Urgent Closed Repair Requests
Description Open Date Close Date Time Elapsed
FM-200116923 01 10/7/01 RIVER TERRACE PRINCIPAL OFFICE CLOSET ASBESTOS ASSESSMENT REQUIRED UNLOCK CLOSET DOOR. CODE A-CLEAR FOR REPAIR BY DCPS SAFETY ER 8/10/01. October 5, 2001 October 7, 2001 2 days
FM-200121898 /01 10/29/01 (RIVER TERRACE) !!URGENT!! FIELD/GOLD POST: GOLD POST BROKEN, WELD LEFT CORNER OF GOLD POST BEFORE MOUNTING. !!FOOTBALL GAME SCHEDULED FOR FRIDAY, OCTOBER 19, 2001!! October 18, 2001 October 29, 2001 11 days
FM-200201072 02 1/17/02 (RIVER TERRACE) FIRE CODE VIOLATION: PAGE (2 OF 2) 1ST FLOOR/ROOM #15: FIRE SAFETY GLASS MISSING FROM DOOR. January 15, 2002 January 17, 2002 2 days
FM-200210060 02 6/25/02 River Terrace ****Urgent**** Exterior/Roof Area Replace three broken skylights. June 24, 2002 June 25, 2002 1 day
FM-200217068 02 9/12/02 (River Terrace) !!!VERY URGENT!!! 1st Floor: Intermediate Side/Boys bathroom: Hand bowls and urinals stopped up. "NEED REPAIRS BEFORE VOTER ELECTION DAY/09/10/02" September 9, 2002 September 12, 2002 3 days
FM-200212779 02 6/2/03 (River Terrace) 1. Asbestos assessment required. Make two keys for doors to all classrooms and resource rooms. Asbestos Code A - Cleared for repairs on 04-28-03 by Leroy Minton Jr. (LM/04-08-03) the Safety Office 202-576-8962. July 19, 2002 June 2, 2003 318 days
FM-200448179 04 5/22/04 (River Terrace) !!!URGENT!!! 1st Floor/Nurse Suite: Repair commode, water continues to run. May 20, 2004 May 22, 2004 2 days
FM-200501348 05 3/17/05 River Terrace Repair plumming in girls and boys Restroom by office 1. sinks , 2. toilets, and 3. faucets. Asbestos Code A - Clear for repairs on 02/10/05. DCPS Safety - Charles Buchanan (RG 02/11/05) February 8, 2005 March 17, 2005 37 days
FM-200504060 05 4/19/05 (River Terrace) "Urgent" First floor. Fabricated and install (2) window guards for computer room. April 14, 2005 April 19, 2005 5 days
FM-200126642 02 10/24/05 (RIVER TERRACE) ASBESTOS ASSESSMENT REQUIRED BOYS BATHROOM NEAR RM #13; TOILET IN RM #6 & WATER FOUNTAIN OUSIDE RM #23 1) BOYS BATHROOM NEAR RM #13 NEEDS THE HAND-BOWL REMOUNTED ONTO THE WALL 2) FLUSH VALVE UNIT ON TOILET IN ROOM #6 NEED TO BE REPLACED 3) WATER FOUNTAIN OUTSIDE ROOM #23 NEEDS TO BE UNCLOGGED & THE TRAP REPLACED ASBESTOS CODE A - CLEAR FOR REPAIRS ON 02/28/02. DCPS- SAFETY RONALD EDWARDS (202)576-6693 (RG 03/0102) January 3, 2002 October 24, 2005 1,390 days
FM-200504061 05 10/24/05 (River Terrace) "Urgent" !!!! Attempted Break-In !!!! Exterior of Building. Secure (2) window gaurds in rear of building. Note: Damage was due to attempted break-in. April 14, 2005 October 24, 2005 193 days
FM-200332932 03 10/24/05 (River Terrace) !!!VERY URGENT!!! Asbestos Assessment Required. Canopy at front entrance - stone work is disintegrating due to water damage. Water is leaking at rear of canopy and running down the entrance doors whenever there is rain. Source of leak needs to be located and repaired. All stone/concrete on canopy needs to be repaired or replaced. July 1, 2003 October 24, 2005 846 days
FM-200501513 05 10/24/05 RIVER-TERRACE EMERGENCY Three front entrance doors and two entrance doors to the cafeteria are in need of immediately replacement due to a critical dry rotting / rusting problem. The rusting problem endangers building security. Code A-clear for repair by DCPS Charles BUchanan on 10/20/05 February 10, 2005 October 24, 2005 256 days
FM-200114243 6/28/01 2/3/06 RIVER TERRACE FIRST FLOOR THROUGHOUT BUILDING 1) ASBESTOS ASSESSMENT REQUIRED 2) INSTALL THIRTY (30) ELECTRICAL BALLASTS IN VARIOUS LOCATIONS NOTE: DURING ELECTRICAL MODERNIZATION IN 1995-1996, ENTIRE BUILDING WAS REWIRED BUILDING STAFF WILL PERFORM WORK ASBESTOS CODE A - CLEAR FOR REPAIRS ON 02/28/02. DCPS- SAFETY RONALD EDWARDS (202)576-6693 (RG 03/0102) June 28, 2001 February 3, 2006 1,681 days
FM-200118487 01 2/3/06 (RIVER TERRACE) ASBESTOS ASSESSMENT REQ. OUTSIDE SEWER DRAIN BEHIND SCHOOL NEEDS TO BE CLEANED OUT. ASBESTOS CODE A - CLEAR FOR REPAIR ON 08/30/01. SYLVIA GRIMES - SAFETY (202)576-5583 August 27, 2001 February 3, 2006 1,621 days
FM-200619718 06 3/9/06 "Urgent" Girls' Restroom. Repair ruptured cold water line on "Bradley" basin. Note: The school staff were able to isolate leak. March 9, 2006 March 9, 2006 0 days
FM-200449822 04 7/21/06 River Terrace Boiler Room Repair leaking 1/2" copper cold water supply line for commode and hand bowl for maintenance staff office. Note: Health hazard exist due to isolation of line. URGENT !!!!! June 25, 2004 July 21, 2006 756 days
FM-200450009 04 1/27/07 (River Terrace) !!EMERGENCY!!! Asbestos Assessment Required Roof Area: Water leaking through roof; opening is large enough to see the outside. Please respond as soon as possible, as more rain storms are ahead. Asbestos Code A - Clear for repairs on 07/08/04. DCPS Safety - Charles Buchanan (RG 07/08/04) July 8, 2004 January 27, 2007 933 days