Urgent Repair Requests Closed in May 2006 (247)
| School |
Description |
Open Date |
Close Date |
Time Elapsed |
| Truesdell Elementary |
FM-200333270 03 5/1/06 (Truesdell) !!URGENT!! 3rd Floor/Hallway: Leaking behind mop sink, floors flooded. Engineer was able to shut water off. |
July 15, 2003 |
May 1, 2006 |
1,021 days |
| Tyler Elementary School |
FM-200621947 06 5/1/06 Basement- URGENT There is a busted pipe in the boiler room (crawl space). |
April 28, 2006 |
May 1, 2006 |
3 days |
| Wilkinson ES |
FM-200458683 /04 5/1/06 Wilkinson First floor ktgn area Need to repair or replace left exit door in ktgn area, the door is bent from outside like someone tried to break in. Asbestos Code A - Clear for repairs on 12/01/04. DCPS Safety - Leroy Minton Jr. (RG 12/01/04) |
November 24, 2004 |
May 1, 2006 |
523 days |
| Truesdell Elementary |
FM-200224024 03 5/1/06 (Truesdell) !!!URGENT!!! Annex building/2nd floor hallway: Water fountain leaking from area unknown. |
January 15, 2003 |
May 1, 2006 |
1,202 days |
| Truesdell Elementary |
FM-200221388 /02 5/2/06 (Truesdell) !!!VERY URGENT!!! 1st Floor/Boys restroom: Water comes from under the floor when urinals are flushed. (Continue mopping water) Asbestos Code A - Clear for repairs on 11/20/02. Horne Engineering - Bipin Nanavaty (RG 11/22/02) |
November 20, 2002 |
May 2, 2006 |
1,259 days |
| Winston EC |
FM-200622077 06 5/2/06 Urgent Repair/Replace hinge on vandalized exterior door. The building cannot be properly secured. |
May 2, 2006 |
May 2, 2006 |
0 days |
| Davis Elementary School |
FM-200215520 02 5/3/06 Davis F-608.1 Fire Code Violation Asbestos Assessment Reqd. 1st Floor Room 117 Need door adjustment. Asbestos Code A - Clear for repairs on 08/27/02. DCPS Safety - Leory Minton Jr. (RG 08/27/02) |
August 23, 2002 |
May 3, 2006 |
1,349 days |
| Dunbar High School |
FM-200620061 06 5/3/06 Very Urgent Ground Floor-Ladies Restroom Repair or replace the sloan valve-Can't shut the water off to the toilet-Water is constantly running. |
March 17, 2006 |
May 3, 2006 |
47 days |
| John Burroughs ES |
FM-200622038 06 5/3/06 Urgent! Basement- Boys Bathroom The shut-off valve is stripped. The toilet is making a loud whistling noise. There is no overflow or leaking. |
May 1, 2006 |
May 3, 2006 |
2 days |
| Davis Elementary School |
FM-200620814 06 5/3/06 Basement-16-boxes on the floor and ceiling tile damaged by water & missing. "Fire Code Violation" Asbestos Code A - Clear for repairs on 04/04/06. DCPS Safety - Richard Gibson (RG) |
April 4, 2006 |
May 3, 2006 |
29 days |
| Hine JHS |
FM-200621907 06 5/4/06 Hine Roof - Cooling System Repair or replace rupture make-up water line for cooling tower. Rupture line bust in (2) two places. Approx. 1-1/4" copper. Urgent !!!! |
April 28, 2006 |
May 4, 2006 |
6 days |
| Shaw JHS |
FM-200620358 06 5/4/06 Shaw Boys Locker Room Asbestos assessment required Repair leaking hot/chill water line. Urgent !!!! Asbestos Code A on 03/27/06 Tidewater - Kenny Long (RG 03/30/06) |
March 26, 2006 |
May 4, 2006 |
39 days |
| Seaton Elementary School |
FM-200621455 06 5/4/06 Seaton Room #305 Asbestos assessment required Repair or replace leaking 2" hot/cold chill water line in room #305 northeast corner by wall. Can not be isolated. Urgent !!!!!! Asbestos Code A - Clear for repairs on 04/19/06. Tidewater - Thomas Johson (RG 04/19/06) |
April 19, 2006 |
May 4, 2006 |
15 days |
| Duke Ellington School |
FM-200449968 04 5/4/06 Ellington Second floor library area Rod that hold light fixture is coming away from bracket on ceiling need repairing. ASAP. Asbestos Code A - Clear for repairs on 07/07/04. DCPS Safety - Leroy Minton Jr. (RG 07/21/04) |
July 1, 2004 |
May 4, 2006 |
672 days |
| Woodson High School |
FM-200621405 06 5/4/06 Woodson ROTC/Computer Lab Asbestos assessment required Repair or replace rupture line in ROTC/Computer Lab Line can not be isolated Urgent !!!!! Asbestos Code A - Clear for repairs on 04/18/06. Tidewater - Tony Marcolin (RG 04/18/06) |
April 18, 2006 |
May 4, 2006 |
16 days |
| West Elementary School |
FM-200515836 /05 5/5/06 Urgent: Repair or replace the garbage disposal in the kitchen on the first floor, It is not working. |
November 28, 2005 |
May 5, 2006 |
158 days |
| Shaw JHS |
FM-200621951 06 5/5/06 URGENT 1st Floor- Physical Education Room There is a busted pipe in the ceiling, which is beneath the science lab. |
April 28, 2006 |
May 5, 2006 |
7 days |
| Reed LC |
FM-200505745 05 5/5/06 ( REED ) URGENT!!!! Ground Floor - Gym 1) Repair or Replace two exit lights. |
May 19, 2005 |
May 5, 2006 |
351 days |
| West Elementary School |
FM-200505202 05 5/5/06 (West) !!!VERY URGENT!!! Main Entrance/Outside Storage Room: Repair or replace main shut-off valve; when valve is turned on, there is flooding in the girls restroom, and lobby |
May 6, 2005 |
May 5, 2006 |
364 days |
| Reed LC |
FM-200514569 /05 5/5/06 (Reed) "Urgent" Second floor, Ms. Johnson. Please survey and repair (3) fluorescent lights in classrrom area. |
October 24, 2005 |
May 5, 2006 |
193 days |
| Reed LC |
FM-200619588 06 5/5/06 Urgent First Floor Corridor-Survey and update all light fixtures |
March 7, 2006 |
May 5, 2006 |
59 days |
| Patricia R Harris Ed Center |
FM-200513630 05 5/5/06 Harris, P. R. Urgent Second Floor-Female Bathroom, Near #8 Stairway Install Door on #4 Stall Asbestos Code A - Clear for repairs on 10/11/05. Tidewater - Tony Marcolin (RG 10/20/05) |
October 7, 2005 |
May 5, 2006 |
210 days |
| Backus Middle School |
FM-200620387 06 5/8/06 First & Second floors. "Urgent" 1.) First floor remount or replace electrical box that is hanging from the wall. 2.) Second floor/Rec. Area, repair or replace breaker # 1 (R) that has a shortage, the breaker is continuously tripping. |
March 27, 2006 |
May 8, 2006 |
42 days |
| Beers Elementary School |
FM-200516302 /05 5/8/06 Beers Boiler Room Locate and repair circulating pump for Domestic Hot Water Heater. No water going throughout building. Urgent !!!! |
December 12, 2005 |
May 8, 2006 |
147 days |
| Adams Elementary School |
FM-200622225 06 5/8/06 URGENT!! 1st Floor- Cafeteria Cannot unlock room that contains children's lunch money. They were unable to access funds for breakfast and will not be able to access funds for lunch. |
May 5, 2006 |
May 8, 2006 |
3 days |
| West Elementary School |
FM-200446798 04 5/9/06 (West) !!!VERY URGENT!!! Through-Out 2nd Floor: Recent plumbing repairs; smelling of sewer gas. |
April 16, 2004 |
May 9, 2006 |
753 days |
| Takoma Educational Center |
FM-200333026 03 5/9/06 (Takoma) Third floor - boys restroom One (1) bradley basin coming from wall. remount bradley basin to wall to prevent injuries. |
July 8, 2003 |
May 9, 2006 |
1,036 days |
| Merritt Middle School |
FM-200621022 06 5/9/06 Third Floor-Ceiling tile missing, after care area. "Fire Code Violation" Asbestos Code A - Clear for repairs on 04/06/06. DCPS Safety - Richard Gibson (RG) |
April 6, 2006 |
May 9, 2006 |
33 days |
| Kimball Elementary School |
FM-200453190 04 5/9/06 Kimball Second floor North wing hallway Replace or repair interior door, door is leaking red fluid on the floor. Asbestos Code A - Clear for repairs on 08/30/04. DCPS Safety - Richard Gibson (RG 08/31/04) |
August 23, 2004 |
May 9, 2006 |
624 days |
| Janney Elementary School |
FM-200211538 02 5/9/06 Janney 1. Asbestos Assessment Reqd. Building Exterior Install stair guards for staircases on east and west-side of building--- represents a safety & cosmetic need. Asbestos Code A - Clear for repairs (LM 08/27/02) Abated on 08/23/02 per Leroy Minton confirmation.Safety Office. (202) 576-8962. |
July 15, 2002 |
May 9, 2006 |
1,394 days |
| Merritt Middle School |
FM-200621034 06 5/9/06 First Floor-Ceiling tile missing-east lobby "Fire Code Violation" Asbestos Code A - Clear for repairs on 04/06/06. DCPS Safety - Richard Gibson (RG) |
April 6, 2006 |
May 9, 2006 |
33 days |
| Merritt Middle School |
FM-200621053 06 5/9/06 Third Floor-Missing and damaged ceiling tile btw. third and fourth stairs close to music room. "Fire Code Violation" Asbestos Code A - Clear for repairs on 04/06/06. DCPS Safety - Richard Gibson (RG) |
April 6, 2006 |
May 9, 2006 |
33 days |
| Murch Elementary School |
FM-200621908 06 5/9/06 Murch Classroom #208 Replace A/C unit window shacker type: 230 V 20 Amp 20,000 BTU Exiting unit inoperatable Urgent !!!!!! |
April 28, 2006 |
May 9, 2006 |
11 days |
| Murch Elementary School |
FM-200621909 06 5/9/06 Murch Teacher lounge Replace A/C unit window shacker type: 230 V 20 Amp (Kenmore) Constantly freezing up. (Possible leaking freon. Exiting unit inoperatable Urgent !!!!!! |
April 28, 2006 |
May 9, 2006 |
11 days |
| Merritt Middle School |
FM-200621030 06 5/10/06 First Floor-Ceiling tile missing-east ramp "Fire Code Violation" Asbestos Code A - Clear for repairs on 04/06/06. DCPS Safety - Richard Gibson (RG) |
April 6, 2006 |
May 10, 2006 |
34 days |
| Moten Elementary School |
FM-200504316 05 5/10/06 Moten HEALTH CODE VIOLATION: Kitchen: 1) Provide self closing device on Bathroom Door. Asbestos Code A - Clear for repairs on 04/26/05. DCPS Safety - Richard Gibson (RG) |
April 20, 2005 |
May 10, 2006 |
385 days |
| Deal Junior High School |
FM-200622371 06 5/11/06 Basement-Kitchen: Replace receptacles located on floor, cracked up and not working properly. Note: Safety Issue |
May 9, 2006 |
May 11, 2006 |
2 days |
| Macfarland Middle School |
FM-200508846 05 5/11/06 Macfarland "Fire Code Violation" Third Floor Door knob missing in room #302-2000 IFC 703.2.2 Code A - clear for repairs as of 8/3/05 by Tidewater. Sylvia Grimes safety office. |
July 27, 2005 |
May 11, 2006 |
288 days |
| Macfarland Middle School |
FM-200508847 05 5/11/06 Macfarland "Fire Code Voilation" Third Floor Broken door handle in room #302-2000 IFC 703.2.2 Code A - clear for repairs as of 8/3/05 by Tidewater. Sylvia Grimes safety office. |
July 27, 2005 |
May 11, 2006 |
288 days |
| Macfarland Middle School |
FM-200508853 05 5/11/06 Macfarland "Fire Code Violation" Second Floor Stairwell exit doors need adjustment-2003 DC Supp. 110.1(12) Code A - clear for repairs as of 8/3/05 by Tidewater. Sylvia Grimes safety office. |
July 27, 2005 |
May 11, 2006 |
288 days |
| Macfarland Middle School |
FM-200508936 05 5/11/06 Macfarland "Fire Code Violation" First Floor Exit door need adjustment and hardware adjustment near copy room- 2003 DC Supp. 110.1(12) and 2000 IFC 703.2.2 Code A - clear for repairs as of 8/3/05 by Tidewater. Sylvia Grimes safety office. |
July 28, 2005 |
May 11, 2006 |
287 days |
| Whittier Elementary School |
FM-200453260 04 5/11/06 Whittier Basement room 18 Remove old ceiling tile and replace with new ceiling tile. Ceiling tile is on site, but it need to be measure and cut. HEADSTART. Asbestos Code A - Clear for repairs on 08/24/04. DCPS Safety - Richard Gibson ( RG) |
August 24, 2004 |
May 11, 2006 |
625 days |
| Turner Elementary School |
FM-200228533 03 5/12/06 (Turner) !!!VERY URGENT!!! Old building/1st Floor, Boys Restroom: Drain outside utility room is stopped up, drain needs to be snaked out. On rainy days, water runs in-to the utility room through the wall and floods the kitchen, and the cafeteria. |
April 9, 2003 |
May 12, 2006 |
1,129 days |
| Dunbar High School |
FM-200618850 06 5/12/06 Dunbar Upper Garage Repair or replace rupture coil in Upper Garage Cold water line to A/C Urgent !!!! |
February 21, 2006 |
May 12, 2006 |
80 days |
| Woodson High School |
FM-200620726 06 5/12/06 Woodson Room #305 Asbestos assessment required on line Repair leak in ceiling of room #305, ceiling tile has fallen in this classroom. Urgent !!!! Asbestos Code B on 04/06/06. Tidewater - Shamika Parker (RG) Asbestos abated on 04/21/06 by Goel Contractors per Ricardo Eley comfirmed.(RG 04/26/06) |
April 3, 2006 |
May 12, 2006 |
39 days |
| Dunbar High School |
FM-200621950 06 5/12/06 Dunbar Upper Garage/Buniess Suite Repair or replace air handler unit #6 coil is leaking and one in the upper garage and business suite on the first floor. Urgent !!!! |
April 28, 2006 |
May 12, 2006 |
14 days |
| Orr Elementary School |
FM-200620007 06 5/13/06 Very Urgent First Floor-Multi Purpose Rm. Need a cherry picker to put bulbs in, the ceiling is too high-there is about 36 light fixtures out and about 4 to each light fixture. |
March 16, 2006 |
May 13, 2006 |
58 days |
| Wilkinson ES |
FM-200622600 06 5/13/06 Wilkinson Boiler Room Repair or replace 3" elbow coming off drain line in Boiler Room. Elbow need to be replace. Urgent !!!!! |
May 12, 2006 |
May 13, 2006 |
1 day |
| Whittier Elementary School |
FM-200513650 05 5/15/06 Whittier Urgent Basement-Teacher Restroom Replace faucet is hanging over and there is no running water. |
October 7, 2005 |
May 15, 2006 |
220 days |
| Dunbar High School |
FM-200512035 05 5/15/06 Dunbar Boiler Room Boiler #1,#2 and #3 Replace safety valves |
September 8, 2005 |
May 15, 2006 |
249 days |
| Gage-Eckington ES |
FM-200512261 05 5/15/06 Gage-Eckington Boiler Room Boiler #1 Perform hydro-test, possible leaks. Per: DC Boiler Inspector Urgent !!!! |
September 11, 2005 |
May 15, 2006 |
246 days |
| Whittier Elementary School |
FM-200510402 05 5/15/06 Whittier Fire Code Violation Second Floor-Missing ceiling tile in library-2003 DC Supp. 110.1(1) Asbestos Code A - Clear for repairs on 08/15/05. DCPS Safety - Richard Gibson (RG) |
August 15, 2005 |
May 15, 2006 |
273 days |
| Kelly Miller MS |
FM-200512264 05 5/15/06 Miller Boilerroom Remove Safety valves and cap off boilers # 1 and # 3 so that the engineer can perform hydro on the boilers. PER BOILER INSPECTOR'S REQUEST |
September 11, 2005 |
May 15, 2006 |
246 days |
| Whittier Elementary School |
FM-200337818 03 5/15/06 (Whittier) !!!URGENT!!! 2nd Floor/Main Office There is a leak under the sink, water is running into the main office flooding the carpet. |
September 22, 2003 |
May 15, 2006 |
966 days |
| Hart Middle School |
FM-200621038 06 5/15/06 Hart Foiler Room Repair or replace brick work in fire box. Boiler #3 Urgent !!!!! |
April 6, 2006 |
May 15, 2006 |
39 days |
| Jefferson JHS |
FM-200513193 05 5/15/06 Jefferson Boiler Room Replace safety valve on Boiler #3 |
September 27, 2005 |
May 15, 2006 |
230 days |
| Young Elementary School |
FM-200618500 06 5/15/06 Asbestos Assessment Required. "Urgent" Need electrician to install electrical outlet for photocopying machine in the teachers' lounge. Note: This is a matter of urgency. The photocopying machine is presently located in the "Health Suite", it has to be moved asap!!! Asbestos Code A - Clear for repairs on 02/09/06. Tidewater - Thomas Johnson (RG 02/10/06) |
February 8, 2006 |
May 15, 2006 |
96 days |
| Wilkinson ES |
FM-200620507 06 5/16/06 Urgent Remove a tree on the stairway outside on playground area leading towards Moten elementary school. |
March 29, 2006 |
May 16, 2006 |
48 days |
| Cardozo High School |
FM-200512202 05 5/16/06 Cardozo Urgent Foorball Stadium-Gate need to be re-attached to the fence |
September 9, 2005 |
May 16, 2006 |
249 days |
| Reed LC |
FM-200621472 06 5/16/06 Grounds- 18th St. Playground Please survey and replace safety mats on the playground. They were vandalized. The playground is out of service because of missing mats. |
April 19, 2006 |
May 16, 2006 |
27 days |
| Ketcham Elementary School |
FM-200337979 03 5/17/06 (Ketcham) (VERY URGENT) Restore electricity to the following area's: Elevators, Refrigerator, and Freezer. |
September 24, 2003 |
May 17, 2006 |
966 days |
| Ferebee-Hope Elementary School |
FM-200507523 05 5/17/06 !!!!VERY URGENT!!!! First Floor - Lobby Area Elevator not working, it's an electrical problem. There was an outage on 7/6/05 and every thing came back on except the elevator. |
July 7, 2005 |
May 17, 2006 |
314 days |
| Ketcham Elementary School |
FM-200450139 04 5/17/06 Ketcham Basement cafeteria Request for a work order to paint with volunteers on Saturday, August 21st from 9:00am to 3:pm. We will paint the cafeteria and kitchen. Request for white paint for the ceiling in kitchen and light yellow paint for the walls. High gloss paint in both colors. Code A - clear for repairs NO SCRAPING OF PAINT safety office Sylvia Grimes. |
July 12, 2004 |
May 17, 2006 |
674 days |
| Brookland Elementary |
FM-200504721 05 5/17/06 Brookland - Pre K 1st floor, Center B 1st floor , Mrs. Pender room 1st floor , and Music room Ground floor. Replace missing ceiling tile in the above areas. Asbestos Code A - Clear for repairs on 04/27/05 by Leroy Minton Jr. to install missing ceiling tiles. DCPS Safety - Richard Gibson (RG) Please Note: Most of the white, 2' x 4' ceiling tiles throughout this facility are asbestos containing, However, the white, 2' x 4' ceiling tiles that need to be replaced are non-asbestos containing as they have been replaced not so long ago, apparently due to same same water damage/leaks in the past. Only replace the missing ceiling tiles. Any questions see Mr. Bibs, the building custodian. (Leroy Minton Jr.) |
April 26, 2005 |
May 17, 2006 |
386 days |
| Drew Elementary School |
FM-200447743 04 5/17/06 (Drew) !!!VERY URGENT!!! 4th Floor/Room #405: Replace window in classroom; student broke window attempting to kill a bee. |
May 10, 2004 |
May 17, 2006 |
737 days |
| Whittier Elementary School |
FM-200219275 /02 5/17/06 Whittier First floor - Boys restroom old side Urinals is stopped up and need a control stop valve. Asbestos Code A - Clear for repairs on 10/15/02. DCPS Safety - Leroy Minton Jr. (RG 10/16/02) |
October 11, 2002 |
May 17, 2006 |
1,314 days |
| Brookland Elementary |
FM-200450469 04 5/17/06 Brookland Kindergarden, Learning Center A Replace drip pan, size 57 1/4" X 4 1/4" in Learning Center A. Condensation is leaking on the carpet. URGENT !!!!! |
July 20, 2004 |
May 17, 2006 |
666 days |
| Drew Elementary School |
FM-200448657 04 5/17/06 (Drew) !!!VERY URGENT!!! 1st Floor/Health Suite: Repair or replace window frames damaged by vandals. |
June 1, 2004 |
May 17, 2006 |
715 days |
| Ronald H. Brown MS |
FM-200622465 06 5/18/06 Third Floor-Fire extinguisher cabinet safety glass missing-2003 D.C.Supp.110.1 (next to stairwell #13) |
May 11, 2006 |
May 18, 2006 |
7 days |
| Ronald H. Brown MS |
FM-200622485 06 5/18/06 Second Floor-Fire extinguisher safety glass missing from fire extinguisher cabinet. |
May 11, 2006 |
May 18, 2006 |
7 days |
| Whittier Elementary School |
FM-200513651 05 5/18/06 Whittier Urgent 1st, 2nd, and 3rd Fl. Hallways-Slop sink is stopped up on all floors. They are over top of each other. There is no water running out of the sinks. |
October 7, 2005 |
May 18, 2006 |
223 days |
| Ronald H. Brown MS |
FM-200622497 06 5/18/06 Second Floor-Fire extinguisher cabinet safety glass missing next to stairwell #2 |
May 11, 2006 |
May 18, 2006 |
7 days |
| Whittier Elementary School |
FM-200203364 02 5/18/06 (Whittier) 1. Asbestos Assessment Required. New side/Hallway: Water fountain is leaking from the handle. CODE A- CLEAR FOR REPAIR BY DCPS SAFETY (CHARLES BUCHANAN) ON3/02/02 (CEB) |
February 22, 2002 |
May 18, 2006 |
1,546 days |
| Patricia R Harris Ed Center |
FM-200334345 03 5/18/06 Harris, P. R. First Floor 1) Plaster and Paint (4) columns in Multi-Purpose Room, paint (4) entrance doors to Multi-Purpose Room, (4) entrance doors to stairwell, paint entrance walls to hallway and paint girls bathroom. Asbestos Code - A Cleared for repairs on 08-05-03 by Leroy Minton Jr. (LM/08-05-03) Safety Office 202-576-8962. |
August 5, 2003 |
May 18, 2006 |
1,017 days |
| Patricia R Harris Ed Center |
FM-200334354 03 5/18/06 Harris, P.R. First floor Multi purpose room Paint metal ceiling tile. Asbestos Code - A Cleared for repairs on 08-05-03 by Leroy Minton Jr. (LM/08-05-03) Safety Office 202-576-8962. |
August 5, 2003 |
May 18, 2006 |
1,017 days |
| Ferebee-Hope Elementary School |
FM-200450357 04 5/18/06 Ferebee-Hope First floor D-building special ed area 3rd teachers bathroom Replace ballasts in bathroom. Asbestos Code A - Clear for repairs on 07/20/04. DCPS Safety - Leroy Minton Jr. (RG 07/20/04) |
July 16, 2004 |
May 18, 2006 |
671 days |
| Ronald H. Brown MS |
FM-200622500 06 5/18/06 Second Floor/Auditorium-Fire extinguisher cabinet safety glass missing next to exit |
May 11, 2006 |
May 18, 2006 |
7 days |
| Turner Elementary School |
FM-200334912 03 5/19/06 (Turner) Asbestos Assessment Required. Old Building/1st Floor: Repair or replace ceiling that has peeling plaster falling in the boys restroom. (Safety Hazard) Lead & Asbestos Code A - Clear for repairs on 08/13/03. Horne Engineering - Edward Rodriguez (RG 08/19/03) |
August 11, 2003 |
May 19, 2006 |
1,012 days |
| John Burroughs ES |
FM-200450354 04 5/19/06 Burrough Lower level rooms 18, 20, 21, 22 Ceiling pealing real bad. Asbestos Code A - Clear for repairs on 10/13/04. DCPS Safety - Leroy Minton Jr. (RG 10/13/04) |
July 16, 2004 |
May 19, 2006 |
672 days |
| Woodson High School |
FM-200506513 05 5/19/06 (Woodson, H.D.) "Urgent" Asbestos Assessment Required. Auditorium. Scrape and paint the ceiling, the paint is constantly falling in the auditorium. Also repair lighting. Note: This work was suppose to be completed last month. Lead & Asbestos Code A - Clear for repairs on 06/09/05. Tidewater - Sheryll James (RG 06/27/05) |
June 8, 2005 |
May 19, 2006 |
345 days |
| Woodson High School |
FM-200501794 05 5/19/06 Woodson, H.D. ( High School Bathroom Survey Report ) Seventh Floor Boys Bathroom - Needs Painting Sixth Floor Boys Restroom - Touch Up Ceiling Paint Second Floor Boys - Touch Up Wall Paint First Floor Teachers Restroom - Repair Ceiling First Floor Female Staff - Touch Up Painting Asbestos Code A - Clear for repairs on 02/22/05. DCPS Safety - Richard Gibson (RG) |
February 20, 2005 |
May 19, 2006 |
453 days |
| Woodson High School |
FM-200459763 /04 5/19/06 Woodson, HD Ground floor Custodian office ceiling need plastering and painting due to pipe busting need soon. Asbestos Code A - Clear for repairs on 12/17/04. DCPS Safety - Richard Gibson (RG) |
December 17, 2004 |
May 19, 2006 |
518 days |
| Woodson High School |
FM-200333885 03 5/19/06 (Woodson) !!!VERY URGENT!!! Asbestos Assessment Required. 4th Floor/Girls restroom: Repair or replace ceiling, plaster falling on the floor in large pieces. Code A-clear for repair by Safety Office on 7/29/03 Charles Buchanan |
July 28, 2003 |
May 19, 2006 |
1,026 days |
| Wilson J. O. ES |
FM-200500472 05 5/19/06 (Wilson, J.O.) URGENT! URGENT! URGENT! Plaster the ceiling A.S.A.P. Plasteris fallling down everyday. Fire and Health Hazard. HA 013 Plaster White Ceiling Plaster No Asbestos HA 064 Brown Coat with HA 013 No Asbestos Code A-clear for repair by DCPS Charles Buchanan on 9/15/05 |
January 5, 2005 |
May 19, 2006 |
499 days |
| Wilkinson ES |
FM-200516598 /05 5/19/06 Urgent:Repair the ceiling in the boys restroom on the second floor. It was damaged by a water leak Asbestos Code A - Clear for repairs on 12/16/05. Tidewater - Kenny Long (RG 12/16/05) |
December 15, 2005 |
May 19, 2006 |
155 days |
| Wilkinson ES |
FM-200502295 05 5/19/06 (Wilkinson) Asbestos assessment required. First floor room number 46/mens restroom Repair partition in gym, seperated from wall. Asbestos Code A - Clear for repairs on 03/08/05. DCPS Safety - Richard Gibson (RG) |
March 7, 2005 |
May 19, 2006 |
438 days |
| Whittier Elementary School |
FM-200513648 05 5/19/06 Whittier Urgent Basement-Rm. 16 Replace faucet to sink. |
October 7, 2005 |
May 19, 2006 |
224 days |
| Ballou Senior High School |
FM-200446504 04 5/19/06 (Ballou) Asbestos Assessment Required. north end of bldg-plaster ceilling and wall in girls rest room on 1st.floor near #120(water damage) Asbestos Code A - Clear for repairs on 04/21/05. DCPS Safety - Leroy Minton Jr. (RG 04/21/05) |
April 7, 2004 |
May 19, 2006 |
772 days |
| Ballou Senior High School |
FM-200446505 04 5/19/06 (Ballou) Asbestos Assessment Required. north end of bldg-plaster ceilling nad wall in girls rest room on 1st.floor near #120(water damage) Asbestos Code A - Clear for repairs on 04/21/05. DCPS Safety - Leroy Minton Jr. (RG 04/21/05) |
April 7, 2004 |
May 19, 2006 |
772 days |
| Webb Elementary School |
FM-200340330 /03 5/19/06 (Webb) Asbestos Assessment Required. 1st Floor/Ladies Restroom: Repair breech in wall. (Safety Hazard) Asbestos Code A - Clear for repairs on 11/18/03. Honre Engineering - Sheryll James (RG 11/19/03) |
November 14, 2003 |
May 19, 2006 |
917 days |
| Benjamin Banneker Academic HS |
FM-200503100 05 5/19/06 (Banneker) Asbestos Assessment Required. Third floor /Kitchen. Plaster 3rd floor girls' restroom and paint kitchen. Code A- clear for repairs as of 8/2/05 Sylvia Grimes safety office. |
March 22, 2005 |
May 19, 2006 |
423 days |
| Benjamin Banneker Academic HS |
FM-200503102 05 5/19/06 (Banneker) Asbestos Assessment Required. Second floor /Third floor Paint 2nd floor girls' restroom and paint third floor girls' restroom. Code A - clear for repairs as 8/2/05 Sylvia Grimes safety office. |
March 22, 2005 |
May 19, 2006 |
423 days |
| Turner Elementary School |
FM-200508009 05 5/19/06 (Turner) Urgent!! Auditorium Unable to cut on faucet leading to the outside because shut off valve was sealed up in the wall. HA 003 Plaster White Plaster No Asbestos HA 036 Brown Coat With HA 003 No Asbestos Code A-clear for repair by DCPS Charles Buchanan on 1/17/06 |
July 18, 2005 |
May 19, 2006 |
305 days |
| Turner Elementary School |
FM-200506425 05 5/19/06 (Turner) "Urgent" Old Bldg. Second floor stairwell, over window. Repair ceiling, plaster is peeling and falling. Note:Safety hazard falling ceiling. Asbestos Code A - Clear for repairs on 06/07/05. DCPS Safety - Leroy Minton (RG 06/07/05 |
June 6, 2005 |
May 19, 2006 |
347 days |
| Turner Elementary School |
FM-200338037 03 5/19/06 (Turner) !!!VERY URGENT!!! Asbestos Assessment Required. Old, and New Building/Through-out 1st and 2nd Floors: Several request has been submitted for many area's that has falling plaster from ceiling. Occasionally, school staff will call in to inquire as to when the repairs will be made. Request today, to give this matter attention, as plaster is falling on students as they use the restrooms. Engineer/Principal will assist in location of area's. Asbestos Code A - Clear for repairs on 09/26/03. Horne Engineering - Bipin Nanavaty (RG 09/29/03) |
September 25, 2003 |
May 19, 2006 |
967 days |
| Turner Elementary School |
FM-200334228 03 5/19/06 (Turner) !!!VERY URGENT!!! Asbestos Assessment Required. 1st Floor/Girls restroom: Repair fallen, and peeling ceiling in girls restroom. (Safety and health hazard) Asbestos Code A - Clear for repairs on 08/04/03. Horne Engineering - Tony Marcolin (RG 08/05/03) |
August 4, 2003 |
May 19, 2006 |
1,019 days |
| Turner Elementary School |
FM-200214650 02 5/19/06 (Turner) !!!Urgent!!! 1. Asbestos assessment required. Old side1st Floor/Room #100: Ceiling in room needs to be repaired and painted where peeling paint and plaster is fallen. Asbestos/Lead code A-clear for repair by Horne Engineer ( Troy Welcome/Edward Rodriguez ) on 8/20/02 Charles E. Buchanan |
August 15, 2002 |
May 19, 2006 |
1,373 days |
| Turner Elementary School |
FM-200214627 02 5/19/06 (Turner) !!!Urgent!!! Girls restroom: Repair falling ceiling in girls restroom, (Where there was a previous leak. Asbestos/Lead Code A-clear for repair by Horne Engineer Sheryll James/ Edward Rodriguez on 8/26/02 DCPS Charles E. Buchanan |
August 15, 2002 |
May 19, 2006 |
1,373 days |
| Turner Elementary School |
FM-200209923 02 5/19/06 Turner ***Very Urgent*** 1. Asbestos Assessment Reqd. 2nd & 3rd Floors/Old Wing Throughout 2. Paint the hallway walls on the 2nd & 3rd floors and both stairwell walls. The walls are badly in need of painting. (Please be advised, this request has reach an urgent status; peeling paint and plaster is falling from the ceiling.) Code A-clear for repair by Horne Engineer ( Edward Rodrigez ) on 6/25/02 Lead Code A-clear for repair by Horne Engineer ( Edward Rodrigez ) on 6/25/02 |
June 20, 2002 |
May 19, 2006 |
1,429 days |
| Truesdell Elementary |
FM-200338383 03 5/19/06 (Truesdell) 1st Floor/Main Entrance: Paint doors, and trans before 10/03/2003, having Government Officials for the Safety for Children Press conference. ADDENDUM: 1. Paint inner set of double entrance doors, and transum, using beige paint. 2. Paint inside, and trim around outer set of interior doors using beige paint. This work must be done prior to October 3rd for a meeting which will be attended by D.C.Council, and the Mayor. (Building will be open until 10:00 p.m.) Lead Code A - Clear for repairs on 10/02/03. Horne Engineering - Edward Rodriguez (RG 10/03/03) |
October 1, 2003 |
May 19, 2006 |
961 days |
| Terrell Mc ES |
FM-200220331 /02 5/19/06 (Terrell, M.C.) 1. Asbestos assessment required. Repair holes that workmen from facilities made, one hole under sink , and one hole beside toilet. Asbestos Code A - Clear for repairs on 04/29/03. DCPS Safety - Leroy Minton Jr. (RG 04/29/03) |
October 30, 2002 |
May 19, 2006 |
1,297 days |
| Terrell Mc ES |
FM-200220329 /02 5/19/06 (Terrell, M.C.) 1. Asbestos assessment required. REPAIR 3 HOLES IN HEALTH SUITE RESTROOM: 1 UNDER SINK, 1 ABOVE TOILET BOWL, 1 BY DOOR TO RIGHT AS YOU ENTER BATHROOM. Asbestos Code A - Clear for repairs on 04/29/03. DCPS Safety - Leroy Minton Jr. (RG 04/29/03) |
October 29, 2002 |
May 19, 2006 |
1,298 days |
| Stoddert ES |
FM-200449808 04 5/19/06 Stoddert Lunchroom Scrape and paint ceiling in lunch room, falling paint. Asbestos Code A - Cleared for repairs on 06-29-04 by Leroy Minton Jr. (LM/06-29-04) Safety Office. 202-576-8962. |
June 25, 2004 |
May 19, 2006 |
693 days |
| Slowe Elementary School |
FM-200452798 04 5/19/06 (Slowe) FIRE CODE VIOLATION: 1st Floor: Defective handrail to stage, right side of auditorium. Asbestos Code A - Clear for repairs on 08/18/04. DCPS Safety - Richard Gibson (RG) |
August 17, 2004 |
May 19, 2006 |
640 days |
| Shaw JHS |
FM-200212409 02 5/19/06 (Shaw) !!Urgent!! 1. Asbestos assessment required. Requesting that the area leased by Nations Capitol Child, and Family Development be painted. The cost will be paid by Nations Capitol Child and Family Development . We will be using current colors that already exist on the walls. Asbestos/Leadcode A-clear for repair by Horne Engineer ( Philip Connollly ) on 8/20/02 Charles E. Buchanan |
July 18, 2002 |
May 19, 2006 |
1,401 days |
| Seaton Elementary School |
FM-200332783 03 5/19/06 (Seaton) !!!VERY URGENT!!! 1st Floor/Girls Restroom: Repair or replace ceiling in the girls restroom; due to damages from a previous leak. Asbestos Code A - Cleared for repairs on 07-01-03 by Leroy Minton Jr. (LM/07-01-03) Safety Office 202-576-8962. |
July 1, 2003 |
May 19, 2006 |
1,053 days |
| Raymond Elementary School |
FM-200622879 06 5/19/06 Raymond Boiler Room Door on outside of lock had key broke off in cyclinder, need to be repaired orreplaced. Urgent !!!! |
May 17, 2006 |
May 19, 2006 |
2 days |
| Plummer Elementary School |
FM-200504466 05 5/19/06 ( PLUMMER ) First Floor 1) Repair and paint ceiling. Lead & Asbestos Code A - Clear for repairs on 04/21/05. DCPS Safety - Richard Gibson(RG) |
April 21, 2005 |
May 19, 2006 |
393 days |
| Plummer Elementary School |
FM-200504179 05 5/19/06 ( PLUMMER ) First Floor - Boys Restroom 1) Repair ceiling plaster, it's falling. Asbestos Code A - Clear for repairs on 04/14/05. DCPS Safety - Richard Gibson (RG) |
April 18, 2005 |
May 19, 2006 |
396 days |
| Plummer Elementary School |
FM-200503995 05 5/19/06 ( PLUMMER ) Second Floor - Cafeteria - Girls Restroom 1) Repair ceiling plaster, it's falling. Asbestos Code A - Clear for repairs on 04/14/05. DCPS Safety - Richard Gibson (RG) |
April 13, 2005 |
May 19, 2006 |
401 days |
| Plummer Elementary School |
FM-200218781 02 5/19/06 (Plummer) !!!URGENT!!! 1st Floor/Boys bathroom: Large portion of ceiling has fallen; other portions of the ceiling loose, and could fall anytime. Asbestos Code A-clear for repair by Horne Engineer Philip Connolly on 10/08/02 DCPS Charles E. Buchanan |
October 3, 2002 |
May 19, 2006 |
1,324 days |
| Moten Elementary School |
FM-200454790 04 5/19/06 Moten EMERGENCY First, second and fourth floors Plastering is needed (old side 16th St., P St.) 2nd boys bathroom ceiling old side. 4th old side hallway. This is the third request in 3 years. Asbestos Code A - Clear for repairs on 09/15/04. DCPS Safety - Leroy Minton Jr. (RG 09/15/04) |
September 15, 2004 |
May 19, 2006 |
611 days |
| Jefferson JHS |
FM-200516954 /05 5/19/06 Urgent: Basement walls need plastering in the hall, there is a hole in the wall. Lead & Asbestos Code A - Clear for repairs on 12/30/05. Tidewater - Roger Small (RG 01/05/06) |
December 28, 2005 |
May 19, 2006 |
142 days |
| Janney Elementary School |
FM-200444047 04 5/19/06 Janney !!!VERY URGENT!!! Asbestos Assessment Required. Third Floor library 1) Plaster - north wall by window. Damage was caused by water. Repairs have been made. Lead & Asbestos Code A - Clear for repairs on 03/12/04. Horne Engineering - Edward Rodriguez (RG 03/12/04) |
February 12, 2004 |
May 19, 2006 |
827 days |
| Janney Elementary School |
FM-200210369 02 5/19/06 Janney A patch of 3' by 6' on the NW wall of the room is bubbling and requires repair work. Requester Phone: 282.0110 Web Form Location ID: 15 Kindergarten room Asbestos Code A - Cleared for repairs on 04-28-03 by Leroy Minton Jr. (LM/04-08-03) the Safety Office 202-576-8962. |
June 24, 2002 |
May 19, 2006 |
1,425 days |
| Woodson High School |
FM-200623034 06 5/19/06 Woodson Chiller Check voltage to line to chiller. Urgent !!!! |
May 19, 2006 |
May 19, 2006 |
0 days |
| Emery Elementary School |
FM-200507471 05 5/19/06 "Urgent" Asbestos Assessment Required. Second floor, Girls' Restroom. Repair fallen ceiling. Asbestos Code A - Clear for repairs on 07/06/05. Tidewater - Sheryll James (RG 07/06/05) |
July 6, 2005 |
May 19, 2006 |
317 days |
| Bunker Hill Elementary School |
FM-200223759 /02 5/19/06 (Bunker-Hill Health Inspection Report- repair is needed to walls and ceiling in preparation and dining areas. Asbestos Code A - Cleared on 03-14-03 by Leroy Minton Jr (LM) Safety Office 202-576-8962. |
November 12, 2002 |
May 19, 2006 |
1,284 days |
| Young Elementary School |
FM-200506111 05 5/19/06 Young Center One Paint and Plaster the Ceiling Lead & Asbestos Code A - Clear for repairs on 05/31/05. DCPS Safety - Richard Gibson (RG) |
May 31, 2005 |
May 19, 2006 |
353 days |
| Bunker Hill Elementary School |
FM-200339206 /03 5/19/06 Bunker Hill URGENT Second and first floor west and east wing and main wing Peeling paint / main wing girls bathroom. Lead & Asbestos Code A - Clear for repairs on 10/23/03. Horne Engineering - Edward Rodriguez (RG 10/27/03) |
October 21, 2003 |
May 19, 2006 |
941 days |
| Nalle Elementary School |
FM-200222335 /02 5/22/06 J. C. Nalle room 200 URGENT NO HEAT Repair / replace leaking convector, heat unit had to be isolated and is only source of heat. With unit isolated room has no heat. NO INSULATION ON UNIT Asbestos Code A-clear for repair by DCPS Safety Charles Buchanan 01/06/03 |
December 10, 2002 |
May 22, 2006 |
1,259 days |
| Nalle Elementary School |
FM-200215458 02 5/22/06 (Nalle) Urgent!! Replace toilets in girls and urinals in boys bathrooms on first and second floors old wing. The toilets and urinals are constantly leaking causing a severe health and safety hazard.Repair exhaust fans on the roof. There is no ventilation in any of the rest rooms. The exhaust fans do not work. This compounds the existing health hazard created by the leaking toilets. Account #: 288 Asbestos Code A - Cleared for repairs on 04-28-03 by Leroy Minton Jr. (LM/04-08-03) the Safety Office 202-576-8962. |
July 30, 2002 |
May 22, 2006 |
1,392 days |
| Nalle Elementary School |
FM-200215426 02 5/22/06 (Nalle) I am requesting that the holes in the walls of the follwing rooms be repaired. The holes were made by contractors,persons removing asbestoes and DCPS workers. They are large enough for children to crawl into. Rooms 118, 217 & 130 Account #: 288 Asbestos Code A - Cleared for repairs on 04-28-03 by Leroy Minton Jr. (LM/04-08-03) the Safety Office 202-576-8962. |
July 25, 2002 |
May 22, 2006 |
1,397 days |
| Nalle Elementary School |
FM-200215379 02 5/22/06 (Nalle) 1. Asbestos assessment required. Windows have popped out in the health suite,and in room 210a. These situations present a security risk. Account #: 288 Requester Phone: 202 645-7300 Asbestos Code A - Cleared for repairs on 05-08-03 by Leroy Minton Jr. (LM/05-08-03) Safety Office 202-576-8962. |
August 20, 2002 |
May 22, 2006 |
1,371 days |
| Nalle Elementary School |
FM-200213146 02 5/22/06 I am requesting that the holes in the follwing rooms be repaired. The holes were made by contractors,persons removing asbestoes and DCPS workers. They are large enough for children to crawl into. Rooms 118, 217 & 130 Account #: 288 Code A Clear for Repair by Leroy Minton, Jr. DCPS Safety 07-30-02 DCPS Safety-Sheila R. Howard 07-30-02 |
July 25, 2002 |
May 22, 2006 |
1,397 days |
| Nalle Elementary School |
FM-200209620 02 5/22/06 Nalle ****Urgent**** Stairway & Lights at the Front Office Lights are off and the main breaker is not working. |
June 14, 2002 |
May 22, 2006 |
1,438 days |
| Nalle Elementary School |
FM-200205110 02 5/22/06 (Nalle) ***Very Urgent*** 1. Asbestos assessment required. The door leading into the second floor hallway is broken. The door is near room 205. The door needs to be repaired immediately. I am afraid that it will fall on someone if not rerpaired. Account #: 288 Duplicate Asbestos code A - clear for repairs on 04/01/02. DCPS Safety - Leroy Minton Jr. (RG 04/02/02) |
March 28, 2002 |
May 22, 2006 |
1,516 days |
| Ronald H. Brown MS |
FM-200226856 03 5/22/06 BROWN, RON (ROPER) Second Floor - Near stairwell #9 1. Please repair and or replace outlet for water located in the hallway . Asbestos Code A - Clear for repairs on 03/11/03. DCPS Safety - Richard Gibson (RG 03/11/03) |
March 11, 2003 |
May 22, 2006 |
1,168 days |
| Peabody Elementary School |
FM-200618920 06 5/22/06 Very Urgent Basement-Girls Restroom R/R two faucets to the sink-Water supply turned off-Water shoots out when water is turned on. |
February 21, 2006 |
May 22, 2006 |
90 days |
| Ronald H. Brown MS |
FM-200224264 03 5/22/06 Brown, Ron Second floor - room 223 Replace carpet in classroom 223. Carpet is damaged and unraveling. Student was injury. Asbestos Code A - Clear for repairs on 01/22/03. Horne Engineering - Troy Wilcome (RG 01/23/03) |
January 21, 2003 |
May 22, 2006 |
1,217 days |
| Burrville Elementary School |
FM-200225287 03 5/22/06 (Burrville) ***Urgent*** Second Floor - Cafeteria 1) Lights are on in the Gym but won't come on in the Cafeteria Area. |
February 6, 2003 |
May 22, 2006 |
1,201 days |
| Cardozo High School |
FM-200508636 05 5/22/06 Cardozo Fire Code Violation Third Floor - Balcony ( Auditorium) 1) Breech in wall . Code A - clear for repairs as of 8/3/05 by Tidewater. Sylvia Grimes safety office. |
July 26, 2005 |
May 22, 2006 |
300 days |
| Burrville Elementary School |
FM-200505540 05 5/22/06 (BURRVILLE) URGENT!!! Second Floor - Auditorium 1) Replace six sets of ceiling lights. (lights needed for upcoming events to be held in the space) |
May 16, 2005 |
May 22, 2006 |
371 days |
| Nalle Elementary School |
FM-200515640 /05 5/22/06 Urgent: Outside-Repair light fixtures on the rear side of the building. |
November 21, 2005 |
May 22, 2006 |
182 days |
| Nalle Elementary School |
FM-200514371 /05 5/22/06 (Nalle) "Urgent" First floor, Main Entrance. Door latch on main entrance door will not catch striker plate. |
October 23, 2005 |
May 22, 2006 |
211 days |
| Nalle Elementary School |
FM-200507202 05 5/22/06 !!!!URGENT!!!! Second Floor - Hallway (New Building) There is a leaking roof drain leaking into the hallway. |
June 27, 2005 |
May 22, 2006 |
329 days |
| Nalle Elementary School |
FM-200457373 /04 5/22/06 J.C.Nalle boiler room (outside) URGENT DANGER of INJURY from steam leak!!!!!!!!! Asbestos abatement/exploratory needed on brick wall - concrete, pipe insulation Location of rupture - Outside boiler room door 3 feet from ground. Repair ruptures steam/condensate line in wall (exterior) Asbestos Code A - Clear for repairs on 10/28/04. DCPS Safety - Leroy Minton Jr. (RG 10/29/04) |
October 25, 2004 |
May 22, 2006 |
574 days |
| Nalle Elementary School |
FM-200341440 /03 5/22/06 Nalle Nurse station Univent is leaking and started stinking. Child could get hurt. |
December 11, 2003 |
May 22, 2006 |
893 days |
| Nalle Elementary School |
FM-200228386 03 5/22/06 (Nalle) Urgent! Fire code violation- furnish and install exit sign over exit door by room 134. Account #: 288 Asbestos Code A - Clear for repairs on 04/08/03. Horne Engineering - Troy Wilcome (RG 04/10/03) |
April 5, 2003 |
May 22, 2006 |
1,143 days |
| Ronald H. Brown MS |
FM-200336544 03 5/22/06 (Brown, Ron (Roper) !!!VERY URGENT!!! 1st Floor/Kitchen: Stopped up drains should be snaked out, as the inspectors are returning today. |
August 28, 2003 |
May 22, 2006 |
998 days |
| Nalle Elementary School |
FM-200228385 03 5/22/06 (Nalle) I am requesting that a plumber install a washer/dryer in the area between rooms 134 and 132. The washer/dryer was donated by Freddie mac four years ago. I have been unable to get the washer/dryer installed. Account #: 288 Asbestos Code A - Clear for repairs on 06/05/03. DCPS Safety - Saeed Rahimi (RG 06/05/03) |
April 5, 2003 |
May 22, 2006 |
1,143 days |
| Nalle Elementary School |
FM-200216092 02 5/22/06 (Nalle) 1. Asbestos assessment required. Repair window in room 211. The window will not close. Account #: 288 Asbestos Code A - Cleared for repairs on 05-08-03 by Leroy Minton Jr. (LM/05-08-03) Safety Office 202-576-8962. |
July 30, 2002 |
May 22, 2006 |
1,392 days |
| Reed LC |
FM-200212768 02 5/22/06 Reed 1. Asbestos Assessment Reqd. 1st Floor Early Childhood Lavatory 2. Repair hole in wall left by plumbers when doing previous repair. Code A Clear for Repair by DCPS Safety-Leroy Minton, Jr. DCPS Safety-Sheila R. Howard 07-26-02. |
July 24, 2002 |
May 22, 2006 |
1,398 days |
| Ronald H. Brown MS |
FM-200217817 02 5/22/06 Brown, Ron ****Urgent**** Hallway Fountain Near Room 225 There are electric sparks coming from the electrical outlet where the water fountain is plugged in near room 225. |
September 18, 2002 |
May 22, 2006 |
1,342 days |
| Burrville Elementary School |
FM-200621545 06 5/22/06 Burrville Chiller Repair or replace chiller, (Down) Low oil temperture,(oil Temperture is 70 degrees) May be heater Urgent !!!! |
April 20, 2006 |
May 22, 2006 |
32 days |
| Ronald H. Brown MS |
FM-200456457 04 5/22/06 Brown, Ron First floor room 104 Need ceiling tile put up in the new computer lab, before the new furniture comes on Thursday, we would like to have it done before back to school nite witch is thursday. (room 104) Asbestos Code A - Clear for repairs on 10/064/03. DCPS Safety - Leroy Minton (RG 10/06/04) |
October 5, 2004 |
May 22, 2006 |
594 days |
| Ronald H. Brown MS |
FM-200217815 02 5/22/06 Brown, Ron ****Urgent**** Asbestos Assessment Reqd. Auditorium Replace incandescent light fixtures with another type of fixture. The light bulbs cannot be replaced with the orginal type bulbs. There will be special programs with the chief officer of the DCPS on 10/10/02 and it would help to have this work done by then. Asbestos Code A - Clear for repairs on 09/19/02. Horne Engineering - Troy Wilcome (RG 09/20/02) |
September 18, 2002 |
May 22, 2006 |
1,342 days |
| Ronald H. Brown MS |
FM-200459280 04 5/22/06 Brown, Ron Exterior door to parking lot The door closer and the hinges are broken and it is hard to secure at night. Asbestos Code A - Clear for repairs on 04/21/05. DCPS Safety - Leroy Minton Jr. (RG 04/21/05) |
December 7, 2004 |
May 22, 2006 |
531 days |
| Ronald H. Brown MS |
FM-200216435 02 5/22/06 Brown,Ron Asbestos Assessment Reqd. 2nd Floor Gymnasium Replace two broken boards on the bleachers in the gymnasium. Asbestos Code A - Clear for repairs on 09/04/02. DCPS Safety - Richard Gibson (RG) |
September 4, 2002 |
May 22, 2006 |
1,356 days |
| Maury Elementary School |
FM-200443670 04 5/22/06 Maury URGENT Landing between 1st and 2nd floor (west) Repair plaster that was damaged by bathroom leak on landing and paint. Lead & Asbestos Code A - Clear for repairs on 02/04/04. Horne Engineering - Bjarne Smith (RG 02/05/04) SEE LINKED DOCUMENTS |
February 4, 2004 |
May 22, 2006 |
838 days |
| Ronald H. Brown MS |
FM-200214246 02 5/22/06 (Ron Brown) !!!Urgent!!! 1. Asbestos assessment required. 1st Floor hallway/Stairwell #2: Light fixture has fallen from ceiling. Asbestos Code A-clear for repair by Horne Engineer ( Edward Rodriguez ) Charles Buchanan on 8/16/02 |
August 13, 2002 |
May 22, 2006 |
1,378 days |
| Ronald H. Brown MS |
FM-200503929 05 5/22/06 (Brown, Ron (Roper) HEALTH CODE VIOLATION: Kitchen: Replace garbage disposal. Asbestos Code A - Clear for repairs on 04/13/05. DCPS Safety - Richard Gibson (RG) |
April 12, 2005 |
May 22, 2006 |
405 days |
| Kramer Middle School |
FM-200510042 05 5/22/06 (Kramer) "Urgent" First floor/Girls' lockerroom. Asbestos Assessment Required. Girls' restroom in girls' lockerroom check for lead base walls & ceiling. Lead & Asbestos Code A - Clear for repairs on 08/10/05. Tidewater - Rodney Disyance/(RG 08/23/05) |
August 10, 2005 |
May 22, 2006 |
285 days |
| Ronald H. Brown MS |
FM-200208129 02 5/22/06 Brown,Ron. ****Urgent**** 3rd Floor Room 312 [Science Lab] Students have vandalized the locks to the door to room 312 and area cannot be secured. Replace existing lock [stronger type, if possible/dead-bolt] to prevent same thing from recurring. |
May 21, 2002 |
May 22, 2006 |
1,462 days |
| Ketcham Elementary School |
FM-200451994 04 5/22/06 Ketcham Second floor old wing Bathrooms boys and girls need to be scraped, plastered and painted. Boys bathroom on 2nd floor new wing ceiling need to be repaired, plastered and painted. Code A - clear for repairs as of 8/31/04 safety Sylvia. |
August 10, 2004 |
May 22, 2006 |
650 days |
| Sousa Middle School |
FM-200455040 04 5/22/06 Sousa Third floor room 322 Large breach in ceiling close and paint area. Code A - clear for repairs as of 10/4/04 safety Sylvia. |
September 17, 2004 |
May 22, 2006 |
612 days |
| Ketcham Elementary School |
FM-200340435 /03 5/22/06 (Ketcham) 2nd Floor/Room #200: Repair plaster on one (1) corner, this is one of the classrooms closed due too roof leaks. Mr. Coleman, roofing supervisor, indicated "no more leaks in room #200. Please plaster room #100, paint too if possible. Room #200 needs work done urgently. Lead & Asbestos Code A - Clear for repairs on 11/19/03. Horne Engineering - Edward Rodriguez (RG11/20/03) |
November 18, 2003 |
May 22, 2006 |
916 days |
| Sousa Middle School |
FM-200458852 /04 5/22/06 SOUSA First Floor-Girls Restroom Rpair Hole in the Ceiling. Asbestos Code A - Clear for repairs on 12/01/04. DCPS Safety - Leroy Minton Jr. (RG 12/01/04) |
November 30, 2004 |
May 22, 2006 |
538 days |
| Kenilworth ES |
FM-200515229 05 5/22/06 Urgent: One row of lights went out in classroom 216 on the second floor. Need the bulbs replaced. |
November 8, 2005 |
May 22, 2006 |
195 days |
| Ronald H. Brown MS |
FM-200511090 05 5/22/06 Brown, Ron Boiler Room Unstop drain in boiler room. Urgent !!! |
August 24, 2005 |
May 22, 2006 |
271 days |
| Ronald H. Brown MS |
FM-200513415 05 5/22/06 Brown, Ron Sub Boiler Room Repair rupture 3/4"line on domestic cold water line in chiller room. Urgent !!!! |
October 3, 2005 |
May 22, 2006 |
231 days |
| Burrville Elementary School |
FM-200455213 04 5/22/06 Burrville Boiler Room 1) Remove and cap off both safety valves on Boilers #1 & #2 , so hydro-test can be perform to pass Boiler Inspection. 2) Remove (1) 1 1/4" nipple from water leg of Boiler #2 |
September 21, 2004 |
May 22, 2006 |
608 days |
| Sousa Middle School |
FM-200504704 05 5/22/06 (Sousa) "Emergency " Asbestos Assessment Required. Second floor/Corridor exit, Security office, Stair wells & Hallways 219. Third floor/Rooms 309 and 315 Security office. Plaster and repair large holes in ceilings. Asbestos Code A - Clear for repairs on 04/26/05. DCPS Safety - Richard Gibson (RG) |
April 25, 2005 |
May 22, 2006 |
392 days |
| Burrville Elementary School |
FM-200451857 04 5/22/06 (Burrville) Roof Top: Survey, and repair roof, experiencing water leaking from that area. Asbestos Code A - Clear for repairs on 09/02/04. DCPS Safety - Leroy Minton Jr. (RG 09/03/04) |
August 9, 2004 |
May 22, 2006 |
651 days |
| Sousa Middle School |
FM-200504705 05 5/22/06 (Sousa) "Emergency " Asbestos Assessment Required. Basement/Room 13. Plaster and repair large holes in ceiling. Asbestos Code A - Clear for repairs on 04/26/05. DCPS Safety - Richard Gibson (RG) |
April 25, 2005 |
May 22, 2006 |
392 days |
| Burrville Elementary School |
FM-200513821 /05 5/22/06 Burrville Urgent First Floor-Entrance Foyer and Stairwell Install lights in entrance foyer division ave. side of bldg. Also install lights in north stairwell on 1st. floor. |
October 13, 2005 |
May 22, 2006 |
221 days |
| Houston Elementary School |
FM-200618122 06 5/22/06 Urgent:Survey the unit vent in classroom 147 |
February 1, 2006 |
May 22, 2006 |
110 days |
| Houston Elementary School |
FM-200502029 05 5/22/06 houston Boiler Room Repair or replace defective sump pump, pump is not pumping. Urgent !!!! |
February 28, 2005 |
May 22, 2006 |
448 days |
| Houston Elementary School |
FM-200455658 04 5/22/06 Houston Survey the ceiling in the kitchen when it rain the ceiling leaks the kitchen closet. Asbestos Code A - Clear for repairs on 09/28/04. DCPS Safety Leroy Minton Jr. (RG 09/28/04) |
September 24, 2004 |
May 22, 2006 |
605 days |
| Ronald H. Brown MS |
FM-200617484 06 5/22/06 First floor, Gymnasium Area. "Urgent" Need to reinstall dead bolt, after temporary repairs from break-in. Asbestos Code A - Clear for repairs on 01/17/06. Tidewater - Thomas Johnson (RG 01/19/06) |
January 17, 2006 |
May 22, 2006 |
125 days |
| Houston Elementary School |
FM-200452180 04 5/22/06 (Houston) !!!VERY URGENT!!! Outside Request light bulbs outside and outside cages around lights (all around). Due to break ins and vandalism |
August 11, 2004 |
May 22, 2006 |
649 days |
| Houston Elementary School |
FM-200451171 04 5/22/06 (Houston) !!!VERY URGENT!!! Through-Out Building: Replace window glass in the following classrooms: 1st Floor/Room #106. 2nd Floor/Classrooms, #205, 207, 208, and #209. |
July 30, 2004 |
May 22, 2006 |
661 days |
| Houston Elementary School |
FM-200448659 04 5/22/06 (Houston) !!!VERY URGENT!!! 1st Floor/Lobby Area: Replace plastic window so grates can be installed. (Vandals entered the school through the plastic window, and will return if window is not repaired) |
June 1, 2004 |
May 22, 2006 |
720 days |
| Houston Elementary School |
FM-200444016 04 5/22/06 Houston !!!VERY URGENT!!! Asbestos Assessment Required. 1st Floor Boys Restroom: Repair boys restroom ceiling, it has a hole that needs to be repaired on the office wing side. June 03, 2004: Call of concern came in reporting particles, and plaster falling through-out the area. Asbestos Code A - Clear for repairs on 02/13/04. Horne Engineering - Philp Connolly (RG 02/18/04) |
February 12, 2004 |
May 22, 2006 |
830 days |
| Houston Elementary School |
FM-200443972 04 5/22/06 (Houston) !!!VERY URGENT!!! Asbestos Assessment Required. 1st Floor/Room #145: Ballast burning in light near the door; very bad burning smell present. Asbestos Code A - Clear for repairs on 02/12/04. Horne Engineering - Troy Wilcome (RG 02/13/04) |
February 11, 2004 |
May 22, 2006 |
831 days |
| Sousa Middle School |
FM-200504707 05 5/22/06 (Sousa) "Emergency " Asbestos Assessment Required. First floor, Plaster and Paint the following areas on the 1st floor. (large breaches in ceiling) rooms #120, 121, corridor 121. Note: Please paint 1st floor Mens' Restroom, Ladies restroom and storage room 121. Asbestos Code A - Clear for repairs on 04/26/05. DCPS Safety - Richard Gibson (RG) |
April 25, 2005 |
May 22, 2006 |
392 days |
| Houston Elementary School |
FM-200221916 02 5/22/06 Houston First floor Southwest side Repair outside door with a big gap between the bottom of the door and floor. Mice can get into the building thru this opening and will cause a health problem. URGENT !!!!!!! |
December 3, 2002 |
May 22, 2006 |
1,266 days |
| Sousa Middle School |
FM-200504710 05 5/22/06 (Sousa) "Emergency " Asbestos Assessment Required. Second floor. Plaster breach in ceilings in the following areas: Girls' restroom 209, storage room 222, corridor exit and security office 219. Asbestos Code A - Clear for repairs on 04/26/05. DCPS Safety - Richard Gibson (RG) |
April 25, 2005 |
May 22, 2006 |
392 days |
| Houston Elementary School |
FM-200205266 02 5/22/06 (Houston) ****Emergency**** Asbestos Assessment Required 1st Floor Hallways Carpenters shall construct new electrical panel box wall chases to protect against physical damage, and personal injury. POC: Palmer Williams 202-724-4622 Code A - Asbestos abated on 07/08/02 PER Leroy Minton confrimation (RG 07/12/02) |
April 2, 2002 |
May 22, 2006 |
1,511 days |
| Sousa Middle School |
FM-200504728 05 5/22/06 ( SOUSA ) Second Floor - Library 1) Repair stained ceiling tile. Asbestos Code A - Clear for repairs on 04/26/05. DCPS Safety - Richard Gibson (RG) |
April 26, 2005 |
May 22, 2006 |
391 days |
| Sousa Middle School |
FM-200504729 05 5/22/06 ( SOUSA ) Main Office 1) Plaster ceiling. Asbestos Code A - Clear for repairs on 04/26/05. DCPS Safety - Richard Gibson (RG) |
April 26, 2005 |
May 22, 2006 |
391 days |
| Houston Elementary School |
FM-200203761 02 5/22/06 (Houston) 1. Asbestos assessment required. Replace exit lights in the auditorium (36). Asbestos Code A - Clear for repairs on 06/05/02. DCPS Safety - Leroy Minton Jr. (RG 06/06/02) Asbestos Code A - Clear for repairs on 6/13/02 DCPS Safety - R. Edwards (RE- 6/13/02) |
February 27, 2002 |
May 22, 2006 |
1,545 days |
| Houston Elementary School |
FM-200203745 02 5/22/06 (Houston) 1. Asbestos assessment required. 1st floor/Right side of lobby. Survey hand rails on the stairwell; right side of lobby. Asbestos Code A - Clear for repairs, on 6/13/02 DCPS Safety - R. Edwards (RE-6/13/02) |
February 27, 2002 |
May 22, 2006 |
1,545 days |
| Houston Elementary School |
FM-200203716 02 5/22/06 (Houston) **Urgent** 1. Asbestos assessment required. 1st floor/Rooms #105 and 145: Sharpe metal objects protruding from electrical panel box. Students and/or staff sustained injury walking into these protruding objects. "Request some type of protective covering to prevent further injury. Assess floor and ceiling Code A-clear for repair by Horne Engineer ( Sharon Voss ) 0n 3/22/02 (CEB |
February 28, 2002 |
May 22, 2006 |
1,544 days |
| Sousa Middle School |
FM-200514021 /05 5/22/06 Sousa Urgent First Floor-Stairs Near 109 and 116 Furnish and Paint Stairways, and the walls are peeling some are damage from furniture removal. Lead & Asbestos Code A - Clear for repairs on 10/27/05. Tidewater - Rodney Distance (RG 11/01/05) |
October 20, 2005 |
May 22, 2006 |
214 days |
| Hine JHS |
FM-200505783 05 5/22/06 ( HINE ) Corridor that leads to the Auditorium 1) Plaster and Paint holes in ceiling. Asbestos Code A - Clear for repairs on 05/23/05. DCPS Safety - Richard Gibson (RG) |
May 20, 2005 |
May 22, 2006 |
367 days |
| Stanton Elementary School |
FM-200336903 03 5/22/06 Stanton Exit doors WUSA is painting all exterior doors. Asbestos Code A - Cleared for repairs on 09-05-03 by Leroy Minton Jr (LM/09-05-03) Safety Office 202-576-8962. |
September 5, 2003 |
May 22, 2006 |
990 days |
| Burrville Elementary School |
FM-200337917 03 5/22/06 (Burrville) !!!URGENT!!! Outside/Behind Pre-K: Stopped up drain, flooding nears stairs approximately one (1) feet of water or more. |
September 23, 2003 |
May 22, 2006 |
972 days |
| Turner Elementary School |
FM-200458350 /04 5/22/06 (Turner) 1st Floor/Girls Restroom: Replace feed line under sink in girls restroom; lines has rusted badly, and water leaking all over floor causing safety hazard. Code A-clear for repair by DCPS Charles Buchanan on 11/17/04 |
November 16, 2004 |
May 22, 2006 |
552 days |
| Turner Elementary School |
FM-200500030 05 5/22/06 TURNER FIRST FL. BOYS TOILET IN NEW BUILDING REMOUNT SINK TO WALL- REPLACE TRAPS Code A-clear for repairs as of 4/15/05 Sylvia Grimes safety. |
January 3, 2005 |
May 22, 2006 |
504 days |
| Adams Elementary School |
FM-200617536 06 5/22/06 Asbestos Assessment Required 1st Floor - Room #102 Repair brickand plaster wall in room 102. Note: Please refer to S.O. # FM-200516658 for assessment. Asbestos Code A - Clear for repairs on 01/18/06. DCPS Safety - Richard Gibson (RG) SEE ASSESSMENTS |
January 18, 2006 |
May 22, 2006 |
124 days |
| Burrville Elementary School |
FM-200513819 /05 5/22/06 Burrville Urgent Second Floor-Storage Room Install electrical outlet to accommodate freezer and refrigerator, currently using an extinsion cord. (Safety Violation) |
October 13, 2005 |
May 22, 2006 |
221 days |
| Webb Elementary School |
FM-200223763 03 5/22/06 Webb Boiler room (URGENT) Repair or replace circulating pumps #1 and # 2 , #1 pump has bad bearing and # 2 pump has missing parts. |
January 13, 2003 |
May 22, 2006 |
1,225 days |
| Webb Elementary School |
FM-200228030 03 5/22/06 Webb Second floor corridor LC II Replace light fixtures in classroom areas do to roof leak. Rooms 203 and 208. URGENT |
April 1, 2003 |
May 22, 2006 |
1,147 days |
| Burrville Elementary School |
FM-200505541 05 5/22/06 (BURRVILLE) URGENT!!! Roof Top 1) Repair or Replace lid to trash shoot, lid has a rotted hole through it allowing pest to enter the building. |
May 16, 2005 |
May 22, 2006 |
371 days |
| Webb Elementary School |
FM-200333232 03 5/22/06 (Webb) !!!VERY URGENT!!! 2nd Floor/Library: Repair or replace leaking ceiling a/c unit; using buckets, and trash cans to contain water. |
July 14, 2003 |
May 22, 2006 |
1,043 days |
| Webb Elementary School |
FM-200333392 03 5/22/06 (Webb) !!!VERY URGENT!!! 2nd Floor/Learning Center #2: Leaking a/c unit; water coming through ceiling, and lights. |
July 17, 2003 |
May 22, 2006 |
1,040 days |
| Webb Elementary School |
FM-200337311 03 5/22/06 Webb First floor Repair outside lights above the doors around building. Safety hazard |
September 11, 2003 |
May 22, 2006 |
984 days |
| Webb Elementary School |
FM-200339805 03 5/22/06 WEBB Westside stairwell EMERGENCY! Repair ruptured supply line to the convector unit on the first floor (1 inch supply line) Assessment may be needed on floor possiblity of going into floor. Contact Mr. Bradley before assessment. Asbestos Code A - Abated on 11/14/03 DCPS Safety - per Ronald Edwards comfirmed. (RG 11/21/03) |
November 3, 2003 |
May 22, 2006 |
931 days |
| Webb Elementary School |
FM-200445810 04 5/22/06 Webb Boiler room Need a density test of the thickness of the boilers # 1 and 2 outer shell to assure the safety of the vessel under pressure. |
March 25, 2004 |
May 22, 2006 |
788 days |
| Webb Elementary School |
FM-200450125 04 5/22/06 Webb Parking lot Remove bulk trash. Safety and Health Hazard |
July 12, 2004 |
May 22, 2006 |
679 days |
| Webb Elementary School |
FM-200450549 04 5/22/06 Webb First floor hallway Repair breach in wall near room 133. Safety hazard Asbestos Code A - Clear for repairs on 07/21/04. DCPS Safety - Leroy Minton Jr. (RG 07/21/04) |
July 20, 2004 |
May 22, 2006 |
671 days |
| Drew Elementary School |
FM-200517369 06 5/22/06 Urgent: Replace the broken 9x9 floor tile in rm. 305 on the third floor. Code A - Asbestos was abated by Goel Construction per Leroy Minton Jr. comfrimed (RG 02/07/06) |
January 12, 2006 |
May 22, 2006 |
130 days |
| Drew Elementary School |
FM-200449992 04 5/22/06 (Drew) !!!VERY URGENT!!! Outside/Front Entrance Near 57th Street: Remove soot from front of building due to fire. (Power Wash) |
July 7, 2004 |
May 22, 2006 |
684 days |
| Webb Elementary School |
FM-200618807 06 5/22/06 Exterior of Building. "Urgent" Replace (4) outside metal air vent covers, to prevent entry of rodents. |
February 17, 2006 |
May 22, 2006 |
94 days |
| Webb Elementary School |
FM-200620265 06 5/22/06 Urgent First Floor-Restroom Near Office Wax ring need to be replaced on the toilet-It's worn. |
March 23, 2006 |
May 22, 2006 |
60 days |
| Drew Elementary School |
FM-200337714 03 5/22/06 (Drew) !!!VERY URGENT!!! Asbestos Assessment Required. Through-out the Building: Ceiling tile need to be replaced. Asbestos Code A - Clear for repairs on 09/23/03. Horne Engineering - Troy Wilcome (RG 09/25/03) |
September 17, 2003 |
May 22, 2006 |
978 days |
| Burrville Elementary School |
FM-200219105 02 5/22/06 BURRVILLE ELECTRICAL SOCKETS ARE NEEDED TO ELIMINATE THE SAFETY HAZARD OF LOOSE ENDS THROUGHOUT BUILDING Clear For Repairs - FM-200112979 Asbestos Code A - Clear for repairs on 02/25/02 DCPS Ronald Edwards (RE) |
October 9, 2002 |
May 22, 2006 |
1,321 days |
| Savoy Elementary School |
FM-200203814 02 5/23/06 (Savoy) ****Urgent**** Asbestos Assessment Required 1st Floor North Stairwell Doors Repair/replace 1st floor stairwell doors which are cracked and exposing a white powder from where the panic bar was removed and never replaced. The white powder might be asbestos. |
March 4, 2002 |
May 23, 2006 |
1,541 days |
| Wilson High School |
FM-200512547 05 5/23/06 Wilson, W. Urgent Exterior of the building Unclog the storm drains |
September 14, 2005 |
May 23, 2006 |
251 days |
| Savoy Elementary School |
FM-200209657 02 5/23/06 (Savoy) 3rd Floor stairwell/South end: Window pane broken and frame damaged beyond repair. This is a safety hazard, as students have crawled out the window. |
June 17, 2002 |
May 23, 2006 |
1,436 days |
| Savoy Elementary School |
FM-200222735 /02 5/23/06 (Savoy) 1. Asbestos assessment required. 1st Floor/All purpose room: We have four (4) broken lunch tables, and one (1) to be repaired. Need new tables as soon as possible. Asbestos Code A - Clear for repairs on 12/18/02. DCPS Safety - Richard Gibson (RG) |
December 17, 2002 |
May 23, 2006 |
1,253 days |
| Savoy Elementary School |
FM-200341190 03 5/23/06 Savoy First floor boys restroom south of building across from day care There are 2 large holes 2'x2' that was made in floor to remove insulation off of piping and was left as holes. Kids are sticking their hands in the holes which lead to the underground crawl space. Afraid that one day a child will try to crawl into the holes. These are pre-k and headstart kids that use these restrooms. (P>S. the holes were made 2 years asgo. this is the 3rd request). Safety hazard Asbestos Code A - Clear for repairs on 12/08/03. Horne Engineering - Tony Marcolin ( RG 12/09/03 ) |
December 8, 2003 |
May 23, 2006 |
897 days |
| Savoy Elementary School |
FM-200452647 04 5/23/06 Savoy Second floor girls and boys restroom The boys and girls restroom have ceilings that are peeling and some parts in danger of falling on someone child at any time. Lead & Asbestos Code A - Clear for repairs on 07/17/05. ( Note ACM is noted to be above plaster ceiling plenum, If repairs require access to ceiling plenum,An abatement design is requried. Contact the Safety Office ) Tidewater - Philp Connolly (RG 07/20/05) |
August 13, 2004 |
May 23, 2006 |
648 days |
| Savoy Elementary School |
FM-200452649 04 5/23/06 Savoy Second floor Room 206 Broken 9x9 floor tile that was determined to obtain asbestos, need to be replaced. Teacher in this room has complained of feeling sick and shortened of breath. Refer to work order FM-200337071 for this work to be done. safety Sylvia. |
August 13, 2004 |
May 23, 2006 |
648 days |
| Savoy Elementary School |
FM-200506310 05 5/23/06 (SAVOY) Second Floor - Teachers Restroom 1) Replace/Repair ceiling, due to water damage Asbestos Code A - Clear for repairs on 06/06/05. DCPS Safety - Richard Gibson (RG) |
June 3, 2005 |
May 23, 2006 |
354 days |
| Wilson High School |
FM-200448314 04 5/23/06 (Wilson, W) Remove unused gas pipe from kitchen beside fryer. Pipe is extremely dangerous safety hazard. Asbestos Code A - Clear for repairs on 05/24/05. Horne Engineering - Sheryll James (RG 05/25/04) |
May 20, 2004 |
May 23, 2006 |
733 days |
| Savoy Elementary School |
FM-200515092 05 5/23/06 Emergency: Replace/Repair the door on the paiking lot side of the multipurpose room due to a fire last night the fire department had to get into the building and damaged the doors. Asbestos Code A - Clear for repairs on 11/04/05. DCPS Safety - Charles Buchanan (RG 11/04/05) |
November 4, 2005 |
May 23, 2006 |
200 days |
| Savoy Elementary School |
FM-200617824 06 5/23/06 First Floor-126, and 127 Very Urgent Cinder block seperation in both rooms worried about structural damage needs to be repaired Code A-clear for repair by DCPS Charles Buchanan on 1/27/06 |
January 25, 2006 |
May 23, 2006 |
118 days |
| Turner Elementary School |
FM-200445036 04 5/23/06 (Turner) !!!VERY URGENT!!! 2nd & 3rd Floor: Boys toilet stopped up, new side, and old side, 3rd floor. |
March 9, 2004 |
May 23, 2006 |
805 days |
| Hardy Middle School |
FM-200455385 04 5/24/06 Hardy Second floor room 201 First floor room 110 Need a lock replaced, teachers can not secure there classroom, very urgent. |
September 22, 2004 |
May 24, 2006 |
609 days |
| Browne Junior High School |
FM-200448274 04 5/24/06 (Browne) !!!URGENT!!! !!!VANDALISM!!! Basement Gym: Repair or replace total of six (6) panic bars, and rods on entrance door to gym; unable to secure door. (Fire in girls rest room by vandals) |
May 21, 2004 |
May 24, 2006 |
733 days |
| Browne Junior High School |
FM-200453224 04 5/24/06 Browne URGENT Rooms 204, 233, 133, 124 and 237 Repair or replace broken locks on the above classrooms listed. |
August 24, 2004 |
May 24, 2006 |
638 days |
| Browne Junior High School |
FM-200458568 /04 5/24/06 Browne Second Floor RM 203 Lock on the Door is inoperable. Asbestos Code A - Clear for repairs on 11/23/04. DCPS Safety - Leroy Minton Jr. (RG 11/23/04) |
November 22, 2004 |
May 24, 2006 |
548 days |
| Browne Junior High School |
FM-200458826 /04 5/24/06 BROWNE Second Floor RM 212 Replace Door Handle Asbestos Code A - Clear for repairs on 12/02/04. DCPS Safety - Leroy Minton Jr. (RG 12/02/04) |
November 30, 2004 |
May 24, 2006 |
540 days |
| Cook J.F. Elementary School |
FM-200444430 04 5/24/06 Cook, J.F. Boiler Room Furnish Roving Engineer with keys to Boiler Room doors to the following schools: Cook, J.F. ; Emery; Walker Jones; Terrell, R.H. Engineer need keys to monitor the Daily Plant Operations. Urgent!!!! |
February 25, 2004 |
May 24, 2006 |
819 days |
| Draper Elementary School |
FM-200455914 04 5/24/06 Draper Cafeteria exit door 2 panic bars needed, lock need installation of both doors. Asbestos Code A - Clear for repairs on 10/01/03. DCPS Safety - Leroy Minton (RG 10/06/04) |
September 28, 2004 |
May 24, 2006 |
603 days |
| Eliot Junior High School |
FM-200448303 04 5/24/06 Eliot URGENT Third floor girls gym Replace panic bar and re-key to exiting master key. |
May 21, 2004 |
May 24, 2006 |
733 days |
| Hardy Middle School |
FM-200455386 04 5/24/06 Hardy First floor room 115 Need a knob lock students can only leave out of one door. Fire Code, very urgent. |
September 22, 2004 |
May 24, 2006 |
609 days |
| Hardy Middle School |
FM-200455389 04 5/24/06 Hardy URGENT First floor boiler room Requesting a key to enter the boiler room door, can not reset the alarm or shut off the water. |
September 22, 2004 |
May 24, 2006 |
609 days |
| Rudolph Elementary School |
FM-200513778 /05 5/24/06 Rudolph Urgent Cafeteria Storage Room-Re-plaster wall Asbestos Code A - Clear for repairs on 10/13/05. Tidewater - Rodney Distance (RG 10/14/05) |
October 12, 2005 |
May 24, 2006 |
224 days |
| Seaton Elementary School |
FM-200445499 04 5/24/06 Seaton URGENT First floor lobby door to playground Repair lock to door. Lock is out of line and can not be secured. |
March 17, 2004 |
May 24, 2006 |
798 days |
| Slowe Elementary School |
FM-200218803 02 5/24/06 Slowe Second floor - New wing Slop sink in custodian closets need to be replaced. Large hole in the bottom. Plumbing fixtures in custodian closets need to be replace no water working. Asbestos Code A - Clear for repairs on 10/08/02. DCPS Safety - Leroy Minton Jr. (RG 10/10/02) |
October 3, 2002 |
May 24, 2006 |
1,329 days |
| Slowe Elementary School |
FM-200224346 03 5/24/06 (Slowe) !!!URGENT!!! 2nd Floor/Boys bathroom there is a pipe leaking, location unknown. |
January 22, 2003 |
May 24, 2006 |
1,218 days |
| Truesdell Elementary |
FM-200622754 06 5/24/06 Truesdell Boiler Room Repair or replace domestic hot water heater will not lite off. Urgent !!!! |
May 16, 2006 |
May 24, 2006 |
8 days |
| Turner Elementary School |
FM-200448521 04 5/24/06 (Turner) !!!URGENT!!! 1st Floor & Cafeteria: Need water fountains adjusted so when the students put paper in the mouth piece, the water will not rise up to high, and flood the floors. |
May 26, 2004 |
May 24, 2006 |
728 days |
| Turner Elementary School |
FM-200331593 03 5/25/06 (Turner) !!!URGENT!!! Ground floor/Custodial Office: Replace corroded, rusty faucets in the restroom; faucets are leaking. |
June 11, 2003 |
May 25, 2006 |
1,079 days |
| Webb Elementary School |
FM-200622843 06 5/26/06 First Floor-Multi Service Center Missing Ceiling Tile Asbestos Code A - Clear for repairs on 05/17/06. DCPS Safety - Richard Gibson (RG) |
May 17, 2006 |
May 26, 2006 |
9 days |
| Deal Junior High School |
FM-200622070 06 5/30/06 Deal Boiler Room Repair or replace domestic hot water heater, module will not open the gas valve to start. Also replace the relief valve. No hot water. Urgent !!!!!! |
May 2, 2006 |
May 30, 2006 |
28 days |
| Kenilworth ES |
FM-200617510 06 5/31/06 Kenliworth Boiler Room Replace bolt,nuts, and flange gasket on hot water supply and return line flange on heat exchange (Bolt where removal by contractor) Heat exchange is just hanging. Urgent !!!!! |
January 18, 2006 |
May 31, 2006 |
133 days |
| Peabody Elementary School |
FM-200513612 05 5/31/06 Peabody Boiler room Replace safety valve on # 1 boiler . Per Boiler Inspector's request. |
October 7, 2005 |
May 31, 2006 |
236 days |
| Browne Junior High School |
FM-200513397 05 5/31/06 Browne Boiler Room Install isolate valves on automatic water feeder on Boilers #1-#6 Urgent !!!! |
October 3, 2005 |
May 31, 2006 |
240 days |
| Montgomery ES |
FM-200620290 06 5/31/06 Montgomery Boiler Room Asbestos assessment required on line Repair leaking pipe in closet in room #10C Urgent !!!!! Asbestos Code A - Clear for repairs on 03/24/06. Tidewater - Roger Small (RG 03/30/06) |
March 24, 2006 |
May 31, 2006 |
68 days |
| Hine JHS |
FM-200620202 06 5/31/06 Urgent Parking Lot-Repair rollers to sliding gate-will not close properly |
March 22, 2006 |
May 31, 2006 |
70 days |
| Ludlow-Taylor ES |
FM-200617922 06 5/31/06 Ludlow-Taylor Classroom #210 Flush heating coil and supply return line, line is clogged. No heat in this room. Urgent !!!!! |
January 26, 2006 |
May 31, 2006 |
125 days |
| Beers Elementary School |
FM-200516862 /05 5/31/06 Beers Room #108 (Old Building) Repair or replace leaking steam regulator valve on univent. Damaging water floor. Can not be islated. Urgent !!!!! |
December 22, 2005 |
May 31, 2006 |
160 days |
| Deal Junior High School |
FM-200620087 06 5/31/06 Deal Classroom #216 Repair or replace busted coil on heating unit. (Leaking into lower level). Can not be isolated. Urgent !!!! |
March 20, 2006 |
May 31, 2006 |
72 days |