Description Open Date Close Date Time Elapsed
FM-200112654 01 9/17/01 (RAYMOND) FIRE CODE VIOLATION: 608.0 1. ASBESTOS ASSESSMENT REQUIRED. 1ST FLOOR/LIBRARY: DOOR HARDWARE PUSH BAR, NEEDS REPAIR. ASBESTOS CODE A - CLEAR FOR REPAIRS ON 09/10/01. RONALD EDWARDS - SAFETY (202)576-6691 June 6, 2001 September 17, 2001 103 days
FM-200112639 01 9/19/01 (RAYMOND) FIRE CODE VIOLATION: F-110.0 1. ASBESTOS ASSESSMENT REQUIRED. 1ST FLOOR/ROOM #118: CEILING TILE MISSING NEXT TO ROOM #118. ASBESTOS CODE A - CLEAR FOR REPAIRS ON 09/10/01. RONALD EDWARDS - SAFETY (202)576-6691 June 6, 2001 September 19, 2001 105 days
FM-200121056 01 10/10/01 (RAYMOND) 1ST FLOOR/ GIRLS BATHROOM !!! URGENT !!! REPAIR 2 SINKS. DRAIN PIPE BROKEN OFF. BATHROOM CLOSED DOWN. October 4, 2001 October 10, 2001 6 days
FM-200120513 /01 10/31/01 (RAYMOND) ASBESTOS ASSESSMENT REQ. 2ND FLOOR/ STAFF BATHROOMS THE BATHROOMS ON THE 2ND FLOOR OLD WING AND THE 2ND NEW WING NEED THE LOCKS REPAIRED STAFF AND MAINTENANCE STAFF MEMBERS ARE UNABLE TO GAIN ACCESS BECAUSE THE LOCKS WILL NOT OPERATE. ASBESTOS CODE A - CLEAR FOR REPAIRS ON 10/25/01. LEROY MINTON - SAFETY (202)576-6691 (RG) October 29, 2001 October 31, 2001 2 days
FM-200201099 02 1/27/02 (RAYMOND) **URGENT** ASBESTOS ASSESSMENT REQUIRED 1ST FLOOR HEALTH SUITE REPLACE LOCK (REPEATED UNAUTHORIZED ENTRY INTO HEALTH SUITE WITH KEY TO EXISTING LOCK). ASBESTOS CODE A-CLEAR FOR REPAIR ON 1/18/02 BY HORNE ENGINEER: SAM EBRAHIM January 25, 2002 January 27, 2002 2 days
FM-200120515 01 2/4/02 (RAYMOND) ASBESTOS ASSESSMENT REQ. 1ST FLOOR/ GIRLS BATHROOM THE DRAIN PIPE CONNECTED TO THE HAND SINKS HAVE BROKEN COMPLETELY OFF. STUDENTS ARE UNABLE TO WASH HANDS BECAUSE THE WATER WILL RUN RIGHT ON THE FLOOR. ASBESTOS CODE A - CLEAR FOR REPAIRS ON 10/25/01. LEROY MINTON - SAFETY (202)576-6691 (RG) September 25, 2001 February 4, 2002 132 days
FM-200120511 01 4/22/02 (RAYMOND) ASBESTOS ASSESSMENT REQ. 3RD FLOOR/ ROOM 36 THE LOCK NEEDS TO BE REPAIRED. THE TEACHER IS UNABLE TO SECURE THE CLASSROOM. ASBESTOS CODE A - CLEAR FOR REPAIRS ON 10/25/01. LEROY MINTON - SAFETY (202)576-6691 (RG) September 25, 2001 April 22, 2002 209 days
FM-200207257 02 6/13/02 Raymond ****Urgent**** 1. Asbestos Assessment Reqd. 1st Floor Girls' Restroom [New Wing] 2. A drain pipe has been broken away from the wall causing flooding across the floor [potential safety hazard to students]. The pipe needs to be replaced to deter large students from stepping on the pipe, causing it to break away from the wall. POC: Chandra Murchison Asbestos Code A - Clear for repairs on 5/07/02 Horne Engineering,Stephen Caldwell (RE- 5/08/02) May 7, 2002 June 13, 2002 37 days
FM-200210418 02 6/28/02 Asbestos Code A - Clear for repairs, on 6/27/02 DCPS Safety, R. Edwards (RE-6/27/02) June 26, 2002 June 28, 2002 2 days
FM-200210416 02 7/3/02 (Raymond) Fire code violation: Page 1 of 2 1. Asbestos assessment required. Next to electrical room: Door closer broken next to electrical room. Asbestos Code A - Clear for repairs, on 6/27/02 DCPS Safety, R. Edwards (RE-6/27/02) June 26, 2002 July 3, 2002 7 days
FM-200210422 02 7/3/02 (Raymond) Fire code violation: Page 2 of 2 1. Asbestos assessment required. 2nd Floor/New wing: Ceiling tile missing next to Teachers Lounge. Asbestos Code A - Clear for repairs, on 6/27/02 DCPS Safety, R. Edwards (RE-6/27/02) June 26, 2002 July 3, 2002 7 days
FM-200102281 /01 9/20/02 RAYMOND FIRST (1ST) FLOOR - ENTRANCE PRE-K AND KINDERGARTEN REPAIR CONCRETE WALKWAY NEAR THE PRE-KINDERGARTEN AND KINDERGARTEN ROOMS. GRAVEL CAUSING STUDENTS AND PARENTS TO TRIP. SAFETY HAZARD. January 26, 2001 September 20, 2002 602 days
FM-200215885 02 10/28/02 Raymond ****Emergency**** 1. Asbestos Assessment Reqd. 3rd Floor Rms. 30 & 31/Old Wing The doors are hanging from the hinges, are out of frame, are old and don't work well at all. Would like to have new doors installed instead of trying to repair the old ones. Asbestos Code A - Clear for repairs on 08/28/02. DCPS Safety - Leroy Minton Jr. (RG 08/28/02) August 28, 2002 October 28, 2002 61 days
FM-200216555 02 11/1/02 (Raymond) ***Very Very Urgent*** Old wing/1st floor: Electrical wall outlet began to spark, smoke and burn, after student bumped into it. September 4, 2002 November 1, 2002 58 days
FM-200207181 02 11/21/02 Raymond 2nd Floor Room 213 [New Wing] & Room 22 [Old Wing] Repair the doors in the areas indicated above. The door hinges are completely broken. Doors cannot be secured properly, posing a safety hazard. May 6, 2002 November 21, 2002 199 days
FM-200224637 03 3/17/03 (Raymond) !!!VERY URGENT!!! New wing/2nd Floor: Door completely off hinges in room #210. Asbestos Code A - Clear for repairs on 01/28/03. Horne Engineering - Sharon Voss ( RG 01/30/03) January 27, 2003 March 17, 2003 49 days
FM-200102283 /01 5/5/03 RAYMOND EXTERIOR REPAIR/REPLACE PLAYGROUND EQUIPMENT AND MATTING. SAFETY HAZARD. January 26, 2001 May 5, 2003 829 days
FM-200216804 02 5/5/03 Raymond First floor (old wing) - Concrete platform The concrete platform located outside the exit door (near cafeteria) need to be repair. The platform is all broken up and the students have to enter the building for breakfast and lunch which may cause tripping. This is a safety violation. September 6, 2002 May 5, 2003 241 days
FM-200102340 /01 5/5/03 RAYMOND PLAYGROUND REPAIR PLAYGROUND EQUIPMENT AND REPLACE DAMAGED MISSING SAFETY MATS. January 29, 2001 May 5, 2003 826 days
FM-200330051 03 6/2/03 Raymond Make the following repairs: Component - K K 72 - 55 1) The safety panel is high off the deck to much space between them. Component - K K 72 - 40 2) The crawl tunnel is not lower enough to the deck, it's to high. Component - K K 72 - 48 3) The chain is broken on the vinyl clad net climber. Component - K K 72 - 48 4) The tic tac toe panel is broken and in need of repair. Component - K K 72 - 44 5) The safety rails have to much space between them , they need to be replaced. 6) A lot of rubber surface is missing, it needs to be replaced. May 12, 2003 June 2, 2003 21 days
FM-200207047 02 6/12/03 Raymond ****Urgent**** Outside Playground Area The outside drain is severely clogged. The water is causing flooding across the entire playround, causing a potential hazard for students leaving the building. May 3, 2002 June 12, 2003 405 days
FM-200333233 03 7/14/03 (Raymond) !!!URGENT!!! 3rd Floor/Room #34: Sparks coming from electrical outlet in room #34; students were evacuated from the room, using safety precautions. July 14, 2003 July 14, 2003 0 days
FM-200450104 04 7/12/04 Raymond Stairwell Install 3/4" gate valves on supply line and return line on convector to isolate. Note: Convector need to be isolated when chiller is in operation. Create a slipping hazard at this times. Urgent !!!!! July 10, 2004 July 12, 2004 2 days
FM-200454876 04 9/23/04 (Raymond) !!!URGENT!!! Old Wing/3rd Floor: Locks are not operating correctly; teachers are unable to secure computers, and other audio equipment. September 16, 2004 September 23, 2004 7 days
FM-200455785 04 10/4/04 Raymond Exterior - Parking Lot 1) Repair or replace storm drain grate. Safety Hazard !! September 27, 2004 October 4, 2004 7 days
FM-200456350 04 10/5/04 Raymond First floor room 113 (counselors office) The individual key and the custodian master key are unable to secure the classrooms. It is URGENT that the lock be replaced. Students (IEP's cumulatives and other personal files need urgent security. The cylinder is not operable. October 1, 2004 October 5, 2004 4 days
FM-200453058 04 1/5/05 Raymond URGENT First floor custodial closetd new and old wing Both closets (sinks) are stopped up and it is causing severe flooding overnight. August 20, 2004 January 5, 2005 138 days
FM-200502841 05 3/29/05 Raymond URGENT First floor room 119 toilet Toilet is closed because of leaking. Kids need the toilet. March 17, 2005 March 29, 2005 12 days
FM-200502837 05 3/29/05 Raymond URGENT First floor health suite Repair inoperable water fountain. March 17, 2005 March 29, 2005 12 days
FM-200502843 05 4/11/05 Raymond URGENT First floor girls toilet Three commodes are not working, one commode flush valve is bad; water running. March 17, 2005 April 11, 2005 25 days
FM-200453013 04 6/1/05 (Raymond) !!!URGENT!!! 1st Floor/Custodian Closet: Unclog slop sink; water from a/c drains to the sink, and the sink is clogged. (Water flooding the floor) August 19, 2004 June 1, 2005 286 days
FM-200207261 02 10/13/05 Raymond 1. Asbestos Assessment Reqd. 1st Floor Cafeteria Replace missing ceiling tiles [12x12-inch]. POC: Chandra Murchison Asbestos Code A - Clear for repairs on 5/08/02 DCPS Safety, Leroy Minton Jr.(RE- 5/08/02) May 7, 2002 October 13, 2005 1,255 days
FM-200228270 03 10/13/05 Raymond First floor new wing - near room Drinking fountain leaking from the turn knob. Potential safety hazard causing small flooding and slipping students passing by. April 3, 2003 October 13, 2005 924 days
FM-200448942 04 10/13/05 (Raymond) New Wing/1st Floor, Boys Bathroom: The "U" shape in the boys restroom has a hole in the pipe causing the floor to flood. The turn handle on the drinking fountain is leaking, causing the floor to flood. (Potential safety hazard for students) June 4, 2004 October 13, 2005 496 days
FM-200451146 04 11/14/05 (Raymond) HEALTH CODE VIOLATIONS: !!!CONSTRUCTION NOTICE OF (30) DAYS!!! You are given a 30 day construction notice to provide a hand wash sink at the food handling area. Your present hand sink is not adequate, and properly located. Any questions: Ms. Alma Alston/202-535-2183 Asbestos Code A - Clear for repairs on 08/19/04. DCPS Safety - Leroy Minton Jr. (RG 08/20/04) July 29, 2004 November 14, 2005 473 days
FM-200512258 05 11/14/05 Raymond Boiler Room Boiler #1 and #2 Repair or replace honeywell temperature control. Element isn't housed properly. Per DC Boiler Inspector Urgent !!!! September 11, 2005 November 14, 2005 64 days
FM-200511522 05 11/14/05 Raymond Boiler Room Repair or replace safety valve on Boiler #1 Per Boiler Inspector August 28, 2005 November 14, 2005 78 days
FM-200510942 05 11/14/05 Raymond Chiller Check leaking freon from pressure relief valve. Urgent !!!! August 23, 2005 November 14, 2005 83 days
FM-200508711 05 11/14/05 Raymond Boiler Room Repair or replace chiller. Chiller is not pulling water temp down (chill water side). Urgent !!!! July 26, 2005 November 14, 2005 111 days
FM-200506324 05 11/14/05 Raymond Boiler Room Repair or replace leaking Condenser pump #3, leaking seals. Urgent !!!!! June 6, 2005 November 14, 2005 161 days
FM-200502836 05 11/14/05 Raymond URGENT Second floor staff toilet Has no heat. March 17, 2005 November 14, 2005 242 days
FM-200455453 04 11/14/05 Raymond Outside (parking lot area) There is a tree on the school ground area growing over the fence on to a home owners roof. It is causing a leaking damage to their roof. This is a safety and potential health hazard, it need to be cut down. September 22, 2004 November 14, 2005 418 days
FM-200453061 04 11/14/05 Raymond URGENT Outside roof The outside roof is leaking into the library area causing damage to the computers and teaching supplies. August 20, 2004 November 14, 2005 451 days
FM-200453060 04 11/14/05 Raymond URGENT First floor rooms 117, 119 and main offices Damage ceilings tile, also fire code violation, all leaks are fixed. Asbestos Code A - Clear for repairs on 08/20/04. DCPS Safety - Richard Gibson. (RG) August 20, 2004 November 14, 2005 451 days
FM-200453059 04 11/14/05 Raymond URGENT First floor boys and girls restrooms Ceilings are severely damaged and plastering is falling. Potential safety hazard for students using lavatory. Asbestos Code A - Clear for repairs on 08/20/04. DCPS Safety - Leroy Minton Jr. (RG 08/20/04) August 20, 2004 November 14, 2005 451 days
FM-200446829 04 11/14/05 Raymond Boiler Room Check domestic hot water. No hot water in building. Urgent !!!!! April 19, 2004 November 14, 2005 574 days
FM-200340374 /03 11/14/05 (Raymond) !!!URGENT!!! Asbestos Assessment Required. 1st Floor/Multipurpose Room. Repair or replace damaged wood floor under floor tile, and replace existing broken floor tile once wood floor has been repaired. Asbestos Code A - Abated and cleared for repairs on 11/05/05 per Goel confirmation (LM-09/29/06) Safety Office 202-576-8962. November 17, 2003 November 14, 2005 728 days
FM-200340373 /03 11/14/05 (Raymond) Asbestos Assessment Required. 1st Floor/Multi-purpose Room: Replace broken, and loose pieces of floor tile that was damaged by water leak located on the left side exit area next to the stage. Asbestos Code A - Abated and cleared for repairs on 11/05/05 per Goel confirmation (LM-09/29/06) Safety Office 202-576-8962. November 17, 2003 November 14, 2005 728 days
FM-200337337 03 11/14/05 (Raymond) !!!VERY URGENT!!! Asbestos Assessment Required. New wing/2nd Floor: Pipe leaking behind wall; water up under floor, and floor is buckling. September 11, 2003 November 14, 2005 795 days
FM-200455456 04 11/20/05 Raymond First floor new wing Boys restroom and drinking fountain The "U" shape in the boys restroom has a hole in the pipe, causing the floor to flood. The turn handle on the drinking fountain is leaking, causing the floor to flood. Potential safety hazard for students. September 22, 2004 November 20, 2005 424 days
FM-200502842 05 11/20/05 Raymond URGENT Second and third floor corridor Repair/replace inoperable and leaking water fountain. March 17, 2005 November 20, 2005 248 days
FM-200622879 06 5/19/06 Raymond Boiler Room Door on outside of lock had key broke off in cyclinder, need to be repaired orreplaced. Urgent !!!! May 17, 2006 May 19, 2006 2 days
FM-200618763 06 6/5/06 Second floor, Room 23/Old Wing. "Urgent" The classroom needs electrical upgrading because the teacher cannot operate the computer lab, because the computers keep tripping the circuit breaker. Note: Need to add power poles, this process will require drilling through plaster ceiling. Asbestos Code A - Clear for repairs on 02/22/06. Tidewater - Shamika Parker (RG 02/23/06) SEE ASSESSMENTS February 16, 2006 June 5, 2006 109 days
FM-200510797 05 9/11/06 Raymond Fire code Violation First Floor-Mlissing ceiling tile at entrance of school/security desk-2003 DC Supp. 110.1 Asbestos Code A - Clear for repairs on 08/19/05. DCPS Safety - Richard Gibson (RG 08/19/05) August 19, 2005 September 11, 2006 388 days
FM-200510759 05 9/11/06 Raymond Fire code Violation Second Floor-Missing ceiling tile in 29A-2003 DC Supp. 110.1 Asbestos Code A - Clear for repairs on 08/19/05. DCPS Safety - Richard Gibson (RG) August 18, 2005 September 11, 2006 389 days
FM-200622456 06 10/24/06 Raymond Boiler Room Correct problem when filling condenser side of cooling system with water. Flow problems. Unit not on line. Urgent !!! May 11, 2006 October 24, 2006 166 days
FM-200631043 /06 11/9/06 Raymond 1st Floor And Basement Repair leaking main feed water line to Boiler drains. Urgent !!!!! October 17, 2006 November 9, 2006 23 days
FM-200620271 06 11/15/06 Raymond Boiler Room Repair or replace burner on Boiler #1. Reading purge MD open Boiler still going out on flame failure. Only operational boiler out of two (2). Urgent !!!!! March 23, 2006 November 15, 2006 237 days
FM-200516950 /05 1/8/07 Raymond Boiler Room Repair or replace Boiler #1. Going out daily on low water alarm. Other Boiler is down for repair. Urgent !!!! December 28, 2005 January 8, 2007 376 days
FM-200633142 /06 2/1/07 Cafeteria Area. Mutli-purpose room/cafeteria -Ceiling tiles missing above air vent duct. Mutli-purpose room/cafeteria - Ceiling tile missing above windows. Six tiles 2 by 4 foot. Asbestos Code A - Clear for repairs on 12/12/06. DCPS Safety Richard Gibson (RG) December 12, 2006 February 1, 2007 51 days
FM-200502834 05 2/23/07 Raymond URGENT First floor Asst. Principal and business managers office It is very cold no heat. March 17, 2005 February 23, 2007 708 days
FM-200701397 3/9/07 3/9/07 Location: Room 117 Replace ceiling tile. Asbestos Code A - Cleared for repairs on 03/09/07 by Tidewater (LM?03-09-07) Safety Office 202-576-8962. March 9, 2007 March 9, 2007 0 days