FM-200116481 01 8/24/01 POWELL 1ST FLOOR BOYS RESTROOM ASBESTOS ASSESSMENT REQUIRED NEAR PLAYGROUND EXIT. BOYS RESTROOM THE THIRD & FIFTH URINALS ARE CLOGGED UP. TRIED TO UNCLOG WITHOUT SUCCESS. CODE A-CLEAR FOR REPAIR BY DCPS SAFETY LM. 8/6/01 August 1, 2001 August 24, 2001 23 days
FM-200110279 01 10/22/01 POWELL PLAYGROUND/SMALL AREA - REPAIR OR REPLACE: COMPONENT DESCRIPTION COMMENTS 1. KK 72-40 CROWL TUNNEL TO HIGH UP OFF DECK 2. KK-72 - 61 DOUBLE WIDE SLIDE SPACE TO SHORT AT END AT EXIT END NEED MORE RUBBER PADS. HEALTH AND SAFETY HAZARD. May 14, 2001 October 22, 2001 161 days
FM-200123757 /01 12/5/01 (POWELL) !!VERY URGENT!! 1ST FLOOR/NEW WING: ALL LIGHTS ARE OUT IN THE CORRIDOR. November 26, 2001 December 5, 2001 9 days
FM-200124019 /01 1/16/02 (POWELL) 1. ASBESTOS ASSESSMENT REQUIRED. OUT-SIDE OF SCHOOL: NO LIGHTS FOR A LONG TIME ON THE SIDE OF BUILDING. DANGEROUS FOR STAFF, PARENTS, AND CHILDREN LEAVING THE AFTER/CARE. ASBESTOS CODE A - CLEAR FOR REPAIRS ON 11/30/01. LEROY MINTON - SAFETY (202)576-6691 November 29, 2001 January 16, 2002 48 days
FM-200203821 02 6/10/02 (Powell) 1. Asbestos assessment required. All faucets in all restrooms keeps coming lose and the screw that tighen the faucets is plastic an on it's way to break on all faucets in the building. Also the stand up urinals in Rm#107 does not work it is a new urinal, and both boys restrooms on the second floor faucets and urinals are new and do not flush properly. All faucets & urinals are new and we are having problems with them both not working properly some one need to come out and expect all the work that the contractor's did. Asbestos Code A - Clear for repairs on 05/13/02. DCPS Safety - Ronald Edwards (RG 05/14/02) February 27, 2002 June 10, 2002 103 days
FM-200120946 01 8/26/02 (POWELL) HEALTH CODE VIOLATION: 1. ASBESTOS ASSESSMENT REQUIRED. CAFETERIA: RESURFACE ENTRANCE TO WALK-IN BOX; AREA IS UNEVEN, AND TRIPPING HAZARD. ASBESTOS CODE A - CLEAR FOR REPAIRS ON 11/05/01 RONALD EDWARDS - SAFETY (202)576-6693 (RG) October 3, 2001 August 26, 2002 327 days
FM-200203005 02 10/3/02 (POWELL) lunch room table need to be welded back together. Requester Phone: 202-576-6247 Web Form Location ID: lunch room Asbestos Code A - Clear for repairs on 04/18/02. DCPS Safety - Richard Gibson (RG 04/18/02) February 13, 2002 October 3, 2002 232 days
FM-200209633 02 10/16/02 (Powell) !!!Very Urgent 1. Asbestos assessment required. Light fixture in lunch room wires are dried out and can not be connected back together. Lights are out in part of the lunch room. (As of 08/24/2002, this request is considered to be "very very urgent.") May 21, 2002 October 16, 2002 148 days
FM-200218305 02 12/4/02 Powell ****Urgent**** 2nd Floor Near Room 203 There is a foul odor coming from inside the water fountain----need plumbers to check and repair/replace. September 25, 2002 December 4, 2002 70 days
FM-200110096 01 5/5/03 POWELL PLAYGROUND/BIG AREA - REPAIR OR REPLACE: COMPONENT DESCRIPTION COMMENTS 1. 78-22-1 BURMA BRIDGE SAFETY RAIL- CHAINS MISSING 2. 78-24-1 VINYL CLAD STEEL RAD IS TAP IN SUSPENSION BRIDGE PLACE NEED REPAIR 3. KK-72-101 TOLFRO SWING SWING ARE 2 CUBE SEATS MISSING HEALTH AND SAFETY HAZARD. May 11, 2001 May 5, 2003 724 days
FM-200127158 01 5/5/03 (POWELL) The meter and the gas line out on the playground need to be caged in to keep anyone from playing around it because it is dangerous. December 7, 2001 May 5, 2003 514 days
FM-200110278 01 5/5/03 POWELL PLAYGROUND/BIG AREA - REPAIR OR REPLACE: REPAIR OR REPLACE COMPONENT DESCRIPTION COMMENTS 1. KK 72-21 VINYL CLAD CHAIN CHAIN IN BROKEN NET CLIMBER AT TOP 2. KK-62 DOUBLE WIDE SPACE TO SHORT AT END DOUBLE LONG SLIDE NEED MORE RUBBER PADS HEALTH AND SAFETY HAZARD. May 14, 2001 May 5, 2003 721 days
FM-200504414 05 4/25/05 ( POWELL ) URGENT!!!! First-Second Floors 1) Repair exit lights, these lights are somehow connected to the hall lights and now the hall lights have become dim. The exit lights are some way hooked up with the fire alarm and that is not working. April 21, 2005 April 25, 2005 4 days
FM-200207558 02 9/26/05 (Powell) Health code violation: Kitchen: No hand sink is present in the food serving area. Asbestos Code A - Clear for repairs on 05/13/02. DCPS Safety - Ronald Edwards (RG 05/14/02) May 10, 2002 September 26, 2005 1,235 days
FM-200205928 02 9/26/05 Powell In rooms 201 A & B you have electrical lines on the floor that need to come up and be replaced around on the walls because that room is becoming a classroom and it is a safety hazard to be on the floor around the kids. April 4, 2002 September 26, 2005 1,271 days
FM-200220080 /02 9/26/05 (Powell) !!!URGENT!!! 1st Floor/boys restroom near payground exit: Replace rusted drain trap on the sink near the window; Note: This trap is rusted and leaking profusely. "Please expedite" Asbestos Code A - Clear for repairs on 10/28/02. DCPS Safety - Leroy Minton Jr. (RG 10/29/02) October 25, 2002 September 26, 2005 1,067 days
FM-200223502 /02 9/26/05 (Powell, (Powell) Inside of walk in refrigerator the floor is rusted and was wrote up by the Health inspector. Floor need to be repaired. Asbestos Code A- Cleared for repairs on 02-14-03 by Leroy Minton Jr (LM/01-15-04) Safety Office. 202-576-8962. November 19, 2002 September 26, 2005 1,042 days
FM-200217350 02 9/26/05 (Powell) !!!VERY URGENT!!! Roof: Sleight falling from roof; very dangerous, as a large piece is hanging over the entrance door. (Safety Hazard) Due to the wind, the problem has become worse. September 12, 2002 September 26, 2005 1,110 days
FM-200333208 03 9/26/05 Powell !!!VERY URGENT!!! Exterior Grounds 1.Remove large tree with a truck boom . July 14, 2003 September 26, 2005 805 days
FM-200120535 01 9/26/05 (POWELL) 1. ASBESTOS ASSESSMENT REQUIRED. THROUGH-OUT electricity needs upgrading. classrooms are not able to use technology. Power goes out when computers/copiers are used. Requester Phone: 576-6247 Requestor Phone: 576-6247 ASBESTOS CODE A - CLEAR FOR REPAIRS ON 12/04/01. RONALD EDWARDS - SAFETY (202)576-6693 (RG) September 25, 2001 September 26, 2005 1,462 days
FM-200213262 02 9/26/05 (Powell) 1. Asbestos assessment required. ciruit breaker switch in lunch room bad, two lights not working, tried changing the bulbs but still not working. (As of August 24, 2002, this request is considered !!!very urgent!!) Code A Clear for Repair by Leroy Minton, Jr. DCPS Safety 07-30-02 DCPS Safety-Sheila R. Howard 07-30-02 July 29, 2002 September 26, 2005 1,155 days
FM-200123904 /01 2/3/06 POWELL FIRST FLOOR FOYER AND LOBBY. UPGRADE LIGHTING. AREAS ARE VERY DARK. PER: S.W.A.T INSPECTION. ## NO WORK PERMIT ISSUED## J. EGGLESTON Asbestos Code A - Cleared for repairs on 04-28-03 by Leroy Minton Jr. (LM/04-08-03) the Safety Office 202-576-8962. November 27, 2001 February 3, 2006 1,529 days
FM-200120519 01 2/3/06 (POWELL) 1. ASBESTOS ASSESSMENT REQUIRED. electricity needs upgrading. classrooms are not able to use technology. Power goes out when computers/copiers are used. Requester Phone: 576-6247 Web Form Location ID: 08 Requestor Phone: 576-6247 ASBESTOS CODE A - CLEAR FOR REPAIRS ON 10/06/01. LEROY MINTON - SAFETY (202)576-6691 September 25, 2001 February 3, 2006 1,592 days
FM-200123892 /01 2/3/06 POWELL UPSHUR STREET SIDE, STAIRS REPAIR/REPLACE METAL HANDRAILS FOR SAFETY ISSUES. MOUNTED IN CONCRETE. PER S.W.A.T. INSPECTION. November 27, 2001 February 3, 2006 1,529 days
FM-200223510 /02 2/15/06 (Powell) 1. Asbestos assessment required. Girls restroom on 2fl need to replace sink because sink fell off the wall and broke. drain pipe need to be replace also. ASAP Thank You Asbestos Code A - Clear for repairs on 04/29/03. DCPS Safety - Leroy Minton Jr. (RG 04/29/03) November 15, 2002 February 15, 2006 1,188 days
FM-200213345 02 2/6/07 Powell ****Urgent**** 1. Asbestos Assessment Reqd. 1st Floor Main Entrance 2. The handle on the middle door of the main entrance is loose and needs tightening. The door [left-hand side going in from outside] can be easily pried open from the outside--even when locked. Another hole may need to be drilled in order to move or tighten the lock inside to make the door more secure against possible illegal entry. Asbestos Code A - Clear for repairs on 04/29/03. Horne Engeering - Sharon VOSS (RG 04/30/03) July 31, 2002 February 6, 2007 1,651 days
FM-200515617 /05 2/6/07 Powell Room #201 Repair or replace leaking nipple or union in room #201 Urgent !!!! November 21, 2005 February 6, 2007 442 days
FM-200632389 89 11/18/06 2/6/07 Replace missing or damaged ceiling tiles in "Head Start" area asap, so that they don't loose their funding. Asbestos Code A - Clear for repairs on 11/27/06. DCPS Safety - Richard Gibson (RG) November 18, 2006 February 6, 2007 80 days
FM-200619679 06 2/6/07 "Urgent" In room 108 that is a Pre-k room and there is an exit door in there the Principal would like to have the panic bar on the door moved up a little higher so that the kids don't open that door and run in the parking lot and get hit by a car. Asbestos Code A - Clear for repairs on 03/09/06 Tidewater - Tony Marcolin (RG 03/10/06) March 8, 2006 February 6, 2007 335 days
FM-200203742 02 2/6/07 (Powell) 1. Asbestos assessment required. Tile in lunch room keeps coming up because floor is damage from water coming some where under the tile. Asbestos Code A - Clear for repairs on 05/13/02. DCPS Safety - Ronald Edwards (RG 05/14/02) February 26, 2002 February 6, 2007 1,806 days