Urgent Open Repair Requests
See Also: All Open Repair Requests at Nalle Elementary School
Detailed Reports
| Description | Open Date |
|---|---|
| FM-200223017 11/26/02 (Nalle) Kitchen has improper lighting because the ballasts are out. Ceiling is falling in storage area and food prep area. Grease trap needs to be snaked out. Asbestos Code A - Cleared for repairs on 05-08-03 by Leroy Minton Jr. (LM/05-08-03) Safety Office 202-576-8962. | |
| FM-200442964 1/20/04 Nalle, J.C. Urgent !!! Old Side - Second Floor - Boys Bathroom 1) Big chunk of ceiling fell down in the bathroom and hit student in head. Asbestos Code A - Clear for repairs on 01/20/04. Horne Engineering - Troy Wilcome (RG 01/20/04) | |
| FM-200500436 1/14/05 Nalle URGENT Second floor boys bathroom Ceiling is leaking. | |
| FM-200501640 2/15/05 Nalle Main Building - Second Floor - Room - 217 1) Roof was repaired, but never came back to plaster. 12x12 ceiling tile is falling. Asbestos Code A - Clear for repairs on 04/21/05. DCPS Safety - Leroy Minton Jr. (RG 04/21/05) | |
| FM-200503638 4/6/05 (Nalle) !!!URGENT!!! Asbestos Assessment Required. Falling plaster, making an inconvenience to those who work in the area. Affecting the following rooms: #104,106, 107, 108. 109, 112, and 113, #202, 203, 204, 205, 206, 207, 208, 209, 212, and 214, and library. Asbestos Code A - Clear for repairs on 01/10/06. DCPS SAFETY - Leroy Minton Jr. - (RG 01/10/06) | |
| FM-200516376 12/12/05 Asbestos Assessment Required "Urgent" Second floor, Old Building/Room 217. Repair or Replace 12 X 12 glue tiles that are falling from ceiling. Ceiling tiles and plaster are falling. Note: The ceiling tiles were attached to the plastered ceiling. Asbestos Code A - Clear for repairs on 12/14/05. Tidewater - Roger Small (RG 12/20/05) | |
| FM-200620459 3/28/06 Very Urgent Outside Playground Area-Basket Ball Court Lamp Post-Exposed wires-Electrical Box is about the size of a speaker. |
© The Washington Post Company
