Open Repair Requests: September 2005
See Also: All Open Repair Requests at Kramer Middle School
September 2005 Summary
- Urgent Requests
5 - Routine Requests
0 - Total Requests
5
Detailed Reports
| Description | Open Date |
|---|---|
| FM-200512681 9/16/05 Kramer Urgent Second Floor-Corridor Rm 209 Corridor window needs to by repaired and/or replaced. "vandelize" | |
| FM-200512684 9/16/05 Kramer Urgent First Floor-Auditorium Ceiling lights out bulb replacement is needed | |
| FM-200512685 9/16/05 Kramer Urgent First Floor-Auditorium Seats needs to be repaired and/or replaced (comming loose from the floor) Asbestos Code A - Clear for repairs on 09/19/05. Tidewater - Philp Connolly (RG 09/21/05) | |
| FM-200512687 9/16/05 Kramer Urgent Third Floor-Rm 313 Remove outlets on floor Room will become an office Asbestos Code A - Clear for repairs on 09/19/05. Tidewater - Philp Connolly (RG 09/21/05) | |
| FM-200513042 9/22/05 Kramer Urgent First and Second Floor-Rms. 101, and 203 Repair sinks, the water runs non-stop, the water is cut off |
© The Washington Post Company
