Open Repair Requests: August 2005

See Also: All Open Repair Requests at Kramer Middle School

August 2005 Summary

  • Urgent Requests
    0
  • Routine Requests
    1
  • Total Requests
    1

Detailed Reports

Routine Repair Requests Opened in August 2005 (1)
Description Open Date
FM-200510228 8/12/05 Kramer Throughout Building 1) Snake out drains, repair or replace defective flush valves, replace missing sinks, commodes, urinals, showerheads and faucets. August 12, 2005

© The Washington Post Company