Urgent Open Repair Requests
See Also: All Open Repair Requests at Montgomery ES
Detailed Reports
| Description | Open Date |
|---|---|
| FM-200515696 11/22/05 Urgent: Repair or replace the door on the first floor in the pre-k area it is hanging off the hinges. Code A-clear for repair by DCPS Charles Buchanan on 11/23/05 | |
| FM-200618240 2/3/06 Montgomery Boiler Room Furnish McDonnel & Miller Boiler Control. (Auto water feeder) 515-2M Urgent !!!!! | |
| FM-200621875 4/27/06 First floor, LC I/Second floor, LC II/Open Space Area. Replace oversized ceiling tiles with standard 2' X 4 ceiling tiles and tracks. Asbestos Code A - Clear for repairs on 04/27/06. DCPS Safety - Richard Gibson (RG) | |
| FM-200629669 9/19/06 Montgomery Exterior Entrance to Boiler Room Unstop drain at base of steps to boiler room. Engineer attempted to unstop with negative result. Note: At present about 18" of water in outside airway and backing up into boiler room. Urgent !!!!!! | |
| FM-200702171 3/19/07 Boiler Room - Furnish and install new lock for boiler room door keyed to master key, inside entrance door. Urgent !!!! | |
| FM-200702448 3/22/07 Boiler Room - Repair or replace condensate return system: a) Condensate returnpump #2 continously feeding water. b) Condensate return pump #1, bad seala. c) Condensate return tank, has no automatic make-up water device. Urgent !!!!! |
© The Washington Post Company
