Urgent Closed Repair Requests
See Also: All Closed Repair Requests at Langdon Elementary School
Detailed Reports
| Description | Open Date | Close Date | Time Elapsed |
|---|---|---|---|
| FM-200115682 01 8/24/01 (LANGDON) FIRE CODE VIOLATION: F-110.1 PAGE (1 OF 3) 1. ASBESTOS ASSESSMENT REQUIRED. 1ST FLOOR/TEACHERS PREP. ROOM: HOLE IN THE CEILING. ASBESTOS CODE A - CLEARED FOR REPAIRS ON 07-26-01. LEROY MINTON JR SAFETY OFFICE ( 202-576-8962 ) | |||
| FM-200115892 01 9/26/01 (LANGDON) FIRE CODE VIOLATION:F- PAGE (3 OF 3) 1. ASBESTOS ASSESSMENT REQUIRED. LEARNING CENTER/1-B: COULD NOT CHECK STORAGE ROOMS IN LEARNING CENTER, THERE ARE NO KEYS. ASBESTOS CODE A - CLEARED FOR REPAIRS ON 07-26-01. LEROY MINTON JR SAFETY OFFICE ( 202-576-8962 ) | |||
| FM-200115738 01 9/26/01 (LANGDON) FIRE CODE VIOLATION: F- PAGE (3 OF 3) 1ST FLOOR/KITCHEN AREA: BROKEN HARDWARE NEXT TO FREEZER. ASBESTOS CODE A - CLEARED FOR REPAIRS ON 07-26-01. LEROY MINTON JR SAFETY OFFICE ( 202-576-8962 ) | |||
| FM-200115727 01 11/2/01 (LANGDON) FIRE CODE VIOLATION: F-110.3 PAGE (2 OF 3) 1. ASBESTOS ASSESSMENT REQUIRED. 2ND FLOOR/ACROSS FROM #2-B: WATER LEAKING IN CEILING CLOSE TO LIGHT FIXTURE, NEXT TO (ACROSS FROM LEARNING CENTER #2-B. ASBESTOS CODE A - CLEARED FOR REPAIRS ON 07-26-01 . LEROY MINTON JR SAFETY OFFICE ( 202-576-8962 ) | |||
| FM-200109990 01 11/27/01 LANGDON OUTSIDE - PLAYGROUND WE HAVE PURCHASED A PLAYGROUND SET FOR OUR PRE-SCHOOL PLAYGROUND. WE NEED A SOFT MATTING SERVICE TO PROTECT THE STUDENTS, IN THE EVENT THEY FALL, FROM INJURY. HEALTH AND SAFETY HAZARD. | |||
| FM-200120813 01 1/28/02 (LANGDON) repair the broken commodes in first floor boys bathroom near the entrance Requester Phone: 576-6048 Requestor Phone: 576-6048 ASBESTOS CODE A - CLEAR FOR REPAIRS ON 11/07/01 RONALD EDWARDS - SAFETY (202)576-6693(RG) | |||
| FM-200201740 02 3/14/02 LANGDON 1ST FL. CORRIDOR ON 20TH ST. SIDE OF BLDG. 1. ASBESTOS ASSESSEMENT REQUIRED ON CEILING TILE AND PIPE INSULATION. 2. REPLACE SECTION OF BLACK PIPE ON RETURN LINE. PIPE LOCATED IN CEILING INSULATION IS ON PIPE. ALSO SECTIONS OF 9 X 9 CEILING TILE WILL HAVE TO BE REMOVED. CODE A CLEAR FOR REPAIR BY HORNE ENG. RAYMOND AGNANT 01-25-02 DCPS SAFETY-SHEILA R. HOWARD 01-25-02 SPECIAL NOTE: THE LEAKING SECTION OF THE PIPE IS INSULATED WITH FIBERGLASS. HOWEVER ASBESTOS FITTINGS ARE WITHIN 5 FT. AVOID DAMAGE TO MUDDED FITTINGS DURING REPAIRS.IF THE MUDDED FITTINGS HAVE TO BE REMOVED THEN STOP WORK AND ALERT DCPS SAFETY FOR HORNE TO REVISIT TO DEVELOP AN ASBESTOS DESIGN. DCB (IT GROUP)/703-461-6848 CODE A - ASBESTOS ABATED ON 02/11/02 PER SHEILA R HOWARD CONFIRMATION.(RG 02/12/02) Grounds (2nd) Trade | |||
| FM-200205274 02 4/29/02 Langdon Second (2nd) Floor - Hallway by Room #165 1. Asbestos Assessment Required. 2. Ceiling has fallen. Replace Ceiling (Plaster) Safety Hazard. Code A-clear for repair by Honre Engineer ( Philip Connolly ) on 4/04/02 | |||
| FM-200202516 02 4/30/02 (LANGDON) ***URGENT*** 1ST FLOOR AUDITORIUM SPARKS CAME FROM THE BREAKER BOX WHEN MR. WILLIAMS TRIED TO POWER THE AUDITORIUM LIGHTS. | |||
| FM-200211075 02 7/18/02 (Langdon) Fire code violation: Page 1 of 2 1. Asbestos assessment required. Exit-20th Street: Door broken. Asbestos Code A clear for repairs, on 7/11/02 DCPS Safety, L. Minton (RE - 7/11/02) | |||
| FM-200211008 02 8/1/02 (Langdon) Fire code violation: Page 1 of 2 LC2 RM-C: Broken door return. Asbestos Code A-clear for repair DCPS Safety Leroy Minton on 7/16/02 Charles E. Buchanan DPCS | |||
| FM-200211080 02 8/16/02 (Langdon) Fire code violation: Page 1 of 2 1. Asbestos assessment required. Exit from to cafeteria-door broken. Asbestos Code A clear for repairs, on 7/11/02 DCPS Safety, L. Minton (RE - 7/11/02) | |||
| FM-200211010 02 11/15/02 (Langdon) Fire code violation: Page 1 of 2 1. Asbestos assessment required. Next to Room #C: Exit lights out. Asbestos Code A-clear for repair DCPS Safety by Leroy Minton on 7/16/02 Charles E. Buchanan DPCS | |||
| FM-200210848 02 3/26/03 (Langdon) ***URGENT*** Urgent!!! Havi8ng DCPS Job Fair Saturday, June 8, 2002. Need Freon in Air Conditioner units in the Auditorium. | |||
| FM-200116230 01 6/9/03 LANGDON LEARNING CENTER 2B ASBESTOS ASSESSMENT REQUIRED PLASTER HALL FROM WALL IN THE HALLWAY IN LEARNING CENTER 2B. FROM WATER DAMAGE. FIRE CODE VOILATION CODE A-CLEAR FOR REPAIR BY DCPS SAFETY RE 8/2/01. | |||
| FM-200452284 04 9/1/04 Landgon Fire Code Violation Basement Replace light switch cover at top of stairs in boiler room. Asbestos Code A - Clear for repairs on 08/12/04. DCPS Safety - Richard Gibson (RG) | |||
| FM-200452280 04 9/1/04 Landgon Fire Code Violation Basement Replace electrical panel cover in boiler room. Asbestos Code A - Clear for repairs on 08/12/04. DCPS Safety - Richard Gibson (RG) | |||
| FM-200452279 04 9/1/04 Landgon Fire Code Violation Basement Replace electrical panel cover in boiler room. Asbestos Code A - Clear for repairs on 08/12/04. DCPS Safety - Richard Gibson (RG) | |||
| FM-200452255 04 9/9/04 Landgon Fire Code Violation Second floor Defective handrail at rear stairway landing from 2nd floor. Asbestos Code A - Clear for repairs on 08/12/04. DCPS Safety - Richard Gibson (RG) | |||
| FM-200102685 01 7/25/05 LANGDON BOILER ROOM WATER METER AREA SURVEY AND MAKE REPAIRS TO PREVENT WATER FROM FILLING UP IN AREA. WATER IS IN AREA ABOUT 6" OR MORE AND WHEN IT PASSES THE THRESHOLD, WATER RUNS ON BOILER ROOM FLOOR CAUSING SERIOUS SAFETY HAZARD IN AREA. | |||
| FM-200456857 /04 8/1/05 (Langdon) !!!EMERGENCY!!! Asbestos Assessment Required. Basement Stairwell/Hot Water Side of Building: Repair or replace ruptured heat line. (Asbestos observed) Code A - clear for repairs as of 10/15/04 safety Sylvia. | |||
| FM-200452269 04 12/22/05 Landgon Fire Code Violation First floor Replace univent covers in hallway, monosiery section. Asbestos Code A - Clear for repairs on 08/23/04. DCPS Safety - Leroy Minton Jr. (RG 08/23/04) | |||
| FM-200114486 01 2/3/06 LANGDON 141 (1) FURNISH AND REPLACE WINDOW A/C UNIT 1-10,000 BTU ASBESTOS CODE A - CLEARED FOR REPAIRS ON 07-25-01. LEROY MINTON JR SAFETY OFFICE ( 202-576-8962 ) | |||
| FM-200114483 01 2/3/06 LANGDON 195 (1) FURNISH AND REPLACE WINDOW A/C UNIT 1-25,000 BTU ASBESTOS CODE A - CLEARED FOR REPAIRS ON 07-25-01. LEROY MINTON JR SAFETY OFFICE ( 202-576-8962 ) | |||
| FM-200114480 01 2/3/06 LANGDON 128 (1) FURNISH AND REPLACE WINDOW A/C UNIT 1-25,000 BTU ASBESTOS CODE A - CLEAR FOR REPAIRS ON 11/28/01 RICHARD GIBSON - SAFETY (202)576-5584(RG) | |||
| FM-200446900 04 8/1/06 (Langdon) !!!VERY URGENT!!! Asbestos Assessment Required. 2nd Floor/Learning Center #2-A: Window that is supported by iron handles, attempting to fall. Request a welder to weld the damaged handles. Asbestos Code A - Clear for repairs on 04/20/04. Horne Engineering - Tony Marcolin (RG 05/03/04) | |||
| FM-200341044 03 1/29/07 (Langdon) !!!VERY URGENT!!! 1st Floor/Boys Restroom: Student stood on the top of sink, sink broke off, and water is flooding the floors. | |||
| FM-200453254 04 1/30/07 (Langdon) !!!VERY URGENT!!! Basement Level: Main panel box rusted out from water running in-to the panel box from an unknown area. | |||
| FM-200445645 04 1/30/07 (Langdon) !!!URGENT!!! 1st Floor/Main Office: Restore electrical power too outlet for computer operation. (April 7, 2004, staff called in today with a concern) | |||
| FM-200446364 04 1/31/07 (Langdon) !!!URGENT!!! Asbestos Assessment Required. Remove the swing beam that is attached to the main structure on the 5-12 age equipment. |