Urgent Repair Requests Closed in June 2006 (65)
| School |
Description |
Open Date |
Close Date |
Time Elapsed |
| Moten Elementary School |
FM-200623606 06 6/1/06 Fourth floor, Boys' Restroom. Repair leaky sink, water is accumulating on the floor and could cause injury. |
May 31, 2006 |
June 1, 2006 |
1 day |
| West Elementary School |
FM-200623129 06 6/1/06 West Roof Repair or replace cooling tower. Unit fan continously runs in automatic. Urgent !!!! |
May 23, 2006 |
June 1, 2006 |
9 days |
| West Elementary School |
FM-200622101 06 6/1/06 West Boiler Room Repair or replace chiller. Appears to be phase-out (Electrical) for unit. Urgent !!!! |
May 2, 2006 |
June 1, 2006 |
30 days |
| Jefferson JHS |
FM-200513640 05 6/2/06 Jefferson Urgent Second Floor-Rm. 210 Repair extra large hole in brick wall inside class room. |
October 7, 2005 |
June 2, 2006 |
238 days |
| Meyer Elementary School |
FM-200513739 /05 6/2/06 Meyer urgent Remove the tree limb that has fell in front of the building. |
October 12, 2005 |
June 2, 2006 |
233 days |
| Wilkinson ES |
FM-200517234 06 6/2/06 First floor and Second floor restrooms. "Urgent" Need plumber to make an adjustment to water temperature, because the water is too hot in sinks and commodes. Note: Teachers have burnt their hands when washing them. |
January 7, 2006 |
June 2, 2006 |
146 days |
| Garfield ES |
FM-200513605 05 6/2/06 Garfield Urgent Outside-Cut back trees away from building. The trees are causing drains to clog up. Also remove trees by Auditorium entrance by Teachers Lounge |
October 6, 2005 |
June 2, 2006 |
239 days |
| Merritt Middle School |
FM-200513585 05 6/2/06 Merritt Urgent Third Floor-Custodian Closet Breech in wall, need to be bricked Asbestos Code A - Clear for repairs on 10/07/05. Tidewater - Tony Marcolin (RG 10/11/05) |
October 6, 2005 |
June 2, 2006 |
239 days |
| Maury Elementary School |
FM-200513549 05 6/2/06 Maury Very Urgent Grounds-Remove graffiti from exterior of building; doors, pavement, playground pad. |
October 6, 2005 |
June 2, 2006 |
239 days |
| Wilkinson ES |
FM-200516594 /05 6/2/06 Urgent:Repair 2 urinals in the boys restroom on the second floor. Need diaphragm |
December 15, 2005 |
June 2, 2006 |
169 days |
| Wilkinson ES |
FM-200339704 /03 6/2/06 (Wilkinson) !!!URGENT!!! Asbestos Assessment Required. Gym Area/Hallway: Water leaking from light fixture. Asbestos Code A - Clear for repairs on 10/30/03. Horne Engineering - Sheryll James (RG 10/31/03) |
October 30, 2003 |
June 2, 2006 |
946 days |
| Maury Elementary School |
FM-200513547 05 6/2/06 Maury Very Urgent Grounds-Re-Install fence around playground, fence was taken down for temporary boilers |
October 6, 2005 |
June 2, 2006 |
239 days |
| Young Elementary School |
FM-200513815 /05 6/2/06 Young Urgent Outside-Around Playground Repair fence |
October 13, 2005 |
June 2, 2006 |
232 days |
| Wilkinson ES |
FM-200506197 05 6/2/06 ( WILKINSON ) URGENT!!! First Floor - Pre-K Area (Girls Restroom) 1) Repair or Replace first sink faucet, its leaking and wont cut off. |
June 1, 2005 |
June 2, 2006 |
366 days |
| Wilkinson ES |
FM-200513538 05 6/2/06 Wilkinson Urgent First Floor-Kgn. Area; Boys Restroom (15) Replace or repair faucet |
October 6, 2005 |
June 2, 2006 |
239 days |
| Coolidge High School |
FM-200514064 /05 6/2/06 Coolidge Urgent Outside-Repair Main Entrance Gate To Parking Lot, It Was Bent By A Van. |
October 21, 2005 |
June 2, 2006 |
224 days |
| Backus Middle School |
FM-200513750 /05 6/2/06 Backus Urgent Front Side Of Building-Entrance Door near Gallatin St. Exit Install hand rail on the Steps, the railing has rusted away, also the steps have shifted need to be repaired |
October 12, 2005 |
June 2, 2006 |
233 days |
| Bunker Hill Elementary School |
FM-200513931 /05 6/2/06 Bunker Hill Urgent Front Entrance of Building Repair the concrete steps. |
October 18, 2005 |
June 2, 2006 |
227 days |
| Young Elementary School |
FM-200513814 /05 6/2/06 Young Urgent Outside-Court by Custodian Office Repair hole in fence |
October 13, 2005 |
June 2, 2006 |
232 days |
| Reed LC |
FM-200513551 05 6/2/06 Reed Very Urgent Grounds-18th St. Playground Cut and remove fallen tree. <Safety Hazard> |
October 6, 2005 |
June 2, 2006 |
239 days |
| Seaton Elementary School |
FM-200514753 /05 6/2/06 Seaton Proposed Wetland Ms Utility - Ticket - 5560214 1) The wetland will be located in existing school yard area and will be enclosed by an eight foot tall fence with a locked gate added for controll access and safety purposes. |
October 28, 2005 |
June 2, 2006 |
217 days |
| Truesdell Elementary |
FM-200513823 /05 6/2/06 Truesdell Urgent Outside-Hamilton St. Side Repair Fence |
October 13, 2005 |
June 2, 2006 |
232 days |
| Macfarland Middle School |
FM-200513786 /05 6/2/06 Macfarland Urgent Exterior-Rehang fence along the drive way by the front parking lot on the south east side of the building. |
October 12, 2005 |
June 2, 2006 |
233 days |
| Bancroft Elementary School |
FM-200513907 /05 6/2/06 Bancroft Urgent Outside Playground-Re-attach screws/bolts on swing equipment. |
October 18, 2005 |
June 2, 2006 |
227 days |
| Kenilworth ES |
FM-200514749 /05 6/2/06 Kenilworth Proposed Wetland Ms Utility - Ticket - 5560200 1) The wetland will be located along the side of the school and will be enclosed by an eight foot tall fence with a locked gate added for controll access and safety purposes. |
October 28, 2005 |
June 2, 2006 |
217 days |
| Reed LC |
FM-200513552 05 6/2/06 Reed Very Urgent Grounds-Playground Area Repair brick wall on the early childhood playground |
October 6, 2005 |
June 2, 2006 |
239 days |
| Peabody Elementary School |
FM-200515219 05 6/3/06 Urgent: Water meter valves are not holding and pipes are badly rusted and leaking. |
November 8, 2005 |
June 3, 2006 |
207 days |
| Wilkinson ES |
FM-200618751 06 6/5/06 Urgent First Floor-Rm. 119 (Custodial Restroom) Unclog Comode-Deeps Over Flowing |
February 16, 2006 |
June 5, 2006 |
109 days |
| Wilkinson ES |
FM-200618152 06 6/5/06 First Floor-Rm. 105 (Health Suite) Very Urgent No Hot Water Comming From The Faucet. |
February 1, 2006 |
June 5, 2006 |
124 days |
| Raymond Elementary School |
FM-200618763 06 6/5/06 Second floor, Room 23/Old Wing. "Urgent" The classroom needs electrical upgrading because the teacher cannot operate the computer lab, because the computers keep tripping the circuit breaker. Note: Need to add power poles, this process will require drilling through plaster ceiling. Asbestos Code A - Clear for repairs on 02/22/06. Tidewater - Shamika Parker (RG 02/23/06) SEE ASSESSMENTS |
February 16, 2006 |
June 5, 2006 |
109 days |
| Merritt Middle School |
FM-200621015 06 6/5/06 Third Floor-Rail missing on stairwell to gym "Fire Code Violation" Asbestos Code A - Clear for repairs on 04/06/06. DCPS Safety - Richard Gibson (RG) |
April 6, 2006 |
June 5, 2006 |
60 days |
| Cleveland Elementary School |
FM-200515355 /05 6/6/06 Cleveland Boiler Room Repair or replace burner on Boiler #1. will not lite off. Only (2) Boiler on site and the other did not pass inspection. Urgent !!!!! |
November 10, 2005 |
June 6, 2006 |
208 days |
| Spingarn High School |
FM-200618583 06 6/6/06 Spingarn Boiler Room Repair or replace condensate pump #1 and #2 are not working. Also repair or replace control starter for pumps. Losing returns form Boilers. Urgent !!!!! |
February 13, 2006 |
June 6, 2006 |
113 days |
| Spingarn High School |
FM-200515202 05 6/7/06 Urgent: Unstop custodian sink on the first floor in the custodial closet. It causes sinks in the girls restroom to become stopped up as well. |
November 8, 2005 |
June 7, 2006 |
211 days |
| Meyer Elementary School |
FM-200515188 05 6/7/06 Urgent: A Tree fell over on the 16th St side of the building where the playground is. |
November 7, 2005 |
June 7, 2006 |
212 days |
| Murch Elementary School |
FM-200623535 06 6/7/06 Murch Outside Annex Building Replace timer on split system heat pump air condition. Carrier Type: Model #38AEO16500 Volts 208/230 Amps 20 5-10 Ton Urgent !!!!! |
May 30, 2006 |
June 7, 2006 |
8 days |
| Spingarn High School |
FM-200516074 05 6/7/06 "Urgent" Second Floor, Custodian closet. Unstop sink in custodian closet. |
December 5, 2005 |
June 7, 2006 |
184 days |
| Backus Middle School |
FM-200617642 06 6/7/06 "Urgent" Lower Level, Kitchen Area. Install Circulation pump in kitchen. |
January 20, 2006 |
June 7, 2006 |
138 days |
| Cardozo High School |
FM-200515210 05 6/7/06 Urgent: Remove graffitti from the dug out in the stadium area. |
November 8, 2005 |
June 7, 2006 |
211 days |
| Park View ES |
FM-200515268 05 6/7/06 Install safety mats under playground equipment |
November 9, 2005 |
June 7, 2006 |
210 days |
| Deal Junior High School |
FM-200515034 05 6/7/06 Urgent: Bulk Trash Pick-Up At Rear Of Building By Rm. 107. |
November 3, 2005 |
June 7, 2006 |
216 days |
| Spingarn High School |
FM-200448144 04 6/8/06 (Spingarn) !!!URGENT!!! Basement/Kitchen: Request plumber to snake out drain; water will back up when running. (This drain is located near deep fryers) |
May 19, 2004 |
June 8, 2006 |
750 days |
| Thomas Elementary School |
FM-200515374 /05 6/8/06 Urgent: Outside on the field behind the cooling tower there are a couple of fox holes that need to be covered or filled. (A child almost fell in one of them) |
November 10, 2005 |
June 8, 2006 |
210 days |
| Ketcham Elementary School |
FM-200515356 /05 6/8/06 Very Urgent: Playground Area-Repair Hole in the fence. There are dogs on the other side, afraid for kids safety. |
November 10, 2005 |
June 8, 2006 |
210 days |
| Murch Elementary School |
FM-200623534 06 6/8/06 Murch Outside Annex Building Repair cooling unit (Carrier Type). Unit comes on for a second then shuts completely off. Need to check braker. Carrier Type: Model #38AEO16500 Volts 208/230 Amps 20 5-10 Ton Urgent !!!!! |
May 30, 2006 |
June 8, 2006 |
9 days |
| Wilkinson ES |
FM-200502822 05 6/8/06 (Wilkinson) "Urgent" Asbestos Assessment Required. First floor / Boys' restroom in gymnasium area. Need to repair urinal, fixture is leaking from wall on to floor. Asbestos Code A - Clear for repairs on 04/21/05. DCPS Safety - Leroy Minton Jr. (RG 04/21/05) |
March 16, 2005 |
June 8, 2006 |
449 days |
| Wilkinson ES |
FM-200618153 06 6/9/06 Very Urgent First Floor-Kgn. Area - Unstop 2 sinks, water will not go down in Ms. Burnnett classroom Note: In House Tried |
February 1, 2006 |
June 9, 2006 |
128 days |
| Bancroft Elementary School |
FM-200513908 /05 6/13/06 Bancroft Urgent Cafeteria (main bldg.) Repair water cooler due to compressor problem. |
October 18, 2005 |
June 13, 2006 |
238 days |
| Bancroft Elementary School |
FM-200515198 05 6/13/06 Urgent: Re-attach faucets in the Main Office Bathroom on the First Floor. It turns 360 degrees around and is leaking water around supply line. |
November 8, 2005 |
June 13, 2006 |
217 days |
| Bancroft Elementary School |
FM-200501056 05 6/13/06 Bancroft Main Building/Boy's Restroom Remount Urinal to wall. Asbestos Code A - Clear for repairs on 02/01/05. DCPS Safety - Leroy Minton (RG 02/01/05) |
February 1, 2005 |
June 13, 2006 |
497 days |
| Bancroft Elementary School |
FM-200514793 /05 6/14/06 Bancroft Urgent Second Floor-(primary wing) Rm. 313 Replace spud/tail pipe on toilet; unable to remove nut. |
October 31, 2005 |
June 14, 2006 |
226 days |
| Wilkinson ES |
FM-200219742 /02 6/16/06 (Wilkinson) 1st Floor Hallway/Near Room #42: Repair or replace bubbler on water fountain; students fingers are subject to injury if fingers are become wedged in between |
October 21, 2002 |
June 16, 2006 |
1,334 days |
| Wilkinson ES |
FM-200517233 06 6/16/06 First floor, Cafeteria Area Near Security Desk. "Urgent" Replace dirty filter in water fountain asap! |
January 7, 2006 |
June 16, 2006 |
160 days |
| Ballou Senior High School |
FM-200620454 06 6/19/06 First floor, Room 104/Teacher's Prep. Room & Room A104/Science Lab. "Urgent" Remove lever locks & install storage room function locks. Also furnish (4) pass keys & key to building's master key. |
March 28, 2006 |
June 19, 2006 |
83 days |
| Young Elementary School |
FM-200513187 05 6/21/06 Young Boiler Room Provide pull chain on safety relief valves on Boilers Per DC Boiler Inspector |
September 27, 2005 |
June 21, 2006 |
267 days |
| Brookland Elementary |
FM-200624297 06 6/21/06 Brookland 1st Floor Kgn Room Asbestos assessment required Repair rupture line on univent in Kgn. Room. Urgent !!!! Asbestos Code A - Clear for repairs on 06/13/06. Tidewater - Kenny Long (RG 06/14/06) SEE ASSESSMENTS |
June 14, 2006 |
June 21, 2006 |
7 days |
| Clark Elementary School |
FM-200516191 05 6/27/06 CLARK room 202 Leak in supply and return line in ceiling of room 202 from univent located in room 302. Check insulation and ceiling tile for asbestos. Asbestos Code C - on 12/08/05 Tidewater - Tony Marcolin (RG 12/09/05) Asbestos Code A - Cleared for repairs on 12/15/05 by Tidewater - Tony Marcolin (LM- 12/15/05) Safety Office 202-576-8962..................Please Note: This is a conditional Code A based on work/crew men not disturbing the ceiling tiles surrounding the opened area.. The ceiling tiles directly below the leak are negative for asbestos. |
December 8, 2005 |
June 27, 2006 |
201 days |
| Tubman Elementary School |
FM-200514465 /05 6/27/06 Tubman Boiler Room Boiler #2 Repair or replace Approx. 4" to 6" header valve. Valve leaking badly. Urgent !!!! |
October 23, 2005 |
June 27, 2006 |
247 days |
| Horace Mann Elementary School |
FM-200617909 06 6/27/06 Mann Boys Rest Room Asbestos assessment required in tunnel area under Boys bathroom on pipes Repair ruptured steam (Branch) line in Boys reset room 1-1/2" line is 1/2 isolated. Steam ceeping from floor area. Urgent !!!! Asbestos Code C - on 02/01/06. Tidewater - Samuel May (RG 02/01/06) Code A - Asbestos was abated by Motir Services per Leroy Minton Jr. comfrimed (RG 02/07/06) |
January 26, 2006 |
June 27, 2006 |
152 days |
| Shaw JHS |
FM-200621257 06 6/27/06 SHAW cooling tower Urgent Replace ruptured 1-1/4 inch line to cooling tower. Also install 1-1/4 inch coupling on same copper line. |
April 12, 2006 |
June 27, 2006 |
76 days |
| Leckie Elementary School |
FM-200619420 06 6/27/06 Leckie Boiler Room Reques for electricans to complete electrical lighting and provide safety. Additional lighting is needed behind Boiler #1 and Boiler #2. URGENT: Lights burn out |
March 3, 2006 |
June 27, 2006 |
116 days |
| Benning Elementary School |
FM-200618774 06 6/30/06 Benning Boiler Room Boiler #2 Replace leaking relief valve and bottom blow down valve. Urgent !!!!! |
February 17, 2006 |
June 30, 2006 |
133 days |
| Coolidge High School |
FM-200516506 /05 6/30/06 Coolidge Boiler Room Replace non return valve and steam stop valve on Boiler #1. Both 6 inch 300 B valve.. Urgent !!!! |
December 14, 2005 |
June 30, 2006 |
198 days |
| Hine JHS |
FM-200623428 06 6/30/06 Hine Boiler Room Repair or replace valves for missing circulating pump. Valves not holding (Leaking Badll). This effect cooling system. Urgent !!!!! |
May 26, 2006 |
June 30, 2006 |
35 days |
| Coolidge High School |
FM-200516496 /05 6/30/06 Coolidge Boiler Room Replace leaking 2" line on Boiler #1. Feed water pump. Piping 2' long flanged at one end 8 bolts union on the other line welded to flange. Urgent !!!!! |
December 14, 2005 |
June 30, 2006 |
198 days |
Routine Repair Requests Closed in June 2006 (361)
| School |
Description |
Open Date |
Close Date |
Time Elapsed |
| Gibbs Elementary School |
FM-200623687 06 6/1/06 Second Floor/Water Cooler Leaking |
June 1, 2006 |
June 1, 2006 |
0 days |
| Bowen Elementary School |
FM-200623070 06 6/1/06 Bowen Boiler room Repair (9) of 10 modular chillers , only 1 will run. |
May 22, 2006 |
June 1, 2006 |
10 days |
| Johnson JHS |
FM-200620177 06 6/1/06 Johnson Boiler room Repair or replace combustion controls for boilers # 2 and #3 burner, |
March 22, 2006 |
June 1, 2006 |
71 days |
| Green Elementary School |
FM-200622596 06 6/1/06 Green Boiler room Rerpair Trane chiller ,unit will not start. |
May 12, 2006 |
June 1, 2006 |
20 days |
| Harris, C.W. ES |
FM-200622029 06 6/1/06 1st Floor- Room 146 Replace lock on door; the room was broken into on 04/29/2006 |
May 1, 2006 |
June 1, 2006 |
31 days |
| Dunbar High School |
FM-200622768 06 6/1/06 Outside-Parking Lot By Dumpster: Remove Bulk Trash + Car In Front Of Dumpster Note: Dumpster can not be dump |
May 16, 2006 |
June 1, 2006 |
16 days |
| Bowen Elementary School |
FM-200623685 06 6/1/06 Re-hang wall hung water cooler in Gym. |
June 1, 2006 |
June 1, 2006 |
0 days |
| Stevens Elementary School |
FM-200618392 06 6/1/06 Inspection or preventive maintenance on playground equipment. |
February 7, 2006 |
June 1, 2006 |
114 days |
| Harris, C.W. ES |
FM-200622025 06 6/1/06 2nd Floor- Room 202 Replace lock on the door, |
May 1, 2006 |
June 1, 2006 |
31 days |
| Ballou Senior High School |
FM-200623351 06 6/1/06 Basement Level, Room A-1-11. Repair or Replace lock cylider on door, also remove pieces of broken master key from out of lock. Note: This door cannot be secured. |
May 25, 2006 |
June 1, 2006 |
7 days |
| Bruce-Monroe Elementary School |
FM-200620291 06 6/1/06 Bruce Monroe Boiler Room Repair or replace Boilers#1 and #2 off on flame failure Had to reset boiler #1 every morning. |
March 24, 2006 |
June 1, 2006 |
69 days |
| Plummer Elementary School |
FM-200504448 05 6/1/06 ( PLUMMER ) Second Floor - Boys Restroom 1) Repair three broken faucets, they are loose. |
April 21, 2005 |
June 1, 2006 |
406 days |
| Wilkinson ES |
FM-200515088 05 6/2/06 Repair leaking toilet and running faucet in the pre-K area restroom. (see Ms. Moten) Repair handle on flush valve in the girls restroom on the second floor. |
November 4, 2005 |
June 2, 2006 |
210 days |
| Ferebee-Hope Elementary School |
FM-200514808 /05 6/2/06 Ferebee-Hope Outside-Playground Area Preventive Maintenance of Playground Equipment |
October 31, 2005 |
June 2, 2006 |
214 days |
| Garfield ES |
FM-200514809 /05 6/2/06 Garfield Outside-Playground Area Preventive Maintenance of Playground Equipment |
October 31, 2005 |
June 2, 2006 |
214 days |
| Wilkinson ES |
FM-200617927 06 6/2/06 Second floor, Boys' restroom. Urinals are running over and the cut off valve does not work!! |
January 26, 2006 |
June 2, 2006 |
127 days |
| Aiton Elementary School |
FM-200513753 /05 6/2/06 (Aiton) Perform preventive maintenance on playground equipment. |
October 12, 2005 |
June 2, 2006 |
233 days |
| Backus Middle School |
FM-200227545 03 6/2/06 (Backus) 1st Floor/Males restroom: Total of two (2) urinals need repairs, inoperable. (Health Issue) |
March 24, 2003 |
June 2, 2006 |
1,166 days |
| Amidon Elementary School |
FM-200513921 /05 6/2/06 Amidon Exterior Grounds - Black Top 1) Need the gate fixed on the black top, gate has fallen down. Fence and gate needs to be re-hung. |
October 18, 2005 |
June 2, 2006 |
227 days |
| Backus Middle School |
FM-200458914 04 6/2/06 Backus There is no hot water in the kitchen and the middle sink is leaking. |
December 1, 2004 |
June 2, 2006 |
548 days |
| Backus Middle School |
FM-200504233 05 6/2/06 ( BACKUS ) Asbestos Assessment Required Through out Building 1) Change automatic flush valves on toilets and urinals. |
April 19, 2005 |
June 2, 2006 |
409 days |
| Backus Middle School |
FM-200508888 05 6/2/06 Backus Blitz Team 1) Repair plumbing throughout. |
July 28, 2005 |
June 2, 2006 |
309 days |
| Wilkinson ES |
FM-200516586 /05 6/2/06 Urgnet: Repair or replace a single faucet, can't cut off the water keeps leaking in rm. 90 (Pre-K girls restroom) on the first floor. |
December 15, 2005 |
June 2, 2006 |
169 days |
| Backus Middle School |
FM-200514443 05 6/2/06 Backus Sinks 2 & 4 needs repairing. The sink is leaking. |
September 12, 2005 |
June 2, 2006 |
263 days |
| Backus Middle School |
FM-200623347 06 6/2/06 2nd Floor- Rooms 209 & 211 These door handles need to be replaced. Room 211 can easily be opened by giggling the handle. Locks are not holding. |
May 25, 2006 |
June 2, 2006 |
8 days |
| Winston EC |
FM-200514412 /05 6/2/06 Winston Remove trash around dumpster & bulkey exercise equipment left outside gym doors by contractors. |
October 21, 2005 |
June 2, 2006 |
224 days |
| Winston EC |
FM-200514306 /05 6/2/06 Winston Exterior 1) Remove graffitti on back and side of building. West end of building near grassy hill. |
October 23, 2005 |
June 2, 2006 |
222 days |
| Wilson High School |
FM-200514496 /05 6/2/06 (Wilson) Near the teachers' parking lot going into the stadium on the grass on Fort Drive, near the boiler room. Remove the bushes and branches from the grounds. |
October 23, 2005 |
June 2, 2006 |
222 days |
| Wilkinson ES |
FM-200516584 /05 6/2/06 Urgnet: Repair or replace the flush handle it's leaking in the 3rd stall to the left in rm. 184 (girls restroom) on the second floor. |
December 15, 2005 |
June 2, 2006 |
169 days |
| Ballou Senior High School |
FM-200623123 06 6/2/06 3rd Fl.-Rm. 312/1st Fl. Rm. 123-Install locks on the doors, the doors were recently installed and the rooms can't be secured. |
May 23, 2006 |
June 2, 2006 |
10 days |
| Wilkinson ES |
FM-200516583 /05 6/2/06 Urgnet: Unstop comode in the 4th stall to the right in the girls restroom (kgn.) on the first floor. |
December 15, 2005 |
June 2, 2006 |
169 days |
| Wilkinson ES |
FM-200516582 /05 6/2/06 Urgnet: Repair the loose/leaking single faucet on the sink in the boys restroom (kgn.) on the first floor |
December 15, 2005 |
June 2, 2006 |
169 days |
| Wilkinson ES |
FM-200516581 /05 6/2/06 Urgnet: Repair or replace the faucet in rm. 99 (office restroom) on the first floor. |
December 15, 2005 |
June 2, 2006 |
169 days |
| Wilkinson ES |
FM-200514657 /05 6/2/06 Wilkinson First Floor - 127 - Kitchen 1) Need to repair/fix...there is no hot water in Kitchen. First Floor - 99- Restroom 2) Need to replace faucet, seat and washer. |
October 26, 2005 |
June 2, 2006 |
219 days |
| Bancroft Elementary School |
FM-200514794 /05 6/2/06 Bancroft Outside-Playground Re-attach screws/bolts on swing equipment |
October 31, 2005 |
June 2, 2006 |
214 days |
| Wilkinson ES |
FM-200514656 /05 6/2/06 Wilkinson First and Second Floor - Bathrooms 1) Need to replace ( 12 ) open front elongated toilet seats for commodes. |
October 26, 2005 |
June 2, 2006 |
219 days |
| Wilkinson ES |
FM-200500486 05 6/2/06 (Wilkinson) !!!EMERGENCY!!! 2nd Floor/Boys Restroom: Urinal over-flowing; shutoff valve broken. |
January 14, 2005 |
June 2, 2006 |
504 days |
| Wilkinson ES |
FM-200458866 04 6/2/06 Wilkinson Second floor girls bathroom Need to repair flush valve. |
December 1, 2004 |
June 2, 2006 |
548 days |
| Wilkinson ES |
FM-200458684 /04 6/2/06 Wilkinson Second floor girls bathroom Need to repair or replace flush valve. |
November 24, 2004 |
June 2, 2006 |
555 days |
| Wilkinson ES |
FM-200456353 04 6/2/06 Wilkinson First floor 44 women bathroom gym area Need to replace seat and washer for sink. Need to replace diaphragm on commode. |
October 1, 2004 |
June 2, 2006 |
609 days |
| Wilkinson ES |
FM-200334658 03 6/2/06 Wilkinson Outside Kgn. Area playground Drain need to be unclogged. Standing water for mosquitoes and bug nest area. |
August 7, 2003 |
June 2, 2006 |
1,030 days |
| Wilkinson ES |
FM-200213984 02 6/2/06 Wilkinson 1. Asbestos Assessment Reqd. 1st Floor Room 93 Pre-K 2. Repair pipe that is leaking water from the ceiling. Asbestos Code A-clear for repair by Horne Engineer ( Edward Rodriguez ) Charles Buchanan on 8/13/02 |
August 9, 2002 |
June 2, 2006 |
1,393 days |
| Webb Elementary School |
FM-200623765 06 6/2/06 1st Floor- Learning Center 1 Ballasts and lights are smoking in the Pre-Kindergarten area. |
June 2, 2006 |
June 2, 2006 |
0 days |
| Walker-Jones EC |
FM-200622400 06 6/2/06 Repair sliding gate on the back field, think it's a wheel missing and the gate might fall. |
May 9, 2006 |
June 2, 2006 |
24 days |
| Tubman Elementary School |
FM-200513742 /05 6/2/06 Tubman Remove graffiti around the outside of the building. |
October 12, 2005 |
June 2, 2006 |
233 days |
| Benning Elementary School |
FM-200514583 /05 6/2/06 Benning Exterior Play ground Preventative Maintence on the play ground equiiptment |
October 25, 2005 |
June 2, 2006 |
220 days |
| Stanton Elementary School |
FM-200514280 /05 6/2/06 Stanton Exterior Grounds - Flower Garden 1) Cement (6) benches into the ground. |
October 22, 2005 |
June 2, 2006 |
223 days |
| Stanton Elementary School |
FM-200514279 /05 6/2/06 Stanton Exterior Grounds - Alabama Ave 1) Car ran into fence. |
October 22, 2005 |
June 2, 2006 |
223 days |
| Brookland Elementary |
FM-200514124 /05 6/2/06 Brookland Playground 1) Repair chain link fence. |
October 22, 2005 |
June 2, 2006 |
223 days |
| Brookland Elementary |
FM-200514731 /05 6/2/06 (Brookland) "Utgent" Rear Exterior. Repair damaged chain link fence. |
October 27, 2005 |
June 2, 2006 |
218 days |
| Sousa Middle School |
FM-200514668 /05 6/2/06 Sousa Outside parking lot steps Remove Graffitti From Steps |
October 26, 2005 |
June 2, 2006 |
219 days |
| Roosevelt High School |
FM-200621571 06 6/2/06 Check electrical line to cooling tower/votage drop-See: Mr. Davis |
April 20, 2006 |
June 2, 2006 |
43 days |
| Randle-Highlands ES |
FM-200623088 06 6/2/06 Playground Replace 2' x 2' broken plexiglass in playground equipment. |
May 22, 2006 |
June 2, 2006 |
11 days |
| Plummer Elementary School |
FM-200623536 06 6/2/06 Second Floor - Hallway - 1) Repair leaking water fountains. |
May 30, 2006 |
June 2, 2006 |
3 days |
| Nalle Elementary School |
FM-200623686 06 6/2/06 Second Floor/Custodial - Unclog drain |
June 1, 2006 |
June 2, 2006 |
1 day |
| Young Elementary School |
FM-200514225 /05 6/2/06 Young Outside By Playground 1) Repair fence around large playground. Fence has been cut in different areas. |
October 22, 2005 |
June 2, 2006 |
223 days |
| Clark Elementary School |
FM-200514541 /05 6/2/06 Clark Exterior Grounds 1) Remove Bulk Trash. |
October 24, 2005 |
June 2, 2006 |
221 days |
| Clark Elementary School |
FM-200514755 /05 6/2/06 Clark Exterior Play ground Preventative Maintence on the play ground equiiptment |
October 28, 2005 |
June 2, 2006 |
217 days |
| Moten Elementary School |
FM-200623690 06 6/2/06 Fourth floor, Boys' Restroom/Newside. Water is running continuously and cannot be shut off. |
June 1, 2006 |
June 2, 2006 |
1 day |
| Davis Elementary School |
FM-200514756 /05 6/2/06 Davis Exterior Play ground Preventative Maintence on the play ground equiiptment |
October 28, 2005 |
June 2, 2006 |
217 days |
| Draper Elementary School |
FM-200514118 /05 6/2/06 Draper Playground 1) Remove piles of debris from playground. Trash put in bags by Volunteers. |
October 22, 2005 |
June 2, 2006 |
223 days |
| Horace Mann Elementary School |
FM-200514239 /05 6/2/06 (Horace Mann) Outside, Parking Lot Area. Need concrete stops for parking lot so cars will not roll down hill at the entrance of building. |
October 22, 2005 |
June 2, 2006 |
223 days |
| Ludlow-Taylor ES |
FM-200513414 05 6/2/06 Ludlow-Taylor Grounds area near Dumpster Area Remove Bulk trash from area |
October 3, 2005 |
June 2, 2006 |
242 days |
| Lafayette Elementary School |
FM-200514811 /05 6/2/06 Lafayette Outside-Playground Area Preventive Maintenance of Playground Equipment |
October 31, 2005 |
June 2, 2006 |
214 days |
| Kenilworth ES |
FM-200514630 /05 6/2/06 (Kenilworth) Exterior of Building. Install 30' X 8' of fence for wetland project. Gate needs to be installed for access. |
October 25, 2005 |
June 2, 2006 |
220 days |
| Jefferson JHS |
FM-200623588 06 6/2/06 Main Floor (by library) / Water Fountain Off The Wall - Water Leaking Everywhere - Can't Cut The Water Off |
May 31, 2006 |
June 2, 2006 |
2 days |
| Woodson High School |
FM-200619219 06 6/5/06 Ground Floor-Need Welder To Fix Cafeteria Tables |
February 28, 2006 |
June 5, 2006 |
97 days |
| Ronald H. Brown MS |
FM-200622512 06 6/5/06 First Floor-Stairwell #8 exit door to outside need adjustment |
May 11, 2006 |
June 5, 2006 |
25 days |
| Spingarn High School |
FM-200225622 03 6/5/06 Spingarn Basement by stairway # 3 Requesting a plummer to survey water leak that is under the stairs to the armory. |
February 11, 2003 |
June 5, 2006 |
1,210 days |
| Ronald H. Brown MS |
FM-200622494 06 6/5/06 Second Floor-Nissing door hardware (closer) to building #2 |
May 11, 2006 |
June 5, 2006 |
25 days |
| Ronald H. Brown MS |
FM-200622487 06 6/5/06 Second Floor-Missing hardware for stairwell door #11 (Door closer) |
May 11, 2006 |
June 5, 2006 |
25 days |
| Ronald H. Brown MS |
FM-200622483 06 6/5/06 Second Floor-Broken door closer for room #218 |
May 11, 2006 |
June 5, 2006 |
25 days |
| Ronald H. Brown MS |
FM-200622467 06 6/5/06 Third Floor-Missing door knob handle for room #310 |
May 11, 2006 |
June 5, 2006 |
25 days |
| Wilkinson ES |
FM-200507543 05 6/5/06 (Summer School Project) Repair or replace water coolers, and check all bathrooms in the building. |
July 7, 2005 |
June 5, 2006 |
333 days |
| Spingarn High School |
FM-200501764 05 6/5/06 Spingarn ( High School Bathroom Survey Report ) Third Floor - Boys Restroom - Replace (3) Urinal Flush Valves and Install (1) Water Closet Flush Valve Third Floor - Boys Restroom ( court) - Replace (4) Faucets Set Second Floor - Boys Restroom - Replace (1) Faucet Set and Replace (6) Urinal Flush Valves Second Floor - Boys Restroom - Replace (1) Faucet Set Day Care - Replace (2) Faucets Sets First Floor - Boys Restroom - Replace (2) Faucets,Replace (2) Urinals,Connect Urinals To Drain Line and Replace (2) Water Closet Flush Valves First Floor - Girls Restroom - Replace (2) Faucets Set,Replace (1) Water Closet Flush Valve Boys Locker Room - Replace (1) Urinal Flush Valve and Replace (2) Water Closet Flush Valves |
February 18, 2005 |
June 5, 2006 |
472 days |
| Eliot Junior High School |
FM-200623672 06 6/5/06 Marking of field for baseball game on 5/17/06 |
June 1, 2006 |
June 5, 2006 |
4 days |
| Webb Elementary School |
FM-200623585 06 6/5/06 1st Floor- Kitchen There is no hot water in the kitchen. |
May 31, 2006 |
June 5, 2006 |
5 days |
| West Elementary School |
FM-200623790 06 6/5/06 Lights in half of the building is out...Call pepco maybe a phaser..Call Electrican - 6:50 am. |
June 5, 2006 |
June 5, 2006 |
0 days |
| Wilkinson ES |
FM-200217212 02 6/5/06 (Wilkinson) Basement Garage Drain in garage is stopped up. |
September 10, 2002 |
June 5, 2006 |
1,364 days |
| Wilkinson ES |
FM-200222323 /02 6/5/06 Wlikinson First floor - Kgn area Three - need to replace delay to sloan flush valve. |
December 10, 2002 |
June 5, 2006 |
1,273 days |
| Wilkinson ES |
FM-200340364 /03 6/5/06 Wilkinson Repair bradley basin in girls room 19. |
November 17, 2003 |
June 5, 2006 |
931 days |
| Wilkinson ES |
FM-200445092 04 6/5/06 Wilkinson ( Maintenance T School Blitz ) 1) Remove Bradley Basins and replace with hand sinks. Asbestos Code A - Clear for repairs on 03/11/04. Horne Engineering - Philp Connolly (RG 03/29/04) |
March 9, 2004 |
June 5, 2006 |
818 days |
| Browne Junior High School |
FM-200621230 06 6/5/06 2nd Floor- Room 237 New Wing Lock needs to fixed. |
April 12, 2006 |
June 5, 2006 |
54 days |
| Roosevelt High School |
FM-200621576 06 6/5/06 Second floor landing by room 216. Repair guard rail and guard post. The rail and guard post need to be welded back to the frame of the door. |
April 20, 2006 |
June 5, 2006 |
46 days |
| Rudolph Elementary School |
FM-200618697 06 6/5/06 First Floor-Rm. 112 (new wing) Replace broken door lock. |
February 15, 2006 |
June 5, 2006 |
110 days |
| Ronald H. Brown MS |
FM-200622539 06 6/5/06 First Floor/Kitchen-Broken door hardware (closer) (loading dock area) |
May 11, 2006 |
June 5, 2006 |
25 days |
| Backus Middle School |
FM-200512754 05 6/5/06 Backus First Floor 1) Custodian Office - Sink line is stopped up. 2) Rec Area - Toilet is leaking from the pipe handle and also need a wax ring. |
September 16, 2005 |
June 5, 2006 |
262 days |
| Ronald H. Brown MS |
FM-200622526 06 6/5/06 First Floor-Room 109: Door hardware broken (closer) |
May 11, 2006 |
June 5, 2006 |
25 days |
| Ronald H. Brown MS |
FM-200622523 06 6/5/06 First Floor-Exit door in stairwell #9 to outside (left exit door will not open) |
May 11, 2006 |
June 5, 2006 |
25 days |
| Spingarn High School |
FM-200204112 02 6/5/06 (Spingarn) 2nd floor/ room 219 Replace old faucets in home-economics room and joining room. Replace (8) eight ea. faucets. Hot water side leaking, very old equipment. |
March 8, 2002 |
June 5, 2006 |
1,550 days |
| Hart Middle School |
FM-200621261 06 6/5/06 Front Entrance Door. Rekey main entrance door, due to issues of security. Note: The custodian forman needs (6) new keys in total |
April 12, 2006 |
June 5, 2006 |
54 days |
| Wilkinson ES |
FM-200500376 05 6/5/06 WILKINSON GARAGE AREA UNSTOP DRAINS IN AREA |
January 12, 2005 |
June 5, 2006 |
509 days |
| Spingarn High School |
FM-200213773 02 6/5/06 Spingarn Basement/Southwest Tunnel Area Replace 3" P-trap in south-west part of tunnel---water is backs up in the line whever it rains and the trap is missing. |
August 7, 2002 |
June 5, 2006 |
1,398 days |
| Leckie Elementary School |
FM-200623057 06 6/6/06 First Floor - Girls Restroom - Third stall stopped up...Custodian snaked out...still stopped up... |
May 22, 2006 |
June 6, 2006 |
15 days |
| Backus Middle School |
FM-200226506 03 6/6/06 Backus Second floor boy lavatory in rec area no water for hand washing. |
March 4, 2003 |
June 6, 2006 |
1,190 days |
| Backus Middle School |
FM-200339241 /03 6/6/06 Backus Second floor kitchen Investigate water coming through light fixtures. |
October 21, 2003 |
June 6, 2006 |
959 days |
| Backus Middle School |
FM-200340539 /03 6/6/06 Backus First floor boys lavatory Remount hand sink to wall. Support brackett is bent. Asbestos Code A - Clear for repairs on 11/20/03. Horne Engineering - Tony Marcolin ( RG 11/21/03 ) |
November 20, 2003 |
June 6, 2006 |
929 days |
| Backus Middle School |
FM-200623538 06 6/6/06 Rooms 303 The handle is missing (handle was lock). Install a new handle. |
May 30, 2006 |
June 6, 2006 |
7 days |
| Backus Middle School |
FM-200623620 06 6/6/06 2nd Floor Teacher's Lounge- handle is missing |
May 31, 2006 |
June 6, 2006 |
6 days |
| Backus Middle School |
FM-200623621 06 6/6/06 2nd Floor Room 212- handle is loose |
May 31, 2006 |
June 6, 2006 |
6 days |
| Backus Middle School |
FM-200623623 06 6/6/06 2nd Floor Near Room 214- handle is missing and panic bar is loose |
May 31, 2006 |
June 6, 2006 |
6 days |
| Bowen Elementary School |
FM-200516263 /05 6/6/06 BOWEN boiler room Check operation and replace hi-limit control switch on boiler # 2 |
December 10, 2005 |
June 6, 2006 |
178 days |
| Bowen Elementary School |
FM-200619227 06 6/6/06 Bowen Boiler Room Boiler #1 Flame failure, Lock out |
March 1, 2006 |
June 6, 2006 |
97 days |
| Merritt Middle School |
FM-200621006 06 6/6/06 Third Floor-Latch broken on exit door-Third Floor East Quarters. "Fire Code Violation" |
April 6, 2006 |
June 6, 2006 |
61 days |
| Merritt Middle School |
FM-200621018 06 6/6/06 Third Floor-Exit door panic bar broken gym back door stairwell exit. "Fire Code Violation" |
April 6, 2006 |
June 6, 2006 |
61 days |
| School WW High School |
FM-200623982 06 6/6/06 Second Floor- Rooms 208 Need electricians to perform electrical assessment for installation of a/c units in the aforementioned areas. NOTE: School has purchased window air conditioning units for above locations Make - Frigidaire model # FAS156N1A 1PH, 115V / 60Hz 15100 BTUs |
June 6, 2006 |
June 6, 2006 |
0 days |
| School WW High School |
FM-200623983 06 6/6/06 Third Floor- Rooms 303 Need electricians to perform electrical assessment for installation of a/c units in the aforementioned areas. NOTE: School has purchased window air conditioning units for above locations Make - Frigidaire model # FAS156N1A 1PH, 115V / 60Hz 15100 BTUs |
June 6, 2006 |
June 6, 2006 |
0 days |
| School WW High School |
FM-200623984 06 6/6/06 Third Floor- Room 304 Need electricians to perform electrical assessment for installation of a/c units in the aforementioned areas. NOTE: School has purchased window air conditioning units for above locations Make - Frigidaire model # FAS156N1A 1PH, 115V / 60Hz 15100 BTUs |
June 6, 2006 |
June 6, 2006 |
0 days |
| School WW High School |
FM-200623985 5 6/6/06 6/6/06 Third Floor- Room 306 Need electricians to perform electrical assessment for installation of a/c units in the aforementioned areas. NOTE: School has purchased window air conditioning units for above locations Make - Frigidaire model # FAS156N1A 1PH, 115V / 60Hz 15100 BTUs |
June 6, 2006 |
June 6, 2006 |
0 days |
| School WW High School |
FM-200623987 7 6/6/06 6/6/06 Third Floor- Room 307 Need electricians to perform electrical assessment for installation of a/c units in the aforementioned areas. NOTE: School has purchased window air conditioning units for above locations Make - Frigidaire model # FAS156N1A 1PH, 115V / 60Hz 15100 BTUs |
June 6, 2006 |
June 6, 2006 |
0 days |
| School WW High School |
FM-200623988 8 6/6/06 6/6/06 Third floor- Room 308. Need electricians to perform electrical assessment for installation of a/c units in the aforementioned areas. NOTE: School has purchased window air conditioning units for above locations Make - Frigidaire model # FAS156N1A 1PH, 115V / 60Hz 15100 BTUs |
June 6, 2006 |
June 6, 2006 |
0 days |
| Tyler Elementary School |
FM-200623071 06 6/6/06 Tyler Boiler room Repair Modular chillers, unit will not start. |
May 22, 2006 |
June 6, 2006 |
15 days |
| Park View ES |
FM-200510193 05 6/7/06 Park View Fire Code Violation Room 115-Floor Breech Asbestos Code A - Clear for repairs on 07/16/05. Tidewater - Paul Berman (RG 08/17/05) |
August 11, 2005 |
June 7, 2006 |
300 days |
| Turner Elementary School |
FM-200623512 06 6/7/06 2nd Floor- Nurses New Suite; Room 200 The lock needs to be replaced on the new Nurses Suite. She cannot secure medical records. |
May 30, 2006 |
June 7, 2006 |
8 days |
| Orr Elementary School |
FM-200514983 05 6/7/06 Perform preventive maintenance on playground equipment. |
November 2, 2005 |
June 7, 2006 |
217 days |
| Plummer Elementary School |
FM-200514986 05 6/7/06 Perform preventive maintenance on playground equipment. |
November 2, 2005 |
June 7, 2006 |
217 days |
| Tubman Elementary School |
FM-200515067 05 6/7/06 Replace ridding horses on playground equipment on the playground. (Ridding horses are in building |
November 3, 2005 |
June 7, 2006 |
216 days |
| Horace Mann Elementary School |
FM-200514814 /05 6/7/06 Mann Outside-Playground Area Preventive Maintenance of Playground Equipment |
October 31, 2005 |
June 7, 2006 |
219 days |
| Truesdell Elementary |
FM-200515031 05 6/7/06 Hamilton St. Side of building Repair fence that is lying on the ground |
November 3, 2005 |
June 7, 2006 |
216 days |
| Raymond Elementary School |
FM-200510836 05 6/7/06 Raymond Fire code Violation First Floor-Exit door need adjustment (gets stuck) in incinerator room-2003 DC Supp 110.1(12) Asbestos Code A - Clear for repairs on 08/22/05. Tidewater - Kenny Long (RG 08/23/05) |
August 19, 2005 |
June 7, 2006 |
292 days |
| Raymond Elementary School |
FM-200510771 05 6/7/06 Raymond Fire code Violation Second Floor-Stairell door need adjustment (does not close properly)-2000 IFC 703.2.3 Code A-clear for repair by DCPS Charles Buchanan on 8/19/05 |
August 18, 2005 |
June 7, 2006 |
293 days |
| Raymond Elementary School |
FM-200510732 05 6/7/06 Raymond Fire code Violation Third Floor-Missing floor tile (tripping hazard) -2003 DC Supp. 110.1 (1,3) room 35 Asbestos Code A - Clear for repairs on 08/19/05. Tidewater -Paul Berman (RG 08/23/05) |
August 18, 2005 |
June 7, 2006 |
293 days |
| Raymond Elementary School |
FM-200510879 05 6/7/06 Raymond Fire code Violation First Floor-Missing ceiling tile and (2) storage rooms need light fixture covers-2003 DC Supp. 110.1 (1) Asbestos Code A - Clear for repairs on 08/23/05. Tidewater - Paul Berman (RG 08/25/05) |
August 22, 2005 |
June 7, 2006 |
289 days |
| Payne Elementary School |
FM-200623506 06 6/7/06 First floor, Exterior exit door leading to the playground. Repair or Replace malfunctioning panic bar. Note: This door cannot be secured properly. |
May 30, 2006 |
June 7, 2006 |
8 days |
| Raymond Elementary School |
FM-200510885 05 6/7/06 Raymond Fire code Violation Second Floor-New Wing Missing ceiling tile in hallway near #217-2003 DC Supp. 110.1 (1) Code A - Clear for repairs on 08/23/05. Tidewater - Paul Berman (RG 08/24/05) |
August 22, 2005 |
June 7, 2006 |
289 days |
| Anacostia Senior High School |
FM-200622930 06 6/7/06 Secure six file cabinet locks and two desk locks in main office to secure files. |
May 17, 2006 |
June 7, 2006 |
21 days |
| Backus Middle School |
FM-200509238 05 6/7/06 Backus "Fire Code Violation" Second Floor Replace ceiling tile throughout second floor IFC 110.0 HA 027 Ceiling tile off white 12" X 12" with gouges No Asbestos HA 028 Ceiling tile white tile 2' X 4' gouged & pinholes No Asbestos HA 029 Ceiling tile white 2' X 4' with random gouges & pinhole No Asbestos HA 031 Ceiling tile white 2' X 2' with textured finish & pinholes No Asbestos Code A-clear for repair by DCPS Charles Buchanan on 8/3/05 |
August 1, 2005 |
June 7, 2006 |
310 days |
| Backus Middle School |
FM-200509239 05 6/7/06 Backus "Fire Code Violation" First Floor Replace ceiling tile throughout first floor IFC 110.0 HA 027 Ceiling tile off white 12" X 12" with gouges No Asbestos HA 028 Ceiling tile white tile 2' X 4' gouged & pinholes No Asbestos HA 029 Ceiling tile white 2' X 4' with random gouges & pinhole No Asbestos HA 031 Ceiling tile white 2' X 2' with textured finish & pinholes No Asbestos Code A-clear for repair by DCPS Charles Buchanan on 8/3/05 |
August 1, 2005 |
June 7, 2006 |
310 days |
| Backus Middle School |
FM-200512816 05 6/7/06 (Backus) "Emergency" Repair ruptured 4" galvanized water line from street into building, This is the main water l;ine from the street to the school. Note: WASA was contacted (Ms. Anderson) |
September 19, 2005 |
June 7, 2006 |
261 days |
| Ronald H. Brown MS |
FM-200623998 06 6/7/06 Kitchen - Grease trap and all drains are stopped up... |
June 7, 2006 |
June 7, 2006 |
0 days |
| Harris, C.W. ES |
FM-200624014 06 6/7/06 First floor, Principal's Office. Need locksmith to unlock principal's office because she left her keys at home. Note: The principal needs to gain access to her office asap!! |
June 7, 2006 |
June 7, 2006 |
0 days |
| Patricia R Harris Ed Center |
FM-200623106 06 6/7/06 Harris, P.R. Boiler Room Replace (1) leaking tube in Boiler #1. Tube has a pinholein it. |
May 23, 2006 |
June 7, 2006 |
15 days |
| Bancroft Elementary School |
FM-200515148 05 6/7/06 Playground-Near Cafeteria: Replace/Repair steps leading to cafeteria badly deteriorated and trip hazard. |
November 7, 2005 |
June 7, 2006 |
212 days |
| Spingarn High School |
FM-200455196 04 6/7/06 Spingarn Kitchen Need plumber to snake out drain where the deep frier is, water comes back up. |
September 20, 2004 |
June 7, 2006 |
625 days |
| Moten Elementary School |
FM-200514982 05 6/7/06 Perform preventive maintenance on playground equipment. |
November 2, 2005 |
June 7, 2006 |
217 days |
| Spingarn High School |
FM-200458205 /04 6/7/06 Spingarn Requesting a plumber to survey the faucets water leaks an stop running. |
November 12, 2004 |
June 7, 2006 |
572 days |
| Kramer Middle School |
FM-200624012 06 6/7/06 Kitchen/Pot Sink Stopped Up |
June 7, 2006 |
June 7, 2006 |
0 days |
| Hine JHS |
FM-200514975 05 6/7/06 Repair hole in fence by basketball court. |
November 2, 2005 |
June 7, 2006 |
217 days |
| Payne Elementary School |
FM-200514985 05 6/7/06 Perform preventive maintenance on playground equipment. |
November 2, 2005 |
June 7, 2006 |
217 days |
| Spingarn High School |
FM-200501047 05 6/7/06 Spingarn Room 207 1) Repair leak in ceiling. |
February 1, 2005 |
June 7, 2006 |
491 days |
| Duke Ellington School |
FM-200514873 /05 6/7/06 Bulk Trash Pick-Up |
October 31, 2005 |
June 7, 2006 |
219 days |
| Spingarn High School |
FM-200505015 05 6/7/06 ( SPINGARN ) Basement - Kitchen 1) Requesting a plummer to snake out drain where the deep fryer sat. |
May 2, 2005 |
June 7, 2006 |
401 days |
| Merritt Middle School |
FM-200514981 05 6/7/06 Perform preventive maintenance on playground equipment. |
November 2, 2005 |
June 7, 2006 |
217 days |
| West Elementary School |
FM-200514979 05 6/7/06 Remove graffiti from Outside-Kindergarten Play Area |
November 2, 2005 |
June 7, 2006 |
217 days |
| Spingarn High School |
FM-200515932 05 6/7/06 Emergency: Repair the leaking pipe in the girls locker room. |
December 1, 2005 |
June 7, 2006 |
188 days |
| Walker-Jones EC |
FM-200623589 06 6/7/06 First floor, Main Lobby. Repair or Replace water fountain, no water is coming out. |
May 31, 2006 |
June 7, 2006 |
7 days |
| Leckie Elementary School |
FM-200514812 /05 6/7/06 Leckie Outside-Playground Area Preventive Maintenance of Playground Equipment |
October 31, 2005 |
June 7, 2006 |
219 days |
| Raymond Elementary School |
FM-200510799 05 6/7/06 Raymond Fire code Violation First Floor-Floor tile missing/need repair in multipurpose room 2003 DC Supp. 110.1(1,3) Asbestos Code A - Clear for repairs on 08/19/05. Tidewater -Paul Berman (RG 08/23/05) |
August 19, 2005 |
June 7, 2006 |
292 days |
| Spingarn High School |
FM-200516554 /05 6/7/06 Asbestos Assessment Required. "Emergency" First floor, Room 115. Assess & Repair leak in ceiling. Asbestos Code A - Clear for repairs on 12/16/05. Tidewater - Roger Small (RG 12/19/05) |
December 15, 2005 |
June 7, 2006 |
174 days |
| Aiton Elementary School |
FM-200514904 /05 6/7/06 Install chain link gate 3'x6' in the teachers parking lot also install chain link gate adjcent sidewalk to the rear of building. |
October 31, 2005 |
June 7, 2006 |
219 days |
| Smothers ES |
FM-200515282 05 6/8/06 Perform preventive maintenance on playground equipment. |
November 9, 2005 |
June 8, 2006 |
211 days |
| Wilkinson ES |
FM-200621806 06 6/8/06 1st Floor- Gym Area There is a stopped up urinal in the boy's bathroom. |
April 26, 2006 |
June 8, 2006 |
43 days |
| Wilkinson ES |
FM-200456359 04 6/8/06 Wilkinson First floor 58 gym area boy bathroom Need to replace flush valve and stop and handle. |
October 1, 2004 |
June 8, 2006 |
615 days |
| Walker-Jones EC |
FM-200515290 05 6/8/06 Perform preventive maintenance on playground equipment. |
November 9, 2005 |
June 8, 2006 |
211 days |
| Tyler Elementary School |
FM-200515288 05 6/8/06 Perform preventive maintenance on playground equipment. |
November 9, 2005 |
June 8, 2006 |
211 days |
| Turner Elementary School |
FM-200515287 05 6/8/06 Perform preventive maintenance on playground equipment. |
November 9, 2005 |
June 8, 2006 |
211 days |
| Tubman Elementary School |
FM-200515377 /05 6/8/06 Parking Lot Remove Sofa |
November 10, 2005 |
June 8, 2006 |
210 days |
| Beers Elementary School |
FM-200624011 06 6/8/06 First Floor/Back Exit Door (by B3) -Bolt lock has been kicked off the door. |
June 7, 2006 |
June 8, 2006 |
1 day |
| Stoddert ES |
FM-200515284 05 6/8/06 Perform preventive maintenance on playground equipment. |
November 9, 2005 |
June 8, 2006 |
211 days |
| Wilkinson ES |
FM-200622090 06 6/8/06 2nd Floor- Room 184 Girl's Restroom Two toilets need to be repaired; they will not flush properly. |
May 2, 2006 |
June 8, 2006 |
37 days |
| Spingarn High School |
FM-200455628 04 6/8/06 Spingarn First floor health suite Unstopped sink. |
September 24, 2004 |
June 8, 2006 |
622 days |
| Spingarn High School |
FM-200455537 04 6/8/06 (Spingarn) 1st Floor/Health Suite: Unstop sink with black chemicals present. |
September 23, 2004 |
June 8, 2006 |
623 days |
| Slowe Elementary School |
FM-200624051 06 6/8/06 First Floor/Boy's Restroom - Urinal Is Leaking From The Rear - Could Not Cut The Water Off |
June 8, 2006 |
June 8, 2006 |
0 days |
| Eastern High School |
FM-200624001 06 6/8/06 Boy's Restroom/Across From B-79 - Urinal is loose from the wall, waste water is leaking down to the room under the restroom. |
June 7, 2006 |
June 8, 2006 |
1 day |
| Wilkinson ES |
FM-200622084 06 6/8/06 1st Floor- Boys Restroom (gym area-58) The urinal flush valve (3-180) needs to be replaced. |
May 2, 2006 |
June 8, 2006 |
37 days |
| Oyster Elementary School |
FM-200624048 /8/06 6/8/06 Oyster Classrooms #404 and #301 Repair or replace heat pumps for cooling and heating. Made by Mr Quay- A/C Company Part #210979200 Made - WFDSI 036K200-200 AA12ZZB1 Volts 460 HZ 60 PH3 Motor: Volts 460 FLA 1.6 LRA 3.5 HZ 60 PH 1 HP 1/2 Compressor: Volts 460 FLA-5.1 HZ 60 PH 3 LRA 33.0 Repair or replace compressor will not stay on, keep cutting off on low pressure. |
June 8, 2006 |
June 8, 2006 |
0 days |
| Wilkinson ES |
FM-200622246 06 6/9/06 Second Fl.-Girls Restroom: Flush valve leaking again, water was cut off. |
May 5, 2006 |
June 9, 2006 |
35 days |
| Browne Junior High School |
FM-200624020 06 6/9/06 Second floor, Room 237. Repair or Replace door lock, staff are unable to gain access to classroom. Note: There appear to be something broke off in the lock. |
June 7, 2006 |
June 9, 2006 |
2 days |
| Wilkinson ES |
FM-200505673 05 6/9/06 Wilkinson First fl. girls Restroom/ Pre-K-Area Repair the Faucet |
May 18, 2005 |
June 9, 2006 |
387 days |
| Plummer Elementary School |
FM-200504422 05 6/9/06 ( PLUMMER ) Third Floor - Boys Restroom 1) Replace broken sink. |
April 21, 2005 |
June 9, 2006 |
414 days |
| Browne Junior High School |
FM-200623944 06 6/9/06 Gymnasium/Girl's Restroom Hallway Need A Door Handle/Lock |
June 6, 2006 |
June 9, 2006 |
3 days |
| Marshall Educational Center |
FM-200619614 06 6/9/06 Exterior Front Entrance. Remove derogative graffitti from off of front entrance. |
March 7, 2006 |
June 9, 2006 |
94 days |
| Webb Elementary School |
FM-200624029 06 6/9/06 First Floor/Vault Door Near Main Office: Replace Lock, It's Broken |
June 7, 2006 |
June 9, 2006 |
2 days |
| Wilkinson ES |
FM-200446881 04 6/9/06 Wilkinson First floor 58 gym area boys bathroom Need to replace back urinal on wall. Asbestos Code A - Clear for repairs on 04/20/04. Horne Engineering - Bjarne Smith (RG 04/21/04) SEE LINKED DOCUMENTS |
April 20, 2004 |
June 9, 2006 |
780 days |
| Houston Elementary School |
FM-200624154 06 6/9/06 Houston Boiler Room Replace circuit breaker for sump pump, breaker keep tripping. Sump pit is full of water. |
June 9, 2006 |
June 9, 2006 |
0 days |
| Patricia R Harris Ed Center |
FM-200621598 06 6/9/06 Entire Exterior of Building. Remove all graffitti from entire exterior of building. |
April 21, 2006 |
June 9, 2006 |
49 days |
| Bancroft Elementary School |
FM-200623102 06 6/9/06 Remove graffitti from school grounds. |
May 22, 2006 |
June 9, 2006 |
18 days |
| Bruce-Monroe Elementary School |
FM-200622394 06 6/9/06 Remove graffiti on Columbia Rd. Side of the building (exterior). |
May 9, 2006 |
June 9, 2006 |
31 days |
| Payne Elementary School |
FM-200623740 06 6/9/06 repair hole in fence at 15th st side of school |
June 2, 2006 |
June 9, 2006 |
7 days |
| Browne Junior High School |
FM-200624021 06 6/9/06 First floor, Room 131. Repair or Replace door lock, staff are unable to gain access to storage room. Note: There appear to be something broke off in the lock. |
June 7, 2006 |
June 9, 2006 |
2 days |
| Seaton Elementary School |
FM-200622939 06 6/9/06 Small Playground- Kindergarten Area Graffitti is on the walls and on the blacktop. |
May 18, 2006 |
June 9, 2006 |
22 days |
| John Burroughs ES |
FM-200622681 06 6/9/06 Graffiti is on the sheild and building of school. alot of graffiti. |
May 9, 2006 |
June 9, 2006 |
31 days |
| Browne Junior High School |
FM-200623909 06 6/9/06 1st Floor- Room 135 (New Wing) They cannot get into the room using that same key as usual. |
June 6, 2006 |
June 9, 2006 |
3 days |
| Plummer Elementary School |
FM-200504437 05 6/9/06 ( PLUMMER ) Third Floor - Girls Restroom 1) Repair/Replace two broken sinks, no hot water. |
April 21, 2005 |
June 9, 2006 |
414 days |
| Browne Junior High School |
FM-200623939 06 6/9/06 Gymnasium/Teacher Restroom - Replace lock on the door. |
June 6, 2006 |
June 9, 2006 |
3 days |
| Wilkinson ES |
FM-200618716 06 6/9/06 Second Floor-184 (Girls Restroom) Replace or repair two flush valves on commodes that are not working/will not flush. |
February 16, 2006 |
June 9, 2006 |
113 days |
| Plummer Elementary School |
FM-200508695 05 6/12/06 Plummer Emergency! Throughout the building there is no running water. |
July 26, 2005 |
June 12, 2006 |
321 days |
| Bancroft Elementary School |
FM-200459376 04 6/12/06 BANCROFT ART RM- SINK SINK IS LEAKING DOWN INTO THE MUSIC RM STORAGE AREA. |
December 8, 2004 |
June 12, 2006 |
551 days |
| Bancroft Elementary School |
FM-200617714 06 6/12/06 No Hot Water In Health Suite |
January 23, 2006 |
June 12, 2006 |
140 days |
| Bancroft Elementary School |
FM-200617417 06 6/12/06 First floor, Nurse's Suite Restroom. Need plumbers to assess & repair hot water issue, currently there's no hot water in this restroom sink. |
January 13, 2006 |
June 12, 2006 |
150 days |
| Anacostia Senior High School |
FM-200623949 06 6/12/06 2nd Floor- Room 228 The lock needs to be changed on the door. |
June 6, 2006 |
June 12, 2006 |
6 days |
| Bancroft Elementary School |
FM-200512867 05 6/12/06 Bancroft Emergency First Floor-110 Art Room (main bldg) Replace sink and fixture unit, leaking water throughout ceileng (8-21-05) |
September 20, 2005 |
June 12, 2006 |
265 days |
| Reed LC |
FM-200623091 06 6/12/06 Ground- Recreational Room Repair/replace 2 doorknobs and locks on entrance doors. The door knobs are broken and the doors cannot be opened. |
May 22, 2006 |
June 12, 2006 |
21 days |
| Montgomery ES |
FM-200623725 06 6/12/06 1st Floor- Counselor's Suite The usual key is not working in the lock. |
June 1, 2006 |
June 12, 2006 |
11 days |
| Moten Elementary School |
FM-200624128 06 6/13/06 2nd & 3rd Floor- Rooms 218 & 307 The locks need to be repaired; they do not work. |
June 9, 2006 |
June 13, 2006 |
4 days |
| Houston Elementary School |
FM-200620863 06 6/13/06 First Floor-Door broken 4th exit door to right-lobby exit to playground. "Fire Code Violation" |
April 4, 2006 |
June 13, 2006 |
70 days |
| Dunbar High School |
FM-200624163 06 6/13/06 2nd Floor- Counselor's Suite Lock needs to be changed; there is a new teacher in this room now. |
June 9, 2006 |
June 13, 2006 |
4 days |
| Dunbar High School |
FM-200622618 06 6/13/06 4th Floor- Room 4 East Oneway lock (on door knob) cannot be locked. |
May 12, 2006 |
June 13, 2006 |
32 days |
| Langdon Elementary School |
FM-200623115 06 6/13/06 Second Floor-Broken door opener/closer (6th grade rm.) |
May 23, 2006 |
June 13, 2006 |
21 days |
| Langdon Elementary School |
FM-200623119 06 6/13/06 First Floor-Breach in ceiling missing tile, Pre-K Asbestos Code A - Clear for repairs on 05/23/06 Tidewater - Kenny Belton (RG 05/25/06) |
May 23, 2006 |
June 13, 2006 |
21 days |
| Wilkinson ES |
FM-200624139 06 6/13/06 First Floor/Parent Center Storage Rm. #86 - Re-key the lock to secure the math & reading materials. |
June 9, 2006 |
June 13, 2006 |
4 days |
| Wilkinson ES |
FM-200624140 06 6/13/06 First Floor/Kindergarden Area Left Entrance Door - Repair or replace the knob lock, it's loose. |
June 9, 2006 |
June 13, 2006 |
4 days |
| Merritt Middle School |
FM-200624214 06 6/13/06 Merritt Emergency Generator Room Repair rim cylinder lock to Emergency Generator Room . Unable to gain access to Generator, Key way has been clogged with debris. |
June 12, 2006 |
June 13, 2006 |
1 day |
| Reed LC |
FM-200623316 06 6/13/06 Second Floor-Glass Missing From Extinguisher Cabinet Outside, CAI Lab |
May 25, 2006 |
June 13, 2006 |
19 days |
| Nalle Elementary School |
FM-200623164 06 6/13/06 First Floor (old bldg.)-Glass cracked on classroom door #108 Asbestos Code A - Clear for repairs on 05/25/06. Tidewater - Carlos Vera (RG 05/30/06) |
May 23, 2006 |
June 13, 2006 |
21 days |
| Truesdell Elementary |
FM-200622929 06 6/13/06 Outside- Playground Remove Graffitti |
May 18, 2006 |
June 13, 2006 |
26 days |
| Bancroft Elementary School |
FM-200623044 06 6/13/06 1st Floor- Main Office (bathroom) Replace faucets (on porcelain sink) and flush valves (on toilets). |
May 19, 2006 |
June 13, 2006 |
25 days |
| Bancroft Elementary School |
FM-200622339 06 6/13/06 Ground Floor- Cafeteria (Main Bldg) There is no running hot water in the wash basin or sink. |
May 8, 2006 |
June 13, 2006 |
36 days |
| Bancroft Elementary School |
FM-200621404 06 6/13/06 1st Floor- Girls Bathroom (main building) Toilet needs to be replaced. It is leaking around the seat and will not flush. |
April 18, 2006 |
June 13, 2006 |
56 days |
| Bancroft Elementary School |
FM-200446502 04 6/13/06 Bancroft Room 215 main bldg. (science), Ground floor music room (100) and First floor room 110 main bldg art room Replace sink, no running water. |
April 8, 2004 |
June 13, 2006 |
796 days |
| Bancroft Elementary School |
FM-200621168 06 6/14/06 Third Floor-Girls Bathroom (Main Bldg.)-Replace entire flush valve assembly/stop valve. |
April 11, 2006 |
June 14, 2006 |
64 days |
| Bunker Hill Elementary School |
FM-200624348 06 6/14/06 Bunker Hill Boiler Room Repair rupture hot water line on domestic hot water line. |
June 14, 2006 |
June 14, 2006 |
0 days |
| Bancroft Elementary School |
FM-200619607 06 6/14/06 Third Floor-Girl's Bathroom (main bldg.) Replace 2 faucets on sink #1, water will not stop running. |
March 7, 2006 |
June 14, 2006 |
99 days |
| Shaw JHS |
FM-200624358 06 6/14/06 First floor, Main Office & Adjacent Offices. No lights in the above admin, offices. |
June 14, 2006 |
June 14, 2006 |
0 days |
| Bancroft Elementary School |
FM-200621134 06 6/14/06 Ground Floor-Cafeteria (main bldg.)-Replace water filter on water cooler. Water is not cold and barely comes out. |
April 10, 2006 |
June 14, 2006 |
65 days |
| Leckie Elementary School |
FM-200513993 /05 6/14/06 Third Floor - 1) Put new ceiling tile to secure the exit signs. New exit light that was installed damaged the ceiling tile. |
October 20, 2005 |
June 14, 2006 |
237 days |
| Shaw JHS |
FM-200623770 06 6/15/06 Basement 4 doors need new locks. |
June 2, 2006 |
June 15, 2006 |
13 days |
| Murch Elementary School |
FM-200624239 06 6/15/06 White Detached Building. (Demountable) Repair lock and furnish keys to entrance doors. |
June 13, 2006 |
June 15, 2006 |
2 days |
| Anacostia Senior High School |
FM-200623490 06 6/15/06 New Bldg./Rm. 412: Broken Door Arm Closer |
May 30, 2006 |
June 15, 2006 |
16 days |
| Anacostia Senior High School |
FM-200623471 06 6/15/06 Second Floor/Across From Room 239: Exit Light Is Not Properly Illuminated. |
May 30, 2006 |
June 15, 2006 |
16 days |
| Coolidge High School |
FM-200513565 05 6/15/06 Coolidge Stadium Area/ Irrigation rm. Repair Door |
October 6, 2005 |
June 15, 2006 |
252 days |
| Coolidge High School |
FM-200508512 05 6/16/06 Coolidge "Fire Code Violation" Second Floor Door #2 door missing (703.2.2) |
July 25, 2005 |
June 16, 2006 |
326 days |
| Backus Middle School |
FM-200509236 05 6/16/06 Backus "Fire Code Violation" Second Floor Missing ceiling tile in recreation area IFC 110.0 HA 027 Ceiling tile off white 12" X 12" with gouges No Asbestos HA 028 Ceiling tile white tile 2' X 4' gouged & pinholes No Asbestos HA 029 Ceiling tile white 2' X 4' with random gouges & pinhole No Asbestos HA 031 Ceiling tile white 2' X 2' with textured finish & pinholes No Asbestos Code A-clear for repair by DCPS Charles Buchanan on 8/3/05 |
August 1, 2005 |
June 16, 2006 |
319 days |
| Simon Elementary School |
FM-200509639 05 6/16/06 Simon Fire Code Violation First Floor Auditorium doors wont close properly 703.2.2 Asbestos Code A - Clear for repairs on 03/03/06 Tidewater - Shamika Parker (RG 03/07/05) |
August 5, 2005 |
June 16, 2006 |
315 days |
| Ballou Senior High School |
FM-200505127 05 6/16/06 (Ballou) First floor, Hall. Rehung wall hung drinking fountain. |
May 4, 2005 |
June 16, 2006 |
408 days |
| Roosevelt High School |
FM-200509412 05 6/16/06 Roosevelt Fire Code Violation Third Floor Missing Ceiling tile in #337-2003 DC Supp 110.1(1) Asbestos Code A - Clear for repairs on 08/04/05. Tidewater - Henry Addison (RG 08/09/05) |
August 3, 2005 |
June 16, 2006 |
317 days |
| Wilkinson ES |
FM-200621743 06 6/16/06 Garage Area Hose bib is leaking. Water is running onto the garage floor. |
April 25, 2006 |
June 16, 2006 |
52 days |
| Spingarn High School |
FM-200619561 06 6/18/06 First Floor-Teachers Bathroom Replace the broken toilet |
March 7, 2006 |
June 18, 2006 |
103 days |
| Ronald H. Brown MS |
FM-200622522 06 6/19/06 First Floor-Poor lighting in room #115 incinerator room |
May 11, 2006 |
June 19, 2006 |
39 days |
| Ronald H. Brown MS |
FM-200622518 06 6/19/06 First Floor/Boiler Room-Exit sign not maintained (hanging) & not illuminated |
May 11, 2006 |
June 19, 2006 |
39 days |
| Ronald H. Brown MS |
FM-200622498 06 6/19/06 Second Floor-Telephone room door missing in building #2 (door needs to be placed back). |
May 11, 2006 |
June 19, 2006 |
39 days |
| Barnard Elementary School |
FM-200514039 /05 6/19/06 Barnard Adult Mens restroom (Lobby) Repair battery operated fjlush valve |
October 20, 2005 |
June 19, 2006 |
242 days |
| Miner Elementary |
FM-200622807 06 6/19/06 Exit light not illuminated |
May 17, 2006 |
June 19, 2006 |
33 days |
| Reed LC |
FM-200623317 06 6/19/06 First Floor-Exit light not illuminated, Stairway 2 |
May 25, 2006 |
June 19, 2006 |
25 days |
| Young Elementary School |
FM-200618717 06 6/19/06 Kitchen-Replace lock on store room door Note: Need to be secure for computer & food. |
February 16, 2006 |
June 19, 2006 |
123 days |
| Draper Elementary School |
FM-200623252 06 6/19/06 First Floor/Exit light ont illuminated near room #111 |
May 24, 2006 |
June 19, 2006 |
26 days |
| Stoddert ES |
FM-200623810 06 6/19/06 First Floor/Exit light not illuminated |
June 5, 2006 |
June 19, 2006 |
14 days |
| Draper Elementary School |
FM-200623250 06 6/19/06 First Floor/Room 111 - Exit sign covered with tape (obscured) & not maintained. |
May 24, 2006 |
June 19, 2006 |
26 days |
| Drew Elementary School |
FM-200624248 06 6/19/06 First Floor/Rear parking lot exit door not latching |
June 13, 2006 |
June 19, 2006 |
6 days |
| Nalle Elementary School |
FM-200623688 06 6/19/06 Outside Grounds-Storage Door/Repair or Replace the Lock |
June 1, 2006 |
June 19, 2006 |
18 days |
| Turner Elementary School |
FM-200619815 06 6/19/06 Fire Code Violation First Floor-Exit light not iluminated Gym x4 |
March 14, 2006 |
June 19, 2006 |
97 days |
| Reed LC |
<