Routine Repair Requests Closed in February 2007 (1628) | School | Description | Open Date | Close Date | Time Elapsed |
| Beers Elementary School | FM-200514343 /05 2/1/07 Beers 1) First Floor - Building 2 - Room 102 Door is off track, will not shut. 2) First Floor - Building 1 Book Room door is hard to shut. Code A-clear for repair by DCPS Charles Buchanan on 10/31/05 | October 23, 2005 | February 1, 2007 | 466 days |
| Park View ES | FM-200447469 04 2/1/07 Park View First floor room 115 Floor tile cracking and need to be replace and check for asbestos.. Asbestos Code A - Clear for repairs on 05/05/04. Horne Engineering - Bipin Nanavaty (RG 05/06/04) | May 4, 2004 | February 1, 2007 | 1,003 days |
| Park View ES | FM-200222097 02 2/1/07 Park View Room 106 Furnish and install one slise bolt lock with IR-reversable screws (if possible) and pad lock to secure the above room. | December 4, 2002 | February 1, 2007 | 1,520 days |
| Park View ES | FM-200445651 04 2/1/07 Park View First floor room 115 Floor tiles cracking and need to be replaced and checked for asbestos. Asbestos Code A - Clear for repairs on 03/23/04. Horne Engineering - Tony Marcolin (RG 03/25/04) | March 22, 2004 | February 1, 2007 | 1,046 days |
| Lafayette Elementary School | FM-200338429 03 2/1/07 Lafayette Ground floor hall Repair or replace panic bar on center door in hall outside gym. Exterior door Asbestos Code A - Clear for repairs on 10/03/03. Horne Engineering - Bipin Nanavaty (RG 10/08/03) | October 2, 2003 | February 1, 2007 | 1,218 days |
| West Elementary School | FM-200513722 /05 2/1/07 (West) "Emergency" First floor, Learning Center. Repair or Replace ceiling (Tracks, Wooden beams and Ceiling tile) Current parts of the ceiling have fallen and the remaining portions are being supported by a stick. Asbestos Code A - Clear for repairs on 11/11/05. Tidewater - Philp Connolly (RG 10/12/05) | October 11, 2005 | February 1, 2007 | 478 days |
| Park View ES | FM-200339555 /03 2/1/07 (Parkview) Exit Door: Door mullion is loose on exit door. Code A-clear for repair by DCPS Charles Buchanan on 10/29/03 | October 27, 2003 | February 1, 2007 | 1,193 days |
| Park View ES | FM-200336953 03 2/1/07 (Park View) !!!EMERGENCY!!! Third Floor 1. Add hinges and locks to (4) attic access panels due to break-in . Asbestos Code A - Clear for repairs on 09/08/03. Horne Engineering - Troy Wilcome (RG 09/09/03) | September 5, 2003 | February 1, 2007 | 1,245 days |
| Payne Elementary School | FM-200700071 /07 2/1/07 First Floor-Day Care (rm. 128) - Requesting to have the exit door replaced, can't secure room (no panic bar) unless using slide bolt which is a fire code violation. Second Request was called in on 1/31/07 - Requesting to have door replaced with new panic bar and door closer Asbestos Code A - Clear for repairs on 01/30/07. Tidewater - Shamika Parker (RG 02/01/07) | January 29, 2007 | February 1, 2007 | 3 days |
| Park View ES | FM-200507130 05 2/1/07 First fl. Playground Exit Door/Second fl; Hallway Doors Near Teachers Lounge Repair or Replace Panic Bar/Adjust door Closers Code A-clear for repair by DCPS Asbestos Code Inspector Charles Buchanan on 6/24/05 | June 23, 2005 | February 1, 2007 | 588 days |
| West Elementary School | FM-200215067 02 2/1/07 West 1st Floor Gymnasium Replace side suppors on both sides and balance both basketball backboards---they are leaning. | August 19, 2002 | February 1, 2007 | 1,627 days |
| Park View ES | FM-200339643 /03 2/1/07 Park View Health suite Door will not close. Asbestos Code A - Clear for repairs on 10/29/03. Horne Engineering - Tony Marcolin (RG 10/30/03) | October 29, 2003 | February 1, 2007 | 1,191 days |
| Park View ES | FM-200337257 03 2/1/07 Park View A Mullion need to be installed on entry door. Asbestos Code A - Clear for repairs on 09/15/03. Horne Engineering - Roger Kager (RG 11/18/03) | September 11, 2003 | February 1, 2007 | 1,239 days |
| West Elementary School | FM-200207459 02 2/1/07 West 1. Asbestos Assessment Reqd. 1st Floor Cafeteria Door Need center-piece in the cafeteria door to be made easily removable by on-site staff in order to accommodate receipt of large items coming into the building. Code A-clear for repair by Horne Engineer ( Sharon Vess ) on 05/13/02 | May 9, 2002 | February 1, 2007 | 1,729 days |
| Raymond Elementary School | FM-200505056 05 2/1/07 (Raymond) Asbestos Assessment Required. 3rd Floor/Room #35: Replace loose floor tiles, and repair wood floor. HA 011 Floor tile teal 12" X 12" with light & Dark Teal Mark No Asbestos HA 012 Floor Mastic with HA... HA011 Code A-Clear for repair by DCPS Charles Buchanan on 5/3/05 | May 2, 2005 | February 1, 2007 | 640 days |
| Tyler Elementary School | FM-200219355 /02 2/2/07 Repair or repalace sump in the boiler room , unit is not pumping,water is rising in the pit | October 15, 2002 | February 2, 2007 | 1,571 days |
| Plummer Elementary School | FM-200228849 03 2/2/07 Plummer Boiler Room Unstop drain in Boiler Room. If drain is not unstop, boiler room will be flooded. | April 17, 2003 | February 2, 2007 | 1,387 days |
| Brookland Elementary | FM-200626118 06 2/2/07 Backdoor Near Playground Area Repair/replace door and frame. Asbestos Code A - Clear for repairs on 07/24/06. Tidewater - Carlos Vera (RG 07/25/06) | July 21, 2006 | February 2, 2007 | 196 days |
| Plummer Elementary School | FM-200450975 04 2/2/07 Plummer Boiler room Calibrate Boiler # 1& 2 AS PER BOILER INSPECTOR REQUEST | July 28, 2004 | February 2, 2007 | 919 days |
| Plummer Elementary School | FM-200451399 04 2/2/07 Plummer Boiler Room Boiler #1replace McDonnell S.Miller 150 low water cut off. Housing is crack. | August 4, 2004 | February 2, 2007 | 912 days |
| Watkins Elementary School | FM-200459031 04 2/2/07 Watkins Burner cilibration. | December 2, 2004 | February 2, 2007 | 792 days |
| Jessie LaSalle Elementary | FM-200205891 02 2/2/07 LaSalle Basement, First (1st) Floor, Classroom #8 and Custodial Closet Locks to be changed: Need to change Locks on following Doors. Room #8, Computer Room (1st) Floor and Basement: Lunch Room and Custodial Closet. Security Hazard. | April 16, 2002 | February 2, 2007 | 1,753 days |
| Kelly Miller MS | FM-200629838 06 2/2/07 Removal of graffiti (interior and exterior) throughout the building. Note: These repairs are to be completed before Dr. Janey's and US Department of Education's site visit on September 25,2006. | September 22, 2006 | February 2, 2007 | 133 days |
| Kelly Miller MS | FM-200622784 06 2/2/07 Parent Called/Basket Ball Court Nets Have Been Cut Down Again | May 16, 2006 | February 2, 2007 | 262 days |
| Cardozo High School | FM-200337962 03 2/2/07 Cardozo Third floor rooms 320, 302, 321 Second floor rooms 212, 222, 224, 223 First floor rooms 120, 116 Ground floor rooms 4, 1, 3, 5, 11 and 13 Repair the above room locks that will not secure rooms for in house sheltering, locks will not lock from inside, some will not unlock from the inside. | September 24, 2003 | February 2, 2007 | 1,227 days |
| Cardozo High School | FM-200339613 /03 2/2/07 (Cardozo) 2nd Floor/Room #212, &216: Repair or replace locks on chemical fire (file) cabinets. | October 28, 2003 | February 2, 2007 | 1,193 days |
| Ludlow-Taylor ES | FM-200206561 02 2/2/07 1) In accordance with grass cutting contract for the summer of 2002 to include grass cutting and edging. | April 25, 2002 | February 2, 2007 | 1,744 days |
| Ludlow-Taylor ES | FM-200443817 04 2/2/07 Ludlow-Taylor First floor room 100 and 101 Repair front gate leading from kindergarten classrooms so it can be unlocked safely from the exit of the classrooms. | February 9, 2004 | February 2, 2007 | 1,089 days |
| Ludlow-Taylor ES | FM-200444537 04 2/2/07 (Ludlow-Taylor) Outside/Near Dumpster: Remove cafeteria table, and utility room poles. | February 27, 2004 | February 2, 2007 | 1,071 days |
| Ludlow-Taylor ES | FM-200446330 04 2/2/07 Ludlow-Taylor Playground Replace pole on large playground equipment, pole in house and repair two cracks on large playground. | April 5, 2004 | February 2, 2007 | 1,033 days |
| Kramer Middle School | FM-200333049 03 2/2/07 Kramer First flooy - gymnasium Ceiling light bulbs burned out. Bulbs need replacement. Cherry picker, a lifter or high ladder may be needed. | July 9, 2003 | February 2, 2007 | 1,304 days |
| Bowen Elementary School | FM-200209731 02 2/2/07 Bowen Throughout Building REkey the lock throughout the building and provide three [3] new master keys. | June 18, 2002 | February 2, 2007 | 1,690 days |
| Ludlow-Taylor ES | FM-200446986 04 2/2/07 Ludlow-Taylor Little and large playground Glue rubber mats back under playground equipment on little playground. Repair one basket ball goal and replace one back goal on large playground. | April 22, 2004 | February 2, 2007 | 1,016 days |
| Plummer Elementary School | FM-200459016 04 2/2/07 PLummer Burner cilibration. | December 2, 2004 | February 2, 2007 | 792 days |
| Kimball Elementary School | FM-200341988 /03 2/2/07 (Kimball) Request keys be issued for the following classrooms: Teacher need keys to locks too secure classrooms # 005, 051, 055, 111, &204. | December 22, 2003 | February 2, 2007 | 1,138 days |
| Ludlow-Taylor ES | FM-200447981 04 2/2/07 Ludlow-Taylor Grounds Trim hedges around school where trees were planted. Cut as short as possible. | May 14, 2004 | February 2, 2007 | 994 days |
| Ludlow-Taylor ES | FM-200503367 05 2/2/07 Ludlow Taylor Exterior of Building 1) Fill large hole in lawn. | March 29, 2005 | February 2, 2007 | 675 days |
| Amidon Elementary School | FM-200459874 /04 2/2/07 Amidon Emergency Throughout No heat. | December 20, 2004 | February 2, 2007 | 774 days |
| Patterson ES | FM-200631382 /06 2/2/07 Main Entrance - Weld gate back, gate broke off the hinges. | October 26, 2006 | February 2, 2007 | 99 days |
| Ludlow-Taylor ES | FM-200507006 05 2/2/07 Ludlow-Taylor Front Lawn Area Close and Repair Two Large Holes in the Front Lawn | June 21, 2005 | February 2, 2007 | 591 days |
| Kenilworth ES | FM-200634022 07 2/2/07 First Floor - Front exit door 6 one not latching (IFC703.2.2) Reinspection on 1-30-07 02/09/2007 07:08 TH - Completed 2/8/07 per Principal Fatima Johnson, Earnest Palmer and inspection | January 17, 2007 | February 2, 2007 | 16 days |
| Kenilworth ES | FM-200634019 07 2/2/07 First Floor - Back stairwell exit door latch needs adjusting (IFC703.2.2) Reinspection on 1-30-07 02/09/2007 06:49 TH - Completed 2-8-07 per Principal Fatima Johnson, Earnest Palmer and inspection | January 17, 2007 | February 2, 2007 | 16 days |
| Ludlow-Taylor ES | FM-200507581 05 2/2/07 Outside Grounds Trim the hedges in front of the school and on seventh street side of the building. Building maintenance do not have a hedger. | July 8, 2005 | February 2, 2007 | 574 days |
| Tyler Elementary School | FM-200337288 03 2/2/07 Tyler Boiler Room Boilers #1 and #2 needs chemical cleaning. | September 11, 2003 | February 2, 2007 | 1,240 days |
| Ludlow-Taylor ES | FM-200510460 05 2/2/07 Ludsow-Taylor Exterior Grounds Remove Bushes from 6st Lot | August 16, 2005 | February 2, 2007 | 535 days |
| Amidon Elementary School | FM-200501007 05 2/2/07 Amidon Cafeteria repair or replace heating unit in cafeteria, room is cold. | January 31, 2005 | February 2, 2007 | 732 days |
| Amidon Elementary School | FM-200507901 05 2/2/07 Amidon Frist fl. Rm 124 Repair Door frame Code A-clear for repair by DCPS Charles Buchanan on 7/18/05 | July 15, 2005 | February 2, 2007 | 567 days |
| Turner Elementary School | FM-200633571 /06 2/2/07 First Floor - Library - Requesting to have the locks changed per Principal's request. Asbestos Code A - Clear for repairs on 12/29/06. Tidewater - Tony Marcolin (RG 01/04/07) | December 28, 2006 | February 2, 2007 | 36 days |
| Turner Elementary School | FM-200631440 /06 2/2/07 First floor, Old Side/Exterior of building near room 100. Replace missing panic bar on Exterior door. | October 26, 2006 | February 2, 2007 | 99 days |
| Turner Elementary School | FM-200630179 06 2/2/07 3rd Floor- Custodial Closet (Old Side) Install slide bolt. | September 27, 2006 | February 2, 2007 | 128 days |
| Ludlow-Taylor ES | FM-200618210 06 2/2/07 Inspection or preventive maintenance on playground equipment. | February 2, 2006 | February 2, 2007 | 365 days |
| Beers Elementary School | FM-200632520 /06 2/2/07 Front Entrance - R/R door, it does not close properly Asbestos Code A - Clear for repairs on 11/28/06. Tidewater - Shamika Parker (RG 12/01/06 ) | November 24, 2006 | February 2, 2007 | 70 days |
| Beers Elementary School | FM-200631454 /06 2/2/07 First Floor - Building 3 - Lobby exit door is not closing properly. | October 27, 2006 | February 2, 2007 | 98 days |
| Beers Elementary School | FM-200625083 06 2/2/07 1st Floor- Building 3 Lobby Door The outside lobby door is broken; please repair/replace. | June 30, 2006 | February 2, 2007 | 217 days |
| Amidon Elementary School | FM-200222364 /02 2/2/07 Amidon First floor - boys and gym bathrooms Need someone to please come out to re plaster the ceiling in the boys restroom by the main office , it have a hole in it and the gym teachers bathroom the ceiling is falling down. Lead & Asbestos Code A - Clear for repairs on 03/10/03. Horne Engineering - Edward Rodriguez (RG 03/11/03) | December 10, 2002 | February 2, 2007 | 1,515 days |
| Amidon Elementary School | FM-200219092 02 2/2/07 (Amidon) Gym/Boys bathroom: Repair or replace lights in the boys bathroom; bulbs were replaced, and they still do not illuminate. | October 8, 2002 | February 2, 2007 | 1,578 days |
| Amidon Elementary School | FM-200217455 02 2/2/07 Amidon 1st Floor Main Entrance Door in Lobby The striker for the bell is gone and people cannot be buzzed in. Need repair to keep from ahving to keep the door open. | September 13, 2002 | February 2, 2007 | 1,603 days |
| Turner Elementary School | FM-200630177 06 2/2/07 2nd Floor- Teacher's Restroom Repair/replace door locks | September 27, 2006 | February 2, 2007 | 128 days |
| Turner Elementary School | FM-200619484 06 2/2/07 Third Floor (Old Side)-Lock is not working on boys restroom door-unable to secure door kids are vandelizing the restroom | March 6, 2006 | February 2, 2007 | 333 days |
| Beers Elementary School | FM-200515676 /05 2/2/07 Assess carpets for mold growth in the classrooms on the second floor in building 1 and building 2. Asbestos Code A - Clear for repairs on 11/28/05. Tidewater - Philp Connolly (RG 11/30/05) SEE ASSESSMENTS | November 22, 2005 | February 2, 2007 | 437 days |
| Turner Elementary School | FM-200337618 03 2/2/07 Turner Change lock in principals office, in room 112, 210, 300 and 313, need key made for room 313. | September 16, 2003 | February 2, 2007 | 1,235 days |
| Amidon Elementary School | FM-200504196 05 2/2/07 Amidon Cafeteria Repair Roof Leak | April 18, 2005 | February 2, 2007 | 655 days |
| Johnson JHS | FM-200446143 04 2/2/07 Johnson All floors classrooms and exit doors Need a carpentary to repair doors. Door closures are broken. Asbestos Code A - Clear for repairs on 03/31/04. Horne Engineering - Sheryll James (RG 04/05/04) | March 30, 2004 | February 2, 2007 | 1,039 days |
| Wilkinson ES | FM-200225876 03 2/2/07 Wilkinson First floor - 63 girls locker room Need to re-key door, lock is broken and it will not turn. | February 14, 2003 | February 2, 2007 | 1,449 days |
| Malcolm X ES | FM-200206603 02 2/2/07 1) In accordance with grass cutting contract for the summer of 2002 to include grass cutting and edging. | April 25, 2002 | February 2, 2007 | 1,744 days |
| Amidon Elementary School | FM-200204506 02 2/2/07 (Amidon) 2nd Corridor Repair the flourescent lights in the 2nd floor corridor that was intalled recently--they are completely out. The bulbs have been changed and the lights still will not illuminate. | March 15, 2002 | February 2, 2007 | 1,785 days |
| Johnson JHS | FM-200445941 04 2/2/07 Johnson First floor early childhood Replace ceiling tile in building D offices(destroyed by flood water). Asbestos Code A - Clear for repairs on 03/29/04. Horne Engineering - Sheryll James (RG 03/30/04) | March 26, 2004 | February 2, 2007 | 1,043 days |
| Malcolm X ES | FM-200455172 04 2/2/07 Malcolm X Exterior Grounds 1) 250 lf of new 48" fence. Poc - Oscar Mebane - 202-345-0688 | September 20, 2004 | February 2, 2007 | 865 days |
| Thomas Elementary School | FM-200633579 8/06 2/2/07 First Floor - Kitchen - Requesting to have knob lock surveyed and repaired or replaced so that the exterior door can be secured. | December 28, 2006 | February 2, 2007 | 36 days |
| Miner Elementary | FM-200507035 05 2/2/07 (MINER) Second Floor - Room 230 (Boys Restroom) 1) Urinals are stoped up and need new flush valves. | June 21, 2005 | February 2, 2007 | 591 days |
| Johnson JHS | FM-200339565 /03 2/2/07 Johnson Second floor rooms 211, 212 and 305 Repair doors, doors are hanging. Asbestos Code A - Clear for repairs on 10/28/03. Horne Engineering - Philp Connolly (RG 10/30/03) | October 28, 2003 | February 2, 2007 | 1,193 days |
| River Terrace ES | FM-200633724 /8/07 2/2/07 1) First Floor - Principal's Office - Requesting to have the lock (handle hardware) replaced/re-keyed and that 3 keys be provided. 2) Requesting 4 interior master keys 3) Rooms 16 & 19 - Requesting to have the broken off key in the lock removed. 4) Requesting 2 key's for Room 6 5) Requesting to have the lock on the Storage Room across from the Office replaced and that 5 keys be provided. 6) Requesting to have the lock (door handles) replaced on rooms 8 & 9 and that 4 keys be provided. 7) Requesting that 2 exterior master keys be provided Note: Do not key classroom doors on Do Not Duplicate Blanks. | January 8, 2007 | February 2, 2007 | 25 days |
| Johnson JHS | FM-200330705 03 2/2/07 Johnson Exterior - Entrance Doors 1) Request a new grand master key. Principal broke key. | May 27, 2003 | February 2, 2007 | 1,347 days |
| Ballou Senior High School | FM-200503672 05 2/2/07 (Ballou) Remove toilets and unstop 4" waste line in kitchen. | April 7, 2005 | February 2, 2007 | 666 days |
| Johnson JHS | FM-200216353 02 2/2/07 Johnson 1st Floor Main Office Repair/replace metal entrance door & frame. Door cannot be opened or closed properly. | September 3, 2002 | February 2, 2007 | 1,613 days |
| Amidon Elementary School | FM-200227395 03 2/2/07 Amidon Rooms 103, 117, 219, 133, 221, 220, 202, 223, 218, 210, 204, 206, 205, 208, and 132 Please send the locksmith out to our sight to fix the locks on the teacher doors because of the problem we are having with the doors. When we have the shelter in place drill we cannot lock the doors from the inside which make the drill useless. | March 20, 2003 | February 2, 2007 | 1,415 days |
| Winston EC | FM-200446029 04 2/2/07 (Winston) PICK-UP SNOW BLOWER FOR SERVICE. KEEPS CUTTING OFF MAKE/ TORO 824XL SERIAL NO/ 7911933 | March 26, 2004 | February 2, 2007 | 1,043 days |
| Plummer Elementary School | FM-200512579 05 2/2/07 Plummer Boiler room Repair or replace modulator motor or controls on # 1 boiler | September 15, 2005 | February 2, 2007 | 505 days |
| School WW High School | FM-200634376 6 1/26/07 2/2/07 Exterior Parking Lot Entrance Door. Repair or replace lock, cylinder is continuously turning. Note: This door cannot be secured. | January 26, 2007 | February 2, 2007 | 7 days |
| Plummer Elementary School | FM-200631571 /06 2/2/07 Rm. 213 - Univent is leaking. | October 31, 2006 | February 2, 2007 | 94 days |
| Plummer Elementary School | FM-200632044 06 2/2/07 Plummer Boiler room Repair or replace mod. motor, or controls for boiler # 1 | November 8, 2006 | February 2, 2007 | 86 days |
| Payne Elementary School | FM-200224685 03 2/2/07 (Payne) 1st Floor/Health suite: Power failure in this area, also, a burning smell. | January 28, 2003 | February 2, 2007 | 1,466 days |
| Shaw JHS | FM-200210348 02 2/2/07 Shaw area by stairwell #3 1st floor. There are three light fixtures that keeps shorting out changed ballast. but lights keep blowing out. | June 19, 2002 | February 2, 2007 | 1,689 days |
| Park View ES | FM-200337258 03 2/2/07 Park View All classrooms need to be re-keyed and set on one master key. | September 11, 2003 | February 2, 2007 | 1,240 days |
| Ferebee-Hope Elementary School | FM-200224917 03 2/2/07 Ferebee-Hope First floor Replace Knobs on boys and girls bathroom doors. Fire code violation | January 30, 2003 | February 2, 2007 | 1,464 days |
| Ferebee-Hope Elementary School | FM-200333396 03 2/2/07 (Ferebee-Hope0 1st Floor/Main Entrance Door: Replace broken door knob in the family service section. | July 17, 2003 | February 2, 2007 | 1,296 days |
| Gage-Eckington ES | FM-200633992 6/07 2/2/07 Rooms 107, 119 and the Art Room - Requesting to have keys made for these rooms, several members are moving from 825 and are going to be using these rooms. | January 16, 2007 | February 2, 2007 | 17 days |
| Patricia R Harris Ed Center | FM-200331983 03 2/2/07 (Harris, P.R.) !!!EMERGENCY!!! 1st Floor/Boys Locker Room: Key broke off in door; Graduation exercise is to take place today, and they need access to some materials. | June 17, 2003 | February 2, 2007 | 1,326 days |
| Patricia R Harris Ed Center | FM-200449528 04 2/2/07 Harris, P.R. Grounds gardener office GTate to gardener shed is being broken into. EDMERGENCY Please respond | June 21, 2004 | February 2, 2007 | 956 days |
| Patricia R Harris Ed Center | FM-200502902 05 2/2/07 Harris, P.R. Exterior Grounds 1) Fill holes in playground from old playground equipment. | March 18, 2005 | February 2, 2007 | 686 days |
| Patricia R Harris Ed Center | FM-200510263 05 2/2/07 (Harris, P.R.) Rear Exterior. Playground equipment needs preventive maintenance | August 12, 2005 | February 2, 2007 | 539 days |
| Amidon Elementary School | FM-200626743 06 2/2/07 First Floor/Principal's Office - Replace floor tile, it's coming up. Asbestos Code C on 08/07/06. Tidewater - Carlos Vera (RG 08/15/06) | August 3, 2006 | February 2, 2007 | 183 days |
| Amidon Elementary School | FM-200633287 /06 2/2/07 Parking Lot - Drain Clogged. | December 14, 2006 | February 2, 2007 | 50 days |
| Hart Middle School | FM-200447707 04 2/2/07 Hart Water Sampling 1) Basement DayCare Center. | May 10, 2004 | February 2, 2007 | 998 days |
| Amidon Elementary School | FM-200505819 05 2/2/07 ( EATON ) Lobby 1) Repair roof leak, water leaking onto lights. | May 20, 2005 | February 2, 2007 | 623 days |
| Gibbs Elementary School | FM-200337619 03 2/2/07 Gibbs Need two doors locks installed, so they can secured newly installed computers in kitchen in the manager office. | September 16, 2003 | February 2, 2007 | 1,235 days |
| Hart Middle School | FM-200509545 05 2/2/07 Hart School Cut down trees from storm | August 4, 2005 | February 2, 2007 | 547 days |
| Stanton Elementary School | FM-200331738 03 2/2/07 (Stanton) !!!EMERGENCY!!! Outside drains: Water has backed up in the fire alarm room, and the emergency shelter, due to stopped up storm drains. | June 13, 2003 | February 2, 2007 | 1,330 days |
| Amidon Elementary School | FM-200624676 06 2/2/07 First Floor/Hall by Principal Office - Lights are making a strange noise and sparks are coming from them. | June 22, 2006 | February 2, 2007 | 225 days |
| Amidon Elementary School | FM-200622126 06 2/2/07 Most of the lights are out in the hallway on the first floor leading to the Main Office, the bulbs were changed but nothing happened. | May 2, 2006 | February 2, 2007 | 276 days |
| Hearst Elementary School | FM-200124429 01 2/2/07 (HEARST) EXTERIOR OF BLDG. REPAIR OF EXTERIOR LIGHTING ON PLAYGROUND SIDE INCREASE IN EXTERIOR LIGHTING ON THE PARKING LOT. | December 4, 2001 | February 2, 2007 | 1,886 days |
| Amidon Elementary School | FM-200507891 05 2/2/07 Amidon Hallway Main Office/Hallway First Grade class Rm Repair Hallway Light Fixtures | July 15, 2005 | February 2, 2007 | 567 days |
| Hart Middle School | FM-200619632 06 2/2/07 Parking Lot and Playground Area. 1.) Fill in rat burrows that are behind the dumpster and also fill in 1 1/2 ' deep by 3 ' wide hole in the ground. 2.) Remove piles of dirt, grass and weeds along fence line and clean out (3) sewer drains that are clogged with dirt, vegetation and debris. 3.) Remove abandoned truck off of parking lot. | March 7, 2006 | February 2, 2007 | 332 days |
| Gage-Eckington ES | FM-200221992 02 2/2/07 Gage-Eckington V St. Early childhood hall closet Lock requested for maintenance closet, key broke off in lock, can not get door open. | December 3, 2002 | February 2, 2007 | 1,522 days |
| Gage-Eckington ES | FM-200221993 02 2/2/07 Gage-Eckington First floor - Mrs. Harris rooms Need lock change and lock plates for the two rooms, doord will not lock. Rooms can not be secured properly. | December 3, 2002 | February 2, 2007 | 1,522 days |
| Amidon Elementary School | FM-200341490 /03 2/2/07 Amidon Second floor room 223 Repair hole in the floor in the above room. | December 12, 2003 | February 2, 2007 | 1,148 days |
| Gage-Eckington ES | FM-200334615 03 2/2/07 Gage-Eckington First floor room 120 Need a locksmith to repair room 120 door, it will not close properly. Needed for security reason computers, etc......need carpenter to align door | August 7, 2003 | February 2, 2007 | 1,275 days |
| Amidon Elementary School | FM-200516173 05 2/2/07 Rm 206 Repair univent in classroom 210 , rewire switch ,electrical sparks | December 8, 2005 | February 2, 2007 | 421 days |
| Amidon Elementary School | FM-200514738 /05 2/2/07 Amidon First Floor - Room 124 - Ms. White's Room 1) Door needs to be repaired that leads from the inside to the outside. Does not lock..Door is swollen and is sticking. Asbestos Code A - Clear for repairs on 11/02/05. Tidewater - Thomas Johnson (RG 11/03/05) | October 28, 2005 | February 2, 2007 | 462 days |
| Amidon Elementary School | FM-200443624 04 2/2/07 (Amidon) 1st Floor/Main Office Hallway and Lobby: Repair light fixture, replaced bulbs, and did not work. | February 2, 2004 | February 2, 2007 | 1,096 days |
| Amidon Elementary School | FM-200444831 04 2/2/07 Amidon First floor boys gym locker, lobby and multi purpose room Lights fixtures need repairing they do not work. Asbestos Code A - Clear for repairs on 03/05/04. Horne Engineering - Tony Marcolin (RG 03/09/04) | March 4, 2004 | February 2, 2007 | 1,065 days |
| Hart Middle School | FM-200517072 06 2/2/07 Repair/Replace outside wall that was vandalized | January 3, 2006 | February 2, 2007 | 395 days |
| Amidon Elementary School | FM-200446873 04 2/2/07 Amidon Possibly if we can get a window A/C unit and someone to install it in the teachers lounge being that we have meetings for the principal and teachers. | April 20, 2004 | February 2, 2007 | 1,018 days |
| Amidon Elementary School | FM-200447246 04 2/2/07 Amidon Exterior 1) The scope of work includes collection of soil and groundwater samples from several locations at each school. We anticipate field work to be completed in three days at each location. Project Manager - Chris L. Boggs, P.G. - 919-388-8101 VEETech P.C. | April 28, 2004 | February 2, 2007 | 1,010 days |
| Amidon Elementary School | FM-200508071 05 2/2/07 Bowen Boiler Room Replace ballasts in (4) four light fixtures in Boiler room. | July 19, 2005 | February 2, 2007 | 563 days |
| Watkins Elementary School | FM-200617649 06 2/2/07 Watkins Room #111 Replace double shaft motor in classroom #111. Motor is burn out. | January 20, 2006 | February 2, 2007 | 378 days |
| Wilson J. O. ES | FM-200626526 06 2/5/07 Pre-K Area- Repair/replace door closer. Asbestos Code A - Clear for repairs on 08/0206. Tidewater - Shamika Parker (RG 08/04/06) | July 31, 2006 | February 5, 2007 | 189 days |
| Wilson J. O. ES | FM-200626626 06 2/5/07 2nd Floor- Room 201 Repair/replace broken mirrors in both Boy's and Girl's bathrooms. Note: Hanging pieces were removed, but sharp glass edges are exposed. | August 1, 2006 | February 5, 2007 | 188 days |
| Jessie LaSalle Elementary | FM-200627318 06 2/5/07 First Floor/Rm. 122 - Replace receptical, it has burned out and burned the wall. | August 11, 2006 | February 5, 2007 | 178 days |
| Ketcham Elementary School | FM-200340124 /03 2/5/07 Ketcham Boiler room NO HEAT Repair burners 1 thru 5 , will not start. | November 10, 2003 | February 5, 2007 | 1,183 days |
| Jessie LaSalle Elementary | FM-200621371 06 2/5/07 1st Floor- Main Hall Busted drinking fountain. They cannot shut off the water. | April 14, 2006 | February 5, 2007 | 297 days |
| Ketcham Elementary School | FM-200341243 03 2/5/07 Ketcham Second floor rooms 212 and 213 Need replacement of univent in rooms 212 and 213 possible on/off switch. Model # FDSNIOH5 SERIAL # 207921 CYCLE 60 PH 1 HP 1/6 Volts 115 AMPS 2.3 | December 9, 2003 | February 5, 2007 | 1,154 days |
| Ketcham Elementary School | FM-200341244 03 2/5/07 Ketcham Third floor new wing open space Univent in Mr. Watts old room shaft will not turn, univent in sech 2 need bleeder valve, the other need a motor, classroom next to north stairwell need bleeder valve, and rooms 301 and 302 (crespar) need. | December 9, 2003 | February 5, 2007 | 1,154 days |
| Jessie LaSalle Elementary | FM-200617984 06 2/5/07 Ground level, Cafeteria Office. Asbestos Assessment Required. Install (3) 3 prong outlets for computers asap! Asbestos Code A - Clear for repairs on 01/30/06. Tidewater - Kenny Long (RG 01/31/06) | January 27, 2006 | February 5, 2007 | 374 days |
| Ketcham Elementary School | FM-200341450 /03 2/5/07 Ketcham Boiler Room 1. Boiler #1 will not come on due to code, lock out standby - 13-3 FVES Open. 2. Boiler #2 Low water cut-out need to be adjusted. (You have to tap on it for it to work). | December 11, 2003 | February 5, 2007 | 1,152 days |
| Ketcham Elementary School | FM-200449554 04 2/5/07 Ketcham Third floor open space Air conditioner need to be service. | June 21, 2004 | February 5, 2007 | 959 days |
| Ketcham Elementary School | FM-200459947 /04 2/5/07 Ketcham 3rd floor new wing open space Univent in Mr. Watts old room shaft will not turn, univent in sec. 42 cneed bleeder valve, the other need a motor, classroomnext to north stairwell need bleeder valve. Room 301 and 302 (resPar) need bleeder valve valves, also K-2 need bleeder valve. | December 21, 2004 | February 5, 2007 | 776 days |
| Ketcham Elementary School | FM-200515823 /05 2/5/07 Ketcham Auditorium - NO HEAT Replace the following (2) motors: Emerson Electric Co: Frame: KS80BXBU Style: 161 12425 Volts: 220 Amps: 3.33 H.P 1/2 RPM 1725/1140 PH 1 Cyc 60 DPM - 53 | November 28, 2005 | February 5, 2007 | 434 days |
| Ketcham Elementary School | FM-200516620 /05 2/5/07 Ketcham Boiler Room Adjust Boilers #1,#2,#3 and #4 to 5-6 Lbs. Adjust pressure control. | December 16, 2005 | February 5, 2007 | 416 days |
| Jessie LaSalle Elementary | FM-200626419 06 2/5/07 Rm. 301/furnish and install new lock for classroom entry door. | July 19, 2006 | February 5, 2007 | 201 days |
| Jessie LaSalle Elementary | FM-200622758 06 2/5/07 Can't shut water off to the water fountain on the first floor by room 122, the button was pushed and the water will not stop running out from the mouth piece. Checked to see if the button was stuck but it wasn't. | May 16, 2006 | February 5, 2007 | 265 days |
| Draper Elementary School | FM-200630355 06 2/5/07 1st Floor- Corridor Window by 109 Repair/replace broken window grate. Note: This may have been the entrance from a recent break-in. | October 2, 2006 | February 5, 2007 | 126 days |
| Kramer Middle School | FM-200448714 04 2/5/07 Kramer Boiler Room Boiler #2 Burner needs to be calibrated. | June 2, 2004 | February 5, 2007 | 978 days |
| Jessie LaSalle Elementary | FM-200626406 06 2/5/07 Tird Floor/Furnish and install ballast in the hall | July 17, 2006 | February 5, 2007 | 203 days |
| Kramer Middle School | FM-200458302 /04 2/5/07 Kramer Boiler Room Repair or replace boiler solenoid valve for feed water tank. Automatic Switch Co. / Rebuilt Kit #302276 / Air, Inert Gas (PSI) 150 Water (PSI) 150 / Lt. Oil (PSI) / Serial # F673280 / Pipe 3/4" Valve Cat. #8210G95 Encl. Types 2,3,35.4X4K (1) Shut off valve Red Hot. | November 16, 2004 | February 5, 2007 | 811 days |
| Kramer Middle School | FM-200458944 04 2/5/07 Kramer Boiler Room Repair or replace return pumps in Boiler Room. | December 2, 2004 | February 5, 2007 | 795 days |
| Kramer Middle School | FM-200458994 04 2/5/07 Kramer Burner cilibration. | December 2, 2004 | February 5, 2007 | 795 days |
| Johnson JHS | FM-200631641 06 2/5/07 Johnson Boiler room Repair burner # 3 , will not start. | November 2, 2006 | February 5, 2007 | 95 days |
| Johnson JHS | FM-200627973 06 2/5/07 Boiler Room - Boiler # 3 - Rewire control to burner. | August 21, 2006 | February 5, 2007 | 168 days |
| Johnson JHS | FM-200622139 06 2/5/07 Johnson Boiler room Repair or replace oil heater on the chiller, not working | May 3, 2006 | February 5, 2007 | 278 days |
| Johnson JHS | FM-200620120 06 2/5/07 Johnson Boiler room Repair # 1 burner, will not start Flame failure. | March 21, 2006 | February 5, 2007 | 321 days |
| Johnson JHS | FM-200618432 06 2/5/07 Johnson PM Chiller Check equipment and perform PM on equipment. | February 8, 2006 | February 5, 2007 | 362 days |
| Johnson JHS | FM-200514434 /05 2/5/07 Johnson Boiler Room Boiler #1 will not start, Flame failure. | October 23, 2005 | February 5, 2007 | 470 days |
| Johnson JHS | FM-200514329 /05 2/5/07 Johnson Boiler Room Boiler #1 Blower motor Down | October 23, 2005 | February 5, 2007 | 470 days |
| Johnson JHS | FM-200502598 05 2/5/07 Johnson Perform PM to Chiller and all equipment. | March 14, 2005 | February 5, 2007 | 693 days |
| Johnson JHS | FM-200501053 05 2/5/07 Johnson Throughout Building Furnish materials for work to be done by technician: Robert Shaw, Freeze stat, Mod #T301, Ser. B68, Volt AC 120 / 208 / 240 | February 1, 2005 | February 5, 2007 | 734 days |
| Johnson JHS | FM-200459842 /04 2/5/07 Johnson No heat Rooms 107, 311, 106, 214, 213, 413 and 312. | December 20, 2004 | February 5, 2007 | 777 days |
| Wilson J. O. ES | FM-200631161 /06 2/5/07 Ground Floor - Pre-K Area - Repair the door, the door is unable to close on it's own. | October 23, 2006 | February 5, 2007 | 105 days |
| Johnson JHS | FM-200455568 04 2/5/07 Johnson Head Start Area Bellts Furnish belts for univent for Head Start Area. Belts size 3L210. | September 24, 2004 | February 5, 2007 | 864 days |
| Kramer Middle School | FM-200503296 05 2/5/07 Kramer Boiler Room Boiler #1 off on alarm, no heat in Building. Only Boiler working. | March 28, 2005 | February 5, 2007 | 679 days |
| Bell High School | FM-200633658 7/06 2/5/07 A part of the gate for the day care center is falling down. Bolts are needed to hold the gate to the post. | December 27, 2006 | February 5, 2007 | 40 days |
| Kramer Middle School | FM-200510793 05 2/5/07 Kramer Annex Rear Play-ground Repair heat pump, won't run- for room #21 fan locked. AO Smith HP-1/4 RPM - 1075 AMP - 1.3 HZ - 60 | August 19, 2005 | February 5, 2007 | 535 days |
| Beers Elementary School | FM-200630573 06 2/5/07 Cafeteria- Repair/replace door check. | October 6, 2006 | February 5, 2007 | 122 days |
| Beers Elementary School | FM-200625767 06 2/5/07 1st Floor- Building III Lobby Area Repair/replace outside door knob; it is broken and has sharp ends. | July 17, 2006 | February 5, 2007 | 203 days |
| Jessie LaSalle Elementary | FM-200633100 /06 2/5/07 First Floor - Counselor's Office - No electric (lights & recepticals on the right side of the wall) | December 11, 2006 | February 5, 2007 | 56 days |
| Jessie LaSalle Elementary | FM-200632995 06 2/5/07 Principal's Office - Power outage | December 7, 2006 | February 5, 2007 | 60 days |
| Johnson JHS | FM-200455428 04 2/5/07 Johnson Lobby Area's, Both Front Door Furnish materials for univents (5) five 89 motor; RPM 1050; Volts 115; Amps 3.3, 1.4, 11, 90, 76 Speed 5 HP 1/10, 1/30, 1/35-1/60-1/70 | September 22, 2004 | February 5, 2007 | 866 days |
| Johnson JHS | FM-200450325 04 2/5/07 Johnson Throughout Building Furnish materials for univents motors, bearings, couplings toggler switches and air handler units throughout Building. | July 15, 2004 | February 5, 2007 | 935 days |
| Johnson JHS | FM-200449347 04 2/5/07 Johnson Jr. Main office, Princilpal's office, Counsler' office Frabricate condensate drip pans for the following areas Main office ,Princilpal's office, and the counsler's office , (approx. 50" X 7" ) ea. Asbestos Code A - Clear for repairs on 06/16/04. Horne Engineering - Edward Rodriguez (RG 06/17/04) | June 16, 2004 | February 5, 2007 | 964 days |
| Kramer Middle School | FM-200619704 06 2/5/07 taginator is neended to put back in stock | March 9, 2006 | February 5, 2007 | 333 days |
| Kramer Middle School | FM-200626769 06 2/5/07 Kramer Boiler Room Boiler room flooded check all electric controls on pumps and boilers | August 3, 2006 | February 5, 2007 | 186 days |
| Johnson JHS | FM-200447023 04 2/5/07 Johnson Boiler room Repair or replace oil heaters on the chiller in the boiler room. | April 23, 2004 | February 5, 2007 | 1,018 days |
| Jessie LaSalle Elementary | FM-200625846 06 2/5/07 Requesting (1) water fountain to be replaced on the third floor hall. | July 11, 2006 | February 5, 2007 | 209 days |
| Kramer Middle School | FM-200630774 /13/06 2/5/07 KRAMER BOILER room Attempt to test fire boiler # 3 will not start out on flame failure. | October 13, 2006 | February 5, 2007 | 115 days |
| Kramer Middle School | FM-200631724 /2/06 2/5/07 KRAMER Boiler # 1 & 2 replace gas valve on boiler s 1 & 2 and fire eye 9n boiler # 2 | November 2, 2006 | February 5, 2007 | 95 days |
| Jessie LaSalle Elementary | FM-200632959 06 2/5/07 Second Floor - Boy's Restroom - Replace window, the frame is out. Asbestos Code A - Clear for repairs on 12/11/06. Tidewater - Roger Small (RG 12/13/06) | December 6, 2006 | February 5, 2007 | 61 days |
| Jessie LaSalle Elementary | FM-200631559 /06 2/5/07 Cafeteria - Water fountain leaking from the bottom | October 31, 2006 | February 5, 2007 | 97 days |
| Kenilworth ES | FM-200633904 07 2/5/07 Third Floor - Missing Ceiling Tile In Hallway (IFC703.1) Reinspection on 1-30-07 Asbestos Code A - Clear for repairs on 01/12/07. Tidewater - Tony Marcolin (RG 01/16/07) 02/09/2007 06:37 TH - Completed 2-8-07 per Principal Fatima Johnson, Earnest Palmer and inspection | January 10, 2007 | February 5, 2007 | 26 days |
| Jessie LaSalle Elementary | FM-200621533 06 2/5/07 Repair and or replace free standing water cooler. | April 19, 2006 | February 5, 2007 | 292 days |
| Jessie LaSalle Elementary | FM-200631497 /06 2/5/07 First floor, Auditorium. Recover exposed electrical wires on stage & side wall | October 30, 2006 | February 5, 2007 | 98 days |
| Jessie LaSalle Elementary | FM-200631116 /06 2/5/07 First floor/Auditorium, Second floor/Boys' Restroom and Repair broken windows & window paynes. Asbestos Code A - Clear for repairs on 10/20/06. Tidewater - Thomas Johnson (RG 02/26/07) | October 20, 2006 | February 5, 2007 | 108 days |
| Jessie LaSalle Elementary | FM-200618555 06 2/5/07 Second floor corridor/ Broken quarter inch supply line to storage tank, please furnish and install a free standing deluxe water cooler. Asbestos Code A - Clear for repairs on 02/14/06. Tidewater - Shamika Parker (RG 02/15/06) | February 10, 2006 | February 5, 2007 | 360 days |
| Jessie LaSalle Elementary | FM-200631067 /06 2/5/07 Requesting to have electricians to furnish and install light ballasts on the 2nd floor hallway. | October 18, 2006 | February 5, 2007 | 110 days |
| Jessie LaSalle Elementary | FM-200630145 06 2/5/07 Repair or reolace water fountain near room 209. This water fountain is leaking constantly and the leak cannot be isolated, dispite shutting the supply line. | September 27, 2006 | February 5, 2007 | 131 days |
| Jessie LaSalle Elementary | FM-200621883 06 2/5/07 Front Entrance Doors-The two on the right side: Change Lock Note: Someone is entering the building through the doors. | April 27, 2006 | February 5, 2007 | 284 days |
| Johnson JHS | FM-200444642 04 2/5/07 Johnson Jr. Kitchen Hood fan Repair or replace exhaust hood fan motor. | March 2, 2004 | February 5, 2007 | 1,070 days |
| Ballou Senior High School | FM-200633996 1/07 2/5/07 Survey: r/r door to room #308 unable to secure do to vandalism. | January 11, 2007 | February 5, 2007 | 25 days |
| Johnson JHS | FM-200444333 04 2/5/07 Johnson EMERGENCY Auditorium HJeat does not work. Engineer check it and said that it need a motor. Motor is locked. | February 23, 2004 | February 5, 2007 | 1,078 days |
| Jessie LaSalle Elementary | FM-200218036 02 2/5/07 (Lasalle) Asbestos Assessment Reqd. 1st floor/Library 124 Install outlet for copy machine. | September 20, 2002 | February 5, 2007 | 1,599 days |
| Jessie LaSalle Elementary | FM-200630049 06 2/5/07 Front Door- Repair/replace door closer. Asbestos Code A - Clear for repairs on 09/28/06. Tidewater - Kenny Long (RG 09/29/06) | September 26, 2006 | February 5, 2007 | 132 days |
| Jessie LaSalle Elementary | FM-200505923 05 2/5/07 ( LASALLE ) Ground Floor - Maintenance Office, and First Floor - Room 118 1) Repair lights in maintenance office, there is a shortage. 2) Replace three light ballast in room 118 | June 1, 2005 | February 5, 2007 | 614 days |
| Johnson JHS | FM-200330977 03 2/5/07 Johnson Boiler under stairs (Boiler Room) Check Boiler under stairs in boiler room use for hot water in kitchen, No hot water. | June 2, 2003 | February 5, 2007 | 1,344 days |
| Kenilworth ES | FM-200634020 07 2/5/07 First Floor - Missing handle on corridor door (IFC703.2.2) Reinspection on 1-30-07 02/09/2007 06:50 TH - Completed 2-8-07 per Principal Fatima Johnson, Earnest Palmer and inspection | January 17, 2007 | February 5, 2007 | 19 days |
| Jessie LaSalle Elementary | FM-200626115 06 2/5/07 LaSalle Classroom #124 Furnish and install (1) one A/C Window unit in classroom. No window shade in classroom. Size of A/C unit: 20,000 to 27,000 BTU's Amps 14.0-15.5 40 Amp Breaker Room size: 1700 square feet | July 21, 2006 | February 5, 2007 | 199 days |
| Jessie LaSalle Elementary | FM-200622211 06 2/5/07 1st Floor- Closet in Boy's Bathroom Plugged custodial sink near the cafeteria. | May 4, 2006 | February 5, 2007 | 277 days |
| Johnson JHS | FM-200220666 /02 2/5/07 Johnson JHS boiler room Replace feed water regulator on boiler # 3 | November 12, 2002 | February 5, 2007 | 1,546 days |
| Jessie LaSalle Elementary | FM-200628484 06 2/5/07 Power Out In Classrooms On The Second And Third Floors | August 30, 2006 | February 5, 2007 | 159 days |
| Johnson JHS | FM-200213820 02 2/5/07 Johnson JHS Boiler Room Replace bearings on # 1 circulating pump. Pump has mechanical seals. | August 8, 2002 | February 5, 2007 | 1,642 days |
| Kenilworth ES | FM-200634021 07 2/5/07 First Floor - Front exit door 4 one not latching (IFC703.2.2) Reinspection on 1-30-07 02/09/2007 06:51 TH - Completed 2-8-07 per Principal Fatima Johnson, Earnest Palmer and inspection | January 17, 2007 | February 5, 2007 | 19 days |
| Slowe Elementary School | FM-200631010 19/06 2/5/07 Front Entrance - Stairwell (old building) - Replace the handrails, they are off the wall. | October 19, 2006 | February 5, 2007 | 109 days |
| Kenilworth ES | FM-200634023 07 2/5/07 First Floor - Front corridor door not latching (IFC703.2.2) Reinspection on 1-30-07 02/09/2007 07:08 TH - Completed 2/8/07 per Principal Fatima Johnson, Earnest Palmer and inspection | January 17, 2007 | February 5, 2007 | 19 days |
| Jessie LaSalle Elementary | FM-200628432 06 2/5/07 Requesting to have water fountains replaced or repaired. 1.) 2nd floor next to room 209. 2.) 3rd floor next to room 308. | August 23, 2006 | February 5, 2007 | 166 days |
| Ketcham Elementary School | FM-200332494 03 2/5/07 Ketcham Boiler Room Check chiller, need refrigerant. | June 25, 2003 | February 5, 2007 | 1,321 days |
| Jessie LaSalle Elementary | FM-200624258 06 2/5/07 Exit Door for the Rear Parking Lot Needs a door closure, and the keeper won't catch. | June 13, 2006 | February 5, 2007 | 237 days |
| Ketcham Elementary School | FM-200336204 03 2/5/07 Ketcham Boiler Room Boiler #4 need burner adjustment. Boiler failed isnpection. | August 25, 2003 | February 5, 2007 | 1,260 days |
| Birney Elementary School | FM-200628704 06 2/5/07 Parking Lot (middle of parking lot)/Storm drain cover is missing | September 1, 2006 | February 5, 2007 | 157 days |
| Jessie LaSalle Elementary | FM-200618556 06 2/5/07 Ground floor Furnish and install door closure for rear exit door. | February 10, 2006 | February 5, 2007 | 360 days |
| Jessie LaSalle Elementary | FM-200618557 06 2/5/07 Furnish and Install roton hinge for the following classrooms doors- 22,305,304&14. Asbestos Code A - Clear for repairs on 02/14/06. Tidewater - Shamika Parker (RG 02/15/06) SEE ASSESSMENTS | February 10, 2006 | February 5, 2007 | 360 days |
| Jessie LaSalle Elementary | FM-200617899 06 2/5/07 Ground floor-13, 14, 22, and 23 Furnish and install partitions Asbestos Code A - Clear for repairs on 01/30/06. Tidewater - Carlos Vera (RG 01/31/06) | January 26, 2006 | February 5, 2007 | 375 days |
| Wilson J. O. ES | FM-200512721 05 2/5/07 Wilson, J.O. First Floor-125 Plat at door entrance is loose and needs to be stabilized before someone trips over it and falls | September 16, 2005 | February 5, 2007 | 507 days |
| Wilson J. O. ES | FM-200625464 06 2/5/07 Computer Lab- Install new a/c units. | July 10, 2006 | February 5, 2007 | 210 days |
| Roosevelt High School | FM-200512565 05 2/6/07 Roosevelt Room #320 Repair univents ,unit #1 will not heat or cool., univent #2 shop put coil in backward and needs motor. | September 14, 2005 | February 6, 2007 | 510 days |
| Backus Middle School | FM-200339118 /03 2/6/07 Backus Second floor room 205 Replace broken window panel. | October 17, 2003 | February 6, 2007 | 1,208 days |
| Backus Middle School | FM-200340538 /03 2/6/07 Backus Second floor room 205 Replace broken exterior window. | November 20, 2003 | February 6, 2007 | 1,174 days |
| Powell Elementary School | FM-200514419 /05 2/6/07 Powell Replace outlet in health suite | October 11, 2005 | February 6, 2007 | 483 days |
| Powell Elementary School | FM-200512776 05 2/6/07 (Powell) During the storm the roof cover blew off the roof and left the roof open for rain and birds to get in builbing. Also where the rain would come through the ceiling, the ceiling has abestos in it. Asbestos Code A - Clear for repairs on 10/21/05. Tidewater - Tony Marcolin (RG 10/25/05) | July 25, 2005 | February 6, 2007 | 561 days |
| Powell Elementary School | FM-200507608 05 2/6/07 Asbestos Assessment Required. Repair or Replace doors in the following areas: First floor. 1.) kindergarten room - off track - 1 door 2.) Bookroom off Track - 1 door 3.) Room 105 off track - 1 door 4.) Room 103 off track - 2 doors 5.) Main office off track - 1 door 6.) All purpose room - 1 door off track Second floor. 1.) Library handle - 1 door 2.) 205 off track - 2 doors 3.) 217 off track - 1 door. Code A-clear for repair by DCPS Charles Buchanan on 7/15/05 | July 8, 2005 | February 6, 2007 | 578 days |
| Powell Elementary School | FM-200505701 05 2/6/07 (Powell) We need round florestant lights we donot have any. Need # FC8T9 and # FC12T9. Need 12 each | May 5, 2005 | February 6, 2007 | 642 days |
| Powell Elementary School | FM-200444572 04 2/6/07 (Powell) Food Service/Cafeteria: Need two disconnect boxes for ovens. | February 27, 2004 | February 6, 2007 | 1,075 days |
| Powell Elementary School | FM-200338658 03 2/6/07 (Powell) Asbestos Assessment Required. There will be a major event in the morning of October 28,2003. Verizon will be giving Powell some computers and Ms. USA will be reading to some kids in the Library. Also the media will be covering the event. The Principal would like to have the carpet replace because it is not safe to walk on it with out tripping on it. We would appreciate if we could get started on this ASAP. Asbestos Code A - clear for repairs on 10/10/03. Horne Engineering - Roger Kager (RG 10/22/03) | October 8, 2003 | February 6, 2007 | 1,217 days |
| Powell Elementary School | FM-200332042 03 2/6/07 Powell Boiler Room Make necessary repair to corract air compressor operation. After compressor cycles off on pressure, it doesn't cycle back on after pressure has drop. | June 18, 2003 | February 6, 2007 | 1,329 days |
| Powell Elementary School | FM-200221459 /02 2/6/07 On second floor all three water fountains need to be replaced because the motor is burned out in all three. There is no drinking fountain working presently on that floor. | October 22, 2002 | February 6, 2007 | 1,568 days |
| Payne Elementary School | FM-200515234 05 2/6/07 Repair # 2 boiler , will not start, lockout | November 8, 2005 | February 6, 2007 | 455 days |
| Powell Elementary School | FM-200221317 /02 2/6/07 Powell Kitchen 1) Repair floor in freezer / and or refrigerator. | November 19, 2002 | February 6, 2007 | 1,540 days |
| Payne Elementary School | FM-200620304 06 2/6/07 Payne Boiler Room Repair #2 hot water supply pump, leaking. Model # E2508E2F1F2LOA Head F2=70 Motor-HP-7.5 RPM-1750 Cap CMP 170-ACO | March 24, 2006 | February 6, 2007 | 319 days |
| Powell Elementary School | FM-200220882 /02 2/6/07 Powell Cafeteria Fabricate and install a new floor for the refrigerator. Asbestos Code A - Clear for repairs on 11/14/02. Horne Engineering - Bipin Nanavaty (RG 11/15/02) | November 13, 2002 | February 6, 2007 | 1,546 days |
| Powell Elementary School | FM-200210467 02 2/6/07 Powell Boiler Room Check and repair or replace flow switch on hot water heater. | June 27, 2002 | February 6, 2007 | 1,685 days |
| Backus Middle School | FM-200445354 04 2/6/07 Backus Room - 105 1) Water is leaking from the ceiling into room 105. Asbestos Code A - Clear for repairs on 03/15/04. Horne Engineering - Bipin Nanavaty (RG 03/16/04) | March 15, 2004 | February 6, 2007 | 1,058 days |
| Backus Middle School | FM-200448302 04 2/6/07 Backus Throughout bldg. halls Replace missing and broken ceiling tiles. Asbestos Code A - Clear for repairs on 05/24/05. Horne Engineering - Tony Marcolin (RG 05/25/04) | May 21, 2004 | February 6, 2007 | 991 days |
| Backus Middle School | FM-200459904 /04 2/6/07 Backus No heat in rooms 214, 211, 210, 208, 205 (motor none), boys lavatory, 203A, 203B, 204, 308, 306, new computer labs, 304, 303, 301, 310, 312, 316 and 202. | December 20, 2004 | February 6, 2007 | 778 days |
| Backus Middle School | FM-200500083 05 2/6/07 Backus First floor The breaker is not working and two rooms are without electric. | January 4, 2005 | February 6, 2007 | 763 days |
| Backus Middle School | FM-200500086 05 2/6/07 Backus Third floor room 308 Need to change lights from 2 bulb lights to the four bulbs lights. Asbestos Code A - Clear for repairs on 06/06/05. Tidewater - Paul Berman (RG 07/24/05) | January 4, 2005 | February 6, 2007 | 763 days |
| Backus Middle School | FM-200501602 05 2/6/07 Backus Rooms 213 and hallway by 214 Door handles are missing. Code A-claer for repair by DCPS Charles Buchanan on 2/16/05 | February 14, 2005 | February 6, 2007 | 722 days |
| Backus Middle School | FM-200502489 05 2/6/07 Backus Cafeteria Replace missing coil in heating unit in cafeteria locker room. Locker room is cold. | March 10, 2005 | February 6, 2007 | 698 days |
| Backus Middle School | FM-200502582 05 2/6/07 (Backus) Asbestos Assessment Required. Second /Third floor. Replace missing floor tiles in recreation room and hallway on second floor. Replace missing floor tiles in rooms 302, 314, library and hallway. HA 001 floor tile 9" X 9" with pink, blue yellow brown & white markings (Yes Asbestos) HA 002 floor tile Belge 9" X 9" with Rust Brown, and white markings (Assumed to be asbestos) Code B | March 11, 2005 | February 6, 2007 | 697 days |
| Backus Middle School | FM-200504234 05 2/6/07 ( BACKUS ) Asbestos Assessment Required Locker Room - Boys Restroom 1) Water pipe is leaking. Code A-Clear for repair by DCPS Charles Buchanan on 5/6/05 | April 19, 2005 | February 6, 2007 | 658 days |
| Backus Middle School | FM-200512800 05 2/6/07 Backus Second Floor 1) Remove two faucets from Room 205 and 203A. | September 19, 2005 | February 6, 2007 | 505 days |
| Backus Middle School | FM-200516391 /05 2/6/07 Install security plates on the following rooms: 210, 211, 208, and 205. Asbestos Code A - Clear for repairs on 12/14/05. Tidewater - Philp Connolly (RG 12/16/05) | December 13, 2005 | February 6, 2007 | 420 days |
| Backus Middle School | FM-200621219 06 2/6/07 Check and repair the air conditioners in the Main Office-Not blowing any air. (vertical and horizontal plugs) | April 12, 2006 | February 6, 2007 | 300 days |
| Backus Middle School | FM-200621229 06 2/6/07 Interior of Building/Rec. Area. Replace malfunctioning breaker in electrical box ASAP! | April 12, 2006 | February 6, 2007 | 300 days |
| Backus Middle School | FM-200621570 06 2/6/07 1st Floor- Main Office/Science Lab The main office is extremely hot, and the science lab. The 2 air conditioners do not work (one makes a loud popping noise). | April 20, 2006 | February 6, 2007 | 292 days |
| Backus Middle School | FM-200622451 06 2/6/07 2nd Floor- Rooms 204-206C Doors need to be realigned. | May 10, 2006 | February 6, 2007 | 272 days |
| Backus Middle School | FM-200623352 06 2/6/07 3rd Floor- Girls Bathroom Unstop the line for the girls bathroom in the gym. | May 25, 2006 | February 6, 2007 | 257 days |
| Backus Middle School | FM-200623942 06 2/6/07 Second Floor/Boy's Restroom - Repair plaster ceiling, it's falling due to a toilet leak in the Bathroom above this one. Lead & Asbestos Code A - Clear for repairs on 06/12/06. Tidewater - Roger Small (RG 06/13/06) SEE ASSESSMENTS | June 6, 2006 | February 6, 2007 | 245 days |
| Backus Middle School | FM-200624164 06 2/6/07 BACKUS main office Furnish and replace (1) window a/c unit 24,000BTU 20amp and (1) window heat pump ilocated in each main offices compressor wll not engage. | June 9, 2006 | February 6, 2007 | 242 days |
| Backus Middle School | FM-200630436 06 2/6/07 Second floor, Kitchen Storeroom. Breach in the ceiling of the kitchen storage room. 36" X 36" of paint and plaster. Breach is the result of new hot water line installed about two years ago. Lead & Asbestos Code A - Clear for repairs on 10/24/06. Tidewater - Roger Small/Shamika Parker (RG 10/26/06) SEE LINKED DOCUMENTS | October 4, 2006 | February 6, 2007 | 125 days |
| Backus Middle School | FM-200632704 /06 2/6/07 Kitchen - Bathroom - Heater is leaking | November 30, 2006 | February 6, 2007 | 68 days |
| Backus Middle School | FM-200632805 06 2/6/07 Kitchen - Office - Check and repair burned out outlet, can't gain access to the computer. | December 4, 2006 | February 6, 2007 | 64 days |
| Beers Elementary School | FM-200624090 06 2/6/07 First floor, Auditorium. Repair or Replace hinges on auditorium door. | June 8, 2006 | February 6, 2007 | 243 days |
| Beers Elementary School | FM-200632519 /06 2/6/07 Bldg. 1, 2 & 3 - Exit doors are missing kick plates. Asbestos Code A - Clear for repairs on 11/28/06. Tidewater - Shamika Parker (RG 01/12/07) | November 24, 2006 | February 6, 2007 | 74 days |
| West Elementary School | FM-200619735 06 2/6/07 West Air handler Unit #1 Repair or replace air handler unit #1 in the Boiler Room. Service Kgn Room. | March 10, 2006 | February 6, 2007 | 333 days |
| West Elementary School | FM-200618447 06 2/6/07 West PM Chiller Check equipment and perform PM on equipment. | February 8, 2006 | February 6, 2007 | 363 days |
| West Elementary School | FM-200330030 03 2/6/07 West Boiler Room Basement Repair or replace chill water pump Name: Bell & Gossett 6 x 12 pump Modlel: VSC9 1/2 BFLHR IDNT# 751495MT Max Working Pressure 175-PSI 600-GPM 80Ft. 20 H.P 1750 RPM Pump is making a very loud noise | May 12, 2003 | February 6, 2007 | 1,366 days |
| West Elementary School | FM-200226401 03 2/6/07 West Boiler Room Basement Repair or replace starter coil to A.H.U Starter will not pull into operate motor for A.H.U | February 28, 2003 | February 6, 2007 | 1,439 days |
| Watkins Elementary School | FM-200633548 /06 2/6/07 Boiler Room - Repair burner # 1 and 2 heating hot water boilers. | December 27, 2006 | February 6, 2007 | 41 days |
| Watkins Elementary School | FM-200633529 /06 2/6/07 Boiler room Repair Boilers # 1 & # 2 boilers cuts off on flame failure and must be reset two or three times each day. HAVC | December 21, 2006 | February 6, 2007 | 47 days |
| Brent Elementary School | FM-200213863 02 2/6/07 Brent Repair or replace shaft and thrust bearing assembly on the house circulating pump,it is needed for the air conditoining unit. | August 8, 2002 | February 6, 2007 | 1,643 days |
| Brent Elementary School | FM-200444093 04 2/6/07 Brent Boiler room Repair # 1 burner ,will not start ,water from leaking tubes. Asbestos Code A - Clear for repairs on 02/18/04. Horne Engineering - Edward Rodriguez (RG 02/19/04) | February 17, 2004 | February 6, 2007 | 1,085 days |
| Brent Elementary School | FM-200503255 05 2/6/07 Brent Room #417 Replace broken shaft in univent room #417, also replace bearings. Univent is needed to heat classroom. | March 25, 2005 | February 6, 2007 | 683 days |
| Brent Elementary School | FM-200504382 05 2/6/07 Brent Chiller Repair chiller. Chiller will not stay on line. Contract is arcing. | April 21, 2005 | February 6, 2007 | 656 days |
| Brent Elementary School | FM-200506122 05 2/6/07 Brent Boiler room Service chiller, unit will start, but only runs for 5 mins. then shuts down. | May 31, 2005 | February 6, 2007 | 616 days |
| Brent Elementary School | FM-200508046 05 2/6/07 Brent Boiler room Service chiller, unit will start. | July 19, 2005 | February 6, 2007 | 567 days |
| Brent Elementary School | FM-200511527 05 2/6/07 Brent Chiller Repair chiller, will not come on. Engineer try to start unit. | August 28, 2005 | February 6, 2007 | 527 days |
| Brent Elementary School | FM-200621905 06 2/6/07 Brent Cooling Tower Replace the float assembly valve on the cooling tower, will not shut off. | April 28, 2006 | February 6, 2007 | 284 days |
| Brent Elementary School | FM-200627828 06 2/6/07 Boiler Room - Check # 1 circulating pump, pump trips out and A/C goes off. | August 17, 2006 | February 6, 2007 | 173 days |
| Watkins Elementary School | FM-200450613 04 2/6/07 Watkins Boiler Room Boilers #1 and #2 repair or replace damper, damper rod is missing (tied with rope) "unsafe" Boilers Failed D.C. Inspection. | July 22, 2004 | February 6, 2007 | 929 days |
| Watkins Elementary School | FM-200338567 03 2/6/07 Watkins Boiler Room Boiler #2 replace 2" gate valve on blow down and relief valve on domestic hot water. | October 7, 2003 | February 6, 2007 | 1,218 days |
| Clark Elementary School | FM-200209672 02 2/6/07 Clark Rooms 207 and 204 Repair or replace shaft coupling on univent. Coupling is worn out. | June 17, 2002 | February 6, 2007 | 1,695 days |
| Harris, C.W. ES | FM-200619570 06 2/6/07 First Floor-Near Rm. 115 Repair window guard in hallway Asbestos Code A - Clear for repairs on 03/08/06 Tidewater - Tony Marcolin (RG 03/10/06) | March 7, 2006 | February 6, 2007 | 336 days |
| Spingarn High School | FM-200633045 /06 2/6/07 First Floor - Stairway #6 - Replace hand rail. Asbestos Code A - Clear for repairs on 12/12/06. Tidewater - Roger Small (RG 12/14/06) | December 8, 2006 | February 6, 2007 | 60 days |
| Spingarn High School | FM-200630223 06 2/6/07 Basement - Cafeteria - Weld seat back that was broken by students. | September 28, 2006 | February 6, 2007 | 131 days |
| Patricia R Harris Ed Center | FM-200700223 07 2/6/07 Second floor, Room 222. Reattach door to hinges, this door is on the verge of completely falling off the hinges. | February 5, 2007 | February 6, 2007 | 1 day |
| Roosevelt High School | FM-200633783 07 2/6/07 Perform Preventive Maintenance on Chillers. | January 8, 2007 | February 6, 2007 | 29 days |
| Roosevelt High School | FM-200633031 06 2/6/07 No Heat Third Floor - Room 2 - Repair heating coil in univent, vent valve broken off. | December 8, 2006 | February 6, 2007 | 60 days |
| Roosevelt High School | FM-200630487 06 2/6/07 1st Floor- Main Hallway Repair broken breaker. | October 5, 2006 | February 6, 2007 | 124 days |
| Roosevelt High School | FM-200628896 06 2/6/07 Basement - Tank Room Tunnel - Repair leaking 4" return line leaking at flange and Replace 3/4" line and 1/2" line connected to 4" line blowing steam. | September 7, 2006 | February 6, 2007 | 152 days |
| Roosevelt High School | FM-200628624 06 2/6/07 Basement- B72 Replace old lock on this door. | August 31, 2006 | February 6, 2007 | 159 days |
| Roosevelt High School | FM-200628303 06 2/6/07 Remove graffitti from school grounds. | August 25, 2006 | February 6, 2007 | 165 days |
| Roosevelt High School | FM-200627531 06 2/6/07 ROOSEVELT SHS Stay Office-Room #102 Repair or replace pneumatic for cooling, PE switch call for heating in the summer time. | August 14, 2006 | February 6, 2007 | 176 days |
| Roosevelt High School | FM-200627171 06 2/6/07 Basement and First Floor - Boys and Girls Bathrooms Repair leaking coil to A/H unit in ceiling of Boys toilet. Repair leaking coil to A/H unit in ceiling of Girls toilet. Asbestos Code A - Clear for repairs on 08/16/06. Tidewater - Thomas Johnson (RG 08/17/06) SEE ASSESSMENTS | August 10, 2006 | February 6, 2007 | 180 days |
| Roosevelt High School | FM-200626671 06 2/6/07 Office of Bilingual Education 3rd Floor- Main Office Repair wall sockets; the breaker is not properly labeled. | August 1, 2006 | February 6, 2007 | 189 days |
| Roosevelt High School | FM-200626669 06 2/6/07 Office of Bilingual Education 3rd Floor- Girl's Restroom Repair 2 toilets. They need flush valves, and need to be snaked out. | August 1, 2006 | February 6, 2007 | 189 days |
| Roosevelt High School | FM-200626666 06 2/6/07 Office of Bilingual Education 3rd Floor- Offices Change bulbs in high ceilings and check ballasts. | August 1, 2006 | February 6, 2007 | 189 days |
| Roosevelt High School | FM-200626656 06 2/6/07 Roosevelt Classroom #100;#115;#123; and #128 Repair or replace motors in the above classrooms. Motors: HP-1/4; Amps 4.3; Volts 115; Speed 1; HZ 60; RPM 1050; Rotation CCW Shaft 1/2X2; MFD 5 Vac 370 Model # D880 | August 1, 2006 | February 6, 2007 | 189 days |
| Roosevelt High School | FM-200625087 06 2/6/07 First Floor/rm.134 - R/R lock, can't lock door cylinder may be broken. | June 30, 2006 | February 6, 2007 | 221 days |
| Roosevelt High School | FM-200625016 06 2/6/07 Library Vault, 203, 333, 317 The cylinder needs to be changed on the following doors. | June 29, 2006 | February 6, 2007 | 222 days |
| Roosevelt High School | FM-200622145 06 2/6/07 Roosevelt Boiler Room Perform yearly maintenance on chiller #1 and chiller #2. Chabge oil, and filter, clean condenser units and do first start up of year. | May 3, 2006 | February 6, 2007 | 279 days |
| Roosevelt High School | FM-200621923 06 2/6/07 Roosevelt Tank Room Replace gasket on 4" Hi Pressure steam line in tunnel. | April 28, 2006 | February 6, 2007 | 284 days |
| Roosevelt High School | FM-200621494 06 2/6/07 Cafeteria-Replace faucet on pot wash sink, it's broken | April 19, 2006 | February 6, 2007 | 293 days |
| Roosevelt High School | FM-200621267 06 2/6/07 Third floor, Main Office. Need electricians to assess and repair electrical problem. The wall sockets on window side are dead, it could possibly be a breaker or line problem. Note: This problems has been existing for more than sixty days. | April 12, 2006 | February 6, 2007 | 300 days |
| Roosevelt High School | FM-200620718 06 2/6/07 Roosevelt Crawl Spike-Near Tank Room Replace three (3)" inch waste line in crawl space. The line is crack and leaking water into basement area. Also 1-1/2" and 1" galvanize cold water leaking from from 100' Ft run. | April 3, 2006 | February 6, 2007 | 309 days |
| Roosevelt High School | FM-200617678 06 2/6/07 Roosevelt Boiler Room Repair or replace vacuum pumps and seals that are leaking. Pumps 1-1/2 HP | January 22, 2006 | February 6, 2007 | 380 days |
| Roosevelt High School | FM-200617621 06 2/6/07 Roosevelt Swimming Pools On going Pool maintenance Chemical treatment, backwash of filter system and pump PM, Vacuum pools and check all related equipment. | January 20, 2006 | February 6, 2007 | 382 days |
| Roosevelt High School | FM-200617432 06 2/6/07 Roosevelt Mechanical room B55 Ground floor outside Replace backflow preventor valve on the city water line to the expanion tank. | January 17, 2006 | February 6, 2007 | 385 days |
| Roosevelt High School | FM-200517217 06 2/6/07 ROOSEVELT Girls restroom basement Repair or replace leaks in the heating coil located in the ceiling of boys and girls restroom in the basement. | January 7, 2006 | February 6, 2007 | 395 days |
| Roosevelt High School | FM-200517045 /05 2/6/07 Roosevelt Boiler Room Repair or replace vacuum pumps leaking seala. Two (2) pumps each 1-1/2 HP. | December 30, 2005 | February 6, 2007 | 403 days |
| Roosevelt High School | FM-200516761 /05 2/6/07 Roosevelt Boiler Room Repair or replace modulating ball valve on feed for Boiler #1. Valve froze in place. | December 20, 2005 | February 6, 2007 | 413 days |
| Roosevelt High School | FM-200516574 /05 2/6/07 Emergency: There are no lights in the following areas: Rm. 174, 178, 175, and the hallway on the first floor. | December 15, 2005 | February 6, 2007 | 418 days |
| Roosevelt High School | FM-200516102 05 2/6/07 Roosevelt Stay School Principal Office Repair burnt out electric motor in univent. HP 1/8 RPM 700 Volts 115 Amps 200 HZ 60/50 | December 6, 2005 | February 6, 2007 | 427 days |
| Roosevelt High School | FM-200515644 /05 2/6/07 Roosevelt Boiler Room Boiler #1repair feedwater regulator. Boiler fill up with water and shut off on Hi water every 15 min. | November 21, 2005 | February 6, 2007 | 442 days |
| Roosevelt High School | FM-200515613 /05 2/6/07 Roosevelt Boiler room Repair # 3 burner unit cuts off on flame failure, ( Limit # 3 , Lockout # 29) | November 21, 2005 | February 6, 2007 | 442 days |
| Roosevelt High School | FM-200515370 /05 2/6/07 Urgnet: First Floor-Gym area in the team room, can't get no electric for the lights also in room 153. Think it might need new breakers. | November 10, 2005 | February 6, 2007 | 453 days |
| Roosevelt High School | FM-200514404 /05 2/6/07 Roosevelt Boiler Room Repair 6" wheel (broken) on chain valve. Valve supply steam to McFarland approximately 14' from floor. | October 23, 2005 | February 6, 2007 | 471 days |
| Backus Middle School | FM-200202713 02 2/6/07 (BACKUS) ASBESTOS ASSESSMENT REQUIRED 2ND FLOOR RECREATION KITCHEN REPLACE BASE OF CABINET (WHICH IS MISSING LEAVING, EXPOSED WATER PIPES) AND DOUBLE-TUB SINK . CABINET BASE IS ON SITE. REF: PREVIOUS WORK REQUEST #200115449 ASBESTOS CODE A-CLEAR FOR REPAIR ON 02/11/02 HORNE ENGINEER: STEPHEN CALDWELL | February 8, 2002 | February 6, 2007 | 1,824 days |
| Roosevelt High School | FM-200514117 /05 2/6/07 Roosevelt First Floor - By Auditorium 1) No lights in the hallway. | October 22, 2005 | February 6, 2007 | 472 days |
| Backus Middle School | FM-200203415 02 2/6/07 Backus, JHS !!!! EMERGENCY !!!! Gymnasium - Girls and Boys Locker Room Replace Six (6) defected mixing valves. (5) Girls and (1) Coach Office The Hot water is coming up in the commodes when it flush. (HOT WATER) NO PENETRATION! | February 25, 2002 | February 6, 2007 | 1,807 days |
| Roosevelt High School | FM-200512851 05 2/6/07 Roosevelt Exterior-Gym Graffiti on the wall and stadium area | September 20, 2005 | February 6, 2007 | 504 days |
| Kenilworth ES | FM-200633442 /06 2/6/07 Repair or replace programmer for Boiler # 1. | December 20, 2006 | February 6, 2007 | 48 days |
| Kenilworth ES | FM-200633908 07 2/6/07 Third Floor - Corridor door closer defective next to custodian's closet (IFC703.2.2) Reinspection on 1-30-07 02/09/2007 06:43 TH - Completed 2-8-07 per Principal Fatima Johnson, Earnest Palmer and inspectern | January 10, 2007 | February 6, 2007 | 27 days |
| Roosevelt High School | FM-200512564 05 2/6/07 Roosevelt Room #222 Replace motor capacity and contact (Burn up) in room #222 | September 14, 2005 | February 6, 2007 | 510 days |
| Roosevelt High School | FM-200512563 05 2/6/07 Roosevelt Room #3;7; and10 Repair or replace rupture coil in univent in room #10 Repair rupture coil in room #3 Replace coil in room #7 Note: See linked document. | September 14, 2005 | February 6, 2007 | 510 days |
| Roosevelt High School | FM-200512562 05 2/6/07 Roosevelt Room #11 Install univent in room #11. Univent is in room. | September 14, 2005 | February 6, 2007 | 510 days |
| Roosevelt High School | FM-200512561 05 2/6/07 Roosevelt Room #113;116 and 120 Replace motor in univents, Room #113 has no coil. | September 14, 2005 | February 6, 2007 | 510 days |
| Roosevelt High School | FM-200512559 05 2/6/07 Roosevelt Third Floor-Main Office Wall sockets on window side are not working, not sure if it is the breaker or the line (Repair Sockets) | September 14, 2005 | February 6, 2007 | 510 days |
| Roosevelt High School | FM-200511925 05 2/6/07 Roosevelt Third Floor-Admin. Unit Radiator burst last year, repair heater befor it gets cold. | September 6, 2005 | February 6, 2007 | 518 days |
| Roosevelt High School | FM-200511760 05 2/6/07 Roosevelt Stay Office- Room #100 Repair or replace heating/cooling air handler unit in ceiling of STAY Office Not working. | September 2, 2005 | February 6, 2007 | 522 days |
| Roosevelt High School | FM-200510920 05 2/6/07 Roosevelt Basement - Main Disconnect Replace or repair main disconnect feed for chiller #2. This is a 4000 amp panel - panel trips on small load. | August 23, 2005 | February 6, 2007 | 532 days |
| Roosevelt High School | FM-200510862 05 2/6/07 Roosevelt Chiller Check chiller, off on low oil pressure. Contractor working on chiller. | August 22, 2005 | February 6, 2007 | 533 days |
| Roosevelt High School | FM-200508715 05 2/6/07 Roosevelt 1 st Floor-Room 125 Replace transformer and electric controls to univent (New motor is good but will not run, up in unit) | July 26, 2005 | February 6, 2007 | 560 days |
| Roosevelt High School | FM-200507375 05 2/6/07 Roosevelt Boiler Room - Pump Replace chill water pump, pump has a dead short, tripping breaker. 50 H.P. pump; 1780 RPM; 326T Frame; 230/460 Volts; 60 Amps | July 1, 2005 | February 6, 2007 | 585 days |
| Roosevelt High School | FM-200507132 05 2/6/07 Roosevelt Main Office Replace improper breakers for main office. Breaker keep tripping and wrong size. 4 Each | June 23, 2005 | February 6, 2007 | 593 days |
| Roosevelt High School | FM-200506486 05 2/6/07 Roosevelt Chiller Check and repair chiller, breaker keep tripping. | June 8, 2005 | February 6, 2007 | 608 days |
| Roosevelt High School | FM-200506419 05 2/6/07 ROOSEVELT SHS Check and make reoairs to chiller 1 and 2 #1 - tripping circuit breaker off, # 2 - Low oil pressure | June 6, 2005 | February 6, 2007 | 610 days |
| Roosevelt High School | FM-200505559 05 2/6/07 ( ROOSEVELT ) First Floor - Counselor Suite - 116 1) Entry door to offices need to be replaced, no handle to open and can't close. | May 16, 2005 | February 6, 2007 | 631 days |
| Roosevelt High School | FM-200503677 05 2/6/07 Roosevelt Repair or replace coils in girls first floor bathroom replaced | April 7, 2005 | February 6, 2007 | 670 days |
| Roosevelt High School | FM-200503674 05 2/6/07 Roosevelt Repair or replace several bleed valves replaced | April 7, 2005 | February 6, 2007 | 670 days |
| Roosevelt High School | FM-200503673 05 2/6/07 Roosevelt B55 Repair or replace several heating coils repaired B55 to prevent freeze up | April 7, 2005 | February 6, 2007 | 670 days |
| Roosevelt High School | FM-200503668 05 2/6/07 Roosevelt Tunnel Repair or replace fallen electrical service line in tunnel restored | April 7, 2005 | February 6, 2007 | 670 days |
| Roosevelt High School | FM-200503667 05 2/6/07 Roosevelt Tunnel Repair or replace flooded tunnel pumped out sump pumps installed | April 7, 2005 | February 6, 2007 | 670 days |
| Lafayette Elementary School | FM-200623367 06 2/6/07 Weld metal door jam that was cut by contractors. Door frame is entrance by gym. | May 25, 2006 | February 6, 2007 | 257 days |
| Roosevelt High School | FM-200503665 05 2/6/07 Roosevelt B55 Repair or replace AHU in B55 sealed | April 7, 2005 | February 6, 2007 | 670 days |
| Roosevelt High School | FM-200503663 05 2/6/07 Roosevelt B15 Repair or replace heat exchange in B15 (repaired) | April 7, 2005 | February 6, 2007 | 670 days |
| Roosevelt High School | FM-200503466 05 2/6/07 Roosevelt Mechanical Room #157 Replace 1-1/4" back flow preventer, valve leaking very bad, | March 31, 2005 | February 6, 2007 | 677 days |
| Roosevelt High School | FM-200502155 05 2/6/07 Roosevelt East tunnel Replace leaking 1" spance reducing valve on steam station in east tunnel near cafeteria. | March 2, 2005 | February 6, 2007 | 706 days |
| Roosevelt High School | FM-200502065 05 2/6/07 Roosevelt Room #222 Repair or replace one starter Robertshaw controls systems div.: Volts AC 120 20B 240 A.C Full load Amps 160 9.2 8.0, A.C. Locked Rotor Amps 96.0 55.7 48.0 | February 28, 2005 | February 6, 2007 | 708 days |
| Roosevelt High School | FM-200502049 05 2/6/07 Roosevelt Gym 1) Repair leaks over weight rooms located in Gym Building. Tim Keegin - 202-889-8400 HRGM Corp | February 28, 2005 | February 6, 2007 | 708 days |
| Roosevelt High School | FM-200501656 05 2/6/07 Roosevelt Storage Room (Basement) Repair supply line in storage room in basement near School bank. | February 15, 2005 | February 6, 2007 | 721 days |
| Roosevelt High School | FM-200500648 05 2/6/07 Roosevelt Boiler Room Check Boiler #2 down on lock #29- air flow switch. | January 21, 2005 | February 6, 2007 | 746 days |
| Roosevelt High School | FM-200500627 05 2/6/07 Roosevelt Room #11- Third Floor Installed univent in room #11, univent was never installed. 1/8 HP motor 115 volts. | January 19, 2005 | February 6, 2007 | 748 days |
| Roosevelt High School | FM-200459544 /04 2/6/07 Roosevelt Tank Room Replace 3" OS&Y valve in tank room. Valve is leaking. | December 13, 2004 | February 6, 2007 | 785 days |
| Backus Middle School | FM-200220793 /02 2/6/07 Backus Second floor - restroom (boys) Peeling paint, scrap and paint. Asbestos/Lead Code A-clear for repair by Horne Engineer Philip Connolly on 11/19/02 DCPS Charles E. Buchanan | November 13, 2002 | February 6, 2007 | 1,546 days |
| Backus Middle School | FM-200223228 /02 2/6/07 Backus Lobby Replace univent broken pulley on motor | December 26, 2002 | February 6, 2007 | 1,503 days |
| Roosevelt High School | FM-200458886 04 2/6/07 Roosevelt Boiler Room Replace boiler room sump pumps- both pumps shorted out from high water, when boiler room flooded. Century 1 1/2" hp motor three phase high voltage (two each). | December 1, 2004 | February 6, 2007 | 797 days |
| Backus Middle School | FM-200226127 03 2/6/07 Backus 1st floor Lobby Replace broken shaft on the univent in the lobby. | February 25, 2003 | February 6, 2007 | 1,442 days |
| Backus Middle School | FM-200227519 03 2/6/07 (Backus) 2nd Floor Recreation room boys bathroom Sink has no water. Health code issue | March 24, 2003 | February 6, 2007 | 1,415 days |
| Roosevelt High School | FM-200456329 04 2/6/07 Roosevelt Cafeteria Door 1) Need door, lite kit, closer push and pull handles. NOTE NEED GLASS | October 1, 2004 | February 6, 2007 | 858 days |
| Roosevelt High School | FM-200456327 04 2/6/07 Roosevelt Basement 1) Gym door need replacing , need panic bar , door closer lite kit. NOTE NEED GLASS | October 1, 2004 | February 6, 2007 | 858 days |
| Roosevelt High School | FM-200456283 04 2/6/07 Roosevelt SHS Boiler Room 1. Boiler # 2 Replace gas shut off valve | October 1, 2004 | February 6, 2007 | 858 days |
| Roosevelt High School | FM-200455909 04 2/6/07 Roosevelt Boiler Room Repair or replace condensate pumps and vacuum pump. | September 28, 2004 | February 6, 2007 | 861 days |
| Roosevelt High School | FM-200455290 04 2/6/07 Roosevelt Basement Gym Wash Room Repair 4" (four) inch domestic water line in tunnel,pipe has been broken for years. | September 21, 2004 | February 6, 2007 | 868 days |
| Roosevelt High School | FM-200453689 04 2/6/07 Roosevelt Kitchen Have a burner stove that is not working, need repairing and the ladies lockerroom there is two toilets that will not flush. | August 31, 2004 | February 6, 2007 | 889 days |
| Roosevelt High School | FM-200452767 04 2/6/07 Roosevelt Cooling Tower Remove panel for cleaning cooling tower. Replace strip seal on panel. * Baltimore - Aircoil Model - Vlt - 1050 D Serial - 77 - 1085 Two (2) Strip seal 4" X 46" Long | August 17, 2004 | February 6, 2007 | 903 days |
| Roosevelt High School | FM-200451394 04 2/6/07 Roosevelt Chiller Check and restart chiller | August 4, 2004 | February 6, 2007 | 916 days |
| Roosevelt High School | FM-200450941 04 2/6/07 Roosevelt Boiler Room Check chiller, chiller will run than it will cut off. Has to reset it. | July 28, 2004 | February 6, 2007 | 923 days |
| Roosevelt High School | FM-200449382 04 2/6/07 (Roosevelt) Asbestos Assessment Required. 1st Floor/Room #100: Replace chalk board that has large hole. Collect bulk samples to determine asbestos content. Asbestos Code A - Clear for repairs on 06/17/04. Horne Engineering - Tony Marcolin (RG 06/18/04) | June 16, 2004 | February 6, 2007 | 965 days |
| Roosevelt High School | FM-200447597 04 2/6/07 Roosevelt Basement cafeteria and kitchen area Electrical floor outlets are loose and one have live wire exposed. | May 6, 2004 | February 6, 2007 | 1,006 days |
| Roosevelt High School | FM-200443809 04 2/6/07 Roosevelt Tunnel 1) Repair leaking water line 3" or 4". | February 9, 2004 | February 6, 2007 | 1,093 days |
| Roosevelt High School | FM-200443757 04 2/6/07 Roosevelt Boiler Room Check, repair or replace return pumps for Boilers. | February 6, 2004 | February 6, 2007 | 1,096 days |
| Roosevelt High School | FM-200443166 04 2/6/07 Roosevelt Room #9 Check univent motor in room #9. Univent motor will not come on. Motor runs hot,coil may be bad. | January 23, 2004 | February 6, 2007 | 1,110 days |
| Roosevelt High School | FM-200443061 04 2/6/07 Roosevelt Auditorium 1) Roof need total replacement. # Note - This effort is to support Middle States. Asbestos Code A - Clear for repairs on 04/09/04. Horne Engineering - Ed Rodriguez (RG 04/13/04) SEE LINKED DOCUMENTS | January 21, 2004 | February 6, 2007 | 1,112 days |
| Roosevelt High School | FM-200443060 04 2/6/07 Roosevelt Rooms - Auditorium 1) Plaster and paint entire auditorium due to water damage. # Note - This effort is to support Middle States. Asbestos & Lead Code A - Clear for repairs on 01/22/04. Horne Engineering - Bjarne Smith/Edward Rodriguez (RG 01/23/04) SEE LINKED DOCUMENTS | January 21, 2004 | February 6, 2007 | 1,112 days |
| Roosevelt High School | FM-200443056 04 2/6/07 Roosevelt Rooms - 154,155,156,Corridors,128,203,204,ROTC - Stairwells. 1) Paint and plaster these rooms due to water damage and age. # Note - This effort is to support Middle States. Asbestos & Lead Code A - Clear for repairs on 01/22/04. Horne Engineering - Bjarne Smith /Edward Rodriguez (RG 01/23/04) SEE LINKED DOCMENTS | January 21, 2004 | February 6, 2007 | 1,112 days |
| Roosevelt High School | FM-200443054 04 2/6/07 Roosevelt Gym 1) Due to water damage Gym floor needs repair. # Note - This effort is to support Middle States. Asbestos Code A - Clear for repairs on 01/21/04. Horne Engineering - Bjarne Smith (RG 01/23/04) SEE LINKED DOCUMENTS | January 21, 2004 | February 6, 2007 | 1,112 days |
| Roosevelt High School | FM-200443053 04 2/6/07 Roosevelt Room - 156 1) Repair newly installed floor tile damage by univent leakage. (New Floor Tile) # Note - This effort is to support Middle States. Asbestos Code A - Clear for repairs on 01/30/04. Horne Engineering - Tony Marcolin (RG 02/02/04) | January 21, 2004 | February 6, 2007 | 1,112 days |
| Roosevelt High School | FM-200442996 04 2/6/07 Roosevelt Southside Tunnel Repair steam leak in southside tunnel, 8" threaded nipple steam line, leaking at threads. | January 21, 2004 | February 6, 2007 | 1,112 days |
| Roosevelt High School | FM-200442808 04 2/6/07 Roosevelt Throughout 1) Ceiling tile needed for in-house staff to replace old and stained peices. # Note - This effort is to support Middle States. Asbestos Code A - Clear for repairs on 01/16/01. Horne Engineering - Bipin Nanavaty (RG 01/20/04) | January 15, 2004 | February 6, 2007 | 1,118 days |
| Roosevelt High School | FM-200442806 04 2/6/07 Roosevelt Basement - B-57 1) Repair or replace this door at present time it is off the hinges. # Note - This effort is to support Middle States. Asbestos Code A - Clear for repairs on 01/16/01. Horne Engineering - Bipin Nanavaty (RG 01/20/04) | January 15, 2004 | February 6, 2007 | 1,118 days |
| Roosevelt High School | FM-200442804 04 2/6/07 Roosevelt Third, First and Second. - Throughout Building 1) Repair or replace existing door closers throughtout this site. # Note - This effort is to support Middle States. Asbestos Code A - Clear for repairs on 01/16/01. Horne Engineering - Bipin Nanavaty (RG 01/20/04) | January 15, 2004 | February 6, 2007 | 1,118 days |
| Roosevelt High School | FM-200442567 04 2/6/07 (Roosevelt) 2nd Floor Corridor Near Library: Repair hallway door near library due to vandalism. Asbestos Code A - Clear for repairs on 01/13/04. Horne Engineering - Tony Marcolin (RG 01/14/04) | January 12, 2004 | February 6, 2007 | 1,121 days |
| Roosevelt High School | FM-200442565 04 2/6/07 (Roosevelt) Stairwell #1: Replace missing hand rail. (Hand rain on-site) (Welder needed) Asbestos Code A - Clear for repairs on 01/13/04. Horne Engineering - Tony Marcolin (RG 01/14/04) | January 12, 2004 | February 6, 2007 | 1,121 days |
| Roosevelt High School | FM-200442563 04 2/6/07 (Roosevelt) 1st Floor/Gym: Recaulking of leaking skylights, needed to save gym floor. | January 12, 2004 | February 6, 2007 | 1,121 days |
| Roosevelt High School | FM-200341311 03 2/6/07 (Roosevelt) 3rd Floor: Door closers needed in the following area's: Stairwells near rooms - 300-313, two (2) doors-room #9. Repairs are to be made by December 11, 2003, for Special Education Compliance. Asbestos Code A - Clear for repairs on 12/10/03. Horne Engineering - Raymond Agnant (RG 12/10/03) | December 9, 2003 | February 6, 2007 | 1,155 days |
| Roosevelt High School | FM-200339953 03 2/6/07 Roosevelt Boiler Room Boiler #2 and #3 needs to be check for wiring problem. | November 5, 2003 | February 6, 2007 | 1,189 days |
| Roosevelt High School | FM-200339071 /03 2/6/07 Roosevelt Pool Electrical Power Main electrical panel not providing power for equipment. Need electrican to come and find out problem. EMERGENCY!!!! | October 17, 2003 | February 6, 2007 | 1,208 days |
| Roosevelt High School | FM-200337919 03 2/6/07 (Roosevelt) Asbestos Assessment Required. Entrance Door Near Auditorium: Repair or replace existing exit door that needs to be secured. Asbestos Code A - Clear for repairs on 09/25/03. Horne Engineering - Troy Wilcome (RG 09/26/03) | September 23, 2003 | February 6, 2007 | 1,232 days |
| Roosevelt High School | FM-200336725 03 2/6/07 Roosevelt Filter Room Flood in the filter room needs to be pumped out. | September 3, 2003 | February 6, 2007 | 1,252 days |
| Roosevelt High School | FM-200332826 03 2/6/07 Roosevelt Cafeteria & Classroom 1. Ceiling tile needed for these two sites due to flooding . Total of 15-packs 1. Repair the main entrance door - due to break-in . | July 2, 2003 | February 6, 2007 | 1,315 days |
| Roosevelt High School | FM-200228887 03 2/6/07 Roosevelt Pool Room First Floor 1. Check all chemical level 2. Added chemcials 3. Added water 4. Adjust heat transfer 5. Fill out log 6. Back wash filter | April 18, 2003 | February 6, 2007 | 1,390 days |
| Roosevelt High School | FM-200227271 03 2/6/07 Roosevelt Tank Room Repair hot water heater. No hot water in Building. | March 19, 2003 | February 6, 2007 | 1,420 days |
| Roosevelt High School | FM-200217035 02 2/6/07 Roosevelt First floor- outside room 126 stairwell # 3 Replace existing broken door handle due to wear. | September 9, 2002 | February 6, 2007 | 1,611 days |
| Roosevelt High School | FM-200204487 02 2/6/07 Roosevelt Basement Mech. Room Replace A.O. Smith 120 gal hot water heater. There is no hot water on one side of bldg. | March 15, 2002 | February 6, 2007 | 1,789 days |
| Roosevelt High School | FM-200204273 02 2/6/07 (Roosevelt) Asbestos Assessment Required 1st Floor Rooms 100 & 118 Remove old carpet and replace with new carpeting. Code A-clear for repair by Horne Engineer ( Pilip Connolly ) on 3/26/02 (CEB) | March 11, 2002 | February 6, 2007 | 1,793 days |
| Powell Elementary School | FM-200633376 76 12/18/06 2/6/07 Cafeteria - Half of the lights are out, may be the breaker. | December 18, 2006 | February 6, 2007 | 50 days |
| Powell Elementary School | FM-200630098 06 2/6/07 In the teacher's lounge there is a sink with the water running real bad it has no shut off value so you have to cut off the main water line we tried but the valve is hard to turn need to get this water off ASAP. | September 23, 2006 | February 6, 2007 | 136 days |
| Powell Elementary School | FM-200625667 06 2/6/07 Lunch Room/The hanging light is not working, the bulb was changed but it still does'nt work. | July 10, 2006 | February 6, 2007 | 211 days |
| Powell Elementary School | FM-200623883 06 2/6/07 On the 2nd floor the water coolers near 215 and 219 and 203 need to replace the water line and filters. Because their is no water cooler working on that floor. Principal would like someone to come as soon as possible. | June 2, 2006 | February 6, 2007 | 249 days |
| Powell Elementary School | FM-200622915 06 2/6/07 On the 2nd floor near room 203 the water cooler is leaking water from the main water line line need to be replaced. | May 17, 2006 | February 6, 2007 | 265 days |
| Powell Elementary School | FM-200621011 06 2/6/07 On the playground near the benches in the corner someone cut a hole in the fence. | April 4, 2006 | February 6, 2007 | 308 days |
| Powell Elementary School | FM-200620692 06 2/6/07 On the 2nd floor the light near the teacher's lounge is bad. I changed the bulb but still not working. | March 31, 2006 | February 6, 2007 | 312 days |
| Powell Elementary School | FM-200620223 06 2/6/07 On the front of the building there is a deep hole that need to be filled up with dirt. | March 22, 2006 | February 6, 2007 | 321 days |
| Powell Elementary School | FM-200619811 06 2/6/07 All the A/C in the building need to be inspected to see if runing right and to be cleaned. | March 13, 2006 | February 6, 2007 | 330 days |
| Powell Elementary School | FM-200619343 06 2/6/07 In the basement restroom there is a light fixture in the ceiling that is to high to change and we need the fixture replaced ASAP, because there is no light working in the restroom. | March 1, 2006 | February 6, 2007 | 342 days |
| Powell Elementary School | FM-200515603 /05 2/6/07 RM 201 Repair Radiator pipe | November 18, 2005 | February 6, 2007 | 445 days |
| Powell Elementary School | FM-200514470 05 2/6/07 Powell In the health suite there are sparks come from an outlet. | September 23, 2005 | February 6, 2007 | 501 days |
| Jessie LaSalle Elementary | FM-200625864 06 2/7/07 First floor, Room 116. Assess and Repair electrical issue, breaker keeps tripping and there is a burning smell. | July 18, 2006 | February 7, 2007 | 204 days |
| Ballou Senior High School | FM-200220170 /02 2/7/07 (Ballou) replace light covers in ceiling. | October 22, 2002 | February 7, 2007 | 1,569 days |
| Brightwood Elementary School | FM-200622680 06 2/7/07 First Floor (global village)-Rooms 100, 101, and the first floor corridor: No working outlets. | May 15, 2006 | February 7, 2007 | 268 days |
| Ballou Senior High School | FM-200218639 02 2/7/07 (Ballou) First floor - Gym One row of lights are working (not bulbs). | October 1, 2002 | February 7, 2007 | 1,590 days |
| Jessie LaSalle Elementary | FM-200619271 06 2/7/07 Emergency Third Floor-309 Furnish and install wood door to the classroom, it's broken will not open or shut. Asbestos Code A - Clear for repairs on 3/02/06. Tidewater - Shamika Parker (RG 05/10/06) | March 1, 2006 | February 7, 2007 | 343 days |
| Brightwood Elementary School | FM-200627089 06 2/7/07 1st Floor- Room 101- Global Village Section Electricity went out in this room.. REPAIR | August 9, 2006 | February 7, 2007 | 182 days |
| Leckie Elementary School | FM-200619688 06 2/7/07 Auditorium - Repair or replace damaged area on stage..areas are buckled up... Asbestos Code A - Clear for repairs on 03/14/06. Tidewater - Samuel May (RG 03/15/06) | March 9, 2006 | February 7, 2007 | 335 days |
| Francis Junior High School | FM-200500412 05 2/7/07 Francis Girls Restoom/Across From Room #108 Asbestos assessment reqiured Repair or replace 1-1/2" steam pipe leaking in girls restroom across from room #108. Steam leak is in floor in girls restroom. See: FM-200500447 Asbestos Code A - Clear for repairs on 07/01/05. Tidewater - Carlos Vera (RG 07/12/05) | January 13, 2005 | February 7, 2007 | 755 days |
| Jessie LaSalle Elementary | FM-200624134 06 2/7/07 3rd Floor- Rooms 304, 305, 309 The doors need to be adjusted; the doors cannot open or close. | June 9, 2006 | February 7, 2007 | 243 days |
| Emery Elementary School | FM-200502620 05 2/7/07 Emery See: fm-200505454 Perform PM to Chiller and all equipment. | March 14, 2005 | February 7, 2007 | 695 days |
| Cook J.F. Elementary School | FM-200453283 04 2/7/07 (Cook, J.F.) See: fm-200453677 Asbestos Assessment Required. The top pole on the fence has completely come down. The pole needs to be reattached to the fence. | August 24, 2004 | February 7, 2007 | 897 days |
| Cook J.F. Elementary School | FM-200337322 03 2/7/07 Cook, J.F. Boiler Room See: fm-200507285 Furnish and install (2) 2 X4 (4) tube light fixtures in Boiler Room. Current fixtures are not adequat. | September 11, 2003 | February 7, 2007 | 1,245 days |
| Ballou Senior High School | FM-200621567 06 2/7/07 Survey:room A-119 for power poles and for computers to eliminate a fire code violation. | April 20, 2006 | February 7, 2007 | 293 days |
| Cook J.F. Elementary School | FM-200228856 03 2/7/07 (Cook, J.F.) See: fm-200210587 1st Floor/Lunchroom: Plaster falling from ceiling. Lead & Asbestos Code A - Clear for repairs on 04/21/03. Horne Engineering - Edward Rodriguez (RG 04/23/03) | April 17, 2003 | February 7, 2007 | 1,392 days |
| Cook J.F. Elementary School | FM-200226854 03 2/7/07 (Cook, J.F.) See: fm-200628779 3rd Floor/Room #306: Plaster falling from ceiling around light fixture; plaster falling in very large pieces. Lead & Asbestos Code A - Clear for repairs on 03/12/03. Horne Engineering - Edward Rodriguez (RG 03/13/03) | March 11, 2003 | February 7, 2007 | 1,429 days |
| Cook J.F. Elementary School | FM-200224392 03 2/7/07 Cook, J.F. See: fm-200338419 Third Floor - Library 1) Paint peeling and falling from ceiling. Needs to be scraped. Lead & Asbestos Code A - Clear For Repairs On 01/23/03. Horne Engineering - Edward Rodriguez (RG 01/24/03) | January 23, 2003 | February 7, 2007 | 1,476 days |
| Whittier Elementary School | FM-200214827 02 2/7/07 Whittier Basement [New Wing]/Boys' Restroom Replace missing louver in door. | August 16, 2002 | February 7, 2007 | 1,636 days |
| Francis Junior High School | FM-200628231 06 2/7/07 3rd Floor- Hallway & Room 309 Repair/replace light fixtures. See: FM-200453114 | August 24, 2006 | February 7, 2007 | 167 days |
| Brightwood Elementary School | FM-200627312 06 2/7/07 First floor, Global Village/Room 106. Repair or Replace light fixture. Note: Sparks are shooting from these light fixtures. | August 11, 2006 | February 7, 2007 | 180 days |
| Emery Elementary School | FM-200444197 04 2/7/07 (Emery) See: FM-200514586 Asbestos Assessment Required. Three light fixture are bad change light bulb lights still will not come on. Code A-clear for repair by DCPS Charles Buchanan on 2/19/04 | February 17, 2004 | February 7, 2007 | 1,086 days |
| Clark Elementary School | FM-200228846 03 2/7/07 Clark Basement/Boiler Room Repair or replace will not feed water in boilers. Boiler #1 and Boiler #2 Size: Low Pressure Regulaor Max Supply Pressure 200lbs. Adjustable Range 10.058 Type 5 (Watts) | April 17, 2003 | February 7, 2007 | 1,392 days |
| Francis Junior High School | FM-200628650 06 2/7/07 1st Floor- Hallway Outside Room 111 See: fm-200629001 Remove old paint and re-paint radiator. Lead Code B Asbestos Code A - Clear for repairs on 09/06/06. Tidewater - Roger Small (RG 09/12/06) SEE ASSESSMENTS | August 31, 2006 | February 7, 2007 | 160 days |
| Ballou Senior High School | FM-200217239 02 2/7/07 Ballou Ground - Cometology classroom Two electrical outlets needed for classroom. Asbestos Code A - Clear for repairs on 09/11/02. Horne Engineering - Sheryll James (RG 09/12/02 | September 11, 2002 | February 7, 2007 | 1,610 days |
| Francis Junior High School | FM-200628651 06 2/7/07 1st Floor- Main Office See: fm-200514906 Replace frosted glass in door with clear glass. Asbestos Code A - Clear for repairs on 09/06/06. Tidewater - Roger Small (RG 09/07/06) | August 31, 2006 | February 7, 2007 | 160 days |
| Francis Junior High School | FM-200629164 06 2/7/07 Second Floor/Hallway (by rm. 107) - Connect electricity for the water cooler. | September 12, 2006 | February 7, 2007 | 148 days |
| Francis Junior High School | FM-200629176 06 2/7/07 First Floor/Cafeteria - Repair or replace free standing water cooler, it's not working. See: FM-200632126 | September 12, 2006 | February 7, 2007 | 148 days |
| Francis Junior High School | FM-200630079 06 2/7/07 1st Floor- Room 110 See: fm-200628395 Replace 8 missing floor tile. Asbestos Code A - Clear for repairs on 09/28/06. Tidewater - Thomas Johnson (RG 09/29/06) | September 26, 2006 | February 7, 2007 | 134 days |
| Francis Junior High School | FM-200632684 84 11/29/06 2/7/07 First Floor - Main Office Storage Room - Unclog roof drain See: FM-200633679 | November 29, 2006 | February 7, 2007 | 70 days |
| Ballou Senior High School | FM-200632713 30/06 2/7/07 Kitchen Area. Provide shield for lights in dry storage rooms. Four light fixtures located in two storage rooms are missing covers. Each fixture contains 4 fluorescent tubes 4 foot long. | November 30, 2006 | February 7, 2007 | 69 days |
| Ballou Senior High School | FM-200500792 05 2/7/07 Ballou Library Need electrical outlets check because the electricity keep blowing the computers out. | January 25, 2005 | February 7, 2007 | 743 days |
| Whittier Elementary School | FM-200444766 04 2/7/07 Whittier First floor hallway new and old wing Need two door closures one on hallway door new wing and one on hallway old wind interior door. | March 3, 2004 | February 7, 2007 | 1,071 days |
| Emery Elementary School | FM-200513206 05 2/7/07 Emery Multistack See: fm-200506375 Check oil leak on compressor. | September 27, 2005 | February 7, 2007 | 498 days |
| Eliot Junior High School | FM-200628498 06 2/7/07 3rd Floor- Hallway Secure 3 fire doors. | August 30, 2006 | February 7, 2007 | 161 days |
| Emery Elementary School | FM-200514324 /05 2/7/07 Emery Boiler Room See: fm-200620237 Boiler #2 Flame failure | October 23, 2005 | February 7, 2007 | 472 days |
| Emery Elementary School | FM-200516537 /05 2/7/07 Three water fountain are clogged and one is broking need to be repair. See: FM-200631054 | December 13, 2005 | February 7, 2007 | 421 days |
| Truesdell Elementary | FM-200338298 03 2/7/07 (Truesdell) Asbestos Assessment Required. 1st Floor Breezeway, between annex, and main door: Door threshold pulled completely away from floor; large space between door, and floor, unable to close door properly. Asbestos Code A - Clear for repairs on 10/02/03. Horne Edward - Tony Marcolin (RG 10/03/03) | September 30, 2003 | February 7, 2007 | 1,226 days |
| Truesdell Elementary | FM-200625879 06 2/7/07 1st Floor- Main Building Re-align hall doors near Room 114. | July 18, 2006 | February 7, 2007 | 204 days |
| Ballou Senior High School | FM-200617504 06 2/7/07 Survey: r/r emergency exit lights for security purpose new tubes/bulbs were installed but no lights still. | January 12, 2006 | February 7, 2007 | 391 days |
| Dunbar High School | FM-200630203 06 2/7/07 Third Floor - Repair breech in the ceiling in the Cafeteria on 3W See: FM-200626201 Asbestos Code A - Clear for repairs on 09/29/06. Tidewater - Carlos Vera( RG 10/02/06) | September 28, 2006 | February 7, 2007 | 132 days |
| Ballou Senior High School | FM-200621713 06 2/7/07 Replace exit sings at gym entrance,3rd.floor north near room #300,childcare, | April 24, 2006 | February 7, 2007 | 289 days |
| Ballou Senior High School | FM-200629729 06 2/7/07 Service:relocate electrical lines in auto shop for newly purchase equipement for students. | September 13, 2006 | February 7, 2007 | 147 days |
| Emery Elementary School | FM-200617845 06 2/7/07 The following rooms have lights See: FM-200514586 out,118-5,116-3,112-3,110-1,mainlobby-7,library-2,200-2,202-1,206,1,teacherlounge-1,208-3,210-1,214-4 ,216-1,218,1,219-1,317-1,312-1,cafeteria-4 thirty seven light are out. Some classrooms are very dark. | January 20, 2006 | February 7, 2007 | 383 days |
| Ballou Senior High School | FM-200458308 /04 2/7/07 (Ballou) Asbestos Assessment Required. Change the electrical outlets to match the plugs for the kitchen equipment the Food Service Room A35 | November 12, 2004 | February 7, 2007 | 817 days |
| Ballou Senior High School | FM-200629823 06 2/7/07 Asbestos Assessment Required 1st & 2nd Floors- Replace lights in 5 stairwells. Note: Floor plans are in the Service Center. Asbestos Code A - Clear for repairs on 09/25/06. Tidewater - Thomas Johnson (RG 09/26/06) | September 21, 2006 | February 7, 2007 | 139 days |
| Ballou Senior High School | FM-200512904 05 2/7/07 (Ballou) First floor, Room 121-E. Need electricians to do survey in room 121-E for additional wall out-let for computers used by students | August 5, 2005 | February 7, 2007 | 551 days |
| Dunbar High School | FM-200621872 06 2/7/07 Floor 3E- Science Lab SEE: FM- A sink is plugged and needs to be snaked out. | April 27, 2006 | February 7, 2007 | 286 days |
| Dunbar High School | FM-200621563 06 2/7/07 There are 4 drinking fountains that are out of service. 3- in the Gym SEE: FM-200506758 1- on Ground level near the Girl's Restroom | April 20, 2006 | February 7, 2007 | 293 days |
| Dunbar High School | FM-200513388 05 2/7/07 Dunbar See: FM-200501749 Second Floor - Business Suite 1) Control valve broken on bradley basin. | October 3, 2005 | February 7, 2007 | 492 days |
| Dunbar High School | FM-200513385 05 2/7/07 Dunbar Emergency !! See: FM-200628934 Lower Garage 1) Sump pump is out. Water is all over Garage. | October 3, 2005 | February 7, 2007 | 492 days |
| Emery Elementary School | FM-200505455 05 2/7/07 Emery Boiler Room See: fm-200506375 Repair (4) four compressor in Boiler Room. Compressors are logged. | May 13, 2005 | February 7, 2007 | 635 days |
| Ballou Senior High School | FM-200621431 06 2/7/07 Outside- 2nd Street Side (night school entrance) A wire is hanging and it was smoking, swinging, and sparking. The fire department just left and all power is disconnected. They need someone to come out and disconnect the wire, so that they can have power everywhere else. | April 18, 2006 | February 7, 2007 | 295 days |
| Dunbar High School | FM-200455145 04 2/7/07 Dunbar Boiler Room See: fm-200514323 Boiler #4 will not reset, need for steam for kitchen. No hot water for cooking. | September 20, 2004 | February 7, 2007 | 870 days |
| Emery Elementary School | FM-200225577 03 2/7/07 Emery Boiler Room See: FM-200505454 P.M Chiller | February 11, 2003 | February 7, 2007 | 1,457 days |
| Bruce-Monroe Elementary School | FM-200514805 /05 2/7/07 (Bruce-Monroe) Exterior of building. Install exterior lighting fixtures. | October 31, 2005 | February 7, 2007 | 464 days |
| Kenilworth ES | FM-200220049 /02 2/7/07 KENILWORTH BOILER ROOM Repair heating h/w circulation pump # 2. Continuously has to be reset. Note # 1 Circ pump is also in need of repair- bldg requires two pump operation at the same time # 3 operates OK. | October 25, 2002 | February 7, 2007 | 1,566 days |
| Ballou Senior High School | FM-200336911 03 2/7/07 Ballou Stay Sub basement A-5 Three (3) electrical power poles are needed for the computers. How possible is it for this to be completed within the week. ASAP Asbestos Code A - Clear for repairs on 09/08/03. Horne Engineering - Philp Connolly (RG 09/09/03) | September 5, 2003 | February 7, 2007 | 1,251 days |
| Tyler Elementary School | FM-200220075 /02 2/7/07 (Tyler) Rear of Building/Exterior lights: Replace three (3) burned out exterior lights in the rear of building. Note: The bulbs are on site, and a cherry picker will be necessary to do this work; it is extremely dark in this area. (Please expedite) | October 25, 2002 | February 7, 2007 | 1,566 days |
| Emery Elementary School | FM-200633483 /06 2/7/07 Need electricians to assess and repair lighting in rooms 206 & 214, five fixture are down and the ballasts could possibly be bad. See: FM-200514586 Note: The camera crew needs this problem rectified asap so that they will be able to begin the filming of the documentary. | December 21, 2006 | February 7, 2007 | 48 days |
| Ballou Senior High School | FM-200226082 03 2/7/07 Ballou First floor gym Replace bad breaker - one whole row of lights are out. | February 24, 2003 | February 7, 2007 | 1,444 days |
| Shepherd ES | FM-200207267 02 2/7/07 Shepherd 1st Floor Room 105/Old Wing The door to 1st floor room 105 needs to be realigned. | May 7, 2002 | February 7, 2007 | 1,737 days |
| Tyler Elementary School | FM-200512572 05 2/7/07 Tyler Back Of School-Need (3) security light bulbs replaced | September 14, 2005 | February 7, 2007 | 511 days |
| Shepherd ES | FM-200220684 /02 2/7/07 Shepherd First floor - old wing Boys bathroom ceiling and walk needs to be redone because of over heating pipes. Asbestos Code A - Clear for repairs on 11/11/02. Horne Engineering - Troy Wilcome (RG 11/14/02) | November 12, 2002 | February 7, 2007 | 1,548 days |
| Ferebee-Hope Elementary School | FM-200206251 02 2/7/07 Ferebee-Hope 1st & 2nd Floors A Bldg. Blue Stairwell Rehang handrail on the stairwell. | April 22, 2002 | February 7, 2007 | 1,752 days |
| Bruce-Monroe Elementary School | FM-200448463 04 2/7/07 Bruce-Monroe First floor main office Metal breaker box facing need mounted to wall. New holes are needed for mounting; The electric stores do not carry the old hook washers. Expose electrical wire is a fire code violation. Asbestos Code A - Clear for repairs on 05/26/04. Horne Engineering - Edward Rodriguez ( RG 05/27/04 ) | May 25, 2004 | February 7, 2007 | 988 days |
| Emery Elementary School | FM-200451605 04 2/7/07 Emery Boiler Room See: fm-200512374 Boiler #1 will not fire off. going out on lock out. (Want to run in manual). | August 5, 2004 | February 7, 2007 | 916 days |
| Shepherd ES | FM-200329730 03 2/7/07 (Shepherd) Through-Out the building: Replace ceiling tiles, damaged by a previous flood in the following locations: New wing/1st Floor office corridor, teachers bathroom, and library corridor, Asbestos Code A - Clear for repairs on 05/08/03. Horne Engineering - Tony Marcolin (RG 05/12/03) | May 7, 2003 | February 7, 2007 | 1,372 days |
| Emery Elementary School | FM-200454931 04 2/7/07 (Emery) See: fm-200633798 Repair 4 multistat units. Units continously trip out. | September 9, 2004 | February 7, 2007 | 881 days |
| Shepherd ES | FM-200507858 05 2/7/07 Shepherd First fl. OLD Building Rm. 120 Replace Class Rm Door Code A-clear for repair by DCPS Charles Buchanan on 7/15/05 | July 14, 2005 | February 7, 2007 | 573 days |
| Shepherd ES | FM-200508193 05 2/7/07 Shepherd Rms.101/104/210/Boys and Girls restroom on the First and Second fl. Repair Radiator Cabinets 07/20/2005 10:08 OB - | July 20, 2005 | February 7, 2007 | 567 days |
| Eliot Junior High School | FM-200700035 29/07 2/7/07 Stairwell #1 - Exit door leading to the playground - Requesting to have door replaced and a panic bar installed. The current door is falling apart and there is no panic bar. The only way to secure during school hours is by using the slide bolt wich is a fire code violation. Asbestos Code A - Clear for repairs on 01/30/07. Tidewater - Shamika Parker (RG 02/01/07) | January 29, 2007 | February 7, 2007 | 9 days |
| Ballou Senior High School | FM-200215416 02 2/7/07 Ballou 1. Asbestos Assessment Reqd. 1st Floor Registrar's & Asst. Principal's Office 2. Install a/c units in these two areas. Asbestos Code A-clear for repair 8/23/02 DCPS Charles E. Buchanan | August 23, 2002 | February 7, 2007 | 1,629 days |
| Leckie Elementary School | FM-200700308 7/07 2/7/07 First floor, Stairwell Exit Door & Exit Door, Third floor, Room # 309A. Replace door closers in above areas. | February 7, 2007 | February 7, 2007 | 0 days |
| Shepherd ES | FM-200624224 06 2/7/07 1st Floor- Room 105 Door needs to be replaced. Asbestos Code A - Clear for repairs on 06/14/06. Tidewater - Carlos Vera (RG 06/15/06) | June 12, 2006 | February 7, 2007 | 240 days |
| Ballou Senior High School | FM-200503073 05 2/7/07 (Ballou) Asbestos Assessment Required. Armory. Furnish and install light ballasts in armory 120@277 are nd.for class. Code A-clear for repair by DCPS Asbestos Code Inspector Charles Buchanan on 6/24/05 | March 13, 2005 | February 7, 2007 | 696 days |
| Whittier Elementary School | FM-200214241 02 2/7/07 Whittier 1st Floor East-side Exit Door Replace broken door handle [listed as fire-code violation by fire marshall]. | August 13, 2002 | February 7, 2007 | 1,639 days |
| Tyler Elementary School | FM-200629574 5/06 2/7/07 Supply and install ballasts in the following areas: 1st Floor- Rooms 111, 109, 113, 122, 123, 125, 126, 127, 129, 134, 136, 139, 141, and throughout the hallway. | September 15, 2006 | February 7, 2007 | 145 days |
| Cook J.F. Elementary School | FM-200632985 12/6/06 2/7/07 The subpump in the boiler room is not operating properly and approximately 2 inches of water was on the floor this morning. See: fm-200632972 | December 6, 2006 | February 7, 2007 | 63 days |
| Cook J.F. Elementary School | FM-200632861 12/5/06 2/7/07 Basement - Boiler Room - A electrician is needed to survey 4 lights in the boiler room to find out why they will not come on. See: fm-200507285 | December 5, 2006 | February 7, 2007 | 64 days |
| Cook J.F. Elementary School | FM-200629557 06 2/7/07 There is a leak in the cafeteria. See: fm-200628779 Asbestos Code A - Clear for repairs on 10/02/06 Tidewater - Shamika Parker (RG 10/03/06) | September 5, 2006 | February 7, 2007 | 155 days |
| Cook J.F. Elementary School | FM-200629555 06 2/7/07 The ceiling in Room 306 is leaking and the plaster has fallen from the ceiling. See: fm-200628779 Lead Code A Asbestos Code A - Clear for repairs on 10/02/06 Tidewater - Shamika Parker (RG 10/06/06) SEE ASSESSMENTS | September 5, 2006 | February 7, 2007 | 155 days |
| Cook J.F. Elementary School | FM-200514440 05 2/7/07 Cook, J.F. See: fm-200443112 The are lights on the parking lot that are out. | September 12, 2005 | February 7, 2007 | 513 days |
| Cook J.F. Elementary School | FM-200513909 /05 2/7/07 Cook J. F. See: fm-200515910 Exterior Gounds Repair Broken flag Pole | October 18, 2005 | February 7, 2007 | 477 days |
| Cook J.F. Elementary School | FM-200504123 05 2/7/07 Cooke J. F See: fm-200503625 Third fl. Balcony Repair Roof Drain | April 15, 2005 | February 7, 2007 | 663 days |
| Cook J.F. Elementary School | FM-200453737 04 2/7/07 (Cook, J.F.) See:fm-200221093 The light in the front of the Auditorium near the exit door needs replacing along with a cover. | August 24, 2004 | February 7, 2007 | 897 days |
| Cook J.F. Elementary School | FM-200453736 04 2/7/07 Cook, J.F.) See: fm-200452166 The window over the storage room door needs replacing. | August 24, 2004 | February 7, 2007 | 897 days |
| Brightwood Elementary School | FM-200620008 06 2/7/07 Emergency First Floor-Global Village-Corridor Check outlet-Wall outlet sparking-It's now covered with tape. Also in rm. 100 | March 16, 2006 | February 7, 2007 | 328 days |
| Roosevelt High School | FM-200620719 06 2/8/07 Roosevelt Mechanical Room #15 Install summer- winton switch to control valves for heating and cooling unit. | April 3, 2006 | February 8, 2007 | 311 days |
| Bowen Elementary School | FM-200225562 03 2/8/07 Bowen Boiler Room P.M Chiller | February 11, 2003 | February 8, 2007 | 1,458 days |
| Bowen Elementary School | FM-200332238 03 2/8/07 Bowen Pre-Kgn Room ( #142) Check Pre-Kgn Room #142, No hot water. This room is schedule to be use for Summer School. | June 20, 2003 | February 8, 2007 | 1,329 days |
| Bowen Elementary School | FM-200332276 03 2/8/07 Bowens Roof cooling tower Check and repair or replace cooling tower motor and magnetic starter for motor , unit has a dead short, wires to starter is disconnected so one fan can run. | June 23, 2003 | February 8, 2007 | 1,326 days |
| Bowen Elementary School | FM-200333093 03 2/8/07 BOWEN Check operation of CAC unit not cooling | July 10, 2003 | February 8, 2007 | 1,309 days |
| Bowen Elementary School | FM-200336600 03 2/8/07 Bowens Boiler room Repair or replace bad compressor on the multi-stack A/C unit in the boiler room. | August 29, 2003 | February 8, 2007 | 1,259 days |
| Bowen Elementary School | FM-200502197 05 2/8/07 Bowen Perform PM to Chiller and all equipment. | March 2, 2005 | February 8, 2007 | 708 days |
| Bowen Elementary School | FM-200504863 05 2/8/07 Bowen Rooftop Unit Repair #1 tower fan. Fan do not work. | April 28, 2005 | February 8, 2007 | 651 days |
| Bowen Elementary School | FM-200617521 06 2/8/07 Bowen Boiler Room Repair burner and control on Boiler #1. | January 18, 2006 | February 8, 2007 | 386 days |
| Bowen Elementary School | FM-200618305 06 2/8/07 Bowen Boiler Room Boiler #1 Flame failure, will not come on. | February 6, 2006 | February 8, 2007 | 367 days |
| Bowen Elementary School | FM-200618317 06 2/8/07 Check Heat-The building is cold Called in again on 1/24/07 - No Heat In Rms 102 & 105 | February 6, 2006 | February 8, 2007 | 367 days |
| Bowen Elementary School | FM-200620176 06 2/8/07 Bowen Boiler Room Repair or replace fire eye on Boiler #1 | March 22, 2006 | February 8, 2007 | 323 days |
| Bowen Elementary School | FM-200633794 07 2/8/07 Perform Preventive Maintenance on Multi Stacks | January 8, 2007 | February 8, 2007 | 31 days |
| Ronald H. Brown MS | FM-200633762 07 2/8/07 Perform Preventive Maintenance on Chillers. | January 8, 2007 | February 8, 2007 | 31 days |
| Emery Elementary School | FM-200443308 04 2/8/07 Center door leading to parking lot will not shut door is draging.People are coming in door.Can not secure. Asbestos Code A - Clear for repairs on 02/20/04. Horne Engineering - Sheryll James (RG 02/24/04) | January 14, 2004 | February 8, 2007 | 1,121 days |
| Emery Elementary School | FM-200337799 03 2/8/07 (Emery) Asbestos Assessment Required. Remount door closer on in 204. Asbestos Code A - Clear for repairs on 09/29/03. Horne Engineering - Troy Wilcome (RG 10/02/03) | September 17, 2003 | February 8, 2007 | 1,240 days |
| Emery Elementary School | FM-200622203 06 2/8/07 Two door closer are defective on parking lot doors.Doors will not close have to put slide bolt on it to keep close | May 3, 2006 | February 8, 2007 | 281 days |
| Hyde Elementary School | FM-200335877 03 2/8/07 Hyde Boiler room Boiler #1 and #2 furnish and install two steam pressure gauges. Calibrted O to 30 PSI. Note: Request Per Boiler Inspector (D.C.) | August 20, 2003 | February 8, 2007 | 1,268 days |
| Nalle Elementary School | FM-200700264 07 2/8/07 First Floor - Boy's Bathroom - Fabricate and install platform for kids to stand on | February 6, 2007 | February 8, 2007 | 2 days |
| Shepherd ES | FM-200513841 /05 2/8/07 Shepherd Emergency First Floot-Admin Office Replace/Repair ceiling, it fell in. Conference area clogged drain. Code A- clear for repairs as of 10/13/05 by TideWater Rodney Distance. | October 13, 2005 | February 8, 2007 | 483 days |
| Kenilworth ES | FM-200634024 07 2/8/07 First Floor - Auditorium door not latching (right side) (IFC703.2.2) Reinspection on 1-30-07 02/09/2007 07:09 TH - Completed 2/8/07 per Principal Fatima Johnson, Earnest Palmer and inspection | January 17, 2007 | February 8, 2007 | 22 days |
| Emery Elementary School | FM-200501476 05 2/8/07 Classroom door room 203 can not close because of new tile install . Code A-clear for repair by DCPS Charles Buchanan on 10/21/05 | January 3, 2005 | February 8, 2007 | 766 days |
| Simon Elementary School | FM-200501827 05 2/8/07 SIMON boiler room Repair / replace # 2 condensate pump. SEE Request # FM-200501987 | February 22, 2005 | February 8, 2007 | 716 days |
| Simon Elementary School | FM-200501987 05 2/8/07 Simon Boiler Room ( Hand feeding ) 1) .Replace 2 coils in condensate box. 15021GOO2 (Series) GE CR 306HO NEMA-Size 00 Max r-600 AC Max A-9 PH 1 Volts 120 HZ 60 V-110 HZ 50 (Need to pump water to Boilers) For sample see Mr. Mashack 2). Repair or replace # 2 condensate pump. | February 25, 2005 | February 8, 2007 | 713 days |
| Simon Elementary School | FM-200516529 /05 2/8/07 Simon Boiler Room Boilers off on flame failure. Repair condensate pump. | December 14, 2005 | February 8, 2007 | 421 days |
| Noyes Elementary School | FM-200633426 /06 2/8/07 Roof - Media Center - Freeze stat lock out will not reset. | December 19, 2006 | February 8, 2007 | 51 days |
| Hyde Elementary School | FM-200516032 05 2/8/07 Hyde Boiler Room Repair or replace Pumps #1 and #2 return pumps, pumps not putting water back into boilers. | December 4, 2005 | February 8, 2007 | 431 days |
| Simon Elementary School | FM-200633446 /06 2/8/07 Adjust float control for condensate pump and boiler. | December 20, 2006 | February 8, 2007 | 50 days |
| Francis Junior High School | FM-200459862 /04 2/8/07 Francis EMERGENCY RTaditor leaking in counselor suite. | December 20, 2004 | February 8, 2007 | 780 days |
| Hendley Elementary School | FM-200619048 06 2/8/07 Third Floor-302 Repair or replace-the door knob will not stay on the door | February 23, 2006 | February 8, 2007 | 350 days |
| Hendley Elementary School | FM-200501779 05 2/8/07 (Hendley) HEALTH CODE VIOLATION: Kitchen: Replace missing part of ceiling in storage rooms. HA 033 Plaster White old section of building No Asbestos HA 043 Brown Coat with ... HA 033 No Asbestos Code A-clear for repair by Charles Buchanan on 3/3/05 | February 18, 2005 | February 8, 2007 | 720 days |
| Dunbar High School | FM-200626171 06 2/9/07 Fifth Floor/5MW water by electrical equipment | July 24, 2006 | February 9, 2007 | 200 days |
| Orr Elementary School | FM-200512973 05 2/9/07 Orr Boiler Room Repair chiller,reading low evaporate refrigerate | September 21, 2005 | February 9, 2007 | 506 days |
| Plummer Elementary School | FM-200206534 02 2/9/07 1) In accordance with grass cutting contract for the summer of 2002 to include grass cutting and edging. | April 25, 2002 | February 9, 2007 | 1,751 days |
| Thomas Elementary School | FM-200450903 04 2/9/07 Thomas Boiler Room Boiler #2 needs water treatment. Boiler failed inspection. | July 28, 2004 | February 9, 2007 | 926 days |
| Plummer Elementary School | FM-200504450 05 2/9/07 ( PLUMMER ) Outside - Main Entrance 1) Repair concrete steps and replace metal traction track. | April 21, 2005 | February 9, 2007 | 659 days |
| Thomas Elementary School | FM-200450906 04 2/9/07 Thomas Boiler Room Boiler #1 adjust damper control. Boiler failed inspection. | July 28, 2004 | February 9, 2007 | 926 days |
| Thomas Elementary School | FM-200453699 04 2/9/07 Thomas throughout A/C is not working need repairing. | August 31, 2004 | February 9, 2007 | 892 days |
| Thomas Elementary School | FM-200501316 05 2/9/07 THOMAS N cooling tower Replace both tower tech cooling tower fan motors. Both motors are inoperable | February 8, 2005 | February 9, 2007 | 731 days |
| Thomas Elementary School | FM-200502186 05 2/9/07 Thomas Perform PM to Chiller and all equipment. | March 2, 2005 | February 9, 2007 | 709 days |
| Dunbar High School | FM-200632276 /06 2/9/07 5MW - Roof Leak SEE: FM-200633057 | November 17, 2006 | February 9, 2007 | 84 days |
| Dunbar High School | FM-200629716 06 2/9/07 Boy's locker Room - Repair the toilet | September 20, 2006 | February 9, 2007 | 142 days |
| Dunbar High School | FM-200629419 06 2/9/07 1st Floor- D Building in Gym SEE: FM-200506758 Repair/replace water fountain. | September 14, 2006 | February 9, 2007 | 148 days |
| Dunbar High School | FM-200623780 06 2/9/07 Dunbar Boiler Room Boiler #1 has water coming from the front and back. Boiler are used heating the pool. | June 3, 2006 | February 9, 2007 | 251 days |
| Dunbar High School | FM-200622967 06 2/9/07 (A. Building) First Floor-Boy's Restroom: Replace the cracked urinal | May 18, 2006 | February 9, 2007 | 267 days |
| Dunbar High School | FM-200622432 06 2/9/07 1st Floor- Ladies Restroom See: FM-200501748 Toilet is clogged in room 3E. | May 10, 2006 | February 9, 2007 | 275 days |
| Dunbar High School | FM-200460089 /04 2/9/07 Dunbar Boiler Room SEE: FM-200512755 Boiler #1 has hole in fire door. | December 29, 2004 | February 9, 2007 | 772 days |
| Dunbar High School | FM-200457807 04 2/9/07 Dunbar Filtration Room Replace 6" OS&Y gate valve on pool filtration tank. | November 2, 2004 | February 9, 2007 | 829 days |
| Plummer Elementary School | FM-200505587 05 2/9/07 ( PLUMMER ) Storage 1) Repair or Replace three lawn mowers. | May 17, 2005 | February 9, 2007 | 633 days |
| Plummer Elementary School | FM-200507085 05 2/9/07 Plummer School Extend mats out to 6 ft. by slide | June 22, 2005 | February 9, 2007 | 597 days |
| Davis Elementary School | FM-200632925 06 2/9/07 Basement - Teacher's Bathroom - Align door | December 6, 2006 | February 9, 2007 | 65 days |
| Davis Elementary School | FM-200632924 06 2/9/07 Basement - Boy's Bathroom - Align door | December 6, 2006 | February 9, 2007 | 65 days |
| Davis Elementary School | FM-200632920 06 2/9/07 Room 16 - Align door | December 6, 2006 | February 9, 2007 | 65 days |
| Kenilworth ES | FM-200634032 /07 2/9/07 Old Side - Second Floor - Fire Extinguisher Cabinet Missing Glass (IFC110.1) Reinspection on 1-30-07 Asbestos Code A - Clear for repairs on 01/17/07. Tidewater - Shamika Parker (RG 01/19/07) 02/09/2007 07:11 TH - Completed 2/8/07 per Principal Fatima Johnson, Earnest Palmer and inspection | January 17, 2007 | February 9, 2007 | 23 days |
| Orr Elementary School | FM-200217878 02 2/9/07 ORR Boiler room Replace altitude and pressure gauges on boilers # 1 and 2. Also replace all necessary fittings and valves. | September 19, 2002 | February 9, 2007 | 1,604 days |
| Plummer Elementary School | FM-200624275 06 2/9/07 The brick wall in the front of the building is crumbling. It was hit by a truck recently. | June 13, 2006 | February 9, 2007 | 241 days |
| Orr Elementary School | FM-200333087 03 2/9/07 ORR Repair / replace motor/shaft bearings for both AHU 1 and 2. | July 10, 2003 | February 9, 2007 | 1,310 days |
| Kramer Middle School | FM-200458555 /04 2/9/07 Kramer Boiler Room Repair or replace float valve on feedwater tank. Leaking and contacts are sticking. Per: Mr Temple | November 22, 2004 | February 9, 2007 | 809 days |
| Kramer Middle School | FM-200501362 05 2/9/07 Kramer Third floor room 313 Univent need to be repaired, motor very loud, no heat in the room. | February 8, 2005 | February 9, 2007 | 731 days |
| Orr Elementary School | FM-200451395 04 2/9/07 Orr Boiler Room Check chiller, unit shuts down on surge, must be reset each time. | August 4, 2004 | February 9, 2007 | 919 days |
| Orr Elementary School | FM-200455212 04 2/9/07 ORR Boiler room Repair leaking bleed valve on the bottom of the air compressor tank. | September 21, 2004 | February 9, 2007 | 871 days |
| Orr Elementary School | FM-200458570 /04 2/9/07 Orr Boiler Room Repair or replace air compressor. compressor is not working. | November 22, 2004 | February 9, 2007 | 809 days |
| Bowen Elementary School | FM-200626435 06 2/9/07 Cafeteria/Exterior Door #4 - Don't Close Properly, Have To Slam Shut. | July 26, 2006 | February 9, 2007 | 198 days |
| Randle-Highlands ES | FM-200633988 /07 2/9/07 Perform Preventive Maintenance on Chillers. | January 16, 2007 | February 9, 2007 | 24 days |
| Randle-Highlands ES | FM-200632569 /06 2/9/07 Boiler Room - Replace defective programmer for boiler/burner # 1. | November 28, 2006 | February 9, 2007 | 73 days |
| Merritt Middle School | FM-200509217 05 2/9/07 Merritt Rooftop Unit #7 Repair rooftop unit #7 compressor #1 will not stay on line (noisy). | August 1, 2005 | February 9, 2007 | 557 days |
| Merritt Middle School | FM-200510466 05 2/9/07 Merritt Rooftop units Make proper repairs to rooftop unit #1 and # 2, units will not cool. Units service the Pre-k area and the main office. | August 16, 2005 | February 9, 2007 | 542 days |
| Merritt Middle School | FM-200514859 /05 2/9/07 Roosevelt Mashack Roof top units Shop - HVAC Replace gas regulaters and igniters on roof top units # 6 and # 8 per gas company. | October 31, 2005 | February 9, 2007 | 466 days |
| Merritt Middle School | FM-200517118 06 2/9/07 Merritt Roof top unit Replace (1) condenser fan motor on roofrop unit # 3 | January 5, 2006 | February 9, 2007 | 400 days |
| Merritt Middle School | FM-200618459 06 2/9/07 Merritt PM Chiller Check equipment and perform PM on equipment. | February 8, 2006 | February 9, 2007 | 366 days |
| Merritt Middle School | FM-200621738 06 2/9/07 Merritt Rooftop Unit Repair or replace unit #4, unit will not come on. | April 25, 2006 | February 9, 2007 | 290 days |
| Harris, C.W. ES | FM-200633544 12/27/06 2/9/07 First Floor - Room 109 and 143 - Replace defective univent motors in classrooms. No Heat Frame - 48 motors. | December 27, 2006 | February 9, 2007 | 44 days |
| Harris, C.W. ES | FM-200516087 05 2/9/07 Harris, C.W Rooms 212, & 213 Replace shaft bearing on nivent in room 212. Replace shaft bearing and sleeve on univent in room 213 | December 6, 2005 | February 9, 2007 | 430 days |
| Merritt Middle School | FM-200621759 06 2/9/07 Merritt Rooftop Unit #9 Replace one (1) condenser fan motor. GE; X70671180017; Motor 5717 HP 1 Volts 460/400 Amp 2.50 R.P.M. 1125/950 | April 25, 2006 | February 9, 2007 | 290 days |
| Hart Middle School | FM-200341297 03 2/9/07 Hart Boiler Room Boiler #3 Replace modulator motor. Also check for excessive blower motor vibration. Information: Honeywell modulator - no model or serial number volt- 120 HZ 50/60 Amps. 48 Watt 33 | December 9, 2003 | February 9, 2007 | 1,158 days |
| Hart Middle School | FM-200341298 03 2/9/07 Hart Boiler Room Boiler #1 Replace programmer. Information: Programmer honeywell Model # R4140L1147 Volts 120 HZ 60 Programmer-Transformer 139270A | December 9, 2003 | February 9, 2007 | 1,158 days |
| Hart Middle School | FM-200442906 04 2/9/07 Hart Boiler Room Boilers #2 & #3 Replace modutrol (modulator) motors. Note: Unit is worn & wear & tear. Information: Modulator Volts 120 AMPS 48 HZ 50/60 Watts 33 (No model number) | January 18, 2004 | February 9, 2007 | 1,118 days |
| Hart Middle School | FM-200513352 05 2/9/07 Hart Boiler Room Boiler #2 Replace damper linkage and gas valve | October 1, 2005 | February 9, 2007 | 496 days |
| Hart Middle School | FM-200632221 /06 2/9/07 Repair # 2 boiler , will not start. | November 15, 2006 | February 9, 2007 | 86 days |
| Hart Middle School | FM-200632544 /06 2/9/07 Basement - Boiler Room - Correct problem with Boiler # 3, Boiler continues to go into flame failure. | November 27, 2006 | February 9, 2007 | 74 days |
| Thomas Elementary School | FM-200335348 03 2/9/07 Neval Thomas Boiler #1 replace damper motor to pass Boiler Inspection.Boiler failed inspection. | August 15, 2003 | February 9, 2007 | 1,274 days |
| Merritt Middle School | FM-200623068 06 2/9/07 Merrett Electrical room / Hot water storage Replace leaking Honeywell Aquastat on domestic hot water recirculating line. | May 22, 2006 | February 9, 2007 | 263 days |
| Roosevelt High School | FM-200458083 04 2/9/07 Roosevelt Boiler Room Repair chemical feed pump on Boilers #1,#2 and #3. also add Boiler chemicals to tank. | November 9, 2004 | February 9, 2007 | 822 days |
| Randle-Highlands ES | FM-200619756 06 2/9/07 Randle Highlands Boiler Room Repair mechanical seal on circulating pump on #3 Boiler. | March 13, 2006 | February 9, 2007 | 333 days |
| Randle-Highlands ES | FM-200513593 05 2/9/07 Randle Highlands First fl. Mechanical RM Repair condensation Leak | October 6, 2005 | February 9, 2007 | 491 days |
| Houston Elementary School | FM-200632502 /06 2/9/07 Room 148 - Repair unit vent in the restroom. | November 24, 2006 | February 9, 2007 | 77 days |
| Bruce-Monroe Elementary School | FM-200500696 05 2/12/07 Bruce-Monroe Old Wing Repair 3/4" steam supply line on radiator, can not be isolated leaking between floors no insulation. | January 22, 2005 | February 12, 2007 | 751 days |
| Ballou Senior High School | FM-200502344 05 2/12/07 Ballou Boiler Room Replace one (1) 6" gate valve on the feedwater slipplyline to Boiler #2. Note: Valve worn and not holding, located on Boiler #2 (rear) | March 8, 2005 | February 12, 2007 | 706 days |
| Tyler Elementary School | FM-200625553 06 2/12/07 1st Floor- Hallway Repair/replace damaged ceiling tile. Asbestos Code A - Clear for repairs on 07/13/06. Tidewater - Thomas Johnson (RG 07/14/06) | July 11, 2006 | February 12, 2007 | 216 days |
| Davis Elementary School | FM-200632616 /06 2/12/07 Basement - Lunchroom - Remove old A/C unit and install new unit that's on site. | November 29, 2006 | February 12, 2007 | 75 days |
| Tyler Elementary School | FM-200619559 06 2/12/07 Hall-Replace damaged floor tile caused by flood (12x2 tan) See Mr Ferguson Asbestos Code A - Clear for repairs on 03/08/06 Tidewater - Tony Marcolin (RG 03/10/06) | March 7, 2006 | February 12, 2007 | 342 days |
| Davis Elementary School | FM-200632923 06 2/12/07 Second Floor - Teacher's Lounge - Align door | December 6, 2006 | February 12, 2007 | 68 days |
| Meyer Elementary School | FM-200700304 07 2/12/07 Main Office - Electrical short in light fixture. Sparks keep shooting from fixture. | February 6, 2007 | February 12, 2007 | 6 days |
| Meyer Elementary School | FM-200631598 06 2/12/07 First, Second & Third floor, Restrooms Replace flush valve kits & wax rings. | November 1, 2006 | February 12, 2007 | 103 days |
| Tyler Elementary School | FM-200619147 06 2/12/07 Room 123-Make repairs to the door | February 27, 2006 | February 12, 2007 | 350 days |
| Ballou Senior High School | FM-200510936 05 2/12/07 Ballou Boiler Room Boiler #2 repair or replace leaking return valve. Per Boiler Inspector | August 23, 2005 | February 12, 2007 | 538 days |
| Tyler Elementary School | FM-200340856 03 2/12/07 Tyler First floor room 132 Repair or replace door. Asbestos Code A - Clear for repairs on 12/01/03. Horne Engineering - Tony Marcolin (RG 12/03/03) | December 1, 2003 | February 12, 2007 | 1,169 days |
| Shaed Elementary School | FM-200632051 06 2/12/07 Outside - By Loading Dock - Clogged drain and standing water. | November 8, 2006 | February 12, 2007 | 96 days |
| Emery Elementary School | FM-200627479 06 2/12/07 First Floor/Exit signs missing on both sides of stage auditorium. | August 14, 2006 | February 12, 2007 | 182 days |
| Turner Elementary School | FM-200700102 07 2/12/07 Asbestos Assessment May Be Required To Wall In Custodian's Closet For Pipe Repair. First Floor - Custodian's Closet - Repair slop sink, when sink is in use the water runs into the class on the basement level. Asbestos Code A - Clear for repairs on 01/30/07. Tidewater - Shamika Parker (RG 02/01/07) | January 31, 2007 | February 12, 2007 | 12 days |
| Nalle Elementary School | FM-200623829 06 2/12/07 Exterior Grounds - Playground Area - Use bobcat to remove playground equipment and burned mats. | June 5, 2006 | February 12, 2007 | 252 days |
| Watkins Elementary School | FM-200512839 05 2/12/07 (Watkins) Second floor, Teachers' lounge 1) Replace cabinet counter top. | September 19, 2005 | February 12, 2007 | 511 days |
| Watkins Elementary School | FM-200512691 05 2/12/07 (Wtkins) Assess flooring and replace carpet. Asbestos Code A - Clear for repairs on 10/27/05. Tidewater -Sheryll James (RG 10/28/05) | June 22, 2005 | February 12, 2007 | 600 days |
| Watkins Elementary School | FM-200507586 05 2/12/07 First Floor- Day Care Room 109 Asbestos Assessment Required For Carpet Replacement. Asbestos Code A - Clear for repairs on 06/13/05. Tidewater - Sheryll James (RG 01/27/06) | July 8, 2005 | February 12, 2007 | 584 days |
| Browne Junior High School | FM-200447144 04 2/12/07 Browne Boiler Room Replace back flow perventor valve that feeds the cooling tower valve is leaking badly. | April 26, 2004 | February 12, 2007 | 1,022 days |
| Watkins Elementary School | FM-200503253 05 2/12/07 Watkins First fl. Principle's Office Please, Check the Walls,We plann to haang Pictures in the future. Code A-clear for repair by DCPS Charles Buchanan on 2/2/06 | March 25, 2005 | February 12, 2007 | 689 days |
| Browne Junior High School | FM-200501766 05 2/12/07 Browne Basement old wing by old gym Old shower room hot water pipes are leaking. | February 18, 2005 | February 12, 2007 | 724 days |
| Browne Junior High School | FM-200502078 05 2/12/07 BROWNE First fl Rm 113 Old Wing Repair Water Pipe Leak in the Ceiling | February 28, 2005 | February 12, 2007 | 714 days |
| Browne Junior High School | FM-200508804 05 2/12/07 Browne Boiler Room Boiler #4 Failed, Install inlet and outlet valves around city water feeder. Per Boiler Inspector | July 27, 2005 | February 12, 2007 | 565 days |
| Watkins Elementary School | FM-200624199 06 2/12/07 Second floor, Room 202. Repair or Replace hinges on door. Currently the door is hanging off the hinges. | June 12, 2006 | February 12, 2007 | 245 days |
| Browne Junior High School | FM-200624002 06 2/12/07 Make the necessary repairs the outside railing at the back of the school building | June 7, 2006 | February 12, 2007 | 250 days |
| Watkins Elementary School | FM-200455094 04 2/12/07 Watkins Rooms 109 and 119 Replace the window with old air conditioner vents openings. We have toned plastic over it to keep out mosquitoes, rain, wind curt dust ate , but it is ugly and inefficiencie. | September 20, 2004 | February 12, 2007 | 875 days |
| Watkins Elementary School | FM-200448780 04 2/12/07 Watkins Main Office , 314, and 417 Remove old window A/C units from window in the Main Office, 314, and 417,install new A/C units in the same areas, the new units are on the job site , the openings are too small for the new units. Asbestos Code A - Clear for repairs on 06/03/04. Horne Engineering - Bjarne Smith ( RG 03/06 ) | June 3, 2004 | February 12, 2007 | 984 days |
| Bowen Elementary School | FM-200506231 05 2/12/07 Bowen Boiler room Repair or replace Domestic hot water circulating in the boiler room , pump was just humming. | June 2, 2005 | February 12, 2007 | 620 days |
| Bruce-Monroe Elementary School | FM-200449524 04 2/12/07 Bruce-Monroe Boiler Room Repair fire door on Boiler #2. (Door rusted out) very badly door. Size 48 1/4" (W) X 37 1/2" (H) | June 20, 2004 | February 12, 2007 | 967 days |
| Bowen Elementary School | FM-200504136 05 2/12/07 Bowen 1st floor mechanical room, and in boiler room Repair or replace domestic hot water pumps, there is no hot water on the side of building. | April 18, 2005 | February 12, 2007 | 665 days |
| Bruce-Monroe Elementary School | FM-200452152 04 2/12/07 Bruce Monroe Furnish angle iron in order to make repairs to boilers | August 11, 2004 | February 12, 2007 | 915 days |
| Watkins Elementary School | FM-200625874 06 2/12/07 1st Floor- Install 2 window a/c units in the cafeteria. Asbestos Code A - Clear for Repairs on 07/19/06. Tidewater - Roger Small (RG 07/21/06) | July 18, 2006 | February 12, 2007 | 209 days |
| Watkins Elementary School | FM-200625875 06 2/12/07 1st Floor- Install 1 window a/c units in the Recreation Center Office. Asbestos Code A - Clear for Repairs on 07/19/06. Tidewater - Roger Small (RG 07/21/06) | July 18, 2006 | February 12, 2007 | 209 days |
| Bruce-Monroe Elementary School | FM-200458919 04 2/12/07 Bruce-Monroe First floor old gym Repair steam leak from radiator. | December 1, 2004 | February 12, 2007 | 803 days |
| Ballou Senior High School | FM-200502530 05 2/12/07 Ballou Boiler Room Replace one (1) 6" gate valve on the feedwater supply line to #2 Boiler. Note: Valve worn and not holding, located on Boiler #2 rear. | March 10, 2005 | February 12, 2007 | 704 days |
| Leckie Elementary School | FM-200634106 9/07 2/12/07 R/R water fountains on all floors | January 19, 2007 | February 12, 2007 | 24 days |
| Murch Elementary School | FM-200700443 07 2/12/07 An loud humming sound coming from the radator LOCATION NOT KNOWN. | February 12, 2007 | February 12, 2007 | 0 days |
| Ballou Senior High School | FM-200506964 05 2/12/07 Ballou Boiler Room Boiler #2 Replace (4) four fire-tubes. Information: Pacific Steel Hot Water Boiler | June 20, 2005 | February 12, 2007 | 602 days |
| Watkins Elementary School | FM-200339922 03 2/12/07 Watkins Old classroom doors All classroom doors throughout the building need to be fix or replace, stuck doors. Asbestos Code A - Clear for repairs on 11/05/03. Horne Engineering - Bipin Nanavaty (RG 11/06/03) | November 5, 2003 | February 12, 2007 | 1,195 days |
| Watkins Elementary School | FM-200633108 /06 2/12/07 First Floor - Lobby - Handicap Door, Broken Door Closer. | December 11, 2006 | February 12, 2007 | 63 days |
| Birney Elementary School | FM-200634080 07 2/12/07 Cafeteria - Busted steam line to univent. | January 18, 2007 | February 12, 2007 | 25 days |
| Webb Elementary School | FM-200630661 /06 2/12/07 Boiler Room. Assess and repair problem No hot water through-out the entire building. | October 11, 2006 | February 12, 2007 | 124 days |
| Birney Elementary School | FM-200206605 02 2/12/07 1) In accordance with grass cutting contract for the summer of 2002 to include grass cutting and edging. | April 25, 2002 | February 12, 2007 | 1,754 days |
| Watkins Elementary School | FM-200339921 03 2/12/07 Watkins Room 417 Room door off hinges, wood at top. Door falling off hinges. Asbestos Code A - Clear for repairs on 11/05/03. Horne Engineering - Bipin Nanavaty (RG 11/06/03) | November 5, 2003 | February 12, 2007 | 1,195 days |
| Watkins Elementary School | FM-200339918 03 2/12/07 Watkins Main office Door off hinges, wood at top. Asbestos Code A - Clear for repairs on 11/05/03. Horne Engineering - Bipin Nanavaty (RG 11/06/03) | November 5, 2003 | February 12, 2007 | 1,195 days |
| John Burroughs ES | FM-200632416 /22/06 2/12/07 Boiler Room - Repair or replace leaking tubes in Boiler # 2. The fire door was removed to check tube sheet. The bottom half of the tube sheet has water damage. A hydro test was performed . Tubes are leaking internal. Water is leaking at the bottom, front and sides. | November 22, 2006 | February 12, 2007 | 82 days |
| Ballou Senior High School | FM-200500861 05 2/12/07 Ballou Boiler Room Asbestos assessment required on Boiler #2. Boiler #2 has crack in rear shell. Asbestos Code A - Clear for repairs on 06/28/05. Tidewater - Philp Connolly (RG 07/12/05) | January 27, 2005 | February 12, 2007 | 746 days |
| Barnard Elementary School | FM-200506003 05 2/12/07 Barnard Boiler Room Asbestos assement required on line. Domestic city water line leaking. Asbestos Code A - Clear for repairs on 05/27/05. Tidewater - Tony Marcolin (RG 06/02/05) | May 26, 2005 | February 12, 2007 | 627 days |
| Bancroft Elementary School | FM-200633943 1/07 2/12/07 Bancroft Boiler Room Check and repair sump pump, keep going off on overload. Boiler Room will flood, if problem is not correct. | January 11, 2007 | February 12, 2007 | 32 days |
| Wilkinson ES | FM-200633871 1/9/07 2/12/07 Second Floor - Literary Area - Repair the sinks faucet, it's leaking. | January 9, 2007 | February 12, 2007 | 34 days |
| Ballou Senior High School | FM-200506965 05 2/12/07 Ballou Boiler Room Boiler #1, #2 and #3 Repair refractory work on boiler explosion doors. Information: Pacific Steel Hot Water Boiler | June 20, 2005 | February 12, 2007 | 602 days |
| Ballou Senior High School | FM-200633451 20/06 2/12/07 Southwest Tunnel - Busted Pipe ( 3/4 inch supply line ). | December 20, 2006 | February 12, 2007 | 54 days |
| Watkins Elementary School | FM-200337895 03 2/12/07 Watkins Room 112 Carpenter needed to fix or replace stuck door. Asbestos Code A - Clear for repairs on 09/26/03. Horne Engineering - Edward Rodriguez (RG 09/26/03) | September 23, 2003 | February 12, 2007 | 1,238 days |
| Ballou Senior High School | FM-200629894 06 2/12/07 Ballou Boiler Room Boiler #1 Hydro test failed due to the relief valve was not removed DC Boiler Inspector | September 24, 2006 | February 12, 2007 | 141 days |
| Nalle Elementary School | FM-200455174 04 2/12/07 Nalle, J.C. Exterior Grounds 1) 40 lf of 72" Mesh Only. Poc - Oscar Mebane - 202-345-0688 | September 20, 2004 | February 12, 2007 | 875 days |
| Ballou Senior High School | FM-200452182 04 2/12/07 Ballou Boiler room Repair refractory on the tube sheet door of #3 boiler. | August 11, 2004 | February 12, 2007 | 915 days |
| Ballou Senior High School | FM-200512349 05 2/12/07 Ballou Boiler Room Install nipples and valves for chemical injections on return and suction line on pumps. | September 12, 2005 | February 12, 2007 | 518 days |
| Jefferson JHS | FM-200700052 /07 2/12/07 First Floor - Boy's Bathroom - R/R Sink that is hanging off the wall, | January 29, 2007 | February 12, 2007 | 14 days |
| Spingarn High School | FM-200446259 04 2/12/07 Spingarn First floor pannel box by room 120 Second floor panel box by the library Requesting an electrician to survey circuit breaker in the box, it will not stay on switch # 18on second floor, and switch # 8 on first floor. Asbestos Code A - Clear for repairs on 04/02/04. Horne Engineering - Sheryll James (RG 04/06/04) | April 1, 2004 | February 12, 2007 | 1,047 days |
| Spingarn High School | FM-200628877 06 2/12/07 Survey outlet in room 205, there is no power coming from it. The breakers where checked by Mr. herbert. | September 6, 2006 | February 12, 2007 | 159 days |
| Spingarn High School | FM-200628927 06 2/12/07 Second Floor/Rm. 202 - Survey outlets, there is no power, it may a bad breaker. | September 7, 2006 | February 12, 2007 | 158 days |
| Stanton Elementary School | FM-200205662 02 2/12/07 Stanton Annex !!! EMERGENCY !!! Exit Back Door / Panic - long bar on the door wont secure the back door to lock. Security Hazard. | April 9, 2002 | February 12, 2007 | 1,770 days |
| Stanton Elementary School | FM-200206637 02 2/12/07 Stanton ES Main Building The pole in the middle of the double door needs to be remounted. The absence of the center pole is causing a lot of problems [can't properly secure the building at night]. | April 25, 2002 | February 12, 2007 | 1,754 days |
| Stanton Elementary School | FM-200218057 02 2/12/07 Stanton Asbestos Assessment Reqd. 2nd Floor Room 206 Repair ceiling. Asbestos Code A - Clear for repairs on 09/25/02. Horne Engineering - Bipin Nanavaty (RG 09/26/02) | September 23, 2002 | February 12, 2007 | 1,603 days |
| Stanton Elementary School | FM-200222026 02 2/12/07 (Stanton) All panic bars need to be repaired. | December 4, 2002 | February 12, 2007 | 1,531 days |
| Stanton Elementary School | FM-200226008 03 2/12/07 (Stanton) Room #106: Ceiling fallen, Possible stopped up roof drain. Asbestos Code A-clear for repair by Horne Engineering Philip Connoliy on 02/26/03 DCPS Charles E Buchanan | February 21, 2003 | February 12, 2007 | 1,452 days |
| Stanton Elementary School | FM-200226201 03 2/12/07 Stanton Annex Room A-2 door need to be repaired. Asbestos Code A - Clear for repairs on 02/26/03. Horne Engineering - Bipin Nanavaty (RG 02/27/03) | February 25, 2003 | February 12, 2007 | 1,448 days |
| Stanton Elementary School | FM-200226285 03 2/12/07 Stanton Third floor - Classroom # 307 and Closet Door . 1. Classroom and maintenance closet doors came off the hinge and need to be rehung . Asbestos Code A - Clear for repairs on 02/27/03. Horne Engineering - Tony Marcolin (RG 02/28/03) | February 26, 2003 | February 12, 2007 | 1,447 days |
| Smothers ES | FM-200633950 07 2/12/07 Smothers Boilerroom Repair or replace 2" inch condensate return line by condensate tank, line has a pin hole in it. | January 12, 2007 | February 12, 2007 | 31 days |
| Hart Middle School | FM-200220599 02 2/12/07 Hart 134/New Wing First Floor There is no electricity being fed to fan coil unit in room 134 to operate motor. | November 1, 2002 | February 12, 2007 | 1,564 days |
| Smothers ES | FM-200624165 06 2/12/07 SMOTHERS Furnish and install window a/c units in the following location one unit in lunchroom 15,000btu 15amps, two units in library 15,000btu 15amps. One unit in computer room 18,000btu 20amp One in teacher room 15,000btu 15amps | June 9, 2006 | February 12, 2007 | 248 days |
| Stanton Elementary School | FM-200226467 03 2/12/07 STANTON FIRST FLOOR - ANNEX HALLWAY . 1.PLEASE REPLACE DOOR FRAME AND DOOR. Asbestos Code A - Clear for repairs on 03/03/03. Horne Engineering - Tony Marcolin (RG 03/04/03) | March 3, 2003 | February 12, 2007 | 1,442 days |
| Smothers ES | FM-200514914 05 2/12/07 First Floor-Library: Replace carpet with tile floor, carpet is old and a health hazard for kids itching and sneezing in the library due to dampness in the carpet. Asbestos Code A - Clear for repairs on 11/03/05. Tidewater - Tony Marcolin (RG 11/04/05) | November 1, 2005 | February 12, 2007 | 468 days |
| Hart Middle School | FM-200329900 03 2/12/07 Hart Computer Lab (223) Provide electrical source for units (Electrical receptacles) 208 volts. Furnish and install (2) window unit air conditioners. | May 9, 2003 | February 12, 2007 | 1,375 days |
| Hart Middle School | FM-200329901 03 2/12/07 Hart Computer Lab (B37) Provide electrical source for units (Electrical receptacles) 208 volts. Furnish and install (2) window unit air conditioners. | May 9, 2003 | February 12, 2007 | 1,375 days |
| Gibbs Elementary School | FM-200633916 07 2/12/07 Kitchen - Check and make repairs to or replace the hot water heater, it's not working. Note: No hot water in the kitchen | January 10, 2007 | February 12, 2007 | 33 days |
| Stanton Elementary School | FM-200227178 03 2/12/07 STANTON First Floor - Kitchen Exterior Door 1. Replace panic bar on kitchen door. Code A-clear for repair by DCPS Charles Buchanan on 3/21/03 | March 17, 2003 | February 12, 2007 | 1,428 days |
| Ballou Senior High School | FM-200625725 06 2/12/07 BALLOU SHS boiler room Furnish engineer with two (2) 50lbs. bags of refractory Note: for interior firebox touch up on boiler # 3 Info: Superheat Crete 28 Refractory, 50lbs | July 17, 2006 | February 12, 2007 | 210 days |
| Wilson J. O. ES | FM-200634105 07 2/12/07 Exterior of Building - Water Meter - Investigate and verify the location of the leak and make the necessary repairs. DCWASA has giving 5 working days for repairs of the meter, failure to comply will result in the termination of water service. | January 19, 2007 | February 12, 2007 | 24 days |
| Ballou Senior High School | FM-200514361 /05 2/12/07 Ballou Band Room/Music Room Install and fabricate four (4) A/C Window trays and braces for A/C window units. Information: Band Room- 2 -each Music Room 2 each | October 23, 2005 | February 12, 2007 | 477 days |
| Woodson High School | FM-200700125 07 2/12/07 Second floor, Room210. Repair or replace ruptured pipe. Note: Abatement is needed. | January 31, 2007 | February 12, 2007 | 12 days |
| Stanton Elementary School | FM-200228608 03 2/12/07 Stanton Third floor rooms 307 and 310 Door are off hinges, Asbestos Code A - Clear for repairs on 04/17/03. Horne Engineering - Bipin Nanavaty (RG 04/23/03) | April 10, 2003 | February 12, 2007 | 1,404 days |
| Smothers ES | FM-200512703 05 2/12/07 Smothers First Floor - Auditorium 1) Both sides of stage flooring need replacing,wooden planks broken and a hole is in the floor. 2) Stage flooring need to be sanded and varnish. Asbestos Code A - Clear for repairs on 09/20/05. Tidewater - Tony Marcolin (RG 09/22/05) SEE ASSESSMENTS | September 16, 2005 | February 12, 2007 | 514 days |
| Smothers ES | FM-200512023 05 2/12/07 Smothers Emergency First Floor-Stairwell Secure the window from break in | September 7, 2005 | February 12, 2007 | 523 days |
| Stanton Elementary School | FM-200329012 03 2/12/07 (Stanton) Asbestos Assessment Required. First floor hallway Door is broken. Code A - Clear for repairs on 04/25/03. Horne Engineering - Sheryll James (RG 04/28/03) | April 24, 2003 | February 12, 2007 | 1,390 days |
| Stanton Elementary School | FM-200337053 03 2/12/07 Stanton Room 306 door need adjusting. Asbestos Code A - Clear for repairs on 09/09/03. Horne Engineering - Sheryll James (RG 09/10/03) | September 8, 2003 | February 12, 2007 | 1,253 days |
| Stanton Elementary School | FM-200337312 03 2/12/07 Stanton Room 309 Door is broken need a carpenter to fix it. Asbestos Code A - Clear for repairs on 09/16/03. Horne Engineering - Philp Connolly (RG 09/25/03) | September 11, 2003 | February 12, 2007 | 1,250 days |
| Stanton Elementary School | FM-200337812 03 2/12/07 (Stanton) Asbestos Assessment Required. Annex/All classrooms: Need assessment for chalk board to be hung. Asbestos Code A - Clear for repairs on 09/24/03. Horne Engineering - Sheryll James (RG 09/29/03) | September 22, 2003 | February 12, 2007 | 1,239 days |
| Stanton Elementary School | FM-200338621 03 2/12/07 (Stanton) Asbestos Assessment Required. Front Entrance Door: Needs immediate repair. Asbestos Code A - Clear for repairs on 10/09/03. Horne Engineering - Philp Connolly (RG 10/10/03) | October 7, 2003 | February 12, 2007 | 1,224 days |
| Hart Middle School | FM-200517082 06 2/12/07 Emergency: Disconnect the power to the univent in the rec. room | January 3, 2006 | February 12, 2007 | 405 days |
| Stanton Elementary School | FM-200446952 04 2/12/07 Stanton Second floor room-211 Door has been fix several times by me, screws are to small need new ones. Asbestos Code A - Clear for repairs on 04/22/04. Horne Engineering - Bipin Nanavaty (RG 04/23/04) | April 21, 2004 | February 12, 2007 | 1,027 days |
| Stanton Elementary School | FM-200446969 04 2/12/07 (Stanton) Main Entrance Door: Replace door closer. Asbestos Code A - Clear for repairs on 04/22/04. Horne Engineering - Bipin Nanavaty (RG 04/23/04) | April 21, 2004 | February 12, 2007 | 1,027 days |
| Stanton Elementary School | FM-200446970 04 2/12/07 (Stanton) 2nd Floor/Main Stairwell: Re-install hand rails leading to the 3rd floor. Asbestos Code A - Clear for repairs on 04/22/04. Horne Engineering - Bipin Nanavaty (RG 04/23/04) | April 21, 2004 | February 12, 2007 | 1,027 days |
| Stanton Elementary School | FM-200448370 04 2/12/07 Stanton Second floor room 211 and 208 The above rooms door are in need of repairing. Asbestos Code A - Clear for repairs on 05/27/04. Horne Engineering - Philp Connolly ( RG 05/27/04 ) | May 24, 2004 | February 12, 2007 | 994 days |
| Watkins Elementary School | FM-200337892 03 2/12/07 Watkins Room 419 Classroom door falling off hinge (wood at the top) Asbestos Code A - Clear for repairs on 09/25/03. Horne Engineering - Edward Rodriguez (RG 09/26/03) | September 23, 2003 | February 12, 2007 | 1,238 days |
| Ballou Senior High School | FM-200452183 04 2/12/07 Ballou BVoiler room Reweld mud legg ,right rear of #3 boiler. | August 11, 2004 | February 12, 2007 | 915 days |
| Smothers ES | FM-200502735 05 2/12/07 (Smothers) "Emergency" Third flloor/Room 301 Repair or Replace classroom door. The door is jammed students are having difficulty entering and exiting classroom. | March 15, 2005 | February 12, 2007 | 699 days |
| Watkins Elementary School | FM-200337750 03 2/12/07 (Watkins) FIRE CODE VIOLATION: Asbestos Assessment Required. 1st Floor/Room #111: Defective door. Code A-clear for repair by DCPS Charles Buchanan on 9/23/03 | September 17, 2003 | February 12, 2007 | 1,244 days |
| Smothers ES | FM-200502734 05 2/12/07 (Smothers) "Emergency" Third flloor/Room 301 Repair or Replace classroom door. The door is jammed students are having difficulty entering and exiting classroom. | March 15, 2005 | February 12, 2007 | 699 days |
| Watkins Elementary School | FM-200337691 03 2/12/07 Watkins Through -Out 1. Repair or replace all classroom doors . First floor classroom doors: 108, 109, 110, 111, 112, 113, 119. Second floor classroom doors: 200, 201, 202, 203, 204, 205. 210, 215, 216. Third floor classroom doors: 300, 301, 302, 303, 304, 305, 306, 307, 309, 314, 315, 316. Fourth floor classroom doors: 400, 401, 402, 403, 404, 405, 406, 407, 410, 415, 416, 417. Code A-clear for repair by DCPS Charles Buchanan on 9/23/03 | September 17, 2003 | February 12, 2007 | 1,244 days |
| Watkins Elementary School | FM-200337690 03 2/12/07 Watkins First / Fourth Floor - Main Office- 417- Recreation Office 1. Repair main office door off hinge .(wood at the top) 2. Repair classroom door falling off hinge (wood at the top) 3. Repair interior and exterior doors hanging off hinge Code A-clear for repair by DCPS Charles Buchanan on 9/23/03 | September 17, 2003 | February 12, 2007 | 1,244 days |
| Watkins Elementary School | FM-200336818 03 2/12/07 Watkins Classroom 111 Carpenter needed to fix or replace stuck door. Asbestos Code A - Clear for repairs on 09/04/03. Horne Engineering - Bipin Nanavaty (RG09/08/03) | September 4, 2003 | February 12, 2007 | 1,257 days |
| Hearst Elementary School | FM-200634227 /07 2/12/07 Boiler Room. Repair or replace ruptured steamline. Note: Steamline ruptured burning a custodian. | January 23, 2007 | February 12, 2007 | 20 days |
| Hearst Elementary School | FM-200634230 /07 2/12/07 Boiler room - Emergency Repair or replace reptured steam line. Line has ruptured filling boiler room with steam. | January 23, 2007 | February 12, 2007 | 20 days |
| Clark Elementary School | FM-200623818 06 2/12/07 1st Floor- Kitchen The plaster is falling from the ceiling. Lead & Asbestos Code A - Clear for repairs on 06/12/06. Tidewater - Roger Small (RG 06/13/06) SEE ASSESSMENTS DUPLICAT OF FM-200516826 | June 5, 2006 | February 12, 2007 | 252 days |
| Stanton Elementary School | FM-200448508 04 2/12/07 Stanton Annex Business Manager office , Computer Lab office, A13 class room Install 25,000 BTUs Window unit in the Business Manager's office.( ANNEX) Install 13,000 BTUs Window unit in the computer Lab. ( ANNEX) Install 24,000 BTUs Window unit room A13. Class room Asbestos Code A - Clear for repairs on 05/27/04. Horne Engineering - Bjarne Smith (RG 06/01/04) | May 26, 2004 | February 12, 2007 | 992 days |
| Ballou Senior High School | FM-200506966 05 2/12/07 Ballou Boiler Room Boiler #1, #2 and #3 Repair refractory work on the interior of boiler. Information: Pacific Steel Hot Water Boiler | June 20, 2005 | February 12, 2007 | 602 days |
| Stanton Elementary School | FM-200449130 04 2/12/07 Stanton annex Main door to annex Need a panic bar put on. Asbestos Code A - Clear for repairs on 06/10/04. Horne Engineering - Bipin Nanavaty (RG 06/14/04) | June 9, 2004 | February 12, 2007 | 978 days |
| Stanton Elementary School | FM-200450047 04 2/12/07 (Stanton) Annex: Repair hole in the floor. | July 9, 2004 | February 12, 2007 | 948 days |
| Smothers ES | FM-200447959 04 2/12/07 Smothers Kitchen: Replace broken and missing floor tile in area where walk-in unit will be ionstalled. Walk-in unit on site. asbestos assessment need. Asbestos Code A - Clear for repairs on 05/14/04. Horne Engineering - Philp Connolly (RG 05/19/04) | May 14, 2004 | February 12, 2007 | 1,004 days |
| Ferebee-Hope Elementary School | FM-200515394 /05 2/12/07 Ferbee-Hope Boiler room Repair sewage injector pumps , Repair sump pump. | November 14, 2005 | February 12, 2007 | 455 days |
| Smothers ES | FM-200447174 04 2/12/07 Smothers First floor hall 12"x12" hole in wall need to be repair with cereamic tile. Asbestos Code A - Clear for repairs on 04/26/04. Horne Engineering - Ed Rodriguez (RG 04/27/04) | April 26, 2004 | February 12, 2007 | 1,022 days |
| Stanton Elementary School | FM-200453000 04 2/12/07 Stanton Third, second and first floor Door closer 3rd floor stairwell door broken, 2nd floor stairwell exit near # 206 broken door closer 1st floor stairwell door handle need to be reinstalled and egress stairwell exit 1st floor near # 109 broken door closer. The interior exit doors are metal doors. Code A-clear for repair by DCPS Charles Buchanan on 8/24/04 | August 19, 2004 | February 12, 2007 | 907 days |
| Stanton Elementary School | FM-200500871 05 2/12/07 Stanton Door to the parking lot and kitchen Someone kicked the middle bar in and the door need to be secure for the night. | January 27, 2005 | February 12, 2007 | 746 days |
| Smothers ES | FM-200220638 /02 2/12/07 Smothers First Floor 1) Repair or replace double exit doors needing alignment and door jamb damaged. Week of ( 11/4-11/8 ) FM-200220845 Asbestos Code A-clear for repair by Charles E. Buchanan on 11/12/02 DCPS Charles E Buchanan | November 12, 2002 | February 12, 2007 | 1,553 days |
| Smothers ES | FM-200216306 02 2/12/07 Smothers Asbestos Assessment Reqd. 1st Floor Kitchen Area Replace 8'x16' linoleum tile flooring in the kitchen that was damaged by a freezer leak, that has now been repaired. There is still water under the tiles---the bond was broken and the tiles are buckled. Asbestos Code A-clear for repair by Horne Engineer Troy Wilcome On 9/05/02 DCPS Charles E. Buchanan | September 3, 2002 | February 12, 2007 | 1,623 days |
| Stanton Elementary School | FM-200501684 05 2/12/07 Stanton Annex The door has come off the hinges. Code A-clear for repair by DCPS Charles Buchanan on 2/17/05 | February 16, 2005 | February 12, 2007 | 726 days |
| Stanton Elementary School | FM-200503784 05 2/12/07 (Stanton) Flagside/Entrance door. Entrance door is sticking , it is very difficult to open and close. | April 8, 2005 | February 12, 2007 | 675 days |
| Stanton Elementary School | FM-200700171 /07 2/12/07 Third Floor - Boy's Bathroom - Urinals Clogged - Mr. Dreher tried using plunger and toilet arger | February 2, 2007 | February 12, 2007 | 10 days |
| Takoma Educational Center | FM-200634342 1/25/07 2/12/07 install marquis sign on playground | January 25, 2007 | February 12, 2007 | 18 days |
| Nalle Elementary School | FM-200623789 06 2/12/07 Exterior Grounds - Playground Area - Playground set on fire. Playground equipment burnt down. | June 5, 2006 | February 12, 2007 | 252 days |
| Noyes Elementary School | FM-200632053 06 2/12/07 Exterior Rear of Building. Unclog exterior drain water is backing up and flooding the auditorium. | November 8, 2006 | February 12, 2007 | 96 days |
| Ballou Senior High School | FM-200510935 05 2/12/07 Ballou Boiler Room Boiler #2 repair or replace leaking tubes Per Boiler Inspector | August 23, 2005 | February 12, 2007 | 538 days |
| Tyler Elementary School | FM-200629573 06 2/12/07 1st Floor- Room 118 Remove floor tile. Asbestos Code A - Clear For Repairs On 09/20/06. Tidewater - Shamika Parker ( RG 09/25/06) SEE ASSESSMENTS | September 15, 2006 | February 12, 2007 | 150 days |
| Randle-Highlands ES | FM-200700277 /07 2/13/07 Main Entrance Door (glass door) - Slamming Shut, Check and Make Repairs | February 6, 2007 | February 13, 2007 | 7 days |
| Orr Elementary School | FM-200226746 03 2/13/07 Orr First floor front door Request that front door frame to be repaired due to corrosion. Asbestos Code A - Clear for repairs on 03/10/03. Horne Engineering - Bipin Nanavaty (RG 03/11/03) | March 7, 2003 | February 13, 2007 | 1,439 days |
| Orr Elementary School | FM-200450866 04 2/13/07 Orr Front main door not closing properly need screws in front door FCV. Cafeteria door need panel bar put on FVC. Need 4 shades on the fourth floor in computer hallway and 3 blinds in the computer lab. Code A-clear for repair by DCPS Charles Buchan on 7/10/04 | July 27, 2004 | February 13, 2007 | 931 days |
| Wilson J. O. ES | FM-200501492 05 2/13/07 (Wilson, J.O. Please replace the light that has fallen half way down. Code A-clear for repair by DCPS Charles Buchanan on 9/15/05 | January 26, 2005 | February 13, 2007 | 748 days |
| Stuart-Hobson Middle School | FM-200629042 06 2/13/07 3rd Floor/Holes in ceiling from leaking ceiling. Asbestos Code A - Clear for repairs on 09/12/06. Tidewater - Kenny Belton (RG 09/15/06) | September 11, 2006 | February 13, 2007 | 155 days |
| Thomas Elementary School | FM-200340685 /03 2/13/07 (Thomas) 1st Floor/Kitchen: Survey, and repair screen door to prevent rodent entry. | November 24, 2003 | February 13, 2007 | 1,177 days |
| Thomas Elementary School | FM-200220365 /02 2/13/07 Thomas First floor - Kitchen Repair crack in the kitchen floor and replace 4" metal around baseboard. Asbestos Code A - Clear for repairs on 11/06/02. Horne Engineering - Sheryll James (RG 02/21/03) | October 31, 2002 | February 13, 2007 | 1,566 days |
| Randle-Highlands ES | FM-200700097 /07 2/13/07 Main Entrance Door & Exit Door Leading To Gym - Can't Secure Door's Due To Vandalism (may be panic bars). Check and make repairs | January 30, 2007 | February 13, 2007 | 14 days |
| Birney Elementary School | FM-200621454 06 2/13/07 Basement-Breach in the ceiling (cafeteria). "Fire Code Violation" Asbestos Code A - Clear for repairs on 04/20/06. Tidewater - Kenny Belton (RG 05/12/06 | April 19, 2006 | February 13, 2007 | 300 days |
| Birney Elementary School | FM-200621450 06 2/13/07 Basement-Breach in the ceiling (stairwell #4 storage room-basement) "Fire Code Violation" Asbestos Code A - Clear for repairs on 04/20/06. Tidewater - Kenny Belton (RG 05/12/06 | April 19, 2006 | February 13, 2007 | 300 days |
| Thomas Elementary School | FM-200226827 03 2/13/07 Thomas First floor exit door in the corridor and exterior door on the landing. Second floor storage room. Third floor exit door. Survey and repair or replace door closures. Fire code violation | March 10, 2003 | February 13, 2007 | 1,436 days |
| Thomas Elementary School | FM-200226828 03 2/13/07 Thomas First floor Kitchen dressing room Survey and repair dressing room door so it can close. Health code violation | March 10, 2003 | February 13, 2007 | 1,436 days |
| Wilson J. O. ES | FM-200617752 06 2/13/07 Lights are out in the back preparation area of the cafeteria. The custodians are not qualified to repair the light fixtures, an electrician is needed. | January 18, 2006 | February 13, 2007 | 391 days |
| Orr Elementary School | FM-200221103 /02 2/13/07 Orr Main Entrance/Front Entrance Doors 1) Doors are rotted out,slide bolts need to be replaced. Unable to secure the door with out the slide bolt. Week of 11/4 - /11/8 Fm-200220854 Asbestos Code A-clear for repair by Horne Engineer Philip Connolly on 11/19/02 DCPS Charles E. Buchanan | November 15, 2002 | February 13, 2007 | 1,551 days |
| Orr Elementary School | FM-200628873 06 2/13/07 First floor Front & Rear Exterior Doors. Replace door closers asap, these doors cannot be secured. Asbestos Code A - Clear for repairs on 09/07/06. Tidewater - Kenny Long (RG 09/08/06) | September 6, 2006 | February 13, 2007 | 160 days |
| Thomas Elementary School | FM-200621548 06 2/13/07 Asbestos Assessment Required. Outside Storage Room. Repair or Replace door. Note: This door is to hard to open and secure. | April 20, 2006 | February 13, 2007 | 299 days |
| Thomas Elementary School | FM-200226829 03 2/13/07 Thomas First floor room 103 Survey and install a sliding bolt on the inside of classroom door, so it can be secured. | March 10, 2003 | February 13, 2007 | 1,436 days |
| Randle-Highlands ES | FM-200621977 06 2/13/07 Second Floor-Teacher's Lounge: Door off the hinges | May 1, 2006 | February 13, 2007 | 288 days |
| Thomas Elementary School | FM-200227227 03 2/13/07 Thomas First floor kitchen Survey and repair gaps in the exterior door to prevent rodent entry. Health code violation Wrote up by the health department to seal all gaps. | March 18, 2003 | February 13, 2007 | 1,428 days |
| Woodson High School | FM-200628256 06 2/13/07 7th Fl./Stairway #4 exit sign hanging | August 24, 2006 | February 13, 2007 | 173 days |
| Raymond Elementary School | FM-200629081 06 2/13/07 (old wing) Third Floor/Breach in ceiling from water damage falling objects Asbestos Code A - Clear for repairs on 09/12/06. Tidewater - Shamika Parker (RG 09/13/06) Note - paint is peeling the entire length of corridor, approximately 300 feet long | September 11, 2006 | February 13, 2007 | 155 days |
| Randle-Highlands ES | FM-200632901 06 2/13/07 Room 2113 - Door off hinges | December 5, 2006 | February 13, 2007 | 70 days |
| Thomas Elementary School | FM-200621094 06 2/13/07 Outside Grounds-Storage Room-Survey and Repair or Replace door which is hard to open and secure. | April 7, 2006 | February 13, 2007 | 312 days |
| Cardozo High School | FM-200633580 /06 2/13/07 Requesting to have the basketball goal in the Girl's Gymnasium repaired, it's loose | December 28, 2006 | February 13, 2007 | 47 days |
| Thomas Elementary School | FM-200446921 04 2/13/07 Thomas Hallway and classroom Furnish and install (replace) 2x4 ceiling tiles. Asbestos Code A - Clear for repairs on 04/21/04. Horne Engineering - Tony Marcolin (RG 04/22/04) | April 21, 2004 | February 13, 2007 | 1,028 days |
| Randle-Highlands ES | FM-200631592 06 2/13/07 Second Floor - Teacher's Lounge - Door is coming off the hinges. | November 1, 2006 | February 13, 2007 | 104 days |
| Cleveland Elementary School | FM-200700478 07 2/13/07 Unlock extinguisher-standpipe cabinets - Completed by in house staff | February 13, 2007 | February 13, 2007 | 0 days |
| Randle-Highlands ES | FM-200625624 06 2/13/07 Ground Floor- Gym Center mullion is missing from the door. | July 12, 2006 | February 13, 2007 | 216 days |
| Thomas Elementary School | FM-200513406 05 2/13/07 Thomas Health Code Violation Kitchen 1) Provide self closing device on bathroom door. Repair have be completed by DCPS Carpently shop. Code A-clear for repair by DCPS Charles Buchanan on 1/13/06 | October 3, 2005 | February 13, 2007 | 498 days |
| Orr Elementary School | FM-200228095 03 2/13/07 Orr First floor parent center Requesting a retractable partition to be installed to separate one room into two rooms. Requesting heavy duty partition. | April 2, 2003 | February 13, 2007 | 1,413 days |
| Anacostia Senior High School | FM-200623476 06 2/13/07 Third Floor/Room 307: Breaches in the ceiling. Asbestos Code A - Clear for repairs on 05/31/06. Tidewater - Samuel May (RG 06/01/03) | May 30, 2006 | February 13, 2007 | 259 days |
| Houston Elementary School | FM-200503518 05 2/13/07 (Houston) Second floor/Class Room 208. Repair or Replace door. Currently the door is off the frame. Code A-clear for repair by DCPS Charles Buchanan on 4/07/05 | April 4, 2005 | February 13, 2007 | 680 days |
| Thomas Elementary School | FM-200627245 /06 2/13/07 Survey + Re-hang the chalk board in rm. 217. Asbestos Code A - Clear for repairs on 08/16/06. Tidewater - Kenny Long (RG 08/17/06) | August 11, 2006 | February 13, 2007 | 186 days |
| Orr Elementary School | FM-200619118 06 2/13/07 Emergency Exterior Front Entrance Door-Repair or replace door closer, it's broken and door can not be secured | February 27, 2006 | February 13, 2007 | 351 days |
| Randle-Highlands ES | FM-200623622 06 2/13/07 Ground/Gym: 2 sets of metal doors wil not close properly (door closer) Note: one set is the interior door and the other is the exterior door | May 31, 2006 | February 13, 2007 | 258 days |
| Garfield ES | FM-200336727 03 2/15/07 Garfield !! Emergency !! First Floor 1. Replace light ballasts that is sparkling in rooms 102,105 and 2E . 2. Replace all light ballasts in the demountable wing. Asbestos Code A - Clear for repairs on 09/03/03. Horne Engineering - Troy Wilcome (RG 09/04/03) | September 3, 2003 | February 15, 2007 | 1,261 days |
| Benjamin Banneker Academic HS | FM-200445772 04 2/15/07 Banneker First floor gym A electrician is needed for light system up in the attic - Bulbs were changed 3/23/04 fixtures will not come on. | March 24, 2004 | February 15, 2007 | 1,058 days |
| Beers Elementary School | FM-200620185 06 2/15/07 Auditorium & Building Survey and reapair 2 exit signs that are out, 1st sign auditorium and 2nd sign building 3, 2nd floor stairway out wires exposed. | March 22, 2006 | February 15, 2007 | 330 days |
| Beers Elementary School | FM-200620276 06 2/15/07 BLDG. 1, Second floor & BLDG. 2, first floor. 1.) Bldg. 1, second floor replace ballasts in the following areas: Rooms 233 (2), 231 (2), 226-A (1), 226-B (1) and 121 (1) RTA. 2.) Bldg. 2, first floor replace ballasts in the following areas: P.T.A. Hallway & Room104. | March 23, 2006 | February 15, 2007 | 329 days |
| Beers Elementary School | FM-200622646 06 2/15/07 Cafeteria-Water fountain is not working, electrical problem. | May 15, 2006 | February 15, 2007 | 276 days |
| Beers Elementary School | FM-200633224 /06 2/15/07 Ballasts are out in these areas; Building 1-First Floor, Building 2-By The Exit Door, & Building 2-Second Fl. Hallway. | December 13, 2006 | February 15, 2007 | 64 days |
| Duke Ellington School | FM-200634053 07 2/15/07 Rear Of Building - Remove Bulk Trash - 2 Trucks Load | January 17, 2007 | February 15, 2007 | 29 days |
| Gage-Eckington ES | FM-200329720 03 2/15/07 Gage-Eckington Boiler room Please lower or relocate ceiling mounted flourescent light fixtures in the boiler room, engineer can not reach light fixtures to change the tubes in a safe manner. We need light in order to service the air conditioning units and to clean the boilers. Asbestos Code A - Clear for repairs on 05/08/03. Horne Engineering - Tony Marcolin (RG 05/08/03) | May 7, 2003 | February 15, 2007 | 1,380 days |
| Gage-Eckington ES | FM-200338360 03 2/15/07 Gage-Eckington Roof side Storm have a piece of electrical wire hanging from the back side of the building. Wires coming from light outside roof. Need to be fixed. | October 1, 2003 | February 15, 2007 | 1,233 days |
| Gage-Eckington ES | FM-200339134 /03 2/15/07 Gage- Eckington Boiler Room Replace contacts and breaker switch on panel. Check and repair 3 phase breaker to panel. | October 20, 2003 | February 15, 2007 | 1,214 days |
| Gage-Eckington ES | FM-200458207 /04 2/15/07 Gage-Eckington Hallway by Elevator Replace electrical breaker that control main office blower anda classroom. | November 12, 2004 | February 15, 2007 | 825 days |
| Gage-Eckington ES | FM-200503256 05 2/15/07 (Gage) "Emergency" Second floor/Kitchen Repair or Replace eletrical outlet that sparks fire when touched by anything metal . Note: This outlet is sticking up from the kitchen floor | March 25, 2005 | February 15, 2007 | 692 days |
| Gage-Eckington ES | FM-200516202 05 2/15/07 Panel in Hallway first fl. Repair circuit breaker that is in trip mode | December 8, 2005 | February 15, 2007 | 434 days |
| Gage-Eckington ES | FM-200619338 06 2/15/07 Restore power to boiler #1 in boiler room. no power to motor blower and motor starter. | March 1, 2006 | February 15, 2007 | 351 days |
| Gage-Eckington ES | FM-200622701 06 2/15/07 First Floor-Intermediate Side: The breaker that controls the lights in the corridor is not working. | May 16, 2006 | February 15, 2007 | 275 days |
| Gage-Eckington ES | FM-200623294 06 2/15/07 First Floor/Boy's Restroom - The breaker that control the boy's restroom lights not working | May 24, 2006 | February 15, 2007 | 267 days |
| Gage-Eckington ES | FM-200623299 06 2/15/07 First & Second Floor/Classrooms - There are two rooms that need a exit sign | May 24, 2006 | February 15, 2007 | 267 days |
| Garfield ES | FM-200205680 02 2/15/07 Garfield First (1st) Floor - Main Office LL - Library / Main Building Replace light fixtures in closet areas fixtures are old and broken. Incandescent fixture Light in office held up by wire. Unsafe. | April 10, 2002 | February 15, 2007 | 1,772 days |
| Garfield ES | FM-200330182 03 2/15/07 Garfield Demanable Electrician needed to check lights in the demanable wing, hallway and classrooms lights are out, checked bulbs and that is not the problem. | May 15, 2003 | February 15, 2007 | 1,372 days |
| Garfield ES | FM-200508999 05 2/15/07 Garfield Exterior Lighting Repair Exposed Wires | July 28, 2005 | February 15, 2007 | 567 days |
| Garfield ES | FM-200511534 05 2/15/07 (Garfield) Second floor classroom. Replace lights in classroom that fell. | August 29, 2005 | February 15, 2007 | 535 days |
| Garfield ES | FM-200618871 06 2/15/07 Emergency Second Floor-Rm. 2C (Main Bldg.) Repair the ele. fixture that is about to fall, it's hanging by 2 wires. | February 21, 2006 | February 15, 2007 | 359 days |
| Garfield ES | FM-200631212 10/24/06 2/15/07 First Floor - 1F - Two outlets are shorting out, check and repair | October 24, 2006 | February 15, 2007 | 114 days |
| Garnet-Patterson MS | FM-200502062 05 2/15/07 Garnet-Patterson Boiler room The fuse is blown out on the emergency light and the fire alarm system. | February 28, 2005 | February 15, 2007 | 717 days |
| Garnet-Patterson MS | FM-200509267 05 2/15/07 (GARNET-PATTERSON) Third Floor - Room #309 1) The plug need an electrical up grade to power the air conditioners. | August 1, 2005 | February 15, 2007 | 563 days |
| Garnet-Patterson MS | FM-200513975 /05 2/15/07 Garnet-Patterson Emergency Basement-Kitchen Investigate and repair electrical problem, lights went out in the kitchen, the light switch or the breaker box dose not do anything. | October 19, 2005 | February 15, 2007 | 484 days |
| Green Elementary School | FM-200624216 06 2/15/07 1st Floor- Kitchen Replace 2 plugs in the kitchen. They were broken when the cooler fell over. | June 12, 2006 | February 15, 2007 | 248 days |
| Hart Middle School | FM-200338682 03 2/15/07 Hart Basement - New Wing B-31, B-35 and B-36 1) Replace 12 ballast in B-31. 2) Replace 5 ballast in B-35. 3) Install 2 Florescent lights fixtures in B-36, fixture is broken. | October 9, 2003 | February 15, 2007 | 1,225 days |
| Hart Middle School | FM-200443636 04 2/15/07 Hart EMERGENCY Room 216 Floor plug in the floor the metal cover has come off and the wire is live. | February 3, 2004 | February 15, 2007 | 1,108 days |
| Hart Middle School | FM-200513161 05 2/15/07 Hart Main Office and Room #105C A/C window unit in room 105C is tripping circuit breaker. lectrical short in unit, | September 26, 2005 | February 15, 2007 | 507 days |
| Hart Middle School | FM-200513526 05 2/15/07 (Hart) First floor, Auditorium. Need electrician to rewire stage lights Note: They need this work done before the October 19, 2005 assembly. | October 5, 2005 | February 15, 2007 | 498 days |
| Hart Middle School | FM-200513839 /05 2/15/07 Hart Rm 130 Replace ballast in light | October 13, 2005 | February 15, 2007 | 490 days |
| Jefferson JHS | FM-200700379 /07 2/15/07 Stairwell landing near girls' lockerroom in gymnasium. Reattach railing, need welders to spot weld to brackets. Asbestos Code A - Clear for repairs on 02/09/07. Tidewater - Roger Small (RG 02/12/07) | February 8, 2007 | February 15, 2007 | 7 days |
| Kenilworth ES | FM-200217963 02 2/15/07 Kenilworth Building Exterior The outside lights on the front of the school needs to be replaced or repaired---they do not come on. | September 20, 2002 | February 15, 2007 | 1,609 days |
| Kenilworth ES | FM-200337764 03 2/15/07 (Kenilworth) Asbestos Assessment Required. 1st Floor/Kitchen: Replace light fixtures; ballast has been replaced, and continues to malfunction. Asbestos Code A - Clear for repairs on 09/25/03. Horne Engineering - Bipin Nanavaty (RG 09/30/03) | September 18, 2003 | February 15, 2007 | 1,246 days |
| Kenilworth ES | FM-200442959 04 2/15/07 Kenilworth Kitchen The electrical switch on oven caught on fire. Need repairing. | January 20, 2004 | February 15, 2007 | 1,122 days |
| Kenilworth ES | FM-200625427 06 2/15/07 3rd Floor- Room 301 Check outlets; they keep cutting off the breaker. | July 7, 2006 | February 15, 2007 | 223 days |
| Kenilworth ES | FM-200625438 06 2/15/07 1st Floor- Kitchen Replace lights; they need to be rewired. Asbestos Code A - Clear for repairs on 07/12/06. Tidewater - Shamika Parker (RG 07/13/06) | July 7, 2006 | February 15, 2007 | 223 days |
| Kenilworth ES | FM-200625441 06 2/15/07 1st Floor- Room 129 (Pre-Kindergarten Class) Light ballasts are needed in the restroom. | July 7, 2006 | February 15, 2007 | 223 days |
| Langdon Elementary School | FM-200632845 06 2/15/07 PLUMBING-Investigate and correct gas smell form domestic hot water heater. | December 4, 2006 | February 15, 2007 | 73 days |
| Leckie Elementary School | FM-200634344 5/07 2/15/07 remove siaiding doors and doors in class room 212,213 | January 25, 2007 | February 15, 2007 | 21 days |
| Horace Mann Elementary School | FM-200634068 07 2/15/07 Exterior entry way of school. Repair or replace entry way light fixtures. Note: Bulbs and ballasts have been changed, still there are hno lights. It is very dark!! | January 17, 2007 | February 15, 2007 | 29 days |
| McKinley Technology High | FM-200206569 5/02 2/15/07 1) In accordance with grass cutting contract for the summer of 2002 to include grass cutting and edging. | April 25, 2002 | February 15, 2007 | 1,757 days |
| Merritt Middle School | FM-200206543 02 2/15/07 1) In accordance with grass cutting contract for the summer of 2002 to include grass cutting and edging. | April 25, 2002 | February 15, 2007 | 1,757 days |
| Merritt Middle School | FM-200626481 06 2/15/07 4th Floor- Learning Center Remove lockers. Asbestos Code A - Clear for repairs on 08/01/06. Tidewater - Kenny Long (RG 08/03/06) | July 28, 2006 | February 15, 2007 | 202 days |
| Merritt Middle School | FM-200626645 06 2/15/07 Exterior of Building. We would like the current shrubbery dug up and removed along with turning the soil. | August 1, 2006 | February 15, 2007 | 198 days |
| Noyes Elementary School | FM-200621856 06 2/15/07 Front & Back of Building Graffitti needs to be removed from both the front and back of the building. | April 26, 2006 | February 15, 2007 | 295 days |
| Orr Elementary School | FM-200206550 02 2/15/07 1) In accordance with grass cutting contract for the summer of 2002 to include grass cutting and edging. | April 25, 2002 | February 15, 2007 | 1,757 days |
| Park View ES | FM-200618219 06 2/15/07 Inspection or preventive maintenance on playground equipment. | February 2, 2006 | February 15, 2007 | 378 days |
| Park View ES | FM-200629135 06 2/15/07 Grounds near Pre-K Area Repair/replace fence. | September 11, 2006 | February 15, 2007 | 157 days |
| Payne Elementary School | FM-200226810 03 2/15/07 (Payne) Exposed electrical wire in Boiler Room. | March 6, 2003 | February 15, 2007 | 1,442 days |
| Payne Elementary School | FM-200339224 /03 2/15/07 Payne Boiler Room - Fire Code Replace Battery in emergency exit light in Boiler Room Overback door. Fire code voilation. Fire Marshall will be back tomorrow to check light. | October 21, 2003 | February 15, 2007 | 1,213 days |
| Payne Elementary School | FM-200514950 05 2/15/07 Urgnet: First Floor-Rm. 129: There is one roll of lights out, the bulbs were changed but they still wont come on. Investigate and Repair Electrical Problem. | November 1, 2005 | February 15, 2007 | 471 days |
| Peabody Elementary School | FM-200453593 04 2/15/07 Peabody Room 4 When the electrician came over to fix the electric for a/c the lights went out and the a/c is not working. | August 30, 2004 | February 15, 2007 | 899 days |
| Powell Elementary School | FM-200206488 02 2/15/07 1) In accordance with grass cutting contract for the summer of 2002 to include grass cutting and edging. | April 24, 2002 | February 15, 2007 | 1,758 days |
| Raymond Elementary School | FM-200206489 02 2/15/07 1) In accordance with grass cutting contract for the summer of 2002 to include grass cutting and edging. | April 24, 2002 | February 15, 2007 | 1,758 days |
| Raymond Elementary School | FM-200618708 06 2/15/07 Repair chain link fence around the emergency generator | February 16, 2006 | February 15, 2007 | 364 days |
| Roosevelt High School | FM-200634339 07 2/15/07 install marquis sign at school on playground | January 25, 2007 | February 15, 2007 | 21 days |
| Rudolph Elementary School | FM-200622244 06 2/15/07 Playground equipment in need of repairs, sliding board is broken. | May 5, 2006 | February 15, 2007 | 286 days |
| Savoy Elementary School | FM-200204586 02 2/15/07 (Savoy) Asbestos Assessment Required 1st Floor Kitchen Area Install electrical outlets to support two air-conditioning units in the kitchen area. Code A-clear for repair by Horne Engineer ( Sam Ebrahim ) on 3/19/02 ( CEB) | March 18, 2002 | February 15, 2007 | 1,795 days |
| Savoy Elementary School | FM-200204591 02 2/15/07 (Savoy) Asbestos Assessment Required 1st Floor Cafeteria Provide & install air-continioners in two cafeteria windows on the 1st floor. POC: Mr. Miller Code A-clear for repair by Horne Engineer ( Sam Ebrahim ) 0n 3/20/02 (CEB) | March 18, 2002 | February 15, 2007 | 1,795 days |
| Savoy Elementary School | FM-200204600 02 2/15/07 (Savoy) 1) Asbestos Assessment Required 1st Floor Main Office, Library, Lobby & Listed Rooms Install electrical outlets for extra computers and fish tanks in areas as follows: a) 1st floor rooms 103, 110, 112, 114, 126 & 127; b) Lobby area behind 150-gal. fish tank & directly behind security desk; and c) Main office & library. POC: Mr. Miller Code A-clear for repair by Horne Engineer ( sam ebrahim ) on 3/19/02 ( CEB) | March 18, 2002 | February 15, 2007 | 1,795 days |
| Savoy Elementary School | FM-200206606 02 2/15/07 1) In accordance with grass cutting contract for the summer of 2002 to include grass cutting and edging. | April 25, 2002 | February 15, 2007 | 1,757 days |
| Savoy Elementary School | FM-200228495 03 2/15/07 Savoy First floor engineers office Need air conditioner installed (21000 btu). Air conditioner on premises. Neede 240 volts outlet. Asbestos Code A - Clear for repairs on 04/10/03. Horne Engineering - Sheryll James (RG 04/11/03) | April 9, 2003 | February 15, 2007 | 1,408 days |
| Savoy Elementary School | FM-200627222 8/11/06 2/15/07 First floor, Principal's Office. Assess and repair issue with electrical plugs. | August 11, 2006 | February 15, 2007 | 188 days |
| Savoy Elementary School | FM-200633431 12/19/06 2/15/07 First Floor - South End, Across From Restrooms - Electrical rod came loose from the cupling and wires are exposed. | December 19, 2006 | February 15, 2007 | 58 days |
| Seaton Elementary School | FM-200219967 /02 2/15/07 Seaton Kitchen cut-off conduit in kitchen. | October 24, 2002 | February 15, 2007 | 1,575 days |
| Seaton Elementary School | FM-200632732 /06 2/15/07 There are two electrical outlets on the first floor foyer(corridor) that need replacing. The custodial staff has tested for output(power) and attempted to replace the outlets with no success. One outlet is used for security camera and the other is at the security desk. Account #: 5910 | November 29, 2006 | February 15, 2007 | 78 days |
| Smothers ES | FM-200339138 /03 2/15/07 Smothers Second floor health suite Lights are out in the health, breaker keep tripping off. | October 20, 2003 | February 15, 2007 | 1,214 days |
| Smothers ES | FM-200453691 04 2/15/07 Smothers First floor exit lights Night lights out at front of the bldg. and all the exit lights are out in the bldg. Some shortage is somewhere. One night light fixture in vandalized, (broken) on east side of bldg. this is one of the lights that is not working at night. All night lights outside not working. | August 31, 2004 | February 15, 2007 | 898 days |
| Spingarn High School | FM-200453226 04 2/15/07 Spingarn Basement ROTC Requesting an electrican to survey the O existing outlets, they do not work. | August 24, 2004 | February 15, 2007 | 905 days |
| Spingarn High School | FM-200459958 /04 2/15/07 SPINGARN SECOND FL. ELECTRICAL PANEL \ BRFEAKER KEEP GOING OFF 12/21/2004 15:19 OB - | December 21, 2004 | February 15, 2007 | 786 days |
| Spingarn High School | FM-200632469 4/06 2/15/07 Third Floor - Rm. 330 - Unable to get power from outlets, and light switch is malfunctioning. | November 24, 2006 | February 15, 2007 | 83 days |
| Stevens Elementary School | FM-200633640 4/07 2/15/07 Outside Playground - Requesting fence repair | January 4, 2007 | February 15, 2007 | 42 days |
| Montgomery ES | FM-200447139 04 2/15/07 Montgomery, Scott Parking lot Repave driveway on the 5th Street side of the building. The driveway has been severly damaged be delivery trucks. The driveway is in a condition that can cause damage to the tires of cars being driven on to the parking lot. | April 26, 2004 | February 15, 2007 | 1,025 days |
| Montgomery ES | FM-200617566 06 2/15/07 Remove Bulk Trash | January 18, 2006 | February 15, 2007 | 393 days |
| Montgomery ES | FM-200621880 06 2/15/07 Playground Area. Remove a tree that fell on the playground. | April 27, 2006 | February 15, 2007 | 294 days |
| Montgomery ES | FM-200627007 06 2/15/07 Second Floor/Boy's Restroom - Asbestos Assessment Required/Repair wall so that urinal's can be placed back on the wall. Asbestos Code A - Clear for repairs on 08/09/06. Tidewater - Roger Small (RG 08/10/06) | August 8, 2006 | February 15, 2007 | 191 days |
| Terrell Mc ES | FM-200217998 02 2/15/07 Terrell,M.C. Pre-K outside Two cover plates electrical outlet live wire. | September 20, 2002 | February 15, 2007 | 1,609 days |
| Terrell Mc ES | FM-200218002 02 2/15/07 Terrell,M.C. Gym Two cover plate electrical outlet live wire. | September 20, 2002 | February 15, 2007 | 1,609 days |
| Terrell Mc ES | FM-200504730 05 2/15/07 (Terrell, M.C.) Electrician is needed to repair lights in ceiling. Majority of lights are out. | April 18, 2005 | February 15, 2007 | 668 days |
| Tyler Elementary School | FM-200634325 5/07 2/15/07 Repair playground equipment | January 25, 2007 | February 15, 2007 | 21 days |
| Patterson ES | FM-200506527 05 2/15/07 Patterson Mechanical Room #121 near Mrs. Dixon class Check and repair W.S.H.P. (Water source heat pump) (Trane) Unit will not operate. Breaker: Fuse #1 showed 277, #2 = Low Voltage, #3- Low Voltage Belimo Valve opened up. Ser, #WO3H37812 Model #GEVB03041GOZ103RCOL Volts=460 HZ=60 PH=3 | June 9, 2005 | February 15, 2007 | 616 days |
| Patterson ES | FM-200513383 05 2/15/07 Patterson Various Location Survey and repair WSHP 1-6 not working. HVAC technician checked problem with WSHP 1-6 and found electrical breaker-20 amp- phase 3 bad, Forwarded work order to electricians. | September 30, 2005 | February 15, 2007 | 503 days |
| Wilkinson ES | FM-200220083 /02 2/15/07 (Wilkinson) 1st Floor/Kitchen: Replace a total of 12 floor tiles in kitchen. Asbestos Code A-clear for repair by Horne Engineer Edward Rodriguez on 10/31/02 DCPS Charles E. Buchanan | October 25, 2002 | February 15, 2007 | 1,574 days |
| Wilkinson ES | FM-200329828 03 2/15/07 (Wilkinson) Outside delivery entrance: Need to upgrade outside lights around building. | May 8, 2003 | February 15, 2007 | 1,379 days |
| Wilson High School | FM-200700083 /07 2/15/07 Stairwell 1 - Landing between the 1st & Basement level - R/R Broken Handrail Asbestos Code A - Clear for repairs on 02/01/07. Tidewater - Tony Marcolin (RG 02/02/07) | January 30, 2007 | February 15, 2007 | 16 days |
| Walker-Jones EC | FM-200632140 1/13/06 2/16/07 Repair live and expose wiring thats hanging in the rotunda. | November 13, 2006 | February 16, 2007 | 95 days |
| Horace Mann Elementary School | FM-200514245 /05 2/16/07 (Horace Mann) Second floor, Room 204. A electrician is needed to assess and repair problem. Lights are not working, ballasts were replaced but the lights are still not working. Also there are hanging fixtures that need to be repaired or replaced. | October 22, 2005 | February 16, 2007 | 482 days |
| Walker-Jones EC | FM-200445063 04 2/16/07 Walker-Jones ( Maintenance T School Blitz ) Open Space - First, Second and Third Floor 1) Repair or replace ( 200 ) light fixtures and ballasts. Asbestos Code A - Clear for repairs on 03/10/04. Horne Engineering - Ray Agnant (RG 03/12/04) | March 9, 2004 | February 16, 2007 | 1,074 days |
| Watkins Elementary School | FM-200336820 03 2/16/07 Watkins Classroom 119 A/C is on site electrican required to wire the room for A/C. Code A-clear for repair by Horne Engineer Bipin Nanavaty on 9/5/03 (CEB) | September 4, 2003 | February 16, 2007 | 1,261 days |
| Peabody Elementary School | FM-200338579 03 2/16/07 Peabody Throughout bldg. Provide and replace 36 ballasts in light fixtures. Penhouse-11 3rd floor rooms 9-1, room 12-2 2nd floor room 5-3, room 6 -1, room 7 -1, room 8-2 and hallway - 1 1st floor room 1- 2, room 2-1 and room 3-5 East stairs - 2 West stairs -1 Asbestos Code A - clear for repairs on 10/10/03. Horne Engineering - Bipin Nanavaty (RG 10/22/03) | October 7, 2003 | February 16, 2007 | 1,228 days |
| Walker-Jones EC | FM-200330736 03 2/16/07 (Walker Jones) Asbestos Assessment Required. the smell of wires burning occurred in room 107 approximately 10:30 on May 22. The fire department arrived and checked the area. They recommended that an electrician from Central immediately come and check the area. The classroom is closed at this time, however there are classroom nearby. | May 22, 2003 | February 16, 2007 | 1,366 days |
| Seaton Elementary School | FM-200632703 /06 2/16/07 Lobby Area - No Electricity | November 30, 2006 | February 16, 2007 | 78 days |
| Gibbs Elementary School | FM-200632720 /06 2/16/07 First Floor - Rm. 101 - Exit door is very difficult to open, check and make repairs | November 30, 2006 | February 16, 2007 | 78 days |
| Watkins Elementary School | FM-200624692 06 2/16/07 1st Floor- Cafeteria A light is hanging from the ceiling in the cafeteria. Hazardous | June 23, 2006 | February 16, 2007 | 238 days |
| Brent Elementary School | FM-200516334 /05 2/16/07 Emergency: The panel box on the second floor has a switch that is tripping, it controls the univents that are not working in rooms 200, 201 and 205 | December 12, 2005 | February 16, 2007 | 431 days |
| Tubman Elementary School | FM-200700553 07 2/16/07 Third Floor - Exit light out near 13th St. side stairway doors - Completed light working 2/12/07 | February 16, 2007 | February 16, 2007 | 0 days |
| Watkins Elementary School | FM-200517288 06 2/16/07 Emergency: Investigate and repair the electrical problem. When the light switch was cut off the phones stop working; See Mr. Kenny for the different locations throughout the building. | January 10, 2006 | February 16, 2007 | 402 days |
| Leckie Elementary School | FM-200700560 6/07 2/16/07 Basement-Third Floor - Boy's & Girl's Bathroom - Make repairs to doors and partitons as needed. | February 16, 2007 | February 16, 2007 | 0 days |
| Miner Elementary | FM-200630408 06 2/16/07 Repair/replace electrical volt. | October 3, 2006 | February 16, 2007 | 136 days |
| Peabody Elementary School | FM-200457956 04 2/16/07 Peabody Basement boys and girls bathroom and center lunchroom area Supply 16 ballasts for replacement in light fixtures. Level 1 work in house. | November 5, 2004 | February 16, 2007 | 833 days |
| Wilkinson ES | FM-200329863 03 2/16/07 (Wilkinson) Asbestos Assessment Required. Basement/Garage corridor: Need to replace door, closet in corridor. Asbestos Code A - Clear for repairs on 05/12/03. Horne Engineering - Tony Marcolin (RG 05/13/03) | May 9, 2003 | February 16, 2007 | 1,379 days |
| Key Elementary School | FM-200629182 /06 2/16/07 Repair/replace outside lights. | September 12, 2006 | February 16, 2007 | 157 days |
| Walker-Jones EC | FM-200342039 /03 2/16/07 Walker-Jones First Floor - Auditorium 1) Lights won't come on , breaker keeps tripping and sparks are coming from breaker. | December 23, 2003 | February 16, 2007 | 1,151 days |
| Walker-Jones EC | FM-200330646 03 2/16/07 (Walker-Jones) !!!EMERGENCY!!! Basement/Main breaker: Breaker has very serious problem with intermitting; shutting down classrooms, and clinic. | May 23, 2003 | February 16, 2007 | 1,365 days |
| Wilkinson ES | FM-200206205 02 2/16/07 Wilkinson !!! Emergency !!! First (1st) Floor - #27 Kgn/Exit Door Exit Door needs hinges and realigned. Fire Code Violation | April 22, 2002 | February 16, 2007 | 1,761 days |
| Tubman Elementary School | FM-200700549 07 2/16/07 Second Floor - Exit light out 13th St. side - Completed light working 2/12/07 | February 16, 2007 | February 16, 2007 | 0 days |
| Peabody Elementary School | FM-200202920 02 2/16/07 (PEABODY) 1ST, 2ND, AND 3RD FLOOR/ TEACHERS LOUNGE, LOBBY, #2, 7, 9, AND 12 HAVE CONTRACTOR REPLACE DEFECTIVE LIGHT FIXTURE BALLAST IN THE FOLLOWING LOCATIONS: 1ST FLOOR-ROOM #2 AND LOBBY 2ND FLOOR- ROOM #7 AND TEACHERS LOUNGE 3RD FLOOR- ROOM #9 AND #12 | February 12, 2002 | February 16, 2007 | 1,830 days |
| Kenilworth ES | FM-200630199 06 2/20/07 Kenilworth Boiler room entrance door from hall way Repair or replace broken dead bolt lock on boiler room door use same key cylinder if possible | September 28, 2006 | February 20, 2007 | 145 days |
| Powell Elementary School | FM-200700632 32 2/20/07 2/20/07 Second Floor/Exit Door's Next To 205 and A12 - First Floor/Exit Door Next To Outside Playground Adj. to Custodian Lounge - Door hardware is broken/need to be reinstalled Violation of (2000) IFC 703.4 Completed 2/20/07 by in house staff Carlos Rich, Head custodian. | February 20, 2007 | February 20, 2007 | 0 days |
| Wilson High School | FM-200208783 02 2/20/07 Wilson,W. Ground Level Pool Building Filtration Room Electrical repair needed---lights and receptacles are not working and the area is very dark. | June 3, 2002 | February 20, 2007 | 1,723 days |
| Montgomery ES | FM-200700081 07 2/20/07 Room 109 - Restor power to univent Second Request Was Called In On 1/30/07 | January 30, 2007 | February 20, 2007 | 21 days |
| Montgomery ES | FM-200700162 07 2/20/07 Scott Montgomery - Over Learning Center # 1 - Install wiring for new in line condensation pump | February 2, 2007 | February 20, 2007 | 18 days |
| Jefferson JHS | FM-200634074 07 2/20/07 Third Floor - Room 303 - Door is locked and can not be opened from the inside or outside with a key. R/R lock on the door | January 18, 2007 | February 20, 2007 | 33 days |
| Jefferson JHS | FM-200513751 /05 2/20/07 Jefferson Emergency Second Floor-Rm. 222 Check and repair electrical wires, the light fell from the ceiling and there are hot wires hangin and on the floor, wires on the floor need to be tied off. | October 12, 2005 | February 20, 2007 | 496 days |
| Janney Elementary School | FM-200628834 /6/06 2/20/07 Main Demountable. Need electricians to assess and repair lighting in this area. Note: Currently there are no lights in this area. | September 6, 2006 | February 20, 2007 | 167 days |
| Seaton Elementary School | FM-200634110 07 2/20/07 Cafeteria - Pantry - Key's where locked inside, can't get the door open. | January 19, 2007 | February 20, 2007 | 32 days |
| Wilson High School | FM-200329897 03 2/20/07 Wilson, W. First and third floor Rooms 123A and 311 Install New A/C units in these two areas. A/C unitd on site. | May 9, 2003 | February 20, 2007 | 1,383 days |
| Wilkinson ES | FM-200338003 03 2/20/07 Wilkinson 2nd Floor/Room #251: Need to replace door closer. Asbestos Code A - Clear for repairs on 09/25/03. Horne Engineering - Sheryll James (RG 09/26/03) | September 24, 2003 | February 20, 2007 | 1,245 days |
| Stuart-Hobson Middle School | FM-200632169 /06 2/20/07 Boiler Room - Repair burner on boiler #3 | November 14, 2006 | February 20, 2007 | 98 days |
| Janney Elementary School | FM-200211537 02 2/20/07 Janney 1. Asbestos Assessment Reqd. Throughout Building 2. Spot coolers do not fit into the new windows. Survey to fabricate pleniums so the coolers can be used without damaging the window casings, which will forfeit the guarantee on the work. A tight fit is needed to keep rain out. Asbestos Code A - Clear for repairs on 07/16/02. Horne Engineering - Sharon Voss (RG 07/17/02) | July 15, 2002 | February 20, 2007 | 1,681 days |
| Janney Elementary School | FM-200211534 02 2/20/07 Janney 1. Asbestos Assessment Reqd. 2nd & 3rd Floors/Rooms: 201,203, 207, 300 & 306 thru 309 2. Install electrical outlets to provide power to eight (8) AC units being installed along with window project---AC units can not be run at this time. Asbestos Code A - Clear for repairs on 07/16/02. Horne Engineering - Sharon Voss (RG 07/17/02) | July 15, 2002 | February 20, 2007 | 1,681 days |
| Janney Elementary School | FM-200204735 02 2/20/07 (Janney) Asbestos Assessment Required 1st Floor MultiPurpose Room Install seven (7) wall receptacles at the base of the stage [receptacles are on site]. The wiring is old and might needs repairs. Asbestos Code A - Clear for repairs on 03/20/02. Horne Engeering - Z Mahmood (RG 05/15/02) | March 19, 2002 | February 20, 2007 | 1,799 days |
| Wilson High School | FM-200228681 03 2/20/07 (Wilson, W.) Pool Filtration Room: Make necessary electrical repairs; lights in this area are not working. No asbestos present in this area. | April 11, 2003 | February 20, 2007 | 1,411 days |
| Hyde Elementary School | FM-200333598 03 2/20/07 Hyde Second Floor - Classroom # 201 1.Electrical receptical and conduit has fallen from the wall need to be repaired and 13 wires are exposed. | July 22, 2003 | February 20, 2007 | 1,309 days |
| Hyde Elementary School | FM-200228424 03 2/20/07 Hyde Second floor room 202 Air conditioner is broken, replace with the owe in main office. | April 8, 2003 | February 20, 2007 | 1,414 days |
| Houston Elementary School | FM-200633405 /06 2/20/07 Stairwell #1 - Replace door closer. | December 19, 2006 | February 20, 2007 | 63 days |
| Simon Elementary School | FM-200700307 07 2/20/07 Boiler Room - Replace boiler feed pump control on # 1 boiler. | February 7, 2007 | February 20, 2007 | 13 days |
| Murch Elementary School | FM-200624259 06 2/20/07 White Detached building. (Demountable) check electrical service so both window air condition units and computers can be used at the same time. | June 13, 2006 | February 20, 2007 | 252 days |
| Murch Elementary School | FM-200622888 06 2/20/07 1st Floor- Main Entrance Main light fixtures need to be repaired or replaced. | May 17, 2006 | February 20, 2007 | 279 days |
| Wilkinson ES | FM-200335489 03 2/20/07 Wilkinson Second floor room 252 Need to reline door, door will not lock. Asbestos Code A - Clear for repairs on 09/11/03. Horne Engineering - Bipin Nanavaty (RG 09/12/03) | August 18, 2003 | February 20, 2007 | 1,282 days |
| Patterson ES | FM-200634203 07 2/20/07 Second floor, Main Office. Repair or replace malfunctioning panic bar. Note: This area houses confidential materials and cannot be secured. | January 23, 2007 | February 20, 2007 | 28 days |
| Murch Elementary School | FM-200622764 06 2/20/07 2nd Floor- Room 207 Install new air conditioner. Asbestos Code A - Clear for repairs on 05/18/06. Tidewater - Kenny Long (RG 05/22/06) | May 16, 2006 | February 20, 2007 | 280 days |
| Shaed Elementary School | FM-200628482 06 2/20/07 Group-3/Hallway - Need to punch out arrows on exit signs | August 30, 2006 | February 20, 2007 | 174 days |
| Walker-Jones EC | FM-200214003 02 2/20/07 Walker-Jones Throughout Buidling Rekey all door locks throughout the entire building. | August 12, 2002 | February 20, 2007 | 1,653 days |
| Backus Middle School | FM-200512994 05 2/20/07 Backus Repair electrical problem in nurse suite bathroom | September 21, 2005 | February 20, 2007 | 517 days |
| Payne Elementary School | FM-200501270 05 2/20/07 Payne Girl bathroom, lobby area and lunchroom first floor Replace or repair ceiling and light fixtures. Lobby area Girls bathroom (AMP 62) HA 010 Plaster White Plaser Patch No Asbestos HA 710 Brown Coat With HA 010 No Asbestos Lunchroom (AMP 44) HA 003 Ceiling Tile White 2' X 4' with Fissures No Asbestos Code A-clear for repair by DCPS Charles Buchanan on 02/9/05 | February 7, 2005 | February 20, 2007 | 743 days |
| Payne Elementary School | FM-200338866 /03 2/20/07 Payne First floor cafeteria Replace or repair door closer. Code A-clear for repair by DCPS Charles Buchanan on 10/15/03 | October 14, 2003 | February 20, 2007 | 1,225 days |
| Payne Elementary School | FM-200633935 /07 2/20/07 Repair or replace automatic water feeder on the # 1 boiler, feeder will not cut off , continuous feeding. | January 11, 2007 | February 20, 2007 | 40 days |
| Wilson J. O. ES | FM-200621069 06 2/20/07 Replace 24 replacment light fixxtures in the kitchen. HEALTH CODE VIOLATION Asbestos Code A - Clear for repairs on 05/03/06. Tidewater - Thomas Johnson (RG 05/05/06) | April 4, 2006 | February 20, 2007 | 322 days |
| Wilson High School | FM-200510952 05 2/20/07 Wilson, W Gym Bldg Provide electrical power (110 volts) to univent in hallway southeast boys side. | August 23, 2005 | February 20, 2007 | 546 days |
| Wilson J. O. ES | FM-200621066 06 2/20/07 Repair outside lights in the front of the building. Six sets out of seven are out. SECURITY VIOLATION. | April 4, 2006 | February 20, 2007 | 322 days |
| Rudolph Elementary School | FM-200700130 07 2/20/07 LL-Exit Door Leading To Playground - Panic Bar Broken, Can't Secure | February 1, 2007 | February 20, 2007 | 19 days |
| Meyer Elementary School | FM-200446823 04 2/20/07 Meyer EMERGENCY Second floor room 213 Need an outlet for the copier machine ASAP. Asbestos Code A - Clear for repairs on 04/19/04. Horne Engineering - Bjarne Smith (RG 04/20/04) | April 19, 2004 | February 20, 2007 | 1,037 days |
| Shaed Elementary School | FM-200630886 /06 2/20/07 Ground Floor - Head Start classroom - Breaker Keep Tripping, Power Goes Out. | October 17, 2006 | February 20, 2007 | 126 days |
| Hart Middle School | FM-200700248 07 2/20/07 Entrance door leading from basketball court into new wing basement. Repair or replace top and bottom door latches. | February 5, 2007 | February 20, 2007 | 15 days |
| Wilson High School | FM-200217593 02 2/20/07 Wilson,W. Asbestos Assessment Reqd. 1st & 3rd Floors/Rooms 141, Counselor's Suite & 327 1. Classroom 141 and counselor's suite need electrical lines for a/c units to be installed; and 2. Classroom 327 has an electrial hookup, but needs the a/c unit installed. Asbesstos Code A-clear for repair by Horne Engineer Bipin Nanavaty DCPS Charles E. Buchanan on 9/18/02 | September 16, 2002 | February 20, 2007 | 1,618 days |
| Backus Middle School | FM-200203200 02 2/20/07 (Backus) Asbestos Assessment Required Electrical Upgrade in All Building Areas Electrical upgrade is needed for all air-conditioner units in all classrooms and offices on all floors. Circuit breakers trip off whenever students and teachers try to use more than 4 computers in each room. Asbestos Code A - Clear for repairs on 06/20/02. Horne Engineering - Bipin Nanavaty ( RG 06/21/02 ) | February 21, 2002 | February 20, 2007 | 1,825 days |
| Wilson J. O. ES | FM-200617844 06 2/20/07 On the west side of the building (6th Street) the lights are out due to water in the fixtures. Custodians are unable to repair. This is the exit to the Teacher's Parking Lot. | January 25, 2006 | February 20, 2007 | 391 days |
| Meyer Elementary School | FM-200442956 04 2/20/07 Meyer Principal office and room 213 The above rooms an electrical outlet for the copy machine. Asbestos Code A - Clear for repairs on 01/21/04. Horne Engineering - Bjarne Smith (RG 01/22/04) | January 20, 2004 | February 20, 2007 | 1,127 days |
| Wilson High School | FM-200217256 02 2/20/07 Wilson, W. Room 322 Repair or replace the AC unit. AC unit blowing out hot air. 220 volt | September 11, 2002 | February 20, 2007 | 1,623 days |
| Park View ES | FM-200632978 06 2/20/07 Lower Level - Boiler Room - Repair # 4 boiler, boiler wont start. | December 7, 2006 | February 20, 2007 | 75 days |
| Payne Elementary School | FM-200631436 /06 2/20/07 First Floor - Kitchen - Door is off the hinges | October 26, 2006 | February 20, 2007 | 117 days |
| Stevens Elementary School | FM-200204097 02 2/20/07 (Stevens) Basement/Exterior Doors Re-key locks to all exterior doors on the basement level. | March 8, 2002 | February 20, 2007 | 1,810 days |
| Meyer Elementary School | FM-200627739 06 2/20/07 Repair or replace air compressor. | August 16, 2006 | February 20, 2007 | 188 days |
| Shaed Elementary School | FM-200631638 06 2/20/07 Rear Exterior of Building. Repair or Replace all exterior lights on rear of building and loading dock area. | November 1, 2006 | February 20, 2007 | 111 days |
| Wilson High School | FM-200212657 02 2/20/07 (Wilson, W. Room #311: 1. Asbestos assessment required. Install (30) electricall wall outlets; room #311 is scheduled to become a Computer lab for school year 2002-2003. Asbestos code A-clear for repair by Horne Engineer ( Troy Welcome ) on 8/06/02 DCPS Charles Buchanan | July 23, 2002 | February 20, 2007 | 1,673 days |
| Backus Middle School | FM-200621227 06 2/20/07 Exterior of Building. Reset timer on exterior lights. Note: The exterior lights are burning continuously | April 12, 2006 | February 20, 2007 | 314 days |
| Hearst Elementary School | FM-200630226 06 2/20/07 Repair electrical outlets in the following areas: - Main Office (1) - Room 102 (1) - Room 208 (1) | September 28, 2006 | February 20, 2007 | 145 days |
| Ballou Senior High School | FM-200203485 02 2/20/07 (Ballou) 1st floor/kitchen: Change combination lock on safe, due to possible theft. | February 26, 2002 | February 20, 2007 | 1,820 days |
| Stevens Elementary School | FM-200634149 2/07 2/20/07 Room 26. Assess and repair electrical issue, carpet is burning, Note: Mr. Daley shut off the electrical power to that room.. | January 22, 2007 | February 20, 2007 | 29 days |
| Terrell Mc ES | FM-200220330 /02 2/20/07 (Terrell, M.C.) EMERGENCY:LOCKSMITH REKEYED EXIT DOOR LOCK. IT HAS NEVER WORKED. LOOKSMITH NEEDED TO MAKE KEY THAT WILL WORK. THIS DOOR HOUSE THE SECURITY SYSTEM USED FOR ENTRY. | October 29, 2002 | February 20, 2007 | 1,575 days |
| Hearst Elementary School | FM-200631024 9/06 2/20/07 Upgrade lighting throughout building, stairwells, hallways, classrooms and lavatories | October 19, 2006 | February 20, 2007 | 124 days |
| Miner Elementary | FM-200628636 06 2/20/07 Miner Mechanical Room; Music Room Entrance Replace the return fan motor on AHU #3 , Which services the cafeteria. The motor is bad (Burned out) Info. Motor: Volts 230/460 PH 3 RPM 1725 HP 1 Frame 56 HZ 60 SerF. 1.15 | August 31, 2006 | February 20, 2007 | 173 days |
| Hendley Elementary School | FM-200700169 07 2/20/07 Basement - Boy's Restroom - Can't unlock the door, key won't fit. May be something stuck in lock. | February 2, 2007 | February 20, 2007 | 18 days |
| Bell High School | FM-200622215 06 2/20/07 3rd Floor- Room 315 Provide outlets & electrical connection for new potter's wheel installation. | May 4, 2006 | February 20, 2007 | 292 days |
| Wilson High School | FM-200510951 05 2/20/07 Wilson, W Gym Bldg Provide electrical power (110 volts) to univent in hallway northeast girls side. | August 23, 2005 | February 20, 2007 | 546 days |
| Wilson High School | FM-200510948 05 2/20/07 Wilson, W Gym Bldg Provide electrical power (110 volts) to univent in hallway outside boys restroom. | August 23, 2005 | February 20, 2007 | 546 days |
| Meyer Elementary School | FM-200336093 03 2/20/07 (Meyer) Asbestos Assessment Required. To have a electrical socket/outlet installed in another office so that we can put a copier machine there. Asbestos Code A - Clear for repairs on 09/11/03. Horne Engineering - Ray Agnant (RG 09/12/03) | August 21, 2003 | February 20, 2007 | 1,279 days |
| Eastern High School | FM-200634307 07 2/20/07 Basement Area Replace door locks on Bookroom & Mr. Bachman's Office asap. | January 24, 2007 | February 20, 2007 | 27 days |
| Shaed Elementary School | FM-200632997 06 2/20/07 Main Office - PA System - Keep goin in and out. Check and make repairs | December 7, 2006 | February 20, 2007 | 75 days |
| Meyer Elementary School | FM-200333322 03 2/20/07 (Meyer) Asbestos Assessment Required. There is a great deal of smoke coming from the light fixtures in the Health Suite. Please send someone out asap. Asbestos Code A - Clear for repairs on 07/16/03. Horne Engineering - Roger Kager (RG 07/23/03) | July 16, 2003 | February 20, 2007 | 1,315 days |
| Meyer Elementary School | FM-200329549 03 2/20/07 Meyer Kitchen 1) The following equipment needs to be disconnected. a) Milk Bin - Precision | May 5, 2003 | February 20, 2007 | 1,387 days |
| Macfarland Middle School | FM-200627212 11/06 2/20/07 Throughout school all exit doors/Must remove all flush bolts. Asbestos Code A - Clear for repairs on 08/17/06. Tidewater - Tony Marcolin (RG 08/18/06) | August 11, 2006 | February 20, 2007 | 193 days |
| Peabody Elementary School | FM-200515172 05 2/20/07 Repair/replace loose door handle on the first floor in the principals' office. The screw in the door handle will not tighten. Metal door Code A-clear for repair by DCPS Charles Buchanan on 11/08/05 | November 7, 2005 | February 20, 2007 | 470 days |
| Clark Elementary School | FM-200634222 23/07 2/20/07 7th Street side, Entrance Door. Repair or replace entrance door lock, the cylinder has gone bad. | January 23, 2007 | February 20, 2007 | 28 days |
| Wilson J. O. ES | FM-200700161 2/2/07 2/20/07 Boiler room Restore Power to burners # 1& 2, no power to control panel | February 2, 2007 | February 20, 2007 | 18 days |
| Wilson High School | FM-200510949 05 2/20/07 Wilson, W Gym Bldg Provide electrical power (110 volts) to univent in hallway outside girls restroom. | August 23, 2005 | February 20, 2007 | 546 days |
| Payne Elementary School | FM-200631433 /06 2/20/07 First Floor - Old Building - Near Custodian Office - Repair or replace door closer. | October 26, 2006 | February 20, 2007 | 117 days |
| Meyer Elementary School | FM-200220579 02 2/20/07 Meyer Outside lights Need six (6) bulds for the outside lights. Need before Tuesday Nov. 5th election day. | November 1, 2002 | February 20, 2007 | 1,572 days |
| Wilkinson ES | FM-200218696 02 2/20/07 Wilkinson First floor - 127 kitchen entrance door Principal entrance door Door need realigned so open properly. | October 2, 2002 | February 20, 2007 | 1,602 days |
| Harris, C.W. ES | FM-200633730 1/8/07 2/20/07 Harris, C.W. Boileroom Correct cause of burner # 3 cutting off on lockout Auto - 3-P Interlock open HVAC shop. | January 8, 2007 | February 20, 2007 | 43 days |
| Maury Elementary School | FM-200206699 02 2/20/07 1st Floor Closet Replace lock on the closet door. Closet houses electrical panel box. | April 26, 2002 | February 20, 2007 | 1,761 days |
| Payne Elementary School | FM-200632772 /06 2/20/07 First Floor - Front Entrance - Exterior Door Is Not Closing Properly. | December 1, 2006 | February 20, 2007 | 81 days |
| Stuart-Hobson Middle School | FM-200634313 07 2/20/07 Second floor, Room 200. Repair or replace malfunctioning lock, something appears to be stuck in the lock. Note: The teacher & students are locked out of this classroom and are unable to gain access to retrieve their personables. | January 24, 2007 | February 20, 2007 | 27 days |
| Patricia R Harris Ed Center | FM-200205288 02 2/20/07 (Patterson/P.R. Harris) 1. Asbestos assessment required. 3rd Floor/room #343 & 345: Repair or replace locks; unable to secure supplies in storage room. Code A-clear for repair by Honre Engineer ( Sharon Voss ) on 4/04/02 | April 2, 2002 | February 20, 2007 | 1,785 days |
| Burrville Elementary School | FM-200634287 07 2/20/07 Principal Office - Principal broke the key off in the door, can't get back in office. Repair lock and replace key. | January 24, 2007 | February 20, 2007 | 27 days |
| Ludlow-Taylor ES | FM-200634051 07 2/20/07 Boiler Room - Repair boiler # 1. | January 17, 2007 | February 20, 2007 | 34 days |
| John Burroughs ES | FM-200202916 02 2/20/07 (BURROUGHS) 1ST FLOOR/ MULITI-PURPOSE ROOM CHANGE THE LOCK ON THE DOORS. PUT LOCKS ON MASTER KEY SYSTEM. | February 12, 2002 | February 20, 2007 | 1,834 days |
| Wilkinson ES | FM-200226572 03 2/20/07 WILKINSON Second Floor - Classrooms # 237 and # 246 1. Need to reline doors , doors will not lock . | March 5, 2003 | February 20, 2007 | 1,448 days |
| Browne Junior High School | FM-200634298 1/24/07 2/20/07 Boy's Restroom - by Rm. 131 - Re-key, can't lock the restroom. Kids are locking themselves in the restroom. | January 24, 2007 | February 20, 2007 | 27 days |
| Browne Junior High School | FM-200634111 1/19/07 2/20/07 Front Entrance Door - R/R the lock, the lock won't turn. Also need to have the boiler rm. door re-keyed. | January 19, 2007 | February 20, 2007 | 32 days |
| Peabody Elementary School | FM-200512705 05 2/20/07 (Peabody) Asbestos Assessment Required. Assess floor tile and replace on first and second floor, including landings. Asbestos Code A - Clear for repairs on 10/25/05. Tidewater -Thomas Johnson (RG 10/26/05) | June 24, 2005 | February 20, 2007 | 606 days |
| Thomas Elementary School | FM-200517253 06 2/20/07 Thomas, N Boiler room Repair # 1 burner , cuts off on fuel end open. | January 9, 2006 | February 20, 2007 | 407 days |
| Lafayette Elementary School | FM-200633968 /07 2/20/07 Master key broke off in the front entrance door, requesting the locksmith to remove the key from the lock and replace the master key. Also need an extra key made for Principal. | January 12, 2007 | February 20, 2007 | 39 days |
| Wilkinson ES | FM-200503706 05 2/20/07 Wilkinson First fl. Gym Area and Kindergarden Repair The bottom panel of Three Doors Code A-clear for repair by DCPS Charles Buchanan on 4/12/05 | April 7, 2005 | February 20, 2007 | 684 days |
| Duke Ellington School | FM-200506311 05 2/20/07 Ellington Cafeteria/Kitchen Repair A/C units not working in kitchen and cafeteria, | June 3, 2005 | February 20, 2007 | 627 days |
| Wilkinson ES | FM-200218915 02 2/20/07 Wilkinson - T-5 First floor - room 100 main office door entrance Door need realigned so close properly. | October 7, 2002 | February 20, 2007 | 1,597 days |
| Payne Elementary School | FM-200626033 06 2/20/07 1st Floor- Cafeteria (Old Building) Replace cafeteria door closer. Asbestos Code A - Clear for repairs on 07/24/06. Tidewater - Kenny Long (RG 07/25/06) | July 20, 2006 | February 20, 2007 | 215 days |
| Wilkinson ES | FM-200218916 02 2/20/07 Wilkinson - T-5 First floor - room 90 girl bathroom Pre area Door need realigned so it can close properly. | October 7, 2002 | February 20, 2007 | 1,597 days |
| Meyer Elementary School | FM-200503436 05 2/20/07 (Meyer) . First floor, Auditorium. Repair or Replace incandescent lights. Note: Lights are needed for auditorium use. | March 30, 2005 | February 20, 2007 | 692 days |
| Wilkinson ES | FM-200502380 05 2/20/07 Wilkinson First fl, Kindergarden Repair Clasroom Door Code A-clear for repair by DCPS Charles Buchanan on 1/18/06 | March 8, 2005 | February 20, 2007 | 714 days |
| Patricia R Harris Ed Center | FM-200205304 02 2/20/07 (W.B. Patterson/P.R. Harris) 1. Asbestos assessment required. 3rd floor/Main office 360: Replace storage room locks; unable to secure supplies. Code A-clear for repair by Honre Engineer ( Sharon Voss ) on 4/04/02 | April 2, 2002 | February 20, 2007 | 1,785 days |
| Bowen Elementary School | FM-200618382 06 2/20/07 First Floor-Kitchen Area Need Locks Changed On 4 Doors & The Door Leading To The Ladies Restroom See: Mr. Hawkins | February 7, 2006 | February 20, 2007 | 378 days |
| River Terrace ES | FM-200700644 20/07 2/20/07 First Floor - Auditorium - Secure frame between middle set of doors IFC 703.2.2 - Completed 2/20/07 by in house staff. Mr. Hudson McCray | February 20, 2007 | February 20, 2007 | 0 days |
| Watkins Elementary School | FM-200700117 07 2/20/07 Room's 304 ,305 & 306 - Motors not running, no heat or power to these areas. Upgraded to Emergency on 2-5-07 | January 31, 2007 | February 20, 2007 | 20 days |
| Watkins Elementary School | FM-200700147 07 2/20/07 Room 315 - Repair lock on door, it's broken. Could enter room because cylinder keeps turning | February 1, 2007 | February 20, 2007 | 19 days |
| Payne Elementary School | FM-200517080 06 2/20/07 Rm 213 in the new wing and in the Cafeteria Repair the door closers Asbestos Code A - Clear for repairs on 01/04/06. Tidewater - Tony Marcolin (RG 01/05/06) | January 3, 2006 | February 20, 2007 | 413 days |
| King M L ES | FM-200700309 07 2/20/07 Front Entrance Door - Replace the panic bar, the latch is not catching. The door can't be secured | February 7, 2007 | February 20, 2007 | 13 days |
| Wilkinson ES | FM-200224772 03 2/20/07 Taft / Choice First floor - 109 front vestibule Reline entrance door will not close. September 22, 2004: Staff called in with a concern of the time frame, and status. | January 29, 2003 | February 20, 2007 | 1,483 days |
| Murch Elementary School | FM-200631013 /06 2/20/07 Replace or repair demountable lights, water fountains etc. | October 19, 2006 | February 20, 2007 | 124 days |
| Nalle Elementary School | FM-200700073 07 2/20/07 Room 132/134 - R/R Motor to univent | January 29, 2007 | February 20, 2007 | 22 days |
| Wilson High School | FM-200510947 05 2/20/07 Wilson, W Gym Bldg Room #152 Install necessary electrical fittings and wiring to connect univent in Room #152. Electric supply to univent in classroom. | August 23, 2005 | February 20, 2007 | 546 days |
| Payne Elementary School | FM-200631059 /06 2/20/07 First Floor - Cafeteria - Replace ceiling tiles Asbestos Code A - Clear for repairs on 10/23/06. Tidewater - Cornell Parks (RG 10/25/06) | October 20, 2006 | February 20, 2007 | 123 days |
| Wilson High School | FM-200501677 05 2/20/07 Wilson, W Gym 1).Electrical assessment needed for installation of 4 (four) heating units in gym. 2). Install (4) heating units, Units are 208-V, Phase-3, Line amps-35.5, Motor amps-1.28, Min. capactity-46 amps & Max Capactity-50 amps. | February 16, 2005 | February 20, 2007 | 734 days |
| Reed LC | FM-200626700 06 2/20/07 2nd Floor- Learning Center 2 Repair/replace 5 fluorescent light fixtures. | August 2, 2006 | February 20, 2007 | 202 days |
| Payne Elementary School | FM-200631058 /06 2/20/07 Second Floor - Hallway - Replace Ceiling Tiles. Asbestos Code A - Clear for repairs on 10/23/06. Tidewater - Cornell Parks (RG 10/25/06) | October 20, 2006 | February 20, 2007 | 123 days |
| Wilson J. O. ES | FM-200631874 06 2/20/07 Store Room - Repair lights, will not come on. | November 7, 2006 | February 20, 2007 | 105 days |
| Wilkinson ES | FM-200500183 05 2/20/07 Wilkinson Emergency Second floor girls bathroom Need door handle inside they can not get out. | January 6, 2005 | February 20, 2007 | 775 days |
| Francis Junior High School | FM-200700284 84 2/6/07 2/20/07 Room 307 - No Lights, Problem With Breaker. Check and repair Note: when breaker switch is flipped it makes a popping sound. | February 6, 2007 | February 20, 2007 | 14 days |
| Meyer Elementary School | FM-200633199 /06 2/21/07 First Floor - Building Entrance - Replace blown bulbs inside of school sign | December 13, 2006 | February 21, 2007 | 70 days |
| Barnard Elementary School | FM-200632048 06 2/21/07 Barnard Boiler Room Repair or replace B&G 10 series return pumps and motors. Motors are not turning. For Boiler #1 and #2 | November 8, 2006 | February 21, 2007 | 105 days |
| Meyer Elementary School | FM-200630272 06 2/21/07 Meyer Boiler Room Replace B&G circulating pumps #1 and #2 located behind boilers mounted on wall. Pumps are for heating hot water. | September 29, 2006 | February 21, 2007 | 145 days |
| Wilkinson ES | FM-200508016 05 2/21/07 (Wilkinson) First Floor Adjust the gym and kindergarten exit doors. Asbestos Code A - Clear for repairs on 07/20/05. Tidewater - Kenny Long (RG 07/21/05) | July 18, 2005 | February 21, 2007 | 583 days |
| Wilkinson ES | FM-200504813 05 2/21/07 Wilkinson First fl. Rm 109 Front Doors Adjust Exit Doors | April 27, 2005 | February 21, 2007 | 665 days |
| Slowe Elementary School | FM-200628585 06 2/21/07 Second Floor/210 - Replace window glass Asbestos Code A - Clear for repairs on 09/01/06. Tidewater - Shamika Parker (RG 09/05/06) | August 31, 2006 | February 21, 2007 | 174 days |
| Backus Middle School | FM-200444342 04 2/21/07 Baskus Boiler Room Repair or replace hot water pump, pump not working. | February 23, 2004 | February 21, 2007 | 1,094 days |
| Slowe Elementary School | FM-200506222 05 2/21/07 ( SLOWE ) Room 122 1) Replace broken glass on the door. | May 24, 2005 | February 21, 2007 | 638 days |
| Shepherd ES | FM-200700123 07 2/21/07 Main Office -Outlets are not working - Need electricians to assess and repair electrical problem. | January 31, 2007 | February 21, 2007 | 21 days |
| Slowe Elementary School | FM-200505460 05 2/21/07 ( SLOWE ) First Floor - Room 122 1) Replace broken door fire glass. | May 13, 2005 | February 21, 2007 | 649 days |
| Barnard Elementary School | FM-200502573 05 2/21/07 Barnard Gym Area Ceiling Heating Unit Cover Hanging and is about to Drop to Floor | March 11, 2005 | February 21, 2007 | 712 days |
| Barnard Elementary School | FM-200504113 05 2/21/07 Barnard Second fl. Boys Restroom Reattach Univent Cover | April 15, 2005 | February 21, 2007 | 677 days |
| Barnard Elementary School | FM-200618441 06 2/21/07 Barnard PM Chiller Check equipment and perform PM on equipment. | February 8, 2006 | February 21, 2007 | 378 days |
| Wilson J. O. ES | FM-200700152 2/1/07 2/21/07 Cafeteria/Kitchen - Install 2 new dedicated lines for 2 new heat pumps | February 1, 2007 | February 21, 2007 | 20 days |
| Slowe Elementary School | FM-200447899 04 2/21/07 Slowe Second floor room 215, 219 and first floor next to room 125 Broken dorrs fire glass need replacing. | May 13, 2004 | February 21, 2007 | 1,014 days |
| Barnard Elementary School | FM-200631048 /06 2/21/07 Barnard Boiler Room Check Boilers #1 and #2, will not come on. | October 20, 2006 | February 21, 2007 | 124 days |
| Spingarn High School | FM-200633587 8/06 2/21/07 Requesting to have a survey & repairs of the lights that are out around the exterior of the building | December 28, 2006 | February 21, 2007 | 55 days |
| Davis Elementary School | FM-200514119 /05 2/21/07 Davis First and Second Floor - 119 and 214 1) Align room 119 and 214 doors, doors are hard for Teachers to open all the way. Code A-clear for repair by DCPS Charles Buchanan on 1/13/06 | October 22, 2005 | February 21, 2007 | 487 days |
| Meyer Elementary School | FM-200627738 06 2/21/07 Building # 2 - Replace hot water heating pumps. | August 16, 2006 | February 21, 2007 | 189 days |
| Stanton Elementary School | FM-200226945 03 2/21/07 Stanton Third floor Room 3 door glass is broken need to be fixed. | March 12, 2003 | February 21, 2007 | 1,442 days |
| Meyer Elementary School | FM-200627736 06 2/21/07 Boiler # 2 - Replacing leaking tubes. | August 16, 2006 | February 21, 2007 | 189 days |
| Woodson High School | FM-200700122 07 2/21/07 Ground Floor - Distric Police Office - No electrical sockets working - need electrical assessment and repair made. | January 31, 2007 | February 21, 2007 | 21 days |
| Meyer Elementary School | FM-200625304 06 2/21/07 Wiring exposed which connects to outdoor lighted announcement board. Plastic covering for wires broken and missing | June 28, 2006 | February 21, 2007 | 238 days |
| Spingarn High School | FM-200624589 06 2/21/07 Increase existing 15AMP electrical circuit supporting IT equipment cabinet in Main Telecommuncations Room to 20amp circuit. No new conduit and run required. Change exsiting duplex faceplate to quad. Contact Mike Thompson,DCPS OIT 202.841.4891 to coordinate installation. | June 21, 2006 | February 21, 2007 | 245 days |
| Meyer Elementary School | FM-200617412 06 2/21/07 Urgnet: Fill big pot holes on the playground area | January 13, 2006 | February 21, 2007 | 404 days |
| Amidon Elementary School | FM-200634292 07 2/21/07 Classroom - 210 - Repair or replace univent. Only unit in the classroom. Appears to be a control problem. | January 24, 2007 | February 21, 2007 | 28 days |
| Davis Elementary School | FM-200632921 06 2/21/07 Room 214 - Align door | December 6, 2006 | February 21, 2007 | 77 days |
| Drew Elementary School | FM-200632917 06 2/21/07 Third Floor - Room 301 - Install blackboard, blackboard is on site. | December 6, 2006 | February 21, 2007 | 77 days |
| Stanton Elementary School | FM-200226102 03 2/21/07 Stanton Third floor Stairwell therr across from room 303 window is out. | February 24, 2003 | February 21, 2007 | 1,458 days |
| Marshall Educational Center | FM-200619321 06 2/21/07 Outside-Parking Lot Lights are all out, most lights need to be replaced Note: Parking lot is very dark. | March 2, 2006 | February 21, 2007 | 356 days |
| Meyer Elementary School | FM-200514466 05 2/21/07 Meyer Main office and principals office replace ballast. | September 22, 2005 | February 21, 2007 | 517 days |
| Davis Elementary School | FM-200442539 04 2/21/07 Davis Basement lunchroom Repair broken bench on two lunchrrom tables. | January 12, 2004 | February 21, 2007 | 1,136 days |
| Garnet-Patterson MS | FM-200512871 05 2/21/07 Garnet-Patterson Basement-Cafeteria Electrical breaker box needs up grading it can't carry the electrical load for the air conditioners and the lights at the same time. | September 20, 2005 | February 21, 2007 | 519 days |
| Garnet-Patterson MS | FM-200506957 05 2/21/07 Garnet-Patterson Second and third fl. Hallway Repair Electrical Service in Area. | June 20, 2005 | February 21, 2007 | 611 days |
| Meyer Elementary School | FM-200458511 /04 2/21/07 Meyer A leak in the APR need attention. HA 610 Plaster - Plaster No Asbestos HA 710 Brown Coat with HA 010 No Asbestos HA 010 Plaster white No Asbestos Code A-clear for repair by DCPS Charles Buchanan on 2/03/05 | November 19, 2004 | February 21, 2007 | 824 days |
| Payne Elementary School | FM-200626032 06 2/21/07 Replace wiremesh glass in the following locations: 2nd Floor- Room 214 1st Floor- Cafeteria door Asbestos Code A - Clear for repairs on 07/24/06. Tidewater - Kenny Long (RG 07/25/06) | July 20, 2006 | February 21, 2007 | 216 days |
| Eastern High School | FM-200333967 03 2/21/07 Eastern Boiler Room Furnish and install motor for compressor for proper operation of Pneumatic controls. Furnish 2 each impellers for the same motor: Infor: Baldor Industrail Motor: Cat. No.M3612T; Spec: 36G78W415; Ser:F1293 Fr: 184T HP-5 TE PH-3 AMP-15-13.2/6.6 RPM: 1750 Hz 60 Volts: 206-230/460 | July 29, 2003 | February 21, 2007 | 1,303 days |
| Meyer Elementary School | FM-200457464 /04 2/21/07 Meyer First floor room 103 Cracked window in room 103, need to be repaired ASAP. | October 26, 2004 | February 21, 2007 | 848 days |
| Meyer Elementary School | FM-200452978 04 2/21/07 Meyer First floor All purpose room There is a leak in the APR . Poddle a water on the floor after rain. | August 19, 2004 | February 21, 2007 | 916 days |
| Meyer Elementary School | FM-200448385 04 2/21/07 Meyers Playground area Brick wall has a crack in it. Looks like it may fall. Needs immediate attention. | May 24, 2004 | February 21, 2007 | 1,003 days |
| Marshall Educational Center | FM-200624688 06 2/21/07 Third Floor/Exposed air handler unit and electrical wires Science Room. Completed Per Mr. Moody | June 23, 2006 | February 21, 2007 | 243 days |
| Spingarn High School | FM-200504559 05 2/21/07 (Spingarn) Exterior of building. Replace blown out exterior bulbs, electrician needed. | April 22, 2005 | February 21, 2007 | 670 days |
| Davis Elementary School | FM-200218212 02 2/21/07 Davis 1. Asbestos Assessment Reqd. Basement and 1st Floor Hallways/New Wing Replace damaged ceiling tiles in the hallways of the 1st floor [7 tiles] and basement hallway [4 tiles], due to children in the building leaving water to run. Asbestos Code A-clear for repair by DCPS Charles Buchanan on 09/26/02 HA 040 Ceiling Tile White 2X4 NAD | September 24, 2002 | February 21, 2007 | 1,611 days |
| Coolidge High School | FM-200700086 07 2/21/07 Boy's & Girl's Gym - Repair light fixtures and replace lamps. | January 30, 2007 | February 21, 2007 | 22 days |
| Meyer Elementary School | FM-200444344 04 2/21/07 Meyer Second floor boys bathroom The window was broken out. Need to be replace. ASAP | February 23, 2004 | February 21, 2007 | 1,094 days |
| Cook J.F. Elementary School | FM-200633259 12/10/06 2/21/07 Cook, J.F. - Boiler Room - Send HVAC mechanic to correct problem that causing boiler #1, to shut down daily on flame failure. Note: Boiler #2, down because of gas dump valve. | December 10, 2006 | February 21, 2007 | 73 days |
| Meyer Elementary School | FM-200442725 04 2/21/07 Meyer First and second floor Rooms doors need to be adjusted. Rooms 103, 229 and 212. | January 14, 2004 | February 21, 2007 | 1,134 days |
| Meyer Elementary School | FM-200341998 /03 2/21/07 (Meyer) 2nd Floor/Boys Bathroom: Replace broken window. | December 22, 2003 | February 21, 2007 | 1,157 days |
| Meyer Elementary School | FM-200336343 03 2/21/07 Meyer Outside lights Two (2) lights are broken on south and north side thatneed to be replaced. | August 27, 2003 | February 21, 2007 | 1,274 days |
| Truesdell Elementary | FM-200631387 /06 2/21/07 TRUESDELL boile room Repair or replace pump control box for # 2 pump (circulating). will not work in hand or auto. | October 26, 2006 | February 21, 2007 | 118 days |
| Meyer Elementary School | FM-200228917 03 2/21/07 Meyer Boiler room Replace coupling on the B&G DHW pump in the boiler room, coupling is broken. | April 22, 2003 | February 21, 2007 | 1,401 days |
| Truesdell Elementary | FM-200630852 /06 2/21/07 Truesdell Boiler Room Repair or replace condensate or reciever tank pumps are not working. | October 17, 2006 | February 21, 2007 | 127 days |
| Truesdell Elementary | FM-200513647 05 2/21/07 Truesdell Boiler Room R/R burner on boiler #1. Flame failure. | October 7, 2005 | February 21, 2007 | 502 days |
| Meyer Elementary School | FM-200226639 03 2/21/07 Meyer First floor Two (2) row of lights are out in health suite. Need attention ASAP | March 6, 2003 | February 21, 2007 | 1,448 days |
| Meyer Elementary School | FM-200225667 03 2/21/07 (Meyer) 2nd Floor Room 229 Glass in door is missing. Need to be replaced a.s.a.p. | February 10, 2003 | February 21, 2007 | 1,472 days |
| Eastern High School | FM-200511636 05 2/21/07 Eastern Repair or replace pneumatic system | August 31, 2005 | February 21, 2007 | 539 days |
| Truesdell Elementary | FM-200505199 05 2/21/07 ( TRUESDELL ) Annex Breezeway 1) Repair radiator that is on the wall, it's leaking. | May 6, 2005 | February 21, 2007 | 656 days |
| Truesdell Elementary | FM-200340735 /03 2/21/07 Truesdell boiler room Replace air compressor motor . Baldor(Industrial Motor) Three phase cat. no. 127466E027 spec. 35B101T469H3 Frame 143T Ser. F699 volts 230/460 amps 3.2/1.6 Rpm 1725 Hz 60 ph 3 class b ser F,1,15 | November 25, 2003 | February 21, 2007 | 1,184 days |
| Stanton Elementary School | FM-200444438 04 2/21/07 (Stanton) 1st Floor/Room #123: Repair broken window. Principal is requesting the cost of the repair for responsible person. | February 25, 2004 | February 21, 2007 | 1,092 days |
| Eaton Elementary School | FM-200621304 06 2/21/07 First Floor-Main Lobby Area-R/R broken door, hinges on gym door-rm. 110 | April 13, 2006 | February 21, 2007 | 314 days |
| Duke Ellington School | FM-200503547 05 2/21/07 Ellington Boiler Room Boiler #2 and #3 off on flame failure. Check Boiler #4 motor making loud noise. | April 5, 2005 | February 21, 2007 | 687 days |
| Duke Ellington School | FM-200506166 05 2/21/07 Ellington Boiler Room Check compressor #1 and #2 down, Chiller down because of compressors. | June 1, 2005 | February 21, 2007 | 630 days |
| Stanton Elementary School | FM-200445878 04 2/21/07 Stanton VANDALISM First floor boys toilet annex Replace broken window glass in boys toilet, annex bldg. Asbestos Code A - Clear for repairs on 03/26/04. Horne Engineering - Bipin Nanavaty (RG 03/30/04) | March 25, 2004 | February 21, 2007 | 1,063 days |
| Duke Ellington School | FM-200506362 05 2/21/07 ( ELLINGTON ) EMERGENCY!!! Auditorium 1) Repair or Replace A/C, it's not working. Having Graduation on 6/7/05 | June 6, 2005 | February 21, 2007 | 625 days |
| Duke Ellington School | FM-200630013 06 2/21/07 Cooling Tower Repair. Control box rusted out, water leakage. Per Mr. Michael Jackson, need wires put back in , about 1"inch for thermostat than put back on-line. | September 25, 2006 | February 21, 2007 | 149 days |
| Duke Ellington School | FM-200625926 06 2/21/07 Ellington Boiler Room Repair or replace condensated return pump #4. Leaking badly, possible bad mechanical seals. | July 19, 2006 | February 21, 2007 | 217 days |
| Duke Ellington School | FM-200514227 /05 2/21/07 Ellington boiler room Repair or replace burner on boiler # 5. Appears to be a programmer problem. | October 22, 2005 | February 21, 2007 | 487 days |
| Birney Elementary School | FM-200632334 /06 2/21/07 Room 315 - Light fixture sparks when the light switch in flipped on, check and repair. | November 20, 2006 | February 21, 2007 | 93 days |
| Birney Elementary School | FM-200630095 06 2/21/07 3rd Floor- Teacher's Bathroom Install ballast. Asbestos Code A - Clear for repairs on 09/28/06. Tidewater - Kenny Long (RG 10/02/06) | September 27, 2006 | February 21, 2007 | 147 days |
| Wilson High School | FM-200507602 05 2/21/07 Asbestos Assessment Required. Furnish and install 110-volt window unit & dedicated electrical service with receptacle 10.000 BTU Asbestos Code A - Clear for repairs on 07/12/05. Tidewater - Philp Connolly (RG 07/20/05) | July 8, 2005 | February 21, 2007 | 593 days |
| Backus Middle School | FM-200338582 03 2/21/07 Backus Boiler Room Boiler #1 will not start, has electric power. | October 7, 2003 | February 21, 2007 | 1,233 days |
| Wilson High School | FM-200445599 04 2/21/07 Wlison, W. Basement hallway near book room Replace missing and crack door glass. | March 19, 2004 | February 21, 2007 | 1,069 days |
| Wilson High School | FM-200445598 04 2/21/07 Wlison, W. Third floor room 303 Replace missing door glass. | March 19, 2004 | February 21, 2007 | 1,069 days |
| Wilson High School | FM-200341169 03 2/21/07 Transportation L Street Room L-13 Window in class room stuck ed up. | December 8, 2003 | February 21, 2007 | 1,171 days |
| Payne Elementary School | FM-200514368 /05 2/21/07 (Payne) First floor, Recreation Office. Replace broken window recreation office. Asbestos Code A - Clear for repairs on 10/26/05. Tidewater - Kenny Long (RG 10/28/05) | October 23, 2005 | February 21, 2007 | 486 days |
| Wilson High School | FM-200330096 03 2/21/07 (Wilson, W.) 1st Floor/Green House: Make necessary roof repairs. Approximately twelve (12) sections of lexan, along with metal support brackets have warped, or fallen out as a result of the snow storm, and now exposed to the elements of nature. | May 13, 2003 | February 21, 2007 | 1,380 days |
| Hart Middle School | FM-200632633 /06 2/21/07 Stairwell 5 By Boy's Side Gym - Broken window, R/R | November 29, 2006 | February 21, 2007 | 84 days |
| Janney Elementary School | FM-200628832 /6/06 2/21/07 Ground floor Water is pouring in around the window seals. | September 6, 2006 | February 21, 2007 | 168 days |
| Janney Elementary School | FM-200443671 04 2/21/07 Janney Third floor hallway There are five (5) roof leaks in the attic. Three (3) are old and two (2) are new. Each leak has been identified, we have put buckets in the attic to catch the water, in order to see the leaks you must climb over the duit work, it cannot be seen in the hall from the exterior roof. | February 4, 2004 | February 21, 2007 | 1,113 days |
| Janney Elementary School | FM-200340261 /03 2/21/07 (Janney) Outside of Building: Down spouts need to be snaked out; they are backing up when it rains. | November 13, 2003 | February 21, 2007 | 1,196 days |
| Backus Middle School | FM-200448113 04 2/21/07 Backus Boiler room Replace bad gas valve on the # 1 and # 3 boiler gas trane, boiler is used to heat the hot water. | May 19, 2004 | February 21, 2007 | 1,008 days |
| Backus Middle School | FM-200456098 04 2/21/07 Backus Boiler Room Boilers #1,#2 and #3 calibration burners at modulation levels. Note: When burner are not modulating properly, it creats big problems when cleaning boilers and reduce efficiency. | September 30, 2004 | February 21, 2007 | 874 days |
| Ferebee-Hope Elementary School | FM-200621138 06 2/21/07 Engineers Office, Hallway/Kitchen, Kitchen Storage Rm., And Storage Next To Engineer Office-R/R light fixture. Also replace outside security light at loading dock area. | April 10, 2006 | February 21, 2007 | 317 days |
| Payne Elementary School | FM-200514367 /05 2/21/07 (Payne) First floor, Boys' Restroom near custodian's office. Replace broken window in restroom. Asbestos Code A - Clear for repairs on 10/25/05. Tidewater -Rodney distance (RG 10/28/05) | October 23, 2005 | February 21, 2007 | 486 days |
| Backus Middle School | FM-200512373 05 2/21/07 Backus Boiler Room Boilers #1,#2 and #3 Calibrate burner to burn properly at all modulation levels. Burners are not modulating properly,creating cleaning problems. | September 12, 2005 | February 21, 2007 | 527 days |
| Backus Middle School | FM-200514315 /05 2/21/07 Backus Boiler Room Boiler #2 Calibrate burner. | October 23, 2005 | February 21, 2007 | 486 days |
| Payne Elementary School | FM-200454873 04 2/21/07 Payne Second floor room 224 new wing Repair or replace window, window is broken. | September 16, 2004 | February 21, 2007 | 888 days |
| Wilson High School | FM-200514497 /05 2/21/07 (Wilson) Basement, Room B-19. Repair (3) windows in classroom B-19, windows can't be secured properly. Lead & Asbestos Code A - Clear for repairs on 10/28/05. Tidewater - Rodney Distance (RG 11/01/05) | October 23, 2005 | February 21, 2007 | 486 days |
| Backus Middle School | FM-200443100 04 2/21/07 Backus Boiler room Repair boiler # 2 | January 22, 2004 | February 21, 2007 | 1,126 days |
| Backus Middle School | FM-200444084 04 2/21/07 Backus Boiler room Repair # 1 bioler it will not start. | February 15, 2004 | February 21, 2007 | 1,102 days |
| Backus Middle School | FM-200338215 03 2/21/07 Backus Boiler Room Send burner technician with calibration instruments to properly calibrate burner (s) at all modulation levels on boiler (s). Boiler #1, #2, and #3. Note: When burners are not modulating properly, it creates big problem when cleaning boilers and reduce efficiency. | September 30, 2003 | February 21, 2007 | 1,240 days |
| Backus Middle School | FM-200618851 06 2/21/07 Backus Boiler Room Boiler #1 off on flame failure. | February 21, 2006 | February 21, 2007 | 365 days |
| Deal Junior High School | FM-200624600 06 2/21/07 Increase existing 15AMP electrical circuit supporting IT equipment cabinet in Main Telecommuncations Room to 20amp circuit. No new conduit and run required. Change exsiting duplex faceplate to quad. Contact Mike Thompson,DCPS OIT 202.841.4891 to coordinate installation. DUPLICATE REQUEST. | June 21, 2006 | February 21, 2007 | 245 days |
| Backus Middle School | FM-200620175 06 2/21/07 Backus Boiler Room Repair or replace Boiler #1 Off on flame failure. | March 22, 2006 | February 21, 2007 | 336 days |
| Birney Elementary School | FM-200628668 06 2/21/07 3rd Floor- Room 317 Install outlet for window a/c unit. Asbestos Code A - Clear for repairs on 09/05/06. Tidewater - Kenny Long (RG 09/06/06) | August 31, 2006 | February 21, 2007 | 174 days |
| Birney Elementary School | FM-200513850 /05 2/21/07 Birney Emergency First Floor-Rm. 106 Check and repair electrical problem, the cameras are being fixed, and electrician is needed to carry ou the work. | October 13, 2005 | February 21, 2007 | 496 days |
| Birney Elementary School | FM-200459397 04 2/21/07 Birney EMERGENCY Kitchen The freezer plub is shorting out the freezer. | December 9, 2004 | February 21, 2007 | 804 days |
| Birney Elementary School | FM-200207569 02 2/21/07 Birney Basement Cafeteria Four sets of lights are out in the cafeteria, although new tubes have been put in. POC: Robert Gillespie | May 10, 2002 | February 21, 2007 | 1,748 days |
| Montgomery ES | FM-200446244 04 2/22/07 (Montgomery) Asbestos Assessment Required. Front of Building Outside/Near Main Office: Occupants complaining. Code A-clear for repair by DCPS Mr. Eley on 4/1/04 | April 1, 2004 | February 22, 2007 | 1,057 days |
| Drew Elementary School | FM-200627726 06 2/22/07 Third floor, Room 313. Install blackboard in classrroom. Note: The blackboard is on site. Asbestos Code A - Clear for repairs on 08/17/06. Tidewater - Kenny Long (RG 08/18/06) | August 16, 2006 | February 22, 2007 | 190 days |
| Raymond Elementary School | FM-200633777 07 2/22/07 Perform Preventive Maintenance on Chillers. | January 8, 2007 | February 22, 2007 | 45 days |
| Wilson J. O. ES | FM-200633252 /06 2/22/07 Third Floor - Boy's Restroom - Three stand up urinals are out of order, check and make repairs. | December 13, 2006 | February 22, 2007 | 71 days |
| Stanton Elementary School | FM-200631332 5/06 2/22/07 Stanton Boiler Room Boiler #1 Repair or replace low water cut off, Need to be adjusted | October 25, 2006 | February 22, 2007 | 120 days |
| Montgomery ES | FM-200339468 /03 2/22/07 Montgomery Boiler Room Check domestic hot water. No hot water in building. | October 27, 2003 | February 22, 2007 | 1,214 days |
| Anacostia Senior High School | FM-200505029 05 2/22/07 Anacostia Boiler Room Replace feed water regulator for Boiler #1 and #3. Boiler make: Orr and Sambower, model #6791 Year built 1974. Max. working pressure 15 PSI; Heating surface 1323 sq. ft. | May 2, 2005 | February 22, 2007 | 661 days |
| Montgomery ES | FM-200510279 05 2/22/07 Montgomery Learning Center 1 , boys toilet Replace bearings on Air Handler unit for Learning Center 1. | August 15, 2005 | February 22, 2007 | 556 days |
| Montgomery ES | FM-200620220 06 2/22/07 Stairwell Between Learning Center I & Learning Center II. Replace metal plate on the upside from LC I to LC II is broken. Asbestos Code A - Clear for repairs on 03/23/06. Tidewater - Kenny Long (RG 03/24/06) | March 22, 2006 | February 22, 2007 | 337 days |
| Montgomery ES | FM-200621886 06 2/22/07 First floor, Learning Center I. Replace berrings on air handler unit. | April 27, 2006 | February 22, 2007 | 301 days |
| Montgomery ES | FM-200621888 06 2/22/07 First floor, Day Care. Repair or Replace heating unit in daycare area, they replaced electric duct in the ceiling but it still does not work. | April 27, 2006 | February 22, 2007 | 301 days |
| Montgomery ES | FM-200621889 06 2/22/07 First floor, Day Care. Repair or Replace heating unit in daycare area, they replaced electric duct in the ceiling but it still does not work. | April 27, 2006 | February 22, 2007 | 301 days |
| Montgomery ES | FM-200621899 06 2/22/07 First floor & Second floor, LC I & LC II. Replace broken metal plate on upside of stairwell leading from LC I to LC II. | April 27, 2006 | February 22, 2007 | 301 days |
| Montgomery ES | FM-200629559 06 2/22/07 Up-Stairs/From Learning Center 1 to Learning Center 2 Replace metal plate on the stairs. Asbestos Code A - Clear for repairs on 09/18/06. Tidewater - Shamika Parker (RG 09/19/06) | September 15, 2006 | February 22, 2007 | 160 days |
| Montgomery ES | FM-200629584 06 2/22/07 1st Floor- LC 1 Repair 2 toilets. | September 15, 2006 | February 22, 2007 | 160 days |
| Montgomery ES | FM-200629719 06 2/22/07 Library - Replace All Windows Asbestos Code A - Clear For Repairs On 09/21/06. Tidewater - Thomas Johnson ( RG 09/25/06) | September 20, 2006 | February 22, 2007 | 155 days |
| Montgomery ES | FM-200631821 06 2/22/07 Second Floor - Rm. 207 - Replace Broken Window | November 6, 2006 | February 22, 2007 | 108 days |
| Montgomery ES | FM-200632252 /06 2/22/07 Scott Montgomery - Over Learning Center # 1 - Repair or replace Air Handler Unit. This unit appears to have flow problems. Possible bad pnematic valves. | November 16, 2006 | February 22, 2007 | 98 days |
| Eaton Elementary School | FM-200506719 05 2/22/07 Eaton Boiler Room Repair or replace burn out air compressor #1. New compressor inside boiler room, need installing. | June 14, 2005 | February 22, 2007 | 618 days |
| Wilson J. O. ES | FM-200632462 /06 2/22/07 Third Floor - Teachers Restroom - Unclog the face bowl, water will not go down | November 24, 2006 | February 22, 2007 | 90 days |
| Thomson Elementary School | FM-200511074 8/24/05 2/22/07 Thomson Between First and Second fl. Repair roof leaks gutters and down spouts Asbestos Code A - Clear for repairs on 08/31/05. Tidewater - Philp Connolly (RG 09/01/05) | August 24, 2005 | February 22, 2007 | 547 days |
| Lafayette Elementary School | FM-200619189 06 2/22/07 Lafayette Boiler Room Boiler #2 off on flame failure. Had to reset Boiler | February 28, 2006 | February 22, 2007 | 359 days |
| Kramer Middle School | FM-200501363 05 2/22/07 Kramer First floor room 106 Univent need to be repaired, leaking water down to basement, no heat in the room. | February 8, 2005 | February 22, 2007 | 744 days |
| Peabody Elementary School | FM-200631755 06 2/22/07 PEABODY Boiler room Repair pump control for boilers # 1 & 3. | November 2, 2006 | February 22, 2007 | 112 days |
| Wilson J. O. ES | FM-200631760 06 2/22/07 Wlison,J.O Boiler room Restore electrical power to burners. | November 3, 2006 | February 22, 2007 | 111 days |
| Wilson J. O. ES | FM-200631516 /06 2/22/07 Kitchen - Repair or replace motor in overhead univents in Kitchen. There is no heat in this food sevice area at all. | October 30, 2006 | February 22, 2007 | 115 days |
| Wilson J. O. ES | FM-200631165 /06 2/22/07 Third Floor - Boy's Restroom - Repair the three urinal 's that are out of service. | October 23, 2006 | February 22, 2007 | 122 days |
| Wilson J. O. ES | FM-200631164 /06 2/22/07 Outside - Repair the gate on the principal's parking lot. | October 23, 2006 | February 22, 2007 | 122 days |
| Wilson J. O. ES | FM-200631154 /06 2/22/07 Wilson, J.O. Boiler Room Repair or replace burner on Boiler #1. Bad timer. | October 23, 2006 | February 22, 2007 | 122 days |
| Wilson J. O. ES | FM-200630878 /06 2/22/07 Third Floor - Teachers Lounge Restroom - Unclog the sink | October 17, 2006 | February 22, 2007 | 128 days |
| Wilson J. O. ES | FM-200627829 06 2/22/07 replace rear gate at parking lot | August 17, 2006 | February 22, 2007 | 189 days |
| Wilson J. O. ES | FM-200625246 06 2/22/07 Second Floor/Repair or replace water coolers; center hallway it's out of order. | July 5, 2006 | February 22, 2007 | 232 days |
| Wilson J. O. ES | FM-200625210 06 2/22/07 Replace Water Cooler - Third Floor Hallway 7th St Side | July 3, 2006 | February 22, 2007 | 234 days |
| Wilson J. O. ES | FM-200623532 06 2/22/07 3rd Floor A/C units are not working. | May 30, 2006 | February 22, 2007 | 268 days |
| Wilson J. O. ES | FM-200621706 06 2/22/07 Outside The grass is knee-high and needs to be cut badly. | April 24, 2006 | February 22, 2007 | 304 days |
| Wilson J. O. ES | FM-200513064 05 2/22/07 Wilson, J.O. Emergency Third Floor-Open Space Key broke off in the door and the room cant be secured. There is a lot of expensive equipment in the room. Need someone as soon as possible. | September 22, 2005 | February 22, 2007 | 518 days |
| School WW High School | FM-200501798 05 2/22/07 School W/O Walls ( High School Bathroom Survey Report ) Basement Boys Restroom - Plaster and Paint Walls and Ceiling Basement Mens Restroom - Plaster and Paint Walls and Ceiling HA 002 Plaster white No Asbestos HA 069 Brown coat with ... HA 002 No Asbestos Code A-clear for repair by DCPS Charles Buchanan on 3/7/05 | February 20, 2005 | February 22, 2007 | 732 days |
| School WW High School | FM-200517287 06 2/22/07 Emergency: Repair broken frame and window on the third floor in rm. 302. Part of the pane is still hanging out of the window and may fall on someone. | January 10, 2006 | February 22, 2007 | 408 days |
| Nalle Elementary School | FM-200501424 05 2/22/07 NALLE J.C. Room 235 Furnish and install complete fan coil unit. Room fan coil unit is missing. | February 9, 2005 | February 22, 2007 | 743 days |
| Wilson J. O. ES | FM-200500921 05 2/22/07 WILSON J.O. kitchen Replace missing squirrel cage, shaft, bearings, and blower assembly for ceiling Trane unit heater. size - AD - 035 ser. 526683 US patents # 3,129,753 volt 115 amps 3 cy-60 ph - 1 hp 1/16 | January 28, 2005 | February 22, 2007 | 755 days |
| Wilson J. O. ES | FM-200453051 04 2/22/07 Wilson, JO( 3rd and 2nd Floor old side corridors Repair or replace leaky water coolers. | August 20, 2004 | February 22, 2007 | 916 days |
| Wilson J. O. ES | FM-200227161 03 2/22/07 J.O.WILSON Third Floor - Corridor across from room 304 ( Old Side ) 1. Reattach water cooler and install outlets to wall across from room #304 . Asbestos Code A - Clear for repairs on 03/18/03. Horne Engineering - Edward Rodriguez (03/19/03) | March 17, 2003 | February 22, 2007 | 1,438 days |
| Wilson J. O. ES | FM-200225099 03 2/22/07 Wilson,W Kitchen Replace 5 fans and casing to heating units in kitchen, they are missing. (Left) Replace belt shift, shift will not turn. SEE ENGINEER | February 3, 2003 | February 22, 2007 | 1,480 days |
| Ballou Senior High School | FM-200633759 8/07 2/22/07 Perform Preventive Maintenance on Chillers. | January 8, 2007 | February 22, 2007 | 45 days |
| Wilson J. O. ES | FM-200206560 02 2/22/07 1) In accordance with grass cutting contract for the summer of 2002 to include grass cutting and edging. | April 25, 2002 | February 22, 2007 | 1,764 days |
| Shepherd ES | FM-200450857 04 2/22/07 Shepherd Boiler Room Repor replace hot water circulating pumps #3 and #4, inoperable. Boilers failed D.C. Inspection. | July 27, 2004 | February 22, 2007 | 940 days |
| West Elementary School | FM-200633790 8/07 2/22/07 Perform Preventive Maintenance on Chillers. | January 8, 2007 | February 22, 2007 | 45 days |
| Hart Middle School | FM-200226660 03 2/22/07 Hart Boiler Room Repair or replace leaking mechanical seal on #1 circulation pump. The pump is a Bell & Gossett Size: 185011 Ident #B98 Serial # 510976 | March 6, 2003 | February 22, 2007 | 1,449 days |
| Brightwood Elementary School | FM-200619947 06 2/22/07 Brightwood Boiler Room Boiler #2 flame failure, will not come on. | March 15, 2006 | February 22, 2007 | 344 days |
| Brightwood Elementary School | FM-200620293 06 2/22/07 Brightwood Boiler Room Boiler #3 Replace automatic low water feeder | March 24, 2006 | February 22, 2007 | 335 days |
| Bruce-Monroe Elementary School | FM-200619079 06 2/22/07 Bruce-Monroe Boiler Room Boiler #1 keep going off on flame failure Had to reset Boiler. | February 24, 2006 | February 22, 2007 | 363 days |
| Woodson High School | FM-200634297 07 2/22/07 Boiler Room - Replace Mcdonnell Miller water level control on Boiler # 1. | January 24, 2007 | February 22, 2007 | 29 days |
| Davis Elementary School | FM-200700755 07 2/22/07 Basement - Door not aligned classroom 16 - Completed 2-22-07 by building staff Mr. Freddie Brown, Head Custodian | February 22, 2007 | February 22, 2007 | 0 days |
| Davis Elementary School | FM-200700756 07 2/22/07 Second Floor - Door not aligned classroom 214 - Completed 2-22-07 by building staff Mr. Freddie Brown, Head Custodian | February 22, 2007 | February 22, 2007 | 0 days |
| Davis Elementary School | FM-200700757 07 2/22/07 Second Floor - Door not aligned classroom teachers lounge - Completed 2-22-07 by building staff Mr. Freddie Brown, Head Custodian | February 22, 2007 | February 22, 2007 | 0 days |
| Davis Elementary School | FM-200700758 07 2/22/07 Basement - Door not aligned classroom boy's bathroom - Completed 2-22-07 by building staff Mr. Freddie Brown, Head Custodian | February 22, 2007 | February 22, 2007 | 0 days |
| Davis Elementary School | FM-200700759 07 2/22/07 Basement - Door not aligned classroom teacher's bathroom - Completed 2-22-07 by building staff Mr. Freddie Brown, Head Custodian | February 22, 2007 | February 22, 2007 | 0 days |
| Seaton Elementary School | FM-200626864 06 2/23/07 Seaton Boiler room Boiler #1 Perform hydrostatic test | August 6, 2006 | February 23, 2007 | 201 days |
| Seaton Elementary School | FM-200625013 06 2/23/07 1st Floor- Boys Bathroom Replace 2 bradley basins. They are not working and there is no water in this bathroom. | June 29, 2006 | February 23, 2007 | 239 days |
| Seaton Elementary School | FM-200625012 06 2/23/07 1st Floor- Boys Bathroom Replace 2 bradley basins. They are not working and there is no water in this bathroom. | June 29, 2006 | February 23, 2007 | 239 days |
| Seaton Elementary School | FM-200625010 06 2/23/07 2nd Floor- Boys Bathroom The urinal is leaking at the wall and flush valve. | June 29, 2006 | February 23, 2007 | 239 days |
| Seaton Elementary School | FM-200625001 06 2/23/07 Roof- Kindergarten & Main Building Remount outside light on Kindergarten roof facing P Street. Repair 2 lights and replace burned out bulbs. | June 29, 2006 | February 23, 2007 | 239 days |
| Seaton Elementary School | FM-200514484 /05 2/23/07 Seaton Computer Lab Repair or replace air handler unit #1 located in ceiling. | October 23, 2005 | February 23, 2007 | 488 days |
| Raymond Elementary School | FM-200502529 05 2/23/07 Raymond 3rd Floor, Room #31 Repair or replace blower to heating unit in room #31, will not work. No heat in room. | March 10, 2005 | February 23, 2007 | 715 days |
| Beers Elementary School | FM-200617605 06 2/23/07 Beers Room #104 Repair or replace burnt up motor in univent. Replace bad wiring in univent to the controls. | January 19, 2006 | February 23, 2007 | 400 days |
| Seaton Elementary School | FM-200514483 /05 2/23/07 Seaton Library Repair or replace starter to air handler unit #3 located in ceiling. Cuttler Haman 18 amp Nema size O BN16BNO | October 23, 2005 | February 23, 2007 | 488 days |
| Seaton Elementary School | FM-200514148 /05 2/23/07 Seaton Second and Third Floor - Boys Bathrooms 1) Furnish and replace 1 flush valve 3rd floor Boys urinal. 2) Replace flush valve 2nd floor 2 urinals. | October 22, 2005 | February 23, 2007 | 489 days |
| Seaton Elementary School | FM-200503641 05 2/23/07 ( SEATON ) Asbestos Assessment Required First Floor - Cafeteria Kitchen (Restroom) Code A-clear for repair byDCPS Charles Buchanan on 4/15/05 1) Bathroom door needs automatic door closer. | April 6, 2005 | February 23, 2007 | 688 days |
| Raymond Elementary School | FM-200617554 06 2/23/07 Raymond New Side: Rooms #217,#209, Old side: #22, #24 Repair or replace new control on units (heating). Controls need programming, are not regulating properly. | January 18, 2006 | February 23, 2007 | 401 days |
| Seaton Elementary School | FM-200501665 05 2/23/07 Seaton First floor cafeteria / kitchen Provide self closing device for restroom door. | February 16, 2005 | February 23, 2007 | 737 days |
| Raymond Elementary School | FM-200623560 06 2/23/07 Raymond Boiler Room Install feed water regulator on cooling tower for chiller. | May 31, 2006 | February 23, 2007 | 268 days |
| Seaton Elementary School | FM-200501083 05 2/23/07 Seaton Library Repair or replacestarter control to air handler unit #1 | February 1, 2005 | February 23, 2007 | 752 days |
| West Elementary School | FM-200700585 6/07 2/23/07 Outside leak running in on to the 1st floor in to the main office | February 16, 2007 | February 23, 2007 | 7 days |
| Raymond Elementary School | FM-200626126 06 2/23/07 Raymond Boiler Room Repair or replace pressure gauges and thermometers on three (3) house pumps #1,#2, and #3; inlet and outlet of chiller and on outlet of Boilers #1 and #2 Needed for Boiler to pass inspection | July 21, 2006 | February 23, 2007 | 217 days |
| Raymond Elementary School | FM-200626152 06 2/23/07 Raymond Old Boiler Room Repair or replace busted circulating pump on hot water heater. Model # S55NXLL4-6257 HP-1/3 RPM 3450 Cat. #112-074 Voltage 115 HZ 60 PH 1 AMPS 4.9 SEA 6.3 Make Emerson Circ Pump | July 23, 2006 | February 23, 2007 | 215 days |
| Drew Elementary School | FM-200618059 06 2/23/07 Drew Boiler room Repair or replace circulating pumps , leaking at the mechanical seals. | January 31, 2006 | February 23, 2007 | 388 days |
| Raymond Elementary School | FM-200628996 06 2/23/07 Raymond Chiller Repair or replace condenser motor to chller. Chiller down. | September 8, 2006 | February 23, 2007 | 168 days |
| Seaton Elementary School | FM-200501082 05 2/23/07 Seaton Library Replace bearing to fan to air handler unit #2 | February 1, 2005 | February 23, 2007 | 752 days |
| Seaton Elementary School | FM-200500322 05 2/23/07 SEATON OUTSIDE LIGHTS FROUNT AND BACK REPAIR LIGHTS | January 11, 2005 | February 23, 2007 | 773 days |
| Seaton Elementary School | FM-200451054 04 2/23/07 Seaton Boiler Room 1. Boiler# 1 & 2 Perform Hydrostatic test for leaks | July 28, 2004 | February 23, 2007 | 940 days |
| Seaton Elementary School | FM-200445794 04 2/23/07 Seaton First floor front door next to security desk Exterior door is very hard to open it is the double door next to the security desk. | March 24, 2004 | February 23, 2007 | 1,066 days |
| Seaton Elementary School | FM-200227667 03 2/23/07 Bancroft First floor parking lot exterior door Doors are difficult to open or close Asbestos Code A-clear for repair by DCPS on 04/07/03 Charles Buchanan | March 26, 2003 | February 23, 2007 | 1,430 days |
| Seaton Elementary School | FM-200217263 02 2/23/07 Seaton First floor Repair or replace exterior door to boys bathroom. Very hard to close. Security hazard Door is open dailey Asbestos Code A-clear for repair by DCPS Charles E Buchanan on 9/11/02 | September 11, 2002 | February 23, 2007 | 1,626 days |
| Seaton Elementary School | FM-200215197 02 2/23/07 Seaton 1st Floor Boys' Restroom Repair Bradley basins. | August 21, 2002 | February 23, 2007 | 1,647 days |
| Winston EC | FM-200516110 05 2/23/07 WINSTON Center # 1 and 2 Replace damaged fan coil motor shaft bearings, unit services center # 1 and 2. Amp motor out to detect cause of overloading condition, unit services gym. | December 6, 2005 | February 23, 2007 | 444 days |
| Jefferson JHS | FM-200700259 /07 2/23/07 First floor, Boys' Restroom. Repair or replace broken water faucet, water is continuously running and cannot be isolated therefore it is causing the sink to overflow. | February 5, 2007 | February 23, 2007 | 18 days |
| Wilson High School | FM-200451105 04 2/23/07 Wilson- Boiler Room Boiler #2 - Defective modulator motor | July 29, 2004 | February 23, 2007 | 939 days |
| Noyes Elementary School | FM-200623439 06 2/23/07 Check and make repairs to the air handler unit in the attic, it's leaking. | May 30, 2006 | February 23, 2007 | 269 days |
| Hart Middle School | FM-200620504 06 2/23/07 Hart Cafetria, Science Comp. 301, Room 219 B-6 Repair or replace (4) four univent motors in the following areas: Cafertia; Science Comp. 301; #219 B-6. Information: General Electric; HP 1/8; V 115; RPM 700 AMP 2.00 Shaft Couplings 1-1/2X 1/2 | March 29, 2006 | February 23, 2007 | 331 days |
| Hart Middle School | FM-200619105 06 2/23/07 Hart Basment Furnish materials for work to be done on (4) four univents location recreation area. | February 27, 2006 | February 23, 2007 | 361 days |
| Hart Middle School | FM-200508723 05 2/23/07 Hart Gym Replace (3) three 70" X 24" air handlers, air unit covers in gym. Note: Fire marshall has sited this area. | July 26, 2005 | February 23, 2007 | 577 days |
| Hart Middle School | FM-200504745 05 2/23/07 Hart Boiler Room Replace mechanical seals and motor mounts on #2 (house pump) on hot water circulating pump. | April 26, 2005 | February 23, 2007 | 668 days |
| Davis Elementary School | FM-200620792 06 2/23/07 Basement-Opening in wall left side below soap dispenser-room 14. Note: 3" hole from removal of water cooler (masory work) "Fire Code Violation" Asbestos Code A - Clear for repairs on 04/05/06. Tidewater - Henry Addison (RG 04/06/06) | April 4, 2006 | February 23, 2007 | 325 days |
| Hart Middle School | FM-200224177 03 2/23/07 Hart B-13E and B-14E (Rec. Area) Fan coil (heating unit) Replace bad motor, drive coupling, shaft bearing assembly in heating unit. Motor info.HP- 1/2,RPM 750, Frame CB6Z, Drive coupling 1.25 "ID X 50" ID | January 18, 2003 | February 23, 2007 | 1,497 days |
| Kramer Middle School | FM-200509230 05 2/23/07 Kramer Boiler Room Replace low water cut off chamber on boiler #1 McDonnell & Miller - 150. | August 1, 2005 | February 23, 2007 | 571 days |
| Hart Middle School | FM-200222174 02 2/23/07 Hart B-14E (Rec. Area) Basement Fan Coil (Heating Unit) Replace bad motor, drive coupling shaft bearing assembly in heating unit. *Motor Info. Hp.1/2, Rpm 750 Frame C56Z Drive Coupling: 1.25"ID x 50" ID | December 9, 2002 | February 23, 2007 | 1,537 days |
| Noyes Elementary School | FM-200625561 06 2/23/07 First floor, Principal's Office. Replace ballasts in light fixtures. | July 11, 2006 | February 23, 2007 | 227 days |
| Kelly Miller MS | FM-200700176 2/2/07 2/23/07 First Floor- Kitchen:Sinks are clogged, and backing up. | February 2, 2007 | February 23, 2007 | 21 days |
| Lafayette Elementary School | FM-200340314 /03 2/23/07 Lafayette Boiler Room Repair or replace badly leaking solenoid valve located at bottom section of large trap. Information: ATE-EA 1.5 No.#74613. HOT!!!! | November 14, 2003 | February 23, 2007 | 1,197 days |
| Lafayette Elementary School | FM-200340316 /03 2/23/07 Lafayette Boiler Room Furnish (1) handhole plate with dog and bolt to replace missing one on Boiler #2. See sample of item with request. HOT!!!! | November 14, 2003 | February 23, 2007 | 1,197 days |
| Hart Middle School | FM-200220596 02 2/23/07 Hart Boy's Locker Room 1st Floor Univent motor needs to be replaced, their is no shaft bearing assembly in univent. | November 1, 2002 | February 23, 2007 | 1,575 days |
| Hart Middle School | FM-200220591 02 2/23/07 Hart Girls Locker Room 1st Floor Univent was damaged by fire, motor and wiring needs to be replaced. | November 1, 2002 | February 23, 2007 | 1,575 days |
| Lafayette Elementary School | FM-200444288 04 2/23/07 Lafayette Boiler Room Furnish (1) handhole plate with dog and bolt to replace missing one on Boiler #2. See sample of item with request. HOT!!!! | February 20, 2004 | February 23, 2007 | 1,099 days |
| Patricia R Harris Ed Center | FM-200459344 04 2/23/07 HARRIS P. R. Main rooms 310 and 318 The doors will not lock because they have been damaged. | December 8, 2004 | February 23, 2007 | 807 days |
| Lafayette Elementary School | FM-200447941 04 2/23/07 Lafayette Boiler room Repair 3 of 10 Climacool modular chillers, units will not reset. | May 14, 2004 | February 23, 2007 | 1,015 days |
| Raymond Elementary School | FM-200633666 07 2/23/07 Rooftop unit won't light off. No heat. | January 4, 2007 | February 23, 2007 | 50 days |
| Green Elementary School | FM-200459143 04 2/23/07 Green First floor main entrance Repair lock on door. Door can not be opened from inside or outside. | December 3, 2004 | February 23, 2007 | 812 days |
| Lafayette Elementary School | FM-200618444 06 2/23/07 Lafayette PM Chiller Check equipment and perform PM on equipment. | February 8, 2006 | February 23, 2007 | 380 days |
| Browne Junior High School | FM-200459285 04 2/23/07 Browne Second floor room 213 Need a new lock for the door need to be re-keyed. | December 7, 2004 | February 23, 2007 | 808 days |
| Langdon Elementary School | FM-200700702 07 2/23/07 Secure Library Shelves To Wall | February 21, 2007 | February 23, 2007 | 2 days |
| Noyes Elementary School | FM-200628750 06 2/23/07 Rear of Building- Repair clogged drain; sewage and water are coming into the building. | September 5, 2006 | February 23, 2007 | 171 days |
| Browne Junior High School | FM-200700381 2/8/07 2/23/07 First floor, Room 133. Repair or replace lock, (2) keys have been broken off in this lock. Note: This classroom cannot be secured. | February 8, 2007 | February 23, 2007 | 15 days |
| Raymond Elementary School | FM-200633064 06 2/23/07 Cooling Tower Near Playground Has Burst, There's water leaking from it. | December 8, 2006 | February 23, 2007 | 77 days |
| Bunker Hill Elementary School | FM-200339554 /03 2/23/07 (Bunker-Hill) 1st Floor/Computer Lab: Replace lock on door. | October 27, 2003 | February 23, 2007 | 1,215 days |
| Ludlow-Taylor ES | FM-200460040 /04 2/23/07 LUDLOW-TAYLOR MAIN ENTRANCE DOOR DOOR-CLOSER BROKEN | December 27, 2004 | February 23, 2007 | 788 days |
| John Burroughs ES | FM-200449609 04 2/23/07 Burrough First floor classrooms Need rooms change to master key. | June 22, 2004 | February 23, 2007 | 976 days |
| John Burroughs ES | FM-200456026 04 2/23/07 Burroughs Throughout 7 breakers need lock on them. | September 29, 2004 | February 23, 2007 | 877 days |
| Burrville Elementary School | FM-200449117 04 2/23/07 Burrville Exterior Door knobs on the exterior of building needs replacing. (25) doors. Asbestos Code A - Clear for repairs on 06/10/04. Horne Engineering - Philp Connolly (RG 06/10/04) | June 9, 2004 | February 23, 2007 | 989 days |
| Truesdell Elementary | FM-200342190 04 2/23/07 Truesdell 1) Install handles on the exterior side of the double doors that enters the lobby between the original building and addition. Door handle must be compliant with ADA guidelines. Code A -claer for repair by DCPS Charles E Buchanan on 01/05/04 | January 2, 2004 | February 23, 2007 | 1,148 days |
| Burrville Elementary School | FM-200700243 07 2/23/07 First & Second Floor/Teacher's Prep Area - Install new locks on doors to secure personal items | February 5, 2007 | February 23, 2007 | 18 days |
| Noyes Elementary School | FM-200632725 /06 2/23/07 First Floor - Kitchen Mop Closet - R/R light fixtures, need light to pass inspection. | November 30, 2006 | February 23, 2007 | 85 days |
| Orr Elementary School | FM-200331934 03 2/23/07 ORR Boiler room Replace explosion door on boilers # 1&2. | June 17, 2003 | February 23, 2007 | 1,347 days |
| McKinley Technology High | FM-200700368 /07 2/23/07 Exterior Main Entrance Door. Repair or lock that has fallen out. Note:This door cannot be secured. | February 8, 2007 | February 23, 2007 | 15 days |
| Eaton Elementary School | FM-200443724 04 2/23/07 Eaton First floor main entrance front door R/R main front door, broken panic bar. (Door can not open) Asbestos Code A - Clear for repairs on 02/06/04. Horne Engineering - Bjarne Smith (RG 02/12/04) | February 5, 2004 | February 23, 2007 | 1,114 days |
| Takoma Educational Center | FM-200700584 2/16/07 2/23/07 In stairwell #4 steamline it an busted on out side of door | February 16, 2007 | February 23, 2007 | 7 days |
| Takoma Educational Center | FM-200700436 2/12/07 2/23/07 NEEDS LOCKS CHANGE CANNOT SECURE GYM EXTERIOR DOOR | February 12, 2007 | February 23, 2007 | 11 days |
| Takoma Educational Center | FM-200626494 06 2/23/07 TAKOMA boiler room Chiller failure due to possible dirty heat exchangers Clean heat exchangers | July 28, 2006 | February 23, 2007 | 210 days |
| Raymond Elementary School | FM-200631482 /06 2/23/07 Raymond Boiler Room Repair or replace boiler #1 off on flame failure. | October 29, 2006 | February 23, 2007 | 117 days |
| Takoma Educational Center | FM-200623739 06 2/23/07 Takoma Mechanical Room #7 Air handler unit #11 shaft collapsed inside of unit on pulley side. | June 2, 2006 | February 23, 2007 | 266 days |
| Takoma Educational Center | FM-200508090 05 2/23/07 Takoma 2nd Floor - AHU #10 Repair or replace air handler unit #10 on 2nd floor Shaft and bearing, shaft broken from unit. | July 20, 2005 | February 23, 2007 | 583 days |
| Takoma Educational Center | FM-200505830 05 2/23/07 Takoma Chiller Repair or replace control panel on chiller, chiller keep blowing fuses. | May 23, 2005 | February 23, 2007 | 641 days |
| Takoma Educational Center | FM-200504046 05 2/23/07 Takoma Boiler Room Inline circulating pump for PreKgn area. Pump is down at central amatuer for repair need pump back. | April 14, 2005 | February 23, 2007 | 680 days |
| Takoma Educational Center | FM-200503598 05 2/23/07 Takoma - Boiler Room 1. Repair and replace motor starter, motor starter overloads heater. Starter coils, filters outside air damper. | April 6, 2005 | February 23, 2007 | 688 days |
| Raymond Elementary School | FM-200632583 /06 2/23/07 Rooftop - A/C/Heating Unit for Cafeteria is not working. There is No Heat. | November 28, 2006 | February 23, 2007 | 87 days |
| Takoma Educational Center | FM-200456068 04 2/23/07 Tokoma Roftop A/C unit Repair A/C rooftop unit ,Bad phase monitor. | September 29, 2004 | February 23, 2007 | 877 days |
| Takoma Educational Center | FM-200339589 /03 2/23/07 Takoma Mechanical Room-(Blue Door) Repair or replace air handler unit. Bad motor bearing. Motor Information: Lincoln, Volts: 208/230/460 Amps 8.3/8.7/4.1 PH: 3, Frame 182 T, (AHU*19) Note: Bad Motor Bearings | October 28, 2003 | February 23, 2007 | 1,214 days |
| Takoma Educational Center | FM-200334882 03 2/23/07 Takoma MER#8 in Computer Lab Repair or replace burned out motor on AHU #9. Century motor Part #8-332578-01; HP 1.5; RPM 1725; AMPS 5.0/2.5; Frame M145T; Volts 230/460; Hertz 60; Phase 3; Type- SC; SF 1.15. | August 11, 2003 | February 23, 2007 | 1,292 days |
| Takoma Educational Center | FM-200334222 03 2/23/07 Takoma Mech.#11 Repair or replace burned out motor on AHU #12. No nomenclature on existing motor. | August 4, 2003 | February 23, 2007 | 1,299 days |
| Montgomery ES | FM-200629332 06 2/23/07 Montgomery Boiler Room Replace couplin to B&G circulating pump to domestic hot water heater. No hot water in building. | September 13, 2006 | February 23, 2007 | 163 days |
| Montgomery ES | FM-200622209 06 2/23/07 1st & 2nd Floors Replace all water coolers throughout building. Asbestos Code A - Clear for repairs on 05/08/06. Tidewater - Kenny Long (RG 05/17/06) SEE ASSESSMENTS | May 4, 2006 | February 23, 2007 | 295 days |
| Montgomery ES | FM-200618389 06 2/23/07 First and Second Floor - Replace broken and bowed exterior windows. | February 7, 2006 | February 23, 2007 | 381 days |
| Tyler Elementary School | FM-200700207 5/07 2/23/07 Kitchen/Storage Room - Clogged floor drain is backing up. | February 5, 2007 | February 23, 2007 | 18 days |
| Benjamin Banneker Academic HS | FM-200447214 04 2/23/07 Banneker First floor gymnasium Locksmith is needed to service several lock on doors. | April 27, 2004 | February 23, 2007 | 1,032 days |
| Shepherd ES | FM-200633280 /06 2/23/07 Replace rubber insert coupling on circulating pump. Woods TB Coupling #6 HVAC Shop | December 11, 2006 | February 23, 2007 | 74 days |
| Bancroft Elementary School | FM-200632974 7/06 2/23/07 Rooftop - Repair or replace pneumatic controls on AHU for science lab and library area. Please contact Engineer radio number # 1869. | December 7, 2006 | February 23, 2007 | 78 days |
| Shepherd ES | FM-200513365 05 2/23/07 Shepherd Boiler Room Boiler #2 Flame failure, reading auxiliary limit #3 | October 2, 2005 | February 23, 2007 | 509 days |
| Bancroft Elementary School | FM-200631886 06 2/23/07 First Floor - 303 Primary Wing - Replace A/C unit switch (shortage) | November 7, 2006 | February 23, 2007 | 108 days |
| Shepherd ES | FM-200504924 05 2/23/07 Shepherd New Wing of building Replace pneumatic valve on hot water system on new side of Building. | April 29, 2005 | February 23, 2007 | 665 days |
| Shepherd ES | FM-200501622 05 2/23/07 Shepherd Boiler Room Repair or replace heat controls in the boiler room and adjust same. | February 15, 2005 | February 23, 2007 | 738 days |
| Bancroft Elementary School | FM-200630759 /06 2/23/07 Boiler Room -Replace deteriorated insulation on tube sheet door. Boiler # 1. Per DCRA Boiler Inspector. | October 13, 2006 | February 23, 2007 | 133 days |
| Bancroft Elementary School | FM-200508064 05 2/23/07 Bancroft Mechanical Room, Open Space Repair or replace chiller. Will not start. Hot !!!! | July 19, 2005 | February 23, 2007 | 584 days |
| Reed LC | FM-200700295 07 2/23/07 Annex/Lower Level - Nurse Office/Medical Rooms - Water backing up from sinks and flooding the offices | February 6, 2007 | February 23, 2007 | 17 days |
| Seaton Elementary School | FM-200632653 /06 2/23/07 First Floor - Library - Restore electrical service to ( 3 ) each ceiling heating and cooling units. | November 29, 2006 | February 23, 2007 | 86 days |
| Ferebee-Hope Elementary School | FM-200205616 02 2/26/07 Ferebee-Hope Basement under swimming pool Replace pneumatic control valve that regulates pool water temperature. | April 9, 2002 | February 26, 2007 | 1,784 days |
| Park View ES | FM-200632979 06 2/26/07 Lower Level - Boiler Room - Repair condensate return line. 4 inch line leaking by condensate tank. | December 7, 2006 | February 26, 2007 | 81 days |
| Park View ES | FM-200629438 06 2/26/07 Boiler Room - Remove check valve caps in rear of boilers 3,4 and 5. Engineering staff unable to remove. (needed for DICRA Inspection) . | September 14, 2006 | February 26, 2007 | 165 days |
| Orr Elementary School | FM-200618218 06 2/26/07 Inspection or preventive maintenance on playground equipment. | February 2, 2006 | February 26, 2007 | 389 days |
| Nalle Elementary School | FM-200512140 05 2/26/07 Nalle Boiler Room 1.Boiler #1 Replace or repair automatic water reset. 2.Boiler #2 Keep shutting off on alarm | September 9, 2005 | February 26, 2007 | 535 days |
| Nalle Elementary School | FM-200510002 05 2/26/07 Nalle Boiler room Calibrate burner # 1 and 2 needed to pass annual boiler inspection, per boiler inspector. | August 10, 2005 | February 26, 2007 | 565 days |
| Nalle Elementary School | FM-200340267 /03 2/26/07 Nalle J.C. Boiler room / tunnel repair or condensate pumps and or controls in the tunnel ,unit will not pump returns back to the boiler room.Boilers constantley cuts on low must be monitored. | November 14, 2003 | February 26, 2007 | 1,200 days |
| Nalle Elementary School | FM-200339623 /03 2/26/07 Nalle J.C. Boiler room Check condensate pump float control for , pumps will not keep correct amount returns in the boilers . | October 29, 2003 | February 26, 2007 | 1,216 days |
| Nalle Elementary School | FM-200339318 /03 2/26/07 Nalle J.C. Boiler room 1) Replace gas regulator valve on the # 2 boiler . | October 23, 2003 | February 26, 2007 | 1,222 days |
| Nalle Elementary School | FM-200226726 03 2/26/07 Nalle Boiler Room Power outage in area, check Boiler #2, program box ringing when boiler off. Try to restart, will not start, keep ringing. (Off in box) | March 7, 2003 | February 26, 2007 | 1,452 days |
| Reed LC | FM-200633981 07 2/26/07 Boiler room Asbestos assessment Required Repair or replace leaking return line (20' FT.) twenty feet in ceiling for boiler #2 unable to determine pipe size and location of leak because of insolation. Asbestos Code A - Clear for repairs on 01/17/07. Tidewater - Roger Small (RG 01/19/07) | January 15, 2007 | February 26, 2007 | 42 days |
| Reed LC | FM-200625524 06 2/26/07 Reed Boiler Room Boiler #1 replace leaking tubes. Boiler was off line from last tear. | July 11, 2006 | February 26, 2007 | 230 days |
| Reed LC | FM-200516972 /05 2/26/07 Survey and repair three flourescent lights in Mrs. Wilson Classroom on the second floor (no power) | December 28, 2005 | February 26, 2007 | 425 days |
| Murch Elementary School | FM-200700190 07 2/26/07 Second Floor - Boy's Bathroom - Urinals backing up & and leaking into health suite. | February 2, 2007 | February 26, 2007 | 24 days |
| Murch Elementary School | FM-200631541 /06 2/26/07 Rooms 207 and 104 - Install window shacker type a/c units. Classroom existing units are not working. 240 volts 18000 btu - new units are located on work site. | October 31, 2006 | February 26, 2007 | 118 days |
| Murch Elementary School | FM-200631538 /06 2/26/07 Boiler Room - Replace condensate returm pump for boiler # 4,2, and 1. Wires burnt out inoperatable. A.O. Smith 1/2 hp, 60/50 hert, 208/ 460 volts, type SC. Note: As of 01/03/07 all pumps (5) are down and was verified. | October 31, 2006 | February 26, 2007 | 118 days |
| Murch Elementary School | FM-200624939 06 2/26/07 Murch A/C Unit Repair or replace motor: HKZ5RC012; T34-110-000;0004 27; Max. Range; 15 A 125 Vac 1/2 HP 125/250 Vac 10 A 250 VA (#A) Pilot 480 #A 125 V / 250 Vac | June 28, 2006 | February 26, 2007 | 243 days |
| Murch Elementary School | FM-200619119 06 2/26/07 Second Floor-Boys Restroom Urgnet Unclog Two Urinals | February 27, 2006 | February 26, 2007 | 364 days |
| Murch Elementary School | FM-200617589 06 2/26/07 Second Floor-Boys Restroom Urgnet Unclog Urinal | January 19, 2006 | February 26, 2007 | 403 days |
| Murch Elementary School | FM-200504608 05 2/26/07 ( MURCH ) Second Floor - Room 208 1) Replace circit breakers for air conditoners. | April 22, 2005 | February 26, 2007 | 675 days |
| Murch Elementary School | FM-200460067 /04 2/26/07 Murch Boiler Room Repair or replace leaking condensate pumps for Boilers #1 and #2 | December 28, 2004 | February 26, 2007 | 790 days |
| Murch Elementary School | FM-200443398 04 2/26/07 Murch 1ST Trailer/Outside Classroom Replace (2) electric heater. Volts 208/240 Watt 3000/4000 HZ 50/60 Heaters will not come on. | January 30, 2004 | February 26, 2007 | 1,123 days |
| Miner Elementary | FM-200700026 07 2/26/07 Room 220 - Replace rusted out flange on chill water line - Room 206 Repair leak in chill water return line. | January 29, 2007 | February 26, 2007 | 28 days |
| Miner Elementary | FM-200700025 07 2/26/07 Boiler room - Replace air vent which is leaking water over boiler # 1 (relief tank) | January 29, 2007 | February 26, 2007 | 28 days |
| Horace Mann Elementary School | FM-200508592 05 2/26/07 Mann Boiler room Repair Sump pump | July 25, 2005 | February 26, 2007 | 581 days |
| Horace Mann Elementary School | FM-200500856 05 2/26/07 Mann Boiler Room Pumps in Boiler Room are down, causing custodian office to flood. | January 26, 2005 | February 26, 2007 | 761 days |
| Ludlow-Taylor ES | FM-200700400 07 2/26/07 Exterior Entrance - Repair or replace rupture hot water pipe in ceiling of over hang . | February 9, 2007 | February 26, 2007 | 17 days |
| Leckie Elementary School | FM-200617411 06 2/26/07 Leckie Throughout Building Redirect condensate 6" away from building coming off the following univents during the summer to prevent condensate back ups. Rooms #214,215,216,217,219,220,221,2nd floor teacher lounge, 300,310,311,312,313,309B,309A, 308,313,118,119,120,121,127,128, main office,health suite, conference room, assit principal office, 200,209,210,211B, 212,211A, 213,314,306,314,315 ,317,318,319,21,20,14,10 | January 13, 2006 | February 26, 2007 | 409 days |
| Kelly Miller MS | FM-200516855 /05 2/26/07 Miller Boiler room Install feed water lines and valves to each boiler , so that boilers can be feed independently and hydrostatic test can be preformed on boilers. | December 22, 2005 | February 26, 2007 | 431 days |
| Key Elementary School | FM-200628045 06 2/26/07 Key Auditorium Repair or replace cooling unit in auditorium not cooling. | August 22, 2006 | February 26, 2007 | 188 days |
| Key Elementary School | FM-200619336 06 2/26/07 Repair or replace starter motor to transformer for #1 heating circulating pump. | March 1, 2006 | February 26, 2007 | 362 days |
| Key Elementary School | FM-200617718 06 2/26/07 Key Boiler Room Repair or replace house pump for Boiler #2. | January 23, 2006 | February 26, 2007 | 399 days |
| Key Elementary School | FM-200515648 /05 2/26/07 Key Boiler Room #4 HV/AC pump will not come on, bad fuses. Are elec. problem. need repair or replace. HV/AC pump for Heating #4 | November 21, 2005 | February 26, 2007 | 462 days |
| Key Elementary School | FM-200514841 /05 2/26/07 Attic Area - Repair main AHV in attic. Roving Unit - 698-1750 | October 31, 2005 | February 26, 2007 | 483 days |
| Key Elementary School | FM-200513491 05 2/26/07 Key Unit outside on the Parking Lot Repair or replace Tane Chiller compressor #2 will not start. Model# RTAA1404YU)!B#DOD; Serial #VOIG04 997;Volts 460 Voltage #460/60/3 Pressure #300 Low Bad Compressor Pressure #300 Low Refrigerant #22 All year system for cooling 55 Degree are above. | October 5, 2005 | February 26, 2007 | 509 days |
| Key Elementary School | FM-200503522 05 2/26/07 Key Boiler Room Check sump pump #2 in boiler room. Not working proper. | April 4, 2005 | February 26, 2007 | 693 days |
| Key Elementary School | FM-200449336 04 2/26/07 Key Chiller Room Check chiller, will not start. Check to see if chiller is still under contract. | June 15, 2004 | February 26, 2007 | 986 days |
| Ketcham Elementary School | FM-200700657 07 2/26/07 Cafeteria - Electrical panel off wall, wires are exposed. | February 21, 2007 | February 26, 2007 | 5 days |
| Kenilworth ES | FM-200624803 06 2/26/07 Roof leak in 1st floor hallway causing flooding from cafeteria to the auditorium. | June 26, 2006 | February 26, 2007 | 245 days |
| Johnson JHS | FM-200700274 2/6/07 2/26/07 Library - Repair rupture fan coil. | February 6, 2007 | February 26, 2007 | 20 days |
| Jefferson JHS | FM-200700704 /07 2/26/07 No power throught out the building (Reply Mr. Hudson) | February 21, 2007 | February 26, 2007 | 5 days |
| Jefferson JHS | FM-200700374 /07 2/26/07 Second floor, Room 204. Need electrician to repair broken outlet thats shooting sparks. | February 8, 2007 | February 26, 2007 | 18 days |
| Janney Elementary School | FM-200515346 /05 2/26/07 Janney Boiler Room Repair or replace submergable pump exiting pump is inoperatable. "Pit is felling fast" Emergency !!!!! | November 10, 2005 | February 26, 2007 | 473 days |
| Hyde Elementary School | FM-200624967 06 2/26/07 Roof/Unclog Roof Drain And Make Repairs To The Skylight, The Water Leaks Are Causing Damage To The Ceiling. | June 28, 2006 | February 26, 2007 | 243 days |
| Rudolph Elementary School | FM-200700376 07 2/26/07 Classroom #3. Repair or replace busted coil in univent, Leak can't be isolated. Note: This is the only unit in this area. | February 8, 2007 | February 26, 2007 | 18 days |
| Rudolph Elementary School | FM-200700775 07 2/26/07 Restore power in music room asap! | February 22, 2007 | February 26, 2007 | 4 days |
| Woodson High School | FM-200700569 07 2/26/07 1st & 7th Floor - Repair wiring for outlets to water coolers | February 16, 2007 | February 26, 2007 | 10 days |
| Winston EC | FM-200628714 06 2/26/07 Third floor, Gymnasium. Roof is leaking in the center of the gymnasium. Asbestos Code B on 11/02/06. Tidewater - Kenny Belton (RG 11/16/06) | September 1, 2006 | February 26, 2007 | 178 days |
| Savoy Elementary School | FM-200506312 05 2/26/07 Savoy Chiller Repair or replace chiller, chiller in lockout. | June 3, 2005 | February 26, 2007 | 633 days |
| Woodson High School | FM-200626930 06 2/26/07 Boiler Room - Repair refractory around burner. As per Boiler Inspector ( DCRA ). | August 7, 2006 | February 26, 2007 | 203 days |
| School WW High School | FM-200700574 4 2/16/07 2/26/07 Basement - Boy's Bathroom - Sky light fell in and shattered every where. need to be replaced to prevent a break in | February 16, 2007 | February 26, 2007 | 10 days |
| Anacostia Senior High School | FM-200511536 05 2/26/07 Anacostia Boiler Room Boiler #1 will not start, No gas to boiler. Boiler out on lock out and flame failure. | August 27, 2005 | February 26, 2007 | 548 days |
| Woodson High School | FM-200631820 06 2/26/07 Woodson , H.D. Boiler room Repair or replace domestic hot water circulating pump located at the rear of hot water storage tank. Pump may be shorted out from the flood. | November 6, 2006 | February 26, 2007 | 112 days |
| Shaw JHS | FM-200631145 23/06 2/26/07 Shaw Summer School Office Flush return line 3/4" in room #148 in Summer School Office. | October 23, 2006 | February 26, 2007 | 126 days |
| Simon Elementary School | FM-200633838 07 2/26/07 Boiler Room - Boiler # 1 and 2 Repair corrode manhole ring. | January 8, 2007 | February 26, 2007 | 49 days |
| Hine JHS | FM-200513353 05 2/26/07 Hine Boiler Room Boiler #3 Replace leaking gas valve | October 1, 2005 | February 26, 2007 | 513 days |
| Hine JHS | FM-200513326 05 2/26/07 Hine Boiler room Calibrate burner # 1 ( Boiler Inspector' s request) | October 1, 2005 | February 26, 2007 | 513 days |
| Hine JHS | FM-200513323 05 2/26/07 Hine Boiler room Repair Burner # 2 , cuts off on pilot ignition | October 1, 2005 | February 26, 2007 | 513 days |
| Hine JHS | FM-200506354 05 2/26/07 Hine Chiller Chiller cuts off on chiller 63 degrees. Chiller cuts off on motor current. | June 6, 2005 | February 26, 2007 | 630 days |
| Hine JHS | FM-200503504 05 2/26/07 Hines Rooms 303, 304, 307, 308, 309, 402, 403, 407, 409, Furnish (31) pieces of metal stripping 72" X 1" to secure louvers on the top of univents. | April 4, 2005 | February 26, 2007 | 693 days |
| Hine JHS | FM-200500641 05 2/26/07 Hine Boiler Room Repair or replace hot water circuilating pump leaking in boiler room that feeds to building. Asbestos Code A - Clear for repairs on 10/24/05. Tidewater - Kenny Long(RG 10/25/05) | January 19, 2005 | February 26, 2007 | 768 days |
| Hine JHS | FM-200500551 05 2/26/07 Hine Boiler Room Repair #3 Boiler cut off on flame failure. | January 18, 2005 | February 26, 2007 | 769 days |
| Hine JHS | FM-200459881 /04 2/26/07 Hine Repair or replace univent due to no heat. Rooms 106, 103, 105, 207, 205, 203, 200, 307, 304, 309, 404, 402, 410, 405, 409, 401, 403, B-wing gym room 233X and 224X. | December 20, 2004 | February 26, 2007 | 798 days |
| Woodson High School | FM-200633541 /06 2/26/07 Second Floor - Room 204 - Repair leaking water lines to univent coil. Asbestos Code A - Clear for repairs on 12/27/06. Tidewater - Aaron Gholson (RG 01/05/07) | December 27, 2006 | February 26, 2007 | 61 days |
| Hine JHS | FM-200458979 04 2/26/07 Hine Burner calibration. | December 2, 2004 | February 26, 2007 | 816 days |
| Hine JHS | FM-200454800 04 2/26/07 Hine Boiler Room Boiler #1, #2 & #3 Calibrate burners | September 15, 2004 | February 26, 2007 | 894 days |
| Hine JHS | FM-200454799 04 2/26/07 Hine Boiler Room Boiler #1 & #3 Replace defective transformer | September 15, 2004 | February 26, 2007 | 894 days |
| Hine JHS | FM-200450606 04 2/26/07 Hine Boiler Room Repair or replace two (2) electric shut off valves. Note: Letting chill water over to Boilers #2 causing condensate build up in tubes. | July 22, 2004 | February 26, 2007 | 949 days |
| Hine JHS | FM-200445904 04 2/26/07 Hine Room #403 Repair or replace univent blower shaft end cut off. | March 26, 2004 | February 26, 2007 | 1,067 days |
| Woodson High School | FM-200634188 07 2/26/07 Room 305 Repair or replace Ruptured hot watre heating supplt line in room 305. | January 23, 2007 | February 26, 2007 | 34 days |
| Hine JHS | FM-200443341 04 2/26/07 Hine Boiler Room Boiler #3 Won't fire off,replace transformer ignition. Has 1 out of 3 Boilers Emergency !!!! | January 29, 2004 | February 26, 2007 | 1,124 days |
| Hine JHS | FM-200331757 03 2/26/07 Hine Boiler Room Replace fuses to cooling tower, Fuse size: TRS-20R. | June 13, 2003 | February 26, 2007 | 1,354 days |
| Hart Middle School | FM-200630243 06 2/26/07 HART boiler room Boiler # 3 repipe pressure relief valve. Was disassembled for hydro-test. | September 28, 2006 | February 26, 2007 | 151 days |
| Woodson High School | FM-200634196 07 2/26/07 Fourth floor, Room 404. Repair or replace ruptured steamline to univent, this leak is causing this classroom to flood. Asbestos Code A - Clear for repairs on 01/23/07. Tidewater - Roger Small (RG 01/22/07) | January 23, 2007 | February 26, 2007 | 34 days |
| Woodson High School | FM-200634291 07 2/26/07 Basement - Cafeteria Managers Office - Fan coil is leaking. | January 24, 2007 | February 26, 2007 | 33 days |
| Green Elementary School | FM-200631931 06 2/26/07 First Floor - Hallway Doors Leading To Lobby - Repair or replace, doors are hard to close | November 7, 2006 | February 26, 2007 | 111 days |
| Gibbs Elementary School | FM-200700513 07 2/26/07 Boiler room- Trouble shoot boilers # 1 and 2 will not reset. | February 13, 2007 | February 26, 2007 | 13 days |
| Gibbs Elementary School | FM-200629681 06 2/26/07 2nd Floor- Library Repair leaking ceiling. Asbestos Code C on 09/21/06 Tidewater - Roger Small (RG 10/11/06) | September 19, 2006 | February 26, 2007 | 160 days |
| Gibbs Elementary School | FM-200625389 06 2/26/07 2nd Floor- Library The ceiling is leaking and being damaged from condensation. | July 6, 2006 | February 26, 2007 | 235 days |
| Garrison ES | FM-200700536 07 2/26/07 On the 1st floor water fountain by the main office cannot shut off, shut off valve in not reachable. the 1st floor is flooding | February 15, 2007 | February 26, 2007 | 11 days |
| Garrison ES | FM-200700238 07 2/26/07 Exterior of Building - Remove trees/bushes beside steps west of building. | February 5, 2007 | February 26, 2007 | 21 days |
| Garnet-Patterson MS | FM-200516883 /05 2/26/07 Second Floor Outside Rm. 216: Two lights are out, fixtures are broken. | December 22, 2005 | February 26, 2007 | 431 days |
| Garnet-Patterson MS | FM-200504332 05 2/26/07 ( GARNET-PATTERSON ) Lunch Room 1) The Air conditioners are not recieving electrical power. | April 20, 2005 | February 26, 2007 | 677 days |
| Aiton Elementary School | FM-200624823 06 2/26/07 Aiton Boiler room Replace draft door on the breaching in the boiler room. | June 27, 2006 | February 26, 2007 | 244 days |
| Francis Junior High School | FM-200700602 02 1/23/07 2/26/07 Francis-Gymnasium- Repair or replace radiator with cracked section. Unit has been isolated. Send Steam Fitter to made repair. | January 23, 2007 | February 26, 2007 | 34 days |
| Francis Junior High School | FM-200700199 99 2/3/07 2/26/07 KITCHEN - Repair rupture heating coil in kitchen for heat | February 3, 2007 | February 26, 2007 | 23 days |
| Francis Junior High School | FM-200622958 06 2/26/07 1st Floor- Kitchen Replace/clean cover on grease trap (2 inches). | May 18, 2006 | February 26, 2007 | 284 days |
| Ferebee-Hope Elementary School | FM-200630657 10/11/06 2/26/07 FEREBEE-HOPE boiler room Perform hydro on boilers 2 and 3 per boiler inspection. | October 11, 2006 | February 26, 2007 | 138 days |
| Ferebee-Hope Elementary School | FM-200513109 05 2/26/07 Ferebee-Hope Boiler Room Boiler $3 Replace (1) one automatic water feeder. | September 25, 2005 | February 26, 2007 | 519 days |
| Ferebee-Hope Elementary School | FM-200513104 05 2/26/07 Ferebee-Hope Boiler Room Boiler $3 Replace gas air press switch range 3 to 21. | September 25, 2005 | February 26, 2007 | 519 days |
| Ferebee-Hope Elementary School | FM-200512175 05 2/26/07 Ferebee-Hope Boiler Room Repair chiller #1, will not run, goes off on over load. | September 9, 2005 | February 26, 2007 | 535 days |
| Ferebee-Hope Elementary School | FM-200512174 05 2/26/07 Ferebee-Hope Boiler Room Repair chiller #2, will not cool after oil spill. | September 9, 2005 | February 26, 2007 | 535 days |
| Ferebee-Hope Elementary School | FM-200510496 05 2/26/07 FEREBEE-HOPE Calibrate burners to boilers # 1, 2, and 3 Needed to pass inspection per boiler inspector | August 16, 2005 | February 26, 2007 | 559 days |
| Ferebee-Hope Elementary School | FM-200509438 05 2/26/07 Ferebee-Hope Boiler Room Boilers failed inspection Internal Boiler Cleaning and chemical clean boiler #1,#2 and #3 in order to pass DC Inspection Per Boiler Inspector | August 3, 2005 | February 26, 2007 | 572 days |
| Ferebee-Hope Elementary School | FM-200507632 05 2/26/07 Ferebee-Hope Boiler room Replace blower motor on # 2 boiler | July 11, 2005 | February 26, 2007 | 595 days |
| Ferebee-Hope Elementary School | FM-200505240 05 2/26/07 Ferebee-Hope Boiler Room Boiler #1 replace actulator valve on gas line. | May 9, 2005 | February 26, 2007 | 658 days |
| Woodson High School | FM-200700012 07 2/26/07 Cafeteria manager's office , ground floor Repair or replace leaking 3/8" copper supply line on small univent in manager's office, laek is causing a unsafe and slipping surroundings. | January 29, 2007 | February 26, 2007 | 28 days |
| Ferebee-Hope Elementary School | FM-200504579 05 2/26/07 Ferebee-Hope Assembly Hall Replace burnt motor on air handler unit-C3, motor size HP3, V 460, HZ 60, RPM 1750, Frame #182T. | April 22, 2005 | February 26, 2007 | 675 days |
| Ferebee-Hope Elementary School | FM-200504173 05 2/26/07 Ferbee-Hope Cooling tower Replace 1 -1/2" solenoid valve (copper line) on the city water makeup line valve will not open and there is no by pass | April 18, 2005 | February 26, 2007 | 679 days |
| Ferebee-Hope Elementary School | FM-200504069 05 2/26/07 Ferebee-Hope B. Building AHU-B5 Mechanical Room Repair return fan motor on air handler unit B5 | April 14, 2005 | February 26, 2007 | 683 days |
| Stuart-Hobson Middle School | FM-200700317 07 2/26/07 Second Floor - Room 201(computer lab) - No power from outlets | February 7, 2007 | February 26, 2007 | 19 days |
| Ferebee-Hope Elementary School | FM-200504068 05 2/26/07 Ferebee-Hope B. Building AHU-B4 Mechanical Room Repair supply fan motor, unit will not operate. | April 14, 2005 | February 26, 2007 | 683 days |
| Ferebee-Hope Elementary School | FM-200504066 05 2/26/07 Ferebee-Hope D. Building/Return Fan Mechanical Room Repair return fan #2 on air handler unit -D2, fan will not work. | April 14, 2005 | February 26, 2007 | 683 days |
| Ferebee-Hope Elementary School | FM-200504064 05 2/26/07 Ferebee-Hope D. Building/D1-Exhaust Mechanical Room Repair exhaust fan for air handler unit D1, fan in inoperable. | April 14, 2005 | February 26, 2007 | 683 days |
| Ferebee-Hope Elementary School | FM-200502171 05 2/26/07 Ferebee-Hope Perform PM to Chiller and all equipment. | March 2, 2005 | February 26, 2007 | 726 days |
| Woodson High School | FM-200700146 07 2/26/07 Second floor, Room 204. Repair ruptured univent pipe. | February 1, 2007 | February 26, 2007 | 25 days |
| Montgomery ES | FM-200628782 06 2/26/07 Repair leaking roof. Asbestos Code A - Clear for repairs on 09/06/06. Tidewater - Carlos Vera (RG 09/07/06) | September 5, 2006 | February 26, 2007 | 174 days |
| Montgomery ES | FM-200630639 /06 2/26/07 S. MONTGOMERY boiler room Remove 2" plugs from boiler # 1 and 2, plugs need to be heated to remove. | October 10, 2006 | February 26, 2007 | 139 days |
| Montgomery ES | FM-200634145 07 2/26/07 First Floor - Library - Repair pneumatic controls in AHU. | January 22, 2007 | February 26, 2007 | 35 days |
| Montgomery ES | FM-200700435 07 2/26/07 Needs bulk trash removed from around dumpster | February 12, 2007 | February 26, 2007 | 14 days |
| Montgomery ES | FM-200700652 07 2/26/07 Scott Montgomery-Room #119-Repair or replace univent. Possible bad trap-Send Steam Fitter to repair. Only unit in area.. | January 25, 2007 | February 26, 2007 | 32 days |
| Ferebee-Hope Elementary School | FM-200500493 05 2/26/07 Ferbee-Hope Boiler room Repair # 2 boiler it will not start. | January 15, 2005 | February 26, 2007 | 772 days |
| Takoma Educational Center | FM-200633855 1/9/07 2/26/07 Kitchen - Replace faucet on sink | January 9, 2007 | February 26, 2007 | 48 days |
| Ferebee-Hope Elementary School | FM-200459714 /04 2/26/07 Ferebee- Hope D. Building, Mech. Room AHU.#B1 Repair or replace air handler unit #B1 in D. Building. Unit will not start, unable to heat Recreation Room. | December 16, 2004 | February 26, 2007 | 802 days |
| Woodson High School | FM-200700148 07 2/26/07 Plaza Area, Main Office. Repair ruptured line in univent. | February 1, 2007 | February 26, 2007 | 25 days |
| Woodson High School | FM-200700151 07 2/26/07 Sixth floor, Asst. Principal's Office. Repair ruptured line in univent from seventh floor. | February 1, 2007 | February 26, 2007 | 25 days |
| Woodson High School | FM-200700153 07 2/26/07 Ground floor, Kitchen Mechanical Room. Repair ruptured steam coil on AHU. | February 1, 2007 | February 26, 2007 | 25 days |
| Ferebee-Hope Elementary School | FM-200457756 04 2/26/07 (Ferebee-Hope) Boiler Room !!!EMERGENCY!!! Repair or replace sump pumps | November 1, 2004 | February 26, 2007 | 847 days |
| Ferebee-Hope Elementary School | FM-200456406 04 2/26/07 Ferebee-Hope AHU For Pool Replace exhaust fan belt for dehumitifier for bathroom exhaust fans. | September 27, 2004 | February 26, 2007 | 882 days |
| Ferebee-Hope Elementary School | FM-200452700 04 2/26/07 Ferebee-Hope Swimming Pool Repair or replace motor starter for swimming pool. | August 16, 2004 | February 26, 2007 | 924 days |
| Ferebee-Hope Elementary School | FM-200450094 04 2/26/07 Ferebee-Hope Engineer's Office Replace fan motor in ceiling univent motor inoperable. | July 9, 2004 | February 26, 2007 | 962 days |
| Ferebee-Hope Elementary School | FM-200446642 04 2/26/07 Ferbee-Hope Boiler room Furnish the following motor : Marathon Burner Motor: Part# 894-1302, Model# RN145TTDR93D3AE Frame: 145TCZ PH.3 Type TDR RPM 3450 Hz 60 HP 5 Volts 208/220/440 Amps 13.6- 13.4/6.7 (1) set Long Arm L shaped Hex Keys 12" ( 3A595) | April 13, 2004 | February 26, 2007 | 1,049 days |
| Ferebee-Hope Elementary School | FM-200446188 04 2/26/07 Ferbee-Hope Boiler room Replace bad solenoid gas dump valve on the gas trane of boilers # 1 and # 2 | April 1, 2004 | February 26, 2007 | 1,061 days |
| Ferebee-Hope Elementary School | FM-200444884 04 2/26/07 Ferbee-Hope Boiler room Replace or repair Condensate Pump # 2 ,pump will not run. Frame: 256T Make: US. Electric Motor HP 20 Type A V230/460 amps 48.8/24.4 RPM 1750 | March 5, 2004 | February 26, 2007 | 1,088 days |
| Ferebee-Hope Elementary School | FM-200444853 04 2/26/07 Ferbee-Hope Boiler room Repair or replace 2 vacuum reture pumps on the condensate return tank , and adjust the float. | March 5, 2004 | February 26, 2007 | 1,088 days |
| Ferebee-Hope Elementary School | FM-200342104 /03 2/26/07 Ferebee-Hope Boiler Room Boiler #1,#2 & #3 tune up burners, burners #1,#2 & #3 | December 29, 2003 | February 26, 2007 | 1,155 days |
| Ferebee-Hope Elementary School | FM-200340063 03 2/26/07 Ferebee - Hope Boiler Room Replace low pressure gas valve on Boiler #3. | November 7, 2003 | February 26, 2007 | 1,207 days |
| Ferebee-Hope Elementary School | FM-200340061 03 2/26/07 Ferebee - Hope Boiler Room Mech. Maint. Shop: Replace modulater control on Boilers #1, #2 and #3. | November 7, 2003 | February 26, 2007 | 1,207 days |
| Ferebee-Hope Elementary School | FM-200340060 03 2/26/07 Ferebee - Hope Boiler Room Mech. Maint. Shop: Replace cam on Burners #1,#2 and #3. | November 7, 2003 | February 26, 2007 | 1,207 days |
| Ferebee-Hope Elementary School | FM-200339189 /03 2/26/07 Ferebee-Hope Boiler Room Boiler #1 and #2 will not go into high fire water feeder is bad. | October 21, 2003 | February 26, 2007 | 1,224 days |
| Ferebee-Hope Elementary School | FM-200339136 /03 2/26/07 Ferebee - Hope Boiler Room Replace water feeder on Boiler #2 | October 20, 2003 | February 26, 2007 | 1,225 days |
| Ferebee-Hope Elementary School | FM-200335037 03 2/26/07 Ferebee-Hope Boiler Room Check chiller, chiller keeps going off on high temperature. Also check air compressor. | August 13, 2003 | February 26, 2007 | 1,293 days |
| Ferebee-Hope Elementary School | FM-200332257 03 2/26/07 Ferebee-Hope Boiler Room Basement Replace solenoid valve on condensate return tank | June 20, 2003 | February 26, 2007 | 1,347 days |
| Ferebee-Hope Elementary School | FM-200224456 03 2/26/07 Ferebee-Hope Teacher's Supply Room Repair/Replace ceiling univent motor, not heating area ceiling is 9'' high. | January 23, 2003 | February 26, 2007 | 1,495 days |
| Ferebee-Hope Elementary School | FM-200223991 03 2/26/07 Ferbee-Hope Boiler room Repair # 2 boiler ,it cut off on flame failure. | January 15, 2003 | February 26, 2007 | 1,503 days |
| Ferebee-Hope Elementary School | FM-200209078 02 2/26/07 Ferebee-Hope Pool Room Furnish (1) motor for pump in pool room, motor is burnt up. | June 6, 2002 | February 26, 2007 | 1,726 days |
| Ferebee-Hope Elementary School | FM-200205878 02 2/26/07 Ferebee-Hope Under pool - pump room Repair or replace condensate return pumps and controls. | April 16, 2002 | February 26, 2007 | 1,777 days |
| Ferebee-Hope Elementary School | FM-200205613 02 2/26/07 Ferebee-Hope Basement under swimming pool Replace float switch on condensate receiver tank. | April 9, 2002 | February 26, 2007 | 1,784 days |
| Eliot Junior High School | FM-200634346 25/07 2/26/07 Boiler Room Repair or replace return line for condensate reciever tank line is ruptured. | January 25, 2007 | February 26, 2007 | 32 days |
| Eaton Elementary School | FM-200630205 06 2/26/07 Second Floor/#221 & 219 Boy's & Girl's Restroom - R/R partition that fell off the wall Asbestos Code A - Clear for repairs on 09/29/06. Tidewater - Carlos Vera( RG 10/02/06) | September 28, 2006 | February 26, 2007 | 151 days |
| Eaton Elementary School | FM-200629636 06 2/26/07 1st Floor- Room 106 Boys Restroom Repair/replace partition. It fell off of the wall. Asbestos Code A - Clear For Repairs On 09/21/06. Tidewater - Thomas Johnson ( RG 09/25/06) | September 18, 2006 | February 26, 2007 | 161 days |
| Eaton Elementary School | FM-200619407 06 2/26/07 Eaton Boiler Room Boiler #1 need Burner calibration | March 3, 2006 | February 26, 2007 | 360 days |
| Eaton Elementary School | FM-200618443 06 2/26/07 Eaton PM Chiller Check equipment and perform PM on equipment. | February 8, 2006 | February 26, 2007 | 383 days |
| Truesdell Elementary | FM-200515073 05 2/26/07 Rm 315 Repair broken window Asbestos Code A - Clear for repairs on 11/08/05. Tidewater - Rodney Distance (RG 11/09/05) | November 3, 2005 | February 26, 2007 | 480 days |
| Eastern High School | FM-200700163 07 2/26/07 Repari steam drum door arm | February 1, 2007 | February 26, 2007 | 25 days |
| Truesdell Elementary | FM-200700082 07 2/26/07 Asbestos Assessment Required Boiler Room - R/R ruptured steam line, 6 or 8 in. flang on flang gasket on main steam line. (building has no heat) Asbestos Code A - Clear for repairs on 01/30/07. Tidewater - Meneka Rodrigo (RG 03/07/07) | January 30, 2007 | February 26, 2007 | 27 days |
| Eastern High School | FM-200700044 07 2/26/07 Boiler Room - Repair manhole. | January 29, 2007 | February 26, 2007 | 28 days |
| Tubman Elementary School | FM-200501012 05 2/26/07 Tubman Multi purpose room Replace one window pane / broken. Replace window locks on 2 windows. Code A-clear for repair by DCPS Charles Buchanan on 2/03/05 | January 31, 2005 | February 26, 2007 | 756 days |
| Tubman Elementary School | FM-200514087 /05 2/26/07 Tubman Third - South West Corridor Hallway 1) Replace window over looking roof. Asbestos Code A - Clear for repairs on 10/31/05. Tidewater - Rodney Distance (RG 11/22/05) | October 21, 2005 | February 26, 2007 | 493 days |
| Tubman Elementary School | FM-200621443 06 2/26/07 First Floor-Stairwell South East Side Of Bldg.-Replace Exit Door Wire Glass, It's Shattered. | April 18, 2006 | February 26, 2007 | 314 days |
| Dunbar High School | FM-200700174 /07 2/26/07 Cafeteria/Kitchen - Sink Clogged and backing up | February 2, 2007 | February 26, 2007 | 24 days |
| Drew Elementary School | FM-200618425 06 2/26/07 Drew Boiler room Repair circulating pump # 1 | February 8, 2006 | February 26, 2007 | 383 days |
| Tyler Elementary School | FM-200628763 06 2/26/07 Repair leaking roof in the following locations: New Wing- 141, 125, 137, 136, 122 Asbestos Code A - Clear for repairs on 09/07/06. Tidewater - Kenny Long (RG 09/08/06) SEE ASSESSMENTS | September 5, 2006 | February 26, 2007 | 174 days |
| Davis Elementary School | FM-200513345 05 2/26/07 Davis Boiler Room Boiler #2 Flame failure | October 1, 2005 | February 26, 2007 | 513 days |
| Tyler Elementary School | FM-200632396 21/06 2/26/07 Repair or replace leaking hot water heating valve in the ceiling in front of # 1 boiler. | November 21, 2006 | February 26, 2007 | 97 days |
| Tyler Elementary School | FM-200633320 15/06 2/26/07 First floor, Room 141. Install glass in newly installed door. | December 15, 2006 | February 26, 2007 | 73 days |
| Woodson High School | FM-200700154 07 2/26/07 Ground floor, Food Service Office. Repair ruptured valves in fan coil unit coil . | February 1, 2007 | February 26, 2007 | 25 days |
| Davis Elementary School | FM-200451339 04 2/26/07 Davis Boiler Room D.C Boiler Inspection Correct problem with boilers # 3 and 4 flame failure. Remove automatic heat timers, will not pass. D.C. Boiler inspection | August 3, 2004 | February 26, 2007 | 937 days |
| Davis Elementary School | FM-200443733 04 2/26/07 Davis boiler room Trouble shoot and start boilers ,they will not start. | February 6, 2004 | February 26, 2007 | 1,116 days |
| Davis Elementary School | FM-200339919 03 2/26/07 Davis Boiler room Repair or replace Burner # 3 & 4 off on flame failure Note: Parts are on site | November 5, 2003 | February 26, 2007 | 1,209 days |
| Marshall Educational Center | FM-200700338 07 2/26/07 2nd Fl. Stage 2, Art classroom - Repair ruptured line in unit ventilator. Water and steam is comming out of line. | February 7, 2007 | February 26, 2007 | 19 days |
| Marshall Educational Center | FM-200700452 07 2/26/07 Exterior overhang - Respond and make emergency repairs to rupture 1" heating hot water line. | February 13, 2007 | February 26, 2007 | 13 days |
| Woodson High School | FM-200700155 07 2/26/07 Fourth floor, Food Teachers' Restroom. Repair ruptured line in teachers' restroom & stairwell # 4. | February 1, 2007 | February 26, 2007 | 25 days |
| Woodson High School | FM-200700157 07 2/26/07 Fourth & Fifth floor, Classrooms 412 & 512. Repair ruptured pipe from univent in office # 512 and classroom # 412 is out of service and office in # 512 there is no heat. | February 1, 2007 | February 26, 2007 | 25 days |
| Coolidge High School | FM-200632904 06 2/26/07 Need electricians to assess and repair electrical issue, there's no power on one side of cafeteria. | December 5, 2006 | February 26, 2007 | 83 days |
| Coolidge High School | FM-200628321 06 2/26/07 Coolidge Boiler Room Provide materials to makes repairs on Boiler room equipment. | August 26, 2006 | February 26, 2007 | 184 days |
| Cardozo High School | FM-200632739 /06 2/26/07 blow down irrigation on football feild | November 30, 2006 | February 26, 2007 | 88 days |
| Burrville Elementary School | FM-200700671 /07 2/26/07 No lights in the cafertira | February 21, 2007 | February 26, 2007 | 5 days |
| Burrville Elementary School | FM-200700289 07 2/26/07 Penthouse Repair or replace rupture line and air handle unit #4. | February 6, 2007 | February 26, 2007 | 20 days |
| Bruce-Monroe Elementary School | FM-200700386 2/9/07 2/26/07 Boiler Room - Boiler # 1 - Replace ruptured 2" nipple on gas line. | February 9, 2007 | February 26, 2007 | 17 days |
| Browne Junior High School | FM-200700337 2/7/07 2/26/07 Kitchen Area. Grease trap needs to be snaked out. Note: The kitchen has flooded. | February 7, 2007 | February 26, 2007 | 19 days |
| Browne Junior High School | FM-200628338 06 2/26/07 Basement- Repair/replace sky light. | August 28, 2006 | February 26, 2007 | 182 days |
| Ronald H. Brown MS | FM-200633290 /06 2/26/07 Ron Brown Boiler room Repair or replace automatic water feeder on boiler # 1 it leaking at the float seal. | December 12, 2006 | February 26, 2007 | 76 days |
| Brookland Elementary | FM-200700298 2/6/07 2/26/07 BOILER ROOM - Replace corrode valve on air separator tank, valve is broken of an need to be welded on. Can not isolate tank. | February 6, 2007 | February 26, 2007 | 20 days |
| Brightwood Elementary School | FM-200700206 /5/07 2/26/07 Boiler Room Repair rupture makeup line on back of Boiler #3. Boiler #1 is down need gas valve adjustment. Only Boiler #2 is working. Need two (2) boilers to heat the building. | February 5, 2007 | February 26, 2007 | 21 days |
| Bowen Elementary School | FM-200219812 /02 2/26/07 (Bowen) 2nd Floor/Nurse office: No hot water coming through faucets. | October 22, 2002 | February 26, 2007 | 1,588 days |
| Birney Elementary School | FM-200633007 06 2/26/07 Repair or replace leaking univent coil in first floor hallway near lounge | December 7, 2006 | February 26, 2007 | 81 days |
| Bell High School | FM-200633929 /07 2/26/07 Rooms B-106, B-208, E-212 & E-218 - Connect icemaker machines to existing piping (one each). Icemakers are stored on site. | January 11, 2007 | February 26, 2007 | 46 days |
| Beers Elementary School | FM-200632641 /06 2/26/07 First Floor - Building 1 - Conference Room & Multipurpose Room - Install two special outlets for copy machines | November 29, 2006 | February 26, 2007 | 89 days |
| Woodson High School | FM-200700219 07 2/26/07 Fourth floor, Room 412. Ruptured steamline off of the univent, water is pouring down into the library. | February 5, 2007 | February 26, 2007 | 21 days |
| Woodson High School | FM-200700568 07 2/26/07 Fourth Floor - Girl's Bathroom (across from 408) - Replace cinder blocks in wall so sink can be replaced. | February 16, 2007 | February 26, 2007 | 10 days |
| Benjamin Banneker Academic HS | FM-200631817 /06 2/26/07 First Floor - Main Office Bathroom - Repair or replace the leaking shut off valve, flooding the bathroom. | November 6, 2006 | February 26, 2007 | 112 days |
| Ballou Senior High School | FM-200510937 05 2/26/07 Ballou Boiler Room Boiler #2 repair or replace leaking gas valve with a broken handle. Per Boiler Inspector | August 23, 2005 | February 26, 2007 | 552 days |
| Wilson J. O. ES | FM-200515295 05 2/26/07 Lights are out on the first floor end of hallway on 6th Street side of building. Mr. Walls changed the bulbs. However, the lights did not come on. He thinks the ballast should be changed. | November 8, 2005 | February 26, 2007 | 475 days |
| Wilson J. O. ES | FM-200516239 05 2/26/07 Need electrician to assess and repair electrical issue. Note: Lights are out on the second floor, open space area. According to Mr. Walls (Custodian) the bulbs are not the reason for the outage. | December 6, 2005 | February 26, 2007 | 447 days |
| Wilson J. O. ES | FM-200617754 06 2/26/07 Repair outlet in the Cafeteria. The outlet is needed for the milk cooler. in the kitchen. (ONLY OUTLET AVAILABLE TO KEEP THE MILK COLD) | January 18, 2006 | February 26, 2007 | 404 days |
| Wilson J. O. ES | FM-200621067 06 2/26/07 Replace ballasts and bulbs in the auditorium. Over 15ft. high. | April 4, 2006 | February 26, 2007 | 328 days |
| Wilson J. O. ES | FM-200623531 06 2/26/07 1st Floor- Cafeteria The panic box is causing the a/c units to cut-off. | May 30, 2006 | February 26, 2007 | 272 days |
| Wilson J. O. ES | FM-200623757 06 2/26/07 Cafeteria The lights need to be changed, a scaffold is needed for servicing. The graduation is on the 9th and will be held in the cafeteria. | June 2, 2006 | February 26, 2007 | 269 days |
| Wilson J. O. ES | FM-200630879 /06 2/26/07 Third Floor - Open Space - Repair toilet, will not flush without leaking. | October 17, 2006 | February 26, 2007 | 132 days |
| Wilson J. O. ES | FM-200632091 06 2/26/07 Ground Floor New Side - R/R breaker switch by the Business Office. | November 9, 2006 | February 26, 2007 | 109 days |
| Wilson J. O. ES | FM-200700280 2/6/07 2/26/07 2nd Floor - Teacher's Restrooms - unclog sinks | February 6, 2007 | February 26, 2007 | 20 days |
| Wilson J. O. ES | FM-200700283 2/6/07 2/26/07 1st Floor - Teacher's Restrooms - toilets not flushing | February 6, 2007 | February 26, 2007 | 20 days |
| Wilson J. O. ES | FM-200700302 2/6/07 2/26/07 Room #205 Repair or replace rupture coil in classroom. | February 6, 2007 | February 26, 2007 | 20 days |
| Peabody Elementary School | FM-200634134 07 2/26/07 Stair well ,2nd floor Replace leaking radiator valve and spud nipple to steam radiator, valve knob is broken off. | January 21, 2007 | February 26, 2007 | 36 days |
| Peabody Elementary School | FM-200634349 07 2/26/07 2nd Hallway Repair or replace leaking radiator on 2nd floor Hallway. | January 25, 2007 | February 26, 2007 | 32 days |
| Plummer Elementary School | FM-200623197 06 2/26/07 Second Floor-Hole in wall in hallway Asbestos Code A - Clear for repairs on 05/25/06. Tidewater - Carlos Verd (RG 05/30/06) | May 23, 2006 | February 26, 2007 | 279 days |
| Ketcham Elementary School | FM-200700940 07 2/27/07 Cafeteria - Broken door hardware (Stairwell exit door) - Completed by building staff Mr. Morris Henderson, Head Custodian. | February 27, 2007 | February 27, 2007 | 0 days |
| Harris, C.W. ES | FM-200628295 06 2/27/07 Second Floor - Hallway - Univent making a loud noise. When you cut on the lights in the Teachers Classroom the univent comes on in the hall. | August 25, 2006 | February 27, 2007 | 186 days |
| Nalle Elementary School | FM-200700441 07 2/27/07 in the library interior door replace/repair lock, it's an dead bolt | February 12, 2007 | February 27, 2007 | 15 days |
| Peabody Elementary School | FM-200632225 /06 2/27/07 Basement - Lunchroom - Repair leak in steam line | November 16, 2006 | February 27, 2007 | 103 days |
| Ronald H. Brown MS | FM-200700788 07 2/27/07 Rear Entrance Door. Master key is jammed in exterior lock and will not come out. | February 23, 2007 | February 27, 2007 | 4 days |
| Peabody Elementary School | FM-200632226 /06 2/27/07 Drive Way - Unstop Drain it's badly clogged. | November 16, 2006 | February 27, 2007 | 103 days |
| Peabody Elementary School | FM-200633311 /06 2/27/07 Third Floor - Room 9 - Roof Leak | December 15, 2006 | February 27, 2007 | 74 days |
| Plummer Elementary School | FM-200623807 06 2/27/07 Plummer Replace window a/c unit in the following location Room 201 15,000 - 15amp | June 5, 2006 | February 27, 2007 | 267 days |
| Bowen Elementary School | FM-200443722 04 2/27/07 (Bowen) Asbestos Assessment Required. 1st Floor Hallway: Bolt broke on door check. Asbestos Code A - Clear for repairs on 02/06/04. Horne Engineering - Troy Wilcome (RG 02/12/04) | February 5, 2004 | February 27, 2007 | 1,118 days |
| Bowen Elementary School | FM-200340791 /03 2/27/07 Bowen Door 13 and 3rd Floor Hallway 1) Panic bar on door 13 is broken off and needs a door check. 2) 3rd floor hallway needs door check. Asbestos Code A - Clear for repairs on 12/01/03. Horne Engineering - Edward Rodriguez (RG 12/03/03) | November 28, 2003 | February 27, 2007 | 1,187 days |
| Plummer Elementary School | FM-200623573 06 2/27/07 Plummer Replace window a/c unit in the following location Library - 24,000 - 20amp | May 31, 2006 | February 27, 2007 | 272 days |
| Plummer Elementary School | FM-200632993 06 2/27/07 Landing by Room 36 - Replace univent motor on landing by 36. Univent has no motor and belt drive has no information. | December 7, 2006 | February 27, 2007 | 82 days |
| Hart Middle School | FM-200627652 06 2/27/07 First Floor/Breech in wall in gym. Asbestos Code A - Clear for repairs on 08/16/06. Tidewater - Tony Marcolin (RG 08/17/06) | August 15, 2006 | February 27, 2007 | 196 days |
| Peabody Elementary School | FM-200513851 /05 2/27/07 Peabody Emergency Fourth Floor-Pen House Repair door lock, can't open it, it's jammed. | October 13, 2005 | February 27, 2007 | 502 days |
| Plummer Elementary School | FM-200631919 06 2/27/07 Second floor, Hallway near room 220. Repair burning & smoking light fire. Note: The school staff shut of the powerr to this fixture. | November 7, 2006 | February 27, 2007 | 112 days |
| Plummer Elementary School | FM-200218840 02 2/27/07 Plummer Third floor hallway replace pieces of 9x9 floor tile that has come loose and is missing outside of classroom 201. Asbestos Code C Bipin Nanavaty on 10/08/02 DCPS Charles E. Buchanan | October 4, 2002 | February 27, 2007 | 1,607 days |
| Peabody Elementary School | FM-200512402 05 2/27/07 Peabody Repair door lock to class rm. #4 1st Fl., and door lock to coat room door #5 2nd Fl. | September 12, 2005 | February 27, 2007 | 533 days |
| Houston Elementary School | FM-200447903 04 2/27/07 Houston All exit doors need to be replace. There is a count of 33. Asbestos Code A - Clear for repairs on 05/18/04. Horne Engineering - Philp Connolly (RG 05/19/04) | May 13, 2004 | February 27, 2007 | 1,020 days |
| Houston Elementary School | FM-200451242 04 2/27/07 Houston Break - In !!!! First Floor - Rooms 160 and 157 Large Playground 1) Repair (2) Exterior doors. ( Classroom Doors) 2) Window needs to be replaced. 3) Window Grate needs to be welded. 5) Repair Electrical Lights on Large Playground Areas. | August 2, 2004 | February 27, 2007 | 939 days |
| Houston Elementary School | FM-200455150 04 2/27/07 Houston Exterior Grounds 1) 101 lf of 96" Mesh w/48" includes 4- 1 5/8" Top Rail. Poc - Oscar Mebane - 202-345-0688 | September 20, 2004 | February 27, 2007 | 890 days |
| Houston Elementary School | FM-200500561 05 2/27/07 Houston Request on the boys restroom ceiling has a hole in it, and need to be work on. HA 005 Plaster white No Asbestos HA 083 Brown coat with No Asbestos Code A-clear for repair by DCPS Charles Buchanan on 2/01/05 | January 18, 2005 | February 27, 2007 | 770 days |
| Houston Elementary School | FM-200500562 05 2/27/07 Houston Replace door closurer in room 113. Code A-clear for repair by DCPS Charles Buchanan on 2/01/05 | January 18, 2005 | February 27, 2007 | 770 days |
| Wilkinson ES | FM-200459341 04 2/27/07 Wilkinson Second floor 216 lib area Need to repair or replace lock on door, broken on knob. | December 8, 2004 | February 27, 2007 | 811 days |
| Plummer Elementary School | FM-200336465 03 2/27/07 Plummer Kitchen Check hot water in kitchen. | August 28, 2003 | February 27, 2007 | 1,279 days |
| Houston Elementary School | FM-200504884 05 2/27/07 Houston Main office Replace (2) two , 23,000 BTUs A/C windows units, 230 /208 volts 20 amps. | April 29, 2005 | February 27, 2007 | 669 days |
| Houston Elementary School | FM-200509852 05 2/27/07 HOUSTON ES Install window a/c units in following rooms 209 and 107 | August 9, 2005 | February 27, 2007 | 567 days |
| Houston Elementary School | FM-200511544 05 2/27/07 Houston Verious Location Check window A/C unit in the following classrooms: Room #104;#108 #202;#208;#209; and #212 | August 29, 2005 | February 27, 2007 | 547 days |
| Houston Elementary School | FM-200512493 05 2/27/07 Huston RM102/109/112/113/107/114/106/105/104/ Boys & Girls bathroom/ Health Suite /103 Repair broken and faded window Glass Asbestos Code A - Clear for repairs on 09/20/05. Tidewater - Rodney Distance (RG 09/21/05) | September 13, 2005 | February 27, 2007 | 532 days |
| Houston Elementary School | FM-200512495 05 2/27/07 Huston Princ. Office / Teachers Lounge/ Teachers restroom/Boys restroom /rm160/ Repair broken and faded window Glass Asbestos Code A - Clear for repairs on 09/15/05. Tidewater - Paul Berman (RG 09/19/05) | September 13, 2005 | February 27, 2007 | 532 days |
| Houston Elementary School | FM-200512499 05 2/27/07 Huston Rm 145/ 146/ 158/ 147/ 148/ 156/ Kitchen/ Bathroom/ Stage Area. Repair broken and faded window Glass Asbestos Code A - Clear for repairs on 09/20/05. Tidewater - Rodney Distance (RG 09/21/05) | September 13, 2005 | February 27, 2007 | 532 days |
| Houston Elementary School | FM-200512500 05 2/27/07 Huston Mult-Purpose RM. Repair broken and faded window Glass Asbestos Code A - Clear for repairs on 09/20/05. Tidewater - Rodney Distance (RG 09/21/05) | September 13, 2005 | February 27, 2007 | 532 days |
| Houston Elementary School | FM-200619123 06 2/27/07 BREAK IN-Rm. 148 Make repairs to or replace windows, window bars, and doors (exterior or interior) (MULTIPLE TRADES) | February 27, 2006 | February 27, 2007 | 365 days |
| Houston Elementary School | FM-200621477 06 2/27/07 1st Floor- Room 107 A lock needs to be put on this classroom door. | April 19, 2006 | February 27, 2007 | 314 days |
| Wilkinson ES | FM-200514658 /05 2/27/07 Wilkinson Second Floor - 161 - Ms. Jennifer's Room 1) Door needs to be alined so door will lock. Second Floor - 141 Conference Room - Center 2 2) Door needs to be alined so it will close properly and lock. First Floor - 90 and 91 Restroom - Pre-K Area 3) Need to repair doors, will not close or lock properly. Asbestos Code A - Clear for repairs on 10/27/05. Tidewater - Carlos Vera (RG 10/28/05) | October 26, 2005 | February 27, 2007 | 489 days |
| Wilkinson ES | FM-200516579 /05 2/27/07 Urgnet: Patch the hole in the floor where the radiator was removed in the boys restroom on the second floor. Asbestos Code A - Clear for repairs on 12/16/05. Tidewater - Kenny Long (RG 12/16/05) | December 15, 2005 | February 27, 2007 | 439 days |
| Wilkinson ES | FM-200622085 06 2/27/07 1st Floor- Room 109 (vestibule entrance) The 4 front entrance doors need to be repaired. They do not close properly. | May 2, 2006 | February 27, 2007 | 301 days |
| Houston Elementary School | FM-200621478 06 2/27/07 Main Office- All Purpose Room The all-purpose room needs to be painted this summer. Lead & Asbestos Code A - Clear for repairs on 05/15/06. Tidewater - Roger Small/Thomas Johnson (RG 05/17/06) SEE ASSESSMENTS | April 19, 2006 | February 27, 2007 | 314 days |
| Houston Elementary School | FM-200624843 06 2/27/07 Break In - Repair Window In Rm. 107 Asbestos Code A - Clear for repairs on 07/03/06. Tidewater - Thomas Johnson (RG 07/05/06) | June 27, 2006 | February 27, 2007 | 245 days |
| Houston Elementary School | FM-200625851 06 2/27/07 Survey the field, big stones are coming out from the ground. | July 18, 2006 | February 27, 2007 | 224 days |
| Houston Elementary School | FM-200625871 06 2/27/07 A new lock is needed on the outside Water Room door. | July 18, 2006 | February 27, 2007 | 224 days |
| Houston Elementary School | FM-200626138 06 2/27/07 Room 147 Plaster ceiling. Asbestos Code A - Clear for repairs on 08/22/06. Tidewater - Roger Small/Kenny Long (RG 08/24/06) | July 21, 2006 | February 27, 2007 | 221 days |
| Peabody Elementary School | FM-200512400 05 2/27/07 Peabody Playground-Cut off broken tree limb hanging from tree on playground | September 12, 2005 | February 27, 2007 | 533 days |
| Houston Elementary School | FM-200626144 06 2/27/07 Room 147 Replace faucet, it will not turn the water on. | July 21, 2006 | February 27, 2007 | 221 days |
| Houston Elementary School | FM-200628243 06 2/27/07 School Grounds & Multi-Purpose Room Remove furniture and other bulk trash. | August 24, 2006 | February 27, 2007 | 187 days |
| Houston Elementary School | FM-200628294 06 2/27/07 Repair fixture in classroom 156 fixture is comming off | August 25, 2006 | February 27, 2007 | 186 days |
| Houston Elementary School | FM-200629119 06 2/27/07 Replace windows in auditorium and cafeteria. | September 11, 2006 | February 27, 2007 | 169 days |
| Houston Elementary School | FM-200631005 /06 2/27/07 Repair or replace outside gate by the small playground | October 19, 2006 | February 27, 2007 | 131 days |
| School WW High School | FM-200110951 01 2/27/07 SCHOOL WITHOUT WALLS BASEMENT LEVEL BOYS AND GIRLS RESTROOMS 1) ISSUE AND INSTALL EXHAUST VENTILATION IN BOYS AND GIRLS RESTROOMS ASBESTOS CODE A-CLEAR FOR REPAIR NO 9/19/01 BY HORNE ENGINEER BIPIN NANAVARY | May 24, 2001 | February 27, 2007 | 2,105 days |
| Peabody Elementary School | FM-200509067 05 2/27/07 Peabody Rm # 10 Near southeast corner Repair Roof Code A-clear for repair by Tidewater Thomas Johnson on 8/5/05. | July 29, 2005 | February 27, 2007 | 578 days |
| Plummer Elementary School | FM-200452431 04 2/27/07 Plummer ES - Classrooms Replace filters in spot coolers in classrooms, 33,34,35,36,37, 38. 130, 131, 132,133, 116, 109, 123, 124. | August 12, 2004 | February 27, 2007 | 929 days |
| Plummer Elementary School | FM-200452897 04 2/27/07 Plummer First floor stairwell Replace broken handle on door. Fire code violation. Metal fire Door Code A-clead for repair by DCPS Charles Buchanan on 8/24/04 | August 18, 2004 | February 27, 2007 | 923 days |
| Houston Elementary School | FM-200631109 /06 2/27/07 Playground - Replace play equipment it was destroyed by fire (this summer) | October 20, 2006 | February 27, 2007 | 130 days |
| Houston Elementary School | FM-200631187 /06 2/27/07 First Floor - Room 103 - Replace cracked/broken windows | October 24, 2006 | February 27, 2007 | 126 days |
| Peabody Elementary School | FM-200502593 05 2/27/07 (Peabody) Asbestos Assessment Required. Basement/Boys' and Girls' restrooms. Replace all missing and damaged insulation on steam line pipes inside and outside , restrooms. Code A-clear for repair by DCPS Charles Buchanan on 3/30/05 Cover damage pipe insulation with plastic covering in Boys restroom. | March 11, 2005 | February 27, 2007 | 718 days |
| Houston Elementary School | FM-200631188 /06 2/27/07 First Floor - Room 104 - Replace cracked/broken windows | October 24, 2006 | February 27, 2007 | 126 days |
| Houston Elementary School | FM-200631189 /06 2/27/07 First Floor - Room 105 - Replace cracked/broken windows | October 24, 2006 | February 27, 2007 | 126 days |
| Peabody Elementary School | FM-200500724 05 2/27/07 Peabody Room 10 third floor southeast corner of room Repair roof leak. | January 24, 2005 | February 27, 2007 | 764 days |
| Houston Elementary School | FM-200631190 /06 2/27/07 First Floor - Room 112 - Replace cracked/broken windows | October 24, 2006 | February 27, 2007 | 126 days |
| Plummer Elementary School | FM-200630627 /06 2/27/07 Book Storage Rm. - Repair leak above plaster ceiling. The ceiling has been breeched Lead & Asbestos Code A - Clear for repairs on 10/11/06. Tidewater - Kenny Long (RG 10/23/06) | October 10, 2006 | February 27, 2007 | 140 days |
| Houston Elementary School | FM-200631191 /06 2/27/07 First Floor - Room 113 - Replace cracked/broken windows | October 24, 2006 | February 27, 2007 | 126 days |
| Houston Elementary School | FM-200631192 /06 2/27/07 First Floor - Room 114 - Replace cracked/broken windows | October 24, 2006 | February 27, 2007 | 126 days |
| Houston Elementary School | FM-200631193 /06 2/27/07 First Floor - Room 160 - Replace cracked/broken windows | October 24, 2006 | February 27, 2007 | 126 days |
| Houston Elementary School | FM-200631194 /06 2/27/07 First Floor - Room 145 - Replace cracked/broken windows | October 24, 2006 | February 27, 2007 | 126 days |
| Houston Elementary School | FM-200631195 /06 2/27/07 First Floor - Room 158 - Replace cracked/broken windows | October 24, 2006 | February 27, 2007 | 126 days |
| Houston Elementary School | FM-200631196 /06 2/27/07 First Floor - Room 146 - Replace cracked/broken windows | October 24, 2006 | February 27, 2007 | 126 days |
| Houston Elementary School | FM-200631197 /06 2/27/07 First Floor - Room 157 - Replace cracked/broken windows | October 24, 2006 | February 27, 2007 | 126 days |
| Peabody Elementary School | FM-200446491 04 2/27/07 Peabody Roof Peabody Elementary School Roof Repair Scope of Work The Scope of Work involves furnishing of materials, equipments, and labor to replace missing Cornice on the parking lot side of the building at Peabody Elementary School, located on 425 C Street, N. E., Washington D.C. 20003. Installation Replace approximately 60 linear feet of cornice, to match existing in size, shape and material. Prime and paint new cornice to match existing Contractor shall make repairs according to the Roofing Industrial Standard. Is mandatory that the contractors visit the site prior to submittal of cost proposal The Contractor shall be responsible to obtain all permits The roof is approximately 70 ft above grade Addendum based on the 3/30/04 site inspection with contractors Add the installation of two (2) down spout on the upper roof, in the general location of the area where the new Cornice will be installed. | April 8, 2004 | February 27, 2007 | 1,055 days |
| Houston Elementary School | FM-200631198 /06 2/27/07 First Floor - Room 147 - Replace cracked/broken windows | October 24, 2006 | February 27, 2007 | 126 days |
| Houston Elementary School | FM-200631199 /06 2/27/07 First Floor - Room 148 - Replace cracked/broken windows | October 24, 2006 | February 27, 2007 | 126 days |
| Houston Elementary School | FM-200631200 /06 2/27/07 First Floor - Room 156 - Replace cracked/broken windows | October 24, 2006 | February 27, 2007 | 126 days |
| Houston Elementary School | FM-200631201 /06 2/27/07 Room 212 - Replace cracked/broken windows | October 24, 2006 | February 27, 2007 | 126 days |
| Houston Elementary School | FM-200631765 06 2/27/07 Room 156 - Lights will not come on; changed bulbs, checked breaker and the lights still don't work. | November 3, 2006 | February 27, 2007 | 116 days |
| Jefferson JHS | FM-200700500 /07 2/27/07 Roof Leak - Rooms 300, 306, 302 | February 13, 2007 | February 27, 2007 | 14 days |
| Plummer Elementary School | FM-200626442 06 2/27/07 Exterior Custodial Storage Room on the C St., Side. Repair or Replace knob lock that's spinning around. Note: Staff are unable to gain access to this storage room. 01/10/2007 08:36 TH - Second request was faxed to the service center on 1-9-07 to r/r lock sylinder on the storage door. Same Requester | July 26, 2006 | February 27, 2007 | 216 days |
| Plummer Elementary School | FM-200623758 06 2/27/07 Cafeteria A power line is needed for a/c units on the opposite side of the cafeteria. | June 2, 2006 | February 27, 2007 | 270 days |
| Eaton Elementary School | FM-200700578 07 2/27/07 First Floor - Main Entrance/Exit Door - Can't secure, lock is broken | February 16, 2007 | February 27, 2007 | 11 days |
| Raymond Elementary School | FM-200700803 07 2/27/07 Rekey main entrance door, boiler room door and principal's office door. Note: The principals keys were stolen. | February 23, 2007 | February 27, 2007 | 4 days |
| Nalle Elementary School | FM-200341688 /03 2/27/07 Nalle Back stairwell old wing Light fixtures on wall are not working. | December 16, 2003 | February 27, 2007 | 1,169 days |
| Peabody Elementary School | FM-200207186 02 2/27/07 Peabody Outside - Playground Entrance Level concrete area around down sprout hub, so that precipatation will run off to area drain. Water is settling around down sprout hub and wall of building. Could become a problem if water seeps through wall into interior of building. | May 6, 2002 | February 27, 2007 | 1,758 days |
| Eastern High School | FM-200700491 07 2/27/07 Basement,1st floor, 2nd floor, 3rd floor girls and boys bathrooms need an latch booth on all doors. Need 5 Keys to room 347, An cabeint in room B30 needs to be open and 3 keys made for it. And a rolling strong box in the sub basement woodshop needs to be open and 3 keys need to be made. | February 13, 2007 | February 27, 2007 | 14 days |
| Peabody Elementary School | FM-200206601 02 2/27/07 1) In accordance with grass cutting contract for the summer of 2002 to include grass cutting and edging. | April 25, 2002 | February 27, 2007 | 1,769 days |
| Plummer Elementary School | FM-200623935 06 2/27/07 3rd Floor- Hallway Half of the lights on this floor are out. Verizon contractors are on the premises. They accidentally pulled some wires. | June 6, 2006 | February 27, 2007 | 266 days |
| Wilson J. O. ES | FM-200700745 /22/07 2/27/07 Outside - Field - Lamp pole fell down on field and wires are still attached to it. | February 22, 2007 | February 27, 2007 | 5 days |
| Montgomery ES | FM-200700361 07 2/27/07 Main Entrance. Repair malfunctioning panic bar on front entrance door, it will not catch. Note: This door cannot be secured. | February 8, 2007 | February 27, 2007 | 19 days |
| Eastern High School | FM-200104028 01 2/27/07 EASTERN BASEMENT BOILER ROOM REPLACE MECHANICAL SEAL ON BOILER FEED WATER PUMP. INFO: INDUSTRIAL STEAM INC., MODEL: J25-672, SER. # F77-0588, GPM-60, TDH: 300. | February 21, 2001 | February 27, 2007 | 2,197 days |
| Harris, C.W. ES | FM-200515431 /05 2/27/07 Second floor, Room 235. Replace broken out access window. Asbestos Code A - Clear for repairs on 11/18/05. Tidewater - Kenny Long (RG 11/21/05 | November 14, 2005 | February 27, 2007 | 470 days |
| Harris, C.W. ES | FM-200620170 06 2/27/07 Harris,C.W. Room 146 Asbestos Assessment required Repair or replace 3" heating hot-water line in the ceiling. Asbestos Code A - Clear for repairs on 03/24/06. Tidewater - Roger Small (RG 03/30/06) | March 22, 2006 | February 27, 2007 | 342 days |
| Nalle Elementary School | FM-200619404 06 2/27/07 Please send a team to paint the building throughout. We have lots of peeling paint and are constantly trying to maintain the aesthetic appearance of the building. Our walls need to be scraped and painted. Asbestos Code A - Clear For Repairs On 09/22/06. Tidewater - Roger Small ( RG 09/25/06) SEE ASSESSMENTS | March 2, 2006 | February 27, 2007 | 362 days |
| Harris, C.W. ES | FM-200621667 06 2/27/07 1st & 2nd Floors- Rooms 102 & 217 Glass in doors needs to be replaced. Asbestos Code A - Clear for repairs on 04/25/06. Tidewater - Samuel May (RG 04/26/06) | April 24, 2006 | February 27, 2007 | 309 days |
| Harris, C.W. ES | FM-200621982 06 2/27/07 First Floor-Girls Restroom 1/2 wing: No lights | May 1, 2006 | February 27, 2007 | 302 days |
| Harris, C.W. ES | FM-200621985 06 2/27/07 Second Floor-Girl's Restroom 5/6 Wing: Repair lock on partitions | May 1, 2006 | February 27, 2007 | 302 days |
| Harris, C.W. ES | FM-200624193 06 2/27/07 Entire Interior of Building. No power!! | June 12, 2006 | February 27, 2007 | 260 days |
| Harris, C.W. ES | FM-200625299 06 2/27/07 First Floor - Main Office/Principal Is Locked Out. (key's may be lost or locked inside, building foreman does not have a key) | July 5, 2006 | February 27, 2007 | 237 days |
| Harris, C.W. ES | FM-200626630 06 2/27/07 1/2 Wing- Custodial Closet Repair sink. There is no running water. | August 1, 2006 | February 27, 2007 | 210 days |
| Harris, C.W. ES | FM-200626633 06 2/27/07 1st Floor- Girl's Restroom Repair/replace J-trap. | August 1, 2006 | February 27, 2007 | 210 days |
| Harris, C.W. ES | FM-200626641 06 2/27/07 2nd Floor- Grounds Replace lights on grounds. Most lights are out in the schools perimeter. | August 1, 2006 | February 27, 2007 | 210 days |
| Harris, C.W. ES | FM-200627955 06 2/27/07 Roof/Standing water on roof causing ceiling damage below (clogged roof drain) | August 21, 2006 | February 27, 2007 | 190 days |
| Nalle Elementary School | FM-200621194 06 2/27/07 First Floor-109-Master key broke off in the door-Repair lock and replace key | April 11, 2006 | February 27, 2007 | 322 days |
| Nalle Elementary School | FM-200623817 06 2/27/07 Basement- Boys Bathroom The sink is hanging off of the wall from the trap & supply line. | June 5, 2006 | February 27, 2007 | 267 days |
| Marshall Educational Center | FM-200206573 02 2/27/07 1) In accordance with grass cutting contract for the summer of 2002 to include grass cutting and edging. | April 25, 2002 | February 27, 2007 | 1,769 days |
| Marshall Educational Center | FM-200209273 02 2/27/07 Marshall 2nd Floor Computer Lab Repair or replace light fixtures in this room. The lights are still not working. | June 10, 2002 | February 27, 2007 | 1,723 days |
| Nalle Elementary School | FM-200624192 06 2/27/07 Entire Interior of Building. No power!! | June 12, 2006 | February 27, 2007 | 260 days |
| Marshall Educational Center | FM-200226450 03 2/27/07 Marshall Second floor - boys lavatory Unstop waste line. Water is backed up when toilets are flush. | March 3, 2003 | February 27, 2007 | 1,457 days |
| Marshall Educational Center | FM-200333851 03 2/27/07 Marshall Pool area Replace Two broken window wire mesh. | July 28, 2003 | February 27, 2007 | 1,310 days |
| Marshall Educational Center | FM-200336385 03 2/27/07 T.Marshall Stage 2 class room windows Fashion plenum for the windows so that spot cooler can be installed in the classes on stage 2. see the engineer. Asbestos Code A - Clear for repairs on 08/28/03. Horne Engineering - Philp Connolly (RG 08/29/03) | August 27, 2003 | February 27, 2007 | 1,280 days |
| Marshall Educational Center | FM-200448617 04 2/27/07 Marshall Summing Pool Replace broken glass to pool deck over top of summing pool. | June 1, 2004 | February 27, 2007 | 1,001 days |
| Marshall Educational Center | FM-200500303 05 2/27/07 Marshall Second floor stage # 2 entrance Entrance of stage water leak. First floor boys bathroom has a leal in ceiling. Code A-clear for repair by DCPS Charles Buchanan on 3/31/05 | January 11, 2005 | February 27, 2007 | 777 days |
| Marshall Educational Center | FM-200503358 05 2/27/07 Marshall First Floor - Gym, Stage 1 Replace light fixture in gym office bathroom, and in stage 1 closets classrooms | March 29, 2005 | February 27, 2007 | 700 days |
| Marshall Educational Center | FM-200512395 05 2/27/07 Outside-Parking Lot Three lidhts on top of the school are not working the parking lot is dark. was faxed on 8-9-05 | September 12, 2005 | February 27, 2007 | 533 days |
| Nalle Elementary School | FM-200624204 06 2/27/07 First Floor Stairwell, C Street Side. Replace flickering light . Note: Need 12 ft. latter to do replacement. | June 12, 2006 | February 27, 2007 | 260 days |
| Marshall Educational Center | FM-200514353 /05 2/27/07 Marshall Stairways 1,4, and 5 1) Need new ballasts. Very dark in stairways, over 10 feet high. | October 23, 2005 | February 27, 2007 | 492 days |
| Marshall Educational Center | FM-200516118 05 2/27/07 Marshall Air Handler for Stage 3 (Roof) Asbestos assessment required Repair or replace ruptured hot water heating line to coil for Air handler that heat stage #3 ,unit services about (10) ten class rooms. Asbestos Code B - on 12/16/05. Tidewater - Tony Marcolin (RG 12/19/05) | December 7, 2005 | February 27, 2007 | 447 days |
| Marshall Educational Center | FM-200618803 06 2/27/07 Second Floor-Stage 3 Investigate and repair roof leak-Water leaking in the back half of the math class. | February 17, 2006 | February 27, 2007 | 375 days |
| Marshall Educational Center | FM-200619203 06 2/27/07 Marshall 2nd Floor - Open Space Asbestos assessment required on leaking flow meter on covertor Repair or replace leaking flow meter on convertor on 2nd floor in Open Space area Teacher name is Ms. Zeal Pipe size is approx. 1" or !-1/4" Damaging the carpet. Asbestos Code A - Clear for repairs on 03/01/06 Tidewater - Roger Small (RG 03/02/05) | February 28, 2006 | February 27, 2007 | 364 days |
| Marshall Educational Center | FM-200619320 06 2/27/07 First Floor-Gym Upper Hallway Light hanging by wires, over 10 feet high need to be repaired. | March 2, 2006 | February 27, 2007 | 362 days |
| Harris, C.W. ES | FM-200628404 06 2/27/07 2nd Floor- Boys Bathroom Replace flush valve and wax ring on urinal. | August 28, 2006 | February 27, 2007 | 183 days |
| Marshall Educational Center | FM-200621694 06 2/27/07 1st Floor- Stage 1 Kindergarten Class (Mrs. Reid) The faucet broke off and needs to be replaced. | April 24, 2006 | February 27, 2007 | 309 days |
| Marshall Educational Center | FM-200623456 06 2/27/07 Basement- Gym Hallway Drywall needs to be replaced in lower gym hallway. Asbestos Code A - Clear for repairs on 05/31/06. Tidewater - Kenny Long(RG 06/01/06) | May 30, 2006 | February 27, 2007 | 273 days |
| Marshall Educational Center | FM-200624274 06 2/27/07 Third Floor/Stage #3 & Science Room - Breech in walls Asbestos Code A - Clear for repairs on 06/14/06. Tidewater - Carlos Vera (RG 06/15/06) | June 13, 2006 | February 27, 2007 | 259 days |
| Harris, C.W. ES | FM-200628858 06 2/27/07 First floor, Boys' & Girls' Restrooms. Repair leaking roof. Asbestos Code A - Clear for repairs on 09/07/06. Tidewater - Carlos Vera (RG 09/11/06 | September 6, 2006 | February 27, 2007 | 174 days |
| Marshall Educational Center | FM-200626861 06 2/27/07 Marshall Rooftop Mechanical Room Air handler units #1 and #2 needs to be replaced due to drain pans rusty under the units, #1 unit also nees fabricateion work. | August 5, 2006 | February 27, 2007 | 206 days |
| Marshall Educational Center | FM-200628540 06 2/27/07 Replace ballasts in stairways 1, 4, & 5. | August 30, 2006 | February 27, 2007 | 181 days |
| Marshall Educational Center | FM-200628541 06 2/27/07 Building Exterior- Fill in holes where bricks are missing with concrete. | August 30, 2006 | February 27, 2007 | 181 days |
| Marshall Educational Center | FM-200629324 06 2/27/07 Stage #3 Remove mold from the room. ( Ceiling Tile ) Asbestos Code A - Clear for repaors on 09/15/06. Tidewater - Shamika Parker (RG 09/18/06) | September 13, 2006 | February 27, 2007 | 167 days |
| Marshall Educational Center | FM-200629433 06 2/27/07 1st Floor- Main Office Install high volt outlet. 01/11/2007 08:27 TH - Second request was called in on 01-10-07 (Plugs in office not working) | September 14, 2006 | February 27, 2007 | 166 days |
| Marshall Educational Center | FM-200629434 06 2/27/07 3rd Floor- Boys Bathroom Unclog toilets. | September 14, 2006 | February 27, 2007 | 166 days |
| Marshall Educational Center | FM-200630057 06 2/27/07 Basement - Gym Boy's Bathroom - Ceiling leak causing mold need repairs. Asbestos Code A - Clear for repairs on 09/28/06. Tidewater - Kenny Long (RG 09/29/06) | September 26, 2006 | February 27, 2007 | 154 days |
| Marshall Educational Center | FM-200630378 06 2/27/07 Test mastic on the ceiling tile in the flooded areas. Asbestos Code A - Clear for repairs on 10/06/06 Tidewater - Kenny Long (RG 10/06/06) | October 3, 2006 | February 27, 2007 | 147 days |
| Marshall Educational Center | FM-200630501 06 2/27/07 Repair/replace lights on Stage 1 that were damaged from the flood. | October 5, 2006 | February 27, 2007 | 145 days |
| Nalle Elementary School | FM-200626685 06 2/27/07 No emergency lights in hallways | August 2, 2006 | February 27, 2007 | 209 days |
| Marshall Educational Center | FM-200632927 06 2/27/07 Nurse Area - Girl's Restroom - Re-set sinks | December 6, 2006 | February 27, 2007 | 83 days |
| Marshall Educational Center | FM-200633193 /06 2/27/07 Snake Main Line | December 13, 2006 | February 27, 2007 | 76 days |
| Marshall Educational Center | FM-200633297 /06 2/27/07 First Floor - Main Office - High volt outlets need to be installed for the copy machine | December 14, 2006 | February 27, 2007 | 75 days |
| Nalle Elementary School | FM-200628365 06 2/27/07 First Floor/Water Fountain; need filter,clogged line. | August 28, 2006 | February 27, 2007 | 183 days |
| Nalle Elementary School | FM-200628526 06 2/27/07 First Floor/Custodial Mop Closet - Floor drain over flowing with water. | August 30, 2006 | February 27, 2007 | 181 days |
| Nalle Elementary School | FM-200631431 /06 2/27/07 First Floor/Newside - Water fountain is leaking, Custodian staff has isolated the leak and needs the water fountain repaired or replaced. Note: Currently there is no drinking water in this area. | October 26, 2006 | February 27, 2007 | 124 days |
| Nalle Elementary School | FM-200631570 /06 2/27/07 Second Floor/Newside - Water fountain is leaking, Custodian staff has isolated the leak and needs the water fountain repaired or replaced. Note: Currently there is no drinking water in this area. | October 31, 2006 | February 27, 2007 | 119 days |
| Harris, C.W. ES | FM-200629177 9/12/06 2/27/07 First floor, Classroom 144. Replace water damaged carpet and install floor tiles. Asbestos Code A - Clear for repairs on 09/08/06. Tidewater - Tony Marcolin (RG 09/15/06) | September 12, 2006 | February 27, 2007 | 168 days |
| Harris, C.W. ES | FM-200630389 10/3/06 2/27/07 Boys & Girls Restrooms- Replace fixtures on sinks. | October 3, 2006 | February 27, 2007 | 147 days |
| Peabody Elementary School | FM-200618221 06 2/27/07 Inspection or preventive maintenance on playground equipment. | February 2, 2006 | February 27, 2007 | 390 days |
| Peabody Elementary School | FM-200628242 06 2/27/07 Bulk Trash Pick Up By Dumpster | August 24, 2006 | February 27, 2007 | 187 days |
| Harris, C.W. ES | FM-200630393 10/3/06 2/27/07 School Grounds Replace lamps/outside lights. | October 3, 2006 | February 27, 2007 | 147 days |
| Harris, C.W. ES | FM-200630471 10/4/06 2/27/07 1st Floor- Girls Restroom Replace J-trap under the sink. | October 4, 2006 | February 27, 2007 | 146 days |
| Harris, C.W. ES | FM-200632040 11/8/06 2/27/07 Room 146 - Pipe leaking in the ceiling. Asbestos Code A - Clear for repairs on 11/13/06. Tidewater - Aaron Gholson (RG 11/15/06) | November 8, 2006 | February 27, 2007 | 111 days |
| Harris, C.W. ES | FM-200633439 12/19/06 2/27/07 Unlock the Business Manager's Office door. The keys were locked in the office. | December 19, 2006 | February 27, 2007 | 70 days |
| Peabody Elementary School | FM-200628604 06 2/27/07 Basement- Lunchroom Repair leaking water line in the ceiling. | August 31, 2006 | February 27, 2007 | 180 days |
| Peabody Elementary School | FM-200629180 06 2/27/07 Basement/Water cooler continues to run from the spout, can't cut it off. | September 12, 2006 | February 27, 2007 | 168 days |
| Peabody Elementary School | FM-200630514 06 2/27/07 Basement- Near West Stairway Replace water fountain that is not working. | October 5, 2006 | February 27, 2007 | 145 days |
| Peabody Elementary School | FM-200631149 /06 2/27/07 Basement - Lunchroom - Steam Line Leak. | October 23, 2006 | February 27, 2007 | 127 days |
| Randle-Highlands ES | FM-200617564 06 2/28/07 Gym-Repair roof leak | January 18, 2006 | February 28, 2007 | 406 days |
| Tyler Elementary School | FM-200632131 13/06 2/28/07 Rm. 125 - Need door opend and lock repaired, the key does not work and the Teacher + Students things are locked in the room. | November 13, 2006 | February 28, 2007 | 107 days |
| Randle-Highlands ES | FM-200515458 /05 2/28/07 Custdoian office ceiling Repair water leak in ceiling (Sub-basement) . | November 15, 2005 | February 28, 2007 | 470 days |
| Smothers ES | FM-200500286 05 2/28/07 SMOTHERS RM 303/ PRINCIPLE'S OFFICE/GIRLS REASROOM FIRST FL. LEAKING RADIATOR/ BAD TRAPS | January 11, 2005 | February 28, 2007 | 778 days |
| Smothers ES | FM-200458234 /04 2/28/07 Smothers First Floor-Multi Purpose Room -Cafeteria,Walls and Roof area. Relamp lights in Cafeteria, wall area and Roof area. | November 12, 2004 | February 28, 2007 | 838 days |
| Spingarn High School | FM-200624607 06 2/28/07 Second Floor/Stairwell Not Labeled - Door Closer Broken Thru-Out Second Floor | June 21, 2006 | February 28, 2007 | 252 days |
| Smothers ES | FM-200458061 04 2/28/07 Smothers Boiler room Repair # 1 boiler ,no power to boiler ,all fuses were checked. | November 9, 2004 | February 28, 2007 | 841 days |
| Smothers ES | FM-200455652 04 2/28/07 Smothers Library 2 A/C inits are broken. | September 24, 2004 | February 28, 2007 | 887 days |
| Benning Elementary School | FM-200631779 06 2/28/07 Kitchen - Locker Room - Peeling paint Lead Code A - Clear for repairs on 11/05/06. Tidewater - Roger Small (RG 11/07/06) SEE LINKED DOCUMENTS | November 3, 2006 | February 28, 2007 | 117 days |
| Benning Elementary School | FM-200631778 06 2/28/07 Kitchen - Storage Room - Peeling paint Lead Code A - Clear for repairs on 11/05/06. Tidewater - Roger Small (RG 11/07/06) SEE LINKED DOCUMENTS | November 3, 2006 | February 28, 2007 | 117 days |
| Benning Elementary School | FM-200631777 06 2/28/07 Kitchen - Pain wall where stove was removed Lead Code A - Clear for repairs on 11/05/06. Tidewater - Roger Small (RG 11/07/06) SEE LINKED DOCUMENTS | November 3, 2006 | February 28, 2007 | 117 days |
| Benning Elementary School | FM-200631776 06 2/28/07 Kitchen - Replace ceiling where fridge was removed Asbestos Code A - Clear for repairs on 11/05/06. Tidewater - Shamika Parker (RG 11/09/06) | November 3, 2006 | February 28, 2007 | 117 days |
| Smothers ES | FM-200453693 04 2/28/07 Smothers Exterior 25 feet long by two feet high concrete retaining wall is deteriorating on west side of the building at Clay street and 44th St. | August 31, 2004 | February 28, 2007 | 911 days |
| Smothers ES | FM-200451696 04 2/28/07 Smothers Boiler Room 1. Install water holes connection - in order to clean the boilers | August 6, 2004 | February 28, 2007 | 936 days |
| Randle-Highlands ES | FM-200631590 06 2/28/07 Gym - No hot water | November 1, 2006 | February 28, 2007 | 119 days |
| Bell High School | FM-200631920 /06 2/28/07 The lock on the door needs to be replaced on (Rm E120 costume) behind the stage. | November 6, 2006 | February 28, 2007 | 114 days |
| Whittier Elementary School | FM-200214830 02 2/28/07 Whittier 1. Asbestos Assessment Reqd. 1st Floor [New Wing] Parent-Teachers' Conference Room 2. Repair flooring. Remove floor tiles, damaged by water, and replace with new flooring. POC: Mr. Lewis | August 16, 2002 | February 28, 2007 | 1,657 days |
| Bell High School | FM-200630531 /06 2/28/07 The dance room door lending into the girls locker room (E205) needs the lock to be fixed. | October 4, 2006 | February 28, 2007 | 147 days |
| Smothers ES | FM-200450108 04 2/28/07 Smother Boiler Room Check domestic hot water heater. (Electric) No hot water in Building. | July 6, 2004 | February 28, 2007 | 967 days |
| Smothers ES | FM-200443200 04 2/28/07 Smother 1st Floor girl's toilet Repair or replace steam leak in supply line of girls toilet 1st floor. (3/4" line) | January 24, 2004 | February 28, 2007 | 1,131 days |
| Thomas Elementary School | FM-200622513 06 2/28/07 1st Floor- Kitchen A pipe is leaking under the sink and kitchen staff are unable to use the water. Medium- Heavy flow of water. | May 11, 2006 | February 28, 2007 | 293 days |
| Smothers ES | FM-200340084 03 2/28/07 (Smothers) 1st Floor/East Exit: Six window panes shattered from bullet holes on top of exit door on the east side. | November 7, 2003 | February 28, 2007 | 1,209 days |
| Smothers ES | FM-200337160 03 2/28/07 Smothers PE Auditorium Big hole in the sliding window size 52x32, six window panes missing. Last year A/C units were installed wrong window was cut, and left unsecured. | September 9, 2003 | February 28, 2007 | 1,268 days |
| Smothers ES | FM-200334766 03 2/28/07 Smothers Replace (2) two McDonnell & Miller regulator control on boiler #1 & #2. Model N51, HD-2 boiler pressure 35 psig | August 11, 2003 | February 28, 2007 | 1,297 days |
| Spingarn High School | FM-200507544 05 2/28/07 Rm 306 Repair Door Lock Code A-clear for repair by DCPS Charles BUchanan on 7/11/05 | July 7, 2005 | February 28, 2007 | 601 days |
| Smothers ES | FM-200226059 03 2/28/07 Smothers Down spout is clogged up on north west side of the building. Roof leak on north west stairs. | February 24, 2003 | February 28, 2007 | 1,465 days |
| Thomas Elementary School | FM-200626208 06 2/28/07 Plaster/paint the ceiling in the following classrooms; they were damaged in the storm: 302, 304, 209, 205, 105, 206 Lead & Asbestos Code A - Clear for repairs on 07/25/06. Tidewater - Roger Small (RG 08/03/06) SEE ASSESSMENTS | July 24, 2006 | February 28, 2007 | 219 days |
| Smothers ES | FM-200224714 03 2/28/07 (Smothers) 1. Asbestos assessment required. Frames on windows, eight (8) feet above the floor has rotted out away from the window. Replace window where air conditioner was installed, and removed. Asbestos Code A - Clear for repairs on 01/29/03. Horne Engineering - Bipin Nanavaty (RG 01/30/03) | January 28, 2003 | February 28, 2007 | 1,492 days |
| Smothers ES | FM-200221448 /02 2/28/07 Smothers Speech lab second floor Prepare for paint and paint speech lab to match existing color (yellow). The room has three large holes in the ceiling. Patch recently that were never painted. Since this area is so small, we are requesting that the entire room be painted. Please expedite Asbestos Code A - Clear for repairs on 11/22/02. Horne Engineering - Edward Rodriguez (RG 11/22/02) | November 20, 2002 | February 28, 2007 | 1,561 days |
| Smothers ES | FM-200216179 02 2/28/07 Smother Various Areas Throughout 1. Replaster and paint ceilings in the following areas: 1st Floor: rooms 13, 105 & 106; 2. 2nd floor science room; and 3. 3rd floor room 303. Asbestos/Lead Code A-clear for repair by Horne Engineer ( Edward Rodriguez) on 8/30/02 DCPS Charles E. Buchanan | August 30, 2002 | February 28, 2007 | 1,643 days |
| Thomas Elementary School | FM-200626210 06 2/28/07 Grounds Re-install bench to the same area where it was removed. | July 24, 2006 | February 28, 2007 | 219 days |
| Smothers ES | FM-200206545 02 2/28/07 1) In accordance with grass cutting contract for the summer of 2002 to include grass cutting and edging. | April 25, 2002 | February 28, 2007 | 1,770 days |
| Hine JHS | FM-200631974 06 2/28/07 Rooms 405, 103 - Repair locks on doors, will not lock | November 7, 2006 | February 28, 2007 | 113 days |
| Randle-Highlands ES | FM-200628785 06 2/28/07 Basement/2nd Floor- 2B11, 2B01, 2114 Repair urinals and handsinks. | September 5, 2006 | February 28, 2007 | 176 days |
| Randle-Highlands ES | FM-200632897 06 2/28/07 Room 2206 - Door loose from hinge | December 5, 2006 | February 28, 2007 | 85 days |
| Thomas Elementary School | FM-200632686 9/06 2/28/07 First, Second & Third Floors - Servey and Repair Knob Locks On Rm. 212 & Make Keys For Rooms 223, 107, & 307 | November 29, 2006 | February 28, 2007 | 91 days |
| Thomas Elementary School | FM-200340719 /03 2/28/07 (Thomas) Replace Light shield in R1 Refrigerator. | November 18, 2003 | February 28, 2007 | 1,198 days |
| Randle-Highlands ES | FM-200632375 /06 2/28/07 Red Exterior Door To Tennis Court - Back Side Of Building - Can't Be Secured, Will Close But Won't Lock. | November 21, 2006 | February 28, 2007 | 99 days |
| Thomas Elementary School | FM-200332917 03 2/28/07 (Thomas, Neval) Outside Grounds/South Side of Building: Survey, and unstop drain in the custodian office area. | July 7, 2003 | February 28, 2007 | 1,332 days |
| Randle-Highlands ES | FM-200624724 06 2/28/07 2nd Floor- Mechanical Room Mechanical Room is flooded. (Causing damage to the ceiling beneath this room, possible floor damage.) | June 26, 2006 | February 28, 2007 | 247 days |
| Thomas Elementary School | FM-200331722 03 2/28/07 Thomas !! EMERGENCY !! Through - Out 1. Power outage due to the storm . | June 13, 2003 | February 28, 2007 | 1,356 days |
| Thomas Elementary School | FM-200330819 03 2/28/07 Thomas First Floor 1. Repair custodain closet door, door is hanging from the hinge . | May 29, 2003 | February 28, 2007 | 1,371 days |
| Thomas Elementary School | FM-200227229 03 2/28/07 Thomas Basement restroom Survey and repair or replace toilet and sink. Area is to be used as fall out shelter for the school. | March 18, 2003 | February 28, 2007 | 1,443 days |
| Thomas Elementary School | FM-200222690 /02 2/28/07 Thomas First floor - kitchen Repair or replace exit light. | December 17, 2002 | February 28, 2007 | 1,534 days |
| Thomas Elementary School | FM-200220361 /02 2/28/07 Thomas Roof Unstop drain and pump water off of the roof because water is pooled on the roof. | October 31, 2002 | February 28, 2007 | 1,581 days |
| Thomas Elementary School | FM-200206556 02 2/28/07 1) In accordance with grass cutting contract for the summer of 2002 to include grass cutting and edging. | April 25, 2002 | February 28, 2007 | 1,770 days |
| Thomas Elementary School | FM-200220135 /02 2/28/07 Neval Thomas First floor corridor conference room 106 1) Disconnect univent and corridor switch from the same panel switch and put them on seperate switches. | October 28, 2002 | February 28, 2007 | 1,584 days |
| Harris, C.W. ES | FM-200630392 10/3/06 2/28/07 1st Floor- Boiler Room Install a window guard outside of the boiler room. | October 3, 2006 | February 28, 2007 | 148 days |
| Randle-Highlands ES | FM-200622331 06 2/28/07 Ground Floor-Gym Area: Repair or replace the center bar on the exterior door, it has come loose and the door can't be locked properly. | May 8, 2006 | February 28, 2007 | 296 days |
| Spingarn High School | FM-200458272 /04 2/28/07 Spingarn Gym The gym floor need to be screen and sealed. Code A-clear for repair by DCPS Charles Buchanan on 11/16/04 | November 15, 2004 | February 28, 2007 | 835 days |
| Garfield ES | FM-200619618 06 2/28/07 D-Wing Demandable-Door closer needed for rooms 107 &109, closer are broken Asbestos Code A - Clear for repairs on 03/09/06. Tidewater - Henry Addison (RG 06/05/06) | March 7, 2006 | February 28, 2007 | 358 days |
| Spingarn High School | FM-200458200 /04 2/28/07 Spingarn Third floor room 330 Need carpenter to repair or replace the door that was damage by students. Metal Doors Code A-clear for repair by DCPS Charles Buchanan on 11/16/04 | November 12, 2004 | February 28, 2007 | 838 days |
| Spingarn High School | FM-200457918 04 2/28/07 (Spingarn) 3rd Floor/Room #330 Repair or replace classroom door, damaged by vandals. | November 4, 2004 | February 28, 2007 | 846 days |
| Thomas Elementary School | FM-200220071 /02 2/28/07 Thomas Roof top of cafeteria Pump (remove) out water on top of cafeteria roof before water leaks into the cafeteria. | October 25, 2002 | February 28, 2007 | 1,587 days |
| Thomas Elementary School | FM-200208795 02 2/28/07 Thomas, Neval First (1st) Floor - Stairwell #1, landing & steps 1. Asbestos Assessment Required. 2. Survey Only 3. Peeling Paint can be scraped. Asbestos & Lead Code A - Clear for repairs on 06/03/02. Horne Engineering - Stephen Caldwell (RG 06/04/02) | June 3, 2002 | February 28, 2007 | 1,731 days |
| Ketcham Elementary School | FM-200631959 06 2/28/07 Repair or replace door locks to the following rooms: 205-B, 202, Basement-Custodian's Office, Electrical Closet, Cafeteria Office, Phys. Ed. Room; and Auditorium need door handle | November 7, 2006 | February 28, 2007 | 113 days |
| Spingarn High School | FM-200452137 04 2/28/07 Spingarn First floor auditorium Requesting a carpenter to replace door closer to door that was broken by student. FCV | August 11, 2004 | February 28, 2007 | 931 days |
| Randle-Highlands ES | FM-200619259 06 2/28/07 Ground level, Cafeteria Area. "Emergency" Repair pipe straps and pipes that are separating. Asbestos Code A - Clear for repairs on 03/02/06 Tidewater - Thomas Johnson (RG 03/08/06) | March 1, 2006 | February 28, 2007 | 364 days |
| Garfield ES | FM-200623375 06 2/28/07 D-Wing Demanables Hinges on the doors entering Demanables need to be repaired. Asbestos Code A - Clear for repairs on 05/31/06. Tidewater - Samuel May (RG 06/01/06) | May 25, 2006 | February 28, 2007 | 279 days |
| Spingarn High School | FM-200447558 04 2/28/07 Spingarn Third floor room 306 and 314 Requesting a carpenter to replace broken door closures that was broken by students. | May 5, 2004 | February 28, 2007 | 1,029 days |
| Thomas Elementary School | FM-200451015 04 2/28/07 Thomas Roof has standing water over the kitchen, please remove. | July 28, 2004 | February 28, 2007 | 945 days |
| Thomas Elementary School | FM-200460014 /04 2/28/07 THOMAS FIRST FL. CORRIDOR/OLD WING AJUST WATER FLOW | December 23, 2004 | February 28, 2007 | 797 days |
| Spingarn High School | FM-200341695 /03 2/28/07 Spingarn First floor by stairway no.# 2 Requesting an carpenter to replace or repair existing fire door, old door was damage by students. Fire Code Violation | December 16, 2003 | February 28, 2007 | 1,170 days |
| Spingarn High School | FM-200341431 /03 2/28/07 Spingarn First floor by security office Requesting a carpenter to repair broken door near security office. | December 11, 2003 | February 28, 2007 | 1,175 days |
| Spingarn High School | FM-200340119 03 2/28/07 (Spingarn) Asbestos Assessment Required. 3rd Floor/Stairway #6: Requesting door closure to be replaced; old door closure broken by student. Code A-clear repair by DCPS Charles Buchanan on 11/10/03 | November 7, 2003 | February 28, 2007 | 1,209 days |
| Spingarn High School | FM-200340118 03 2/28/07 (Spingarn) Asbestos Assessment Required. 1st Floor/Gym: Request door closer to be replaced on door to the boys side of the gym. Code A-clear repair by DCPS Charles Buchanan on 11/10/03 | November 7, 2003 | February 28, 2007 | 1,209 days |
| Spingarn High School | FM-200339798 03 2/28/07 Spingarn First floor auditorium Requesting a carpenter to replace door closure to auditorium door which was broken by student. Asbestos Code A - Clear for repairs on 11/04/03. Horne Engineering - Troy Wilcome (RG 11/14/03) | November 3, 2003 | February 28, 2007 | 1,213 days |
| Spingarn High School | FM-200338111 03 2/28/07 Spingarn First floor health suite Requesting a plasterer to fix ceiling due to water leaking from above classroom. Asbestos Code A - Clear for repairs on 09/29/03. Horne Engineering - Sheryll James (RG 10/01/03) | September 26, 2003 | February 28, 2007 | 1,251 days |
| Spingarn High School | FM-200337770 03 2/28/07 (Spingarn) Asbestos Assessment Required. 2nd Floor/Stairwell #3: Request carpenter to put back th existing door that was damaged by students. Asbestos Code A - Clear for repairs on 09/24/03. Horne Engineering - Troy Wilcome (RG 09/26/03) | September 18, 2003 | February 28, 2007 | 1,259 days |
| Thomas Elementary School | FM-200450523 04 2/28/07 Thomas Where the old playground equipment use to be There is a pole that a child got cut that need to be remove. | July 20, 2004 | February 28, 2007 | 953 days |
| Spingarn High School | FM-200337768 03 2/28/07 (Spingarn) Asbestos Assessment Required. 1st Floor/Wood Shop: Request carpenter to survey, and make adjustments to the door, and something is wrong with door hinge. | September 18, 2003 | February 28, 2007 | 1,259 days |
| Spingarn High School | FM-200337377 03 2/28/07 Spingarn First floor stairway no. 3 Replace existing handrail. It was broken by students. Old rail can not be fix. Asbestos Code A - Clear for repairs on 09/17/03. Horne Engineering - Troy Wilcome (RG 11/18/03) | September 12, 2003 | February 28, 2007 | 1,265 days |
| Thomas Elementary School | FM-200449372 04 2/28/07 Navel Thomas School Field needs cutting for Family Day Friday June 18th | June 16, 2004 | February 28, 2007 | 987 days |
| Spingarn High School | FM-200337376 03 2/28/07 Spingarn Second floor stairway no. 3 Replace door closures. Existing one was damage by students. This is a fire code violation. Asbestos Code A - Clear for repairs on 09/17/03. Horne Engineering - Troy Wilcome (RG 11/18/03) | September 12, 2003 | February 28, 2007 | 1,265 days |
| Spingarn High School | FM-200336329 03 2/28/07 Spingarn First and third floor girls Requesting doors to be replaced on stolls in girls restroom. | August 27, 2003 | February 28, 2007 | 1,281 days |
| Thomas Elementary School | FM-200505207 05 2/28/07 ( THOMAS ) First Floor - Kitchen (Storage Room) 1) Survey and provide adequate lighting in the dry food storage room. | May 6, 2005 | February 28, 2007 | 663 days |
| Spingarn High School | FM-200333081 03 2/28/07 (Spingarn) 3rd Floor/Room #309: Requesting carpenter to replace existing door; old door is broken. Asbestos Code A - Clear for repairs on 07/10/03. Horne Engineering - Troy Wilcome (RG 07/15/03) | July 9, 2003 | February 28, 2007 | 1,330 days |
| Thomas Elementary School | FM-200505212 05 2/28/07 ( THOMAS ) First Floor- Kitchen 1) Replace 4 inch metal around basebord. Code A-clear for repair by DSCPS Charles Buchanan on 5/10/05 | May 6, 2005 | February 28, 2007 | 663 days |
| Thomas Elementary School | FM-200505214 05 2/28/07 ( THOMAS ) First Floor - Kitchen Dressing Room 1) Survey and repair dressing room door, it can not close. Code A-clear for repair by DSCPS Charles Buchanan on 5/10/05 | May 6, 2005 | February 28, 2007 | 663 days |
| Thomas Elementary School | FM-200512849 05 2/28/07 Thomas Emergency First Floor-Old Wing (Girls Restroom) Water running from the cut off valve on the toilet and flooding the floor. | September 20, 2005 | February 28, 2007 | 526 days |
| Thomas Elementary School | FM-200513074 05 2/28/07 (Thomas) "Emergency" Repair or Replace playground fence, the damaged was sustained by an automobile. | September 22, 2005 | February 28, 2007 | 524 days |
| Spingarn High School | FM-200332761 03 2/28/07 Spingarn Third floor room 320 Requesting existing carpet be removed and replaced with tile , due to water damage, rain. Requesting ceiling to be fixed due to main, and someone to survey the mold thats on the wall. there places were the wall paper has begun to come off the wall due to rain coming in thru the ceiling. Asbestos Code A - Clear for repairs on 07/02/03. Horne Engineering - Troy Wilcome ( RG 07/03/03 ) | July 1, 2003 | February 28, 2007 | 1,338 days |
| Spingarn High School | FM-200225112 03 2/28/07 (Spingarn) 3rd Floor/Room #326: Due to vandalism, replace doors, split, rotted out, and off hinges. Asbestos Code A - Clear for repairs on 02/04/03. Horne Engineering - Troy Wilcome (RG 02/04/03) | February 3, 2003 | February 28, 2007 | 1,486 days |
| Spingarn High School | FM-200221873 02 2/28/07 Spingarn First floor - gym floor Screen floors for up-coming basketball season. | December 2, 2002 | February 28, 2007 | 1,549 days |
| Spingarn High School | FM-200218059 02 2/28/07 Spingarn 3rd Floor Room 326 Repair/replace damaged door to room 326---cannot close the door properly and lock will not engage because of it. | September 23, 2002 | February 28, 2007 | 1,619 days |
| Smothers ES | FM-200632537 /06 2/28/07 Boiler Room - No domestic hot water in the building. | November 27, 2006 | February 28, 2007 | 93 days |
| Smothers ES | FM-200631333 /06 2/28/07 First floor, Utility Closet. Unclog utility sink that's is backing up all over floor. | October 25, 2006 | February 28, 2007 | 126 days |
| Garfield ES | FM-200630028 06 2/28/07 Rooms 205, 206, 107, 109 - Door closers needed on room doors | September 26, 2006 | February 28, 2007 | 155 days |
| Thomas Elementary School | FM-200442437 04 2/28/07 Thomas First floor 106 Survey and replace floor tiles that are coming up due to leaking pipe on univent. | January 9, 2004 | February 28, 2007 | 1,146 days |
| Thomas Elementary School | FM-200341303 03 2/28/07 (Thomas) !!!EMERGENCY!!! 1st Floor/Old Wing: Toilet running over in the girls restroom, shut off valve inoperative. | December 9, 2003 | February 28, 2007 | 1,177 days |
| Anacostia Senior High School | FM-200623479 06 2/28/07 Third Floor/Boy's Restroom, Room 306, Room 303: All Have Breches In The Ceiling. Asbestos Code A - Clear for repairs on 05/31/06. Tidewater - Samuel May (RG 06/01/06) | May 30, 2006 | February 28, 2007 | 274 days |
| Smothers ES | FM-200625867 06 2/28/07 Front Exterior Door. Replace lock on front exterior door lock because staff member lost his keys. | July 18, 2006 | February 28, 2007 | 225 days |
| Smothers ES | FM-200625797 06 2/28/07 Need locksmiths to rekey locks because custodian lost his keys and there is no way to secure building. Note: A locksmith is needed asap! | July 17, 2006 | February 28, 2007 | 226 days |
| Smothers ES | FM-200623744 06 2/28/07 Exterior- West Side of the Building There is graffitti (profanity) on the exterior doors and side walk. | June 2, 2006 | February 28, 2007 | 271 days |
| Lincoln Middle School | FM-200631917 06 2/28/07 The lock on the door came out and you need a core key to insert the lock back into the set. | November 6, 2006 | February 28, 2007 | 114 days |