Urgent Repair Requests Closed in March 2007 (119)
| School |
Description |
Open Date |
Close Date |
Time Elapsed |
| Kelly Miller MS |
FM-200633022 2/8/06 3/1/07 First Floor - Girl's Bathroom Near Gym - R/R Partition, it fell down Asbestos Code A - Clear for repairs on 12/08/06. DCPS Safety - Richard Gibson (RG) |
December 8, 2006 |
March 1, 2007 |
83 days |
| Kelly Miller MS |
FM-200629853 06 3/1/07 Replacement of damaged or missing ceiling tile throughout the building. Note: These repairs are to be completed before Dr. Janey's and US Department of Education's site visit on September 25,2006. Asbestos Code A - Clear for repairs on 09/22/06. DCPS Safety - Richard Gibson (RG 09/22/06) |
September 22, 2006 |
March 1, 2007 |
160 days |
| Kelly Miller MS |
FM-200506068 05 3/1/07 (Miller) Asbestos Assessment Required. Main lobby area. Install dedication plaque in specified area. Asbestos Code A - Clear for repairs on 05/27/05. DCPS Safety - Richard Gibson (RG) |
May 27, 2005 |
March 1, 2007 |
643 days |
| Spingarn High School |
FM-200213261 02 3/1/07 Spingarn Room 211 1. Asbestos assessment required. Make electrical adjustments - run electrical outlets for 2 window a/c units and electrical line for microwave oven and computer. Code A Clear for Repair by Leroy Minton, Jr. DCPS Safety-07-30-02 DCPS Safety-Sheila R. Howard 07-30-02 |
July 26, 2002 |
March 1, 2007 |
1,679 days |
| Spingarn High School |
FM-200512455 05 3/1/07 (Spingarn) "Very Urgent" Third floor. Need electricians to assess and repair problem. Note: When spot cooler is turned on all the lights inside classroom goes off, spot cooler may need a dedicated circuit. |
September 13, 2005 |
March 1, 2007 |
534 days |
| Spingarn High School |
FM-200622396 06 3/1/07 Basement- Boys Lockerroom VERY URGENT! The children kicked the door in completely. The door needs to be replaced/repaired and installed. (THE BOY'S LOCKERROOM IS OPEN WITH FULL EXPOSURER TO STUDENTS PASSING BY) Asbestos Code A - Clear for repairs on 05/11/06. Tidewater - Thomas Johnson (RG 05/12/06 |
May 9, 2006 |
March 1, 2007 |
296 days |
| Spingarn High School |
FM-200459826 /04 3/1/07 SPINGARN FIRST FL. RM 126 INSTALL DUPLEX RECEPTACLE Asbestos Code A - Clear for repairs on 12/22/04. DCPS Safety - Leroy Minton Jr. (RG 12/22/04) |
December 20, 2004 |
March 1, 2007 |
801 days |
| Patterson ES |
FM-200453040 04 3/2/07 Patterson, W.B./Harris, PR Main entrance Exterior door stuck hard to open. Asbestos Code A - Clear for repairs on 08/23/04. DCPS Safety - Leroy Minton Jr. (RG 08/23/04) |
August 20, 2004 |
March 2, 2007 |
924 days |
| Spingarn High School |
FM-200502250 05 3/2/07 Spingarn Third floor rooms 326 and 328 Requesting safety to survey roof leaking on the rooms and check out the spot that looks like mold in room 328. Water damage has shown up from when it rains. AMP Room 309 AMP Room 305 HA 017 Plaster White No Asbestos HA 717 Brown Coat With HA 017 No Asbestos Code A-clear for repair by DCPS Charles Buchanan on 1/13/06 |
March 4, 2005 |
March 2, 2007 |
728 days |
| Spingarn High School |
FM-200501801 05 3/2/07 Spingarn ( High School Bathroom Survey Report ) Second Floor Boys Restroom - Paint Walls and Ceiling First Floor Boys Restroom - Paint Walls and Ceiling First Floor Girls Restroom - Paint Walls and Ceiling Boys Locker Room - Paint Walls and Ceiling Girls Locler Room - Paint Walls and Ceiling Code A- clear for repairs as of 3/15/05 Sylvia Grimes safety office. Paint tested negative in earlier survey's 03/15/2005 10:28 SG - |
February 20, 2005 |
March 2, 2007 |
740 days |
| Spingarn High School |
FM-200501771 05 3/2/07 Spingarn First floor room 115 Requesting safety to survey leak from the ceiling. HA 017 Plaster Coat No Asbestos HA 717 Brown Coat With HA 017 No Asbestos Code A-clear for repair by DCPS Charles Buchanan on 1/13/06 |
February 18, 2005 |
March 2, 2007 |
742 days |
| Patterson ES |
FM-200453039 04 3/2/07 Patterson, W.B. Third floor girls room stairwell # 4 Batch two holes in drywall. Asbestos Code A - Clear for repairs on 08/23/04. DCPS Safety - Leroy Minton Jr. (RG 08/23/04) |
August 20, 2004 |
March 2, 2007 |
924 days |
| Spingarn High School |
FM-200504271 05 3/2/07 ( SPINGARN ) Third Floor - Stairway #4 1) Replace wire mesh glass. Asbestos Code A - Clear for repairs on 04/19/05. DCPS Safety - Leory Minton Jr.(RG 04/20/05) |
April 19, 2005 |
March 2, 2007 |
682 days |
| Spingarn High School |
FM-200207099 02 3/2/07 Spingarn Asbestos Assessment Reqd. 2nd Floor Custodial Closet Close hole in brick wall in custodial closet. Asbestos Code A - Clear for repairs on 05/03/02. DCPS Safety - Richard Gibson (RG 05/03/02) |
May 3, 2002 |
March 2, 2007 |
1,764 days |
| Plummer Elementary School |
FM-200504182 05 3/5/07 ( PLUMMER ) First Floor - Boys Restroom 1) Replace missing doors. Asbestos Code A - Clear for repairs on 04/19/05. DCPS Safety - Richard Gibson (RG) |
April 18, 2005 |
March 5, 2007 |
686 days |
| Stuart-Hobson Middle School |
FM-200514144 /05 3/5/07 (Stuart-Hobson) "Urgent" Ground floor, Cafeteria & Cafeteria Dressing room. Repair or Replace loose ceiling tiles and replace missing ceiling tiles in cafeteria over serving table tables. Note: Tiles are falling and recently feel during lunch period. HA 037 Ceiling tile white 1' X 1' with holes in straight lines No Asbestos HA 042 Plaster old school N0 Asbestos HA 742 Brown coat with HA 042 No Asbestos Code A-clear for repair by DCPS Charles Buchanan on 11/03/05 |
October 22, 2005 |
March 5, 2007 |
499 days |
| Stuart-Hobson Middle School |
FM-200218410 02 3/5/07 Stuart-Hobson ****Urgent**** Asbestos Assessment Reqd. Girls' Restroom Throughout Furnish and install handicapped railings in the first stall of all girls' lavatories on all floors. Bars may need to be placed behind the commodes. There is a handicapped student in the school who has classes on all floors [safety concerns]. Asbestos Code A-clear for repair by Horne Engineer Roger Kager DCPS Charles Buchanan on 09/27/02 |
September 26, 2002 |
March 5, 2007 |
1,621 days |
| Plummer Elementary School |
FM-200331199 03 3/5/07 Plummer Room 213 Provide and install new set of double entrance doors to replace old set that wood came off hinges due to age and deteriorattions. URGENT Asbestos Code A - Clear for repairs on 06/05/03. Horne Engineering - Tony Marcolin (RG 06/05/03) |
June 4, 2003 |
March 5, 2007 |
1,370 days |
| Stuart-Hobson Middle School |
FM-200621460 06 3/5/07 Second Floor Teacher's Lounge - Asbestos Assessment Required - Has cracked and broken floor tiles. Asbestos Code D - on 04/19/06. Tidewater - Shamika Parker (RG 04/26/06) Asbestos Code A - Abated and repaire on 11/01/06 by Motir Services (LM-11/15/06) Safety Office 202-576-8962. |
April 19, 2006 |
March 5, 2007 |
320 days |
| Woodson High School |
FM-200619885 06 3/6/07 Woodson Boiler Room Repair or replace seal in pump #17. Pump is leaking badly. Pump service stairs and classrooms. Urgent !!!!! |
March 14, 2006 |
March 6, 2007 |
357 days |
| Green Elementary School |
FM-200700023 9/07 3/6/07 Boiler room - URGENT - Correct existing problems with boiler # 4 that continuously fails to flame failure. Boiler # 3 still awaiting parts. |
January 29, 2007 |
March 6, 2007 |
36 days |
| Woodson High School |
FM-200619887 06 3/6/07 Woodson Boiler Room Repair or replace pump #16. Pump will not come on. Pump seem to had no power. Urgent !!!!! |
March 14, 2006 |
March 6, 2007 |
357 days |
| Ballou Senior High School |
FM-200501369 05 3/7/07 (Ballou) Locksmith needed for repair handle and combination to school vault,unable open(urgent). |
January 29, 2005 |
March 7, 2007 |
767 days |
| Aiton Elementary School |
FM-200622347 06 3/7/07 Repair the stairs to the stage in the cafeteria on the first floor. Note: Someone may get hurt a sharp piece is sticking out. Asbestos Code A - Clear for repairs on 0/09/06. Tidewater - Kenny Long (RG 05/10/06) |
May 9, 2006 |
March 7, 2007 |
302 days |
| Rudolph Elementary School |
FM-200500689 05 3/7/07 Rudolph Room #112 Repair or replace shaft bearing on heating unit in room #112, the shaft bearing is bad. Urgent !!!!!! |
January 22, 2005 |
March 7, 2007 |
774 days |
| Benning Elementary School |
FM-200338788 /03 3/7/07 Benning Basement The electrical panel in the electric room need to be disconnected, because the light pole is being taken down for safety reason. Asbestos Code A - Clear for repairs on 10/14/03. Horne Engineering - Troy Wilcome (RG 10/22/03) |
October 10, 2003 |
March 7, 2007 |
1,244 days |
| Turner Elementary School |
FM-200501707 05 3/7/07 (Turner) !!!URGENT!!! Rooms #212, 313, 314: Change locks on rooms documented, and storage room door; install guard plates. (Key alike) |
February 16, 2005 |
March 7, 2007 |
749 days |
| Wilson J. O. ES |
FM-200634290 07 3/7/07 Main Roof Repair or replace split system unit#3 Unit is continously being reset daily. Once unit reach set temperature, will not restart on its own. Space unit service are cold. Urgent !!!! |
January 24, 2007 |
March 7, 2007 |
42 days |
| Benning Elementary School |
FM-200501219 05 3/7/07 Benning Stairways Repair Lighting on steps Asbestos Code A - Clear for repairs on 02/04/05. DCPS Safety - Richard Gibson (RG) |
February 4, 2005 |
March 7, 2007 |
761 days |
| Eaton Elementary School |
FM-200633240 06 3/7/07 Eaton School - Boiler Room - Urgent Request - Send H.V.A.C. machanic to repair or replace pneumatic control system for H.V.A.C. equipment. Appears to be a bad filter valve. Valve Information: PP902D-1007-2-9807, ( Press-Reg. ) Made by Honeywell. Difficult to control heat in some areas. |
December 9, 2006 |
March 7, 2007 |
88 days |
| Benning Elementary School |
FM-200500304 05 3/7/07 Benning Area in fron of school main doors have unenev concrete and someone will bump into it and injury them self. |
January 11, 2005 |
March 7, 2007 |
785 days |
| Hart Middle School |
FM-200338793 /03 3/7/07 Hart Basement positive nature -B wing Remove broken and cracked floor and ceiling tiles in classrooms and corridor on basement level. Install missing ceiling tiles and floor tiles in above area after abatement. Assessment needed. Asbestos Code A - Clear for repairs on 10/10/03. DCPS Safety - Ronald Edwards (RG 10/10/03) Code A clear for 2'x4' acoustical ceiling tiles in the basemment hallway. and to install 12"x12" floor tiles in the basement hall way and room B35 on the basement level. (R. Edwards 10/10/03) |
October 10, 2003 |
March 7, 2007 |
1,244 days |
| Stoddert ES |
FM-200700349 2/8/07 3/7/07 Boiler Room Repair or replace Boiler, Boiler keep going off on flame failure. Only Boiler in Building. Urgent !!!! |
February 8, 2007 |
March 7, 2007 |
27 days |
| Raymond Elementary School |
FM-200701397 3/9/07 3/9/07 Location: Room 117 Replace ceiling tile. Asbestos Code A - Cleared for repairs on 03/09/07 by Tidewater (LM?03-09-07) Safety Office 202-576-8962. |
March 9, 2007 |
March 9, 2007 |
0 days |
| Dunbar High School |
FM-200701393 /07 3/9/07 Location: Large ground area near boys and girls locker room ramp. Please Replace 40 peices of ceiling tile damaged and on the floor covering a large ground space by the boys and girls locker room area. Ceiling tile 28" x 48" Hanging (electric) wiring is reported as hanging from the ceiling. Asbestos Code A - Clear for repairs on 03/08/07. DCPS Safety - Richard Gibson (RG) |
March 8, 2007 |
March 9, 2007 |
1 day |
| Shaed Elementary School |
FM-200514669 /05 3/12/07 Shaed Very Urgent First Floor-Book Room The key to the book room was lost and there is no way to open the room. |
October 26, 2005 |
March 12, 2007 |
502 days |
| Wilson J. O. ES |
FM-200700711 /21/07 3/12/07 Open Space, 3rd, 2nd Floor, and Library (2nd floor) - Adjust temperature in area indicated. Extremily hot. Urgent !!!! |
February 21, 2007 |
March 12, 2007 |
19 days |
| Patricia R Harris Ed Center |
FM-200514729 /05 3/12/07 Harris, P.R. Urgent Basement-Repair locks to 32 doors so that the panic bar can be locked with the key. Unable to secure basement area.Students are vancalising the area also change locks on iron doors to gated area. New principal and custodial foreman need keys. Note: Interior Stairwell Doors |
October 27, 2005 |
March 12, 2007 |
501 days |
| Slowe Elementary School |
FM-200701062 4/07 3/12/07 Boiler Room - Repair or replace Boiler #1, Boiler will not start. Urgent !!!! |
March 4, 2007 |
March 12, 2007 |
8 days |
| Hyde Elementary School |
FM-200514703 /05 3/12/07 (Hyde) "Urgent" Asbestos Assessment Required. Basement Level, Cafeteria Area. Repair or Replace knob on door leading to cafeteria it cannot be opened. Note: Currently it is jammed because of the door knob is malfunctioning. |
October 27, 2005 |
March 12, 2007 |
501 days |
| Reed LC |
FM-200700680 07 3/12/07 Penthouse, Mechanical Room - AHU #11 Repair or replace sleeve covering to the pulley end of the shaft on air handle unit #11; Air handle unit metal sleeve split in halt; unit is needed to heat Learning Center on the 2nd floor, also several classrooms on the 2nd floor. Urgent !!!!! |
February 21, 2007 |
March 12, 2007 |
19 days |
| Ballou Senior High School |
FM-200513360 05 3/12/07 (Ballou) "Urgent" Asst. Principal's Office. Survey & rekey knob locks to asst.principal suite to building master(out going principal lost keys.) |
August 23, 2005 |
March 12, 2007 |
566 days |
| Houston Elementary School |
FM-200701236 07 3/12/07 Boiler room URGENT!!!!!!!!! Repair Boiler # 2 , unit cut off on main flame failure after temperature is reached and must be reset each time. # 1 boiler is also flame failure. |
March 8, 2007 |
March 12, 2007 |
4 days |
| Watkins Elementary School |
FM-200511711 05 3/12/07 Watkins Very Urgent Entire Building-Re-Key doors inside and outside. |
September 1, 2005 |
March 12, 2007 |
557 days |
| Kimball Elementary School |
FM-200618323 06 3/12/07 Kimball Cafeteria Check and repair breaker and lights in cafeteria. No lights working. Engineer check light switch and ballast Urgent !!!!! |
February 6, 2006 |
March 12, 2007 |
399 days |
| Ronald H. Brown MS |
FM-200514684 /05 3/12/07 Brown Very Urgent Second Floor-Custodial Closet Re-Key lock on closet door. |
October 26, 2005 |
March 12, 2007 |
502 days |
| Kimball Elementary School |
FM-200500708 05 3/12/07 Kimball Ramp door Need a lock put on the ramp door, because it is dangerous going down to the boiler room. |
January 24, 2005 |
March 12, 2007 |
777 days |
| Kimball Elementary School |
FM-200456089 04 3/12/07 Kimball Main entrance entry system The front door entry system is not working. Repair ASAP Safety Concern. Asbestos Code A - Clear for repairs on 10/01/04. DCPS Safety - Leroy Minton Jr. (RG 10/01/04) |
September 29, 2004 |
March 12, 2007 |
894 days |
| Janney Elementary School |
FM-200700624 25/07 3/12/07 Two door hinges are broken off of exit door on west side of demountable three. The door is a health and safety hazard. |
January 25, 2007 |
March 12, 2007 |
46 days |
| Kimball Elementary School |
FM-200455588 04 3/12/07 Kimball First floor room 115 Replace floor carpet ASAP due to water damage. Carpet is damage need to be replace. HA 002 Carpet Masic Yellow No Asbsestos HA 004 Floor tile Off-White 9" x 9" with Olilvve streaks Assumed HA 005 Floor Mastic with HA 004 Assumed HA 006 Floor tile Off-White 9" x 9" with Olilvve streaks Yes for asbestos HA 007 Floor Mastic with HA 006 No for asbestos HA 008 Floor Tile Beige 9" X 9' With White Streaks Assumed HA 009 Floor Mastic with HA 008 Assumed "Code A" Cleared for repairs/replacement on 8/29/05 . Carpet tiles are on site. DCPS Safety 8/02/05 Also reference FM-200507291 |
September 24, 2004 |
March 12, 2007 |
899 days |
| Kimball Elementary School |
FM-200448574 04 3/12/07 (Kimball) Asbestos Assessment Required. Furnish and install carpet in the following area's: Room #102, North Wing, #122, 105, 109, 111, 113, 115, and others. Carpet is damaged, dirty, and safety hazard. (FWT) |
May 27, 2004 |
March 12, 2007 |
1,019 days |
| Ketcham Elementary School |
FM-200701347 07 3/12/07 Request that someone come out and re-attach light fixture to ceiling because it is hanging and could possibly fall. Urgent!!! |
March 8, 2007 |
March 12, 2007 |
4 days |
| Eaton Elementary School |
FM-200507630 05 3/12/07 !!!!VERY URGENT!!!! First Floor - Main Lobby Area Main security door can't be secured and is falling off the henge. |
July 11, 2005 |
March 12, 2007 |
609 days |
| Macfarland Middle School |
FM-200217452 02 3/12/07 MacFarland ****Urgent**** Auditorium 1. Repair or replace a fallen light fixture that barely missed someone's head when it fell; and 2. Survey and check all ceiling fixtures to ensure that fixture mountings are tight and secure [safety issue]. |
September 13, 2002 |
March 12, 2007 |
1,641 days |
| Eastern High School |
FM-200514917 05 3/13/07 Urgent: Furnish and install a 3 phase breaker in eletrical panel for freezer breaker is bad and food must be picked up every Friday and brought back on Munday. Info: General Electric 40 amp breaker PH - 3 TYPE: NLAB W-4 STYLE: 5 PANEL INFO: General Electric VOLTS: 208Y/200 AMP-225 PLANT-P PH-3 |
November 1, 2005 |
March 13, 2007 |
497 days |
| Shaw JHS |
FM-200631948 6/06 3/13/07 URGENT:Two slide bolts needed for outside of home economics room. 11/06/06 |
November 6, 2006 |
March 13, 2007 |
127 days |
| Eastern High School |
FM-200500181 05 3/13/07 Eastern B-70 Furnish and install light fixtures in store room in science-chemistry room. NOTE: Safety officer need light replaced to inventory chemicals in lab. Inspectio will take place on 1/10/05. Code A-clear for repair by DCPS Charles Buchanan on 1/12/05 |
January 6, 2005 |
March 13, 2007 |
796 days |
| Eastern High School |
FM-200514713 /05 3/13/07 Eastern Urgent Furnish and install electrical switch to cut on/off air conditioners. The units has been installed |
October 27, 2005 |
March 13, 2007 |
502 days |
| Clark Elementary School |
FM-200221179 /02 3/16/07 Clark Third floor Girls restroom bradley basins are not working properly. One is draining slow and the other one sensors are off. No way children can wash their hands. Asbestos Code A- Cleared for repairs on 03-04-03 by Leroy Minton Jr (LM/01-15-04) Safety Office. 202-576-8962. |
November 18, 2002 |
March 16, 2007 |
1,579 days |
| Merritt Middle School |
FM-200701625 07 3/19/07 1st Floor/Library; Missing ceiling tile. Asbestos Code A - Clear for repairs on 03/13/07. DCPS Safety - Richard Gibson (RG) |
March 13, 2007 |
March 19, 2007 |
6 days |
| Francis Junior High School |
FM-200459574 /04 3/19/07 Francis Third floor 303 Door hinges need to be rehung, the door will not line up. Asbestos Code A - Clear for repairs on 12/14/04. DCPS Safety - Richard Gibson (RG) |
December 14, 2004 |
March 19, 2007 |
825 days |
| Janney Elementary School |
FM-200221230 /02 3/19/07 Janney First floor - outside / front of bldg. Plumbing: Need a plumber to evaluate / survey cause of water flooding tunnel after it rains. We cut drain and put flex pipe extended out to lawn. This did not stop the flood. Told that cast iron pipe underground is broken causing rain (water) to flood tunnel in basement. Safety hazard. |
November 18, 2002 |
March 19, 2007 |
1,582 days |
| Turner Elementary School |
FM-200701081 07 3/19/07 Room - 214 - Asbestos assessment required Repair ruptured line in ceiling of room 214. Asbestos Code A - Abated and cleared for repairs on 03/05/07 by Motir Services (LM/03-07-07) Safety Office 202-576-8962. |
March 5, 2007 |
March 19, 2007 |
14 days |
| Merritt Middle School |
FM-200701626 07 3/19/07 1st Floor/Observation Room; Missing ceiling tile. Asbestos Code A - Clear for repairs on 03/13/07. DCPS Safety - Richard Gibson (RG)) |
March 13, 2007 |
March 19, 2007 |
6 days |
| West Elementary School |
FM-200515216 05 3/20/07 Urgent: Replace five pad locks and key entry locks in the stairwell by gym. |
November 8, 2005 |
March 20, 2007 |
497 days |
| Seaton Elementary School |
FM-200701461 07 3/20/07 Boiler Room - Repair or replace leaking tubes in Boiler #2. Note: Boiler #1 already down with leaks in combustion chamber. No heat in building. Urgent !!!! |
March 11, 2007 |
March 20, 2007 |
9 days |
| Young Elementary School |
FM-200701252 07 3/20/07 2nd fl. Double doors in hallway missing safety glass - Right side door glass measures 8x30 inches. Asbestos Code A - Clear for repairs on 03/08/07. Tidewater - Kenny Long (RG 03/13/07) |
March 8, 2007 |
March 20, 2007 |
12 days |
| Roosevelt High School |
FM-200631564 /06 3/20/07 Roosevelt Room B-15 Correct electrical problem in room B-15 No lights in room. Need lights to see how to operate equipment. Safety Hazard !!!! |
October 31, 2006 |
March 20, 2007 |
140 days |
| Roosevelt High School |
FM-200501554 05 3/20/07 Roosevelt Install 120 volt quad outlet near security console unit to be installed in main entrance lobby. Code A - clear for repairs as of 2/24/05. Sylvia Grimes Safety office. |
February 11, 2005 |
March 20, 2007 |
767 days |
| Wilkinson ES |
FM-200619954 06 3/20/07 Very Urgent First Floor-Pre-K Hallway Change Light Fixture In This Area-Replace Bulbs But Lights Still Wont Come On. |
March 15, 2006 |
March 20, 2007 |
370 days |
| Watkins Elementary School |
FM-200515830 /05 3/20/07 Exterior rear of building, First floor. "Urgent" Repair or Replace lock on exterior door leading from incinerator into building currently the lock is jammed. |
November 28, 2005 |
March 20, 2007 |
477 days |
| Young Elementary School |
FM-200701201 07 3/20/07 2nd fl. 5th grade Special Ed - safety glass not installed properly - No putty around glass. Glass is loose in frame Asbestos Code A - Clear for repairs on 03/08/07. Tidewater - Kenny Long (RG 03/13/07) |
March 7, 2007 |
March 20, 2007 |
13 days |
| Walker-Jones EC |
FM-200501327 05 3/20/07 Walker-Jones Mechanical Rooms (2 ) Stage Repair or replace locking mechanism on mechanical room entrance doors. Key alike. These door must be secured, because they creat a unsafe condition. Urgent !!!!! |
February 8, 2005 |
March 20, 2007 |
770 days |
| Kimball Elementary School |
FM-200513058 05 3/20/07 Kimball Urgent First Floor-Middle Wing Rekey rm. 107 |
September 22, 2005 |
March 20, 2007 |
544 days |
| Burrville Elementary School |
FM-200701388 /07 3/20/07 Location: Resource Room on the 1st floor. Urgent-teacher's purse locked in resource room. Called Mr. Abdul and informed him of the emergency request. |
March 8, 2007 |
March 20, 2007 |
12 days |
| Burrville Elementary School |
FM-200505282 05 3/20/07 (Burrville) 2nd Floor/Gym: Repair or replace door handle on door; will not open from hallway. Asbestos Code A - Clear for repairs on 05/11/05. DCPS Safety - Richard Gibson (RG) |
May 9, 2005 |
March 20, 2007 |
680 days |
| Wilkinson ES |
FM-200513982 /05 3/20/07 Wilkinson Urgent First Floor-Principal Office Re-Key Storage Closet. The principal does not have the key. |
October 19, 2005 |
March 20, 2007 |
517 days |
| Wilkinson ES |
FM-200513681 /05 3/20/07 Wilkinson Very Urgent First Floor-Principal Office Repair/Replace light fixtures, the light bulbs were changed but the lights keep going out. |
October 11, 2005 |
March 20, 2007 |
525 days |
| Wilkinson ES |
FM-200513636 05 3/20/07 Wilkinson Urgent First, and Second Floors Duplicate keys to room doors and storage room doors. |
October 7, 2005 |
March 20, 2007 |
529 days |
| Backus Middle School |
FM-200218488 02 3/20/07 Backus ****Urgent**** Asbestos Assessment Reqd. 1st Floor Room 104 Replace/upgrade lights and ballasts. The ballast exploded in room 104. POC: Mr. Belzher 576-6112 Asbestos Code A - Clear for repairs on 09/30/02. Horne Engineering - Bipin Nanavaty ( RG 10/01/02) |
September 27, 2002 |
March 20, 2007 |
1,635 days |
| Wilkinson ES |
FM-200513540 05 3/20/07 Wilkinson Urgent First Floor-Cafeteria, Gym and Kindergarten Area Fluorescent light bulbs changed over 14 FT. |
October 6, 2005 |
March 20, 2007 |
530 days |
| Adams Elementary School |
FM-200701514 4 3/12/07 3/21/07 Boiler Room - Asbestos assessment may be required. Repair or replace leaking condensate return line on boiler #4 and #1. Urgent !!!! Asbestos Code A - Clear for repairs on 03/14/07. Tidewater - Shamika Parker (RG 03/15/07) |
March 12, 2007 |
March 21, 2007 |
9 days |
| Kramer Middle School |
FM-200503758 05 3/21/07 ( KRAMER ) !!!VERY URGENT!!! Second Floor - Room 203 1) Repair/Replace sink fixtures Classroom sink is running hot water, no cut-off valve . Asbestos Code A - Clear for repairs on 04/08/05. DCPS Safety - Richard Gibson (RG) |
April 8, 2005 |
March 21, 2007 |
712 days |
| Kimball Elementary School |
FM-200622285 06 3/21/07 Kimball Boiler Room Repair or replace circulating pump for domestic hot water heater. No hot water in building. Urgent !!!!! |
May 8, 2006 |
March 21, 2007 |
317 days |
| Adams Elementary School |
FM-200701521 1 3/12/07 3/21/07 Early Childhead, Lavatory by stairway #6. Replace a 3/4" supply line that services a univent in this lavatory. Note: This 3/4" line has rusted out and is leaking. Also this is the only sourse of heating in this lavatory. Urgent !!!! |
March 12, 2007 |
March 21, 2007 |
9 days |
| Shaw JHS |
FM-200631207 20/06 3/22/07 URGENT:Graffiti team needed for outside of shaw 1. R st side 2.R.I.ave side down in pit leading to pool. |
October 20, 2006 |
March 22, 2007 |
153 days |
| Peabody Elementary School |
FM-200515220 05 3/22/07 Urgent: Unstop area drains on the playground and in the drive way. |
November 8, 2005 |
March 22, 2007 |
499 days |
| Reed LC |
FM-200515829 /05 3/22/07 18th St., Side, Playground Area. "Urgent" Please repair stone wall on the 18th St., side playground in several areas. |
November 28, 2005 |
March 22, 2007 |
479 days |
| Hine JHS |
FM-200227908 03 3/22/07 (Hine) Exterior door by stairwell#6 Panic bar device need repairing-will not open Asbestos Code A-clear for repair by DCPS Safety Ofice Charles Buchanan on 5/12/03 |
March 28, 2003 |
March 22, 2007 |
1,455 days |
| Hine JHS |
FM-200227913 03 3/22/07 (Hine) Exterior door-Panic bar device need repairing-Door will not open (FIRE CODE VIOLATION) Asbestos Code A-clear for repair by DCPS Safety Ofice Charles Buchanan on 5/12/03 |
March 28, 2003 |
March 22, 2007 |
1,455 days |
| Woodson High School |
FM-200618943 06 3/22/07 Very Urgent Replace the windows that are out on the fourth and fifth floors. |
February 22, 2006 |
March 22, 2007 |
393 days |
| Hine JHS |
FM-200210697 02 3/22/07 Hine 1. Asbestos assessment required. Panic bar device not working properly, very hard to open-- fire code voliation. Asbestos Code A - Cleared for repairs on 04-28-03 by Leroy Minton Jr. (LM/04-08-03) the Safety Office 202-576-8962. |
June 5, 2002 |
March 22, 2007 |
1,751 days |
| Winston EC |
FM-200700734 2/22/07 3/22/07 Floor tiles by Elevator are coming up due unknown reasons causing safety hazard Lead & Asbestos Code A - Clear for repairs on 02/22/07. Tidewater - Roger Small/Shamika Parker (RG 02/23/07) |
February 22, 2007 |
March 22, 2007 |
28 days |
| Woodson High School |
FM-200207531 02 3/23/07 Woodson, H.D. !!! Emergency !!! Second (2nd) Floor - Boys Restroom Due a Fire in the School. 1. Asbestos Assessment Required. 2. Power Wash the room. 3. Paint the area. Health and Safety Hazard. Code A-clear for repair by Horne Engineer ( Philip Connolly ) on 05/13/02 |
May 9, 2002 |
March 23, 2007 |
1,779 days |
| Woodson High School |
FM-200453109 04 3/23/07 Woodson, HD First floor library classroom by elevator Repair wall / hole with excess panel @ 24x24. Ground: by elevator large hole in wall, ceramic wall brick wall up and install access panel @ 16x16. Asbestos Code A - Clear for repairs on 08/20/04. DCPS Safety - Richard Gibson (RG) |
August 20, 2004 |
March 23, 2007 |
945 days |
| Woodson High School |
FM-200204829 02 3/23/07 (Woodson) ***Urgent*** Ground Floor/Pool office: Damage ceiling due to previous leak; ceiling falling. Code A-clear for repair by Horne Engineer (Bipin Nanavaty) 0n 3/22/02 (CEB |
March 21, 2002 |
March 23, 2007 |
1,828 days |
| Woodson High School |
FM-200452828 04 3/23/07 Woodson, HD Ground floor girls restroom Replace missing partition and door. Asbestos Code A - Clear for repairs on 08/18/04. DCPS Safety - Richard Gibson (RG 08/18/04) |
August 18, 2004 |
March 23, 2007 |
947 days |
| Woodson High School |
FM-200504200 05 3/23/07 ( WOODSON, H.D. ) URGENT!!!! Plaza-Stairwell 2 1) Repair exterior door, it's busted. |
April 18, 2005 |
March 23, 2007 |
704 days |
| Woodson High School |
FM-200228865 03 3/23/07 (Woodson, H.D.) Asbestos Assessment Required. Ground Floor/Cafeteria: Replace track for ceiling tile, and replace ceiling tile. Asbestos Code A - Clear for repairs on 04/18/03. DCPS Safety - Richard Gibson (RG) |
April 17, 2003 |
March 23, 2007 |
1,436 days |
| Woodson High School |
FM-200504760 05 3/23/07 Woodson H.D Restrooms Thru-out Building Install Lath Guards where needed on all Stalls Asbestos Code A - Clear for repairs on 04/26/05. DCPS Safety - Richard Gibson (RG) |
April 26, 2005 |
March 23, 2007 |
696 days |
| Woodson High School |
FM-200621065 06 3/23/07 Plaza Level-Exit door is coming off the frame-"The door can be secured for tonight-don't know how long it's going to last"-Need to have repaird. Very Urgent See: Mr. Blanks |
April 6, 2006 |
March 23, 2007 |
351 days |
| Davis Elementary School |
FM-200214902 02 3/26/07 Davis 1. Asbestos Assessment Reqd. Basement/Nwe Wing Room 14, 26 & Hallway 2. Repalce 18 ceiling ties in room14; 15 in room 16; and three in the hallway. The damage was from flooding. Asbestos code A-clear for repair by DCPS safety Charles Buchanan on 8/20/02 Charles E. Buchanan HA 14 Ceiling tile White Pinholes&Pegholes 12" X 12" NAD |
August 19, 2002 |
March 26, 2007 |
1,680 days |
| Davis Elementary School |
FM-200455464 04 3/26/07 Davis. URGENT Basement, First, second and third floor align electric room door located in maintenance staff office and teacher bathroom door located on the first and second floor new wing. |
September 22, 2004 |
March 26, 2007 |
915 days |
| King M L ES |
FM-200501928 05 3/27/07 King, M.L. Need 15 two(2) amp light ballast, and need installation before March 6, 2005 for mid state assessment. Asbestos Code A - Clear for repairs on 02/25/05. DCPS Safety - Leroy Minton Jr. (RG 03/02/05) |
February 23, 2005 |
March 27, 2007 |
762 days |
| King M L ES |
FM-200510898 05 3/27/07 King Boiler Room Repair problem on lights in boiler room, Fire comes from lights when you turn on the lights, then the breaker shuts off. Safety Hazard !!!!! |
August 22, 2005 |
March 27, 2007 |
582 days |
| King M L ES |
FM-200620127 06 3/27/07 First Floor-Health Suite Place cover over telephone wires Safety Hazard |
March 21, 2006 |
March 27, 2007 |
371 days |
| Webb Elementary School |
FM-200512038 05 3/27/07 Webb Boiler Room Repair or replace circulating pump for hot water is binding. Urgent !!!! |
September 8, 2005 |
March 27, 2007 |
565 days |
| King M L ES |
FM-200455630 04 3/27/07 King First floor by 114 circuit breaker box Need to have # 8 circuit breaker replace light in the teacher bathroom will not come on. Asbestos Code A - Clear for repairs on 09/24/04. DCPS Safety Richard Gibson. (RG) |
September 24, 2004 |
March 27, 2007 |
914 days |
| Webb Elementary School |
FM-200617688 06 3/27/07 Webb Boiler Room Replace leaking seal on pump #4 Urgent !!!!! |
January 23, 2006 |
March 27, 2007 |
428 days |
| Francis Junior High School |
FM-200632151 51 11/14/06 3/28/07 Third Floor - Rm. 311 - Install external bars on ten windows for students safety |
November 14, 2006 |
March 28, 2007 |
134 days |
| Johnson JHS |
FM-200336588 03 3/28/07 Johnson Second floor room 213 Replace wood entrance door. Door is split and dangerous. Asbestos Code A - Clear for repairs on 08/29/03. Horne Engineering - Edward Rodriguez ( RG 09/02/03 ) |
August 29, 2003 |
March 28, 2007 |
1,307 days |
| Wilkinson ES |
FM-200702182 3/19/07 3/29/07 Location: Outside trash dumpster area Need two remove (2) old Bradley basins from outside trash. Safety Hazard. |
March 19, 2007 |
March 29, 2007 |
10 days |
| Kimball Elementary School |
FM-200504695 05 3/29/07 ( KIMBALL ) URGENT!!!!! Cafeteria - Girls Restroom 1) Repair the ceiling, it's falling |
April 25, 2005 |
March 29, 2007 |
703 days |
| Jefferson JHS |
FM-200702527 /07 3/29/07 Location: Boiler Room /Door Located next to room B18. Repair the lock on the door to the boiler room. Children are acessing the room. Safety Hazard |
March 26, 2007 |
March 29, 2007 |
3 days |
| Kelly Miller MS |
FM-200627267 06 3/29/07 Second Floor/Glass broken front stairwell Asbestos Code A - Clear for repairs on 08/11/06. DCPS Safety - Richard Gibson(RG) |
August 11, 2006 |
March 29, 2007 |
230 days |
| Johnson JHS |
FM-200443916 04 3/30/07 Johnson First floor gym Very dangerous, two sets of bleachers are broken need to be repair. Asbestos Code A - Clear for repairs on 02/11/04. Horne Engineering - Edward Rodriguez (RG 02/12/04) |
February 10, 2004 |
March 30, 2007 |
1,144 days |
| Cleveland Elementary School |
FM-200505981 05 3/30/07 Cleveland Main Office Floor Install Alluminum Thress Hold Asbestos Code A - Clear for repairs on 05/25/05. DCPS Safety - Richard Gibson (RG) |
May 25, 2005 |
March 30, 2007 |
674 days |
| Cleveland Elementary School |
FM-200513290 05 3/30/07 (Cleveland) "Emergency" First floor, Pre-K classroom. Need carpenters to secure sound proof ceiling tile it is currently hanging. School staff did not have the appropriate tool to perform task. Note: This is a safety hazard. Asbestos Code A - Clear for repairs on 09/29/05. Tidewater - Philp Connolly (RG 09/30/05) |
September 29, 2005 |
March 30, 2007 |
547 days |
| Johnson JHS |
FM-200456053 04 3/30/07 Johnson EMERGENY Third floor room 416: Door is hanging on one hinge. Damaged door to room #416 Asbestos Code A - Clear for repairs on 10/15/04. DCPS Safety - Richard Gibson (RG) |
September 29, 2004 |
March 30, 2007 |
912 days |
Routine Repair Requests Closed in March 2007 (765)
| School |
Description |
Open Date |
Close Date |
Time Elapsed |
| Spingarn High School |
FM-200515627 /05 3/1/07 Urgnet: Screen and seal gym floor for the basketball season. Asbestos Code A - Clear for repairs on 11/29/05. Tidewater - Tony Marcolin (RG 11/22/05) |
November 21, 2005 |
March 1, 2007 |
465 days |
| Spingarn High School |
FM-200628028 06 3/1/07 2nd Floor- Stairway #1 Replace door closer. Asbestos Code A - Clear for repairs on 08/23/06. Tidewater - Thomas Johnson (RG 08/24/06) |
August 21, 2006 |
March 1, 2007 |
192 days |
| Spingarn High School |
FM-200516150 05 3/1/07 Urgnet: Survey the lights in the gym area ther lights are not working. Note: See Mr. Herbert |
December 7, 2005 |
March 1, 2007 |
449 days |
| Spingarn High School |
FM-200628027 06 3/1/07 Basement- Replace exit door near custodian's office. It was broken during a break-in. Asbestos Code A - Clear for repairs on 08/23/06. Tidewater - Thomas Johnson (RG 08/24/06) |
August 21, 2006 |
March 1, 2007 |
192 days |
| Spingarn High School |
FM-200516436 /05 3/1/07 Repair plaster ceiling on the third floor in rm. 325. Asbestos Code A - Clear for repairs on 12/16/05. Tidewater - Roger Small (RG 12/19/05) |
December 14, 2005 |
March 1, 2007 |
442 days |
| Spingarn High School |
FM-200628026 06 3/1/07 3rd Floor- Stairway #3 Replace door closer; it was broken by a student. Asbestos Code A - Clear for repairs on 08/23/06. Tidewater - Thomas Johnson (RG 08/24/06) |
August 21, 2006 |
March 1, 2007 |
192 days |
| Kelly Miller MS |
FM-200629846 06 3/1/07 Missing door needs to be installed (Right of main office) Several doors throughout the building get stuck and will not open properly. Note: These repairs are to be completed before Dr. Janey's and US Department of Education's site visit on September 25,2006. Asbestos Code A - Clear for repairs on 09/22/06. Tidewater - Meneka Rodrigo (RG 09/22/06) |
September 22, 2006 |
March 1, 2007 |
160 days |
| Kelly Miller MS |
FM-200626111 06 3/1/07 Need to have partitions installed in restrooms: (Boy's) First Floor, Second Floor, Third Floor, Boy's Locker Room, Boy's Restroom By Music Room. Asbestos Code A - Clear for Repairs on 07/21/06. Richard Gibson (RG) |
July 21, 2006 |
March 1, 2007 |
223 days |
| Spingarn High School |
FM-200622876 06 3/1/07 2nd Floor- Rooms 219 & 211 New doors are needed for classrooms. Students set a fire today and broke into these two rooms. |
May 17, 2006 |
March 1, 2007 |
288 days |
| Kelly Miller MS |
FM-200626083 06 3/1/07 Need to have door closer installed on 11 stairwell doors. See: Mr. Ford |
July 20, 2006 |
March 1, 2007 |
224 days |
| Kelly Miller MS |
FM-200620617 06 3/1/07 First Floor - New Gym - Boys Bathroom - Partition is falling off wall, almost fell on student. |
March 30, 2006 |
March 1, 2007 |
336 days |
| Kelly Miller MS |
FM-200507191 05 3/1/07 Repair/Replace partitions on the first floor - (three) boys Restroom (two)Girls Restroom Third Floor - Boys Restroom (one) Second Floor - Girls Restroom (one) Some are loose and some are away from the wall. Code A-clear for repair by DCPS Charles Buchanan on 6/27/05 |
June 24, 2005 |
March 1, 2007 |
615 days |
| Kelly Miller MS |
FM-200626113 06 3/1/07 Need to have 3 doors replaced and installed on the first floor. See Mr. Ford Asbestos Code A - Clear for repairs on 07/24/06. Tidewater - Carlos Vera (RG 07/25/06) |
July 21, 2006 |
March 1, 2007 |
223 days |
| Kelly Miller MS |
FM-200626114 06 3/1/07 Need to have cafeteria door near gym repaired, unable to secure |
July 21, 2006 |
March 1, 2007 |
223 days |
| Spingarn High School |
FM-200205983 02 3/1/07 (Spingarn) 3rd floor/room #323: Overload, too much for circuit; need additional wiring. Contact person: Ingraham. Code A-clear for repair by Horne Engineer ( Troy Wilcome ) on 4/19/02 |
April 17, 2002 |
March 1, 2007 |
1,779 days |
| Spingarn High School |
FM-200503318 05 3/1/07 Spingarn Basement Near Stairwell # 6 Replace Exit Sign |
March 28, 2005 |
March 1, 2007 |
703 days |
| Spingarn High School |
FM-200213457 02 3/1/07 Spingarn Between Basement & 1st Floor Repair or replace lights on the stairways between the basement and 1st floors----lights are out. |
August 2, 2002 |
March 1, 2007 |
1,672 days |
| Spingarn High School |
FM-200336827 03 3/1/07 Spingarn Third floor stairway # 4 Requesting an electrican to replace exit sign by stairway # 4, due to being an fire code violation. Stusednts taken old one off the wall. Asbestos Code A - Clear for repairs on 09/04/03. Horne Engineering - Troy Wilcome (RG 09/08/03) |
September 4, 2003 |
March 1, 2007 |
1,274 days |
| Spingarn High School |
FM-200336828 03 3/1/07 Spingarn First floor main entrance to the building Requesting an electrican to survey the lights as you enter the building, only one light works. Code A-clear for repair by DCPS Charles Buchanan 09/05/2003 11:05 CXB - |
September 4, 2003 |
March 1, 2007 |
1,274 days |
| Spingarn High School |
FM-200338415 03 3/1/07 Spingarn First floor room 126 Requesting an electrican to survey the outlets on the walls by the window, there is no power checked panel box. # 9 switch will not stay on. |
October 2, 2003 |
March 1, 2007 |
1,246 days |
| Spingarn High School |
FM-200453227 04 3/1/07 Spingarn Third floor stairway # 1 Requesting an electrican to replace light fixtures back to the wall light is hanging. |
August 24, 2004 |
March 1, 2007 |
919 days |
| Spingarn High School |
FM-200453250 04 3/1/07 Spingarn Basement ROTC Requesting an electrican to replace the ballast on the light.. |
August 24, 2004 |
March 1, 2007 |
919 days |
| Spingarn High School |
FM-200505017 05 3/1/07 ( SPINGARN ) Gym 1) Replace exit sing that was broken by students. |
May 2, 2005 |
March 1, 2007 |
668 days |
| Spingarn High School |
FM-200453384 04 3/1/07 (Spingarn) VANDALISM 3rd Floor/Stairway # 6 Requesting an electrician to replace ext sign that was damage by student. Do not have any on sight. |
August 26, 2004 |
March 1, 2007 |
917 days |
| Spingarn High School |
FM-200618873 06 3/1/07 Third Floor-Stairway #6 Replace the broken door closer that was destroyed by students. Asbestos Code A - Clear for repairs on 02/21/06. Tidewater - Shamika Parker (RG 02/22/06) |
February 21, 2006 |
March 1, 2007 |
373 days |
| Spingarn High School |
FM-200631723 06 3/1/07 Second Floor - Stairway #5 - Replace door closer to stop door from slamming. |
November 2, 2006 |
March 1, 2007 |
119 days |
| Spingarn High School |
FM-200630805 /06 3/1/07 First Floor - Door by Stairway #3 - Replace the roton hinge. |
October 16, 2006 |
March 1, 2007 |
136 days |
| Kelly Miller MS |
FM-200632681 1/29/06 3/1/07 First Floor - Gym - Repair 4 benches on the bleachers Asbestos Code A - Clear for repairs on 11/30/06. Tidewater - Aaron Gholson (RG 02/26/07) |
November 29, 2006 |
March 1, 2007 |
92 days |
| Spingarn High School |
FM-200504178 05 3/1/07 Eastern Front Entrance Rewire Font Entrance Lights to a New Switch |
April 18, 2005 |
March 1, 2007 |
682 days |
| Hart Middle School |
FM-200629469 06 3/2/07 Gym- Supply and install new door. |
September 14, 2006 |
March 2, 2007 |
169 days |
| Hart Middle School |
FM-200631277 /06 3/2/07 Replace broken door closers in the following areas: 1.) First floor, Stairwell # 7, auditorium, gymnasium entrance door. 2.) Second floor, Stairwells 6 & 7. |
October 24, 2006 |
March 2, 2007 |
129 days |
| Patterson ES |
FM-200623911 06 3/2/07 First floor, Classrooms. Replace louvers in doors. |
June 6, 2006 |
March 2, 2007 |
269 days |
| Patterson ES |
FM-200618742 06 3/2/07 Asbestos Assessment Required. First floor, Boys' Restroom/Near Science Lab. Repair broken door to the boys' restroom on the first floor. Note: A hole has been kicked in the bottom of door. Asbestos Code A - Clear for repairs on 12/21/05. Tidewater - Roger Small (RG 12/22/05) |
February 16, 2006 |
March 2, 2007 |
379 days |
| Patterson ES |
FM-200516715 /05 3/2/07 Asbestos Assessment Required. First floor, Girls' Restroom/Near Science Lab. Repair broken door to the girls' restroom on the first floor. Note: A hole has been kicked in the bottom of door. Asbestos Code A - Clear for repairs on 12/21/05. Tidewater - Roger Small (RG 12/22/05) |
December 19, 2005 |
March 2, 2007 |
438 days |
| Patterson ES |
FM-200514665 /05 3/2/07 W. B. Patterson First Floor - 123 and 131 1) Door rubbing frame. Code A-clear for repair by DCPS Charles Buchanan on 10/31/05 |
October 26, 2005 |
March 2, 2007 |
492 days |
| Spingarn High School |
FM-200633590 9/06 3/2/07 First Floor - Main Office - Requesting to have the wire mesh glass to the door replaced due to a break in. Asbestos Code A - Clear for repairs on 01/03/07. Tidewater - Thomas Johnson (RG 01/04/07) |
December 29, 2006 |
March 2, 2007 |
63 days |
| Spingarn High School |
FM-200632193 /06 3/2/07 Second Floor - Rm. 203 - Survey and repair the leak coming from the ceiling. Asbestos Code A - Clear for repairs on 11/15/06. Tidewater - Kenny Belton (RG 11/15/06) |
November 15, 2006 |
March 2, 2007 |
107 days |
| Spingarn High School |
FM-200630124 06 3/2/07 Stadium- Unstop steeple chase pit. |
September 27, 2006 |
March 2, 2007 |
156 days |
| Spingarn High School |
FM-200629812 06 3/2/07 Cafeteria- Repair/replace lock and/or cylinder. |
September 21, 2006 |
March 2, 2007 |
162 days |
| Spingarn High School |
FM-200628898 06 3/2/07 Outside in front of the building/Survey lights on the roof. |
September 7, 2006 |
March 2, 2007 |
176 days |
| Spingarn High School |
FM-200626437 06 3/2/07 First floor, Room 116. Request for locksmiths to repair or replace lock so that staff can open and close door. |
July 26, 2006 |
March 2, 2007 |
219 days |
| Spingarn High School |
FM-200622803 06 3/2/07 1st Floor- Cafeteria Wire mesh glass need to be replaced. Asbestos Code A - Clear for repairs on 05/18/06. Tidewater - Shamika Parker (RG 05/22/06) SEE ASSESSMENTS |
May 17, 2006 |
March 2, 2007 |
289 days |
| Spingarn High School |
FM-200621324 06 3/2/07 Basement-Cafeteria Office-Change light fixture to brighten the office. |
April 13, 2006 |
March 2, 2007 |
323 days |
| Spingarn High School |
FM-200618901 06 3/2/07 Second Floor-Library Place a guard over the lock to keep students from getting into the classroom |
February 21, 2006 |
March 2, 2007 |
374 days |
| Spingarn High School |
FM-200618730 06 3/2/07 Third Floor-Rm. 329 Chang the lock to the room |
February 16, 2006 |
March 2, 2007 |
379 days |
| Spingarn High School |
FM-200618013 06 3/2/07 First Floor - Room 115 - Repair or replace damaged cylinder. |
January 30, 2006 |
March 2, 2007 |
396 days |
| Spingarn High School |
FM-200516848 /05 3/2/07 Outside of Gym Repair outside llights |
December 21, 2005 |
March 2, 2007 |
436 days |
| Spingarn High School |
FM-200515479 /05 3/2/07 First fl. Stairways #4 & 7 Repair broken wire mash glass in both arears Asbestos Code A - Clear for repairs on 11/16/05. Tidewater - Kenny Long (RG 11/16/05) . |
November 15, 2005 |
March 2, 2007 |
472 days |
| Spingarn High School |
FM-200514190 /05 3/2/07 Spingarn First Floor - Telephone Booth - Replace wire mese glass. First Floor - Stairwell 6 - Replace wire mese glass. First Floor - Stairwell 1- Replace wire mese glass. Code A-clear for repair by DCPS Charles Buchanan on 1/13/06 |
October 22, 2005 |
March 2, 2007 |
496 days |
| Spingarn High School |
FM-200512718 05 3/2/07 Spingarn Third Floor-Rm. 306 Repair or replace lock that was broken by students |
September 16, 2005 |
March 2, 2007 |
532 days |
| Spingarn High School |
FM-200512717 05 3/2/07 Spingarn First Floor-Gym Repair or replace panel bar to gym door, kids are able to pull the door open |
September 16, 2005 |
March 2, 2007 |
532 days |
| Spingarn High School |
FM-200504611 05 3/2/07 ( SPINGARN ) Third Floor - Room 300 and by Stairway 5 1) Survey leak comming from the roof. HA 017 Plaster White No Asbestos HA Brown Coat No Asbestos Code A-clear for repair by DSCPS Charles Buchanan on 5/10/05 |
April 22, 2005 |
March 2, 2007 |
679 days |
| Spingarn High School |
FM-200504610 05 3/2/07 ( SPINGARN ) First Floor - Stairway 6 1) Replace wire mess glass. |
April 22, 2005 |
March 2, 2007 |
679 days |
| Spingarn High School |
FM-200453386 04 3/2/07 Spingarn Second floor by room 219 Requesting brick mason to replace missing tile. |
August 26, 2004 |
March 2, 2007 |
918 days |
| Spingarn High School |
FM-200453300 04 3/2/07 Spingarn Second floor on wall across from stairway # 6 and # 1 and by room 218 Requesting brick mason to replace missing tile. |
August 25, 2004 |
March 2, 2007 |
919 days |
| Spingarn High School |
FM-200222455 /02 3/2/07 Spingarn Rooms 311 thru 319 Water is leaking requesting someone to come out and survey the roof. |
December 12, 2002 |
March 2, 2007 |
1,541 days |
| Spingarn High School |
FM-200222031 02 3/2/07 Spingarn Basement - door next to barber shop Requesting glazer to measure and replace broken wire mesh glass. |
December 4, 2002 |
March 2, 2007 |
1,549 days |
| Spingarn High School |
FM-200213459 02 3/2/07 Spingarn 1. Asbestos Assessment Reqd. 1st Floor Boys' Restrooms 2. Paint boys' restroom [paint damaged from a fire on 2/5/01]. Asbestos/Lead code A-clear for repair by Horne Engineer ( Stephen Caldwell? ) on 8/20/02 Charles E. Buchanan |
August 2, 2002 |
March 2, 2007 |
1,673 days |
| Dunbar High School |
FM-200700994 /07 3/2/07 Third Floor - Stairwell door slamming need repairs |
February 28, 2007 |
March 2, 2007 |
2 days |
| Hart Middle School |
FM-200331330 03 3/2/07 Hart Replace door closures in the following areas: 1) 225,231,229,228,232,320,318,130,139, Second Floor - Stairwell (5) and Stairwell (9), Asbestos Code A - Clear for repairs on 06/05/03. Horne Engineering - Sharon Voss (RG 06/06/03) |
June 5, 2003 |
March 2, 2007 |
1,366 days |
| Stuart-Hobson Middle School |
FM-200513008 05 3/5/07 (Stuart-Hobson) Installing new carpet in library, please confirm that old carpet does not contain any asbestos or that there is no tile underneath carpet. Asbestos Code A - Clear for repairs on 09/30/05. Tidewater - Tony Marcolin (RG 10/04/05) |
August 12, 2005 |
March 5, 2007 |
570 days |
| Stuart-Hobson Middle School |
FM-200623934 06 3/5/07 Replace a/c unit in the Auditorium; it does not work. |
June 6, 2006 |
March 5, 2007 |
272 days |
| Stuart-Hobson Middle School |
FM-200623936 06 3/5/07 Replace a/c unit in the Auditorium; it does not work. |
June 6, 2006 |
March 5, 2007 |
272 days |
| Benning Elementary School |
FM-200701091 07 3/5/07 1st Fl. Cafeteria door closer missing from exit door. - Completed 3/2/07-Door is self closing and latching. Device missing and cited is hold door in the open position when needed. |
March 5, 2007 |
March 5, 2007 |
0 days |
| Coolidge High School |
FM-200443072 04 3/5/07 (Coolidge) Asbestos Assessment Required. Frank Williams Activity Center: Repair or replace or remove partitions, damaged by students. (Hanging from the upper level) Room #322: New door needs to be adjusted. Asbestos Code A - Clear for repairs on 01/22/04. Horne Engineering - Sheryll James (RG 01/23/04) |
January 21, 2004 |
March 5, 2007 |
1,139 days |
| Coolidge High School |
FM-200630002 06 3/5/07 Second Floor/Rm. 225 - Door fell off the hinges. |
September 25, 2006 |
March 5, 2007 |
161 days |
| Plummer Elementary School |
FM-200623809 06 3/5/07 Plummer Plummer Replace window a/c unit in the following location Room 215 - 24,000 - 20amp |
June 5, 2006 |
March 5, 2007 |
273 days |
| Janney Elementary School |
FM-200633636 /4/07 3/5/07 South end of field. Fabricate and install drain cover. |
January 4, 2007 |
March 5, 2007 |
60 days |
| Plummer Elementary School |
FM-200623808 06 3/5/07 Plummer Replace window a/c units in the following locations Room 202A - 15,000 - 15amp |
June 5, 2006 |
March 5, 2007 |
273 days |
| Stuart-Hobson Middle School |
FM-200217642 02 3/5/07 Stuart-Hobson Asbestos Assessment Reqd. 3rd FLoor Room 307 Replace floor tiles that came up from the floor due to previous leakage from the air cooler. Asbesstos Code A-clear for repair by Horne Engineer Philip Connolly DCPS Charles E. Buchanan on 9/24/02 |
September 17, 2002 |
March 5, 2007 |
1,630 days |
| Woodson High School |
FM-200621422 06 3/6/07 Woodson Boiler Room Repair or replace seals in chilled water pumps #6 and #11. Re: No A/C |
April 18, 2006 |
March 6, 2007 |
322 days |
| Woodson High School |
FM-200627657 06 3/6/07 Replace mechanical seals in HWCW circulating pump # 4, and # 6. |
August 15, 2006 |
March 6, 2007 |
203 days |
| Gage-Eckington ES |
FM-200700879 6/07 3/6/07 Boiler Room - Boiler #2 Flame failure |
February 26, 2007 |
March 6, 2007 |
8 days |
| Woodson High School |
FM-200631747 06 3/6/07 WOODSON, H.D. Amp out pumps # 13 & 14 motor continuously tripping breaker. Pumps # 12, 13, and 14 Request # FM-200449255 |
November 2, 2006 |
March 6, 2007 |
124 days |
| Simon Elementary School |
FM-200700836 07 3/6/07 Boiler room - Repair condensate return pump float sticking. |
February 25, 2007 |
March 6, 2007 |
9 days |
| Woodson High School |
FM-200628322 06 3/6/07 Woodson Boiler Room Repair or replace pumps and motors for Plaza Level A/C and Heating. Ppumps are number 10 and 11. |
August 27, 2006 |
March 6, 2007 |
191 days |
| Woodson High School |
FM-200620139 06 3/6/07 Basement Level, Boiler Room. "Emergency" Repair or Replace ruptured seal on pump. Note: The first pump as you enter the boiler room. |
March 21, 2006 |
March 6, 2007 |
350 days |
| Woodson High School |
FM-200633879 07 3/6/07 Boiler Room - Circulator pump's not working, check and repair. |
January 9, 2007 |
March 6, 2007 |
56 days |
| Smothers ES |
FM-200634240 07 3/6/07 Boiler Room - Boiler # 1 - Replace automatic water feeder. |
January 24, 2007 |
March 6, 2007 |
41 days |
| Woodson High School |
FM-200454954 04 3/6/07 Woodson, H.D. Boiler Room Repair or replace duel water circulation pump #13 motor is bad, |
September 17, 2004 |
March 6, 2007 |
900 days |
| Woodson High School |
FM-200621162 06 3/6/07 Basement - Boiler Room - Repair or replace seals in chilled water pumps # 6 and # 11, Re: No A/C. |
April 11, 2006 |
March 6, 2007 |
329 days |
| Woodson High School |
FM-200449255 04 3/6/07 Woodson Boiler Room Repair or replace circulating pumps#12, #13 and #14. Pump #12 cuts off when it get hot Pump #13 are use for center coil Pump #14 is use for ground floor Pumps will not come on. Pumps was under water when the Boiler Room flooded. |
June 13, 2004 |
March 6, 2007 |
996 days |
| Garfield ES |
FM-200617563 06 3/6/07 Emergency. Secure pieces of roof siding, several pieces have blown off roof onto the playground. Note: A large piece is hanging off the roof now. |
January 18, 2006 |
March 6, 2007 |
412 days |
| Clark Elementary School |
FM-200700876 26/07 3/6/07 Boiler Room - Repair or replace Boiler #2 Flame failure, will not stay on. |
February 26, 2007 |
March 6, 2007 |
8 days |
| Benning Elementary School |
FM-200332553 03 3/7/07 (Benning) 1st Floor/TV Studio Room: Stop water leak. Asbestos Code A - Clear for repairs on 06/26/03. Horne Engineering - Sheryll James (RG 07/02/03) |
June 26, 2003 |
March 7, 2007 |
1,350 days |
| Simon Elementary School |
FM-200700778 07 3/7/07 Room 208 - Repair or replace univent shaft bearings and align on completion. |
February 22, 2007 |
March 7, 2007 |
13 days |
| Benning Elementary School |
FM-200330644 03 3/7/07 Benning Boiler Room Replace compressed air dryer. Compressor not working. - MOD - HKN - 8010A; Ser# 0302A - 1-9106-2814 -N-LR 40907 Rated cap- 10 SCFM - 100 PSIG - 100 F. Inlet air MWP -175 PSIG - Min-max ambient 110 (45c) 115 V.A.C. Min104 - Max 126 V-A.C. unit FLA3.3 Compressor H.P. 1/6; Compressor FLA 2.9 Comp LRA 18.0 Fan motor amps -5 watts 4 Refrigerant R-12 Charge 6.5 oz. Section Pres. 34 PSIG. |
May 23, 2003 |
March 7, 2007 |
1,384 days |
| Benning Elementary School |
FM-200227360 03 3/7/07 Benning Center 2 Move the light frame from which is blocking the trap door. For the engineer can service the motor in the ceiling girl restroom. |
March 20, 2003 |
March 7, 2007 |
1,448 days |
| Benning Elementary School |
FM-200226263 03 3/7/07 Benning Drain is to small. Need a large drain outside kindgerten storage room. |
February 26, 2003 |
March 7, 2007 |
1,470 days |
| Benning Elementary School |
FM-200226256 03 3/7/07 Benning TV room has water leaking in from the wall. It is about 2 or 3 storey down in the ground. |
February 26, 2003 |
March 7, 2007 |
1,470 days |
| Benning Elementary School |
FM-200226255 03 3/7/07 Benning Center All of learning centers was ruin do to flood water. Need to replace all the carpet in the teachers lounge all conference rooms, TV room and all the open space area and learning centers. Asbestos Code A - Clear for repairs on 02/27/03. Horne Engineering - Edward Rodriguez (RG 02/28/03) |
February 26, 2003 |
March 7, 2007 |
1,470 days |
| Rudolph Elementary School |
FM-200631074 /06 3/7/07 Rudolph Room #204 Repair or replace univent bearing assembly for fan shaft. Shaft size is approx.1. |
October 20, 2006 |
March 7, 2007 |
138 days |
| Benning Elementary School |
FM-200225541 03 3/7/07 (Benning) Open space/1st, 2nd & 3rd floors: Replace damaged, stained carpet. Asbestos Code A - Clear for repairs on 02/27/03. Horne Engineering - Edward Rodriguez (RG 02/28/03) |
February 11, 2003 |
March 7, 2007 |
1,485 days |
| Benning Elementary School |
FM-200224600 03 3/7/07 (BENNING) First floor/kitchen REPAIR/ REPLACE CERAMIC FLOOR TILE. Asbestos Code A - Clear for repairs on 01/27/03. Horne Engineering - Bipin Nanavaty (RG 01/28/03) |
January 27, 2003 |
March 7, 2007 |
1,500 days |
| Benning Elementary School |
FM-200222949 /02 3/7/07 (Benning) Stairwell #2: Water coming from top of high ceiling in the stairwell, problem appears to be coming from the roof. |
December 20, 2002 |
March 7, 2007 |
1,538 days |
| River Terrace ES |
FM-200700655 21/07 3/7/07 Boiler Room - Boiler #1 and #2 off, reading short. (Flame Failure) No heat in building. |
February 21, 2007 |
March 7, 2007 |
14 days |
| Deal Junior High School |
FM-200700559 6/07 3/7/07 Boiler Room - Repair or replace boiler # 1. Burner is going out on flame failure continuously. Building is cold. |
February 16, 2007 |
March 7, 2007 |
19 days |
| Bell High School |
FM-200700901 /07 3/7/07 In the practice room (E114) DCPS installed a lock for the door but we do not have any keys to lock the door. |
February 26, 2007 |
March 7, 2007 |
9 days |
| Draper Elementary School |
FM-200618495 06 3/7/07 Draper Boiler Room Replace McDonnell-Miller Boiler control. Pressure 35 PSI Model #51S- HD |
February 8, 2006 |
March 7, 2007 |
392 days |
| Raymond Elementary School |
FM-200700450 07 3/7/07 Boiler Room - Repair or replace boiler #1 Keep going off on flame failure |
February 13, 2007 |
March 7, 2007 |
22 days |
| Bell High School |
FM-200517057 06 3/7/07 Bell Boiler Room Boiler #3 Check burner, will not come on. |
January 2, 2006 |
March 7, 2007 |
429 days |
| Randle-Highlands ES |
FM-200632804 06 3/7/07 Sub - Basement - Boiler Room - Repair or replace gas control valve on Boiler # 2. Valve is leaking fluid. Replace defective programmer for boiler 1. |
December 4, 2006 |
March 7, 2007 |
93 days |
| Drew Elementary School |
FM-200700319 07 3/7/07 Boiler room Repair boiler # 1 , will not start. |
February 7, 2007 |
March 7, 2007 |
28 days |
| Hart Middle School |
FM-200628318 06 3/7/07 Repair breach in outside wall where exhaust fall fell out. |
August 25, 2006 |
March 7, 2007 |
194 days |
| Benjamin Banneker Academic HS |
FM-200516018 05 3/7/07 Banneker Boiler Room Repair or replace automatic water feeder on Boiler #3. Only Boiler Working. |
December 3, 2005 |
March 7, 2007 |
459 days |
| Benjamin Banneker Academic HS |
FM-200514708 /05 3/7/07 Banneker First Floor-Repair lock on rm. 105 door it is off track |
October 27, 2005 |
March 7, 2007 |
496 days |
| Orr Elementary School |
FM-200700588 07 3/7/07 Boiler room - Repair existing pnuematic system and air compressor. |
February 17, 2007 |
March 7, 2007 |
18 days |
| Nalle Elementary School |
FM-200700955 07 3/7/07 Basement - Repair wall behind water cooler |
February 27, 2007 |
March 7, 2007 |
8 days |
| Reed LC |
FM-200700995 07 3/7/07 Repair outside concrete wall area above main entrance. Pieces of concrete fell from an area above the main entrance on 2/28/07. Mr. Boyd, Head Custodian has contacted Tyrone Jones, Grounds Leader who has made a site visit and will schedule repairs. |
February 28, 2007 |
March 7, 2007 |
7 days |
| Takoma Educational Center |
FM-200700891 2/26/07 3/7/07 Gym - Exterior door - R/R lock due to break in |
February 26, 2007 |
March 7, 2007 |
9 days |
| Terrell Mc ES |
FM-200504255 05 3/7/07 Terrell, M.C.) Replace lock on principal's office door. Lock was repaired on April 7th but condition still exists and principal cannot lock the door. Lock needs to be replaced immediately for security and protection of important documents and other items. |
April 18, 2005 |
March 7, 2007 |
688 days |
| Terrell Mc ES |
FM-200700706 07 3/7/07 Temp boiler room - Install deadbolt lock to prevent breakins. |
February 21, 2007 |
March 7, 2007 |
14 days |
| Murch Elementary School |
FM-200700703 07 3/7/07 Boiler Room - Repair or replace Boiler #3; Burner shutting off on flame failure |
February 21, 2007 |
March 7, 2007 |
14 days |
| Bancroft Elementary School |
FM-200700736 2/07 3/7/07 First Floor - computer Lab (primary wing) - Replace lock cylinder or repair latch cylinder, door having problems locking. |
February 22, 2007 |
March 7, 2007 |
13 days |
| Thomas Elementary School |
FM-200700529 /07 3/7/07 Classroom #223 Replace defective univent shaft bearings. No heat in classroom. |
February 15, 2007 |
March 7, 2007 |
20 days |
| Truesdell Elementary |
FM-200620299 06 3/7/07 Truesdell Boiler Room Properly calibrate burner on Boiler #1, over firing. Note: This repair can not be made unless approved by DC Boiler Inspector through Mr. B. Shaw or Mr. Rice |
March 24, 2006 |
March 7, 2007 |
348 days |
| Tubman Elementary School |
FM-200700484 07 3/7/07 First Floor - Exit door unopenable on kenyon St. side - Left side door panic hardware not working, right side door will not close and latch. |
February 13, 2007 |
March 7, 2007 |
22 days |
| Tubman Elementary School |
FM-200700488 07 3/7/07 First Floor - Rm 110 has broken door hardware - Door closer is not attached and is missing hardware |
February 13, 2007 |
March 7, 2007 |
22 days |
| Eaton Elementary School |
FM-200701025 07 3/7/07 First Floor - Main Entrance/Exit Door - Can't secure, lock is broken |
March 1, 2007 |
March 7, 2007 |
6 days |
| Lafayette Elementary School |
FM-200700874 /07 3/7/07 Team 2 - Gym door adj. to exit door is out of alignment IFC 703.2.3 (2000) |
February 26, 2007 |
March 7, 2007 |
9 days |
| Lafayette Elementary School |
FM-200700873 /07 3/7/07 Team 2 - Outside Of Gym - Exit door out of alignment, center and reght door frame broken IFC 703.2.3 (2000) |
February 26, 2007 |
March 7, 2007 |
9 days |
| Brightwood Elementary School |
FM-200633369 /13/06 3/7/07 Brightwood - Boiler Room - Send HVAC mechanic, to repair or replace boiler # 1. Burner will not lite off. Possible problem with gas actuator. |
December 13, 2006 |
March 7, 2007 |
84 days |
| Clark Elementary School |
FM-200700136 /1/07 3/7/07 Boiler Room - Replace gas actvator on burner # 1 boiler. No Heat !! |
February 1, 2007 |
March 7, 2007 |
34 days |
| Benning Elementary School |
FM-200701092 07 3/7/07 1st Fl. Cafeteria door not latching by stage right. - Door latch needs adjustment. Plate on door frame is recessed to far and prevents door from connect with latch. |
March 5, 2007 |
March 7, 2007 |
2 days |
| Cleveland Elementary School |
FM-200500723 05 3/7/07 Cleveland Engineer Office Change lock on Engineer Office and furnish 3 keys for staff. |
January 24, 2005 |
March 7, 2007 |
772 days |
| Benning Elementary School |
FM-200701089 07 3/7/07 Basement - Elevator room lock defective. - Master key will not open door. |
March 5, 2007 |
March 7, 2007 |
2 days |
| Benning Elementary School |
FM-200625773 06 3/7/07 Front of Building- Cut down 2 trees in the front and 2 on the side; they are dead. |
July 17, 2006 |
March 7, 2007 |
233 days |
| Benning Elementary School |
FM-200501192 05 3/7/07 Benning thru-out Building Repair toilets and urinal |
February 3, 2005 |
March 7, 2007 |
762 days |
| Janney Elementary School |
FM-200700250 /5/07 3/7/07 Boiler Room Boiler #1 need flame adjustment (MTIF) |
February 5, 2007 |
March 7, 2007 |
30 days |
| Cleveland Elementary School |
FM-200700564 /16/07 3/7/07 Boiler Room - Repair or replace # 1 and # 2 boilers. Because of power failure can not get boilers started . Building cold. |
February 16, 2007 |
March 7, 2007 |
19 days |
| Cleveland Elementary School |
FM-200700579 /16/07 3/7/07 Boiler Room - Check and repair sump heater on cooling tower . Heater is not working proper. Water is frozen in cooling tower. |
February 16, 2007 |
March 7, 2007 |
19 days |
| Benning Elementary School |
FM-200500149 05 3/7/07 Benning The principal need a new lock on his closet door. Out going principal did not leave key. |
January 5, 2005 |
March 7, 2007 |
791 days |
| Benning Elementary School |
FM-200453031 04 3/7/07 Benning A clogged drain on playground. |
August 20, 2004 |
March 7, 2007 |
929 days |
| Benning Elementary School |
FM-200451992 04 3/7/07 Benning Boiler room Check valve on hot water tank need replacing. Because I have hot water in the toilets through out the building. |
August 10, 2004 |
March 7, 2007 |
939 days |
| Benning Elementary School |
FM-200447254 04 3/7/07 Benning Learning Center #2 Repair or replace motor in air handler unit #7 in Learning Center #2 on 2nd Floor. Motor - Uniclosed motor; HP- 3; PH-3; Frame-182T; Volt-230-260; Amps-1.2-4.6; RPM-1740; ID #F-4542-01-347 |
April 28, 2004 |
March 7, 2007 |
1,043 days |
| Coolidge High School |
FM-200516922 /05 3/7/07 Coolidge Boiler Room Boiler #1 will not come on. Replace programmer. Electic to Building will be off for approx. 3 hours. (Pepco) Should be back on by 11 O'Clock |
December 27, 2005 |
March 7, 2007 |
435 days |
| Benning Elementary School |
FM-200341656 /03 3/7/07 Benning The machine room in the rear of the building have four air handlers unit. Three are broken two are for the lunchroom. One is for the kitchen in the area there is no heat. No heat in kitchen. |
December 16, 2003 |
March 7, 2007 |
1,177 days |
| Kimball Elementary School |
FM-200630644 /06 3/7/07 Kimball Roo106 Replace shaft and or bearings onthe heat unit in room 106. |
October 11, 2006 |
March 7, 2007 |
147 days |
| Hart Middle School |
FM-200628205 06 3/7/07 1st Floor- Stairwell #7 Repair/replace door closer. Asbestos Code A - Clear for repairs on 08/24/06. Tidewater - Carlos Vera (RG 08/28/06) |
August 23, 2006 |
March 7, 2007 |
196 days |
| Hart Middle School |
FM-200628206 06 3/7/07 Auditorium- Install door closer. Asbestos Code A - Clear for repairs on 08/24/06. Tidewater - Carlos Vera (RG 08/28/06) |
August 23, 2006 |
March 7, 2007 |
196 days |
| Benning Elementary School |
FM-200341027 03 3/7/07 (Benning) TV Room: Lights are out in the TV room due to water leaking through the walls. All electricity was shorted out. |
December 3, 2003 |
March 7, 2007 |
1,190 days |
| Benning Elementary School |
FM-200338225 03 3/7/07 Benning Main Roof Restored electricity to (2) two exhaust fans, fans are located on main roof. |
September 30, 2003 |
March 7, 2007 |
1,254 days |
| Benning Elementary School |
FM-200338182 03 3/7/07 Benning Water started leaking again from the ceiling in Pre-K room. |
September 29, 2003 |
March 7, 2007 |
1,255 days |
| Benning Elementary School |
FM-200336617 03 3/7/07 Benning Learning center # 1 , Leaning center # 2 ,Music Room Asbestos assessment may be required 1). Replace starter coil on the Return air air handler unit # 5 in learning center # 2 2). Replace air handler motor on air handler unit # 1 in learning center #1 3). Replace motor on the return air fan # 1 in the music room. 4). Replace bad motor on air handler unit # 8 in the mechanicial room outside, 5). Replace motor starter on air handler unit # 3 in the mechancial room outside. POC Curtis Emerson @ 202-438-7434 Asbestos Code A - Clear for repairs on 03/25/04. Horne Engineering - Bipin Nanavaty (RG 03/26/04) |
August 30, 2003 |
March 7, 2007 |
1,285 days |
| Benning Elementary School |
FM-200332589 03 3/7/07 Benning First And Second Floor 1. Replace carpet in the 1st floor pre-kindergarten and kindergarten areas. 2. Replace the carpet in the 2nd floor learning center II . Asbestos Code A - Clear for repairs on 06/27/03. Horne Engineering - Troy Wilcome (RG 07/02/03) |
June 26, 2003 |
March 7, 2007 |
1,350 days |
| Hart Middle School |
FM-200700918 07 3/7/07 Room 214 - R/R lock it was broken due to vandalism. |
February 27, 2007 |
March 7, 2007 |
8 days |
| Hart Middle School |
FM-200338774 /03 3/7/07 Hart Basement - Rec Room B-13 F 1) Repair holes in dry wall in office area, area being set-up for Balllou students. Asbestos Code A - clear for repairs on 10/10/03. Horne Engineering - Philp Connolly (RG 10/22/03) |
October 10, 2003 |
March 7, 2007 |
1,244 days |
| Wilson J. O. ES |
FM-200701022 3/1/07 3/7/07 Ground floor, New Side/Multi Service Center. Change locks on offices for security reasons. |
March 1, 2007 |
March 7, 2007 |
6 days |
| Hart Middle School |
FM-200500045 05 3/7/07 Gynasium. Remount bleachers to the wall. |
January 3, 2005 |
March 7, 2007 |
793 days |
| Hart Middle School |
FM-200502388 05 3/7/07 Hart First fl. Exit Door Replace or Repair Exit Door Repair |
March 8, 2005 |
March 7, 2007 |
729 days |
| Hart Middle School |
FM-200503499 05 3/7/07 hART Cafeteria Replace Windows on Girl's side of Cafeteria Code A-clear for repair by DCPS charles Buchanan on 4/14/05 |
April 1, 2005 |
March 7, 2007 |
705 days |
| Hart Middle School |
FM-200505332 05 3/7/07 Hart Second fl. New Wing Replace 15 , 9x9 Ceiling Tilels HA 041 Ceiling Tile White 1' X 1' Gouges and Pinholes No Asbestos HA 775 Ceiling Tile White 1' X 1' Ceiling T ile - Fessurs and Dots No Asbestos Code A-clear for repair by DCPS Charles Buchanan on 5/ 20/05 |
May 10, 2005 |
March 7, 2007 |
666 days |
| Winston EC |
FM-200700674 07 3/7/07 First Floor - Electrical Closet - Repair lock to the electrical panel closet. Unable to turn the lights off. |
February 21, 2007 |
March 7, 2007 |
14 days |
| Hyde Elementary School |
FM-200700784 07 3/7/07 Boiler room Repair # 2 Boiler , unit will not fire off, cuts before pre purge. |
February 23, 2007 |
March 7, 2007 |
12 days |
| Hart Middle School |
FM-200623244 06 3/7/07 Replace or repair door closer for the Auditorium Door and Basement Stairwell 7 Door. |
May 24, 2006 |
March 7, 2007 |
287 days |
| Hart Middle School |
FM-2006 |