Open Repair Requests: November 2005

See Also: All Open Repair Requests at Kramer Middle School

November 2005 Summary

  • Urgent Requests
    0
  • Routine Requests
    1
  • Total Requests
    1

Detailed Reports

Routine Repair Requests Opened in November 2005 (1)
Description Open Date
FM-200515445 11/15/05 Kramer Boiler Room Boiler #3 bottom blowdown valve is inoperative, needs to be replace. Emergency !!! November 15, 2005

© The Washington Post Company