Urgent Open Repair Requests
See Also: All Open Repair Requests at Patterson ES
Detailed Reports
| Description | Open Date |
|---|---|
| FM-200221143 200221143 11/18/02 Patterson Second floor Paint restrooms (mens) near doors # 5 and 3. Permit was not issued. Asbestos/Lead Code A-clear for repair by Horne Engineer Edward Rodriguez DCPS Safety on 11/21/02 Charles E. Buchanan | |
| FM-200506502 6/8/05 Patterson Elmira St. Entrance Repair Exterior Door (Broken Glass) Asbestos Code A - Clear for repairs on 06/08/05. DCPS Safety (RG) | |
| FM-200509280 8/1/05 Patterson URGENT URGENT First and Second fl. Exterior Doors Over Head Glass Repair Glass | |
| FM-200515218 11/8/05 Urgent: Replace broken windows in the cafeteria on the first floor, and the stairwell on the third floor | |
| FM-200626030 7/20/06 3rd Floor- Stairwell C & D Replace ceiling tile. Asbestos Code A - Clear for Repairs on 07/21/06. DCPS Safety - Richard Gibson ( RG) | |
| FM-200630988 10/19/06 1st, 2nd, & 3rd Floors - Hallways and Stairwells - Paint bottom half blue with washable paint. Asbestos Code A - Clear for repairs on 10/19/06. DCPS Safety - Richard Gibson (RG) | |
| FM-200702147 702147 3/19/07 Seond Floor: Replace ceiling tile in the cudstodian closet on the second floot. Asbestos Code A - Clear for repairs on 03/19/07. DCPS Safety - Richard Gibson (RG) |
© The Washington Post Company
