| FM-200120113 01 9/26/01 HARRIS, P.R. MAIN ENTRANCE CAR JUMP THE CURB AND DAMAGE THE FRONT OF THE FENCE. NEEDS TO REPLACE THE FENCE. HEALTH AND SAFETY HAZARD. ISOLATE EMERGENCY!!! | |||
| FM-200119843 01 11/28/01 (HARRIS, P.R.) FRONT OF BUILDING !!!!! EMERGENCY !!!!!! CAR RAN INTO SCHOOL FENCE ON 9/5/01. REPAIR OR REPLACE FENCE. POLES ARE STICKING UP OUT OF THE GROUND. (SAFETY HAZARD) | |||
| FM-200120725 01 12/3/01 (HARRIS, P.R.) ASBESTOS ASSESSMENT REQ. MAIN FLOOR/ RESTROOM #7 REPAIR STAND UP TOILET. WATER KEEPS RUNNING. ASBESTOS CODE A - CLEAR FOR REPAIRS ON 10/22/01. LEROY MINTON - SAFETY (202)576-6691 (RG | |||
| FM-200120739 01 12/5/01 (HARRIS, P.R.) ASBESTOS ASSESSMENT REQ. MAIN FLOOR/ FRONT OF THE BUILDING WATER FOUNTAIN OUT OF ORDER THIS NEEDS TO BE REPLACED. A.S.A.P. ASBESTOS CODE A - CLEAR FOR REPAIRS ON 10/22/01. LEROY MINTON - SAFETY (202)576-6691 (RG | |||
| FM-200120738 01 12/5/01 (HARRIS, P.R.) ASBESTOS ASSESSMENT REQ. MAIN FLOOR/ FRONT OF THE BUILDING WATER FOUNTAIN OUT OF ORDER THIS NEEDS TO BE REPLACED. A.S.A.P. ASBESTOS CODE A - CLEAR FOR REPAIRS ON 10/22/01. LEROY MINTON - SAFETY (202)576-6691 (RG | |||
| FM-200109381 01 1/23/02 HARRIS, P.R. SAFETY REPAIRS ON PLAYGROUND EQUIPMENT PER SAFETY INSPECTION 1. 8 INCHES SECTION OF CHAIN MISSING. 2. STABILIZING BAR NEED TO BE FLUSH TO GROUND. 3. CHAIN IN DEFECTIVE TO STABILIZING BAR. 4. PLASTIC COVER ON HORIZONTAL DECKS NEED REPLACING. 5. SWINGS SHARPE NOT TIGHT. 6. MISSING BAR ON SLIDING BOARD. | |||
| FM-200201647 02 2/1/02 (HARRIS, P.R.) FIRE CODE VIOLATION: PAGE (1 OF 5) 1. ASBESTOS ASSESSMENT REQUIRED. 2ND FLOOR/STAIRWELL #1: CABINET NEEDS CLOSURE. ASBESTOS CODE - A - CLEAR FOR REPAIRS ON 01/25/02 RICHARD GIBSON - SAFETY (202)576-8962(RG)-01/25/02 | |||
| FM-200201717 02 2/4/02 (HARRIS, P.R.) FIRE CODE VIOLATION: PAGE (2 OF 5) 1. ASBESTOS ASSESSMENT REQUIRED. 1ST FLOOR/MAIN EXIT DOOR: DOOR #2 MIS-ALIGNED PREVENTING FROM OPENING PROPERLY. THIS DOOR IS LOCATED AT STAIRWELL #8 CODE B-ASBESTOS ABATEMENT REQUIRED HORNE ENG. ROGER KAGER 01-25-02 DCPS SAFETY SHEILA R. HOWARD 01-25-02 ( HORNE COULD NOT CONFORM IF THE DOOR IS SOLID OR HOLLOW METAL.) ASBESTOS CODE A-CLEAR FOR REPAIR ON 1/30/02 BY HORNE ENGINEER: ROGER KAGER | |||
| FM-200114132 01 2/4/02 HARRIS, P. H. FIRST FLOOR - MECHANCIAL ROOM 1) DRAIN/LINE STOPPED UP, AREA FLOODING. ASBESTOS CODE A - CLEAR FOR REPAIRS ON 11/03/01. RICHARD GIBSON- SAFETY (202)576-5584(RG) | |||
| FM-200201727 02 2/4/02 (HARRIS, P.R.) FIRE CODE VIOLATION: PAGE (3 OF 5) 1. ASBESTOS ASSESSMENT REQUIRED. 1ST FLOOR: CEILING TILE MISSING 231 X 2 TILES. CODE A- CLEAR FOR REPAIR BY HORNE ENG. ROGER KAGER 01-25-02 DCPS SAFETY SHEILA R. HOWARD 01-25-02 | |||
| FM-200202736 02 2/16/02 (HARRIS,P.R.) ***URGENT*** 1ST FLOOR KITCHEN REPAIR ENTRANCE LOCKS TO 3 DOORS TO KITCHEN LOCK: 1) CYLINDER CONTINUES TO TURN 2) KEY IS BROKEN OFF IN THE LOCK 3) DEAD-BOLT LOCK IS BROKEN | |||
| FM-200202066 02 2/20/02 (HARRIS,P.R.) ***URGENT*** ASBESTOS ASSESSMENT REQUIRED 1ST FLOOR KITCHEN REPLACE BROKEN WINDOW IN KITCHEN ASBESTOS CODE - A - CLEAR FOR REPAIRS ON 01/30/02 SHERYL JAMES - HORNE ENGINEERING (RE) | |||
| FM-200201719 02 3/5/02 (HARRIS, P.R.) FIRE CODE VIOLATION: PAGE (3 OF 5) 1ST FLOOR/ROOM #226: DOOR OUT OF ALIGNMENT ROOM #226. CODE A CLEAR FOR REPAIR BY HORNE ENG. ROGER KAGER 01-25-02 DCPS SAFETY SHEILA R. HOWARD 01-25-02 | |||
| FM-200204442 02 3/15/02 (Harris,P.R.) Asbestos Assessment Required 1st & 2nd Floors 1) Teachers Lounge [rm 322] & Health Suite [1st flr] Rekey the knob lock on the door to the teachers lounge [rm 322 at the top of of the 2nd floor]. 2) Install new knob-locks on the 1st floor health suite door by stairway #1 and the custial m aintainance locker [rm 216] on the 1st floor by stairway #5 [vandalism & possible safety hazard]. Code A-clear for repair by Horne Engineer ( Bipin Nanavaty ) on 3/18/02 (CEB) | |||
| FM-200207548 02 5/17/02 Harris,P.R. 1. Asbestos Assessment Reqd. Restrooms @ #6 Stairwell Area/Main Floor of Buidling 2. Replace the lock on one door [women's restroom], old lock will not hold. 3. Install a new lock on one door [girls' restroom] so door can be properly secured. Asbestos Code A - Clear for repairs on 6/13/02 DCPS Safety - R. Edwards (RE- 6/13/02) | |||
| FM-200207544 02 5/22/02 Harris,P.R. ****Urgent**** Grounds/Playground Area The pole light has fallen and exposed live wires. | |||
| FM-200205663 02 5/22/02 Harris,P.R. ****Urgent**** 1st Floor Auditorium The lights failed to come on in the auditorium and there is a morning program scheduled today. | |||
| FM-200207545 02 6/3/02 Harris,P.R. ****Urgent**** Grounds/Playground Area in Back of Building Over Exit Doorway #2 & the Recreation Doorway There are exposed live wires in these areas. | |||
| FM-200206917 02 6/6/02 ****Urgent**** Exterior Grounds/Playground The grate covering the sewage line, on the playground, has been removed and students are running by trying to jump over/or in the hole. Fabricate another grate to cover the hole and prevent students from being able to remove the grate and receive injury. | |||
| FM-200209360 02 6/14/02 Harris, P.R. !!! Emergency !!! Kitchen Slop sink is backing up, the sewage drain needs to be snaked out. Health and Safety Hazard. | |||
| FM-200212495 02 7/23/02 (Harris, P.R.) !!!Very Very Urgent!!! Back of building/Loading dock: Due to attempted break-in, hinges and gates are damaged to the point where unable to close, also, grates are damaged. | |||
| FM-200215048 02 8/20/02 (Harris, P.R.) !!!Urgent!!! Main Floor/Room #227: Need locksmith to get in-to room. Cylinder continues to turn and never opens. | |||
| FM-200206173 02 8/29/02 (Harris, P.R.) 1. Asbestos assessment required. 3rd Floor/Room #309: Door needs to be repaired in order for bolt to work on door. Asbestos Code A - Clear for repairs on 04/30/02. DCPS Safety - Ronald Edwards (RG 04/30/02) | |||
| FM-200216716 02 9/10/02 Harris,P.R. ****Urgent**** 2nd Floor Male Lavatory Repair or replace lock on male teachers' lavatory. The lock is broken and the door will not close. The male teachers are having to use the female lavatory. | |||
| FM-200207547 02 10/1/02 Harris,P.R. 1. Asbestos Assessment Reqd. Teachers Restroom I 2. The stall (partition?) is broken away from the wall and is starting to destroy the all altogether. Repair wall & rehang or replace stall (partition?). Asbestos Code A - Clear for repairs on 6/13/02 DCPS Safety - R. Edwards (RE- 6/13/02) Damaged or missing stall partitions were also observed in the following areas All Boys and Girls Restrooms on the Ground floor, located near stairwells 1-8. also 1st floor, Boys and Girls Lockerroom restrooms. (R. Edwards -6/13/02) | |||
| FM-200216607 02 10/10/02 Harris,P.R. Asbestos Assessment Reqd. Auditorium Repair or replace broken theater seats and reattach those that have come up from the floor [safety hazard]. Asbestos Code A - Clear for repairs on 09/05/02. DCPS Safety - Leroy Minton Jr. (RG 09/06/02) | |||
| FM-200221197 /02 11/18/02 (Harris, P.R.) !!!VERY URGENT!!! Through-Out the building: When commodes are flushed, all other toilets back-up, and over-flow, water is running down it-to the basement primary bottom level. | |||
| FM-200221330 /02 12/13/02 Harris, P.R. Urgent Outside Pre-K area The gate around pre-k play area right corner, a hole was cut into the gate to break-in school. This area cannot be secure. Need welder to weld bars across hole in gate. | |||
| FM-200217542 02 1/17/03 Harris, P.R. Stairwell 4 exit door Doors will not close the way they should, the building cannot be secured right. Asbestos Code A - Cleared for repairs on 09-18-02 (LM 09-18-02) per Leroy Minton confirmation. Safety Office. (202) 576-8962. | |||
| FM-200221710 /02 1/24/03 Harris, P.R. (Patterson) !!!URGENT!!! Pre-K Classroom #370: Furnish and install two (2) baseboard heaters to provide heat for room #370. (Pre-K classroom.) | |||
| FM-200225244 03 2/5/03 Harris, P.R. Second floor - room 229 URGENT Breaker needs replacing, that controls lights in room 229. Lights are unable to come on. Teacher can not have class. No other rooms are available. | |||
| FM-200121723 /01 2/26/03 (HARRIS, P.R.) ASBESTOS ASSESSMENT REQ. GROUND FLOOR/ BIG GYM THE GYM FLOOR IS ALL BEAT UP BECAUSE OF TERMITES AND THE BLEACHERS ARE BROKEN WITH METAL STICKING OUT IS SUCH AWAY AS TO HURT A CHILD TAKING GYM IN THIS AREA. ASBESTOS CODE-A CLEAR FOR REPAIR BY HORNE ENGINEER : EDWARD RODRIGUEZ 10/24/01 (CEB) | |||
| FM-200124010 /01 3/13/03 (HARRIS, P.R.) GROUNDS/PLAYGROUN AREA IN REAR A SWING BROKE CAUSING A CHILD TO BE INJURED AND RUSHED TO THE HOSPITAL 11-19-01. REPAIR OR TAKE THE SWING DOWN ALL TOGETHER SO NO OTHER CHILDREN CAN BE INJURED (SAFETY HAZARD). | |||
| FM-200124935 /01 3/25/03 P.R. HARRIS BOILER ROOM RELOCATE GAS VENT LINES FROM DISCHARGING ONTO LOADING DOCK AREA AND RAISE TO ROOF TOP AIRA. * SAFETY HAZARD GAS FUNES FROM VENT LINES ENTERING KITCHEN AREA. Code-A clear for repiar by Horne Engineer ( Sam Ebrahim ) 3/07/02 CEB | |||
| FM-200126106 /01 3/25/03 P.R.HARRIS KINDERARTEN ROOMS 102,103,104,105 AND 106 1. ASBESTOS ASSESTMENT REQUIRED 2. PROVIDE ELECTRICAL SERVICE FOR THE FOLLOWING, FURNISH AND INSTALL DAYTON ELECTRIC WALL MOUNT HEATERS FOR THE FOLLOWING KINDERGARTEN ROOMS: (2)-102, (1)-103, (1)-104, (1)-105, AND (2)-106. NEEDED TO PREVENT OTHER AREAS IN BUILDING FROM OVERHEATING. ASBESTOS CODE A - CLEAR FOR REPAIRS ON 12/28/01. DCPS SAFETY - RONALD EDWARDS (RE) | |||
| FM-200222192 02 4/7/03 Harris, P.R. Gym Asbestos assessment required Repair rupture coil in air handle unit in gym ceil. Asbestos Code A - Clear for repairs on 12/09//02 DCPS Safety - Charles Buchanan (RG 12/09/02) Horne Engineering -Donald Maglienti (RG 12/12/02) | |||
| FM-200227860 03 5/15/03 Harris, P.R. Urgent First floor home economic lab Two (2) sets of double sinks are backing up on the floor. Unstop | |||
| FM-200221897 02 5/19/03 P.R. Harris / Patterson Various Classrooms 1) Furnish and install (325) coat hooks in various classrooms. Total - (22) Classrooms. Asbestos Code A - Cleared for repairs on 01-21-03 by Leroy Minton Jr. (LM/01-21-03) Safety Office (202) 576-8962. | |||
| FM-200330313 03 6/3/03 Harris, P. R. URGENT First floor Auditorium Replace lights by June 17, 2003 for graduation. Lights are to high for staff to install. lights are on site . | |||
| FM-200333802 03 7/27/03 Harris, P.R. Urgent!! Exterior Grounds - Right hand side of the front of the building 1) Weld Gates - Gates has been torn away from brick wall exposing windows to Pre-K rooms on Ground Floor. | |||
| FM-200336642 03 10/7/03 HARRIS P.R. REPAIR/REPLACE VALVE (STOP/SAFETY) PERFORM HYDRO TEST # 4 BOILER Asbestos Code A - Clear for repairs on 09/02/03. DCPS Safety - Charles Buchanan ( RG 09/02/03) | |||
| FM-200329619 03 10/15/03 Harris, P. R. URGENT Second Floor 1. No lights on the second floor and stairwell . Please repair | |||
| FM-200219639 /02 10/15/03 (Harris, P.R.) !!!URGENT!!! Small Gymnasium: Install lights in small gym; ceilings are high, and we do not have the equipment. | |||
| FM-200227892 03 10/29/03 Harris, P.R. Urgent Ground floor Restroom # 8 and 3 The restroom #8 has water coming from the bottom of the toilet and the restroom at # 3 has water overflowing whenever three or moore standup urinals are flushed at the same time. | |||
| FM-200338795 /03 12/8/03 Harris, P.R. URGENT Roof security night lights Issue, install or replace roof top security night lights. There are 16 lights that are out around the top of bldg. Need new bulbs after care will be starting in one week, also the security of staff entering and leaving the bldg. at night, plus the changing of time safety hazard of students and staff. | |||
| FM-200226917 03 1/13/04 Harris, P.R. Ground floor entrance to kindingaten area Repair or replace four (4) wooden doors. Doors are to hard for students to open. Therefore they are left prop open. Several small students have had their fingers court in the door. Safety hazard and fire hazard to leave standing open. | |||
| FM-200444648 04 3/3/04 Harris, P.R. Urgent !!! First Floor - Security Office - 223 1) Repair or replace lock on door. Door won't lock. | |||
| FM-200331555 03 3/19/04 (Harris, P.R.) !!!VERY URGENT!!! Basement/N. Thomas Section. ( Boys Gym ) Repair or replace ceramic tile on floor in boys lavatory. Asbestos Code A - Cleared for repairs on 09-10-03 by Leroy Minton Jr. (LM/09-10-03) Safety Office 202-576-8962. Note: Informed by Charles Gross that this area has not suffered any water leaks in the past year (9/02 - 9/03) that he recollects. | |||
| FM-200110065 01 5/7/04 (HARRIS, P.R.) FIRE CODE VIOLATION: GYM EXIT DOOR: REPLACE DOOR IN THE GYM. Asbestos code A - Clear for repairs on 7/15/02 DCPS Safety R. Edwards, (RE-7/15/02) | |||
| FM-200449743 04 7/1/04 Harris, P.R. Safety Hazard Ground floor storage room # 2 Repair or replace cylinder to lock on the outside storage room at stairway # 2. Outside storage room has flamable materials in room. | |||
| FM-200456959 /04 10/26/04 Harris, P.R. URGENT Ground floor restroom # 1 and # 8 Ground floor # 3 restroom Theses restrooms need parts to be repaired. (the trap need to be replaced in # 1 and the hand assembly or parts of it needs to be replaced. Toilet out of order will not flush needs plumbing parts on # 3 restroom. | |||
| FM-200456958 /04 10/26/04 Harris, P.R. URGENT Ground floor restroom # 3 and # 7 Both of these restrooms have out of order toilets, They will not flush. | |||
| FM-200456957 /04 10/26/04 Harris, P.R. URGENT Main floor # 4 girls restroom Toilet has some kind of stoppage in it. We snaked it we plugged it an still it will not flushed. | |||
| FM-200452220 04 12/6/04 Harris , PR Fire Code Violation First floor Door not closing properly far left exit door stairway # 5. Code A - Cleared for repairs on 08/28/04 by Leroy Minton Jr. (LM/08-28-04) Safety Office (202) 576-8962. | |||
| FM-200452131 04 12/6/04 Harris, PR Fire Code Violation Second floor Door closer missing on the two middle doors (stairway # 8). Code A - Cleared for repairs on 08/28/04 by Leroy Minton Jr. (LM/08-28-04) Safety Office (202) 576-8962. | |||
| FM-200452235 04 12/6/04 Harris , PR Fire Code Violation Ground floor Electrical outlet need replacing next to office supply room. Asbestos Code A - Clear for repairs on 08/23/04. DCPS Safety - Leroy Minton Jr. (RG 08/23/04) | |||
| FM-200452216 04 12/6/04 Harris , PR Fire Code Violation First floor Panic bar not working for right door stairway # 5. Code A - Cleared for repairs on 08/28/04 by Leroy Minton Jr. (LM/08-28-04) Safety Office (202) 576-8962. | |||
| FM-200456477 04 1/26/05 Harris, P.R. Small gym On the ground floor in the small gym the door knob is missing from the door at the locker room. Asbestos Code A - Clear for repairs on 10/05/03. DCPS Safety - Leroy Minton (RG 10/06/04) | |||
| FM-200452229 04 2/1/05 Harris , PR Fire Code Violation Ground floor Door closer need room 107. Code A - Cleared for repairs on 08/28/04 by Leroy Minton Jr. (LM/08-28-04) Safety Office (202) 576-8962. | |||
| FM-200452228 04 2/1/05 Harris , PR Fire Code Violation Ground floor Door need closer near room 100. Code A - Cleared for repairs on 08/28/04 by Leroy Minton Jr. (LM/08-28-04) Safety Office (202) 576-8962. | |||
| FM-200452130 04 2/1/05 Harris, PR Fire Code Violation First floor Door hardware not working (far right door of stairway # 8. Code A - Cleared for repairs on 08/28/04 by Leroy Minton Jr. (LM/08-28-04) Safety Office (202) 576-8962. | |||
| FM-200452201 04 3/17/05 Harris, P.R. Fire Code Violation Second floor NOTE; BRICK MASON NEEDED Breach in the wall (2) water fountain and outlet, next to stair 2. Asbestos Code A - Clear for repairs on 08/23/04. DCPS Safety - Leroy Minton Jr. (RG 08/23/04) | |||
| FM-200502437 05 4/6/05 Harris, P.R. Second floor rooms 324 and 358 Need plummer to install kitchen type, deck mount faucets with hot and cold water supply lines, also stop valves in teachers lounge room 358, and assistant principal office room 324 on the second floor faucets are old, cracked F.W.T. (safety hazard) staff cannot wash hands, or etc........ | |||
| FM-200505918 05 5/31/05 (Harris, P.R.) "Emergency" Second floor, Room 329 Asbestos Assessment Required. Repair or Replace door to room # 329. The door is off the hinges also the lock is broken. Note: The door is old and needs to be rapaired or replaced it is a safety hazard. Asbestos Code A - Clear for repairs on 05/25/05. DCPS Safety - Richard Gibson (RG) | |||
| FM-200456974 /04 8/1/05 Harris, P.R. Roof Need electrician to repair or replace roof top security lights in front entrance to bldg. Also back lights by loading dock. These areas are dark in the morning and at night when maintenance staff are going and coming to work. Time changes this month - Plus after care leaves ae 6:30 PM. SAFETY HAZARD | |||
| FM-200457183 /04 8/1/05 Harris, P.R. First floor boys bathroom near stairwell # 1 Need ceiling and wall painted, because of fire. Asbestos Code A - Clear for repairs on 10/20/04. DCPS Safety - Ricardo Eley (RG 10/20/04) | |||
| FM-200456962 /04 8/1/05 Harris, P.R. URGENT Ground floor restroom # 1 and # 8 First, second ground and main floor We have ballasts that need to be replaced. 10 all together that are in classroom areas and restrooms. (1). Mens teachers L.T.V. room. (2). Mens teachers next to the teachers lounge on the ground floor. (3). Women teachers # 6 on the ground floor. (4). 7 in Pod A. Code A-clear for repair by DCPS Charles Buchanan on 10/21/04 | |||
| FM-200452233 04 12/27/05 Harris , PR Fire Code Violation Ground floor Ceiling tile missing next to room 110. Code A - Cleared for repairs on 08/28/04 by Leroy Minton Jr. (LM/08-28-04) Safety Office (202) 576-8962. | |||
| FM-200452214 04 12/27/05 Harris , PR Fire Code Violation Second floor Ceiling tile missing next to stairway # 1. Code A - Cleared for repairs on 08/28/04 by Leroy Minton Jr. (LM/08-28-04) Safety Office (202) 576-8962. | |||
| FM-200452213 04 12/27/05 Harris , PR Fire Code Violation First floor Ceiling tile missing cafeteria. Code A - Cleared for repairs on 08/28/04 by Leroy Minton Jr. (LM/08-28-04) Safety Office (202) 576-8962. | |||
| FM-200452198 04 12/27/05 Harris, P.R. Fire Code Violation Second floor Ceiling tile missing, hallway near stairway # 7. Code A - Cleared for repairs on 08/28/04 by Leroy Minton Jr. (LM/08-28-04) Safety Office (202) 576-8962. | |||
| FM-200452231 04 12/27/05 Harris , PR Fire Code Violation Ground floor Ceiling tile missing room 119. Code A - Cleared for repairs on 08/28/04 by Leroy Minton Jr. (LM/08-28-04) Safety Office (202) 576-8962. | |||
| FM-200120727 01 2/3/06 (HARRIS, P.R.) ASBESTOS ASSESSMENT REQ. 2ND, 3RD FLOOR/ ASSISTANT PRINCIPALS OFFICE ELECTRIC OUTLETS ARE NEEDED TO BE REPAIRED BECAUSE THE ONES ON THE LEFT HAND SIDE OF THE ROOM DO NOT WORK. ASBESTOS CODE A - CLEAR FOR REPAIRS ON 10/22/01. LEROY MINTON - SAFETY (202)576-6691 (RG | |||
| FM-200202021 02 2/3/06 (HARRIS,P.R.) ***URGENT*** ASBESTOS ASSESSMENT REQUIRED REPLACETHE LIGHTS IN THE AUDITORIUM CEILING WHERE THERE IS AN ELECTRICAL SHORT. ASBESTOS CODE A-CLEAR FOR REPAIR ON 1/30/02 BY HORNE ENGINEER: SHERYLL JAMES | |||
| FM-200202017 02 2/3/06 (HARRIS,P.R.) ***URGENT*** ASBESTOS ASSESSMENT REQUIRED MAIN OFFICE REPLACE KNOB LOCKS ON THREE (3) DOORS IN THE MAIN OFFICE (WHERE CONFIDENTIAL RECORDS ARE KEPT) WHICH CANNOT BE PROPERLY SECURED. ASBESTOS CODE A-CLEAR FOR REPAIR ON 1/30/02 BY HORNE ENGINEER: SHERYLL JAMES | |||
| FM-200516116 05 2/14/06 "Urgent" Home Economics Dining Area & Rooms 203, 207 & 226. Area lights will not come on, bulbs have already been replaced. Need electricians to do assessment of sensors. Note: Area will be used for luncheon program on Dec. 7, 2005 at 9:00 A.M. | |||
| FM-200449458 04 2/15/06 Harris, P.R. Urgent !!! 1) Sewage drain by loading dock is flooded. Water needs to be pumped out. Loading dock can not be used. | |||
| FM-200618779 06 3/8/06 Harris, P.R. Boiler Room Repair or replace 3" OS&Y valve; 125 Lb. breaching off main city water line to hot water storage tank and 1: gate valve (copper Line) going to storage tank. Needed so that contractor can install condensate tank (#4 Steam Boiler) Urgent !!!!!! | |||
| FM-200618251 06 4/3/06 Harris, P.R. Room #310 Replace leaking couplin and 3/4" nipple on conventor. Hot water system. Urgent !!!! | |||
| FM-200501400 05 4/3/06 (Harris, P.R.) HEALTH CODE VIOLATION: Kitchen: Repair or replace broken garbage disposal. Asbestos Code A - Clear for repairs on 02/08/05. DCPS Safety - Richard Gibson (RG) | |||
| FM-200617783 06 4/12/06 "Urgent" 1.) First floor/Replace faucets in boys' and girls' restrooms in auditorium area. 2.) Repair leaking supply line on sink in boys' lavatory next to stairwell # 1. 3.) Repair faucets and commodes in teachers' lavatory on the third floor. Note: Dr. Janney, will be Principal for a day on 01/26/06. | |||
| FM-200116696 01 4/14/06 HARRIS, P.R. BACK OF SCHOOL IN YARD ASBESTOS ASSESSMENT REQUIRED THE DRIVEWAY NEED TO BE REDONE VERY BAD. IT HAS HOLES IN AREAS THAT ARE POT HOLED. P.S. ON SUNDAY AND DURING WEEK THIS AREA IS USED A LOT. CODE ACLEAR FOR REPAIR BY DCPS SAFETY SRH 8/7/01. | |||
| FM-200120918 01 4/14/06 PR HARRIS STAIRWELL #2/CORRIDOR #2-TOP LEVEL REPAIR HOLE IN CENDER BLOCK WALL ON THE SECOND FLOOR AT CORRIDOR NO.2. ELECTRICAL OUTLET IS SHOWING AND THIS IS A SAFETY HAZARD. | |||
| FM-200513630 05 5/5/06 Harris, P. R. Urgent Second Floor-Female Bathroom, Near #8 Stairway Install Door on #4 Stall Asbestos Code A - Clear for repairs on 10/11/05. Tidewater - Tony Marcolin (RG 10/20/05) | |||
| FM-200334345 03 5/18/06 Harris, P. R. First Floor 1) Plaster and Paint (4) columns in Multi-Purpose Room, paint (4) entrance doors to Multi-Purpose Room, (4) entrance doors to stairwell, paint entrance walls to hallway and paint girls bathroom. Asbestos Code - A Cleared for repairs on 08-05-03 by Leroy Minton Jr. (LM/08-05-03) Safety Office 202-576-8962. | |||
| FM-200334354 03 5/18/06 Harris, P.R. First floor Multi purpose room Paint metal ceiling tile. Asbestos Code - A Cleared for repairs on 08-05-03 by Leroy Minton Jr. (LM/08-05-03) Safety Office 202-576-8962. | |||
| FM-200446127 04 8/14/06 PR Harris Pressure wash all interior and exterior surfaces of the cooling tower Clean all spray nozzles and/or grommets. Replace all eliminators Inspect and properly adjust all floats Perform preventive maintenance on all auxiliary equipment (including but not limited to: greasing motors, replacing all belts, etc.) Clean all debris from jobsite Replace, as necessary, defective spray nozzle and/or grommet each Replace, as necessary, defective floats each Poc - Jay Dolphin - 576-3364 Asbestos Code A - Clear for repairs on 03/31/04. DCPS Safety - Richard Gibson (RG) | |||
| FM-200620182 06 11/27/06 Harris, P.R. Boiler Room Repair or replace domestic hot water heater. No hot water in the Building. Urgent !!!!! | |||
| FM-200514728 /05 11/30/06 Harris, P.R. Urgent Basement-Fabricate metal covers for 32 exit door glasses. Students are vandalizing door glasses. Must secure entire basement area. | |||
| FM-200502435 05 1/22/07 Harris, P.R. Second floor elem. side Need carpentry shop in bldg. to install some kind of coat racks for elem. students to hang up there coats and back packs. Clothing is now on the floor. Teachers and parents are complaining. Most walls are sheet rock and brick. This has been going on for over two weeks. (safety hazard for students) Asbestos Code A - Clear for repairs on 03/14/05. DCPS Safety - Leroy Minton Jr. (RG 03/14/05) | |||
| FM-200333884 03 1/22/07 Harris, P.R. Pre-K, Common area thru out bldg. Furnish and install 55 burnout ballast. Building is getting dark. 277 volts rapid start. URGENT Fixtures are marked to indicate ballast need (BB). Asbestos Code - A Cleared for repairs on 08-05-03 by Leroy Minton Jr. (LM/08-05-03) Safety Office 202-576-8962. | |||
| FM-200502952 05 1/22/07 Harris, P.R. / Old Patterson Second floor rooms 307 and 369 Provide and install coat racks and hooks on room walls. Asbestos Code A - Clear for repairs on 03/30/05. DCPS Safety - Leroy Minton Jr. (RG 03/30/05) | |||
| FM-200227508 03 1/22/07 Harris, P.R. - URGENT Ballasts throughout the whole building need to be replaced. ASAP Some restrooms are dark because of bad ballasts that need to be replaced. These are 277 Ballasts and they are leaking PCB Asbestos Code A - Clear for repairs on 04/28/03. DCPS Safety - Charles Buchanan (RG 05/01/03) | |||
| FM-200620399 06 2/2/07 Grounds/Southwest corner at rear of building near gas station. "Urgent" Remove hedges, trash and debris from rear of building. Note: This is a safety issue. | |||
| FM-200459229 04 2/23/07 HARRIS P. R. URGENT!!!!!!!!! URGENT!!!!!!!! PATTERSON SIDE OF BUILDING SECURE THIS SIDE OF BUILDING . | |||
| FM-200514729 /05 3/12/07 Harris, P.R. Urgent Basement-Repair locks to 32 doors so that the panic bar can be locked with the key. Unable to secure basement area.Students are vancalising the area also change locks on iron doors to gated area. New principal and custodial foreman need keys. Note: Interior Stairwell Doors |