Urgent Open Repair Requests

See Also: All Open Repair Requests at Randle-Highlands ES

Detailed Reports

Urgent Open Repair Requests
Description Open Date
FM-200453183 8/23/04 Randle-Highlands EMERGENCY Basement 2B03 Repair crack in wall in classroom structure damage. Asbestos Code A - Clear for repairs on 08/24/04. DCPS Safety - Leroy Minton Jr. (RG 08/24/04) August 23, 2004
FM-200505218 5/6/05 ( RANDLE-HIGHLANDS ) Basement - Principal Office, Rooms 2B01, and 2B03 1) Repair cracks in wall, due to the building settling. Asbestos Code A - Clear for repairs on 05/06/05. DCPS Safety - Richard Gibson (RG) May 6, 2005
FM-200513930 10/18/05 Randle-Highlands Very Urgent Stairwell 2 Between 1st and 2nd Floor Repair the rubber treads on the steps, they are loose and causing a tripping hazard, need contact cement. October 18, 2005
FM-200620510 3/29/06 Repair or replace the plywood over the entrance to the over path (on the over path leading to the first and the second floor. (Birds are entering the building) Asbestos Code A - Clear for repairs on 03/2/9/06. DCPS Safety - Richard Gibson (RG) March 29, 2006
FM-200700826 6 2/24/07 Boiler room URGENT!!!!!!!!!! Correct cause of inoperatable VAHU #2 Heating air fan motor ,upon start-up blows numerous fuses (AJT 40 40 amps 600VAC ) unit service about 16 class rooms. February 24, 2007

© The Washington Post Company