Open Repair Requests: August 2006
See Also: All Open Repair Requests at Kramer Middle School
August 2006 Summary
- Urgent Requests
0 - Routine Requests
5 - Total Requests
5
Detailed Reports
| Description | Open Date |
|---|---|
| FM-200626627 8/1/06 2nd Floor- Room 200 (Library) Remove electrical outlets in the floors; wires are exposed. Asbestos Code A - Clear for repairs on 08/02/06. Tidewater - Kenny Long (RG 08/04/06) | |
| FM-200627001 8/8/06 Basement - Boiler Room - Replace gate valve for hot water holding tank, not holding. | |
| FM-200627002 8/8/06 Basement - Boiler Room - Replace 2" gate valve on bottom blow down discharge lines, boilers # 2 and # 3, inoperative. | |
| FM-200628251 8/24/06 Assistant Principal Restroom/Replaster the wall and ceiling due to water damage Lead Code B Asbestos Code A - Clear For Repairs On 09/09/06 SEE ASSESSMENTS Tidewater - Carlos Vera (RG 09/21/06) | |
| FM-200628263 8/24/06 Weld a three inch pipe on hot water tank. |