Open Repair Requests: August 2006

See Also: All Open Repair Requests at Kramer Middle School

August 2006 Summary

  • Urgent Requests
    0
  • Routine Requests
    5
  • Total Requests
    5

Detailed Reports

Routine Repair Requests Opened in August 2006 (5)
Description Open Date
FM-200626627 8/1/06 2nd Floor- Room 200 (Library) Remove electrical outlets in the floors; wires are exposed. Asbestos Code A - Clear for repairs on 08/02/06. Tidewater - Kenny Long (RG 08/04/06) August 1, 2006
FM-200627001 8/8/06 Basement - Boiler Room - Replace gate valve for hot water holding tank, not holding. August 8, 2006
FM-200627002 8/8/06 Basement - Boiler Room - Replace 2" gate valve on bottom blow down discharge lines, boilers # 2 and # 3, inoperative. August 8, 2006
FM-200628251 8/24/06 Assistant Principal Restroom/Replaster the wall and ceiling due to water damage Lead Code B Asbestos Code A - Clear For Repairs On 09/09/06 SEE ASSESSMENTS Tidewater - Carlos Vera (RG 09/21/06) August 24, 2006
FM-200628263 8/24/06 Weld a three inch pipe on hot water tank. August 24, 2006