Closed Repair Requests: September 2006

See Also: All Closed Repair Requests at Kramer Middle School

September 2006 Summary

  • Urgent Requests
    1
    Average Time Elapsed: 486 Days
  • Routine Requests
    6
    Average Time Elapsed: 300 Days
  • Total Requests
    7

Detailed Reports

Urgent Repair Requests Completed in September 2006 (1)
Description Open Date Close Date Time Elapsed
FM-200505852 05 9/21/06 Kramer Boiler Room Boiler #1 Replace Safety valve, Kunkle Valve co. Black mountain, NC Cleaver Brooks - 940-039-24 Size 3" Set 15 Lbs PSI X FIG 920-1 May 23, 2005 September 21, 2006 486 days

Routine Repair Requests Completed in September 2006 (6)
Description Open Date Close Date Time Elapsed
FM-200627744 06 9/5/06 Ground floor, Cafeteria Area. Repair or Replace lock on cafeteria door, it is locked and the lock was damaged by vandals. August 16, 2006 September 5, 2006 20 days
FM-200508057 05 9/20/06 Kramer Boiler Room Boiler #1 replace bottom blow down pipe to drain. July 19, 2005 September 20, 2006 428 days
FM-200508059 05 9/20/06 Kramer Boiler Room Boiler #1 Remove (4) four plugs on cross connections on feedwater regulator and low water fuel cut off. July 19, 2005 September 20, 2006 428 days
FM-200508060 05 9/20/06 Kramer Boiler Room Boiler #2 Remove (1) one plug on cross connections on feedwater regulator. July 19, 2005 September 20, 2006 428 days
FM-200505853 05 9/21/06 Kramer Boiler Room Boiler #1 Replace 2" valve bottom blow down valve. May 23, 2005 September 21, 2006 486 days
FM-200629210 12/06 9/22/06 Basement/Rm. 12 - Busted pipe in the wall Asbestos Code A - Clear for repairs on 09/13/06. Tidewater - Kenny Belton (RG 09/13/06) September 12, 2006 September 22, 2006 10 days

© The Washington Post Company