Open Repair Requests: September 2003

See Also: All Open Repair Requests at Kramer Middle School

September 2003 Summary

  • Urgent Requests
    0
  • Routine Requests
    1
  • Total Requests
    1

Detailed Reports

Routine Repair Requests Opened in September 2003 (1)
Description Open Date
FM-200337699 9/17/03 Kramer Roof 1. Unclog and or repair drains on the roof - causing water damage to the walls in the auditorium . September 17, 2003

© The Washington Post Company