Closed Repair Requests in March 2007

Closed Repairs Summary

  • Urgent Requests
    119
  • Routine Requests
    765
  • Total Requests
    884

Detailed Reports

Urgent Repair Requests Closed in March 2007 (119)
School Description Open Date Close Date Time Elapsed
Kelly Miller MS FM-200633022 2/8/06 3/1/07 First Floor - Girl's Bathroom Near Gym - R/R Partition, it fell down Asbestos Code A - Clear for repairs on 12/08/06. DCPS Safety - Richard Gibson (RG) December 8, 2006 March 1, 2007 83 days
Kelly Miller MS FM-200629853 06 3/1/07 Replacement of damaged or missing ceiling tile throughout the building. Note: These repairs are to be completed before Dr. Janey's and US Department of Education's site visit on September 25,2006. Asbestos Code A - Clear for repairs on 09/22/06. DCPS Safety - Richard Gibson (RG 09/22/06) September 22, 2006 March 1, 2007 160 days
Kelly Miller MS FM-200506068 05 3/1/07 (Miller) Asbestos Assessment Required. Main lobby area. Install dedication plaque in specified area. Asbestos Code A - Clear for repairs on 05/27/05. DCPS Safety - Richard Gibson (RG) May 27, 2005 March 1, 2007 643 days
Spingarn High School FM-200213261 02 3/1/07 Spingarn Room 211 1. Asbestos assessment required. Make electrical adjustments - run electrical outlets for 2 window a/c units and electrical line for microwave oven and computer. Code A Clear for Repair by Leroy Minton, Jr. DCPS Safety-07-30-02 DCPS Safety-Sheila R. Howard 07-30-02 July 26, 2002 March 1, 2007 1,679 days
Spingarn High School FM-200512455 05 3/1/07 (Spingarn) "Very Urgent" Third floor. Need electricians to assess and repair problem. Note: When spot cooler is turned on all the lights inside classroom goes off, spot cooler may need a dedicated circuit. September 13, 2005 March 1, 2007 534 days
Spingarn High School FM-200622396 06 3/1/07 Basement- Boys Lockerroom VERY URGENT! The children kicked the door in completely. The door needs to be replaced/repaired and installed. (THE BOY'S LOCKERROOM IS OPEN WITH FULL EXPOSURER TO STUDENTS PASSING BY) Asbestos Code A - Clear for repairs on 05/11/06. Tidewater - Thomas Johnson (RG 05/12/06 May 9, 2006 March 1, 2007 296 days
Spingarn High School FM-200459826 /04 3/1/07 SPINGARN FIRST FL. RM 126 INSTALL DUPLEX RECEPTACLE Asbestos Code A - Clear for repairs on 12/22/04. DCPS Safety - Leroy Minton Jr. (RG 12/22/04) December 20, 2004 March 1, 2007 801 days
Patterson ES FM-200453040 04 3/2/07 Patterson, W.B./Harris, PR Main entrance Exterior door stuck hard to open. Asbestos Code A - Clear for repairs on 08/23/04. DCPS Safety - Leroy Minton Jr. (RG 08/23/04) August 20, 2004 March 2, 2007 924 days
Spingarn High School FM-200502250 05 3/2/07 Spingarn Third floor rooms 326 and 328 Requesting safety to survey roof leaking on the rooms and check out the spot that looks like mold in room 328. Water damage has shown up from when it rains. AMP Room 309 AMP Room 305 HA 017 Plaster White No Asbestos HA 717 Brown Coat With HA 017 No Asbestos Code A-clear for repair by DCPS Charles Buchanan on 1/13/06 March 4, 2005 March 2, 2007 728 days
Spingarn High School FM-200501801 05 3/2/07 Spingarn ( High School Bathroom Survey Report ) Second Floor Boys Restroom - Paint Walls and Ceiling First Floor Boys Restroom - Paint Walls and Ceiling First Floor Girls Restroom - Paint Walls and Ceiling Boys Locker Room - Paint Walls and Ceiling Girls Locler Room - Paint Walls and Ceiling Code A- clear for repairs as of 3/15/05 Sylvia Grimes safety office. Paint tested negative in earlier survey's 03/15/2005 10:28 SG - February 20, 2005 March 2, 2007 740 days
Spingarn High School FM-200501771 05 3/2/07 Spingarn First floor room 115 Requesting safety to survey leak from the ceiling. HA 017 Plaster Coat No Asbestos HA 717 Brown Coat With HA 017 No Asbestos Code A-clear for repair by DCPS Charles Buchanan on 1/13/06 February 18, 2005 March 2, 2007 742 days
Patterson ES FM-200453039 04 3/2/07 Patterson, W.B. Third floor girls room stairwell # 4 Batch two holes in drywall. Asbestos Code A - Clear for repairs on 08/23/04. DCPS Safety - Leroy Minton Jr. (RG 08/23/04) August 20, 2004 March 2, 2007 924 days
Spingarn High School FM-200504271 05 3/2/07 ( SPINGARN ) Third Floor - Stairway #4 1) Replace wire mesh glass. Asbestos Code A - Clear for repairs on 04/19/05. DCPS Safety - Leory Minton Jr.(RG 04/20/05) April 19, 2005 March 2, 2007 682 days
Spingarn High School FM-200207099 02 3/2/07 Spingarn Asbestos Assessment Reqd. 2nd Floor Custodial Closet Close hole in brick wall in custodial closet. Asbestos Code A - Clear for repairs on 05/03/02. DCPS Safety - Richard Gibson (RG 05/03/02) May 3, 2002 March 2, 2007 1,764 days
Plummer Elementary School FM-200504182 05 3/5/07 ( PLUMMER ) First Floor - Boys Restroom 1) Replace missing doors. Asbestos Code A - Clear for repairs on 04/19/05. DCPS Safety - Richard Gibson (RG) April 18, 2005 March 5, 2007 686 days
Stuart-Hobson Middle School FM-200514144 /05 3/5/07 (Stuart-Hobson) "Urgent" Ground floor, Cafeteria & Cafeteria Dressing room. Repair or Replace loose ceiling tiles and replace missing ceiling tiles in cafeteria over serving table tables. Note: Tiles are falling and recently feel during lunch period. HA 037 Ceiling tile white 1' X 1' with holes in straight lines No Asbestos HA 042 Plaster old school N0 Asbestos HA 742 Brown coat with HA 042 No Asbestos Code A-clear for repair by DCPS Charles Buchanan on 11/03/05 October 22, 2005 March 5, 2007 499 days
Stuart-Hobson Middle School FM-200218410 02 3/5/07 Stuart-Hobson ****Urgent**** Asbestos Assessment Reqd. Girls' Restroom Throughout Furnish and install handicapped railings in the first stall of all girls' lavatories on all floors. Bars may need to be placed behind the commodes. There is a handicapped student in the school who has classes on all floors [safety concerns]. Asbestos Code A-clear for repair by Horne Engineer Roger Kager DCPS Charles Buchanan on 09/27/02 September 26, 2002 March 5, 2007 1,621 days
Plummer Elementary School FM-200331199 03 3/5/07 Plummer Room 213 Provide and install new set of double entrance doors to replace old set that wood came off hinges due to age and deteriorattions. URGENT Asbestos Code A - Clear for repairs on 06/05/03. Horne Engineering - Tony Marcolin (RG 06/05/03) June 4, 2003 March 5, 2007 1,370 days
Stuart-Hobson Middle School FM-200621460 06 3/5/07 Second Floor Teacher's Lounge - Asbestos Assessment Required - Has cracked and broken floor tiles. Asbestos Code D - on 04/19/06. Tidewater - Shamika Parker (RG 04/26/06) Asbestos Code A - Abated and repaire on 11/01/06 by Motir Services (LM-11/15/06) Safety Office 202-576-8962. April 19, 2006 March 5, 2007 320 days
Woodson High School FM-200619885 06 3/6/07 Woodson Boiler Room Repair or replace seal in pump #17. Pump is leaking badly. Pump service stairs and classrooms. Urgent !!!!! March 14, 2006 March 6, 2007 357 days
Green Elementary School FM-200700023 9/07 3/6/07 Boiler room - URGENT - Correct existing problems with boiler # 4 that continuously fails to flame failure. Boiler # 3 still awaiting parts. January 29, 2007 March 6, 2007 36 days
Woodson High School FM-200619887 06 3/6/07 Woodson Boiler Room Repair or replace pump #16. Pump will not come on. Pump seem to had no power. Urgent !!!!! March 14, 2006 March 6, 2007 357 days
Ballou Senior High School FM-200501369 05 3/7/07 (Ballou) Locksmith needed for repair handle and combination to school vault,unable open(urgent). January 29, 2005 March 7, 2007 767 days
Aiton Elementary School FM-200622347 06 3/7/07 Repair the stairs to the stage in the cafeteria on the first floor. Note: Someone may get hurt a sharp piece is sticking out. Asbestos Code A - Clear for repairs on 0/09/06. Tidewater - Kenny Long (RG 05/10/06) May 9, 2006 March 7, 2007 302 days
Rudolph Elementary School FM-200500689 05 3/7/07 Rudolph Room #112 Repair or replace shaft bearing on heating unit in room #112, the shaft bearing is bad. Urgent !!!!!! January 22, 2005 March 7, 2007 774 days
Benning Elementary School FM-200338788 /03 3/7/07 Benning Basement The electrical panel in the electric room need to be disconnected, because the light pole is being taken down for safety reason. Asbestos Code A - Clear for repairs on 10/14/03. Horne Engineering - Troy Wilcome (RG 10/22/03) October 10, 2003 March 7, 2007 1,244 days
Turner Elementary School FM-200501707 05 3/7/07 (Turner) !!!URGENT!!! Rooms #212, 313, 314: Change locks on rooms documented, and storage room door; install guard plates. (Key alike) February 16, 2005 March 7, 2007 749 days
Wilson J. O. ES FM-200634290 07 3/7/07 Main Roof Repair or replace split system unit#3 Unit is continously being reset daily. Once unit reach set temperature, will not restart on its own. Space unit service are cold. Urgent !!!! January 24, 2007 March 7, 2007 42 days
Benning Elementary School FM-200501219 05 3/7/07 Benning Stairways Repair Lighting on steps Asbestos Code A - Clear for repairs on 02/04/05. DCPS Safety - Richard Gibson (RG) February 4, 2005 March 7, 2007 761 days
Eaton Elementary School FM-200633240 06 3/7/07 Eaton School - Boiler Room - Urgent Request - Send H.V.A.C. machanic to repair or replace pneumatic control system for H.V.A.C. equipment. Appears to be a bad filter valve. Valve Information: PP902D-1007-2-9807, ( Press-Reg. ) Made by Honeywell. Difficult to control heat in some areas. December 9, 2006 March 7, 2007 88 days
Benning Elementary School FM-200500304 05 3/7/07 Benning Area in fron of school main doors have unenev concrete and someone will bump into it and injury them self. January 11, 2005 March 7, 2007 785 days
Hart Middle School FM-200338793 /03 3/7/07 Hart Basement positive nature -B wing Remove broken and cracked floor and ceiling tiles in classrooms and corridor on basement level. Install missing ceiling tiles and floor tiles in above area after abatement. Assessment needed. Asbestos Code A - Clear for repairs on 10/10/03. DCPS Safety - Ronald Edwards (RG 10/10/03) Code A clear for 2'x4' acoustical ceiling tiles in the basemment hallway. and to install 12"x12" floor tiles in the basement hall way and room B35 on the basement level. (R. Edwards 10/10/03) October 10, 2003 March 7, 2007 1,244 days
Stoddert ES FM-200700349 2/8/07 3/7/07 Boiler Room Repair or replace Boiler, Boiler keep going off on flame failure. Only Boiler in Building. Urgent !!!! February 8, 2007 March 7, 2007 27 days
Raymond Elementary School FM-200701397 3/9/07 3/9/07 Location: Room 117 Replace ceiling tile. Asbestos Code A - Cleared for repairs on 03/09/07 by Tidewater (LM?03-09-07) Safety Office 202-576-8962. March 9, 2007 March 9, 2007 0 days
Dunbar High School FM-200701393 /07 3/9/07 Location: Large ground area near boys and girls locker room ramp. Please Replace 40 peices of ceiling tile damaged and on the floor covering a large ground space by the boys and girls locker room area. Ceiling tile 28" x 48" Hanging (electric) wiring is reported as hanging from the ceiling. Asbestos Code A - Clear for repairs on 03/08/07. DCPS Safety - Richard Gibson (RG) March 8, 2007 March 9, 2007 1 day
Shaed Elementary School FM-200514669 /05 3/12/07 Shaed Very Urgent First Floor-Book Room The key to the book room was lost and there is no way to open the room. October 26, 2005 March 12, 2007 502 days
Wilson J. O. ES FM-200700711 /21/07 3/12/07 Open Space, 3rd, 2nd Floor, and Library (2nd floor) - Adjust temperature in area indicated. Extremily hot. Urgent !!!! February 21, 2007 March 12, 2007 19 days
Patricia R Harris Ed Center FM-200514729 /05 3/12/07 Harris, P.R. Urgent Basement-Repair locks to 32 doors so that the panic bar can be locked with the key. Unable to secure basement area.Students are vancalising the area also change locks on iron doors to gated area. New principal and custodial foreman need keys. Note: Interior Stairwell Doors October 27, 2005 March 12, 2007 501 days
Slowe Elementary School FM-200701062 4/07 3/12/07 Boiler Room - Repair or replace Boiler #1, Boiler will not start. Urgent !!!! March 4, 2007 March 12, 2007 8 days
Hyde Elementary School FM-200514703 /05 3/12/07 (Hyde) "Urgent" Asbestos Assessment Required. Basement Level, Cafeteria Area. Repair or Replace knob on door leading to cafeteria it cannot be opened. Note: Currently it is jammed because of the door knob is malfunctioning. October 27, 2005 March 12, 2007 501 days
Reed LC FM-200700680 07 3/12/07 Penthouse, Mechanical Room - AHU #11 Repair or replace sleeve covering to the pulley end of the shaft on air handle unit #11; Air handle unit metal sleeve split in halt; unit is needed to heat Learning Center on the 2nd floor, also several classrooms on the 2nd floor. Urgent !!!!! February 21, 2007 March 12, 2007 19 days
Ballou Senior High School FM-200513360 05 3/12/07 (Ballou) "Urgent" Asst. Principal's Office. Survey & rekey knob locks to asst.principal suite to building master(out going principal lost keys.) August 23, 2005 March 12, 2007 566 days
Houston Elementary School FM-200701236 07 3/12/07 Boiler room URGENT!!!!!!!!! Repair Boiler # 2 , unit cut off on main flame failure after temperature is reached and must be reset each time. # 1 boiler is also flame failure. March 8, 2007 March 12, 2007 4 days
Watkins Elementary School FM-200511711 05 3/12/07 Watkins Very Urgent Entire Building-Re-Key doors inside and outside. September 1, 2005 March 12, 2007 557 days
Kimball Elementary School FM-200618323 06 3/12/07 Kimball Cafeteria Check and repair breaker and lights in cafeteria. No lights working. Engineer check light switch and ballast Urgent !!!!! February 6, 2006 March 12, 2007 399 days
Ronald H. Brown MS FM-200514684 /05 3/12/07 Brown Very Urgent Second Floor-Custodial Closet Re-Key lock on closet door. October 26, 2005 March 12, 2007 502 days
Kimball Elementary School FM-200500708 05 3/12/07 Kimball Ramp door Need a lock put on the ramp door, because it is dangerous going down to the boiler room. January 24, 2005 March 12, 2007 777 days
Kimball Elementary School FM-200456089 04 3/12/07 Kimball Main entrance entry system The front door entry system is not working. Repair ASAP Safety Concern. Asbestos Code A - Clear for repairs on 10/01/04. DCPS Safety - Leroy Minton Jr. (RG 10/01/04) September 29, 2004 March 12, 2007 894 days
Janney Elementary School FM-200700624 25/07 3/12/07 Two door hinges are broken off of exit door on west side of demountable three. The door is a health and safety hazard. January 25, 2007 March 12, 2007 46 days
Kimball Elementary School FM-200455588 04 3/12/07 Kimball First floor room 115 Replace floor carpet ASAP due to water damage. Carpet is damage need to be replace. HA 002 Carpet Masic Yellow No Asbsestos HA 004 Floor tile Off-White 9" x 9" with Olilvve streaks Assumed HA 005 Floor Mastic with HA 004 Assumed HA 006 Floor tile Off-White 9" x 9" with Olilvve streaks Yes for asbestos HA 007 Floor Mastic with HA 006 No for asbestos HA 008 Floor Tile Beige 9" X 9' With White Streaks Assumed HA 009 Floor Mastic with HA 008 Assumed "Code A" Cleared for repairs/replacement on 8/29/05 . Carpet tiles are on site. DCPS Safety 8/02/05 Also reference FM-200507291 September 24, 2004 March 12, 2007 899 days
Kimball Elementary School FM-200448574 04 3/12/07 (Kimball) Asbestos Assessment Required. Furnish and install carpet in the following area's: Room #102, North Wing, #122, 105, 109, 111, 113, 115, and others. Carpet is damaged, dirty, and safety hazard. (FWT) May 27, 2004 March 12, 2007 1,019 days
Ketcham Elementary School FM-200701347 07 3/12/07 Request that someone come out and re-attach light fixture to ceiling because it is hanging and could possibly fall. Urgent!!! March 8, 2007 March 12, 2007 4 days
Eaton Elementary School FM-200507630 05 3/12/07 !!!!VERY URGENT!!!! First Floor - Main Lobby Area Main security door can't be secured and is falling off the henge. July 11, 2005 March 12, 2007 609 days
Macfarland Middle School FM-200217452 02 3/12/07 MacFarland ****Urgent**** Auditorium 1. Repair or replace a fallen light fixture that barely missed someone's head when it fell; and 2. Survey and check all ceiling fixtures to ensure that fixture mountings are tight and secure [safety issue]. September 13, 2002 March 12, 2007 1,641 days
Eastern High School FM-200514917 05 3/13/07 Urgent: Furnish and install a 3 phase breaker in eletrical panel for freezer breaker is bad and food must be picked up every Friday and brought back on Munday. Info: General Electric 40 amp breaker PH - 3 TYPE: NLAB W-4 STYLE: 5 PANEL INFO: General Electric VOLTS: 208Y/200 AMP-225 PLANT-P PH-3 November 1, 2005 March 13, 2007 497 days
Shaw JHS FM-200631948 6/06 3/13/07 URGENT:Two slide bolts needed for outside of home economics room. 11/06/06 November 6, 2006 March 13, 2007 127 days
Eastern High School FM-200500181 05 3/13/07 Eastern B-70 Furnish and install light fixtures in store room in science-chemistry room. NOTE: Safety officer need light replaced to inventory chemicals in lab. Inspectio will take place on 1/10/05. Code A-clear for repair by DCPS Charles Buchanan on 1/12/05 January 6, 2005 March 13, 2007 796 days
Eastern High School FM-200514713 /05 3/13/07 Eastern Urgent Furnish and install electrical switch to cut on/off air conditioners. The units has been installed October 27, 2005 March 13, 2007 502 days
Clark Elementary School FM-200221179 /02 3/16/07 Clark Third floor Girls restroom bradley basins are not working properly. One is draining slow and the other one sensors are off. No way children can wash their hands. Asbestos Code A- Cleared for repairs on 03-04-03 by Leroy Minton Jr (LM/01-15-04) Safety Office. 202-576-8962. November 18, 2002 March 16, 2007 1,579 days
Merritt Middle School FM-200701625 07 3/19/07 1st Floor/Library; Missing ceiling tile. Asbestos Code A - Clear for repairs on 03/13/07. DCPS Safety - Richard Gibson (RG) March 13, 2007 March 19, 2007 6 days
Francis Junior High School FM-200459574 /04 3/19/07 Francis Third floor 303 Door hinges need to be rehung, the door will not line up. Asbestos Code A - Clear for repairs on 12/14/04. DCPS Safety - Richard Gibson (RG) December 14, 2004 March 19, 2007 825 days
Janney Elementary School FM-200221230 /02 3/19/07 Janney First floor - outside / front of bldg. Plumbing: Need a plumber to evaluate / survey cause of water flooding tunnel after it rains. We cut drain and put flex pipe extended out to lawn. This did not stop the flood. Told that cast iron pipe underground is broken causing rain (water) to flood tunnel in basement. Safety hazard. November 18, 2002 March 19, 2007 1,582 days
Turner Elementary School FM-200701081 07 3/19/07 Room - 214 - Asbestos assessment required Repair ruptured line in ceiling of room 214. Asbestos Code A - Abated and cleared for repairs on 03/05/07 by Motir Services (LM/03-07-07) Safety Office 202-576-8962. March 5, 2007 March 19, 2007 14 days
Merritt Middle School FM-200701626 07 3/19/07 1st Floor/Observation Room; Missing ceiling tile. Asbestos Code A - Clear for repairs on 03/13/07. DCPS Safety - Richard Gibson (RG)) March 13, 2007 March 19, 2007 6 days
West Elementary School FM-200515216 05 3/20/07 Urgent: Replace five pad locks and key entry locks in the stairwell by gym. November 8, 2005 March 20, 2007 497 days
Seaton Elementary School FM-200701461 07 3/20/07 Boiler Room - Repair or replace leaking tubes in Boiler #2. Note: Boiler #1 already down with leaks in combustion chamber. No heat in building. Urgent !!!! March 11, 2007 March 20, 2007 9 days
Young Elementary School FM-200701252 07 3/20/07 2nd fl. Double doors in hallway missing safety glass - Right side door glass measures 8x30 inches. Asbestos Code A - Clear for repairs on 03/08/07. Tidewater - Kenny Long (RG 03/13/07) March 8, 2007 March 20, 2007 12 days
Roosevelt High School FM-200631564 /06 3/20/07 Roosevelt Room B-15 Correct electrical problem in room B-15 No lights in room. Need lights to see how to operate equipment. Safety Hazard !!!! October 31, 2006 March 20, 2007 140 days
Roosevelt High School FM-200501554 05 3/20/07 Roosevelt Install 120 volt quad outlet near security console unit to be installed in main entrance lobby. Code A - clear for repairs as of 2/24/05. Sylvia Grimes Safety office. February 11, 2005 March 20, 2007 767 days
Wilkinson ES FM-200619954 06 3/20/07 Very Urgent First Floor-Pre-K Hallway Change Light Fixture In This Area-Replace Bulbs But Lights Still Wont Come On. March 15, 2006 March 20, 2007 370 days
Watkins Elementary School FM-200515830 /05 3/20/07 Exterior rear of building, First floor. "Urgent" Repair or Replace lock on exterior door leading from incinerator into building currently the lock is jammed. November 28, 2005 March 20, 2007 477 days
Young Elementary School FM-200701201 07 3/20/07 2nd fl. 5th grade Special Ed - safety glass not installed properly - No putty around glass. Glass is loose in frame Asbestos Code A - Clear for repairs on 03/08/07. Tidewater - Kenny Long (RG 03/13/07) March 7, 2007 March 20, 2007 13 days
Walker-Jones EC FM-200501327 05 3/20/07 Walker-Jones Mechanical Rooms (2 ) Stage Repair or replace locking mechanism on mechanical room entrance doors. Key alike. These door must be secured, because they creat a unsafe condition. Urgent !!!!! February 8, 2005 March 20, 2007 770 days
Kimball Elementary School FM-200513058 05 3/20/07 Kimball Urgent First Floor-Middle Wing Rekey rm. 107 September 22, 2005 March 20, 2007 544 days
Burrville Elementary School FM-200701388 /07 3/20/07 Location: Resource Room on the 1st floor. Urgent-teacher's purse locked in resource room. Called Mr. Abdul and informed him of the emergency request. March 8, 2007 March 20, 2007 12 days
Burrville Elementary School FM-200505282 05 3/20/07 (Burrville) 2nd Floor/Gym: Repair or replace door handle on door; will not open from hallway. Asbestos Code A - Clear for repairs on 05/11/05. DCPS Safety - Richard Gibson (RG) May 9, 2005 March 20, 2007 680 days
Wilkinson ES FM-200513982 /05 3/20/07 Wilkinson Urgent First Floor-Principal Office Re-Key Storage Closet. The principal does not have the key. October 19, 2005 March 20, 2007 517 days
Wilkinson ES FM-200513681 /05 3/20/07 Wilkinson Very Urgent First Floor-Principal Office Repair/Replace light fixtures, the light bulbs were changed but the lights keep going out. October 11, 2005 March 20, 2007 525 days
Wilkinson ES FM-200513636 05 3/20/07 Wilkinson Urgent First, and Second Floors Duplicate keys to room doors and storage room doors. October 7, 2005 March 20, 2007 529 days
Backus Middle School FM-200218488 02 3/20/07 Backus ****Urgent**** Asbestos Assessment Reqd. 1st Floor Room 104 Replace/upgrade lights and ballasts. The ballast exploded in room 104. POC: Mr. Belzher 576-6112 Asbestos Code A - Clear for repairs on 09/30/02. Horne Engineering - Bipin Nanavaty ( RG 10/01/02) September 27, 2002 March 20, 2007 1,635 days
Wilkinson ES FM-200513540 05 3/20/07 Wilkinson Urgent First Floor-Cafeteria, Gym and Kindergarten Area Fluorescent light bulbs changed over 14 FT. October 6, 2005 March 20, 2007 530 days
Adams Elementary School FM-200701514 4 3/12/07 3/21/07 Boiler Room - Asbestos assessment may be required. Repair or replace leaking condensate return line on boiler #4 and #1. Urgent !!!! Asbestos Code A - Clear for repairs on 03/14/07. Tidewater - Shamika Parker (RG 03/15/07) March 12, 2007 March 21, 2007 9 days
Kramer Middle School FM-200503758 05 3/21/07 ( KRAMER ) !!!VERY URGENT!!! Second Floor - Room 203 1) Repair/Replace sink fixtures Classroom sink is running hot water, no cut-off valve . Asbestos Code A - Clear for repairs on 04/08/05. DCPS Safety - Richard Gibson (RG) April 8, 2005 March 21, 2007 712 days
Kimball Elementary School FM-200622285 06 3/21/07 Kimball Boiler Room Repair or replace circulating pump for domestic hot water heater. No hot water in building. Urgent !!!!! May 8, 2006 March 21, 2007 317 days
Adams Elementary School FM-200701521 1 3/12/07 3/21/07 Early Childhead, Lavatory by stairway #6. Replace a 3/4" supply line that services a univent in this lavatory. Note: This 3/4" line has rusted out and is leaking. Also this is the only sourse of heating in this lavatory. Urgent !!!! March 12, 2007 March 21, 2007 9 days
Shaw JHS FM-200631207 20/06 3/22/07 URGENT:Graffiti team needed for outside of shaw 1. R st side 2.R.I.ave side down in pit leading to pool. October 20, 2006 March 22, 2007 153 days
Peabody Elementary School FM-200515220 05 3/22/07 Urgent: Unstop area drains on the playground and in the drive way. November 8, 2005 March 22, 2007 499 days
Reed LC FM-200515829 /05 3/22/07 18th St., Side, Playground Area. "Urgent" Please repair stone wall on the 18th St., side playground in several areas. November 28, 2005 March 22, 2007 479 days
Hine JHS FM-200227908 03 3/22/07 (Hine) Exterior door by stairwell#6 Panic bar device need repairing-will not open Asbestos Code A-clear for repair by DCPS Safety Ofice Charles Buchanan on 5/12/03 March 28, 2003 March 22, 2007 1,455 days
Hine JHS FM-200227913 03 3/22/07 (Hine) Exterior door-Panic bar device need repairing-Door will not open (FIRE CODE VIOLATION) Asbestos Code A-clear for repair by DCPS Safety Ofice Charles Buchanan on 5/12/03 March 28, 2003 March 22, 2007 1,455 days
Woodson High School FM-200618943 06 3/22/07 Very Urgent Replace the windows that are out on the fourth and fifth floors. February 22, 2006 March 22, 2007 393 days
Hine JHS FM-200210697 02 3/22/07 Hine 1. Asbestos assessment required. Panic bar device not working properly, very hard to open-- fire code voliation. Asbestos Code A - Cleared for repairs on 04-28-03 by Leroy Minton Jr. (LM/04-08-03) the Safety Office 202-576-8962. June 5, 2002 March 22, 2007 1,751 days
Winston EC FM-200700734 2/22/07 3/22/07 Floor tiles by Elevator are coming up due unknown reasons causing safety hazard Lead & Asbestos Code A - Clear for repairs on 02/22/07. Tidewater - Roger Small/Shamika Parker (RG 02/23/07) February 22, 2007 March 22, 2007 28 days
Woodson High School FM-200207531 02 3/23/07 Woodson, H.D. !!! Emergency !!! Second (2nd) Floor - Boys Restroom Due a Fire in the School. 1. Asbestos Assessment Required. 2. Power Wash the room. 3. Paint the area. Health and Safety Hazard. Code A-clear for repair by Horne Engineer ( Philip Connolly ) on 05/13/02 May 9, 2002 March 23, 2007 1,779 days
Woodson High School FM-200453109 04 3/23/07 Woodson, HD First floor library classroom by elevator Repair wall / hole with excess panel @ 24x24. Ground: by elevator large hole in wall, ceramic wall brick wall up and install access panel @ 16x16. Asbestos Code A - Clear for repairs on 08/20/04. DCPS Safety - Richard Gibson (RG) August 20, 2004 March 23, 2007 945 days
Woodson High School FM-200204829 02 3/23/07 (Woodson) ***Urgent*** Ground Floor/Pool office: Damage ceiling due to previous leak; ceiling falling. Code A-clear for repair by Horne Engineer (Bipin Nanavaty) 0n 3/22/02 (CEB March 21, 2002 March 23, 2007 1,828 days
Woodson High School FM-200452828 04 3/23/07 Woodson, HD Ground floor girls restroom Replace missing partition and door. Asbestos Code A - Clear for repairs on 08/18/04. DCPS Safety - Richard Gibson (RG 08/18/04) August 18, 2004 March 23, 2007 947 days
Woodson High School FM-200504200 05 3/23/07 ( WOODSON, H.D. ) URGENT!!!! Plaza-Stairwell 2 1) Repair exterior door, it's busted. April 18, 2005 March 23, 2007 704 days
Woodson High School FM-200228865 03 3/23/07 (Woodson, H.D.) Asbestos Assessment Required. Ground Floor/Cafeteria: Replace track for ceiling tile, and replace ceiling tile. Asbestos Code A - Clear for repairs on 04/18/03. DCPS Safety - Richard Gibson (RG) April 17, 2003 March 23, 2007 1,436 days
Woodson High School FM-200504760 05 3/23/07 Woodson H.D Restrooms Thru-out Building Install Lath Guards where needed on all Stalls Asbestos Code A - Clear for repairs on 04/26/05. DCPS Safety - Richard Gibson (RG) April 26, 2005 March 23, 2007 696 days
Woodson High School FM-200621065 06 3/23/07 Plaza Level-Exit door is coming off the frame-"The door can be secured for tonight-don't know how long it's going to last"-Need to have repaird. Very Urgent See: Mr. Blanks April 6, 2006 March 23, 2007 351 days
Davis Elementary School FM-200214902 02 3/26/07 Davis 1. Asbestos Assessment Reqd. Basement/Nwe Wing Room 14, 26 & Hallway 2. Repalce 18 ceiling ties in room14; 15 in room 16; and three in the hallway. The damage was from flooding. Asbestos code A-clear for repair by DCPS safety Charles Buchanan on 8/20/02 Charles E. Buchanan HA 14 Ceiling tile White Pinholes&Pegholes 12" X 12" NAD August 19, 2002 March 26, 2007 1,680 days
Davis Elementary School FM-200455464 04 3/26/07 Davis. URGENT Basement, First, second and third floor align electric room door located in maintenance staff office and teacher bathroom door located on the first and second floor new wing. September 22, 2004 March 26, 2007 915 days
King M L ES FM-200501928 05 3/27/07 King, M.L. Need 15 two(2) amp light ballast, and need installation before March 6, 2005 for mid state assessment. Asbestos Code A - Clear for repairs on 02/25/05. DCPS Safety - Leroy Minton Jr. (RG 03/02/05) February 23, 2005 March 27, 2007 762 days
King M L ES FM-200510898 05 3/27/07 King Boiler Room Repair problem on lights in boiler room, Fire comes from lights when you turn on the lights, then the breaker shuts off. Safety Hazard !!!!! August 22, 2005 March 27, 2007 582 days
King M L ES FM-200620127 06 3/27/07 First Floor-Health Suite Place cover over telephone wires Safety Hazard March 21, 2006 March 27, 2007 371 days
Webb Elementary School FM-200512038 05 3/27/07 Webb Boiler Room Repair or replace circulating pump for hot water is binding. Urgent !!!! September 8, 2005 March 27, 2007 565 days
King M L ES FM-200455630 04 3/27/07 King First floor by 114 circuit breaker box Need to have # 8 circuit breaker replace light in the teacher bathroom will not come on. Asbestos Code A - Clear for repairs on 09/24/04. DCPS Safety Richard Gibson. (RG) September 24, 2004 March 27, 2007 914 days
Webb Elementary School FM-200617688 06 3/27/07 Webb Boiler Room Replace leaking seal on pump #4 Urgent !!!!! January 23, 2006 March 27, 2007 428 days
Francis Junior High School FM-200632151 51 11/14/06 3/28/07 Third Floor - Rm. 311 - Install external bars on ten windows for students safety November 14, 2006 March 28, 2007 134 days
Johnson JHS FM-200336588 03 3/28/07 Johnson Second floor room 213 Replace wood entrance door. Door is split and dangerous. Asbestos Code A - Clear for repairs on 08/29/03. Horne Engineering - Edward Rodriguez ( RG 09/02/03 ) August 29, 2003 March 28, 2007 1,307 days
Wilkinson ES FM-200702182 3/19/07 3/29/07 Location: Outside trash dumpster area Need two remove (2) old Bradley basins from outside trash. Safety Hazard. March 19, 2007 March 29, 2007 10 days
Kimball Elementary School FM-200504695 05 3/29/07 ( KIMBALL ) URGENT!!!!! Cafeteria - Girls Restroom 1) Repair the ceiling, it's falling April 25, 2005 March 29, 2007 703 days
Jefferson JHS FM-200702527 /07 3/29/07 Location: Boiler Room /Door Located next to room B18. Repair the lock on the door to the boiler room. Children are acessing the room. Safety Hazard March 26, 2007 March 29, 2007 3 days
Kelly Miller MS FM-200627267 06 3/29/07 Second Floor/Glass broken front stairwell Asbestos Code A - Clear for repairs on 08/11/06. DCPS Safety - Richard Gibson(RG) August 11, 2006 March 29, 2007 230 days
Johnson JHS FM-200443916 04 3/30/07 Johnson First floor gym Very dangerous, two sets of bleachers are broken need to be repair. Asbestos Code A - Clear for repairs on 02/11/04. Horne Engineering - Edward Rodriguez (RG 02/12/04) February 10, 2004 March 30, 2007 1,144 days
Cleveland Elementary School FM-200505981 05 3/30/07 Cleveland Main Office Floor Install Alluminum Thress Hold Asbestos Code A - Clear for repairs on 05/25/05. DCPS Safety - Richard Gibson (RG) May 25, 2005 March 30, 2007 674 days
Cleveland Elementary School FM-200513290 05 3/30/07 (Cleveland) "Emergency" First floor, Pre-K classroom. Need carpenters to secure sound proof ceiling tile it is currently hanging. School staff did not have the appropriate tool to perform task. Note: This is a safety hazard. Asbestos Code A - Clear for repairs on 09/29/05. Tidewater - Philp Connolly (RG 09/30/05) September 29, 2005 March 30, 2007 547 days
Johnson JHS FM-200456053 04 3/30/07 Johnson EMERGENY Third floor room 416: Door is hanging on one hinge. Damaged door to room #416 Asbestos Code A - Clear for repairs on 10/15/04. DCPS Safety - Richard Gibson (RG) September 29, 2004 March 30, 2007 912 days

Routine Repair Requests Closed in March 2007 (765)
School Description Open Date Close Date Time Elapsed
Spingarn High School FM-200515627 /05 3/1/07 Urgnet: Screen and seal gym floor for the basketball season. Asbestos Code A - Clear for repairs on 11/29/05. Tidewater - Tony Marcolin (RG 11/22/05) November 21, 2005 March 1, 2007 465 days
Spingarn High School FM-200628028 06 3/1/07 2nd Floor- Stairway #1 Replace door closer. Asbestos Code A - Clear for repairs on 08/23/06. Tidewater - Thomas Johnson (RG 08/24/06) August 21, 2006 March 1, 2007 192 days
Spingarn High School FM-200516150 05 3/1/07 Urgnet: Survey the lights in the gym area ther lights are not working. Note: See Mr. Herbert December 7, 2005 March 1, 2007 449 days
Spingarn High School FM-200628027 06 3/1/07 Basement- Replace exit door near custodian's office. It was broken during a break-in. Asbestos Code A - Clear for repairs on 08/23/06. Tidewater - Thomas Johnson (RG 08/24/06) August 21, 2006 March 1, 2007 192 days
Spingarn High School FM-200516436 /05 3/1/07 Repair plaster ceiling on the third floor in rm. 325. Asbestos Code A - Clear for repairs on 12/16/05. Tidewater - Roger Small (RG 12/19/05) December 14, 2005 March 1, 2007 442 days
Spingarn High School FM-200628026 06 3/1/07 3rd Floor- Stairway #3 Replace door closer; it was broken by a student. Asbestos Code A - Clear for repairs on 08/23/06. Tidewater - Thomas Johnson (RG 08/24/06) August 21, 2006 March 1, 2007 192 days
Kelly Miller MS FM-200629846 06 3/1/07 Missing door needs to be installed (Right of main office) Several doors throughout the building get stuck and will not open properly. Note: These repairs are to be completed before Dr. Janey's and US Department of Education's site visit on September 25,2006. Asbestos Code A - Clear for repairs on 09/22/06. Tidewater - Meneka Rodrigo (RG 09/22/06) September 22, 2006 March 1, 2007 160 days
Kelly Miller MS FM-200626111 06 3/1/07 Need to have partitions installed in restrooms: (Boy's) First Floor, Second Floor, Third Floor, Boy's Locker Room, Boy's Restroom By Music Room. Asbestos Code A - Clear for Repairs on 07/21/06. Richard Gibson (RG) July 21, 2006 March 1, 2007 223 days
Spingarn High School FM-200622876 06 3/1/07 2nd Floor- Rooms 219 & 211 New doors are needed for classrooms. Students set a fire today and broke into these two rooms. May 17, 2006 March 1, 2007 288 days
Kelly Miller MS FM-200626083 06 3/1/07 Need to have door closer installed on 11 stairwell doors. See: Mr. Ford July 20, 2006 March 1, 2007 224 days
Kelly Miller MS FM-200620617 06 3/1/07 First Floor - New Gym - Boys Bathroom - Partition is falling off wall, almost fell on student. March 30, 2006 March 1, 2007 336 days
Kelly Miller MS FM-200507191 05 3/1/07 Repair/Replace partitions on the first floor - (three) boys Restroom (two)Girls Restroom Third Floor - Boys Restroom (one) Second Floor - Girls Restroom (one) Some are loose and some are away from the wall. Code A-clear for repair by DCPS Charles Buchanan on 6/27/05 June 24, 2005 March 1, 2007 615 days
Kelly Miller MS FM-200626113 06 3/1/07 Need to have 3 doors replaced and installed on the first floor. See Mr. Ford Asbestos Code A - Clear for repairs on 07/24/06. Tidewater - Carlos Vera (RG 07/25/06) July 21, 2006 March 1, 2007 223 days
Kelly Miller MS FM-200626114 06 3/1/07 Need to have cafeteria door near gym repaired, unable to secure July 21, 2006 March 1, 2007 223 days
Spingarn High School FM-200205983 02 3/1/07 (Spingarn) 3rd floor/room #323: Overload, too much for circuit; need additional wiring. Contact person: Ingraham. Code A-clear for repair by Horne Engineer ( Troy Wilcome ) on 4/19/02 April 17, 2002 March 1, 2007 1,779 days
Spingarn High School FM-200503318 05 3/1/07 Spingarn Basement Near Stairwell # 6 Replace Exit Sign March 28, 2005 March 1, 2007 703 days
Spingarn High School FM-200213457 02 3/1/07 Spingarn Between Basement & 1st Floor Repair or replace lights on the stairways between the basement and 1st floors----lights are out. August 2, 2002 March 1, 2007 1,672 days
Spingarn High School FM-200336827 03 3/1/07 Spingarn Third floor stairway # 4 Requesting an electrican to replace exit sign by stairway # 4, due to being an fire code violation. Stusednts taken old one off the wall. Asbestos Code A - Clear for repairs on 09/04/03. Horne Engineering - Troy Wilcome (RG 09/08/03) September 4, 2003 March 1, 2007 1,274 days
Spingarn High School FM-200336828 03 3/1/07 Spingarn First floor main entrance to the building Requesting an electrican to survey the lights as you enter the building, only one light works. Code A-clear for repair by DCPS Charles Buchanan 09/05/2003 11:05 CXB - September 4, 2003 March 1, 2007 1,274 days
Spingarn High School FM-200338415 03 3/1/07 Spingarn First floor room 126 Requesting an electrican to survey the outlets on the walls by the window, there is no power checked panel box. # 9 switch will not stay on. October 2, 2003 March 1, 2007 1,246 days
Spingarn High School FM-200453227 04 3/1/07 Spingarn Third floor stairway # 1 Requesting an electrican to replace light fixtures back to the wall light is hanging. August 24, 2004 March 1, 2007 919 days
Spingarn High School FM-200453250 04 3/1/07 Spingarn Basement ROTC Requesting an electrican to replace the ballast on the light.. August 24, 2004 March 1, 2007 919 days
Spingarn High School FM-200505017 05 3/1/07 ( SPINGARN ) Gym 1) Replace exit sing that was broken by students. May 2, 2005 March 1, 2007 668 days
Spingarn High School FM-200453384 04 3/1/07 (Spingarn) VANDALISM 3rd Floor/Stairway # 6 Requesting an electrician to replace ext sign that was damage by student. Do not have any on sight. August 26, 2004 March 1, 2007 917 days
Spingarn High School FM-200618873 06 3/1/07 Third Floor-Stairway #6 Replace the broken door closer that was destroyed by students. Asbestos Code A - Clear for repairs on 02/21/06. Tidewater - Shamika Parker (RG 02/22/06) February 21, 2006 March 1, 2007 373 days
Spingarn High School FM-200631723 06 3/1/07 Second Floor - Stairway #5 - Replace door closer to stop door from slamming. November 2, 2006 March 1, 2007 119 days
Spingarn High School FM-200630805 /06 3/1/07 First Floor - Door by Stairway #3 - Replace the roton hinge. October 16, 2006 March 1, 2007 136 days
Kelly Miller MS FM-200632681 1/29/06 3/1/07 First Floor - Gym - Repair 4 benches on the bleachers Asbestos Code A - Clear for repairs on 11/30/06. Tidewater - Aaron Gholson (RG 02/26/07) November 29, 2006 March 1, 2007 92 days
Spingarn High School FM-200504178 05 3/1/07 Eastern Front Entrance Rewire Font Entrance Lights to a New Switch April 18, 2005 March 1, 2007 682 days
Hart Middle School FM-200629469 06 3/2/07 Gym- Supply and install new door. September 14, 2006 March 2, 2007 169 days
Hart Middle School FM-200631277 /06 3/2/07 Replace broken door closers in the following areas: 1.) First floor, Stairwell # 7, auditorium, gymnasium entrance door. 2.) Second floor, Stairwells 6 & 7. October 24, 2006 March 2, 2007 129 days
Patterson ES FM-200623911 06 3/2/07 First floor, Classrooms. Replace louvers in doors. June 6, 2006 March 2, 2007 269 days
Patterson ES FM-200618742 06 3/2/07 Asbestos Assessment Required. First floor, Boys' Restroom/Near Science Lab. Repair broken door to the boys' restroom on the first floor. Note: A hole has been kicked in the bottom of door. Asbestos Code A - Clear for repairs on 12/21/05. Tidewater - Roger Small (RG 12/22/05) February 16, 2006 March 2, 2007 379 days
Patterson ES FM-200516715 /05 3/2/07 Asbestos Assessment Required. First floor, Girls' Restroom/Near Science Lab. Repair broken door to the girls' restroom on the first floor. Note: A hole has been kicked in the bottom of door. Asbestos Code A - Clear for repairs on 12/21/05. Tidewater - Roger Small (RG 12/22/05) December 19, 2005 March 2, 2007 438 days
Patterson ES FM-200514665 /05 3/2/07 W. B. Patterson First Floor - 123 and 131 1) Door rubbing frame. Code A-clear for repair by DCPS Charles Buchanan on 10/31/05 October 26, 2005 March 2, 2007 492 days
Spingarn High School FM-200633590 9/06 3/2/07 First Floor - Main Office - Requesting to have the wire mesh glass to the door replaced due to a break in. Asbestos Code A - Clear for repairs on 01/03/07. Tidewater - Thomas Johnson (RG 01/04/07) December 29, 2006 March 2, 2007 63 days
Spingarn High School FM-200632193 /06 3/2/07 Second Floor - Rm. 203 - Survey and repair the leak coming from the ceiling. Asbestos Code A - Clear for repairs on 11/15/06. Tidewater - Kenny Belton (RG 11/15/06) November 15, 2006 March 2, 2007 107 days
Spingarn High School FM-200630124 06 3/2/07 Stadium- Unstop steeple chase pit. September 27, 2006 March 2, 2007 156 days
Spingarn High School FM-200629812 06 3/2/07 Cafeteria- Repair/replace lock and/or cylinder. September 21, 2006 March 2, 2007 162 days
Spingarn High School FM-200628898 06 3/2/07 Outside in front of the building/Survey lights on the roof. September 7, 2006 March 2, 2007 176 days
Spingarn High School FM-200626437 06 3/2/07 First floor, Room 116. Request for locksmiths to repair or replace lock so that staff can open and close door. July 26, 2006 March 2, 2007 219 days
Spingarn High School FM-200622803 06 3/2/07 1st Floor- Cafeteria Wire mesh glass need to be replaced. Asbestos Code A - Clear for repairs on 05/18/06. Tidewater - Shamika Parker (RG 05/22/06) SEE ASSESSMENTS May 17, 2006 March 2, 2007 289 days
Spingarn High School FM-200621324 06 3/2/07 Basement-Cafeteria Office-Change light fixture to brighten the office. April 13, 2006 March 2, 2007 323 days
Spingarn High School FM-200618901 06 3/2/07 Second Floor-Library Place a guard over the lock to keep students from getting into the classroom February 21, 2006 March 2, 2007 374 days
Spingarn High School FM-200618730 06 3/2/07 Third Floor-Rm. 329 Chang the lock to the room February 16, 2006 March 2, 2007 379 days
Spingarn High School FM-200618013 06 3/2/07 First Floor - Room 115 - Repair or replace damaged cylinder. January 30, 2006 March 2, 2007 396 days
Spingarn High School FM-200516848 /05 3/2/07 Outside of Gym Repair outside llights December 21, 2005 March 2, 2007 436 days
Spingarn High School FM-200515479 /05 3/2/07 First fl. Stairways #4 & 7 Repair broken wire mash glass in both arears Asbestos Code A - Clear for repairs on 11/16/05. Tidewater - Kenny Long (RG 11/16/05) . November 15, 2005 March 2, 2007 472 days
Spingarn High School FM-200514190 /05 3/2/07 Spingarn First Floor - Telephone Booth - Replace wire mese glass. First Floor - Stairwell 6 - Replace wire mese glass. First Floor - Stairwell 1- Replace wire mese glass. Code A-clear for repair by DCPS Charles Buchanan on 1/13/06 October 22, 2005 March 2, 2007 496 days
Spingarn High School FM-200512718 05 3/2/07 Spingarn Third Floor-Rm. 306 Repair or replace lock that was broken by students September 16, 2005 March 2, 2007 532 days
Spingarn High School FM-200512717 05 3/2/07 Spingarn First Floor-Gym Repair or replace panel bar to gym door, kids are able to pull the door open September 16, 2005 March 2, 2007 532 days
Spingarn High School FM-200504611 05 3/2/07 ( SPINGARN ) Third Floor - Room 300 and by Stairway 5 1) Survey leak comming from the roof. HA 017 Plaster White No Asbestos HA Brown Coat No Asbestos Code A-clear for repair by DSCPS Charles Buchanan on 5/10/05 April 22, 2005 March 2, 2007 679 days
Spingarn High School FM-200504610 05 3/2/07 ( SPINGARN ) First Floor - Stairway 6 1) Replace wire mess glass. April 22, 2005 March 2, 2007 679 days
Spingarn High School FM-200453386 04 3/2/07 Spingarn Second floor by room 219 Requesting brick mason to replace missing tile. August 26, 2004 March 2, 2007 918 days
Spingarn High School FM-200453300 04 3/2/07 Spingarn Second floor on wall across from stairway # 6 and # 1 and by room 218 Requesting brick mason to replace missing tile. August 25, 2004 March 2, 2007 919 days
Spingarn High School FM-200222455 /02 3/2/07 Spingarn Rooms 311 thru 319 Water is leaking requesting someone to come out and survey the roof. December 12, 2002 March 2, 2007 1,541 days
Spingarn High School FM-200222031 02 3/2/07 Spingarn Basement - door next to barber shop Requesting glazer to measure and replace broken wire mesh glass. December 4, 2002 March 2, 2007 1,549 days
Spingarn High School FM-200213459 02 3/2/07 Spingarn 1. Asbestos Assessment Reqd. 1st Floor Boys' Restrooms 2. Paint boys' restroom [paint damaged from a fire on 2/5/01]. Asbestos/Lead code A-clear for repair by Horne Engineer ( Stephen Caldwell? ) on 8/20/02 Charles E. Buchanan August 2, 2002 March 2, 2007 1,673 days
Dunbar High School FM-200700994 /07 3/2/07 Third Floor - Stairwell door slamming need repairs February 28, 2007 March 2, 2007 2 days
Hart Middle School FM-200331330 03 3/2/07 Hart Replace door closures in the following areas: 1) 225,231,229,228,232,320,318,130,139, Second Floor - Stairwell (5) and Stairwell (9), Asbestos Code A - Clear for repairs on 06/05/03. Horne Engineering - Sharon Voss (RG 06/06/03) June 5, 2003 March 2, 2007 1,366 days
Stuart-Hobson Middle School FM-200513008 05 3/5/07 (Stuart-Hobson) Installing new carpet in library, please confirm that old carpet does not contain any asbestos or that there is no tile underneath carpet. Asbestos Code A - Clear for repairs on 09/30/05. Tidewater - Tony Marcolin (RG 10/04/05) August 12, 2005 March 5, 2007 570 days
Stuart-Hobson Middle School FM-200623934 06 3/5/07 Replace a/c unit in the Auditorium; it does not work. June 6, 2006 March 5, 2007 272 days
Stuart-Hobson Middle School FM-200623936 06 3/5/07 Replace a/c unit in the Auditorium; it does not work. June 6, 2006 March 5, 2007 272 days
Benning Elementary School FM-200701091 07 3/5/07 1st Fl. Cafeteria door closer missing from exit door. - Completed 3/2/07-Door is self closing and latching. Device missing and cited is hold door in the open position when needed. March 5, 2007 March 5, 2007 0 days
Coolidge High School FM-200443072 04 3/5/07 (Coolidge) Asbestos Assessment Required. Frank Williams Activity Center: Repair or replace or remove partitions, damaged by students. (Hanging from the upper level) Room #322: New door needs to be adjusted. Asbestos Code A - Clear for repairs on 01/22/04. Horne Engineering - Sheryll James (RG 01/23/04) January 21, 2004 March 5, 2007 1,139 days
Coolidge High School FM-200630002 06 3/5/07 Second Floor/Rm. 225 - Door fell off the hinges. September 25, 2006 March 5, 2007 161 days
Plummer Elementary School FM-200623809 06 3/5/07 Plummer Plummer Replace window a/c unit in the following location Room 215 - 24,000 - 20amp June 5, 2006 March 5, 2007 273 days
Janney Elementary School FM-200633636 /4/07 3/5/07 South end of field. Fabricate and install drain cover. January 4, 2007 March 5, 2007 60 days
Plummer Elementary School FM-200623808 06 3/5/07 Plummer Replace window a/c units in the following locations Room 202A - 15,000 - 15amp June 5, 2006 March 5, 2007 273 days
Stuart-Hobson Middle School FM-200217642 02 3/5/07 Stuart-Hobson Asbestos Assessment Reqd. 3rd FLoor Room 307 Replace floor tiles that came up from the floor due to previous leakage from the air cooler. Asbesstos Code A-clear for repair by Horne Engineer Philip Connolly DCPS Charles E. Buchanan on 9/24/02 September 17, 2002 March 5, 2007 1,630 days
Woodson High School FM-200621422 06 3/6/07 Woodson Boiler Room Repair or replace seals in chilled water pumps #6 and #11. Re: No A/C April 18, 2006 March 6, 2007 322 days
Woodson High School FM-200627657 06 3/6/07 Replace mechanical seals in HWCW circulating pump # 4, and # 6. August 15, 2006 March 6, 2007 203 days
Gage-Eckington ES FM-200700879 6/07 3/6/07 Boiler Room - Boiler #2 Flame failure February 26, 2007 March 6, 2007 8 days
Woodson High School FM-200631747 06 3/6/07 WOODSON, H.D. Amp out pumps # 13 & 14 motor continuously tripping breaker. Pumps # 12, 13, and 14 Request # FM-200449255 November 2, 2006 March 6, 2007 124 days
Simon Elementary School FM-200700836 07 3/6/07 Boiler room - Repair condensate return pump float sticking. February 25, 2007 March 6, 2007 9 days
Woodson High School FM-200628322 06 3/6/07 Woodson Boiler Room Repair or replace pumps and motors for Plaza Level A/C and Heating. Ppumps are number 10 and 11. August 27, 2006 March 6, 2007 191 days
Woodson High School FM-200620139 06 3/6/07 Basement Level, Boiler Room. "Emergency" Repair or Replace ruptured seal on pump. Note: The first pump as you enter the boiler room. March 21, 2006 March 6, 2007 350 days
Woodson High School FM-200633879 07 3/6/07 Boiler Room - Circulator pump's not working, check and repair. January 9, 2007 March 6, 2007 56 days
Smothers ES FM-200634240 07 3/6/07 Boiler Room - Boiler # 1 - Replace automatic water feeder. January 24, 2007 March 6, 2007 41 days
Woodson High School FM-200454954 04 3/6/07 Woodson, H.D. Boiler Room Repair or replace duel water circulation pump #13 motor is bad, September 17, 2004 March 6, 2007 900 days
Woodson High School FM-200621162 06 3/6/07 Basement - Boiler Room - Repair or replace seals in chilled water pumps # 6 and # 11, Re: No A/C. April 11, 2006 March 6, 2007 329 days
Woodson High School FM-200449255 04 3/6/07 Woodson Boiler Room Repair or replace circulating pumps#12, #13 and #14. Pump #12 cuts off when it get hot Pump #13 are use for center coil Pump #14 is use for ground floor Pumps will not come on. Pumps was under water when the Boiler Room flooded. June 13, 2004 March 6, 2007 996 days
Garfield ES FM-200617563 06 3/6/07 Emergency. Secure pieces of roof siding, several pieces have blown off roof onto the playground. Note: A large piece is hanging off the roof now. January 18, 2006 March 6, 2007 412 days
Clark Elementary School FM-200700876 26/07 3/6/07 Boiler Room - Repair or replace Boiler #2 Flame failure, will not stay on. February 26, 2007 March 6, 2007 8 days
Benning Elementary School FM-200332553 03 3/7/07 (Benning) 1st Floor/TV Studio Room: Stop water leak. Asbestos Code A - Clear for repairs on 06/26/03. Horne Engineering - Sheryll James (RG 07/02/03) June 26, 2003 March 7, 2007 1,350 days
Simon Elementary School FM-200700778 07 3/7/07 Room 208 - Repair or replace univent shaft bearings and align on completion. February 22, 2007 March 7, 2007 13 days
Benning Elementary School FM-200330644 03 3/7/07 Benning Boiler Room Replace compressed air dryer. Compressor not working. - MOD - HKN - 8010A; Ser# 0302A - 1-9106-2814 -N-LR 40907 Rated cap- 10 SCFM - 100 PSIG - 100 F. Inlet air MWP -175 PSIG - Min-max ambient 110 (45c) 115 V.A.C. Min104 - Max 126 V-A.C. unit FLA3.3 Compressor H.P. 1/6; Compressor FLA 2.9 Comp LRA 18.0 Fan motor amps -5 watts 4 Refrigerant R-12 Charge 6.5 oz. Section Pres. 34 PSIG. May 23, 2003 March 7, 2007 1,384 days
Benning Elementary School FM-200227360 03 3/7/07 Benning Center 2 Move the light frame from which is blocking the trap door. For the engineer can service the motor in the ceiling girl restroom. March 20, 2003 March 7, 2007 1,448 days
Benning Elementary School FM-200226263 03 3/7/07 Benning Drain is to small. Need a large drain outside kindgerten storage room. February 26, 2003 March 7, 2007 1,470 days
Benning Elementary School FM-200226256 03 3/7/07 Benning TV room has water leaking in from the wall. It is about 2 or 3 storey down in the ground. February 26, 2003 March 7, 2007 1,470 days
Benning Elementary School FM-200226255 03 3/7/07 Benning Center All of learning centers was ruin do to flood water. Need to replace all the carpet in the teachers lounge all conference rooms, TV room and all the open space area and learning centers. Asbestos Code A - Clear for repairs on 02/27/03. Horne Engineering - Edward Rodriguez (RG 02/28/03) February 26, 2003 March 7, 2007 1,470 days
Rudolph Elementary School FM-200631074 /06 3/7/07 Rudolph Room #204 Repair or replace univent bearing assembly for fan shaft. Shaft size is approx.1. October 20, 2006 March 7, 2007 138 days
Benning Elementary School FM-200225541 03 3/7/07 (Benning) Open space/1st, 2nd & 3rd floors: Replace damaged, stained carpet. Asbestos Code A - Clear for repairs on 02/27/03. Horne Engineering - Edward Rodriguez (RG 02/28/03) February 11, 2003 March 7, 2007 1,485 days
Benning Elementary School FM-200224600 03 3/7/07 (BENNING) First floor/kitchen REPAIR/ REPLACE CERAMIC FLOOR TILE. Asbestos Code A - Clear for repairs on 01/27/03. Horne Engineering - Bipin Nanavaty (RG 01/28/03) January 27, 2003 March 7, 2007 1,500 days
Benning Elementary School FM-200222949 /02 3/7/07 (Benning) Stairwell #2: Water coming from top of high ceiling in the stairwell, problem appears to be coming from the roof. December 20, 2002 March 7, 2007 1,538 days
River Terrace ES FM-200700655 21/07 3/7/07 Boiler Room - Boiler #1 and #2 off, reading short. (Flame Failure) No heat in building. February 21, 2007 March 7, 2007 14 days
Deal Junior High School FM-200700559 6/07 3/7/07 Boiler Room - Repair or replace boiler # 1. Burner is going out on flame failure continuously. Building is cold. February 16, 2007 March 7, 2007 19 days
Bell High School FM-200700901 /07 3/7/07 In the practice room (E114) DCPS installed a lock for the door but we do not have any keys to lock the door. February 26, 2007 March 7, 2007 9 days
Draper Elementary School FM-200618495 06 3/7/07 Draper Boiler Room Replace McDonnell-Miller Boiler control. Pressure 35 PSI Model #51S- HD February 8, 2006 March 7, 2007 392 days
Raymond Elementary School FM-200700450 07 3/7/07 Boiler Room - Repair or replace boiler #1 Keep going off on flame failure February 13, 2007 March 7, 2007 22 days
Bell High School FM-200517057 06 3/7/07 Bell Boiler Room Boiler #3 Check burner, will not come on. January 2, 2006 March 7, 2007 429 days
Randle-Highlands ES FM-200632804 06 3/7/07 Sub - Basement - Boiler Room - Repair or replace gas control valve on Boiler # 2. Valve is leaking fluid. Replace defective programmer for boiler 1. December 4, 2006 March 7, 2007 93 days
Drew Elementary School FM-200700319 07 3/7/07 Boiler room Repair boiler # 1 , will not start. February 7, 2007 March 7, 2007 28 days
Hart Middle School FM-200628318 06 3/7/07 Repair breach in outside wall where exhaust fall fell out. August 25, 2006 March 7, 2007 194 days
Benjamin Banneker Academic HS FM-200516018 05 3/7/07 Banneker Boiler Room Repair or replace automatic water feeder on Boiler #3. Only Boiler Working. December 3, 2005 March 7, 2007 459 days
Benjamin Banneker Academic HS FM-200514708 /05 3/7/07 Banneker First Floor-Repair lock on rm. 105 door it is off track October 27, 2005 March 7, 2007 496 days
Orr Elementary School FM-200700588 07 3/7/07 Boiler room - Repair existing pnuematic system and air compressor. February 17, 2007 March 7, 2007 18 days
Nalle Elementary School FM-200700955 07 3/7/07 Basement - Repair wall behind water cooler February 27, 2007 March 7, 2007 8 days
Reed LC FM-200700995 07 3/7/07 Repair outside concrete wall area above main entrance. Pieces of concrete fell from an area above the main entrance on 2/28/07. Mr. Boyd, Head Custodian has contacted Tyrone Jones, Grounds Leader who has made a site visit and will schedule repairs. February 28, 2007 March 7, 2007 7 days
Takoma Educational Center FM-200700891 2/26/07 3/7/07 Gym - Exterior door - R/R lock due to break in February 26, 2007 March 7, 2007 9 days
Terrell Mc ES FM-200504255 05 3/7/07 Terrell, M.C.) Replace lock on principal's office door. Lock was repaired on April 7th but condition still exists and principal cannot lock the door. Lock needs to be replaced immediately for security and protection of important documents and other items. April 18, 2005 March 7, 2007 688 days
Terrell Mc ES FM-200700706 07 3/7/07 Temp boiler room - Install deadbolt lock to prevent breakins. February 21, 2007 March 7, 2007 14 days
Murch Elementary School FM-200700703 07 3/7/07 Boiler Room - Repair or replace Boiler #3; Burner shutting off on flame failure February 21, 2007 March 7, 2007 14 days
Bancroft Elementary School FM-200700736 2/07 3/7/07 First Floor - computer Lab (primary wing) - Replace lock cylinder or repair latch cylinder, door having problems locking. February 22, 2007 March 7, 2007 13 days
Thomas Elementary School FM-200700529 /07 3/7/07 Classroom #223 Replace defective univent shaft bearings. No heat in classroom. February 15, 2007 March 7, 2007 20 days
Truesdell Elementary FM-200620299 06 3/7/07 Truesdell Boiler Room Properly calibrate burner on Boiler #1, over firing. Note: This repair can not be made unless approved by DC Boiler Inspector through Mr. B. Shaw or Mr. Rice March 24, 2006 March 7, 2007 348 days
Tubman Elementary School FM-200700484 07 3/7/07 First Floor - Exit door unopenable on kenyon St. side - Left side door panic hardware not working, right side door will not close and latch. February 13, 2007 March 7, 2007 22 days
Tubman Elementary School FM-200700488 07 3/7/07 First Floor - Rm 110 has broken door hardware - Door closer is not attached and is missing hardware February 13, 2007 March 7, 2007 22 days
Eaton Elementary School FM-200701025 07 3/7/07 First Floor - Main Entrance/Exit Door - Can't secure, lock is broken March 1, 2007 March 7, 2007 6 days
Lafayette Elementary School FM-200700874 /07 3/7/07 Team 2 - Gym door adj. to exit door is out of alignment IFC 703.2.3 (2000) February 26, 2007 March 7, 2007 9 days
Lafayette Elementary School FM-200700873 /07 3/7/07 Team 2 - Outside Of Gym - Exit door out of alignment, center and reght door frame broken IFC 703.2.3 (2000) February 26, 2007 March 7, 2007 9 days
Brightwood Elementary School FM-200633369 /13/06 3/7/07 Brightwood - Boiler Room - Send HVAC mechanic, to repair or replace boiler # 1. Burner will not lite off. Possible problem with gas actuator. December 13, 2006 March 7, 2007 84 days
Clark Elementary School FM-200700136 /1/07 3/7/07 Boiler Room - Replace gas actvator on burner # 1 boiler. No Heat !! February 1, 2007 March 7, 2007 34 days
Benning Elementary School FM-200701092 07 3/7/07 1st Fl. Cafeteria door not latching by stage right. - Door latch needs adjustment. Plate on door frame is recessed to far and prevents door from connect with latch. March 5, 2007 March 7, 2007 2 days
Cleveland Elementary School FM-200500723 05 3/7/07 Cleveland Engineer Office Change lock on Engineer Office and furnish 3 keys for staff. January 24, 2005 March 7, 2007 772 days
Benning Elementary School FM-200701089 07 3/7/07 Basement - Elevator room lock defective. - Master key will not open door. March 5, 2007 March 7, 2007 2 days
Benning Elementary School FM-200625773 06 3/7/07 Front of Building- Cut down 2 trees in the front and 2 on the side; they are dead. July 17, 2006 March 7, 2007 233 days
Benning Elementary School FM-200501192 05 3/7/07 Benning thru-out Building Repair toilets and urinal February 3, 2005 March 7, 2007 762 days
Janney Elementary School FM-200700250 /5/07 3/7/07 Boiler Room Boiler #1 need flame adjustment (MTIF) February 5, 2007 March 7, 2007 30 days
Cleveland Elementary School FM-200700564 /16/07 3/7/07 Boiler Room - Repair or replace # 1 and # 2 boilers. Because of power failure can not get boilers started . Building cold. February 16, 2007 March 7, 2007 19 days
Cleveland Elementary School FM-200700579 /16/07 3/7/07 Boiler Room - Check and repair sump heater on cooling tower . Heater is not working proper. Water is frozen in cooling tower. February 16, 2007 March 7, 2007 19 days
Benning Elementary School FM-200500149 05 3/7/07 Benning The principal need a new lock on his closet door. Out going principal did not leave key. January 5, 2005 March 7, 2007 791 days
Benning Elementary School FM-200453031 04 3/7/07 Benning A clogged drain on playground. August 20, 2004 March 7, 2007 929 days
Benning Elementary School FM-200451992 04 3/7/07 Benning Boiler room Check valve on hot water tank need replacing. Because I have hot water in the toilets through out the building. August 10, 2004 March 7, 2007 939 days
Benning Elementary School FM-200447254 04 3/7/07 Benning Learning Center #2 Repair or replace motor in air handler unit #7 in Learning Center #2 on 2nd Floor. Motor - Uniclosed motor; HP- 3; PH-3; Frame-182T; Volt-230-260; Amps-1.2-4.6; RPM-1740; ID #F-4542-01-347 April 28, 2004 March 7, 2007 1,043 days
Coolidge High School FM-200516922 /05 3/7/07 Coolidge Boiler Room Boiler #1 will not come on. Replace programmer. Electic to Building will be off for approx. 3 hours. (Pepco) Should be back on by 11 O'Clock December 27, 2005 March 7, 2007 435 days
Benning Elementary School FM-200341656 /03 3/7/07 Benning The machine room in the rear of the building have four air handlers unit. Three are broken two are for the lunchroom. One is for the kitchen in the area there is no heat. No heat in kitchen. December 16, 2003 March 7, 2007 1,177 days
Kimball Elementary School FM-200630644 /06 3/7/07 Kimball Roo106 Replace shaft and or bearings onthe heat unit in room 106. October 11, 2006 March 7, 2007 147 days
Hart Middle School FM-200628205 06 3/7/07 1st Floor- Stairwell #7 Repair/replace door closer. Asbestos Code A - Clear for repairs on 08/24/06. Tidewater - Carlos Vera (RG 08/28/06) August 23, 2006 March 7, 2007 196 days
Hart Middle School FM-200628206 06 3/7/07 Auditorium- Install door closer. Asbestos Code A - Clear for repairs on 08/24/06. Tidewater - Carlos Vera (RG 08/28/06) August 23, 2006 March 7, 2007 196 days
Benning Elementary School FM-200341027 03 3/7/07 (Benning) TV Room: Lights are out in the TV room due to water leaking through the walls. All electricity was shorted out. December 3, 2003 March 7, 2007 1,190 days
Benning Elementary School FM-200338225 03 3/7/07 Benning Main Roof Restored electricity to (2) two exhaust fans, fans are located on main roof. September 30, 2003 March 7, 2007 1,254 days
Benning Elementary School FM-200338182 03 3/7/07 Benning Water started leaking again from the ceiling in Pre-K room. September 29, 2003 March 7, 2007 1,255 days
Benning Elementary School FM-200336617 03 3/7/07 Benning Learning center # 1 , Leaning center # 2 ,Music Room Asbestos assessment may be required 1). Replace starter coil on the Return air air handler unit # 5 in learning center # 2 2). Replace air handler motor on air handler unit # 1 in learning center #1 3). Replace motor on the return air fan # 1 in the music room. 4). Replace bad motor on air handler unit # 8 in the mechanicial room outside, 5). Replace motor starter on air handler unit # 3 in the mechancial room outside. POC Curtis Emerson @ 202-438-7434 Asbestos Code A - Clear for repairs on 03/25/04. Horne Engineering - Bipin Nanavaty (RG 03/26/04) August 30, 2003 March 7, 2007 1,285 days
Benning Elementary School FM-200332589 03 3/7/07 Benning First And Second Floor 1. Replace carpet in the 1st floor pre-kindergarten and kindergarten areas. 2. Replace the carpet in the 2nd floor learning center II . Asbestos Code A - Clear for repairs on 06/27/03. Horne Engineering - Troy Wilcome (RG 07/02/03) June 26, 2003 March 7, 2007 1,350 days
Hart Middle School FM-200700918 07 3/7/07 Room 214 - R/R lock it was broken due to vandalism. February 27, 2007 March 7, 2007 8 days
Hart Middle School FM-200338774 /03 3/7/07 Hart Basement - Rec Room B-13 F 1) Repair holes in dry wall in office area, area being set-up for Balllou students. Asbestos Code A - clear for repairs on 10/10/03. Horne Engineering - Philp Connolly (RG 10/22/03) October 10, 2003 March 7, 2007 1,244 days
Wilson J. O. ES FM-200701022 3/1/07 3/7/07 Ground floor, New Side/Multi Service Center. Change locks on offices for security reasons. March 1, 2007 March 7, 2007 6 days
Hart Middle School FM-200500045 05 3/7/07 Gynasium. Remount bleachers to the wall. January 3, 2005 March 7, 2007 793 days
Hart Middle School FM-200502388 05 3/7/07 Hart First fl. Exit Door Replace or Repair Exit Door Repair March 8, 2005 March 7, 2007 729 days
Hart Middle School FM-200503499 05 3/7/07 hART Cafeteria Replace Windows on Girl's side of Cafeteria Code A-clear for repair by DCPS charles Buchanan on 4/14/05 April 1, 2005 March 7, 2007 705 days
Hart Middle School FM-200505332 05 3/7/07 Hart Second fl. New Wing Replace 15 , 9x9 Ceiling Tilels HA 041 Ceiling Tile White 1' X 1' Gouges and Pinholes No Asbestos HA 775 Ceiling Tile White 1' X 1' Ceiling T ile - Fessurs and Dots No Asbestos Code A-clear for repair by DCPS Charles Buchanan on 5/ 20/05 May 10, 2005 March 7, 2007 666 days
Winston EC FM-200700674 07 3/7/07 First Floor - Electrical Closet - Repair lock to the electrical panel closet. Unable to turn the lights off. February 21, 2007 March 7, 2007 14 days
Hyde Elementary School FM-200700784 07 3/7/07 Boiler room Repair # 2 Boiler , unit will not fire off, cuts before pre purge. February 23, 2007 March 7, 2007 12 days
Hart Middle School FM-200623244 06 3/7/07 Replace or repair door closer for the Auditorium Door and Basement Stairwell 7 Door. May 24, 2006 March 7, 2007 287 days
Hart Middle School FM-2006