Urgent Closed Repair Requests

See Also: All Closed Repair Requests at Payne Elementary School

Detailed Reports

Urgent Closed Repair Requests
Description Open Date Close Date Time Elapsed
FM-200102179 01 9/17/01 PAYNE FIRST (1ST) FLOOR - WOMENS RESTROOM NEW WING REPLACE HANDICAP RAIL TO AID TEACHER WITH A DISABILITY. MT-20001365 ASBESTOS CODE A - CLEAR FOR REPAIRS ON 05/11/01. MR. LEROY MINTON - SAFETY (202)576-6691 January 25, 2001 September 17, 2001 235 days
FM-200122261 /01 10/29/01 (PAYNE) !!!EMERGENCY!!! OLD WING/3RD FLOOR: WATER FOUNTAIN LEAKING; ENGINEER ATTEMPTED TO SHUT VALVE OFF, AND WAS UNABLE TO DO SO. WATER IS LEAKING FROM THE VALVE. PRINCIPAL IS CONCERNED WITH INJURIES DUE TO SLIPPERY FLOOR. October 24, 2001 October 29, 2001 5 days
FM-200126004 /01 2/12/02 (PAYNE) ASBESTOS ASSESSMENT REQUIRED 1ST FLOOR TEACHERS LOUNGE REPLACE CONTROL STOP VALVE ON SINK. HOT WATER RUNS CONTINUOUSLY & THERE IS NO ISOLATION VALVE FOR THIS AREA. ASBESTOS CODE A - CLEAR FOR REPAIRS ON 12/22/01. RICHARD GIBSON - SAFETY (202)576-5584 (RG) December 21, 2001 February 12, 2002 53 days
FM-200126122 /01 2/12/02 (PAYNE) ASBESTOS ASSESSMENT REQUIRED 1ST FLOOR KITCHEN REPAIR OR REPLACE FLUSH VALVES ON TOILET. CONTROL VALVE IS NOT WORKING. CODE A -CLEAR FOR REPAIR BY HORNE ENGINEERING PHILIP CONNOLLY 12-31-01 (DCPS SAFETY- SHEILA R. HOWARD 12-31-01) December 27, 2001 February 12, 2002 47 days
FM-200202698 02 2/26/02 (PAYNE) ***URGENT*** 1ST FLOOR HEALTH SUITE FLUSH-VALVE ON TOILET IS NOT WORKING & THERE IS NO WATER IN THE FIXTURE. February 8, 2002 February 26, 2002 18 days
FM-200203996 02 3/11/02 (Payne) ****Urgent**** 2nd & 3rd Floors/Boys Restrooms 2nd Floor: Toilets are clogged and flush valves not working properly. 3rd Floor: There is a major back up and flush valves are not working properly. March 7, 2002 March 11, 2002 4 days
FM-200205939 02 4/19/02 (Payne) ****Very Urgent**** Boiler room: Engineer discovered boiler room door open with key broke off in the door on arrival in the a.m. It appeared to him that the door was left open on the night before. April 17, 2002 April 19, 2002 2 days
FM-200205242 02 5/3/02 (Payne) 1. Asbestos assessment required. 2nd Floor/boys restroom; Replace control valves on three (3) commodes. Asbestos Code A - Clear For Repairs On 04/02/02. DCPS Safety - Richard Gibson (04/02/02) April 2, 2002 May 3, 2002 31 days
FM-200210125 02 6/25/02 Payne ****Urgent**** 1st Floor Entrance Door in Lobby Replace broken panic bar so area can be secured. June 24, 2002 June 25, 2002 1 day
FM-200206695 02 8/5/02 Floors 2 & 3, Old Wing: Rooms 205 thru 208 & 210; 306 & 307, 309 & 310. Install the window A/C units in the above listed classrooms which will be used for summer school. POC: Butler In-House Assessment performed by Leroy Minton, Jr. -7-26-02 Asbestos Code A - Clear for repairs, on 7/26/02 DCPS Safety - L. Minton, (RE - 7/26/02) April 26, 2002 August 5, 2002 101 days
FM-200215173 02 8/26/02 Payne ****Urgent**** 1st Floor Lobby/Main Entrance Door Center mullion is loose, door is not tight and secure. Previous repair not adequate to secure door. Door can be easily shaken open from outside posing a security breach. August 20, 2002 August 26, 2002 6 days
FM-200216108 02 9/3/02 (Payne) !!Very Very Urgent!! 1st Floor/Kitchen: Trap under sink has ruptured, leaking profusely. The faucettes are not functioning properly on top of sink. August 29, 2002 September 3, 2002 5 days
FM-200216559 02 9/6/02 (Payne) !!!Very Very Urgent!!! 1st Floor/Old building: Stop control valves will not hold, water running over on the floor in the nurse office. 09/05/02 , approx. 1:50 p.m. call came in from Principal indicating room is completely flooded. (Please respond) This request should be upgraded to "emergency." September 4, 2002 September 6, 2002 2 days
FM-200216811 02 9/12/02 (Payne) ****Very Very Urgent**** 2nd and 3rd Floor: Need new cylinder for locks that are sticking, unable to get in-to rooms #310, and #210. September 6, 2002 September 12, 2002 6 days
FM-200216494 02 9/12/02 (Payne) !!Urgent!!! 2nd & 3rd floor/Old building: 1. Cylinder continues to turn when key is inserted in door of room #209. 2. Key broke off in door to room #310. Asbestos Code A - Clear for repairs on 09/05/02. DCPS Safety - Leroy Minton Jr. (RG 09/06/02) September 4, 2002 September 12, 2002 8 days
FM-200214073 02 10/31/02 Payne Very ****Urgent**** 1. Asbestos Assessment Reqd. 3rd Floor/Old Wing 2. Replace the door leading to the roof--it is rotted and hanging from the door closer. Approximately 2:28 p.m. Principal states door is completely off, and that would make it easy access for vandals. Asbestos Code A - Clear for repairs on 08/22/02. DCPS Safety - Charles Buchanan (RG 08/22/02) August 12, 2002 October 31, 2002 80 days
FM-200225204 03 2/10/03 (Payne) !!!VERY URGENT!!! New wing/2nd Floor: Key will not turn in lock; unable to unlock door. February 5, 2003 February 10, 2003 5 days
FM-200225548 03 2/13/03 (Payne) !!!VERY URGENT!!! Old wing/2nd Floor/room 207 Key broken off in door need locksmith to remove broken keys and replace it with new keys. February 11, 2003 February 13, 2003 2 days
FM-200225372 03 2/19/03 Payne Second floor - health suite Replace shorted incondecent bulb with lay-in (recessed) four (4) tube fluorescent (tube) light fixture (2). Urgent As of now ther is no light in the health suite. February 6, 2003 February 19, 2003 13 days
FM-200225435 03 3/10/03 (Payne) !!!URGENT!!! Playground: Fence pole damaged with sharpe edges exposed. February 10, 2003 March 10, 2003 28 days
FM-200227613 03 3/26/03 Payne URGENT Second floor computer room new wing The lock on the computer room door is broken. Need to be repair or replace. March 25, 2003 March 26, 2003 1 day
FM-200226090 03 4/7/03 (Payne) !!!VERY URGENT!!! Foyer/Main entrance: Sparks shooting from recess lights. February 24, 2003 April 7, 2003 42 days
FM-200226346 03 4/7/03 (Payne) !!!VERY URGENT!!! Hallway and auditorium Have ten (10) exit lights went out. I check lights, No power going to exit lights. Fire Code Violation February 27, 2003 April 7, 2003 39 days
FM-200227170 03 4/7/03 (Payne) !!!VERY URGENT!!! New Wing/1st Floor boys restroom: Water leaking from flush valves; unable to shut off the water. 03/20/03, calls came in today, conditions are critical. March 17, 2003 April 7, 2003 21 days
FM-200112337 01 5/13/03 PAYNE SECOND FLOOR BOYS RESTROOM NEW WING 1) WATER IS LEAKING FROM BASE UNDER SINK POSSIBLE BROKEN NIPPLE IN WALL Exp Demo 2nd floor boys bathroom. TSI repair AMP room 22,29,3,50,77,98, 119,120,129,102,55 fam room. Envirobate - Charles Crenshaw - 571-436-1150. Code A Clear for Repair asbestos abatement was 06-24-02 confirmed by Leroy Minton DCPS Safety Sheila R. Howard DCPS Safety 06-28-02. June 4, 2001 May 13, 2003 708 days
FM-200333551 03 7/23/03 (Payne) !!!URGENT!!! Engineers Entry Door: Key broke off in door. July 22, 2003 July 23, 2003 1 day
FM-200336543 03 9/4/03 (Payne) !!!URGENT!!! New Wing/2nd Floor: Problem with lock, keys will not turn in the following rooms; Computer lab, and room #217. August 28, 2003 September 4, 2003 7 days
FM-200341585 /03 12/15/03 (Payne) !!!VERY URGENT!!! 3rd Floor/Room #309: Teacher is locked out from her room, key will not unlock door, cylinder continues to spin around. December 15, 2003 December 15, 2003 0 days
FM-200341798 /03 12/31/03 (Payne) !!!VERY URGENT!!! New Wing/1st Floor: Replace stop control valve that is stripped, leaking from flush valve, and unable too shut off. December 18, 2003 December 31, 2003 13 days
FM-200334440 03 12/31/03 Payne Second floor girls restroom old building Two commode not working, water pressure and one need a flush valves. Urgent August 5, 2003 December 31, 2003 148 days
FM-200335843 03 4/19/04 Payne F-110.0 Fire Code Violation Second floor New wing safety glass in fire exiting cab. August 20, 2003 April 19, 2004 243 days
FM-200335845 03 4/19/04 Payne F-110.0 Fire Code Violation First floor New wing safety glass in fire exiting cab. August 20, 2003 April 19, 2004 243 days
FM-200335841 03 4/19/04 Payne F-110.0 Fire Code Violation Second floor New wing room 224 safety glass. August 20, 2003 April 19, 2004 243 days
FM-200447952 04 5/21/04 (Payne) !!!VERY URGENT!!! New Wing/2nd Floor: Key will not turn cylinder lock in classroom #224. (Students standing outside) May 14, 2004 May 21, 2004 7 days
FM-200454874 04 10/1/04 Payne First floor boys restroom old bldg. Repair or replace door closer. Asbestos Code A - Clear for repairs on 09/16/04. DCPS Safety - Richard Gibson (RG) September 16, 2004 October 1, 2004 15 days
FM-200457545 /04 11/4/04 (Payne) !!!VERY URGENT!!! pep 2nd Floor/Boys Bathroom: The second toilet in restroom leaking, unable to shut the water off. (Water has covered the floor) October 27, 2004 November 4, 2004 8 days
FM-200459469 04 12/12/04 (Payne) HEALTH CODE VIOLATION: Kitchen: Caulk juntion of hand sink and wall. Asbestos Code A - Clear for repairs on 12/10/04. DCPS Safety - Richard Gibson (RG) December 9, 2004 December 12, 2004 3 days
FM-200457071 /04 3/28/05 Payne First floor old building Teacher bathroom replace broken glass in bathroom. Asbestos Code A - Clear for repairs on 10/25/04. DCPS Safety - Leroy Minton Jr. (RG 10/25/04) October 19, 2004 March 28, 2005 160 days
FM-200500769 05 4/14/05 Payne Boiler Room Repair or replace sump pump float or pump. Pump float gone. Urgent!!!! January 25, 2005 April 14, 2005 79 days
FM-200507449 05 7/12/05 Second floor, New Wing/Teachers' restroom. Replace flush valve on commode it constantly runs. Note: The custodian on site attempted to replace flush valve but he was unsuccessful. Asbestos Code A - Clear for repairs on 07/06/05. DCPS Safety - Richard Gibson (RG) July 5, 2005 July 12, 2005 7 days
FM-200508079 05 7/19/05 (Payne) "Urgent" Old Building, Third floor/Custodian closet. Unclog slop sink. Note: Custodian foreman was unable to unclog sink he requested for the plumbers to bring a K-50. July 19, 2005 July 19, 2005 0 days
FM-200457067 /04 8/1/05 Payne First floor exit door near auditorium Repair or replace door handles. Asbestos Code A - Clear for repairs on 10/22/04. DCPS Safety - Leroy Minton Jr. (RG 10/22/04) October 19, 2004 August 1, 2005 286 days
FM-200511176 05 10/12/05 Payne Fire Code Violation Second Floor-Bars on safety glass room 218 August 24, 2005 October 12, 2005 49 days
FM-200455508 04 11/29/05 Payne URGENT!!! 2nd Floor Need electrician to survey electrical system to see why no power going to heating univents on 2nd floor. No heat on 2nd floor. September 23, 2004 November 29, 2005 432 days
FM-200445258 04 11/29/05 Payne Urgent !! First Floor - Teachers Bathroom 1) Repair or replace light fixtures. Light fixture fell from the ceiling. March 12, 2004 November 29, 2005 627 days
FM-200335855 03 11/30/05 Payne F-110.0 Fire Code Violation First floor Safety glass at exit by cafeteria. August 20, 2003 November 30, 2005 833 days
FM-200453595 04 12/27/05 Payne Fire Code Violation First floor Main entrance ceiling tiles need to be replaced. Asbestos Code A - Clear for repairs on 08/31/04. DCPS Safety - Richard Gibson ( 09/01/04 ) August 30, 2004 December 27, 2005 484 days
FM-200453573 04 12/27/05 Payne Fire Code Violation Room 309 Broken door hardware (door closer). Asbestos Code A - Clear for repairs on 08/31/04. DCPS Safety - Richard Gibson ( 09/01/04 ) August 30, 2004 December 27, 2005 484 days
FM-200125976 /01 2/3/06 (PAYNE) 1ST FLOOR KITCHEN 1) REPAIR/REPLACE FLUSH VALVES ON TOILET 2) CONTROL VALVE NOT WORKING Asbestos Code A - Clear for repairs on 04/01/03. DCPS Safety - RIchard Gibson (RG) December 21, 2001 February 3, 2006 1,505 days
FM-200509585 05 2/10/06 Payne Furnish (2) Two window A/C units.Cafeteria BTU,s 24,000 Urgent !!!! August 5, 2005 February 10, 2006 189 days
FM-200618682 06 2/15/06 Urgent First Floor-Rm. 128 Pre-K (New Wing) Water leaking from a cracked pipe under the sink-Repair or Replace. February 15, 2006 February 15, 2006 0 days
FM-200215576 02 3/8/06 Payne 1. Asbestos Assessment Reqd. 2nd Floor Hallway/Corridor 2. Install three (3) 2'x4' ceiling panels at the west end of the hallway. Asbestos Code A - Clear for repairs on 08/26/02. DCPS Safety - Leroy Minton Jr. (RG 08/26/02) August 26, 2002 March 8, 2006 1,290 days
FM-200219466 /02 3/8/06 (Payne) !!!VERY URGENT!!! New wing #133: Glass, and frame blown out of window from the wind. October 16, 2002 March 8, 2006 1,239 days
FM-200219684 /02 3/8/06 Payne Third floor - Boys restroom Repair hole in wall in bathroom. Hole was mode to access waste line. Asbestos Code A - Cleared for repairs on 10-23-02 (LM 10/24/02) Leroy Minton Jr. Safety Office 202-576-8962. October 18, 2002 March 8, 2006 1,237 days
FM-200502420 05 3/8/06 (Payne) Asbestos Assessment Required. First floor/Cafeteria. Repair or Replace drinking fountain, water is leaking. Asbestos Code A - Clear for repairs on 03/14/05. DCPS Safety - Leroy Minton Jr. (RG 03/14/05) March 9, 2005 March 8, 2006 364 days
FM-200220142 /02 3/8/06 (Payne) !!!URGENT!!! 3rd Floor/Room #310: After repairmen serviced air conditioner, all electrical power lost. October 28, 2002 March 8, 2006 1,227 days
FM-200224847 03 3/8/06 Payne URGENT!!! Playground Please replace broken exterior door light around boiler room and cafeteria. Parents pick up their children from this area late in the afternoon. All this outside lights are broken. January 29, 2003 March 8, 2006 1,134 days
FM-200513085 05 3/8/06 Payne Very Urgent First Floor-Teachers Restroom (new wing) Replace automatic censer with regular flush valve, the automatic on has gone bad. September 23, 2005 March 8, 2006 166 days
FM-200202493 02 3/8/06 (PAYNE) 1. ASBESTOS ASSESSMENT REQUIRED. 3RD FLOOR/ROOM #309: REMOVE AND REPLACE FLOOR TILE 9 X 9 TILE IS COMING UP FROM FLOOR. Asbestos Code A - Clear for repairs. Abated on 07-30-02 (LM) per Leroy Minton confirmation. Safety Office 202-576-8962. February 5, 2002 March 8, 2006 1,492 days
FM-200334593 03 3/8/06 (Payne) !!!VERY URGENT!!! New wing/Day Care: Window broken by vandals. August 6, 2003 March 8, 2006 945 days
FM-200228899 03 8/25/06 Payne Tunnel (Basement) 1.Assessment required in tunnel. 2.Repair steam leaks in tunnel areas Asbesos Code A Cleared for repairs DCPS Safety R. Edwards 11/2/04 Abatement conducted by EBG; Air Monitoring conducted by USA Environmntal Repairs conducted by M&M Welding Reinsulation not required according to DCPS Mechanical Maintenance 12/02/04 April 21, 2003 August 25, 2006 1,222 days
FM-200629531 06 10/10/06 first Floor (new wing) - Classroom 126 broken safety glass. Asbestos Code A - Clear for repairs on 09/18/06. Tidewater - Kenny Long (RG 09/19/06) September 15, 2006 October 10, 2006 25 days
FM-200629516 06 10/10/06 Second Floor (new wing) - Classroom 214 broken door safety glass. Asbestos Code A - Clear for repairs on 09/18/06. Tidewater - Kenny Long (RG 09/19/06) September 15, 2006 October 10, 2006 25 days
FM-200629507 06 10/26/06 Second Floor (new wing) - Missing safety glass on door in classroom #29 Asbestos Code A - Clear for repairs on 09/18/06. Tidewater - Kenny Long (RG 09/19/06) September 15, 2006 October 26, 2006 41 days
FM-200623521 06 12/21/06 First floor, Main Office. Replace broken glass behind secretary's desk. Note: This is a safety hazard because jaggered glass is exposed! May 30, 2006 December 21, 2006 205 days
FM-200447419 04 2/20/07 Payne !!!URGENT!!! First Floor/New wing library Replace door knob in the office in the library, knob is broken cannot open. Asbestos code A - Clear for repairs on 05/05/04. Horne Engineering - Bjarne Smith (RG 05/05/04) May 3, 2004 February 20, 2007 1,023 days
FM-200620647 06 2/21/07 Rm. 126-Replace safety glass in door. Asbestos Code A - Clear for repairs on 03/31/06. Tidewater - Carlos Vera (RG 04/03/06) March 31, 2006 February 21, 2007 327 days