Urgent Open Repair Requests
See Also: All Open Repair Requests at Park View ES
Detailed Reports
| Description | Open Date |
|---|---|
| FM-200203169 169 2/20/02 (Park View) ***Urgent*** Asbestos Assessment Required Roof Area Above Room 115 Repair roof leak above room 115 which is causing damage to the classroom walls. Roofer need to go through ceiling in classroom to make repairs. LEAD & ASBESTOS CODE A-CLEAR FOR REPAIR NO 2/21/02 HORNE ENGINEER: ROGER KAGER | |
| FM-200203331 331 2/22/02 (Parkview) Asbestos Assessment Reqd. 2nd floor/ Exhibit Hall Exit door closure needs a steel plate, screw holes are worn out. Asbestos Code A - Clear for repairs on 05/14/02. DCPS Safety - Ronald Edwards (RG 05/15/02) | |
| FM-200221456 11/20/02 Park View Lower level above cafeteria at rear entrance Restore / repair plaster and tile wall in hallway that was opened to repair steam leak (which has been completed). Please Expedite Asbestos Code A-clear for repair by DCPS Safety Charles E. Buchanan on 11/25/02 | |
| FM-200221457 11/20/02 Park View Lower level floor above cafeteria at rear entrance Reclose / repair concrete floor where opening was made to repair steam leak (which has been completed). Please Expedite Asbestos Code A-clear for repair by DCPS Safety Charles E. Buchanan on 11/25/02 | |
| FM-200446527 4/8/04 Parkview Boiler Room Unstop floor drain in boiler in front of condensate return pumps. Engineer attempted to unstop with negative results. Urgent !!!!! | |
| FM-200500002 1/2/05 Park View Mechanical Room in Boiler Room Repair or replace old air handler unit. Both shaft and motor are losing a lot of oil, possible bad seals. Urgent !!!!! | |
| FM-200501294 2/7/05 Park View Boiler Room Repair Boiler #2 has closed fuel valve, will not start. Keep going into safety. | |
| FM-200513795 10/12/05 Park View Very Urgent 2nd Fl. Rms. 232, 229, and Basement Boys Restroom Repair Ceiling, plaster and/or paint is falling and hanging from the ceiling. Lead & Asbestos Code A - Clear for repairs on 10/14/05. Tidewater - Rodney Distance (RG 10/19/05) | |
| FM-200514766 10/28/05 (Parkview) "Emergeny" Asbestos Assessment Required. First floor, Girls' Restroom. The ceiling is falling in chunks . Note: This is a safety issue. Asbestos Code A - Clear for repairs on 10/31/05. Tidewater - Rodney Distance (RG 11/01/05) | |
| FM-200516442 12/14/05 Parkview Boiler Room Repair gas line leaks on generator, and Boilers #2 and #3 Cited by Washington Gas. Note: Boilers 2 of 5 operating. Urgent !!!!! | |
| FM-200628340 8/28/06 Repair leaking sink in cafeteria. Note: This is a safety hazard. | |
| FM-200629002 9/8/06 Second floor, Room 224. Repair plaster ceiling, chunks of plaster are falling in the classroom. Note: This is a safety hazard. Lead & Asbestos Code A - Clear for repairs on 09/12/06. Tidewater - Roger Small (RG 09/13/06) SEE ASSESSMENTS | |
| FM-200632046 11/8/06 Parkview Boiler Room Repair or replace return condensate line to the condensate tank station leaking. Urgent !!!!! |
© The Washington Post Company
