Urgent Repair Requests Closed in January 2007 (557)
| School |
Description |
Open Date |
Close Date |
Time Elapsed |
| Brent Elementary School |
FM-200513947 /05 1/3/07 Brent Very Urgent Second Floor-Stairwell Handicap rail is loose, secure it to the wall for safety Asbestos Code A - Clear for repairs on 10/19/05. Tidewater - Tony Marcolin (RG 10/20/05) |
October 18, 2005 |
January 3, 2007 |
442 days |
| Brent Elementary School |
FM-200513948 /05 1/3/07 Brent Very Urgent Second Floor-Rm. 202 Repair floor tile by univent, it's buckling and cracking Asbestos Code A - Clear for repairs on 10/19/05. Tidewater - Tony Marcolin (RG 10/20/05) SEE ASSESSMENTS |
October 18, 2005 |
January 3, 2007 |
442 days |
| Park View ES |
FM-200448471 04 1/4/07 Parkview Boiler Room Repair or replace McDonnell a & Miller 150 pump centrol on Boiler #4. Note: Broken mercury bulb in control box. Urgent !!!! |
May 25, 2004 |
January 4, 2007 |
954 days |
| Johnson JHS |
FM-200506524 05 1/4/07 ( JOHNSON ) URGENT!!! Fourth Floor - Room 419 1) Replace a large broken out window |
June 8, 2005 |
January 4, 2007 |
575 days |
| Bancroft Elementary School |
FM-200621329 06 1/4/07 First Floor-Hallway (primary wing)-Replace fire doors or replace wire mesh safety glass Asbestos Code A - Clear for repairs on 04/18/06. Tidewater - Thomas Johnson (RG 04/20/06) |
April 13, 2006 |
January 4, 2007 |
266 days |
| Truesdell Elementary |
FM-200620285 06 1/4/07 Truesdell Boiler room URGENT!!!!!!!! Repair # 2 burner, burner control linkage malfunction. NO HEAT #1 Burner is down. |
March 24, 2006 |
January 4, 2007 |
286 days |
| Terrell Mc ES |
FM-200622685 06 1/4/07 At M. C. Terrell ES - hard plastic under the skylight glass is falling (about 80 ft high) onto hallway 7. A very dangerous condition. |
May 10, 2006 |
January 4, 2007 |
239 days |
| Ludlow-Taylor ES |
FM-200631558 /06 1/4/07 Ludlow-Taylor Boiler Room Replace refactory on Boiler #1 rear corner. Safety Issue |
October 31, 2006 |
January 4, 2007 |
65 days |
| Maury Elementary School |
FM-200513545 05 1/4/07 Maury Very Urgent First Floor-Classroom 3 Replace broken window pane approx. 11x19 |
October 6, 2005 |
January 4, 2007 |
455 days |
| Eastern High School |
FM-200619611 06 1/4/07 Urgent Furnish and install wire mesh glass in room 153, and several pieces for fire ext. boxes. Note: If they can furnish some extra pieces we will install, 6 pieces that fit classroom wire mesh glass on sides. |
March 7, 2006 |
January 4, 2007 |
303 days |
| Whittier Elementary School |
FM-200621118 06 1/4/07 Whittier Boiler Room Repair or replace smoke detector for #1 Boiler, it seems to be stuck/ This is a safety Hazard. |
April 7, 2006 |
January 4, 2007 |
272 days |
| Cardozo High School |
FM-200448062 04 1/4/07 CARDOZO SHS Urgent Replace packing gland plate on domestic hot water heating circulating pump. |
May 18, 2004 |
January 4, 2007 |
961 days |
| Aiton Elementary School |
FM-200442464 04 1/5/07 (Aiton) !!!URGENT!!! Asbestos Assessment Required. 1st Floor/Main Office: Install outlets on left hand side of wall, as you enter office. Asbestos Code A - Clear for repairs on 01/08/04. Horne Engineering - Troy Wilcome (RG 01/12/04) |
January 9, 2004 |
January 5, 2007 |
1,092 days |
| Browne Junior High School |
FM-200626937 06 1/5/07 1) Girls Locker Room Closed And Posted Danger - 2) Cut off all electric to area Note: See FM-200626934 & FM-200626929 |
August 7, 2006 |
January 5, 2007 |
151 days |
| Bruce-Monroe Elementary School |
FM-200516902 /05 1/5/07 Bruce-Monroe Old Wing,Boiler Room Repair or replace #150, automatic water feeder on Boiler #3. Feeder is not putting water in boiler properly. Urgent !!!!! |
December 23, 2005 |
January 5, 2007 |
378 days |
| Noyes Elementary School |
FM-200627380 06 1/5/07 First Floor/Broken Safety Glass Across From Rm. 121 (Auditorium) Asbestos Code A - Clear for repairs on 08/15/06. Tidewater - Tony Marcolin (RG 08/17/06) |
August 14, 2006 |
January 5, 2007 |
144 days |
| Aiton Elementary School |
FM-200450162 04 1/5/07 Aiton Second and fourth floor A/C need to be replace in: 1 - second floor - bookroom 2 - second floor teacher lounge 3 - fourth floor room 405, 402, 403 and 410 Asbestos Code A - Clear for repairs on 07/22/04. DCPS Safety - Leroy Minton Jr. (RG 07/28/04) |
July 13, 2004 |
January 5, 2007 |
906 days |
| Raymond Elementary School |
FM-200516950 /05 1/8/07 Raymond Boiler Room Repair or replace Boiler #1. Going out daily on low water alarm. Other Boiler is down for repair. Urgent !!!! |
December 28, 2005 |
January 8, 2007 |
376 days |
| Shaw JHS |
FM-200618903 06 1/8/07 Shaw Boiler Room Correct temp. flooding problem in boiler room. No electrical power to building. Note: Approx. three (3") inch of water on floor at present. Urgent !!!!! |
February 21, 2006 |
January 8, 2007 |
321 days |
| Anacostia Senior High School |
FM-200515207 05 1/8/07 Urgent: Replace door closers on the second fl. gym bldg., cafeteria, third fl. fire doors and south wing second fl. fire doors. Asbestos Code A - Clear for repairs on 11/10/05. Tidewater - Tony Marcolin (RG 11/16/05) |
November 8, 2005 |
January 8, 2007 |
426 days |
| Adams Elementary School |
FM-200622041 06 1/8/07 Asbestos Assessment Required. First floor, Room 102A. Replace damaged floor tile. Asbestos Code D - on 5/02/06. Tidewater - Thomas Johnson (RG 05/10/06) Asbestos Code A - Abated and cleared for repairs on 07/19/06 by Leroy Minton Jr per Motir confirmation (LM/07-19-06) Safety Office 202-576-8962. |
May 1, 2006 |
January 8, 2007 |
252 days |
| Brent Elementary School |
FM-200514285 /05 1/9/07 (Brent) Urgent First floor, Exihibit Hall. Replace solid wood door with a door with a window, room is becoming a classroom. |
October 22, 2005 |
January 9, 2007 |
444 days |
| Bruce-Monroe Elementary School |
FM-200631477 10/29/06 1/9/07 Bruce-Monroe Boiler Room Repair or replace pneumatic controls thru-out building. Parts to system are missing, disconnected etc. Building is extremly hot. Urgent !!!!! |
October 29, 2006 |
January 9, 2007 |
72 days |
| Cardozo High School |
FM-200627596 06 1/9/07 Building/Furnish safety wire glass 11 inches by 11 inches for replacement in hall fire doors. Asbestos Code A - Clear for repairs on 08/16/06. Tidewater - Carlos Vera (RG 08/17/06) |
August 15, 2006 |
January 9, 2007 |
147 days |
| Rudolph Elementary School |
FM-200513980 /05 1/9/07 (Rudolph) "Urgent" First floor, New Wing/Room 108. Repair or Replace broken windows. |
October 19, 2005 |
January 9, 2007 |
447 days |
| Ballou Senior High School |
FM-200515243 05 1/9/07 Asbestos Assessment Required. Armory Area. Replace broken window in classroom. Note: This a safety issue. Asbestos Code A - Clear for repairs on 11/09/05. Tidewater - Rodney Distance (RG 11/14/05) |
November 8, 2005 |
January 9, 2007 |
427 days |
| Noyes Elementary School |
FM-200633510 /06 1/9/07 Auditorium Lobby - Broken Window Due to Vandalism Asbestos Code A - Clear for repairs on 12/22/06. DCPS Safety - Richard Gibson (RG) |
December 22, 2006 |
January 9, 2007 |
18 days |
| Bruce-Monroe Elementary School |
FM-200458539 /04 1/9/07 Bruce-Monroe Hallway near auditoreium Replace exterior door, door has 15 bullet holes init. Asbestos Code A - Clear for repairs on 11/23/04. DCPS Safety - Leroy Minton Jr. (RG 11/23/04) |
November 19, 2004 |
January 9, 2007 |
781 days |
| Amidon Elementary School |
FM-200513756 /05 1/10/07 Amidon Urgent Outside-Parking Lot Install a gate in the parking lot area, teachers have no where to park, there are other cars on the lot and some are stolen. |
October 12, 2005 |
January 10, 2007 |
455 days |
| Amidon Elementary School |
FM-200513755 /05 1/10/07 Amidon Urgent Outside-Blacktop Repair a Large cast iron gate, it fell, and the door came off. |
October 12, 2005 |
January 10, 2007 |
455 days |
| Cleveland Elementary School |
FM-200505421 05 1/11/07 (Cleveland) Emergency First floor, Main Office. Install aluminum transition strip. (Threshold Plate) Note: tripping hazard Asbestos Code A - Clear for repairs on 05/17/05. DCPS Safety - Richard Gibson (RG) |
May 12, 2005 |
January 11, 2007 |
609 days |
| Bowen Elementary School |
FM-200333361 03 1/11/07 Anthony Bowen - Learning Center # 1 & 2 1. Install 2 spot coolers in the open space areas Asbestos Code A - Cleared for repairs on 07-17-03 by Leroy Minton Jr (LM/07-17-03) Safety Office 202-576-8962. |
July 17, 2003 |
January 11, 2007 |
1,274 days |
| Backus Middle School |
FM-200513752 /05 1/11/07 Backus Urgent Install a new A/C unit in the window of rooms 304, and 316 |
October 12, 2005 |
January 11, 2007 |
456 days |
| Backus Middle School |
FM-200512538 05 1/11/07 Backus Urgent Door by room 101 is broken and need to be repaired/replaced Code A-clear for repair by DCPS Charles Buchanan on 9/16/05 |
September 14, 2005 |
January 11, 2007 |
484 days |
| Bancroft Elementary School |
FM-200630441 06 1/11/07 Girls Restroom- Replace partition door. Asbestos Code A - Clear for repairs on 10/04/06 DCPS Safety - Richard Gibson (RG) |
October 4, 2006 |
January 11, 2007 |
99 days |
| Bowen Elementary School |
FM-200509657 05 1/11/07 Bowen Boiler Room Repair or replace Boiler room back door. Door has came from frame. Urgent !!!!! Asbestos Code A - Clear for repairs on 08/09/05 by Leroy Minton Jr. (LM/08*09-05) Safety Office 202-576-8962. |
August 7, 2005 |
January 11, 2007 |
522 days |
| Backus Middle School |
FM-200453430 04 1/11/07 Backus exterior first by the big parking lot Repair door the hinge reattach and panic bar. Asbestos Code A - Clear for repairs on 08/27/04. DCPS Safety - Leroy Minton (RG 08/27/04) |
August 26, 2004 |
January 11, 2007 |
868 days |
| Backus Middle School |
FM-200453184 04 1/11/07 Backus First, Second Floor - Main Entrance - 104 and 205 1) Re-align entrance door on Main Lobby, Room 104 and Storage Room 205., so Locksmith can secure door. Asbestos Code A - Clear for repairs on 08/27/04. DCPS Safety - Leroy Minton (RG 08/27/04) |
August 23, 2004 |
January 11, 2007 |
871 days |
| Bunker Hill Elementary School |
FM-200449622 04 1/11/07 Bunker Hill Library Unbolt and remove metal shelves from all walls in the library. Asbestos Code A - Clear for repairs on 06/25/04. DCPS Safety - Richard Gibson (RG) |
June 22, 2004 |
January 11, 2007 |
933 days |
| Bunker Hill Elementary School |
FM-200459637 /04 1/11/07 Bunker Hill Lunchroom Need 20 ceiling tiles replace, tile is still falling from ceiling. Asbestos Code A - Clear for repairs on 12/15/04. DCPS Safety - Richard Gibson (RG) |
December 15, 2004 |
January 11, 2007 |
757 days |
| Gibbs Elementary School |
FM-200226171 03 1/11/07 Gibbs First floor - 103 Kgn 102, 101, & hallway Mildew smell do to wet ceiling from leaking roof, Kids ie getting sick. Asbestos Code A-clear for repair by DPCS Safety on 2/27/03 Charles Buchanan |
February 25, 2003 |
January 11, 2007 |
1,416 days |
| Bowen Elementary School |
FM-200223008 /02 1/11/07 (Bowen) !!!VERY URGENT!!! 1. Asbestos assessment required. Through-out the building: Check all exit doors, leading to hallways and classrooms. Student injured by door. Asbestos Code A - Clear for repairs on 12/23/02. Horne Engineering - Bipin Nanavaty (RG 12/24/02) |
December 20, 2002 |
January 11, 2007 |
1,483 days |
| Simon Elementary School |
FM-200514977 05 1/12/07 Repair or replace handrail, it is leaning and broken. The metal pole hand rail can fall off and may cause injury to children. It is located at the front side of the school bldg. outside on the Mississippi ave side where the steps are. |
November 2, 2005 |
January 12, 2007 |
436 days |
| Stanton Elementary School |
FM-200217123 02 1/12/07 Stanton ****Urgent**** Throughout Building Need locks rekeyed throughout building [complete staff turnover in transformation school since August 1, 2002]. A lot of keys are missing to classrooms & offices and there has been at least one theft since the changeover. |
September 10, 2002 |
January 12, 2007 |
1,585 days |
| Johnson JHS |
FM-200619915 06 1/12/07 Very Urgent Second floor-exterior walkway Patio near library railings are loose. Weld-Student almost fell off of patio |
March 14, 2006 |
January 12, 2007 |
304 days |
| Deal Junior High School |
FM-200618275 06 1/12/07 Field-Cut foul pole to ground level, safety issue |
February 3, 2006 |
January 12, 2007 |
343 days |
| Dunbar High School |
FM-200633919 /07 1/12/07 First Floor - Gym - Exit door frame is loose from the wall Asbestos Code A - Cleared for repairs on 12/10/07 by Leroy Minton Jr. (LM/12-10-07) Safety Office 202-576-8962. |
January 10, 2007 |
January 12, 2007 |
2 days |
| Anacostia Senior High School |
FM-200619092 06 1/12/07 Asbestos Assessment Required. Replace 40 pieces of asbestos floor tile in gym hallway. Asbestos Code D -on 03/03/06 Tidewater - Thomas Johnson (RG 03/07/05) Asbestos Code A - Abated and cleared for repairs on 09/28/06 per Goel confirmation (LM-09/29/06) Safety Office 202-576-8962. |
February 23, 2006 |
January 12, 2007 |
323 days |
| John Burroughs ES |
FM-200456024 04 1/12/07 Burroughs Lower level boys restroom Behind toilet grates are broken and rusted. Code A - clear for repairs as of 10/12/04 custodian say work is done Safety Sylvia. |
September 29, 2004 |
January 12, 2007 |
835 days |
| Hart Middle School |
FM-200619567 06 1/12/07 Very Urgent Back Of Building By Gas Meters-Need A Welder to weld the door to the shed so students can't get in. |
March 7, 2006 |
January 12, 2007 |
311 days |
| Reed LC |
FM-200632369 /06 1/15/07 Gym - Ceiling tile falling from the ceiling, repair or replace Asbestos Code A - Clear for repairs on 11/21/06. DCPS Safety - Richard Gibson (RG ) |
November 21, 2006 |
January 15, 2007 |
55 days |
| Reed LC |
FM-200458265 /04 1/15/07 Reed First floor auditorium and gym Please replace ceiling tile (50 pieces). Asbestos Code A - Clear for repairs on 11/15/04. DCPS Safety - Richard Gibson (RG) |
November 15, 2004 |
January 15, 2007 |
791 days |
| Reed LC |
FM-200452973 04 1/15/07 Reed, Marie Ground floor gym Replace thirty (30) pieces of damage or missing ceiling tile. Asbestos Code A - Clear for repairs on 08/19/04. DCPS Safety - Richard Gibson (RG 08/19/04) |
August 19, 2004 |
January 15, 2007 |
879 days |
| Reed LC |
FM-200224009 03 1/15/07 Reed, Marie Damage ceiling tile list that need replacing. 1.) Recreation office 2.) Auditorium 3.) Gym 4.) Library 5.) And other places Asbestos Code A - Clear for repairs on 01/23/03. DCPS Safety - Leroy Minton Jr. (RG 01/27/03) |
January 15, 2003 |
January 15, 2007 |
1,461 days |
| Reed LC |
FM-200625558 06 1/15/07 Ground floor, Gymnasium & Rec. Area. Replace ceiling tile due to flooding. Asbestos Code A - Clear for repairs on 07/13/06. DCPS Safety - Richard Gibson (RG) |
July 11, 2006 |
January 15, 2007 |
188 days |
| Jefferson JHS |
FM-200633337 /06 1/16/07 First Floor - Library - Install locks on the entrance doors (wood). Asbestos Code "A" cleared for repairs 12/28/06--DCPS Safety/Tidewater |
December 15, 2006 |
January 16, 2007 |
32 days |
| Jefferson JHS |
FM-200517028 /05 1/16/07 Third floor, Girls' restroom. "Urgent" Repair or Replace sink that was broken off of wall. Asbestos Code A - Clear for repairs on 01/04/06. Tidewater - Roger Small (RG 01/05/06) |
December 29, 2005 |
January 16, 2007 |
383 days |
| Jefferson JHS |
FM-200516959 /05 1/16/07 Urgent: Repair the water fountains on the first floor-gym area and by the library. |
December 28, 2005 |
January 16, 2007 |
384 days |
| Jefferson JHS |
FM-200515174 05 1/16/07 Urgent: Re-hang sinks on the second and third floor in the girls restroom. The sinks are broken off the wall. |
November 7, 2005 |
January 16, 2007 |
435 days |
| Jefferson JHS |
FM-200514625 /05 1/16/07 Jefferson Very Urgent Third Floor-Girls Restroom Re-mount sink on the wall, the water is turned off but it still leaks a little. Asbestos Code A - Clear for repairs on 03/03/06 Tidewater - Henry Addison (RG 03/07/05) |
October 25, 2005 |
January 16, 2007 |
448 days |
| Jefferson JHS |
FM-200511548 05 1/16/07 Jefferson Urgent Second Floor-Teachers Bathroom Men bathroom: toilet stopped up and urinal stopped up |
August 29, 2005 |
January 16, 2007 |
505 days |
| Jefferson JHS |
FM-200509077 05 1/16/07 (Jefferson)) "Urgent" Need grounds staff to remove and dispose of tree that was struck by lightning. The tree is currently blocking sidewalk and laying on the fence. |
July 29, 2005 |
January 16, 2007 |
536 days |
| Jefferson JHS |
FM-200506462 05 1/16/07 ( JEFFERSON ) VERY URGENT!!!! Second Floor - Boys Restroom 1) Water is leaking from the ceiling, may be a broken pipe. Asbestos Code A - Clear for repairs on 06/08/05. Tidewater - Rodney Distance (RG 06/08/05) |
June 7, 2005 |
January 16, 2007 |
588 days |
| Jefferson JHS |
FM-200505864 05 1/16/07 (Jefferson) "Urgent" Drain pipe. Repair drain pipe there is a hole in it and water is leaking inside storage room and down hallway. |
May 23, 2005 |
January 16, 2007 |
603 days |
| Bancroft Elementary School |
FM-200331657 03 1/16/07 Bancroft !! URGENT !! First Floor - Classroom 1. Repair and or replace window in classroom #121- located in the 1921 orginal bldg . Asbestos Code A - Clear for repairs on 06/12/03 Horne Engeering - Philp Connolly (RG 06/16/03) |
June 12, 2003 |
January 16, 2007 |
1,314 days |
| Bancroft Elementary School |
FM-200449242 04 1/16/07 Bancroft Basement music room bathroom First and third floor boys bathroom (main bldg) Replace 1 paper towel dispenser. Replace 1 toilet paper dispenser.(music room) Replace 2 broken toilet paper dispenser ( boys bathroom main bldg). Asbestos Code A - Clear for repairs on 06/14/04. DCPS Safety - Richard Gibson (RG) |
June 10, 2004 |
January 16, 2007 |
950 days |
| Bancroft Elementary School |
FM-200513782 /05 1/16/07 Bancroft Very Urgent Ground Floor-Stairwell Leading To The First By Cafeteria Repair/Replace window guard, the latch is broken |
October 12, 2005 |
January 16, 2007 |
461 days |
| Bancroft Elementary School |
FM-200617827 06 1/16/07 Urgent: Second Floor-Rm. 310 (primary wing) Replace 2-3 ballast because the lights have a shortage in them |
January 25, 2006 |
January 16, 2007 |
356 days |
| Bancroft Elementary School |
FM-200618367 06 1/16/07 First Floor-Principals' Office Urgent Secure window from the top and the bottom; jammed and cannot be properly closed. Asbestos Code A - Clear for repairs on 02/08/06. Tidewater - Carlos Vera (RG 02/09/06) |
February 7, 2006 |
January 16, 2007 |
343 days |
| Bancroft Elementary School |
FM-200630951 /06 1/16/07 First Floor - Girl's Bathroom (main bldg.) - Re-attach sink to the wall #3, sharp edges a child may get hurt. Asbestos Code A - Clear for repairs on 10/20/06. Tidewater - Kenneth Belton (RG 10/24/06) |
October 18, 2006 |
January 16, 2007 |
90 days |
| Rudolph Elementary School |
FM-200215590 02 1/16/07 Rudolph ****Urgent**** 1st Floor Classrooms 1. Need window guard welded on the outside at the boys' restroom on the first floor. Window allows easy accss from the ground and it is urgent that the guard is put in place. 2. Ten (10) additional window guards are needed on the remaining 1st floor classroom windows, especially where the computers are kept. All these windows are easily accessible from the ground. |
August 26, 2002 |
January 16, 2007 |
1,604 days |
| Benning Elementary School |
FM-200626262 06 1/16/07 1st Floor- Main Office Replace door checks in the main office, and shave one door (it swells and will not open). Asbestos Code A - Cleared for repairs on 08/02/06 by Tidewater/Kenny Long (LM-08/02/06) Safety Office 202-576-8962. |
July 24, 2006 |
January 16, 2007 |
176 days |
| Wilson High School |
FM-200454903 04 1/17/07 Wilson, W. Basement cafeteria Repair or replace broken eating tables. Asbestos Code A - Clear for repairs on 09/16/04. DCPS Safety - Richard Gibson (RG) |
September 16, 2004 |
January 17, 2007 |
853 days |
| Orr Elementary School |
FM-200516456 /05 1/17/07 Urgent: Start the hot water heater in the boiler room on the first floor. |
December 14, 2005 |
January 17, 2007 |
399 days |
| Woodson High School |
FM-200458133 04 1/17/07 Woodson, H.D. Seventh floor principals office Light will not come on. Asbestos Code A - Clear for repairs on 11/10/04. DCPS Safety - Richard Gibson (RG) |
November 9, 2004 |
January 17, 2007 |
799 days |
| Murch Elementary School |
FM-200515502 /05 1/17/07 Urgent: Install a new commercial grade value door closer, the door to the kaufman wing-pre-k area will not close properly and cannot be locked. Asbestos Code A - Clear for repairs on 12/05/05. Tidewater - Tony Marcolin (RG 12/08/05) |
November 16, 2005 |
January 17, 2007 |
427 days |
| Murch Elementary School |
FM-200515069 05 1/17/07 Emergency: Repair or replace outside lights around the building. There are only three lights working. (Safety Issue) |
November 3, 2005 |
January 17, 2007 |
440 days |
| Murch Elementary School |
FM-200226107 03 1/17/07 Murch First floor room 100 For safety to evealuate mole. Damage resulting from roof leaking after recent snow storm. Asbestos Code A - Clear for repairs on 02/26/03. Horne Engineering - Edward Rodriguez (RG 02/27/03) |
February 24, 2003 |
January 17, 2007 |
1,423 days |
| Duke Ellington School |
FM-200455841 04 1/17/07 Ellington, Duke Exterior front courtyard For pole lamp, global cover needs replacing, lamp wire and fixtures is j=hanging from lamp fixture. Pole lamp in front courtyard near handicapp ramp. Asbestos Code A - Clear for repairs on 09/27/04. DCPS Safety Leroy Minton Jr. (RG 09/28/04) |
September 27, 2004 |
January 17, 2007 |
842 days |
| Beers Elementary School |
FM-200501328 05 1/17/07 Beers Second floor bldg. 3 lobby Metal cage has been pulled down by a child. Survey this - safety hazard. URGENT Asbestos Code A - Clear for repairs on 06/27/05. Tidewater - Kenny Long (RG 07/05/05) |
February 8, 2005 |
January 17, 2007 |
708 days |
| Gage-Eckington ES |
FM-200339282 /03 1/17/07 First floor corridor Have several lights out do to bulbs being unable to screw in(socet broken) Urgent Asbestos Code A - Clear for repairs on 10/22/03. DCPS Safety - Richard Gibson (RG 10/22/03) Duplicate request. |
October 22, 2003 |
January 17, 2007 |
1,183 days |
| Barnard Elementary School |
FM-200619184 06 1/17/07 This is an urgent request. Bathroom door in the second floor by room 210 coming off the wall. The door is hanging and is a potential hazard for the students and staff on the second floor. Asbesto Code A - Clear for repairs on 03/10/06 Tidewater - Roger Small (RG 03/13/06) |
February 23, 2006 |
January 17, 2007 |
328 days |
| Orr Elementary School |
FM-200213468 02 1/17/07 (Orr) 1. Asbestos assessment required. 1st Floor Gym/Multipurpose room: Light fixture damaged. Asbestos Code A - Clear for repairs on 08/05/02. DCPS Safety - Leroy Minton Jr. (RG 08/06/02) |
August 2, 2002 |
January 17, 2007 |
1,629 days |
| Barnard Elementary School |
FM-200515047 05 1/18/07 Urgent: Repair the lower window in room 113. |
November 3, 2005 |
January 18, 2007 |
441 days |
| Hine JHS |
FM-200514501 /05 1/18/07 Hine Emergency Third Floor-Stair Landing Repair window, it's hanging out of frame. Safety Hazard. |
October 24, 2005 |
January 18, 2007 |
451 days |
| Meyer Elementary School |
FM-200502277 05 1/18/07 Lunchroom table welding repair (URGENT NEED). Students have no other space to sit for meals. |
March 4, 2005 |
January 18, 2007 |
685 days |
| Stoddert ES |
FM-200217613 02 1/18/07 (STODDERT) ****Urgent**** Building Exterior Two (2) wooden columns need to be replaced. ONe of them is badly rotting out from the bottom. |
September 17, 2002 |
January 18, 2007 |
1,584 days |
| Eastern High School |
FM-200450764 04 1/18/07 Eastern Cafeteria Repair or replace metal -wood cafeteria tables; that was damaged due to a fight and big uproar in cafeteria. tables are broken and need to be bolted back down to floor- tables and seating benches are mounted together - seating and tables are safety hazard. |
July 26, 2004 |
January 18, 2007 |
906 days |
| Aiton Elementary School |
FM-200202846 02 1/18/07 (AITON) ASBESTOS ASSESSMENT REQUIRED 1ST FLOOR CAFETERIA WELD BROKEN LEG ON CAFETERIA TABLE ASBESTOS CODE A - CLEAR FOR REPAIRS ON 02/12/02. RICHARD GIBSON - SAFETY (202)576-5584 |
February 12, 2002 |
January 18, 2007 |
1,801 days |
| Murch Elementary School |
FM-200619121 06 1/18/07 Very Urgent Remove two trees that fell outside the kaufman wing. This is an area where kids play. |
February 27, 2006 |
January 18, 2007 |
325 days |
| Murch Elementary School |
FM-200516894 /05 1/18/07 Urgent: R/R the lock to the Main Entrance Door on the first floor. It is broken due to normal wear and tear the door cannot be secured during the day but it can be chained up at night. |
December 22, 2005 |
January 18, 2007 |
392 days |
| Bunker Hill Elementary School |
FM-200329895 03 1/18/07 Bunker Hill Second floor boys restroom middle wing Secure window guard (Safety Hazard). Child seen on roof outside of window, said he went out to retrieve toy. |
May 9, 2003 |
January 18, 2007 |
1,350 days |
| Stoddert ES |
FM-200453235 04 1/18/07 Stoddert First floor girls restroom Swing door in toilet area have been knock down, need someone to replace door hedge. Requesting an electrican to replace ballast on stairway # 3 by the boys side of the gym and by the girls side of the gym. Asbestos Code A - Clear for repairs on 08/24/04. DCPS Safety - Richard Gibson. (RG 08/24/04) |
August 24, 2004 |
January 18, 2007 |
877 days |
| Benning Elementary School |
FM-200617469 06 1/19/07 Urgent: Office-Repair or replace front door Asbestos Code A - Clear for repairs on 01/17/06. Tidewater - Henry Addison (RG 01/17/06) |
January 17, 2006 |
January 19, 2007 |
367 days |
| Stoddert ES |
FM-200453240 04 1/19/07 Stoddert URGENT First floor Lunch room Ventilation fan put into oven area because oven is tripping fire alarm when in use. Two times in one day. |
August 24, 2004 |
January 19, 2007 |
878 days |
| Benning Elementary School |
FM-200515181 05 1/19/07 Urgent: R/R door in the Pre-K area, its broken. Asbestos Code A - Clear for repairs on 11/10/05. Tidewater - Rodney Distance (RG 11/14/05) |
November 7, 2005 |
January 19, 2007 |
438 days |
| Stoddert ES |
FM-200449804 04 1/19/07 Stoddert Replace beam infront of building. URGENT |
June 25, 2004 |
January 19, 2007 |
938 days |
| Stoddert ES |
FM-200449213 04 1/19/07 (Stoddert) !!!VERY URGENT!!! 1st Floor/Room #102: Sparks appears when lights are turned on. Replaced with brand new ballast, and lights will not come on. Restore electrical power to lights. |
June 10, 2004 |
January 19, 2007 |
953 days |
| Anacostia Senior High School |
FM-200501815 05 1/19/07 Anacostia High School - Bathroom Survey Second Floor - Girls Restroom - Re-secure Partition Door First Floor - Girls Restroom - Install ( 2 ) Toilet Partition Doors Asbestos Code A - Clear for repairs on 02/22/05. DCPS Safety - Richard Gibson (RG) |
February 22, 2005 |
January 19, 2007 |
696 days |
| Hardy Middle School |
FM-200445891 04 1/20/07 (Hardy) !!!VERY URGENT!!! 1st Floor/Main Office Hallway: No lights, very dark. (Reason unknown) |
March 26, 2004 |
January 20, 2007 |
1,030 days |
| Winston EC |
FM-200513400 05 1/20/07 (Winston) "Urgent" Asbestos Assessment Required. Need help installing wall dividers in 7th & 8th grade learning center to close in classes. |
August 23, 2005 |
January 20, 2007 |
515 days |
| Winston EC |
FM-200507626 05 1/20/07 URGENT!!!! Roof Check the roof and the flashing around the cooling tile. |
July 11, 2005 |
January 20, 2007 |
558 days |
| Winston EC |
FM-200451375 04 1/20/07 Winston #1,2 Center/Room#137 and #146 Unstop drain on Air Handler Unit,drain is clog up, leaking bad. Room #137 Air Handler Unit leaking. Urgent !!!! |
August 3, 2004 |
January 20, 2007 |
900 days |
| Winston EC |
FM-200448885 04 1/20/07 Winston URGENT Grounds Replace drainage grate in driveway of upper parking lot. 8" opening safety hazard. |
June 4, 2004 |
January 20, 2007 |
960 days |
| Winston EC |
FM-200445527 04 1/20/07 (Winston) Asbestos Assessment Required. 4th Floor SPECIAL ED. OFFICE URGENT ROOF LEAK!!! - TWO (2) AREAS OF STANDING WATER LEAKING INTO OFFICE. DRAINS ARE OPEN Asbestos Code A - Clear for repairs on 03/19/04. Horne Engineering - Philp Connolly (RG 03/23/04) |
March 17, 2004 |
January 20, 2007 |
1,039 days |
| Winston EC |
FM-200444258 04 1/20/07 (Winston) URGENT!!! 3rd Fl. Computer lab: 1) Cover exposed wires- corner conduit cap missing.(metal) |
February 19, 2004 |
January 20, 2007 |
1,066 days |
| Winston EC |
FM-200337355 03 1/20/07 Winston Replace damaged ceiling tiles throughout the building at Winston Educational Center. Replace non-asbestos ceiling tiles marked with green paint throughout building. Asbestos Code A - Clear for repairs on 09/11/03. DCPS Safety - Saeed Rahim (RG 0912/03) |
September 12, 2003 |
January 20, 2007 |
1,226 days |
| Winston EC |
FM-200331808 03 1/20/07 Winston !!!VERY URGENT!!! Exteroir 1. Garage drains backing up and flooding . |
June 13, 2003 |
January 20, 2007 |
1,317 days |
| Winston EC |
FM-200220210 /02 1/20/07 (Winston) !!!VERY URGENT!!! 3rd Floor/Kitchen: 1) Floor drain backed up. |
October 29, 2002 |
January 20, 2007 |
1,544 days |
| Winston EC |
FM-200216070 02 1/20/07 Winston ****Urgent**** 1. Asbestos Assessment Reqd. 1st Floor Learning Centers 1 & 2 2. There is a leak coming through the ceiling at the stairwell area near the parking lot. Asbestos Code A - Clear for repairs on 08/29/02. Honre Engineering - Sam Ebrahim (RG 08/30/02) |
August 28, 2002 |
January 20, 2007 |
1,606 days |
| Wilson High School |
FM-200511865 05 1/20/07 Wilson,W Very Urgent First Floor-Gym Area (near girls bathroom) Repair or Repair exit door, there is a piece at the bottom missing that holds the door in place. had to lock it so that it wont hurt no one. |
September 6, 2005 |
January 20, 2007 |
501 days |
| Wilson High School |
FM-200502456 05 1/20/07 First floor Door leading into gym lobby Replace door leading into gym lobby. The replacement door is on site. Asbestos Code A - Clear for repairs on 03/14/05. DCPS Safety - Leroy Minton Jr. (RG 03/14/05) DUPLICATE REQUEST |
March 9, 2005 |
January 20, 2007 |
682 days |
| Wilson High School |
FM-200336643 03 1/20/07 Wilson, W. Third floor stairway exit # 2 Repair or replace fire door do not close properly. Asbestos Code A - Clear for repairs on 08/25/04. DCPS Safety - Leroy Minton Jr. (RG 08/26/04) |
September 2, 2003 |
January 20, 2007 |
1,236 days |
| Wilson High School |
FM-200336641 03 1/20/07 Wilson, W. Basement book room Repair or replace door can not be secured properly. Asbestos Code A - Clear for repairs on 08/25/04. DCPS Safety - Leroy Minton Jr. (RG 08/26/04) |
September 2, 2003 |
January 20, 2007 |
1,236 days |
| Wilson High School |
FM-200224222 03 1/20/07 (Wilson, W.) !!!EMERGENCY!!! 1. Asbestos assessment required. 1st Floor Breezeway/Library: Entrance/exit door, office door, and window pane, damaged due to vandalism. Doors are severely damaged to the point where they are splintered. Asbestos Code A- Cleared for repairs on 01-25-03 by Leroy Minton Jr (LM/01-15-04) Safety Office. 202-576-8962. |
January 21, 2003 |
January 20, 2007 |
1,460 days |
| Wilson High School |
FM-200216374 02 1/20/07 Wilson,W. ****Urgent**** Asbestos Assessment Reqd. Ground Floor Room 18/Armory 1. Remove existing wiring which is no longer connected to electric power; and the long bolts [now a safety concern] that were left behind after the driver training equipment was removed; 2. Remove the tables that were left behind. Asbestos Code C Abasement Required Asbestos Code A - Abated and cleared for repairs on 09-23-02 (LM/10--08-02) per Leroy Minton Jr. confirmation. Safety Office (202-576-8962) |
September 3, 2002 |
January 20, 2007 |
1,600 days |
| Wilson High School |
FM-200207601 02 1/20/07 Wilson,W. 1. Asbestos Assessment Reqd. 1st Floor Room 124 Repair/replace office door. The door needs adjustment [old and cannot be properly secured]. Asbestos Code A - Clear for repairs on 06/07/02. DCPS Safety - Ronald Edwards (RG 06/10/02) |
May 13, 2002 |
January 20, 2007 |
1,713 days |
| Wilson High School |
FM-200206224 02 1/20/07 Wilson,W. 1. Asbestos Assessment Reqd. 1st floor girl's Locker Room Adjust the exit door in back of the girl's locker room. The door does not close properly. Asbestos Code A - Clear for repairs on 04/23/02. DCPS Safety - Ronaid Edwards (RG 04/23/02) |
April 22, 2002 |
January 20, 2007 |
1,734 days |
| Wilson High School |
FM-200204131 02 1/20/07 (Wilson, W.) Asbestos Assessment Reqd. Basement Exit doors behind the girls locker room do not close properly. Asbestos Code A - Clear for repairs on 06/07/02. DCPS Safety - Ronald Edwards (RG 06/10/02) |
March 8, 2002 |
January 20, 2007 |
1,779 days |
| Wilkinson ES |
FM-200459941 /04 1/20/07 Wilkinson Second floor 180 boys bathroom Need to repair or replace bathroom door on partition, broken off. Asbestos Code A - Clear for repairs on 12/21/04. DCPS Safety - Richard Gibson (RG) |
December 21, 2004 |
January 20, 2007 |
760 days |
| Wilkinson ES |
FM-200455606 04 1/20/07 Wilkinson URGENT Outside basketball court Need to scrape old burn metal off mplayground area. Tripping hazard for children. |
September 24, 2004 |
January 20, 2007 |
848 days |
| Wilkinson ES |
FM-200455604 04 1/20/07 Wilkinson URGENT Outside playground area Need to replace wood brench, wood is rotten and pull apart, danger to students. One or moore planks about 20 feet. |
September 24, 2004 |
January 20, 2007 |
848 days |
| Ballou Senior High School |
FM-200501344 05 1/20/07 (Ballou) furnish and install sink in restroom,thrid reqest for this violation(infant cntr.)URGENT. |
January 31, 2005 |
January 20, 2007 |
719 days |
| Ballou Senior High School |
FM-200630620 06 1/20/07 SERVICE:EGRES DOORS 1ST.FL.NORTH,THIS IS THE MAIN ENTRANCE TO THE BUILDING-URGENT. |
October 6, 2006 |
January 20, 2007 |
106 days |
| Patterson ES |
FM-200630989 /06 1/20/07 Third Floor - Stairwells C & D - Replace ceiling tile need scafold. DUPLICATE REQUEST Asbestos Code A - Clear for repairs on 10/19/06. DCPS Safety - Richard Gibson (RG) |
October 19, 2006 |
January 20, 2007 |
93 days |
| Patterson ES |
FM-200506104 05 1/20/07 (Patterson, W.B.) "Emergency" Asbestos Assessment Required. Second floor exterior door, Elmira Street side. Replace broken glass pane in doors Asbestos Code A - Clear for repairs on 05/31/05. DCPS Safety - Richard Gibson (RG) |
May 31, 2005 |
January 20, 2007 |
599 days |
| Turner Elementary School |
FM-200630184 06 1/20/07 1st Floor- Girls Bathroom Replace 2 stall doors. Asbestos Code A - Clear for repairs on 09/28/06. DCPS Safety - Richard Gibson (RG) |
September 27, 2006 |
January 20, 2007 |
115 days |
| Turner Elementary School |
FM-200619483 06 1/20/07 Very Urgent Water fountain outside rooms 310 and 311 are stoped up and smelling. |
March 6, 2006 |
January 20, 2007 |
320 days |
| Turner Elementary School |
FM-200619224 06 1/20/07 Exterior of Building. "Emergency" Repair concrete wall that is deteorating where grate is connected to fence leading to outside cafeteria fence and entrance; the curb along the fence line. Note: This is a safety Hazard. |
February 28, 2006 |
January 20, 2007 |
326 days |
| Turner Elementary School |
FM-200517198 06 1/20/07 Very Urgent: Roof-Repair or replace the security lights facing the playground area. The lights are not working. |
January 6, 2006 |
January 20, 2007 |
379 days |
| Turner Elementary School |
FM-200332742 03 1/20/07 (Turner) !!!VERY URGENT!!! Kitchen/Cafeteria: Drain pipe leaking water profusely from this sink, this sink is used for washing trays, and other items of cafeteria use. |
June 30, 2003 |
January 20, 2007 |
1,300 days |
| Tubman Elementary School |
FM-200506791 05 1/20/07 (Tubman) First, Second and Third floors. Repair or Replace water coolers Note: Summer School Project. Asbestos Code A - Clear for repairs on 06/16/05. DCPS Safety - Richard Gibson (RG) |
June 14, 2005 |
January 20, 2007 |
585 days |
| Tubman Elementary School |
FM-200502871 05 1/20/07 TUBMFAN First fl. East Corridor Replace Broken Window (Wire Mesh) Glass Asbestos Code A - Clear for repairs on 04/22/05. DCPS Safety - Leroy Minton Jr. (RG 04/25/05) |
March 17, 2005 |
January 20, 2007 |
674 days |
| Tubman Elementary School |
FM-200220244 /02 1/20/07 (Tubman) !!!URGENT!!! 2nd Floor/Computer lab: Key broke in cylinder; request lock and keys. |
October 29, 2002 |
January 20, 2007 |
1,544 days |
| Stevens Elementary School |
FM-200514838 /05 1/20/07 Urgent-Bathrooms thru-out the building need washers to hold faucets in place. |
October 31, 2005 |
January 20, 2007 |
446 days |
| Stevens Elementary School |
FM-200514018 /05 1/20/07 Stevens Urgent Second Floor-# 26 Replane door handle on classroom # 26 & repair or replace solid wooding door (needs to be put on the hinges.) Code A-clear for repair by DCPS Charlles Buchanan on 10/24/05 |
October 20, 2005 |
January 20, 2007 |
457 days |
| Stevens Elementary School |
FM-200452730 04 1/20/07 Stevens Basement Work permit needed for painting basement floors. Asbestos Code A - Clear for repairs on 08/25/04. DCPS Safety - Leroy Minton Jr. (RG 08/26/04) |
August 16, 2004 |
January 20, 2007 |
887 days |
| Stevens Elementary School |
FM-200216254 02 1/20/07 Stevens 1. Asbestos Assessment Reqd. Room #3 Replace defective closet door in room #3. Asbestos Code A - Clear for repairs on 09/05/02. DCPS Safety - Leroy Minton Jr. (RG 09/06/02) DUPLICATE |
August 30, 2002 |
January 20, 2007 |
1,604 days |
| Stevens Elementary School |
FM-200216252 02 1/20/07 Stevens 1. Asbestos Assessment Reqd. 3rd Floor Room 36 2. Ceiling breaches in closet; 3. Breaches in plaster wall in closet; and 4. Paint entry door--paint is peeling off the door. Asbestos Code A - Clear for repairs on 09/05/02. DCPS Safety - Leroy Minton Jr. (RG 09/06/02) DUPLICATE |
August 30, 2002 |
January 20, 2007 |
1,604 days |
| Stanton Elementary School |
FM-200445566 04 1/20/07 (Stanton) Annex/Room #A-1: Room has two (2) broken windows, please repair. (Student injured) |
March 18, 2004 |
January 20, 2007 |
1,038 days |
| Stanton Elementary School |
FM-200331142 03 1/20/07 Stanton URGENT Third floor Stairwell across from room 303 a window is out. |
June 3, 2003 |
January 20, 2007 |
1,327 days |
| Birney Elementary School |
FM-200505287 05 1/20/07 ( BIRNEY ) URGENT!!! Basement, First, Second, and Third Floor 1) Repair/Replace water coolers, they are not working. |
May 9, 2005 |
January 20, 2007 |
621 days |
| Shepherd ES |
FM-200204244 02 1/20/07 SHEPHERD FIRST FLOOR GIRL'S BATHROOM AT PLAYGROUND HAS MISSING FLOOR TILES THAT CAUSE PEOPLE TO TRIP PRIORITY. Asbestos Code A - Clear For Repairs On 03/25/02. DCPS Safety - Sheila R Howard (RG 03/26/02) |
March 7, 2002 |
January 20, 2007 |
1,780 days |
| Oyster Elementary School |
FM-200515412 /05 1/20/07 Urgent Front doors at the main entrance-Repair exit door it is hard to close, may need adjustments to the door closer. Asbestos Code A - Clear for repairs on 11/14/05. DCPS Safety - Richard Gibson (RG 11/14/05) |
November 14, 2005 |
January 20, 2007 |
432 days |
| Oyster Elementary School |
FM-200514494 /05 1/20/07 Oyster Boiler Room Supply 50 gallons of Glycol for cooling and heating units. Unit is completely out. Urgent !!!! DUPLICATE |
October 23, 2005 |
January 20, 2007 |
454 days |
| Oyster Elementary School |
FM-200513985 /05 1/20/07 Oyster Urgent First Floor-Cafeteria Repair exit door it is hard to close, may need adjustments to the door closer. Asbestos Code A - Clear for repairs on 10/20/05. DCPS Safety - Richard Gibson (RG) |
October 19, 2005 |
January 20, 2007 |
458 days |
| Moten Elementary School |
FM-200620924 06 1/20/07 Second floor, Principal's Office. Replace wet and damaged ceiling tile in principal's office due to flood in fourth floor, teacher's lounge ASAP!!. Note: This is an urgent matter because the principal is asthmatic! Asbestos Code A - Clear for repairs on 04/05/06. Tidewater - Henry Addison (RG 04/06/06) |
April 5, 2006 |
January 20, 2007 |
290 days |
| Moten Elementary School |
FM-200620828 06 1/20/07 Moten Room 318, Urgent!!!!!!! Abestos assessment required . Room 216 needs assessment done on the the heating pipes Repair or replace ruptured 1" nipple , and 90 elbow in room 318, repairs can be made from the room below. Asbestos Code A - Clear for repairs on 04/04/06. Tidewater - Shamika Parker (RG 04/05/06) SEE ASSESSMENTS |
April 4, 2006 |
January 20, 2007 |
291 days |
| Moten Elementary School |
FM-200516648 /05 1/20/07 Moten Room #415 Replace 3/4" supply line and corroded valve is leaking badley, replace 3/4" drain valve leaking and handle broken off and replace auto bleeder also. Building might flood. Urgent !!!! |
December 16, 2005 |
January 20, 2007 |
400 days |
| Moten Elementary School |
FM-200514711 /05 1/20/07 Moten Urgent First Floor-Repair 2 exterior doors for cafeteria and 1 door for custodian Office Code A-clear for repair by DCPS Charles Buchanan on 11/03/05 |
October 27, 2005 |
January 20, 2007 |
450 days |
| Moten Elementary School |
FM-200514502 /05 1/20/07 Moten Urgent Third Floor-Girls Restroom (old side) Repair Ceiling, It's Peeling. (Check for spray on insulation above ceiling) Lead & Asbestos Code A - Clear for repairs on 11/14/05. Tidewater - Rodney Distance/Tony Marcolin (RG 11/21/05 |
October 24, 2005 |
January 20, 2007 |
453 days |
| Moten Elementary School |
FM-200514066 /05 1/20/07 Moten Urgent Ground Floor-Girls Bathroom Repair Wall, Structure Is Cracking Asbestos Code A - Clear for repairs on 10/24/05. Tidewater - Kenny Long(RG 10/25/05) |
October 21, 2005 |
January 20, 2007 |
456 days |
| Moten Elementary School |
FM-200512618 05 1/20/07 (Moten) "Urgent" Throughout bldg., Mainly 2nd & 3rd floor. AC and lights flickering off and on. Need electricians to assess and repair problem. |
September 15, 2005 |
January 20, 2007 |
492 days |
| Moten Elementary School |
FM-200507013 05 1/20/07 (MOTEN) First Floor - Girls Restroom (New Side) 1) Replace old partitions. Asbestos Code A - Clear for repairs on 06/21/05. DCPS Safety - Richard Gibson (RG) |
June 21, 2005 |
January 20, 2007 |
578 days |
| Moten Elementary School |
FM-200506995 05 1/20/07 (Moten) "Urgent" Asbestos Assessment Required. Ground floor near science class. Need masonry repair to damaged structure wall by science class the hole is staight through to exterior of building. Note: The principal requested that this problemm be addressed ASAP! Code A-clear for repair by DCPS Charles Buchanan on 6/21/05 |
June 20, 2005 |
January 20, 2007 |
579 days |
| Moten Elementary School |
FM-200503777 05 1/20/07 ( MOTEN ) URGENT!!! First Floor - girls Restroom, in front of the elevator 1) Need partitions removed to get the smell and remaining water off floor. |
April 8, 2005 |
January 20, 2007 |
652 days |
| Moten Elementary School |
FM-200501343 05 1/20/07 Moten URGENT!!!!! Second floor - Main Office 1) There is a receptacle sticking up out of the floor with no cover on it. Repair the receptacle, and cover it |
February 8, 2005 |
January 20, 2007 |
711 days |
| Moten Elementary School |
FM-200451248 04 1/20/07 (Moten) !!!URGENT!!! All Classrooms & Hallways: We need ceiling tile for all of the classrooms, and hallways. Code A - clear for repairs as 8/6/04 safety Sylvia. Spoke with Ms. Wolley replace none asbestos tiles only. |
August 2, 2004 |
January 20, 2007 |
901 days |
| Moten Elementary School |
FM-200451117 04 1/20/07 Moten Second floor Boys restroom old side Plastering is fallen down from ceiling and also is hanging from ceiling. It is half of the ceiling. Code A - clear for repairs as of 9/1/04 safety Sylvia. |
July 29, 2004 |
January 20, 2007 |
905 days |
| Moten Elementary School |
FM-200444681 04 1/20/07 (Moten) !!!VERY URGENT!!! Outside/Behind Kitchen: Drains are stopped up, running into the kitchen. |
March 2, 2004 |
January 20, 2007 |
1,054 days |
| Moten Elementary School |
FM-200339309 /03 1/20/07 (Moten) !!!VERY URGENT!!! Elevator: No electricity. |
October 22, 2003 |
January 20, 2007 |
1,186 days |
| Moten Elementary School |
FM-200221514 /02 1/20/07 Moten Rooms - 203,207,321,418,419,420, and 421. 1) Install (7) electrical outlets in (7) classrooms. Poc: Charles Wiggins - 301-332-2992 Wiggins Telecommunications Asbestos Code A-clear for repair by Horne Engineer Sheryll James DCPS Safety Charles E. Buchanan on 11/26/02 |
November 22, 2002 |
January 20, 2007 |
1,520 days |
| Moten Elementary School |
FM-200221513 /02 1/20/07 Moten Rooms - 114,116 and 418 1) Mount TV brackets in classrooms running coaxial cable from the room to the main feed in hallway. Poc: Charles Wiggins - 301-332-2992 Wiggins Telecommunications Asbestos Code A-clear for repair by Horne Engineer Sheryll James DCPS Safety Charles E. Buchanan on 11/26/02 |
November 22, 2002 |
January 20, 2007 |
1,520 days |
| Moten Elementary School |
FM-200218140 02 1/20/07 (Moten) ****Urgent*** Asbestos Assessment Reqd. Throughout All Floors All walls are separating on all floors [from the ground floor through the fourth floor. There is separation occuring from where the wall meets the ceiling at the top, to where the wall meets the floor at the bottom. This condition could cause the collapse of the ceilings. Need a complete survey to discern the extent to which repairs need to be made. Asbestos Code A - Clear for repairs on 04/29/03. Horne Engeering - Philp Connoll (RG 04/30/03) |
September 23, 2002 |
January 20, 2007 |
1,580 days |
| Moten Elementary School |
FM-200217252 02 1/20/07 Moten Classroom Replace A.C units in room 402 (A) unit has bad fan motor Asbestos Code A - Cleared for repairs on 11-14-02 by Leroy Minton Jr (LM/01-13-04) Safety Office 202-576-8962. Note: If there is a need for new penetrations, please stop and contact this office. |
September 11, 2002 |
January 20, 2007 |
1,592 days |
| Moten Elementary School |
FM-200215123 02 1/20/07 Moten 3rd Floor Room 303 Repair/replace a/c unit that will not come on. Asbestos Code A - Clear for repairs on 04/18/03. DCPS Safety - Richard Gibson (RG) |
August 20, 2002 |
January 20, 2007 |
1,614 days |
| Moten Elementary School |
FM-200215122 02 1/20/07 Moten ****Urgent**** 16th Street Side of Lobby Entrance Replace carpet that cannot be cleaned and is in very bad shape. Asbestos Code C Abasement Required |
August 20, 2002 |
January 20, 2007 |
1,614 days |
| Moten Elementary School |
FM-200214913 02 1/20/07 Moten 1. Asbestos Assessment Reqd. 1st Floor 16th Street Side 2. Replaster wall. Asbestos code A-clear for repair by DCPS safety Charles Buchanan on 8/20/02 Charles E. Buchanan |
August 19, 2002 |
January 20, 2007 |
1,615 days |
| Moten Elementary School |
FM-200214259 02 1/20/07 Moten 1. Asbestos Assessment Reqd. 1st Floor Counselor's Office 2. Repair [realign] the doors to the counselor's office. There was a break-in and now the door cannot be locked. Personal records are kept in this office. Asbestos Code A - Clear for repairs on 08/28/01. DCPS Safety - Leroy Minton Jr. (RG 08/28/02) |
August 13, 2002 |
January 20, 2007 |
1,621 days |
| Moten Elementary School |
FM-200207375 02 1/20/07 Moten 1st Floor Stairell "A" Repair hanging handrail [safety hazard]. POC: Sutton |
May 8, 2002 |
January 20, 2007 |
1,718 days |
| Moten Elementary School |
FM-200206831 02 1/20/07 ****Urgent**** 1st, 2d, 3rd & 4th Floors/Custodian's Closets Repair & rekey locks on doors to the custodian's closets on all floors. Students are entering the closets and accessing toxic cleaning substances. [Safety hazard] POC: Sutton |
April 29, 2002 |
January 20, 2007 |
1,727 days |
| Moten Elementary School |
FM-200206685 02 1/20/07 Moten 1st Floor Stairwell B Repair/replace loose slate on steps in stairwell B. The loose piece moves when stepped on, creating a potential safety hazard. POC: Sutton |
April 26, 2002 |
January 20, 2007 |
1,730 days |
| Lafayette Elementary School |
FM-200503032 05 1/20/07 Lafayette First floor music room hall Clearance to remove carpet. Floor to be tiled. In house work. Asbestos Code A - Clear for repairs on 03/24/05. DCPS Safety - Ronald Edwards (RG 03/29/05) |
March 21, 2005 |
January 20, 2007 |
670 days |
| Lafayette Elementary School |
FM-200445429 04 1/20/07 Lafayette Replace carpet in blue hall. Damages due to fire damage. Asbestos Code A - Clear for repairs on 03/16/04. DCPS Safety - Leory Minton (RG 03/16/04) |
March 16, 2004 |
January 20, 2007 |
1,040 days |
| Lafayette Elementary School |
FM-200445424 04 1/20/07 Lafayette Damages due from fire damages. Replace ceiling tile gym hallway, nurses suite and blue hallway. Asbestos Code A - Clear for repairs on 03/16/04. DCPS Safety - Leory Minton (RG 03/16/04) |
March 16, 2004 |
January 20, 2007 |
1,040 days |
| Key Elementary School |
FM-200515017 05 1/20/07 Urgent: Second Floor-Library Roof: Replace or repair leaking roof, because of this books, carpet, and computers are getting wet. |
November 3, 2005 |
January 20, 2007 |
443 days |
| Key Elementary School |
FM-200515014 05 1/20/07 Urgent: First Fl.-Hallway Door: When pushing the bar on the door the lock will not release. This door will not open unless forced. The door remains closed, due to this being a double door only the right side can be used. |
November 3, 2005 |
January 20, 2007 |
443 days |
| Hardy Middle School |
FM-200623221 5/24/06 1/20/07 Hardy(Rosario) Boiler Room Repair or replace inoperable sump pumps. Causing section of this area to flood and creates problems when dumping boilers. urgent !!!! |
May 24, 2006 |
January 20, 2007 |
241 days |
| Hardy Middle School |
FM-200515509 /05 1/20/07 Urgent: Replace light fixture on the first floor in the cafeteria storage room it does not work, it is a very old fixture |
November 16, 2005 |
January 20, 2007 |
430 days |
| Hardy Middle School |
FM-200502488 05 1/20/07 {Hardy) " Urgent" Asbestos Assessment Required. First floor. Repair/Replace drinking fountains, they are running continously and leaking very badly. Note: Currently there is no drinking water on the first floor. Asbestos Code A - Clear for repairs on 03/14/05. DCPS Safety - Leroy Minton Jr. (RG 03/15/05) |
March 10, 2005 |
January 20, 2007 |
681 days |
| Hardy Middle School |
FM-200459209 04 1/20/07 Hardy Girls and boys gymnasium Replace lights. Asbestos Code A - Clear for repairs on 12/10/04. DCPS Safety - Leroy Minton (RG 12/10/04) |
December 6, 2004 |
January 20, 2007 |
775 days |
| Hardy Middle School |
FM-200455390 04 1/20/07 Hardy URGENT First floor boys restroom Two partitions missing. Asbestos Code A - Clear for repairs on 09/22/04. DCPS Safety - Richard Gibson (RG) DUPLICATE |
September 22, 2004 |
January 20, 2007 |
850 days |
| Hardy Middle School |
FM-200339342 /03 1/20/07 (Hardy) !!!URGENT!!! 1st Floor/Through-out: Repair or replace locks on the following doors: Rooms #103, 105, 113, and 15. Students are hitting handles causing doors to open. |
October 23, 2003 |
January 20, 2007 |
1,185 days |
| Hardy Middle School |
FM-200331540 03 1/20/07 (Hardy Middle School) 2nd Floor/Boys Restroom: Unstop urinals, #5 & 7 are clogged. It is urgent that we have someone to come out and service this bathroom, as graduation excercise is to take place on Friday, June 13, 2003. |
June 10, 2003 |
January 20, 2007 |
1,320 days |
| Hardy Middle School |
FM-200220410 /02 1/20/07 Hardy First and second floor Girls and boys bathroom Installing a handicap toilet bowl and handicap face bowl and railing. Safety needs to come out and inspect where these things need to go. This is an extreme emergency for a student that has been register at Hardy. Asbeatos Code A - Clear for repairs on 11/04/02. Horne Engineering - Sharon Voss (RG 03/06/01) |
October 31, 2002 |
January 20, 2007 |
1,542 days |
| Hardy Middle School |
FM-200219324 /02 1/20/07 (Hardy) !!!URGENT!!! Roof Drains/Below girls gym: Water from drains running down in-to 2nd Floor; successfully unstopped all other drains, however, drains #8 and #23, need to be cleared. |
October 11, 2002 |
January 20, 2007 |
1,562 days |
| Hardy Middle School |
FM-200207904 02 1/20/07 (Hardy) 2nd floor/room #210: Door knob broken on classroom door. Asbestos Code A - Clear for repairs on 5/17/02 DCPS Safety, Leroy Minton (RE - 5/20/02) |
May 16, 2002 |
January 20, 2007 |
1,710 days |
| Hardy Middle School |
FM-200206932 02 1/20/07 1st Floor Cafeteria & Counselor's Office Need door closures for the cafeteria & counselor's office doors. Closure make and series is Norton 7500 for the cafeteria. Asbestos Code A - Clear for repairs on 05/02/02. DCPS Safety - Ronald Edwards (RG 05/06/02) |
April 30, 2002 |
January 20, 2007 |
1,726 days |
| Hardy Middle School |
FM-200206930 02 1/20/07 1. Asbestos Assessment Reqd. 1st & 2nd Floors/Rooms 103, Boy's Restroom, 201, 209 & 210, 216, Boy's Restroom 2. Realign doors in the areas above, which are sticking. Students and teaching staff are having problems getting in & out of the doors. Asbestos Code A - Clear for repairs on 05/02/02. DCPS Safety - Ronald Edwards (RG 05/06/02) |
April 30, 2002 |
January 20, 2007 |
1,726 days |
| Hardy Middle School |
FM-200206927 02 1/20/07 1. Asbestos Assessment Reqd. 3rd Floor Rooms 311, 312 & 317 2. Doors are out of alignment and do not close properly. 3. Check the outside strips on the opposite sides of the doors. Asbestos Code A - Clear for repairs on 05/01/02. DCPS Safety - Ronald Edwards (RG 05/02/02) |
April 30, 2002 |
January 20, 2007 |
1,726 days |
| Gage-Eckington ES |
FM-200625281 06 1/20/07 Throughout the Building A total of 80 ceiling tile are missing throughout the building. One case of 4x4 drop ceiling tile is needed. Asbestos Code A - Clear for repairs on 07/05/06. DCPS Safety - Richard Gibson (RG 07/05/06) Duplicate request. |
July 5, 2006 |
January 20, 2007 |
199 days |
| Gage-Eckington ES |
FM-200457827 04 1/20/07 1) First and Second Floor There are numerous pieces of ceiling tile missing though out building. If ceiling tile is furnished we will install ourselves Asbestos Code A - Clear for repairs on 11/02/04. DCPS Safety - Richard Gibson (RG) Duplicate request. |
November 2, 2004 |
January 20, 2007 |
809 days |
| Gage-Eckington ES |
FM-200210282 02 1/20/07 1. Asbestos Assessment Reqd. 1st Floor Boys' Restroom 2. Furnish & install replacement partitions [4]. The old stalls were removed because of age, urine damage and pervasive, permanently bad odors in this closed building. Facilities has replacement partitions on hand. [Represents a health hazard.] Asbestos Code A - Clear for repairs on, 6/26/02 DCPS Safety, R. Edwards (RE - 6/26/02) Duplicate request. |
June 25, 2002 |
January 20, 2007 |
1,670 days |
| Ferebee-Hope Elementary School |
FM-200217798 02 1/20/07 (Ferebee-Hope) Outside Grounds [Entire] Need electrical survey to pinpoint the reason that all lights are not working and repair them [safety hazard]. |
September 18, 2002 |
January 20, 2007 |
1,585 days |
| Duke Ellington School |
FM-200619584 06 1/20/07 Very Urgent Repair exterior lights-10 in front of the building-in rear handicap ramp for pole lamp, global cover needs replacing lamp wires and fixtures are hanging from the lamp. DUPLICATE |
March 7, 2006 |
January 20, 2007 |
319 days |
| Duke Ellington School |
FM-200619583 06 1/20/07 Urgent Classroom 201-Sink is stoped up and needs to be snaked out. |
March 7, 2006 |
January 20, 2007 |
319 days |
| Duke Ellington School |
FM-200512997 05 1/20/07 Ellington Very Urgent Cold water pipe over the nurse door in the hallway is leaking through the joint. |
September 21, 2005 |
January 20, 2007 |
486 days |
| Duke Ellington School |
FM-200503926 05 1/20/07 (Ellington) HEALTH CODE VIOLATION: Kitchen: Remove scaling paint from walls in storeroom, inside kitchen. Lead & Asbestos Code A - Clear for repairs on 05/02/05. DCPS Safety - Richard Gibson (RG) DUPLICATE |
April 12, 2005 |
January 20, 2007 |
648 days |
| Duke Ellington School |
FM-200340325 /03 1/20/07 (Ellington) !!!VERY URGENT!!! Exterior Roof Molding/Roof Shingle: Part of roof shingle gave way near building, back up generator is sout side of building, near reservoir Road; needs repairing as soon as possible. |
November 14, 2003 |
January 20, 2007 |
1,163 days |
| Duke Ellington School |
FM-200336524 03 1/20/07 (Ellington) !!!VERY URGENT!!! Roof Drains: Drains leaking, in-to Gym area, and storagae room, flooding the floors. (Needs to be unstopped. Asbestos Code A - Clear for repairs on 09/26/03. Horne Engineering - Ray Agnant (RG 09/29/03) |
August 28, 2003 |
January 20, 2007 |
1,241 days |
| Duke Ellington School |
FM-200335713 03 1/20/07 (Ellington) !!!VERY URGENT!!! Basement/Nurse's Office: Unable to turn lights on; sparks shooting from light fixtures. |
August 19, 2003 |
January 20, 2007 |
1,250 days |
| Duke Ellington School |
FM-200221830 02 1/20/07 (Ellington) 1. Asbestos assessment required. First Floor principals office At the door of the principals office the floor tile is broken and needs repair. Asbestos Code A - Abated and cleared for repairs on 12-16-02 (LM) per Leroy Minton Jr. confirmation. Safety Office (202) 576-8962. |
December 2, 2002 |
January 20, 2007 |
1,510 days |
| Duke Ellington School |
FM-200221616 /02 1/20/07 (Ellington) 1. Asbestos assessment required. Room #101: Need an electrical outlet installed. Asbestos Code A - clear for repairs as of 12/3/02 by Horne Engineers Bipin Nanavaty DCPS safety Sylvia Grimes. |
November 25, 2002 |
January 20, 2007 |
1,517 days |
| Duke Ellington School |
FM-200221436 /02 1/20/07 Ellington, Duke Basement - hallways The wall is peeling plaster outside the cafeteria door across from the lockers on the nurses side of the building. Asbestos/Lead Code A-clear for repair by Horne Engineer Sheryll James/ Edward Rodriguez DCPS Safety Charles E. Buchanan on 11/26/02 |
November 20, 2002 |
January 20, 2007 |
1,522 days |
| Draper Elementary School |
FM-200516768 /05 1/20/07 Draper Cafeteria Repair or replace leaking heating unit in ceiling of cafeteria. Urgent !!!!! |
December 20, 2005 |
January 20, 2007 |
396 days |
| Draper Elementary School |
FM-200443358 04 1/20/07 Draper URGENT Cafeteria and basement Repair heating mechanism on roof of cafeteria, repair univents or service univents. |
January 29, 2004 |
January 20, 2007 |
1,087 days |
| Bowen Elementary School |
FM-200450683 04 1/22/07 (Bowen) Main Entrance Door: Plate on door coming up on Delaware avenue side. Code A - clear for repairs as of 8/19/04 safety Sylvia |
July 23, 2004 |
January 22, 2007 |
913 days |
| Nalle Elementary School |
FM-200452793 04 1/22/07 Nalle EMERGENCY Rooms 212 and 209 The ceiling is falling and it might fall and injure a child. Do not know if it is coming from the windows or the roof. The roof was fix but it may be still leaking. Asbestos Code A - Clear for repairs on 08/18/04. DCPS Safety - Leroy Minton Jr. (RG 08/18/04) |
August 17, 2004 |
January 22, 2007 |
888 days |
| Hardy Middle School |
FM-200445769 04 1/22/07 Hardy Boiler Room/Sump pump Service control panel. For operation of sump pumps. Boiler and air way are flooding do to manlfunction of automatic controls. Automatic controls are not working on pumps #1, #2, #3 and #4. Urgent !!!! |
March 24, 2004 |
January 22, 2007 |
1,034 days |
| Bowen Elementary School |
FM-200224694 03 1/22/07 (Bowen) 1. Asbestos Assessment Required. Replace torn and ripped carpeting in the following: Learning center #1, 2, and 3. The carpeting in these area's are old and is a safety hazard. Asbestos Code A - Clear for repairs on 01/29/03. Horne Engineering - Tony Marcolin (RG 01/31/03) |
January 28, 2003 |
January 22, 2007 |
1,455 days |
| Bowen Elementary School |
FM-200224697 03 1/22/07 (Bowen) 1. Asbestos Assessment Required. Learning centers #1, 2, & 3/Gymnasium: 1. Replace missing & damaged ceiling tiles in gymnasium, approx. six (6) pieces. (Scaffoling is needed due to the ceiling height. (2' X 4') 2. Replace missing and damaged 12" X 12" spline ceiling tiles as needed in the learning centers #1, 2, & 3. Asbestos Code A - Clear for repairs on 03/12/03. DCPS-Safety - Richard Gibson (RG 03/12/03) |
January 28, 2003 |
January 22, 2007 |
1,455 days |
| Hardy Middle School |
FM-200207037 02 1/22/07 Hardy ****Urgent**** Water is leaking into the boys gymnasium from the roof. Roof drain need to be unstopped. Water leakage is causing the gym floor to buckle. |
May 3, 2002 |
January 22, 2007 |
1,725 days |
| John Burroughs ES |
FM-200456031 04 1/22/07 (Burroughs) 1st Floor Office Door entry missing five tiles on floor. Code A - clear for repairs as of 10/12/04 safety Sylvia. |
September 29, 2004 |
January 22, 2007 |
845 days |
| Leckie Elementary School |
FM-200510270 05 1/22/07 (Leckie) "Urgent" Asbestos Assessment Required. Second floor, Room 200/Through out building. Replace fallen ceiling tile in room 200 also replace ceiling through out building. Asbestos Code A - Clear for repairs on 08/12/05. Tidewater - Samuel May (RG 08/12/05) |
August 12, 2005 |
January 22, 2007 |
528 days |
| John Burroughs ES |
FM-200456014 04 1/22/07 Burroughs First floor Ms. Hollaway # 14 Missing door panel. Code A- clear for repairs was told that work was complete by custodian. safety Sylvia |
September 28, 2004 |
January 22, 2007 |
846 days |
| John Burroughs ES |
FM-200455485 04 1/22/07 (Burroughs) 1st Floor/Computer: Prep, and install vinyl floor in the computer lab. Asbestos Code A - Clear for repairs on 09/23/04. DCPS Safety - Richard Gibson (RG) (Related to FM-200453697) |
September 22, 2004 |
January 22, 2007 |
852 days |
| John Burroughs ES |
FM-200449608 04 1/22/07 Burrough First floor girls restroom Lower level girls restroom. Two (2) door panels broke off on first floor. On lower level panel broke off. Code A - clear for repairs as of 6/25/04 by DCPS safety Sylvia Grimes. |
June 22, 2004 |
January 22, 2007 |
944 days |
| Hardy Middle School |
FM-200337613 03 1/22/07 Hardy URGENT Unstop roof drains # 3 over principals office on third floor; # 15 over cafeteria and # 26 over gym. Water is damaging wood floor of gym, principals office floor and cafeteria ceilings. |
September 16, 2003 |
January 22, 2007 |
1,224 days |
| Leckie Elementary School |
FM-200504867 05 1/22/07 ( LECKIE ) URGENT!!!! Third Floor - Room 312 1) Replace window pane. |
April 28, 2005 |
January 22, 2007 |
634 days |
| Hardy Middle School |
FM-200445770 04 1/22/07 Hardy Boiler Room/Sump pump Repair or replace coupling on sump pumps. Rubber coupling needs replacing do to wear and tear. Coupling size 3 or 4. Will pull coupling to take to HVAC. Urgent !!!! |
March 24, 2004 |
January 22, 2007 |
1,034 days |
| Hardy Middle School |
FM-200455388 04 1/22/07 Hardy URGENT First floor Female restroom Partitions need to be put up 3 are missing. Asbestos Code A - Clear for repairs on 09/22/04. DCPS Safety - Richard Gibson (RG) |
September 22, 2004 |
January 22, 2007 |
852 days |
| Leckie Elementary School |
FM-200626040 06 1/22/07 1st Floor- Cafeteria DUPLICATE REQUEST Replace center mullion on cafeteria door. Asbestos Code A - Cleared for repairs on 08/02/06 by Tidewater/Kenny Belton (LM-08/02/06) Safety Office 202-576-8962. |
July 20, 2006 |
January 22, 2007 |
186 days |
| Hardy Middle School |
FM-200500967 05 1/22/07 Rosario/Hardy Boiler Room- Tunnel Repair reputure line under ground leading from tunnel, water is coming into the Boiler room. Problem has reoccurred. See engineer, Mr Chance. Urgent !!!!! |
January 31, 2005 |
January 22, 2007 |
721 days |
| Hardy Middle School |
FM-200505966 05 1/22/07 (Hardy/Fillmore) "Urgent" Asbestos Assessment Required. Third floor. Scrape old paint off wall in preparation for plastering and painting. Lead & Asbestos Code A - Clear for repairs on 05/25/05. DCPS Safety - Richard Gibson ( RG ) |
May 25, 2005 |
January 22, 2007 |
607 days |
| Hardy Middle School |
FM-200513717 /05 1/22/07 (Hardy) "Urgent" First & Second floor/Girls' & Boys' restrooms. Need electricians to assess and repair electrical issues. Note: The lighting is malfunctioning. |
October 11, 2005 |
January 22, 2007 |
468 days |
| Bowen Elementary School |
FM-200620402 06 1/22/07 Exterior Cafeteria Door. "Urgent" Repair or replace 4th metal exit door frame. Note:The frame was damaged during an attempted break-in. 04/05/2006 14:49 TH - This is now an emergency-Mr. Hawkins said that the door can't be secured. The panic bar will lock but all youhave to do is push or pull the door and it's not very hard to open. |
March 27, 2006 |
January 22, 2007 |
301 days |
| Hardy Middle School |
FM-200515519 /05 1/22/07 Hardy- Rosario Boiler Room Repair or replace automatic water feeder on Boiler #2. Will not shut off, cintinously feeding water. Urgent !!!! |
November 16, 2005 |
January 22, 2007 |
432 days |
| Hardy Middle School |
FM-200516382 /05 1/22/07 Rosario/Hardy Kitchen Survey and take steps to install some type of heating system in this area. None exit at present. Urgent !!!!! |
December 13, 2005 |
January 22, 2007 |
405 days |
| Hardy Middle School |
FM-200620314 3/24/06 1/22/07 Very Urgent Front entrance 35th St. side-Bricks are loose - Afraid someone will get hurt. |
March 24, 2006 |
January 22, 2007 |
304 days |
| Hardy Middle School |
FM-200620989 4/6/06 1/22/07 Hardy/Filmore Boiler Room Repair or replace safety valve on Boiler #5. The valve can not be tested by hand as required. Urgent !!!!! |
April 6, 2006 |
January 22, 2007 |
291 days |
| Patricia R Harris Ed Center |
FM-200227508 03 1/22/07 Harris, P.R. - URGENT Ballasts throughout the whole building need to be replaced. ASAP Some restrooms are dark because of bad ballasts that need to be replaced. These are 277 Ballasts and they are leaking PCB Asbestos Code A - Clear for repairs on 04/28/03. DCPS Safety - Charles Buchanan (RG 05/01/03) |
March 24, 2003 |
January 22, 2007 |
1,400 days |
| Patricia R Harris Ed Center |
FM-200333884 03 1/22/07 Harris, P.R. Pre-K, Common area thru out bldg. Furnish and install 55 burnout ballast. Building is getting dark. 277 volts rapid start. URGENT Fixtures are marked to indicate ballast need (BB). Asbestos Code - A Cleared for repairs on 08-05-03 by Leroy Minton Jr. (LM/08-05-03) Safety Office 202-576-8962. |
July 28, 2003 |
January 22, 2007 |
1,274 days |
| Drew Elementary School |
FM-200455874 04 1/22/07 Drew Second floor rooms 205 and 204 Repair the above classroom doors. Asbestos Code A - Clear for repairs on 10/01/03. DCPS Safety - Leroy Minton (RG 10/06/04) |
September 27, 2004 |
January 22, 2007 |
847 days |
| Macfarland Middle School |
FM-200633550 /27/06 1/22/07 Tunnel - Repair 1 1/2 " steam line ruptured, line need urgent attention ( blowing on electric disconnect and meters. Asbestos Code "A" cleared for repairs 12/29/06 Tidewater |
December 27, 2006 |
January 22, 2007 |
26 days |
| Patricia R Harris Ed Center |
FM-200502435 05 1/22/07 Harris, P.R. Second floor elem. side Need carpentry shop in bldg. to install some kind of coat racks for elem. students to hang up there coats and back packs. Clothing is now on the floor. Teachers and parents are complaining. Most walls are sheet rock and brick. This has been going on for over two weeks. (safety hazard for students) Asbestos Code A - Clear for repairs on 03/14/05. DCPS Safety - Leroy Minton Jr. (RG 03/14/05) |
March 9, 2005 |
January 22, 2007 |
684 days |
| Eaton Elementary School |
FM-200514947 05 1/22/07 Urgent: First Floor-Cafeteria: Repair/Replace flooring, it's warped in several spots throughout cafeteria Asbestos Code A - Clear for repairs on 11/08/05. Tidewater - Tom Marcolin (RG 11/09/05) SEE ASSESSMENTS DUPLICATE WORK ORDER |
November 1, 2005 |
January 22, 2007 |
447 days |
| Wilson High School |
FM-200452837 04 1/22/07 Wilson, W. Classroom L-14 Replace ceiling tiles. Tiles was damaged due to roof leaks in the library. Asbestos Code A - Clear for repairs on 08/25/04. DCPS Safety - Leroy Minton Jr. (RG 08/26/04) |
August 18, 2004 |
January 22, 2007 |
887 days |
| Patricia R Harris Ed Center |
FM-200502952 05 1/22/07 Harris, P.R. / Old Patterson Second floor rooms 307 and 369 Provide and install coat racks and hooks on room walls. Asbestos Code A - Clear for repairs on 03/30/05. DCPS Safety - Leroy Minton Jr. (RG 03/30/05) |
March 18, 2005 |
January 22, 2007 |
675 days |
| Leckie Elementary School |
FM-200502629 05 1/22/07 Third floor landing - Need light and shell to cover light fixture. (Safety Hazard) DUPLICATE REQUEST |
March 14, 2005 |
January 22, 2007 |
679 days |
| Leckie Elementary School |
FM-200459946 /04 1/22/07 Leckie Third floor room 318 Need window Replace cold air coming in room. Window crack due to bb gun. Asbestos Code A - Clear for repairs on 04/22/05. DCPS Safety - Leroy Minton Jr. (RG 04/22/05) |
December 21, 2004 |
January 22, 2007 |
762 days |
| Leckie Elementary School |
FM-200628331 06 1/22/07 Second floor, Room 213. DUPLICATE REQUEST Secure partitions asap! Note: This is a safety hazard. |
August 28, 2006 |
January 22, 2007 |
147 days |
| Leckie Elementary School |
FM-200450003 04 1/22/07 Leckie EMERGENCY First floor cafeteria door Panic bar on door need replacement or repairing. It keep getting stuck . Will not secure. Code A - clear for repairs as of 7/13/04 by safety office Sylvia Grimes. |
July 8, 2004 |
January 22, 2007 |
928 days |
| Leckie Elementary School |
FM-200225790 03 1/22/07 Roof: Flashing hanging from the roof; very dangerous to staff and students playing out side or entering/exiting the building. DUPLICATE REQUEST |
February 13, 2003 |
January 22, 2007 |
1,439 days |
| Johnson JHS |
FM-200502719 05 1/22/07 (Johnson) "Emergency" Asbestos Assessment Required. Third floor/Room 315. Repair and Replace large wire mesh glass in door. Note: Student vandalized. Asbestos Code A - Clear for repairs on 03/30/05. DCPS Safety - Leroy Minton Jr. (RG 03/30/05) |
March 15, 2005 |
January 22, 2007 |
678 days |
| Johnson JHS |
FM-200337635 03 1/22/07 Johnson Second floor room 213 Replace wood entrance door. Door is split and dangerous. Code A-clear for repair by DCPS Charles Buchanan on 9/17/03 |
September 16, 2003 |
January 22, 2007 |
1,224 days |
| Coolidge High School |
FM-200458903 04 1/22/07 (Coolidge) Asbestos Assessment Required. Basement/1st Floor: Provide additional window guards on windows with out on the area's indicated. Asbestos Code A - Clear for repairs on 12/02/04. DCPS Safety - Leroy Minton Jr. (RG 12/03/04) |
December 1, 2004 |
January 22, 2007 |
782 days |
| Leckie Elementary School |
FM-200626039 06 1/22/07 1st Floor- Main Office Replaster main office. Asbestos Code A - Cleared for repairs on 08/02/06 by Tidewater/Kenny Belton (LM-08/02/06) Safety Office 202-576-8962. Lead-Based Paint Code A - Cleared for repairs on 08/02/06 by Tidewater/Roger Smalls (LM-08/02/06) Safety Office 202-576-8962. |
July 20, 2006 |
January 22, 2007 |
186 days |
| Leckie Elementary School |
FM-200625972 06 1/22/07 Second Floor - 212 and 213 - Can not close metal block at divider. Repair partitions that are hanging very dangerously. DUPLICATE REQUEST |
July 20, 2006 |
January 22, 2007 |
186 days |
| Francis Junior High School |
FM-200442403 04 1/22/07 (Francis) 3rd Floor Stairwell: Repair or replace two (2) metal railings missing from the stairwell. (Safety concern) Asbestos Code A - Clear for repairs on 01/08/04. Horne Engineering - Philp Connolly (RG 01/12/04) |
January 8, 2004 |
January 22, 2007 |
1,110 days |
| Francis Junior High School |
FM-200455927 04 1/22/07 Francis Third floor stairwell Replace or repair two metal railings they are missing from stairwell it is a safety concen. Asbestos Code A - Clear for repairs on 09/28/04. DCPS Safety - Richard Gibson. (RG) |
September 28, 2004 |
January 22, 2007 |
846 days |
| Leckie Elementary School |
FM-200515455 /05 1/22/07 Urgent: Third Floor Girls Restroom-Partition doors need repairing or rehung. DUPLICATE REQUEST Code A-clear for repaire by DCPS Charles Buchanan on 11/16/05 |
November 15, 2005 |
January 22, 2007 |
433 days |
| Leckie Elementary School |
FM-200630771 /06 1/22/07 LECKIE boiler room Trouble shoot and make repairs to boiler # 1 and 2 going off due to safety code on programmer: (3P run purge interlock open. Hi/lo limit press). |
October 13, 2006 |
January 22, 2007 |
101 days |
| Leckie Elementary School |
FM-200515451 /05 1/22/07 Urgent: In-large door to the outside shed in order to install riding lawn mower, at this time the law mower is in the hallway. (Fire Code) DUPLICATE REQUEST Code A-clear for repaire by DCPS Charles Buchanan on 11/16/05 |
November 15, 2005 |
January 22, 2007 |
433 days |
| Garfield ES |
FM-200215482 02 1/22/07 Garfield F-303.4 Fire Code Violation Asbestos Assessment Reqd. 1st Floor [Main Building Lower Level] Girls' Restroom Need to replace exit doors. Asbestos Code A |