM-200445008 04 9/28/05 Kramer ( Maintenance T School Blitz ) Kitchen 1) Scrape and Paint kitchen ceiling from window to mid-way ceiling. Lead & Asbestos Code A - Clear for repairs on 03/10/04. Horne Engineering - Edward Rodriguez (RG 03/12/04) March 9, 2004 September 28, 2005 568 days
FM-200445006 04 9/28/05 Kramer ( Maintenance T School Blitz ) Through out 1) Replace missing floor tile thru-out the building. Asbestos Code A - Clear for repairs on 03/15/04. Horne Engineering - Bjame Smith (RG 03/16/04) March 9, 2004 September 28, 2005 568 days
FM-200445005 04 9/28/05 Kramer ( Maintenance T School Blitz ) Roof 1) Repair main roof and auditorium roof. 2) Repair roof gutters Asbestos Code A - Clear for repairs on 04/27/04. Horne Engineering - Ray Agnant (RG 04/29/04) March 9, 2004 September 28, 2005 568 days
FM-200444896 04 9/28/05 Kramer First floor parking lot / playground A hole has been drill into ground where children have recess. Please locate partys and repair. March 5, 2004 September 28, 2005 572 days
FM-200444381 04 9/28/05 50 bags of feild marking lime for baseball games willl start soon!!!!!!! February 24, 2004 September 28, 2005 582 days
FM-200443847 04 9/28/05 Kramer School Repair fence that was knocked down by car February 9, 2004 September 28, 2005 597 days
FM-200341078 03 9/28/05 (Kramer) Grounds/Front Yard: Display sign has been vandalized; new parts are on hand. 3/32" bit to accommodate a #34 pop rivet. December 4, 2003 September 28, 2005 664 days
FM-200340821 /03 9/28/05 Kramer Middle School Storage Room #16 Repair/Replace air handler unit motor, for heat in the Gym Room (motor has been removed). November 28, 2003 September 28, 2005 670 days
FM-200340634 /03 9/28/05 Kramer Gym Repair Lights 1) Lights went out while PTA was going on. November 21, 2003 September 28, 2005 677 days
FM-200338438 03 9/28/05 (Kramer) !!EMERGENCY!! 1st Floor/Room #114: Please replace key for medicine cabinet; former employee did not return key. Nurse need access to medications. October 2, 2003 September 28, 2005 727 days
FM-200337849 03 9/28/05 Kramer Third floor corridor Ceiling leaking water could be the drains or brick work across from room 208. September 23, 2003 September 28, 2005 736 days
FM-200337813 03 9/28/05 (Kramer) Through-Out/3rd Floor & Basement: Room #304-defective door. Stairwell D-Door knobs defective, two (2) knobs needed. (Handle type) Hallway basement door, Stairwell C-Door defective. Code A-clear for repair by DCPS Charles Buchanan on 9/25/03 September 22, 2003 September 28, 2005 737 days
FM-200336701 03 9/28/05 Kramer First floor room 105 parent center AC unit has been install, 2 outlets needed. September 2, 2003 September 28, 2005 757 days
FM-200336494 03 9/28/05 Kramer First floor auditorium Breakers in panel box needs to be repaired or replace. No. 21 and 23 AC units. August 28, 2003 September 28, 2005 762 days
FM-200336337 03 9/28/05 Kramer Basement and third floor A and D Defective doors on "D". Door knob stairwell "D". Check for other defective hardware on steps. August 27, 2003 September 28, 2005 763 days
FM-200336194 03 9/28/05 Kramer Second and third floor throughout Repair broken partitions, one girls restroom 216 missing door, one boys restroom 319 missing frame, and one girls restroom 320 missing door. August 25, 2003 September 28, 2005 765 days
FM-200336187 03 9/28/05 Kramer First floor outside Lights not working in front of building, around to the 18th Street side of building. August 25, 2003 September 28, 2005 765 days
FM-200335500 03 9/28/05 Kramer Second floor room 214 Wall has water damage restroom area. Please repair ASAP. Asbestos Code A - Clear for repairs on 08/18/03. Horne Engineering - Tony Marcolin (RG 08/19/03) August 18, 2003 September 28, 2005 772 days
FM-200334407 03 9/28/05 Kramer Second floor rooms 212, 208 and kitchen Rooms has water damage plaster has fallen. Lead Code B Asbestos Code A - Clear for repairs on 08/06/03. Horne Engineering - Edward Rodriguez (RG 08/07/03) August 5, 2003 September 28, 2005 785 days
FM-200333996 03 9/28/05 Kramer First floor room 101 to 103 Remove an air conditioner from room 101 to room 103. Asbestos Code A - Clear for repairs on 09/11/03. Horne Engineering - Bipin Nanavaty (RG 09/12/03) July 30, 2003 September 28, 2005 791 days
FM-200333186 03 9/28/05 (Kramer) !!!EMERGENCY!!! Basement/Boiler Room: Pipe leaking, water flooding through the tunnel. July 11, 2003 September 28, 2005 810 days
FM-200333052 03 9/28/05 Kramer Second floor - room 201 Floor buckling tile cracking and coming away from floor. Asbestos Code A - Clear for repairs on 07/09/03. Horne Engineering - Philp Connolly (RG 07/15/03) July 9, 2003 September 28, 2005 812 days
FM-200332836 03 9/28/05 Kramer Throughout Nolights in parts of building. No AC in parts of building. July 2, 2003 September 28, 2005 819 days
FM-200332101 03 9/28/05 Kramer School Clean cath basins June 19, 2003 September 28, 2005 832 days
FM-200331544 03 9/28/05 Kramer Annex 1) Furnish Graffiti materials. June 10, 2003 September 28, 2005 841 days
FM-200330309 03 9/28/05 (Kramer) Parking Lot: Fence by rear entrance gate damage, please repair or replace. Repair track on top entrance gate. May 19, 2003 September 28, 2005 863 days
FM-200330073 03 9/28/05 (Kramer) Parking Lot: Gate is off the track; please repair as soon as possible. May 12, 2003 September 28, 2005 870 days
FM-200329878 03 9/28/05 Kramer 1) In accordance with the grass cutting contract for the summer of 2003 to include grass cutting and edging. May 9, 2003 September 28, 2005 873 days
FM-200329381 03 9/28/05 Kramer Parking lot Entrance gate off track, please repair ASAP. May 2, 2003 September 28, 2005 880 days
FM-200228650 03 9/28/05 Kramer First floor auditorium Panel box has a shortage, please come and fix it. April 11, 2003 September 28, 2005 901 days
FM-200225855 03 9/28/05 All school locations Removal of snow from all school locations February 14, 2003 September 28, 2005 957 days
FM-200222749 /02 9/28/05 Kramer Room 323 Install outlet for copy machine in room 323. (Heavy duty outlet) December 18, 2002 September 28, 2005 1,015 days
FM-200222302 /02 9/28/05 Provide 2000 bags of icemelt or salt or snow removal December 10, 2002 September 28, 2005 1,023 days
FM-200220904 /02 9/28/05 Kramer First floor - room101 Electrical work needed breaker in panel box not working. Lights ans wall sockets no power. November 13, 2002 September 28, 2005 1,050 days
FM-200213778 02 9/28/05 repair trailer rear bearing need to be replace and rear lights work needs to be don by precision small engines August 7, 2002 September 28, 2005 1,148 days
FM-200203091 02 9/28/05 Kramer Basement - Kitchen Asbestos Assessment Required 1) Plaster and Paint hanging from ceiling over the stove. LEAD & ASBESTOS CODE A-CLEAR FOR REPAIR NO 2/21/02 HORNE ENGINEER: ROGER KAGER February 19, 2002 September 28, 2005 1,317 days
FM-200117113 01 9/28/05 KRAMER KITCHEN REPAIR OR REPLACE KITCHEN EXHAUST FAN. WP-200108869 August 10, 2001 September 28, 2005 1,510 days
FM-200508351 05 9/28/05 Kramer HEALTH CODE VIOLATION Kitchen: 1) Provide a cover for light or plastic coated blub for ref. unit R1. July 22, 2005 September 28, 2005 68 days
FM-200508350 05 9/28/05 Kramer HEALTH CODE VIOLATION Kitchen: 1) Replace faucet or washer so water does not run over faucet when water is on. July 22, 2005 September 28, 2005 68 days
FM-200507842 05 9/28/05 submersible pumps are needed to make repairs July 14, 2005 September 28, 2005 76 days
FM-200507824 05 9/28/05 CONCRET SAW IS NEEDED TO DO REPAIR,S TO TEN DRIVE WAYS AND PLAYGROUNDS July 13, 2005 September 28, 2005 77 days
FM-200507232 05 9/28/05 Basement - Rear exit door - Door closure broken. Second Floor - Room 209 - Door closure broken all the way off. Code A-clear for repair by DCPS Charles Buchanan on 6/28/05 June 28, 2005 September 28, 2005 92 days
FM-200506517 05 9/28/05 Kramer Rear Playground Areas Repair or replace A/C units. Unit is not working. For room #21. A.O. Smith HP-1/4 RPM 1075 AMPS 1.3 HZ 60 Unit is needed for basement areas. June 8, 2005 September 28, 2005 112 days
FM-200503819 05 9/28/05 Kramer Junior High School Repair basketball court April 11, 2005 September 28, 2005 170 days
FM-200455844 04 9/28/05 Kramer Basement room 21 Doors need to be rekeyed. September 27, 2004 September 28, 2005 366 days
FM-200451861 04 9/28/05 Kramer First floor gym Floor seal needed. August 9, 2004 September 28, 2005 415 days
FM-200449361 04 9/28/05 Kramer Basement, Second and Third Floor 1) Defective doors Stairwell C, Basement Stairwell A and D, Stairwell A Second Floor, Room 311 and 304. Code A-clear for repair by DCPS Charles Buchanan on 6/17/04 June 16, 2004 September 28, 2005 469 days
FM-200447324 04 9/28/05 Kramer Throughout building Circuit breakers need to be repaired or replaced. Breaker box in cafeteria 20 an 22 Auditorium circuit 22 and 24 "C" second floor steps landing circuit 22 and 23 "D" third floor steps landing circuit 40 and 42. April 29, 2004 September 28, 2005 517 days

© The Washington Post Company