Urgent Closed Repair Requests
Description Open Date Close Date Time Elapsed
FM-200104192 2 2/23/01 9/13/01 REED BOILER ROOM REPAIR OR REPLACE LEAKING SAFETY VALVE ON ALL (3) BOILERS. ASBESTOS CODE A - CLEAR FOR REPAIRS ON 06/15/01 February 23, 2001 September 13, 2001 202 days
FM-200106926 6 3/29/01 10/5/01 REED GROUNDS PRUNE TWELVE (12) TREES ON SURROUNDING SCHOOL GROUNDS. SAFETY HAZARD FOR STUDENTS , STAFF ETC. March 29, 2001 October 5, 2001 190 days
FM-200112142 01 10/7/01 REED FIRST AND GROUND FLOOR AUDITORIUM 1) REPLACE SIX (6) LOCKS ON AUDITORIUM DOOR FOR SAFETY AND SECURITY REASONS October 5, 2001 October 7, 2001 2 days
FM-200119437 01 10/30/01 (REED) 1ST FLOOR/ MAIN CAFETERIA PLEASE SURVEY AND REPAIR CAFETERIA TABLES (FOLDING). SOME HAVE DAMAGE OR MISSING WHEELS, SEAT BOLTS, AND SAFETY TRIM MOLDING. September 7, 2001 October 30, 2001 53 days
FM-200115435 01 11/13/01 MARIE REED FIRST FLOOR STAIRWAY 1) REMOVE HANGING CABLE FROM CEILING AND WALL , IN THE MIDDLE OF THE STAIRWAY. 2) PRINCIPAL REPORT IT AS A SAFETY HAZARD. ASBESTOS CODE A - CLEAR FOR REPAIR ON 07/20/01. LEROY MINTON - SAFETY (202)576-6691 Asbestos Code A - Clear for repairs on 10/02/01 Horne Engineer - Troy Wilcome (RE) July 20, 2001 November 13, 2001 116 days
FM-200110960 01 11/13/01 REED OUTSIDE GROUND CHAMPLAIN STREET CLINIC 1) SURVEY EXTERIOR WALL FOR INSTALLATION OF A MEMORIAL PLAQUE ASBESTOS CODE A - CLEAR FOR REPAIRS ON 09/21/01. LEROY MINTON - SAFETY (202)576-6691 May 24, 2001 November 13, 2001 173 days
FM-200121002 01 12/6/01 (REED) ASBESTOS ASSESSMENT REQ. GROUND FLOOR/ STAIRWAY #2 AN ELECTRICIAN IS NEEDED TO DETERMINE WHY THESE FLOURESENT LIGHTS WILL NOT COME ON. ASBESTOS CODE A - CLEAR FOR REPAIRS ON 10/22/01. LEROY MINTON - SAFETY (202)576-6691 (RG October 4, 2001 December 6, 2001 63 days
FM-200126624 02 1/7/02 (REED) !!VERY URGENT!! 1. ASBESTOS ASSESSMENT REQUIRED. BASEMENT LEVEL: UNSTOP SLOP SINK IN THE POOL AREA: ADBESTOS CODE A - CLEAR FOR REPAIRS ON 01/04/02. HORNE ENGINEERING - EDWARD RODRIGUEZ January 3, 2002 January 7, 2002 4 days
FM-200119851 01 4/23/02 (REED) ASBESTOS ASSESSMENT REQ. 2ND FLOOR/ GIRLS BATHROOM REPLACE A OFF SET FLANGE FOR A FLOOR MOUNTED TOILET IN GIRLS RESTROOM 2ND FLOOR BY STAIRWAY #7. TOILET WILL NOT STAY STATIONARY AND LEAKS. ASBESTOS CODE A - CLEAR FOR REPAIRS ON 09/17/01. LEROY MINTON - SAFETY (202)576-6691 September 14, 2001 April 23, 2002 221 days
FM-200208152 02 5/30/02 (Reed) Fire code violation: Page 1 of 5 Stairwell #8: Door will not open. Asbestos Code A - Clear for repairs on 05/22/02. DCPS Safety - Ronald Edwards (RG 05/23/02) May 22, 2002 May 30, 2002 8 days
FM-200208192 02 5/30/02 (Reed) Fire code violation: 1. Asbestos assessment required. Auditorium: Door near boys bathroom will not open. Asbestos Code A - Clear for repairs on 05/22/02. DCPS Safety - Ronald Edwards (RG 05/23/02) May 22, 2002 May 30, 2002 8 days
FM-200208185 02 5/30/02 (Reed) Fire code volation: Page 3 of 5 Reyes: Need exit signs installed. Asbestos Code A - Clear for repairs on 05/22/02. DCPS Safety - Ronald Edwards (RG 05/23/02) May 22, 2002 May 30, 2002 8 days
FM-200205118 02 6/3/02 (Reed) 1. Asbestos assessment required. 1st floor/health suite: Repair or replace garbage disposal; gargage disposal is old and out of date. Asbestos code A - Clear for repairs on 04/05/02. DCPS Safety - Ronald Edwards (202) 576-6693 (RG 04/08/02 ) March 29, 2002 June 3, 2002 66 days
FM-200208183 02 6/7/02 (Reed) Fire code volation: Page 3 of 5 Thorne: Need exit signs installed. Asbestos Code A - Clear for repairs on 05/22/02. DCPS Safety - Ronald Edwards (RG 05/23/02) May 22, 2002 June 7, 2002 16 days
FM-200208203 02 6/21/02 (Reed) Fire code violation: Page 4 of 5 Gym floor: All doors are not closing properly. Asbestos Code A - Clear for repairs on 05/22/02. DCPS Safety - Ronald Edwards (RG 05/23/02) May 22, 2002 June 21, 2002 30 days
FM-200210523 02 7/12/02 Reed 1. Asbestos Assessment Reqd./Need Exploratory 1st Floor Early Childhood Boys' Restroom 2. Replace a broken toilet that leaks in the boys' restroom in this area. (Needs a hole in the wall Ref: FM-200121003 for prior clearance.) *Special Note: Philip Connolly of Horne Engineering wii need a work authorization to prform to light broscope procedure. DCPS Safety-Sheila R. Howard 07-10-02. POC: Melvin Mack (202)576-8046 June 27, 2002 July 12, 2002 15 days
FM-200205119 02 7/15/02 (Reed) 1. Asbestos assessment required. Ground floor/male locker room: Re-align entrance door near step #2; door is hard to open and close. Asbestos code A - Clear for repairs on 04/05/02. DCPS Safety - Ronald Edwards (202) 576-6693 (RG 04/08/02 ) March 29, 2002 July 15, 2002 108 days
FM-200208204 02 7/16/02 (Reed) Fire code violation: Page 4 of 5 Pool: Locker room door won't open properly. Asbestos Code A - Clear for repairs on 05/22/02. DCPS Safety - Ronald Edwards (RG 05/23/02) May 22, 2002 July 16, 2002 55 days
FM-200212521 02 7/24/02 Reed ****Urgent**** 2nd Floor Boys' Restroom Learning Center 1 Two urinals will not flush---urine has been standing 1 or 2 weeks. Urinals need clearing. July 22, 2002 July 24, 2002 2 days
FM-200205895 02 8/2/02 Reed ****Urgent**** Exterior Grounds Cut down and remove tree at the corner of Champlain & Ontario Road. The tree is leaning and appears ready to fall at any time, possibly onto city property. April 16, 2002 August 2, 2002 108 days
FM-200119849 01 9/11/02 (REED) ASBESTOS ASSESSMENT REQ. 2ND FLOOR/ ARTS AND SCIENCE #3 AND #8 A PLUMMER IS NEEDED TO FURNISH AND INSTALL (2) DECK MOUNT FAUCETS AND SUPPLY LINES. ASBESTOS CODE A - CLEAR FOR REPAIRS ON 09/17/01. LEROY MINTON - SAFETY (202)576-6691 September 14, 2001 September 11, 2002 362 days
FM-200217509 02 10/31/02 Reed ****Urgent**** Ground-Floor Level East & West Exit Doors The panic bars on the double-door exits at both the East & West ends of the hallway are not working properly. The panic bars move, but the doors do not open right away. If there were any emergency calling for evacuation of students and personnel, a timely evacuation would not take place [safety hazard]. September 13, 2002 October 31, 2002 48 days
FM-200203583 02 10/31/02 (Reed) Asbestos Assessment Reqd. 2nd Floor Art Rm. & Special Ed Room Near Step 4 Repair/replace window locks on 6 windows in the above rooms where the windows cannot be locked [safety hazard]. Asbestos Code A - Clear for repairs on 5/16/02 DCPS Safety, Ronald Edwards (RE) February 27, 2002 October 31, 2002 246 days
FM-200217534 02 11/8/02 Reed LC First floor - Exit door Ontario Rd. Repair or replace lock on door. Safety Hazard September 16, 2002 November 8, 2002 53 days
FM-200221382 /02 11/20/02 (Reed) !!!VERY URGENT!!! 1st Floor/Main hallway: Leaking convector fin tube, damaging carpet. (Valves are not holding. November 20, 2002 November 20, 2002 0 days
FM-200201398 02 2/14/03 (REED) ASBESTOS ASSESSMENT REQUIRED GROUND FLOOR LIFE GUARDS ROOM SPARKS ARE COMING FROM THE BREAKER BOX THAT PROVIDES POWER TO THE POOL PUMP ROOM & THERE IS NO ELECTRICITY (CANNOT SEE TO ADD CHLORINE TO THE POOL WATER) ASBESTOS CODE - A - CLEAR FOR REPAIRS ON 01/24/02 RICHARD GIBSON - SAFETY (202)576-5584 (RG)-01/24/02 January 22, 2002 February 14, 2003 388 days
FM-200226659 03 3/11/03 REED Ground Floor - Exit Door Near Teachers Lounge First Floor - Rear Gynasium Door 1. Repair and or replace lock on exit door . 2.Rpair and or replace lock on rear exit gym door . NOTE: you can not lock these doors from the outside , which make them a safety hazard. March 6, 2003 March 11, 2003 5 days
FM-200209248 02 3/26/03 Reed Boiler Room 1.Asbestos assessment required 2. Asbestos assessment require need on standing water in boiler room floor. 3.Pump 7' of standing water from boiler room. Asbestos Code A - Clear for repairs on 06/10/02. DCPS Safety - Leroy Minton Jr. (RG 06/10/02) June 10, 2002 March 26, 2003 289 days
FM-200227394 03 3/28/03 Reed, Marie Ground floor step # 4 pool door Repair or replace lock on door leading from step # 4 to the pool area. Very urgent March 20, 2003 March 28, 2003 8 days
FM-200228487 03 4/24/03 Reed, Marie URGENT Recreation office room Repair or replace the lock and door knob on two (2) doors in the reacreation area. You can not open the exit door. April 9, 2003 April 24, 2003 15 days
FM-200202816 02 5/5/03 (REED) EARLY CHILDHOOD PLAYGROUND: CHECK EQUIPMENT AND INSTALL MISING HAND RAIL AND SAFETY MATS. February 11, 2002 May 5, 2003 448 days
FM-200112479 01 5/5/03 REED FIRST FLOOR CAFETERIA LIVING ROOM 1) CLEAN EXTERIOR WINDOWS AND LEDGES DUE TO BIRDS A LIFT IS NEEDED TO REACH THESE WINDOWS ASBESTOS CODE A - CLEAR FOR REPAIRS ON 02/27/02. DCPS- SAFETY RONALD EDWARDS (202)576-6693 (RG 03/0102) June 5, 2001 May 5, 2003 699 days
FM-200122538 /01 5/5/03 (REED) FENCE TO SOCCER FIELD: PLEASE INSTALL TWO (2) GATES IN SOCCER FIELD NEAR CHAMPLAIN STREET. ASBESTOS CODE A-CLEAR FOR REPAIR BY 10/30/01 DCPS SAFETY SRH October 29, 2001 May 5, 2003 553 days
FM-200331648 03 6/12/03 (Marie Reed) Playground/Field: Trim, and remove very large tree limb for safety reasons. June 12, 2003 June 12, 2003 0 days
FM-200332270 03 6/20/03 Reed, Marie Ground swimming pool area Survey and repair the panic bar and lock on the pool entrance door. Safety hazard June 20, 2003 June 20, 2003 0 days
FM-200332152 03 6/24/03 Reed, Marie Ground floor rec hallway Survey and repair steps. A section of metal step guard is missing. Safety hazard due to sharp edge. June 19, 2003 June 24, 2003 5 days
FM-200332098 03 6/26/03 Reed, Marie - Very urgent First floor entrance door Please supply three (3) entrance door keys. June 19, 2003 June 26, 2003 7 days
FM-200333194 03 7/14/03 (Reed) Grounds/Outside Gym Entrance: Please divert rain water run-off to prevent it from entering the gym area. Code A-clear for repair by Charles Buchanan Safety Compliance/7/14/03 July 11, 2003 July 14, 2003 3 days
FM-200334401 03 8/20/03 Reed, Marie Urgent Ground floor kitchen A plumber is needed to unstop floor drain in kitchen. August 5, 2003 August 20, 2003 15 days
FM-200227863 03 9/26/03 (Reed) !!!URGENT!!! 1st Floor/Main entrance door on 18th street side: Repair or replace lock. March 28, 2003 September 26, 2003 182 days
FM-200337999 03 9/26/03 (Reed) !!!URGENT!!! Cafeteria/Custodial Equipment Room: Key broke off in cylinder of cafeteria closet. September 24, 2003 September 26, 2003 2 days
FM-200337277 03 9/26/03 Reed Outside grounds 18th St. playground Please repair or removed damage sliding board. ASAP danger to children during school hours and after hours. September 11, 2003 September 26, 2003 15 days
FM-200339756 /03 3/3/04 Reed, Marie Ground floor room # 5 W.I.C. clinic Replace lock cylinder. Safety storage area for medicine. October 31, 2003 March 3, 2004 124 days
FM-200445848 04 4/19/04 Reed Ground floor Girls lavatory rec. area Replace a 4" waste line that is cracked located in the the ceiling in this lavatory. This is a safety hazard. Asbestos Code A - Clear for repairs on 03/22/04. Horne Engineering - Bjame Smith (RG 03/30/04) March 25, 2004 April 19, 2004 25 days
FM-200456469 04 10/7/04 (Reed, Marie) Basement/Garage Exit Gate: Broken latch/on gate; unable to secure pad lock. Asbestos Code A - Clear for repairs on 10/05/04. DCPS Safety - Richard Gibson (RG) October 5, 2004 October 7, 2004 2 days
FM-200458228 /04 11/30/04 (Reed) Kitchen: Asbestos Assessment Required. 1st Floor/Stairwell #5: Please re-attach handrails to the walls in the rear gym stairwell. Asbestos Code A - Clear for repairs on 11/15/04. DCPS Safety - Richard Gibson (RG) November 12, 2004 November 30, 2004 18 days
FM-200458383 /04 1/6/05 M. Reed Boiler Room Repair or replace sump pump, Boiler Room flooded. Urgent !!!! November 17, 2004 January 6, 2005 50 days
FM-200455837 04 6/8/05 Reed Ground stairwell # 8. Please re-align exterior door. Also furnish and replace door closure. Asbestos Code A - Clear for repairs on 09/27/04. DCPS Safety Leroy Minton Jr. (RG 09/28/04) September 27, 2004 June 8, 2005 254 days
FM-200457305 /04 6/8/05 Reed, Marie Ground floor pool area stairwell leading to female locker room Re-attach handrail and replace four (4) broken handrail brackets. NOTE: Handrail repair needed ASAP due to slippery steps in the pool area. Asbestos Code A - Clear for repairs on 10/22/04. DCPS Safety - Richard Gibson (RG) October 22, 2004 June 8, 2005 229 days
FM-200456318 04 6/9/05 Reed, Marie Second floor Special Ed Mrs. Cock-Burn Best Re-attach sliding curtain support rail to block wall. Need ASAP due to location of the window in Special Ed. classroom. Asbestos Code A - Clear for repairs on 10/01/04. DCPS Safety - Richard Gibson (RG) October 1, 2004 June 9, 2005 251 days
FM-200452590 04 6/20/05 Reed, Marie FIRE CODE VIOLATION: Second floor Art room door is off track. Asbestos Code A - Clear for repairs on 08/17/04. DCPS Safety - Leroy Minton Jr. (RG 08/18/04) August 13, 2004 June 20, 2005 311 days
FM-200506896 05 7/6/05 (REED) Ground Floor - Pool-Male Locker Room 1) Repair or Replace the lock on the door. Note: Due to the safety of the public and students (This door will not lock) June 17, 2005 July 6, 2005 19 days
FM-200106930 0 3/29/01 7/27/05 REED AUDITORIUM, GYM & STAIRWAY BASEMENT AN ELECTRICIAN IS NEEDED TO COME AND COMPLETE WORK ON LIGHTS. THIS WORK ORDER IS BEING RESUBMITTED. Asbestos Code A - Clear for repairs on 04/16/02. DCPS Safety - Richard Gibson March 29, 2001 July 27, 2005 1,581 days
FM-200505718 05 9/8/05 ( REED ) URGENT!! First Floor - Stairwell 2 1) Re-attach one handrail to the wall. (Safety Hazard) May 19, 2005 September 8, 2005 112 days
FM-200505297 05 9/12/05 ( MARIE REED ) Urgent!!! Ground Floor - Male Locker Room 1) Unstop the sink in the custodial closet. May 9, 2005 September 12, 2005 126 days
FM-200513513 05 10/5/05 (Marie Reed) "Emergency" Kitchen Area. Repair leaking pipe underneath sink. Note: This is a safety hazard. October 5, 2005 October 5, 2005 0 days
FM-200513553 05 10/19/05 Reed Very Urgent First Floor-Early Childhood Replace the lock on the custodial closet door. October 6, 2005 October 19, 2005 13 days
FM-200514551 /05 10/24/05 (Reed) "Urgent" Ground floor, Men's Lockerroom. Please survey and repair electrical power failure to (Fluorescent Lights) in the shower area. October 24, 2005 October 24, 2005 0 days
FM-200336688 03 12/14/05 Reed, Marie Ground pool area A mason is needed to replace ceramic tile through out pool area deck and pool edges. This is a safety hazard. September 2, 2003 December 14, 2005 834 days
FM-200335047 03 12/14/05 Reed, Marie Prune a total of eight (8 ) trees on the school grounds. Note: Some of the trees are leaking onto the school wall and some are a safety hazars due to low hanging limbs. August 13, 2003 December 14, 2005 854 days
FM-200331828 03 12/14/05 Reed, Marie Ground soccer field Due to erosion, area need to be re-surface )black top) and fill in with soil. Please survey and repair. Safety Hazard ASAP June 16, 2003 December 14, 2005 912 days
FM-200224238 03 12/14/05 (Reed) Ground - Near UPO area Re-pave or correct the water drainage problem near UPO entrance door. Large area of standing water. Safety hazard January 21, 2003 December 14, 2005 1,058 days
FM-200212764 02 12/14/05 Reed Grounds/18th Street Side--Basketball Court Cut down remaining standing portion of fallen tree, cut portion that had already fallen and remove all [safety hazard]. July 24, 2002 December 14, 2005 1,239 days
FM-200122537 /01 12/14/05 (REED) PLAYGROUND AREA: REPLACE WOODEN CROSS TIES ON PLAYGROUND AREAS. (SAFETY HAZARD) October 29, 2001 December 14, 2005 1,507 days
FM-200226766 03 12/20/05 Reed, Marie Garage A plumber is need to find out why there is a leak from a sewage line in the garage. This is a health problem and also a safety hazard. Back area of garage. A plumber is needed to come and replace or repair a busted or cracked drain linein the ceiling. It is leaking. March 7, 2003 December 20, 2005 1,019 days
FM-200459427 04 12/20/05 REED First Fl. Health Suite Replace WAX RING on wall mounted commode Asbestos Code A - Clear for repairs on 12/09/04. DCPS Safety - Richard Gibson (RG) December 9, 2004 December 20, 2005 376 days
FM-200515024 05 12/20/05 Urgent: Unstop the shower drains in the male shower room. November 3, 2005 December 20, 2005 47 days
FM-200452586 04 12/27/05 Reed, Marie FIRE CODE VIOLATION: Ground floor Exterior door near elevator is off track. Asbestos Code A - Clear for repairs on 08/17/04. DCPS Safety - Leroy Minton Jr. (RG 08/18/04) August 13, 2004 December 27, 2005 501 days
FM-200452585 04 12/27/05 Reed, Marie FIRE CODE VIOLATION: Ground floor Gym has ceiling breaches. Asbestos Code A - Clear for repairs on 08/17/04. DCPS Safety - Leroy Minton Jr. (RG 08/18/04) August 13, 2004 December 27, 2005 501 days
FM-200516027 05 2/2/06 Reed Boiler Room Unstop drain in boiler room between pump #2 and #3. Water on floor of boiler room. Urgent !!!!! December 4, 2005 February 2, 2006 60 days
FM-200121004 01 2/3/06 (REED) ASBESTOS ASSESSMENT REQ. 1ST AND GROUND FLOOR/ EARLY CHILDHOOD BOYS RESTROOM,STAIRS #5 EXIT DOOR IN EARLY CHILDHOOD WILL NOT OPEN AND EXIT DOOR ON STAIRWAY #5 IS HARD TO CLOSE. ASBESTOS CODE A - CLEAR FOR REPAIRS ON 10/22/01. LEROY MINTON - SAFETY (202)576-6691 (RG October 4, 2001 February 3, 2006 1,583 days
FM-200124578 01 2/3/06 REED, MARIE SWIMMING POOL AREA AND MEZANNENE INSTALL LIGHT FIXTURES AROUND POOL AND UPPER MEZANNENE AREA. CONTRACTOR: DERRICK HOWARD 301-203-2804 FM-200124583 ASBESTOS CODE A-CLEAR FOR REPAIR ON 12/6/01 BY DCPS SAFETY CHARLES E. BUCHANAN WORK ORDER FM-200124583 IS A CODE A. December 5, 2001 February 3, 2006 1,521 days
FM-200124583 01 2/3/06 MARIE REED SWIMMING POOL AREA ASBESTOS ASSESSMENT REQUIRED 1) REPLACE LIGHT FIXTURES IN POOL AREA. POC: PROSPERITY CONTRACTORS DERRICK HOWARD - 301-203-2804 FM-200124578 ASBESTOS CODE A-CLEAR FOR REPAIR ON 12/6/01 BY DCPS SAFETY CHARLES E. BUCHANAN WORK ORDER FM-200124578 IS A CODE A. December 6, 2001 February 3, 2006 1,520 days
FM-200113268 01 2/3/06 REED OUTSIDE GROUNDS FLAMMABLE TOOL SHED 1) SUPPLY AND INSTALL GATE VALVE WATER CONTINUES TO RUN SIZE UNKNOWN DUE TO PIPE INSULATION ASBESTOS CODE A - CLEAR FOR REPAIRS ON 09/04/01. LEROY MINTON - SAFETY (202)576-6691 (RG) June 13, 2001 February 3, 2006 1,696 days
FM-200121130 01 2/3/06 REED SWIMMING POOL DECK SAND AND FINISH BENCHES AROUND THE POOL DECK PERIMETER. ASBESTOS CODE A - CLEAR FOR REPAIRS ON 12/18/01. SHEILA HOWARD - SAFETY (202) 576-8962 (RG) October 5, 2001 February 3, 2006 1,582 days
FM-200515025 05 2/8/06 Urgent: Survey and install a condensation line on walk in refrigerator in the kitchen on the basement floor. Asbestos Code A - Clear for repairs on 11/08/05. Tidewater - Philp Connolly (RG 11/09/05) November 3, 2005 February 8, 2006 97 days
FM-200453028 04 2/13/06 Reed All exterior lights fun under pass through building Furnish 12 cases of fluorescent lamps. (30 cach) . Furnish exterior light for safety and security 4 cases. August 20, 2004 February 13, 2006 542 days
FM-200512925 05 2/16/06 Reed Ground Floor-Men Locker Room Re-align door and replace door closure (Safety Hazard) due to the pool location. Asbestos Code A - Clear for repairs on 09/21/05. Tidewater - Rodney Distance (RG 09/22/05) September 20, 2005 February 16, 2006 149 days
FM-200514550 /05 3/17/06 (Reed) "Urgent" Ground floor, Men's Lockerroom. Asbestos Assessment Required. Please survey and repair (1) electrical wall outlet and receptacle box. They have deteriorated due to moisture in the locker and shower room area. Note: This is a safety hazard. Asbestos Code A - Clear for repairs on 11/01/05. Tidewater - Tony Marcolin (RG 11/02/05) October 24, 2005 March 17, 2006 144 days
FM-200458530 /04 3/27/06 Reed First floor stairwell # 1 Please re-align stairwell exterior door. Asbestos Code A - Clear for repairs on 11/19/04. DCPS Safety - Richard Gibson (RG 11/19/04) November 19, 2004 March 27, 2006 493 days
FM-200449298 04 3/27/06 REED LC chiller room URGENT Please check # 1 and # 2 multi-stack chiller units and compressors, cannot operate # 1 chiller, unit problably need to be charged. System need to be in operation June 14, 2004 March 27, 2006 651 days
FM-200328951 03 3/27/06 (Marie Reed) Asbestos Assessment Required. 2nd Floor/Art Room: Please re-align classroom door so it will close and lock. Asbestos Code A-clear for repair by DCPS Safety Ofice Charles Buchanan on 5/12/03 April 22, 2003 March 27, 2006 1,070 days
FM-200449961 04 3/27/06 Reed, Marie First floor stairwell # 2 P{lease repair or replace panic bar on exterior door. Safety Hazard Asbestos Code A-clear for repair by DCPS Charles Buchanan on 7/08/04 July 1, 2004 March 27, 2006 634 days
FM-200450226 04 3/27/06 URGENT Furnish (6) six boxes of 30 amp fuses for replacement on blown fuses for multi-stack A/C unit. July 14, 2004 March 27, 2006 621 days
FM-200450261 04 3/27/06 URGENT Check operation of boiler room sump pump Boiler room flooded about 2" of water on floor July 14, 2004 March 27, 2006 621 days
FM-200227393 03 3/27/06 Reed, Marie First floor main entrance, early childhood and gym balcony Re-align three (3) exits door so they will open and close properly. Very urgent. March 20, 2003 March 27, 2006 1,103 days
FM-200447513 04 3/27/06 Reed Grounds 18th St. playground and also Ontario Rd. Please replace missing and damage safety mats. This repair need attention ASAP. May 5, 2004 March 27, 2006 691 days
FM-200443827 04 3/27/06 (Reed) !!!EMERGENCY!!! Exterior/Champlain Street Side. Electrical pole has fallen to the ground; electrical wires are exposed. (Concerned for student/staff safety) February 9, 2004 March 27, 2006 777 days
FM-200443190 04 3/27/06 (Reed) 1st Floor/Small Cafeteria: Welder is needed to survey, and secure four (4) tables. (These tables are a Safety hazard to the staff, and students. January 23, 2004 March 27, 2006 794 days
FM-200455836 04 3/27/06 Reed Ground corridor entrance Please re-align exterior door in corridor area. (located near the elevator) Asbestos Code A - Clear for repairs on 09/27/04. DCPS Safety Leroy Minton Jr. (RG 09/28/04) September 27, 2004 March 27, 2006 546 days
FM-200455839 04 3/27/06 Reed Second floor art room and science room Please re-align two (2) classrooms doors. Asbestos Code A - Clear for repairs on 09/27/04. DCPS Safety Leroy Minton Jr. (RG 09/28/04) September 27, 2004 March 27, 2006 546 days
FM-200458773 /04 3/27/06 Reed Boiler Room Repair or replace seal in hot water circulating pump #2 is leaking. Urgent !!!!! November 29, 2004 March 27, 2006 483 days
FM-200459432 04 3/27/06 REED GROUNDS-PLAYAREA 18TH ST. SIDE REPAIR METAL BENCH. SAFETY HAZARD!!!!!!!!!!!!! December 9, 2004 March 27, 2006 473 days
FM-200619591 06 4/3/06 Urgent First Floor-Custodial Closet Repair or replace the lock on the closet door near the cafeteria March 7, 2006 April 3, 2006 27 days
FM-200202826 02 4/11/06 (REED) 1. ASBESTOS ASSESSMENT REQUIRED. 18TH STREET PLAYGROUND: REPLACE CUT-OFF VALVE WHICH CONTROLS OUT-SIDE WATER FOUNTAIN. (SAFETY HAZARD/WATER ICE) CODE A- CLEAR FOR REPAIR BY HORNE ENGINEER( Z MAHMOOD ) ON3/01/02 (CEB) February 11, 2002 April 11, 2006 1,520 days
FM-200514569 /05 5/5/06 (Reed) "Urgent" Second floor, Ms. Johnson. Please survey and repair (3) fluorescent lights in classrrom area. October 24, 2005 May 5, 2006 193 days
FM-200619588 06 5/5/06 Urgent First Floor Corridor-Survey and update all light fixtures March 7, 2006 May 5, 2006 59 days
FM-200505745 05 5/5/06 ( REED ) URGENT!!!! Ground Floor - Gym 1) Repair or Replace two exit lights. May 19, 2005 May 5, 2006 351 days
FM-200621472 06 5/16/06 Grounds- 18th St. Playground Please survey and replace safety mats on the playground. They were vandalized. The playground is out of service because of missing mats. April 19, 2006 May 16, 2006 27 days
FM-200212768 02 5/22/06 Reed 1. Asbestos Assessment Reqd. 1st Floor Early Childhood Lavatory 2. Repair hole in wall left by plumbers when doing previous repair. Code A Clear for Repair by DCPS Safety-Leroy Minton, Jr. DCPS Safety-Sheila R. Howard 07-26-02. July 24, 2002 May 22, 2006 1,398 days
FM-200513552 05 6/2/06 Reed Very Urgent Grounds-Playground Area Repair brick wall on the early childhood playground October 6, 2005 June 2, 2006 239 days
FM-200513551 05 6/2/06 Reed Very Urgent Grounds-18th St. Playground Cut and remove fallen tree. <Safety Hazard> October 6, 2005 June 2, 2006 239 days
FM-200629543 06 9/29/06 Reed Boiler Room Repair or replace defected safety relief valve on boiler #1 September 15, 2006 September 29, 2006 14 days
FM-200516865 /05 9/29/06 Reed Boiler Room Repair or replace defected safety relief valve on #2 low pressure hot water Boiler. This valve is malfunctioning causing hot water from the interior of the Boiler to constantly dump onto the floor direty by the gas line, this is a dangerous situation. December 22, 2005 September 29, 2006 281 days
FM-200623330 06 11/8/06 Second Floor-Ceiling tile missing in library Asbestos Code A - Clear for repairs on 05/25/06 DCPS Safety - Richard Gibson (RG) May 25, 2006 November 8, 2006 167 days
FM-200458451 /04 12/12/06 Reed Boiler Room Repair or replace feed water regulator on city water line, feed waters to Boilers #1,#2 and #3. Sending to much water to Boilers. Urgent !!!!! November 18, 2004 December 12, 2006 754 days
FM-200632369 /06 1/15/07 Gym - Ceiling tile falling from the ceiling, repair or replace Asbestos Code A - Clear for repairs on 11/21/06. DCPS Safety - Richard Gibson (RG ) November 21, 2006 January 15, 2007 55 days
FM-200625558 06 1/15/07 Ground floor, Gymnasium & Rec. Area. Replace ceiling tile due to flooding. Asbestos Code A - Clear for repairs on 07/13/06. DCPS Safety - Richard Gibson (RG) July 11, 2006 January 15, 2007 188 days
FM-200458265 /04 1/15/07 Reed First floor auditorium and gym Please replace ceiling tile (50 pieces). Asbestos Code A - Clear for repairs on 11/15/04. DCPS Safety - Richard Gibson (RG) November 15, 2004 January 15, 2007 791 days
FM-200452973 04 1/15/07 Reed, Marie Ground floor gym Replace thirty (30) pieces of damage or missing ceiling tile. Asbestos Code A - Clear for repairs on 08/19/04. DCPS Safety - Richard Gibson (RG 08/19/04) August 19, 2004 January 15, 2007 879 days
FM-200224009 03 1/15/07 Reed, Marie Damage ceiling tile list that need replacing. 1.) Recreation office 2.) Auditorium 3.) Gym 4.) Library 5.) And other places Asbestos Code A - Clear for repairs on 01/23/03. DCPS Safety - Leroy Minton Jr. (RG 01/27/03) January 15, 2003 January 15, 2007 1,461 days
FM-200510609 05 1/26/07 REED chiller room Urgent Check and correct the following problems with multi-stack units (chiller) 1. Chiller # 1 - 6 compressors not working or not working properly. 2. Chiller # 2 - 8 compressors not working or not working properly. August 17, 2005 January 26, 2007 527 days
FM-200517179 06 1/31/07 Front & Rear of Building/Play Ground Area. Replace safety tile underneath playground equipment. January 5, 2006 January 31, 2007 391 days
FM-200700680 07 3/12/07 Penthouse, Mechanical Room - AHU #11 Repair or replace sleeve covering to the pulley end of the shaft on air handle unit #11; Air handle unit metal sleeve split in halt; unit is needed to heat Learning Center on the 2nd floor, also several classrooms on the 2nd floor. Urgent !!!!! February 21, 2007 March 12, 2007 19 days
FM-200515829 /05 3/22/07 18th St., Side, Playground Area. "Urgent" Please repair stone wall on the 18th St., side playground in several areas. November 28, 2005 March 22, 2007 479 days