Urgent Open Repair Requests
See Also: All Open Repair Requests at Lafayette Elementary School
Detailed Reports
| Description | Open Date |
|---|---|
| FM-200330101 101 5/13/03 LaFayette First Floor - Team #2 1. Replace ceiling tile that was damaged by univent leak . Asbestos Code A - Clear for repairs on 05/13/03. DCPS Safety - Richard Gibson (RG) | |
| FM-200333969 969 7/29/03 (Lafayette) !!!VERY URGENT!!! Roof: Repair skylight; broken by vandals. | |
| FM-200338537 10/6/03 (Lafayette) !!!URGENT!!! Asbestos Assessment Required. Roof Aea: Repair flashing on roof, above team #3. (Slate Roof) Asbestos Code A - Clear for repairs on 10/07/03. Horne Engineering - Roger Kager (RG 10/09/03) | |
| FM-200445385 3/15/04 Lafayette Outside front Fabricate and install grate in front of building brside gas equipment. Grate size 18"x5 1/2" Asbestos Code A - Clear for repairs on 03/16/04. DCPS Safety - Leory Minton (RG 03/16/04) | |
| FM-200502407 3/9/05 Lafayette First and second floor team volts Repair lights in teams 1 - 2- 3 and 4. The lights in the volts do not work. Asbestos Code A - Clear for repairs on 03/24/05. DCPS Safety - Ronald Edwards(RG 03/29/05) | |
| FM-200513191 9/27/05 (Lafayette) "Urgent" Exterior front of building. Repair brick wall outside front of building. Note: The wall is falling apart. | |
| FM-200632021 11/8/06 Lafayette Boiler Room Unstop clogged drain in Boiler Room beside condensate tank. Engineer attempted to unstop with negative results. Urgent !!!! |