Urgent Closed Repair Requests
Description Open Date Close Date Time Elapsed
FM-200116783 01 8/30/01 (MONTGOMERY) 1. ASBESTOS ASSESSMENT REQUIRED. 1ST & 2ND FLOORS/CUSTODIALS CLOSETS: SINKS ARE STOPPED UP ON BOTH FLOORS, CONTRACTORS USED SINKS FOR CERTAIN JOBS, CAUSING SINKS TO BE CLOGGED. CODE A-CLEAR FOR REPAIR BY DCPS SAFETY RE 8/9/01. CLOSED PER AP/ 9-4 August 6, 2001 August 30, 2001 24 days
FM-200118850 01 9/5/01 SCOTT MONTGOMERY SECOND FLOOR ROOMS: 204 AND 207 1) REPAIR AND REPLACE BROKEN WINDOW GUARDS. BROKEN GLASS REMAINS IN FRAME, AND EXPOSED SHARP EDGES. BROKEN GLASS CAN NOT BE REMOVED WITHOUT DISTURBING, WINDOW CAULKING. ASBESTOS CODE A - CLEAR FOR REPAIR ON 08/15/01. RONALD EWARD - SAFETY (202)576-6693 August 30, 2001 September 5, 2001 6 days
FM-200120548 01 9/28/01 (MONTGOMERY) ASBESTOS ASSESSMENT REQ. !!! EMERGENCY !!! 1ST FLOOR/ PRINCIPALS OFFICE COMMODE IS NOT WORKING AND THE SCHOOL DOES NOT HAVE ANY FLUSH VAVLES. (NO PENETRATION) ASBESTOS CODE A - CLEAR FOR REPAIRS ON 09/26/01. LEROY MINTON - SAFETY (202)576-6691 (RG) September 26, 2001 September 28, 2001 2 days
FM-200120954 01 10/17/01 (MONTGOMERY) ASBESTOS ASSESSMENT REQ. 1ST FLOOR/ GIRLS BATHROOM SPUD IS LEAKING ON A TOILET. ASBESTOS CODE A - CLEAR FOR REPAIRS ON 10/06/01. LEROY MINTON - SAFETY (202)576-6691 October 3, 2001 October 17, 2001 14 days
FM-200203095 02 2/20/02 (Montgomery) 1st floor/ Main entrance door !!! Urgent !!! Replace broken window panes on main entrance doors. February 19, 2002 February 20, 2002 1 day
FM-200203081 02 2/20/02 (Montgomery) ***Urgent*** Entrance Doors/P-Street Side Replace broken door glass in 4 doors due to vandalism. Guards are needed over the glass (glass is 9x9). February 19, 2002 February 20, 2002 1 day
FM-200205081 02 4/2/02 (Montgomery) ****Urgent**** Asbestos Assessment Reqd. 1st Floor Main Entrance Door/West Side Repair main entrance door at the west end of the buidling. The door will not shut unless it is slammed. Code A-clear for repair by Horne Engineer ( Bipin Nanavaty ) on 4/01/02 (CEB) March 29, 2002 April 2, 2002 4 days
FM-200207731 02 6/7/02 (Montgomery) Fire code violation: Page 1 of 1 Basement/Meter room: Water leaking in meter room. Asbestos Code A - Clear for repairs on 05/16/02. DCPS Safety - Leroy Minton Jr. (RG 05/16/02) May 14, 2002 June 7, 2002 24 days
FM-200207728 02 6/10/02 (Montgomery) Fire code violation: Page 1 of 1 Room #111: Exit door needs to be checked. Asbestos Code A - Clear for repairs on 05/16/02. DCPS Safety - Leroy Minton Jr. (RG 05/16/02) May 14, 2002 June 10, 2002 27 days
FM-200216832 02 9/19/02 (Montgomery) !!!URGENT!!! 1st floor: Repair ceilings in the observation room, in the multipurpose room. This room is used as office space, and it is critical for the opening of school that the lights are working. September 6, 2002 September 19, 2002 13 days
FM-200215430 02 10/16/02 S. Montgomery ****Urgent**** Multi-Purpose Room II Repair ceiling light in the observation room in multi-purpose room II. This room is used as office space and it is critical for the opening of school that the lights are working. August 23, 2002 October 16, 2002 54 days
FM-200205833 02 10/23/02 Montgomery Parking Lot Repair fence that was damage during the Spring Break. This is a safety hazard because of exposed wiring. April 15, 2002 October 23, 2002 191 days
FM-200218170 02 11/1/02 S. Montgomery ****Urgent**** 1st Floor Learning Center I Repair ceiling light in the boys' lavatory and restore power. Condensation from the central-air conditioning unit caused the light to short out and the electricity was turned off in the area to prevent a fire. The students cannot use the facility because there is still no electricity. September 24, 2002 November 1, 2002 38 days
FM-200219866 /02 11/20/02 Montgomery, Scott First floor - Boys toilet learning center I Only B basin is not working, no other place to wash hands, no sink in this toilet. This is a health hazard. !!!!!Urgent!!!!!! October 23, 2002 November 20, 2002 28 days
FM-200221288 /02 11/20/02 (Montgomery) !!!VERY URGENT!!! 1st Floor/Boys restroom: Replace flush valves; engineer does not have the proper tools to remove the old equipment. (Please assist.) November 19, 2002 November 20, 2002 1 day
FM-200219870 /02 11/21/02 Montgomery, Scott Second floor - Girl's toilet Learning center II Repair / replace bradley basin which is not working. This is the only one (no sink) in this toilet, nowhere to wash hands. !!!!!Urgent!!!!!! October 23, 2002 November 21, 2002 29 days
FM-200220111 /02 11/21/02 Montgomery, Scott Second floor - Girl's toilet Learning center I and II Repair bradley basin In learning centers I and II. Basins continue to leak since the installation two years ago. Plumbera cut the water off. Students cannot wash their hands and this creates unsanitary situations. !!!!!Urgent!!!!!! October 28, 2002 November 21, 2002 24 days
FM-200216772 02 12/5/02 Montgomery ****Urgent**** 1st Floor Library Repair or replace faulty, leaking faucet in library. Water is continuously running and water is spilling over onto the carpet. Shut-off valve does not work. September 6, 2002 December 5, 2002 90 days
FM-200219869 /02 12/5/02 Montgomery, Scott Second floor - Men's toilet Learning center Repair / replace leaking commode - all the way to the first floor. Soon the ceiling in the first floor will fall. Water cannot be shut off. Flush valve problem. !!!!!Urgent!!!!!! Asbestos Code A - Clear for repairs on 10/23/02. Horne Engineering - Edward Rodriguez (RG 10/25/02) October 23, 2002 December 5, 2002 43 days
FM-200222430 /02 1/8/03 Montgomery, Scott Playground Repair or replace fence and gate around the playground that was knock down by DCPS truck driver, when he was delivering salt and sand in preparation for the ice storm. This is an urgent request. December 12, 2002 January 8, 2003 27 days
FM-200219871 /02 1/17/03 Montgomery, Scott First floor - Cafeteria Repair / replace ceiling with a hole and peeling paint / plaster. !!!!!Urgent!!!!!! Lead & Asbestos Code A - Clear for repairs on 10/23/02. Horne Engineering - Edward Rodriguez (RG 10/25/02) October 23, 2002 January 17, 2003 86 days
FM-200219872 /02 1/17/03 Montgomery, Scott First floor - Multi purpose room Repair / replace inoperable toggle switch. Some lights cannot be turned on.. !!!!!Urgent!!!!!! October 23, 2002 January 17, 2003 86 days
FM-200220154 /02 1/21/03 Montgomery, Scott First floor - cafeteria The sink in the kitchen in the cafeteria needs a new faucet. It has a continuous drip. !!!!!Urgent!!!!!! October 28, 2002 January 21, 2003 85 days
FM-200212251 02 2/21/03 Montgomery ****Urgent**** 1st Floor Room 108 near Entrance Straighten and reattach the security grate that was pulled away from the window. July 16, 2002 February 21, 2003 220 days
FM-200203455 02 3/3/03 MONTGOMERY FIRST (1ST) FLOOR - CAFETERIA EXPLORATORY DEMOLITION IN CAFETERIA. 1. ASBESTOS ASSESSMENT REQUIRED. 2. WATER LEAK IS FLOWING DOWN THRU THE WALL, UNDER THE FLOOR DONOT KNOW WERE ITS COMING FROM. DCB (IT GROUP)/703-461-6848 Code A- Clear for Repair- Asbestos Abatement Date 03-06-02- DCPS Safety-Sheila R. Howard Confirmed By Sheila R. Howard with Craig Payne DCPS Steamfitter 03-13-02. The cinder block wall can be knocked down for the repair there is no asbestos impact. (SRH) February 26, 2002 March 3, 2003 370 days
FM-200104038 01 3/25/03 S. MONTGOMERY FIRST (1ST) FLOOR - ROOM 108 REPAIR LEAKING CEILING CEILING HAS ALREADY BEEN CLEARED FOR ASBESTOS (CHECK THIS) ASBESTOS CODE A - CLEAR FOR REPAIRS ON 11/29/01. RONALD EDWARDS - SAFETY (202)576-6693 February 21, 2001 March 25, 2003 762 days
FM-200224820 03 4/22/03 (Montgomery) !!!VERY URGENT!!! Cafeteria area: Large hole behind water fountain; rodents are entering the building from that area. (Please repair) Asbestos Code A-clear for repair by Horne Engineering Tony Marcolin on 01/31/03 Charles Buchanan January 29, 2003 April 22, 2003 83 days
FM-200120152 01 5/5/03 MONTGOMERY PLAYGROUND - BASKETBALL COURT POLE IS LENDING AND HAS A CRACK IN IT. NOT SECURE. SAFETY HAZARD. ISOLATE EMERGENCY !!!! September 19, 2001 May 5, 2003 593 days
FM-200331161 03 6/5/03 (Montogomery) !!!VERY URGENT!!! 1st Floor/Girls Bathroom: Crack in floor around the toilet, water is running from that crack in the floor, flooding the bathroom floor. Request water to be shut-off until the plumbers arrive. June 3, 2003 June 5, 2003 2 days
FM-200207448 02 8/5/03 Montgomery 1st Floor Install window a/c units [units are on-site new & boxed] in the 1st floor principal's & secretary's offices. Asbestos Code A - Clear for repairs on 06/02/03. DCPS Safety - Leroy Minton Jr. (RG 06/02/03) May 9, 2002 August 5, 2003 453 days
FM-200336315 03 8/29/03 (Montgomery) !!VERY URGENT!! 5th Street side: Chain link fence has come up from the concrete; very sharpe, and jaggered edges are present. (Safety Hazard) August 26, 2003 August 29, 2003 3 days
FM-200228035 03 9/5/03 Montgomery, Scott Repair steps leading from early childhood classroom 108 to the playground. The steps are badly cracked and presents a safety hazard to the students when they leave the room. The steps are cement. URGENT SAFETY HAZARD April 1, 2003 September 5, 2003 157 days
FM-200341227 03 2/17/04 (Montgomery) Outside/Playground: Please remove play equipment with missing, and broken parts. (Safety Hazard) December 8, 2003 February 17, 2004 71 days
FM-200337106 03 3/18/04 Montgomery Exterior 1. Dismantle and remove play equipment on playground. Equipment certified unsafe in May 2001, by Clifton Purks, Code and Compliance Officer. This unsafe equipment poses a safety Hazard to the students . September 9, 2003 March 18, 2004 191 days
FM-200227134 03 3/18/04 MONTGOMERY boiler room "URGENT BOILER ROOM WILL FLOOD" Check float control for sump pump, control have to be activated manually to pump water down in sump pit. Boiler room was flooded this morning 3/17/03 4" of water on floor. March 17, 2003 March 18, 2004 367 days
FM-200113944 01 3/18/04 MONTGOMERY 1) INSTALLATION OF CARPET, ACTIVITY RUGS, CLEANING OF VCT. 2) ROOM 106 REQUIRES THE WOOD FLOOR TO BE STRIPED, REFINISHED WITH REPLACEMENT OF WOOD PLANKS AS NECESSARY. AEC CONTRACTORS IN-HOUSE DCPS SAFETY ASSESSMENT ASBESTOS CODE A-CLEAR FOR REPAIR BY CHARLES E BUCHANAN 7/9/01. June 25, 2001 March 18, 2004 997 days
FM-200205661 02 3/25/04 Montgomery, Scott !!! EMERGENCY !!! Outside - Grounds 1. Repair defective auto valve. 2. Install fence around meter for safety. See Attachment, April 9, 2002 March 25, 2004 716 days
FM-200219867 /02 3/29/04 Montgomery, Scott First floor - Kitchen Repair / replace faucet - water continuously run (cannot be stop). !!!!!Urgent!!!!!! October 23, 2002 March 29, 2004 523 days
FM-200222104 02 3/29/04 Montgomery, Scott Second floor - door leading to roof Repair or replace door handle on the door leading to the roof. The door handle is broken and the door to the roof cannot be secured. This door is located near the music room. Very Urgent December 4, 2002 March 29, 2004 481 days
FM-200106312 01 3/29/04 MONTGOMERY, S. MULTI-PURPOSE ROOM #2 DRAIN WATER LEAKING FROM WALL DOWN FROM CEILING IN ROOM. URGENT. PROPERTY DAMAGE AND SAFETY HAZARD. March 20, 2001 March 29, 2004 1,105 days
FM-200338157 03 3/29/04 Montgomery, Scott First and second floor LC 1 and 2, multi purpose room 1 and 2 Repair central air conditioning. The main circuit board appears to have been damaged by power surge during the harricane storm. Asbestos Code A - Clear for repairs on 09/29/03. DCPS Safety - Richard Gibson (RG 09/29/03) September 29, 2003 March 29, 2004 182 days
FM-200205832 02 3/29/04 Montgomery !!! Emergency !!! First (1st) Caferteria 1. Asbestos Assessment Requried. 2. Plaster is needed to fill in the holes left in the wall after the leak was repaired. Asbestos Code A - Clear for repairs on 04/16/02. DCPS Safety - Sheila R Howard (RG) April 15, 2002 March 29, 2004 714 days
FM-200218331 02 3/29/04 (Montgomery) ****Urgent**** 1st floor: Repair ceiling lights in the observation room and in the multipurpose room. This room is used as office space, and it is critical for the opening of school that the lights are working. September 25, 2002 March 29, 2004 551 days
FM-200118852 01 3/29/04 SCOTT MONTGOMERY FIRST FLOOR ASST. PRINCIPAL BATHROOM 1) REPAIR DAMAGED WALL SURFACE, (PLASTER AND PAINT) TEST PAINT SURFACE FOR LEAD CONTENT. LEAD CODE A - CLEAR FOR REPAIR ON 08/15/01. RONALD EWARD - SAFETY (202)576-6693 August 30, 2001 March 29, 2004 942 days
FM-200214925 02 3/29/04 Montgomery ****Urgent**** 1. Asbestos Assessment Reqd. 1st Floor Main Office 2. Install an electrical outlet designed for newly delivered Canon copy machine. This is an urgent request because the volume of copying to be done is in preparation for the opening of school. Asbestos code A-clear for repair by Horne Engineer ( Sharaon Voss ) on 8/20/02 Charles E. Buchanan August 19, 2002 March 29, 2004 588 days
FM-200213281 02 3/29/04 Montgomery ****Urgent**** 1. Asbestos Assessment Reqd. Basement Tunnel [Right Side] 2. Drain in the tunnel needs to be unclogged so the men can work in the tunnel [pipe is insulated]. [NOTE: Work was to start today---please expidite] Asbestos code A-clear for repair by Horne Engineer ( Bipin Nanavaty ) on 8/06/02 DCPS Charles Buchanan July 29, 2002 March 29, 2004 609 days
FM-200203903 02 3/29/04 (Montgomery) 1st floor/ Womens Lavatory Repair door to stall. It has come off the hinges. This presents a safety hazard because the door could fall on someone. March 5, 2002 March 29, 2004 755 days
FM-200204722 02 3/29/04 (Montgomery) Asbestos Assessment Required 2nd Floor Learning Center II Stairwell Replace dim light fixtures at the top of the stairwell with flourescent lights to avoid accidents and injuries. Asbestos Code A - Clear For Repairs On 03/20/02. Horne Engineering - Stephen Caldwell (RG 04/10/02) March 19, 2002 March 29, 2004 741 days
FM-200328946 03 3/31/04 Montgomery Exterior Grounds Fence Removal and Replacement a) Replace with new fence b) Remove safety hazards on school property. c) Must install safety fence or tape. e) All old bricks must be removed daily. f) No parking of trucks or cars on school lot when school is in session. April 22, 2003 March 31, 2004 344 days
FM-200448259 04 6/3/04 Montgomery roof (main building) URGENT !!! Check operation of # 1 RTU, compressor motor continuously has to be reset. Unit supplies air to Main Building May 21, 2004 June 3, 2004 13 days
FM-200339971 03 7/15/04 (Montgomery) !!!URGENT!!! 1st Floor/Principal's /Suite: Install electrical outlet so that the a/c can be operable. November 5, 2003 July 15, 2004 253 days
FM-200453095 04 9/14/04 Montgomery, Scott Basement engineer room Repair or replace pipe under sink. Our maintenance staff attempted to unstop sink and found the pipe inside the wall to be rusted. The pipe is broken aff at the wall. Asbestos Code A - Clear for repairs on 08/25/04. DCPS Safety - Leroy Minton Jr. (RG 08/26/04) August 20, 2004 September 14, 2004 25 days
FM-200457630 /04 11/4/04 (Montgomery) !!!URGENT!!! Main Entrance Door: Custodian's key broke off in door. October 28, 2004 November 4, 2004 7 days
FM-200505327 05 10/24/05 (Scott-Montgomery) "Emergency" Asbestos Assesment Required. First floor ,Second floor, Room 121,122, Main Office, Learning Center 1 & 2, Rooms 205, 211, Library, and Corridor outside room 206. remove and replace ceiling tile, repair plaster walls and ceiling. Assess ceiling & wall for mold and mildew. Code A - clear for repairs and of 5/12/05 Sylvia Grimes safety. May 10, 2005 October 24, 2005 167 days
FM-200444212 04 10/24/05 SCOTT MONTGOMERY BOILER ROOM 2nd request Repair sump pump coupling to prevent boiler room from flooding causing a potential safety hazard. February 19, 2004 October 24, 2005 613 days
FM-200337756 03 12/14/05 (Montgomery) !!!EMERGENCY!!! Playground Side: Brick wall adjacent to smoke stack, bricks are separating, wall is leaning. Smoke stack is the only support for that wall, if the smoke stack is blown away, the wall will fall. (Someone could be injured) September 17, 2003 December 14, 2005 819 days
FM-200228369 03 12/14/05 (Montgomery, Scott First floor - cafeteria Patch up big hole behind the water fountain (cinder block wall). URGENT Fire Code April 7, 2003 December 14, 2005 982 days
FM-200513684 /05 1/26/06 Montgomery Very Urgent Parking lot area on 5th St. side Near walkway to Cafeteria Repair Rence, the pole is bent due to an accident over the weekend. (A Student May Get Hurt) October 11, 2005 January 26, 2006 107 days
FM-200513927 /05 2/16/06 Montgomery Very Urgent First Floor-Auditorium & Kitchen entrence door Repair the exterior door on the left side of the auditorum, it can not be secured properly. Code A-clear for repair by DCPS Charles Buchanan on 10/19/05 October 18, 2005 February 16, 2006 121 days
FM-200620094 06 3/28/06 First floor, Auditorium. "Urgent" Repair or Replace lock on left exit doors,. lock is not catching good. March 20, 2006 March 28, 2006 8 days
FM-200620290 06 5/31/06 Montgomery Boiler Room Asbestos assessment required on line Repair leaking pipe in closet in room #10C Urgent !!!!! Asbestos Code A - Clear for repairs on 03/24/06. Tidewater - Roger Small (RG 03/30/06) March 24, 2006 May 31, 2006 68 days
FM-200446828 04 8/18/06 MONTGOMERY new building Urgent!!!!! No Air / No Windows Repair Trane air conditiong unit for day care. Unit is inoperable April 19, 2004 August 18, 2006 851 days
FM-200618663 06 10/24/06 Montgomery Boiler Room Repair or replace float on condensate tank 3/4" feed. Tank is overflowing and filling up returns. Urgent !!! February 15, 2006 October 24, 2006 251 days
FM-200629122 06 10/24/06 MONTGOMERY RTU URGENT Units will not stay on continuoulsy short cycling.Repair rooftop units for new, old and day care center. Unit filters and coils have been changed and belts have been checked by building engineer. Previous request have been submitted for repairs to this units. September 11, 2006 October 24, 2006 43 days
FM-200631517 /06 1/29/07 Outside Of Boiler Room - Furnish and install light over door of boiler room. The light is missing, this is a safety hazard. October 30, 2006 January 29, 2007 91 days
FM-200620119 06 1/29/07 Playground Area. Replace lights on playground. Note: This is an issue of safety. March 20, 2006 January 29, 2007 315 days
FM-200511927 05 2/15/07 Montgomery Very Urgent Playground Area-Tree fell on the playgroung, need to have it removed September 6, 2005 February 15, 2007 527 days
FM-200446830 04 2/20/07 MONTGOMERY attic next to learning center # 2 Urgent!!!!! No Air / No Windows Replace bearings on air handler unit for day care (main air supplies). April 19, 2004 February 20, 2007 1,037 days
FM-200618163 06 2/22/07 First Floor-Learning Center 1 Very Urgent Water Fountain Backing Up. Note: water cut off to the fountain and it's still backing up, flooding the floor at least twice a day. February 1, 2006 February 22, 2007 386 days
FM-200618747 06 2/22/07 Very Urgent First Floor-Learning Center 1 Very Urgent Heating Unit In The Closet Is Leaking Water See: Russ February 16, 2006 February 22, 2007 371 days