Open Repair Requests: May 2003
See Also: All Open Repair Requests at Kramer Middle School
May 2003 Summary
- Urgent Requests
0 - Routine Requests
1 - Total Requests
1
Detailed Reports
| Description | Open Date |
|---|---|
| FM-200329499 5/5/03 (Kramer Middle School) Asbestos Assessment Required. 1st Floor/Boys bathroom: Repair ceiling Due to previous leak, ceiling is still very moist, and very large portions have falling down on the bathroom urinals. Asbestos Code A - Clear for repairs on 05/05/03. Horne Engineering - Edward Rodriguez (RG 05/06/03) |
© The Washington Post Company
