Open Repair Requests: September 2006
See Also: All Open Repair Requests at Kramer Middle School
September 2006 Summary
Detailed Reports
| Description | Open Date |
|---|---|
| FM-200629961 9/25/06 Basement - Stairwell B - Step Treads Has Come Up "Safety Hazard" Asbestos Code A - Clear For Repairs On 06/26/06. Tidewater - Thomas Johnson (RG 09/28/06) | |
| FM-200630135 9/27/06 KRAMER boiler room Boiler # 1 replace safety valve |
| Description | Open Date |
|---|---|
| FM-200628850 9/6/06 Rm. 205/Air conditioner has been installed, need outlet installed to run it. Asbestos Code A - Clear for repairs on 09/08/06. Tidewater - Carlos Vera (RG 09/12/06) | |
| FM-200628851 9/6/06 Rm. 300/Repair or replace A/C unit | |
| FM-200629653 9/19/06 Third Floor/307 - Repair or replace wood floor, it's damaged Asbestos Code A - Clear For Repairs On 09/19/06 Tidewater - Roger Small (RG 09/21/06) | |
| FM-200629651 9/19/06 Second Floor/207 - Repair or replace wood floor, it's damaged Asbestos Code A - Clear For Repairs On 09/19/06 Tidewater - Roger Small (RG 09/21/06) | |
| FM-200630132 9/27/06 KRAMER boiler room Boiler # 3 repair refractory around fire door per boiler inspector. | |
| FM-200630206 9/28/06 First Floor/Lobby Entrance - Fire mesh glass broken out. Asbestos Code A - Clear for repairs on 09/29/06. Tidewater - Kenny Long (RG 10/02/06) | |
| FM-200630293 9/29/06 3rd Floor- Room 318 Troubleshoot and repair gas smell in the Home Economics room. The gas line may need to be capped off. |