Closed Repair Requests in June 2006

Closed Repairs Summary

  • Urgent Requests
    65
  • Routine Requests
    361
  • Total Requests
    426

Detailed Reports

Urgent Repair Requests Closed in June 2006 (65)
School Description Open Date Close Date Time Elapsed
Moten Elementary School FM-200623606 06 6/1/06 Fourth floor, Boys' Restroom. Repair leaky sink, water is accumulating on the floor and could cause injury. May 31, 2006 June 1, 2006 1 day
West Elementary School FM-200623129 06 6/1/06 West Roof Repair or replace cooling tower. Unit fan continously runs in automatic. Urgent !!!! May 23, 2006 June 1, 2006 9 days
West Elementary School FM-200622101 06 6/1/06 West Boiler Room Repair or replace chiller. Appears to be phase-out (Electrical) for unit. Urgent !!!! May 2, 2006 June 1, 2006 30 days
Jefferson JHS FM-200513640 05 6/2/06 Jefferson Urgent Second Floor-Rm. 210 Repair extra large hole in brick wall inside class room. October 7, 2005 June 2, 2006 238 days
Meyer Elementary School FM-200513739 /05 6/2/06 Meyer urgent Remove the tree limb that has fell in front of the building. October 12, 2005 June 2, 2006 233 days
Wilkinson ES FM-200517234 06 6/2/06 First floor and Second floor restrooms. "Urgent" Need plumber to make an adjustment to water temperature, because the water is too hot in sinks and commodes. Note: Teachers have burnt their hands when washing them. January 7, 2006 June 2, 2006 146 days
Garfield ES FM-200513605 05 6/2/06 Garfield Urgent Outside-Cut back trees away from building. The trees are causing drains to clog up. Also remove trees by Auditorium entrance by Teachers Lounge October 6, 2005 June 2, 2006 239 days
Merritt Middle School FM-200513585 05 6/2/06 Merritt Urgent Third Floor-Custodian Closet Breech in wall, need to be bricked Asbestos Code A - Clear for repairs on 10/07/05. Tidewater - Tony Marcolin (RG 10/11/05) October 6, 2005 June 2, 2006 239 days
Maury Elementary School FM-200513549 05 6/2/06 Maury Very Urgent Grounds-Remove graffiti from exterior of building; doors, pavement, playground pad. October 6, 2005 June 2, 2006 239 days
Wilkinson ES FM-200516594 /05 6/2/06 Urgent:Repair 2 urinals in the boys restroom on the second floor. Need diaphragm December 15, 2005 June 2, 2006 169 days
Wilkinson ES FM-200339704 /03 6/2/06 (Wilkinson) !!!URGENT!!! Asbestos Assessment Required. Gym Area/Hallway: Water leaking from light fixture. Asbestos Code A - Clear for repairs on 10/30/03. Horne Engineering - Sheryll James (RG 10/31/03) October 30, 2003 June 2, 2006 946 days
Maury Elementary School FM-200513547 05 6/2/06 Maury Very Urgent Grounds-Re-Install fence around playground, fence was taken down for temporary boilers October 6, 2005 June 2, 2006 239 days
Young Elementary School FM-200513815 /05 6/2/06 Young Urgent Outside-Around Playground Repair fence October 13, 2005 June 2, 2006 232 days
Wilkinson ES FM-200506197 05 6/2/06 ( WILKINSON ) URGENT!!! First Floor - Pre-K Area (Girls Restroom) 1) Repair or Replace first sink faucet, its leaking and wont cut off. June 1, 2005 June 2, 2006 366 days
Wilkinson ES FM-200513538 05 6/2/06 Wilkinson Urgent First Floor-Kgn. Area; Boys Restroom (15) Replace or repair faucet October 6, 2005 June 2, 2006 239 days
Coolidge High School FM-200514064 /05 6/2/06 Coolidge Urgent Outside-Repair Main Entrance Gate To Parking Lot, It Was Bent By A Van. October 21, 2005 June 2, 2006 224 days
Backus Middle School FM-200513750 /05 6/2/06 Backus Urgent Front Side Of Building-Entrance Door near Gallatin St. Exit Install hand rail on the Steps, the railing has rusted away, also the steps have shifted need to be repaired October 12, 2005 June 2, 2006 233 days
Bunker Hill Elementary School FM-200513931 /05 6/2/06 Bunker Hill Urgent Front Entrance of Building Repair the concrete steps. October 18, 2005 June 2, 2006 227 days
Young Elementary School FM-200513814 /05 6/2/06 Young Urgent Outside-Court by Custodian Office Repair hole in fence October 13, 2005 June 2, 2006 232 days
Reed LC FM-200513551 05 6/2/06 Reed Very Urgent Grounds-18th St. Playground Cut and remove fallen tree. <Safety Hazard> October 6, 2005 June 2, 2006 239 days
Seaton Elementary School FM-200514753 /05 6/2/06 Seaton Proposed Wetland Ms Utility - Ticket - 5560214 1) The wetland will be located in existing school yard area and will be enclosed by an eight foot tall fence with a locked gate added for controll access and safety purposes. October 28, 2005 June 2, 2006 217 days
Truesdell Elementary FM-200513823 /05 6/2/06 Truesdell Urgent Outside-Hamilton St. Side Repair Fence October 13, 2005 June 2, 2006 232 days
Macfarland Middle School FM-200513786 /05 6/2/06 Macfarland Urgent Exterior-Rehang fence along the drive way by the front parking lot on the south east side of the building. October 12, 2005 June 2, 2006 233 days
Bancroft Elementary School FM-200513907 /05 6/2/06 Bancroft Urgent Outside Playground-Re-attach screws/bolts on swing equipment. October 18, 2005 June 2, 2006 227 days
Kenilworth ES FM-200514749 /05 6/2/06 Kenilworth Proposed Wetland Ms Utility - Ticket - 5560200 1) The wetland will be located along the side of the school and will be enclosed by an eight foot tall fence with a locked gate added for controll access and safety purposes. October 28, 2005 June 2, 2006 217 days
Reed LC FM-200513552 05 6/2/06 Reed Very Urgent Grounds-Playground Area Repair brick wall on the early childhood playground October 6, 2005 June 2, 2006 239 days
Peabody Elementary School FM-200515219 05 6/3/06 Urgent: Water meter valves are not holding and pipes are badly rusted and leaking. November 8, 2005 June 3, 2006 207 days
Wilkinson ES FM-200618751 06 6/5/06 Urgent First Floor-Rm. 119 (Custodial Restroom) Unclog Comode-Deeps Over Flowing February 16, 2006 June 5, 2006 109 days
Wilkinson ES FM-200618152 06 6/5/06 First Floor-Rm. 105 (Health Suite) Very Urgent No Hot Water Comming From The Faucet. February 1, 2006 June 5, 2006 124 days
Raymond Elementary School FM-200618763 06 6/5/06 Second floor, Room 23/Old Wing. "Urgent" The classroom needs electrical upgrading because the teacher cannot operate the computer lab, because the computers keep tripping the circuit breaker. Note: Need to add power poles, this process will require drilling through plaster ceiling. Asbestos Code A - Clear for repairs on 02/22/06. Tidewater - Shamika Parker (RG 02/23/06) SEE ASSESSMENTS February 16, 2006 June 5, 2006 109 days
Merritt Middle School FM-200621015 06 6/5/06 Third Floor-Rail missing on stairwell to gym "Fire Code Violation" Asbestos Code A - Clear for repairs on 04/06/06. DCPS Safety - Richard Gibson (RG) April 6, 2006 June 5, 2006 60 days
Cleveland Elementary School FM-200515355 /05 6/6/06 Cleveland Boiler Room Repair or replace burner on Boiler #1. will not lite off. Only (2) Boiler on site and the other did not pass inspection. Urgent !!!!! November 10, 2005 June 6, 2006 208 days
Spingarn High School FM-200618583 06 6/6/06 Spingarn Boiler Room Repair or replace condensate pump #1 and #2 are not working. Also repair or replace control starter for pumps. Losing returns form Boilers. Urgent !!!!! February 13, 2006 June 6, 2006 113 days
Spingarn High School FM-200515202 05 6/7/06 Urgent: Unstop custodian sink on the first floor in the custodial closet. It causes sinks in the girls restroom to become stopped up as well. November 8, 2005 June 7, 2006 211 days
Meyer Elementary School FM-200515188 05 6/7/06 Urgent: A Tree fell over on the 16th St side of the building where the playground is. November 7, 2005 June 7, 2006 212 days
Murch Elementary School FM-200623535 06 6/7/06 Murch Outside Annex Building Replace timer on split system heat pump air condition. Carrier Type: Model #38AEO16500 Volts 208/230 Amps 20 5-10 Ton Urgent !!!!! May 30, 2006 June 7, 2006 8 days
Spingarn High School FM-200516074 05 6/7/06 "Urgent" Second Floor, Custodian closet. Unstop sink in custodian closet. December 5, 2005 June 7, 2006 184 days
Backus Middle School FM-200617642 06 6/7/06 "Urgent" Lower Level, Kitchen Area. Install Circulation pump in kitchen. January 20, 2006 June 7, 2006 138 days
Cardozo High School FM-200515210 05 6/7/06 Urgent: Remove graffitti from the dug out in the stadium area. November 8, 2005 June 7, 2006 211 days
Park View ES FM-200515268 05 6/7/06 Install safety mats under playground equipment November 9, 2005 June 7, 2006 210 days
Deal Junior High School FM-200515034 05 6/7/06 Urgent: Bulk Trash Pick-Up At Rear Of Building By Rm. 107. November 3, 2005 June 7, 2006 216 days
Spingarn High School FM-200448144 04 6/8/06 (Spingarn) !!!URGENT!!! Basement/Kitchen: Request plumber to snake out drain; water will back up when running. (This drain is located near deep fryers) May 19, 2004 June 8, 2006 750 days
Thomas Elementary School FM-200515374 /05 6/8/06 Urgent: Outside on the field behind the cooling tower there are a couple of fox holes that need to be covered or filled. (A child almost fell in one of them) November 10, 2005 June 8, 2006 210 days
Ketcham Elementary School FM-200515356 /05 6/8/06 Very Urgent: Playground Area-Repair Hole in the fence. There are dogs on the other side, afraid for kids safety. November 10, 2005 June 8, 2006 210 days
Murch Elementary School FM-200623534 06 6/8/06 Murch Outside Annex Building Repair cooling unit (Carrier Type). Unit comes on for a second then shuts completely off. Need to check braker. Carrier Type: Model #38AEO16500 Volts 208/230 Amps 20 5-10 Ton Urgent !!!!! May 30, 2006 June 8, 2006 9 days
Wilkinson ES FM-200502822 05 6/8/06 (Wilkinson) "Urgent" Asbestos Assessment Required. First floor / Boys' restroom in gymnasium area. Need to repair urinal, fixture is leaking from wall on to floor. Asbestos Code A - Clear for repairs on 04/21/05. DCPS Safety - Leroy Minton Jr. (RG 04/21/05) March 16, 2005 June 8, 2006 449 days
Wilkinson ES FM-200618153 06 6/9/06 Very Urgent First Floor-Kgn. Area - Unstop 2 sinks, water will not go down in Ms. Burnnett classroom Note: In House Tried February 1, 2006 June 9, 2006 128 days
Bancroft Elementary School FM-200513908 /05 6/13/06 Bancroft Urgent Cafeteria (main bldg.) Repair water cooler due to compressor problem. October 18, 2005 June 13, 2006 238 days
Bancroft Elementary School FM-200515198 05 6/13/06 Urgent: Re-attach faucets in the Main Office Bathroom on the First Floor. It turns 360 degrees around and is leaking water around supply line. November 8, 2005 June 13, 2006 217 days
Bancroft Elementary School FM-200501056 05 6/13/06 Bancroft Main Building/Boy's Restroom Remount Urinal to wall. Asbestos Code A - Clear for repairs on 02/01/05. DCPS Safety - Leroy Minton (RG 02/01/05) February 1, 2005 June 13, 2006 497 days
Bancroft Elementary School FM-200514793 /05 6/14/06 Bancroft Urgent Second Floor-(primary wing) Rm. 313 Replace spud/tail pipe on toilet; unable to remove nut. October 31, 2005 June 14, 2006 226 days
Wilkinson ES FM-200219742 /02 6/16/06 (Wilkinson) 1st Floor Hallway/Near Room #42: Repair or replace bubbler on water fountain; students fingers are subject to injury if fingers are become wedged in between October 21, 2002 June 16, 2006 1,334 days
Wilkinson ES FM-200517233 06 6/16/06 First floor, Cafeteria Area Near Security Desk. "Urgent" Replace dirty filter in water fountain asap! January 7, 2006 June 16, 2006 160 days
Ballou Senior High School FM-200620454 06 6/19/06 First floor, Room 104/Teacher's Prep. Room & Room A104/Science Lab. "Urgent" Remove lever locks & install storage room function locks. Also furnish (4) pass keys & key to building's master key. March 28, 2006 June 19, 2006 83 days
Young Elementary School FM-200513187 05 6/21/06 Young Boiler Room Provide pull chain on safety relief valves on Boilers Per DC Boiler Inspector September 27, 2005 June 21, 2006 267 days
Brookland Elementary FM-200624297 06 6/21/06 Brookland 1st Floor Kgn Room Asbestos assessment required Repair rupture line on univent in Kgn. Room. Urgent !!!! Asbestos Code A - Clear for repairs on 06/13/06. Tidewater - Kenny Long (RG 06/14/06) SEE ASSESSMENTS June 14, 2006 June 21, 2006 7 days
Clark Elementary School FM-200516191 05 6/27/06 CLARK room 202 Leak in supply and return line in ceiling of room 202 from univent located in room 302. Check insulation and ceiling tile for asbestos. Asbestos Code C - on 12/08/05 Tidewater - Tony Marcolin (RG 12/09/05) Asbestos Code A - Cleared for repairs on 12/15/05 by Tidewater - Tony Marcolin (LM- 12/15/05) Safety Office 202-576-8962..................Please Note: This is a conditional Code A based on work/crew men not disturbing the ceiling tiles surrounding the opened area.. The ceiling tiles directly below the leak are negative for asbestos. December 8, 2005 June 27, 2006 201 days
Tubman Elementary School FM-200514465 /05 6/27/06 Tubman Boiler Room Boiler #2 Repair or replace Approx. 4" to 6" header valve. Valve leaking badly. Urgent !!!! October 23, 2005 June 27, 2006 247 days
Horace Mann Elementary School FM-200617909 06 6/27/06 Mann Boys Rest Room Asbestos assessment required in tunnel area under Boys bathroom on pipes Repair ruptured steam (Branch) line in Boys reset room 1-1/2" line is 1/2 isolated. Steam ceeping from floor area. Urgent !!!! Asbestos Code C - on 02/01/06. Tidewater - Samuel May (RG 02/01/06) Code A - Asbestos was abated by Motir Services per Leroy Minton Jr. comfrimed (RG 02/07/06) January 26, 2006 June 27, 2006 152 days
Shaw JHS FM-200621257 06 6/27/06 SHAW cooling tower Urgent Replace ruptured 1-1/4 inch line to cooling tower. Also install 1-1/4 inch coupling on same copper line. April 12, 2006 June 27, 2006 76 days
Leckie Elementary School FM-200619420 06 6/27/06 Leckie Boiler Room Reques for electricans to complete electrical lighting and provide safety. Additional lighting is needed behind Boiler #1 and Boiler #2. URGENT: Lights burn out March 3, 2006 June 27, 2006 116 days
Benning Elementary School FM-200618774 06 6/30/06 Benning Boiler Room Boiler #2 Replace leaking relief valve and bottom blow down valve. Urgent !!!!! February 17, 2006 June 30, 2006 133 days
Coolidge High School FM-200516506 /05 6/30/06 Coolidge Boiler Room Replace non return valve and steam stop valve on Boiler #1. Both 6 inch 300 B valve.. Urgent !!!! December 14, 2005 June 30, 2006 198 days
Hine JHS FM-200623428 06 6/30/06 Hine Boiler Room Repair or replace valves for missing circulating pump. Valves not holding (Leaking Badll). This effect cooling system. Urgent !!!!! May 26, 2006 June 30, 2006 35 days
Coolidge High School FM-200516496 /05 6/30/06 Coolidge Boiler Room Replace leaking 2" line on Boiler #1. Feed water pump. Piping 2' long flanged at one end 8 bolts union on the other line welded to flange. Urgent !!!!! December 14, 2005 June 30, 2006 198 days

<
Routine Repair Requests Closed in June 2006 (361)
School Description Open Date Close Date Time Elapsed
Gibbs Elementary School FM-200623687 06 6/1/06 Second Floor/Water Cooler Leaking June 1, 2006 June 1, 2006 0 days
Bowen Elementary School FM-200623070 06 6/1/06 Bowen Boiler room Repair (9) of 10 modular chillers , only 1 will run. May 22, 2006 June 1, 2006 10 days
Johnson JHS FM-200620177 06 6/1/06 Johnson Boiler room Repair or replace combustion controls for boilers # 2 and #3 burner, March 22, 2006 June 1, 2006 71 days
Green Elementary School FM-200622596 06 6/1/06 Green Boiler room Rerpair Trane chiller ,unit will not start. May 12, 2006 June 1, 2006 20 days
Harris, C.W. ES FM-200622029 06 6/1/06 1st Floor- Room 146 Replace lock on door; the room was broken into on 04/29/2006 May 1, 2006 June 1, 2006 31 days
Dunbar High School FM-200622768 06 6/1/06 Outside-Parking Lot By Dumpster: Remove Bulk Trash + Car In Front Of Dumpster Note: Dumpster can not be dump May 16, 2006 June 1, 2006 16 days
Bowen Elementary School FM-200623685 06 6/1/06 Re-hang wall hung water cooler in Gym. June 1, 2006 June 1, 2006 0 days
Stevens Elementary School FM-200618392 06 6/1/06 Inspection or preventive maintenance on playground equipment. February 7, 2006 June 1, 2006 114 days
Harris, C.W. ES FM-200622025 06 6/1/06 2nd Floor- Room 202 Replace lock on the door, May 1, 2006 June 1, 2006 31 days
Ballou Senior High School FM-200623351 06 6/1/06 Basement Level, Room A-1-11. Repair or Replace lock cylider on door, also remove pieces of broken master key from out of lock. Note: This door cannot be secured. May 25, 2006 June 1, 2006 7 days
Bruce-Monroe Elementary School FM-200620291 06 6/1/06 Bruce Monroe Boiler Room Repair or replace Boilers#1 and #2 off on flame failure Had to reset boiler #1 every morning. March 24, 2006 June 1, 2006 69 days
Plummer Elementary School FM-200504448 05 6/1/06 ( PLUMMER ) Second Floor - Boys Restroom 1) Repair three broken faucets, they are loose. April 21, 2005 June 1, 2006 406 days
Wilkinson ES FM-200515088 05 6/2/06 Repair leaking toilet and running faucet in the pre-K area restroom. (see Ms. Moten) Repair handle on flush valve in the girls restroom on the second floor. November 4, 2005 June 2, 2006 210 days
Ferebee-Hope Elementary School FM-200514808 /05 6/2/06 Ferebee-Hope Outside-Playground Area Preventive Maintenance of Playground Equipment October 31, 2005 June 2, 2006 214 days
Garfield ES FM-200514809 /05 6/2/06 Garfield Outside-Playground Area Preventive Maintenance of Playground Equipment October 31, 2005 June 2, 2006 214 days
Wilkinson ES FM-200617927 06 6/2/06 Second floor, Boys' restroom. Urinals are running over and the cut off valve does not work!! January 26, 2006 June 2, 2006 127 days
Aiton Elementary School FM-200513753 /05 6/2/06 (Aiton) Perform preventive maintenance on playground equipment. October 12, 2005 June 2, 2006 233 days
Backus Middle School FM-200227545 03 6/2/06 (Backus) 1st Floor/Males restroom: Total of two (2) urinals need repairs, inoperable. (Health Issue) March 24, 2003 June 2, 2006 1,166 days
Amidon Elementary School FM-200513921 /05 6/2/06 Amidon Exterior Grounds - Black Top 1) Need the gate fixed on the black top, gate has fallen down. Fence and gate needs to be re-hung. October 18, 2005 June 2, 2006 227 days
Backus Middle School FM-200458914 04 6/2/06 Backus There is no hot water in the kitchen and the middle sink is leaking. December 1, 2004 June 2, 2006 548 days
Backus Middle School FM-200504233 05 6/2/06 ( BACKUS ) Asbestos Assessment Required Through out Building 1) Change automatic flush valves on toilets and urinals. April 19, 2005 June 2, 2006 409 days
Backus Middle School FM-200508888 05 6/2/06 Backus Blitz Team 1) Repair plumbing throughout. July 28, 2005 June 2, 2006 309 days
Wilkinson ES FM-200516586 /05 6/2/06 Urgnet: Repair or replace a single faucet, can't cut off the water keeps leaking in rm. 90 (Pre-K girls restroom) on the first floor. December 15, 2005 June 2, 2006 169 days
Backus Middle School FM-200514443 05 6/2/06 Backus Sinks 2 & 4 needs repairing. The sink is leaking. September 12, 2005 June 2, 2006 263 days
Backus Middle School FM-200623347 06 6/2/06 2nd Floor- Rooms 209 & 211 These door handles need to be replaced. Room 211 can easily be opened by giggling the handle. Locks are not holding. May 25, 2006 June 2, 2006 8 days
Winston EC FM-200514412 /05 6/2/06 Winston Remove trash around dumpster & bulkey exercise equipment left outside gym doors by contractors. October 21, 2005 June 2, 2006 224 days
Winston EC FM-200514306 /05 6/2/06 Winston Exterior 1) Remove graffitti on back and side of building. West end of building near grassy hill. October 23, 2005 June 2, 2006 222 days
Wilson High School FM-200514496 /05 6/2/06 (Wilson) Near the teachers' parking lot going into the stadium on the grass on Fort Drive, near the boiler room. Remove the bushes and branches from the grounds. October 23, 2005 June 2, 2006 222 days
Wilkinson ES FM-200516584 /05 6/2/06 Urgnet: Repair or replace the flush handle it's leaking in the 3rd stall to the left in rm. 184 (girls restroom) on the second floor. December 15, 2005 June 2, 2006 169 days
Ballou Senior High School FM-200623123 06 6/2/06 3rd Fl.-Rm. 312/1st Fl. Rm. 123-Install locks on the doors, the doors were recently installed and the rooms can't be secured. May 23, 2006 June 2, 2006 10 days
Wilkinson ES FM-200516583 /05 6/2/06 Urgnet: Unstop comode in the 4th stall to the right in the girls restroom (kgn.) on the first floor. December 15, 2005 June 2, 2006 169 days
Wilkinson ES FM-200516582 /05 6/2/06 Urgnet: Repair the loose/leaking single faucet on the sink in the boys restroom (kgn.) on the first floor December 15, 2005 June 2, 2006 169 days
Wilkinson ES FM-200516581 /05 6/2/06 Urgnet: Repair or replace the faucet in rm. 99 (office restroom) on the first floor. December 15, 2005 June 2, 2006 169 days
Wilkinson ES FM-200514657 /05 6/2/06 Wilkinson First Floor - 127 - Kitchen 1) Need to repair/fix...there is no hot water in Kitchen. First Floor - 99- Restroom 2) Need to replace faucet, seat and washer. October 26, 2005 June 2, 2006 219 days
Bancroft Elementary School FM-200514794 /05 6/2/06 Bancroft Outside-Playground Re-attach screws/bolts on swing equipment October 31, 2005 June 2, 2006 214 days
Wilkinson ES FM-200514656 /05 6/2/06 Wilkinson First and Second Floor - Bathrooms 1) Need to replace ( 12 ) open front elongated toilet seats for commodes. October 26, 2005 June 2, 2006 219 days
Wilkinson ES FM-200500486 05 6/2/06 (Wilkinson) !!!EMERGENCY!!! 2nd Floor/Boys Restroom: Urinal over-flowing; shutoff valve broken. January 14, 2005 June 2, 2006 504 days
Wilkinson ES FM-200458866 04 6/2/06 Wilkinson Second floor girls bathroom Need to repair flush valve. December 1, 2004 June 2, 2006 548 days
Wilkinson ES FM-200458684 /04 6/2/06 Wilkinson Second floor girls bathroom Need to repair or replace flush valve. November 24, 2004 June 2, 2006 555 days
Wilkinson ES FM-200456353 04 6/2/06 Wilkinson First floor 44 women bathroom gym area Need to replace seat and washer for sink. Need to replace diaphragm on commode. October 1, 2004 June 2, 2006 609 days
Wilkinson ES FM-200334658 03 6/2/06 Wilkinson Outside Kgn. Area playground Drain need to be unclogged. Standing water for mosquitoes and bug nest area. August 7, 2003 June 2, 2006 1,030 days
Wilkinson ES FM-200213984 02 6/2/06 Wilkinson 1. Asbestos Assessment Reqd. 1st Floor Room 93 Pre-K 2. Repair pipe that is leaking water from the ceiling. Asbestos Code A-clear for repair by Horne Engineer ( Edward Rodriguez ) Charles Buchanan on 8/13/02 August 9, 2002 June 2, 2006 1,393 days
Webb Elementary School FM-200623765 06 6/2/06 1st Floor- Learning Center 1 Ballasts and lights are smoking in the Pre-Kindergarten area. June 2, 2006 June 2, 2006 0 days
Walker-Jones EC FM-200622400 06 6/2/06 Repair sliding gate on the back field, think it's a wheel missing and the gate might fall. May 9, 2006 June 2, 2006 24 days
Tubman Elementary School FM-200513742 /05 6/2/06 Tubman Remove graffiti around the outside of the building. October 12, 2005 June 2, 2006 233 days
Benning Elementary School FM-200514583 /05 6/2/06 Benning Exterior Play ground Preventative Maintence on the play ground equiiptment October 25, 2005 June 2, 2006 220 days
Stanton Elementary School FM-200514280 /05 6/2/06 Stanton Exterior Grounds - Flower Garden 1) Cement (6) benches into the ground. October 22, 2005 June 2, 2006 223 days
Stanton Elementary School FM-200514279 /05 6/2/06 Stanton Exterior Grounds - Alabama Ave 1) Car ran into fence. October 22, 2005 June 2, 2006 223 days
Brookland Elementary FM-200514124 /05 6/2/06 Brookland Playground 1) Repair chain link fence. October 22, 2005 June 2, 2006 223 days
Brookland Elementary FM-200514731 /05 6/2/06 (Brookland) "Utgent" Rear Exterior. Repair damaged chain link fence. October 27, 2005 June 2, 2006 218 days
Sousa Middle School FM-200514668 /05 6/2/06 Sousa Outside parking lot steps Remove Graffitti From Steps October 26, 2005 June 2, 2006 219 days
Roosevelt High School FM-200621571 06 6/2/06 Check electrical line to cooling tower/votage drop-See: Mr. Davis April 20, 2006 June 2, 2006 43 days
Randle-Highlands ES FM-200623088 06 6/2/06 Playground Replace 2' x 2' broken plexiglass in playground equipment. May 22, 2006 June 2, 2006 11 days
Plummer Elementary School FM-200623536 06 6/2/06 Second Floor - Hallway - 1) Repair leaking water fountains. May 30, 2006 June 2, 2006 3 days
Nalle Elementary School FM-200623686 06 6/2/06 Second Floor/Custodial - Unclog drain June 1, 2006 June 2, 2006 1 day
Young Elementary School FM-200514225 /05 6/2/06 Young Outside By Playground 1) Repair fence around large playground. Fence has been cut in different areas. October 22, 2005 June 2, 2006 223 days
Clark Elementary School FM-200514541 /05 6/2/06 Clark Exterior Grounds 1) Remove Bulk Trash. October 24, 2005 June 2, 2006 221 days
Clark Elementary School FM-200514755 /05 6/2/06 Clark Exterior Play ground Preventative Maintence on the play ground equiiptment October 28, 2005 June 2, 2006 217 days
Moten Elementary School FM-200623690 06 6/2/06 Fourth floor, Boys' Restroom/Newside. Water is running continuously and cannot be shut off. June 1, 2006 June 2, 2006 1 day
Davis Elementary School FM-200514756 /05 6/2/06 Davis Exterior Play ground Preventative Maintence on the play ground equiiptment October 28, 2005 June 2, 2006 217 days
Draper Elementary School FM-200514118 /05 6/2/06 Draper Playground 1) Remove piles of debris from playground. Trash put in bags by Volunteers. October 22, 2005 June 2, 2006 223 days
Horace Mann Elementary School FM-200514239 /05 6/2/06 (Horace Mann) Outside, Parking Lot Area. Need concrete stops for parking lot so cars will not roll down hill at the entrance of building. October 22, 2005 June 2, 2006 223 days
Ludlow-Taylor ES FM-200513414 05 6/2/06 Ludlow-Taylor Grounds area near Dumpster Area Remove Bulk trash from area October 3, 2005 June 2, 2006 242 days
Lafayette Elementary School FM-200514811 /05 6/2/06 Lafayette Outside-Playground Area Preventive Maintenance of Playground Equipment October 31, 2005 June 2, 2006 214 days
Kenilworth ES FM-200514630 /05 6/2/06 (Kenilworth) Exterior of Building. Install 30' X 8' of fence for wetland project. Gate needs to be installed for access. October 25, 2005 June 2, 2006 220 days
Jefferson JHS FM-200623588 06 6/2/06 Main Floor (by library) / Water Fountain Off The Wall - Water Leaking Everywhere - Can't Cut The Water Off May 31, 2006 June 2, 2006 2 days
Woodson High School FM-200619219 06 6/5/06 Ground Floor-Need Welder To Fix Cafeteria Tables February 28, 2006 June 5, 2006 97 days
Ronald H. Brown MS FM-200622512 06 6/5/06 First Floor-Stairwell #8 exit door to outside need adjustment May 11, 2006 June 5, 2006 25 days
Spingarn High School FM-200225622 03 6/5/06 Spingarn Basement by stairway # 3 Requesting a plummer to survey water leak that is under the stairs to the armory. February 11, 2003 June 5, 2006 1,210 days
Ronald H. Brown MS FM-200622494 06 6/5/06 Second Floor-Nissing door hardware (closer) to building #2 May 11, 2006 June 5, 2006 25 days
Ronald H. Brown MS FM-200622487 06 6/5/06 Second Floor-Missing hardware for stairwell door #11 (Door closer) May 11, 2006 June 5, 2006 25 days
Ronald H. Brown MS FM-200622483 06 6/5/06 Second Floor-Broken door closer for room #218 May 11, 2006 June 5, 2006 25 days
Ronald H. Brown MS FM-200622467 06 6/5/06 Third Floor-Missing door knob handle for room #310 May 11, 2006 June 5, 2006 25 days
Wilkinson ES FM-200507543 05 6/5/06 (Summer School Project) Repair or replace water coolers, and check all bathrooms in the building. July 7, 2005 June 5, 2006 333 days
Spingarn High School FM-200501764 05 6/5/06 Spingarn ( High School Bathroom Survey Report ) Third Floor - Boys Restroom - Replace (3) Urinal Flush Valves and Install (1) Water Closet Flush Valve Third Floor - Boys Restroom ( court) - Replace (4) Faucets Set Second Floor - Boys Restroom - Replace (1) Faucet Set and Replace (6) Urinal Flush Valves Second Floor - Boys Restroom - Replace (1) Faucet Set Day Care - Replace (2) Faucets Sets First Floor - Boys Restroom - Replace (2) Faucets,Replace (2) Urinals,Connect Urinals To Drain Line and Replace (2) Water Closet Flush Valves First Floor - Girls Restroom - Replace (2) Faucets Set,Replace (1) Water Closet Flush Valve Boys Locker Room - Replace (1) Urinal Flush Valve and Replace (2) Water Closet Flush Valves February 18, 2005 June 5, 2006 472 days
Eliot Junior High School FM-200623672 06 6/5/06 Marking of field for baseball game on 5/17/06 June 1, 2006 June 5, 2006 4 days
Webb Elementary School FM-200623585 06 6/5/06 1st Floor- Kitchen There is no hot water in the kitchen. May 31, 2006 June 5, 2006 5 days
West Elementary School FM-200623790 06 6/5/06 Lights in half of the building is out...Call pepco maybe a phaser..Call Electrican - 6:50 am. June 5, 2006 June 5, 2006 0 days
Wilkinson ES FM-200217212 02 6/5/06 (Wilkinson) Basement Garage Drain in garage is stopped up. September 10, 2002 June 5, 2006 1,364 days
Wilkinson ES FM-200222323 /02 6/5/06 Wlikinson First floor - Kgn area Three - need to replace delay to sloan flush valve. December 10, 2002 June 5, 2006 1,273 days
Wilkinson ES FM-200340364 /03 6/5/06 Wilkinson Repair bradley basin in girls room 19. November 17, 2003 June 5, 2006 931 days
Wilkinson ES FM-200445092 04 6/5/06 Wilkinson ( Maintenance T School Blitz ) 1) Remove Bradley Basins and replace with hand sinks. Asbestos Code A - Clear for repairs on 03/11/04. Horne Engineering - Philp Connolly (RG 03/29/04) March 9, 2004 June 5, 2006 818 days
Browne Junior High School FM-200621230 06 6/5/06 2nd Floor- Room 237 New Wing Lock needs to fixed. April 12, 2006 June 5, 2006 54 days
Roosevelt High School FM-200621576 06 6/5/06 Second floor landing by room 216. Repair guard rail and guard post. The rail and guard post need to be welded back to the frame of the door. April 20, 2006 June 5, 2006 46 days
Rudolph Elementary School FM-200618697 06 6/5/06 First Floor-Rm. 112 (new wing) Replace broken door lock. February 15, 2006 June 5, 2006 110 days
Ronald H. Brown MS FM-200622539 06 6/5/06 First Floor/Kitchen-Broken door hardware (closer) (loading dock area) May 11, 2006 June 5, 2006 25 days
Backus Middle School FM-200512754 05 6/5/06 Backus First Floor 1) Custodian Office - Sink line is stopped up. 2) Rec Area - Toilet is leaking from the pipe handle and also need a wax ring. September 16, 2005 June 5, 2006 262 days
Ronald H. Brown MS FM-200622526 06 6/5/06 First Floor-Room 109: Door hardware broken (closer) May 11, 2006 June 5, 2006 25 days
Ronald H. Brown MS FM-200622523 06 6/5/06 First Floor-Exit door in stairwell #9 to outside (left exit door will not open) May 11, 2006 June 5, 2006 25 days
Spingarn High School FM-200204112 02 6/5/06 (Spingarn) 2nd floor/ room 219 Replace old faucets in home-economics room and joining room. Replace (8) eight ea. faucets. Hot water side leaking, very old equipment. March 8, 2002 June 5, 2006 1,550 days
Hart Middle School FM-200621261 06 6/5/06 Front Entrance Door. Rekey main entrance door, due to issues of security. Note: The custodian forman needs (6) new keys in total April 12, 2006 June 5, 2006 54 days
Wilkinson ES FM-200500376 05 6/5/06 WILKINSON GARAGE AREA UNSTOP DRAINS IN AREA January 12, 2005 June 5, 2006 509 days
Spingarn High School FM-200213773 02 6/5/06 Spingarn Basement/Southwest Tunnel Area Replace 3" P-trap in south-west part of tunnel---water is backs up in the line whever it rains and the trap is missing. August 7, 2002 June 5, 2006 1,398 days
Leckie Elementary School FM-200623057 06 6/6/06 First Floor - Girls Restroom - Third stall stopped up...Custodian snaked out...still stopped up... May 22, 2006 June 6, 2006 15 days
Backus Middle School FM-200226506 03 6/6/06 Backus Second floor boy lavatory in rec area no water for hand washing. March 4, 2003 June 6, 2006 1,190 days
Backus Middle School FM-200339241 /03 6/6/06 Backus Second floor kitchen Investigate water coming through light fixtures. October 21, 2003 June 6, 2006 959 days
Backus Middle School FM-200340539 /03 6/6/06 Backus First floor boys lavatory Remount hand sink to wall. Support brackett is bent. Asbestos Code A - Clear for repairs on 11/20/03. Horne Engineering - Tony Marcolin ( RG 11/21/03 ) November 20, 2003 June 6, 2006 929 days
Backus Middle School FM-200623538 06 6/6/06 Rooms 303 The handle is missing (handle was lock). Install a new handle. May 30, 2006 June 6, 2006 7 days
Backus Middle School FM-200623620 06 6/6/06 2nd Floor Teacher's Lounge- handle is missing May 31, 2006 June 6, 2006 6 days
Backus Middle School FM-200623621 06 6/6/06 2nd Floor Room 212- handle is loose May 31, 2006 June 6, 2006 6 days
Backus Middle School FM-200623623 06 6/6/06 2nd Floor Near Room 214- handle is missing and panic bar is loose May 31, 2006 June 6, 2006 6 days
Bowen Elementary School FM-200516263 /05 6/6/06 BOWEN boiler room Check operation and replace hi-limit control switch on boiler # 2 December 10, 2005 June 6, 2006 178 days
Bowen Elementary School FM-200619227 06 6/6/06 Bowen Boiler Room Boiler #1 Flame failure, Lock out March 1, 2006 June 6, 2006 97 days
Merritt Middle School FM-200621006 06 6/6/06 Third Floor-Latch broken on exit door-Third Floor East Quarters. "Fire Code Violation" April 6, 2006 June 6, 2006 61 days
Merritt Middle School FM-200621018 06 6/6/06 Third Floor-Exit door panic bar broken gym back door stairwell exit. "Fire Code Violation" April 6, 2006 June 6, 2006 61 days
School WW High School FM-200623982 06 6/6/06 Second Floor- Rooms 208 Need electricians to perform electrical assessment for installation of a/c units in the aforementioned areas. NOTE: School has purchased window air conditioning units for above locations Make - Frigidaire model # FAS156N1A 1PH, 115V / 60Hz 15100 BTUs June 6, 2006 June 6, 2006 0 days
School WW High School FM-200623983 06 6/6/06 Third Floor- Rooms 303 Need electricians to perform electrical assessment for installation of a/c units in the aforementioned areas. NOTE: School has purchased window air conditioning units for above locations Make - Frigidaire model # FAS156N1A 1PH, 115V / 60Hz 15100 BTUs June 6, 2006 June 6, 2006 0 days
School WW High School FM-200623984 06 6/6/06 Third Floor- Room 304 Need electricians to perform electrical assessment for installation of a/c units in the aforementioned areas. NOTE: School has purchased window air conditioning units for above locations Make - Frigidaire model # FAS156N1A 1PH, 115V / 60Hz 15100 BTUs June 6, 2006 June 6, 2006 0 days
School WW High School FM-200623985 5 6/6/06 6/6/06 Third Floor- Room 306 Need electricians to perform electrical assessment for installation of a/c units in the aforementioned areas. NOTE: School has purchased window air conditioning units for above locations Make - Frigidaire model # FAS156N1A 1PH, 115V / 60Hz 15100 BTUs June 6, 2006 June 6, 2006 0 days
School WW High School FM-200623987 7 6/6/06 6/6/06 Third Floor- Room 307 Need electricians to perform electrical assessment for installation of a/c units in the aforementioned areas. NOTE: School has purchased window air conditioning units for above locations Make - Frigidaire model # FAS156N1A 1PH, 115V / 60Hz 15100 BTUs June 6, 2006 June 6, 2006 0 days
School WW High School FM-200623988 8 6/6/06 6/6/06 Third floor- Room 308. Need electricians to perform electrical assessment for installation of a/c units in the aforementioned areas. NOTE: School has purchased window air conditioning units for above locations Make - Frigidaire model # FAS156N1A 1PH, 115V / 60Hz 15100 BTUs June 6, 2006 June 6, 2006 0 days
Tyler Elementary School FM-200623071 06 6/6/06 Tyler Boiler room Repair Modular chillers, unit will not start. May 22, 2006 June 6, 2006 15 days
Park View ES FM-200510193 05 6/7/06 Park View Fire Code Violation Room 115-Floor Breech Asbestos Code A - Clear for repairs on 07/16/05. Tidewater - Paul Berman (RG 08/17/05) August 11, 2005 June 7, 2006 300 days
Turner Elementary School FM-200623512 06 6/7/06 2nd Floor- Nurses New Suite; Room 200 The lock needs to be replaced on the new Nurses Suite. She cannot secure medical records. May 30, 2006 June 7, 2006 8 days
Orr Elementary School FM-200514983 05 6/7/06 Perform preventive maintenance on playground equipment. November 2, 2005 June 7, 2006 217 days
Plummer Elementary School FM-200514986 05 6/7/06 Perform preventive maintenance on playground equipment. November 2, 2005 June 7, 2006 217 days
Tubman Elementary School FM-200515067 05 6/7/06 Replace ridding horses on playground equipment on the playground. (Ridding horses are in building November 3, 2005 June 7, 2006 216 days
Horace Mann Elementary School FM-200514814 /05 6/7/06 Mann Outside-Playground Area Preventive Maintenance of Playground Equipment October 31, 2005 June 7, 2006 219 days
Truesdell Elementary FM-200515031 05 6/7/06 Hamilton St. Side of building Repair fence that is lying on the ground November 3, 2005 June 7, 2006 216 days
Raymond Elementary School FM-200510836 05 6/7/06 Raymond Fire code Violation First Floor-Exit door need adjustment (gets stuck) in incinerator room-2003 DC Supp 110.1(12) Asbestos Code A - Clear for repairs on 08/22/05. Tidewater - Kenny Long (RG 08/23/05) August 19, 2005 June 7, 2006 292 days
Raymond Elementary School FM-200510771 05 6/7/06 Raymond Fire code Violation Second Floor-Stairell door need adjustment (does not close properly)-2000 IFC 703.2.3 Code A-clear for repair by DCPS Charles Buchanan on 8/19/05 August 18, 2005 June 7, 2006 293 days
Raymond Elementary School FM-200510732 05 6/7/06 Raymond Fire code Violation Third Floor-Missing floor tile (tripping hazard) -2003 DC Supp. 110.1 (1,3) room 35 Asbestos Code A - Clear for repairs on 08/19/05. Tidewater -Paul Berman (RG 08/23/05) August 18, 2005 June 7, 2006 293 days
Raymond Elementary School FM-200510879 05 6/7/06 Raymond Fire code Violation First Floor-Missing ceiling tile and (2) storage rooms need light fixture covers-2003 DC Supp. 110.1 (1) Asbestos Code A - Clear for repairs on 08/23/05. Tidewater - Paul Berman (RG 08/25/05) August 22, 2005 June 7, 2006 289 days
Payne Elementary School FM-200623506 06 6/7/06 First floor, Exterior exit door leading to the playground. Repair or Replace malfunctioning panic bar. Note: This door cannot be secured properly. May 30, 2006 June 7, 2006 8 days
Raymond Elementary School FM-200510885 05 6/7/06 Raymond Fire code Violation Second Floor-New Wing Missing ceiling tile in hallway near #217-2003 DC Supp. 110.1 (1) Code A - Clear for repairs on 08/23/05. Tidewater - Paul Berman (RG 08/24/05) August 22, 2005 June 7, 2006 289 days
Anacostia Senior High School FM-200622930 06 6/7/06 Secure six file cabinet locks and two desk locks in main office to secure files. May 17, 2006 June 7, 2006 21 days
Backus Middle School FM-200509238 05 6/7/06 Backus "Fire Code Violation" Second Floor Replace ceiling tile throughout second floor IFC 110.0 HA 027 Ceiling tile off white 12" X 12" with gouges No Asbestos HA 028 Ceiling tile white tile 2' X 4' gouged & pinholes No Asbestos HA 029 Ceiling tile white 2' X 4' with random gouges & pinhole No Asbestos HA 031 Ceiling tile white 2' X 2' with textured finish & pinholes No Asbestos Code A-clear for repair by DCPS Charles Buchanan on 8/3/05 August 1, 2005 June 7, 2006 310 days
Backus Middle School FM-200509239 05 6/7/06 Backus "Fire Code Violation" First Floor Replace ceiling tile throughout first floor IFC 110.0 HA 027 Ceiling tile off white 12" X 12" with gouges No Asbestos HA 028 Ceiling tile white tile 2' X 4' gouged & pinholes No Asbestos HA 029 Ceiling tile white 2' X 4' with random gouges & pinhole No Asbestos HA 031 Ceiling tile white 2' X 2' with textured finish & pinholes No Asbestos Code A-clear for repair by DCPS Charles Buchanan on 8/3/05 August 1, 2005 June 7, 2006 310 days
Backus Middle School FM-200512816 05 6/7/06 (Backus) "Emergency" Repair ruptured 4" galvanized water line from street into building, This is the main water l;ine from the street to the school. Note: WASA was contacted (Ms. Anderson) September 19, 2005 June 7, 2006 261 days
Ronald H. Brown MS FM-200623998 06 6/7/06 Kitchen - Grease trap and all drains are stopped up... June 7, 2006 June 7, 2006 0 days
Harris, C.W. ES FM-200624014 06 6/7/06 First floor, Principal's Office. Need locksmith to unlock principal's office because she left her keys at home. Note: The principal needs to gain access to her office asap!! June 7, 2006 June 7, 2006 0 days
Patricia R Harris Ed Center FM-200623106 06 6/7/06 Harris, P.R. Boiler Room Replace (1) leaking tube in Boiler #1. Tube has a pinholein it. May 23, 2006 June 7, 2006 15 days
Bancroft Elementary School FM-200515148 05 6/7/06 Playground-Near Cafeteria: Replace/Repair steps leading to cafeteria badly deteriorated and trip hazard. November 7, 2005 June 7, 2006 212 days
Spingarn High School FM-200455196 04 6/7/06 Spingarn Kitchen Need plumber to snake out drain where the deep frier is, water comes back up. September 20, 2004 June 7, 2006 625 days
Moten Elementary School FM-200514982 05 6/7/06 Perform preventive maintenance on playground equipment. November 2, 2005 June 7, 2006 217 days
Spingarn High School FM-200458205 /04 6/7/06 Spingarn Requesting a plumber to survey the faucets water leaks an stop running. November 12, 2004 June 7, 2006 572 days
Kramer Middle School FM-200624012 06 6/7/06 Kitchen/Pot Sink Stopped Up June 7, 2006 June 7, 2006 0 days
Hine JHS FM-200514975 05 6/7/06 Repair hole in fence by basketball court. November 2, 2005 June 7, 2006 217 days
Payne Elementary School FM-200514985 05 6/7/06 Perform preventive maintenance on playground equipment. November 2, 2005 June 7, 2006 217 days
Spingarn High School FM-200501047 05 6/7/06 Spingarn Room 207 1) Repair leak in ceiling. February 1, 2005 June 7, 2006 491 days
Duke Ellington School FM-200514873 /05 6/7/06 Bulk Trash Pick-Up October 31, 2005 June 7, 2006 219 days
Spingarn High School FM-200505015 05 6/7/06 ( SPINGARN ) Basement - Kitchen 1) Requesting a plummer to snake out drain where the deep fryer sat. May 2, 2005 June 7, 2006 401 days
Merritt Middle School FM-200514981 05 6/7/06 Perform preventive maintenance on playground equipment. November 2, 2005 June 7, 2006 217 days
West Elementary School FM-200514979 05 6/7/06 Remove graffiti from Outside-Kindergarten Play Area November 2, 2005 June 7, 2006 217 days
Spingarn High School FM-200515932 05 6/7/06 Emergency: Repair the leaking pipe in the girls locker room. December 1, 2005 June 7, 2006 188 days
Walker-Jones EC FM-200623589 06 6/7/06 First floor, Main Lobby. Repair or Replace water fountain, no water is coming out. May 31, 2006 June 7, 2006 7 days
Leckie Elementary School FM-200514812 /05 6/7/06 Leckie Outside-Playground Area Preventive Maintenance of Playground Equipment October 31, 2005 June 7, 2006 219 days
Raymond Elementary School FM-200510799 05 6/7/06 Raymond Fire code Violation First Floor-Floor tile missing/need repair in multipurpose room 2003 DC Supp. 110.1(1,3) Asbestos Code A - Clear for repairs on 08/19/05. Tidewater -Paul Berman (RG 08/23/05) August 19, 2005 June 7, 2006 292 days
Spingarn High School FM-200516554 /05 6/7/06 Asbestos Assessment Required. "Emergency" First floor, Room 115. Assess & Repair leak in ceiling. Asbestos Code A - Clear for repairs on 12/16/05. Tidewater - Roger Small (RG 12/19/05) December 15, 2005 June 7, 2006 174 days
Aiton Elementary School FM-200514904 /05 6/7/06 Install chain link gate 3'x6' in the teachers parking lot also install chain link gate adjcent sidewalk to the rear of building. October 31, 2005 June 7, 2006 219 days
Smothers ES FM-200515282 05 6/8/06 Perform preventive maintenance on playground equipment. November 9, 2005 June 8, 2006 211 days
Wilkinson ES FM-200621806 06 6/8/06 1st Floor- Gym Area There is a stopped up urinal in the boy's bathroom. April 26, 2006 June 8, 2006 43 days
Wilkinson ES FM-200456359 04 6/8/06 Wilkinson First floor 58 gym area boy bathroom Need to replace flush valve and stop and handle. October 1, 2004 June 8, 2006 615 days
Walker-Jones EC FM-200515290 05 6/8/06 Perform preventive maintenance on playground equipment. November 9, 2005 June 8, 2006 211 days
Tyler Elementary School FM-200515288 05 6/8/06 Perform preventive maintenance on playground equipment. November 9, 2005 June 8, 2006 211 days
Turner Elementary School FM-200515287 05 6/8/06 Perform preventive maintenance on playground equipment. November 9, 2005 June 8, 2006 211 days
Tubman Elementary School FM-200515377 /05 6/8/06 Parking Lot Remove Sofa November 10, 2005 June 8, 2006 210 days
Beers Elementary School FM-200624011 06 6/8/06 First Floor/Back Exit Door (by B3) -Bolt lock has been kicked off the door. June 7, 2006 June 8, 2006 1 day
Stoddert ES FM-200515284 05 6/8/06 Perform preventive maintenance on playground equipment. November 9, 2005 June 8, 2006 211 days
Wilkinson ES FM-200622090 06 6/8/06 2nd Floor- Room 184 Girl's Restroom Two toilets need to be repaired; they will not flush properly. May 2, 2006 June 8, 2006 37 days
Spingarn High School FM-200455628 04 6/8/06 Spingarn First floor health suite Unstopped sink. September 24, 2004 June 8, 2006 622 days
Spingarn High School FM-200455537 04 6/8/06 (Spingarn) 1st Floor/Health Suite: Unstop sink with black chemicals present. September 23, 2004 June 8, 2006 623 days
Slowe Elementary School FM-200624051 06 6/8/06 First Floor/Boy's Restroom - Urinal Is Leaking From The Rear - Could Not Cut The Water Off June 8, 2006 June 8, 2006 0 days
Eastern High School FM-200624001 06 6/8/06 Boy's Restroom/Across From B-79 - Urinal is loose from the wall, waste water is leaking down to the room under the restroom. June 7, 2006 June 8, 2006 1 day
Wilkinson ES FM-200622084 06 6/8/06 1st Floor- Boys Restroom (gym area-58) The urinal flush valve (3-180) needs to be replaced. May 2, 2006 June 8, 2006 37 days
Oyster Elementary School FM-200624048 /8/06 6/8/06 Oyster Classrooms #404 and #301 Repair or replace heat pumps for cooling and heating. Made by Mr Quay- A/C Company Part #210979200 Made - WFDSI 036K200-200 AA12ZZB1 Volts 460 HZ 60 PH3 Motor: Volts 460 FLA 1.6 LRA 3.5 HZ 60 PH 1 HP 1/2 Compressor: Volts 460 FLA-5.1 HZ 60 PH 3 LRA 33.0 Repair or replace compressor will not stay on, keep cutting off on low pressure. June 8, 2006 June 8, 2006 0 days
Wilkinson ES FM-200622246 06 6/9/06 Second Fl.-Girls Restroom: Flush valve leaking again, water was cut off. May 5, 2006 June 9, 2006 35 days
Browne Junior High School FM-200624020 06 6/9/06 Second floor, Room 237. Repair or Replace door lock, staff are unable to gain access to classroom. Note: There appear to be something broke off in the lock. June 7, 2006 June 9, 2006 2 days
Wilkinson ES FM-200505673 05 6/9/06 Wilkinson First fl. girls Restroom/ Pre-K-Area Repair the Faucet May 18, 2005 June 9, 2006 387 days
Plummer Elementary School FM-200504422 05 6/9/06 ( PLUMMER ) Third Floor - Boys Restroom 1) Replace broken sink. April 21, 2005 June 9, 2006 414 days
Browne Junior High School FM-200623944 06 6/9/06 Gymnasium/Girl's Restroom Hallway Need A Door Handle/Lock June 6, 2006 June 9, 2006 3 days
Marshall Educational Center FM-200619614 06 6/9/06 Exterior Front Entrance. Remove derogative graffitti from off of front entrance. March 7, 2006 June 9, 2006 94 days
Webb Elementary School FM-200624029 06 6/9/06 First Floor/Vault Door Near Main Office: Replace Lock, It's Broken June 7, 2006 June 9, 2006 2 days
Wilkinson ES FM-200446881 04 6/9/06 Wilkinson First floor 58 gym area boys bathroom Need to replace back urinal on wall. Asbestos Code A - Clear for repairs on 04/20/04. Horne Engineering - Bjarne Smith (RG 04/21/04) SEE LINKED DOCUMENTS April 20, 2004 June 9, 2006 780 days
Houston Elementary School FM-200624154 06 6/9/06 Houston Boiler Room Replace circuit breaker for sump pump, breaker keep tripping. Sump pit is full of water. June 9, 2006 June 9, 2006 0 days
Patricia R Harris Ed Center FM-200621598 06 6/9/06 Entire Exterior of Building. Remove all graffitti from entire exterior of building. April 21, 2006 June 9, 2006 49 days
Bancroft Elementary School FM-200623102 06 6/9/06 Remove graffitti from school grounds. May 22, 2006 June 9, 2006 18 days
Bruce-Monroe Elementary School FM-200622394 06 6/9/06 Remove graffiti on Columbia Rd. Side of the building (exterior). May 9, 2006 June 9, 2006 31 days
Payne Elementary School FM-200623740 06 6/9/06 repair hole in fence at 15th st side of school June 2, 2006 June 9, 2006 7 days
Browne Junior High School FM-200624021 06 6/9/06 First floor, Room 131. Repair or Replace door lock, staff are unable to gain access to storage room. Note: There appear to be something broke off in the lock. June 7, 2006 June 9, 2006 2 days
Seaton Elementary School FM-200622939 06 6/9/06 Small Playground- Kindergarten Area Graffitti is on the walls and on the blacktop. May 18, 2006 June 9, 2006 22 days
John Burroughs ES FM-200622681 06 6/9/06 Graffiti is on the sheild and building of school. alot of graffiti. May 9, 2006 June 9, 2006 31 days
Browne Junior High School FM-200623909 06 6/9/06 1st Floor- Room 135 (New Wing) They cannot get into the room using that same key as usual. June 6, 2006 June 9, 2006 3 days
Plummer Elementary School FM-200504437 05 6/9/06 ( PLUMMER ) Third Floor - Girls Restroom 1) Repair/Replace two broken sinks, no hot water. April 21, 2005 June 9, 2006 414 days
Browne Junior High School FM-200623939 06 6/9/06 Gymnasium/Teacher Restroom - Replace lock on the door. June 6, 2006 June 9, 2006 3 days
Wilkinson ES FM-200618716 06 6/9/06 Second Floor-184 (Girls Restroom) Replace or repair two flush valves on commodes that are not working/will not flush. February 16, 2006 June 9, 2006 113 days
Plummer Elementary School FM-200508695 05 6/12/06 Plummer Emergency! Throughout the building there is no running water. July 26, 2005 June 12, 2006 321 days
Bancroft Elementary School FM-200459376 04 6/12/06 BANCROFT ART RM- SINK SINK IS LEAKING DOWN INTO THE MUSIC RM STORAGE AREA. December 8, 2004 June 12, 2006 551 days
Bancroft Elementary School FM-200617714 06 6/12/06 No Hot Water In Health Suite January 23, 2006 June 12, 2006 140 days
Bancroft Elementary School FM-200617417 06 6/12/06 First floor, Nurse's Suite Restroom. Need plumbers to assess & repair hot water issue, currently there's no hot water in this restroom sink. January 13, 2006 June 12, 2006 150 days
Anacostia Senior High School FM-200623949 06 6/12/06 2nd Floor- Room 228 The lock needs to be changed on the door. June 6, 2006 June 12, 2006 6 days
Bancroft Elementary School FM-200512867 05 6/12/06 Bancroft Emergency First Floor-110 Art Room (main bldg) Replace sink and fixture unit, leaking water throughout ceileng (8-21-05) September 20, 2005 June 12, 2006 265 days
Reed LC FM-200623091 06 6/12/06 Ground- Recreational Room Repair/replace 2 doorknobs and locks on entrance doors. The door knobs are broken and the doors cannot be opened. May 22, 2006 June 12, 2006 21 days
Montgomery ES FM-200623725 06 6/12/06 1st Floor- Counselor's Suite The usual key is not working in the lock. June 1, 2006 June 12, 2006 11 days
Moten Elementary School FM-200624128 06 6/13/06 2nd & 3rd Floor- Rooms 218 & 307 The locks need to be repaired; they do not work. June 9, 2006 June 13, 2006 4 days
Houston Elementary School FM-200620863 06 6/13/06 First Floor-Door broken 4th exit door to right-lobby exit to playground. "Fire Code Violation" April 4, 2006 June 13, 2006 70 days
Dunbar High School FM-200624163 06 6/13/06 2nd Floor- Counselor's Suite Lock needs to be changed; there is a new teacher in this room now. June 9, 2006 June 13, 2006 4 days
Dunbar High School FM-200622618 06 6/13/06 4th Floor- Room 4 East Oneway lock (on door knob) cannot be locked. May 12, 2006 June 13, 2006 32 days
Langdon Elementary School FM-200623115 06 6/13/06 Second Floor-Broken door opener/closer (6th grade rm.) May 23, 2006 June 13, 2006 21 days
Langdon Elementary School FM-200623119 06 6/13/06 First Floor-Breach in ceiling missing tile, Pre-K Asbestos Code A - Clear for repairs on 05/23/06 Tidewater - Kenny Belton (RG 05/25/06) May 23, 2006 June 13, 2006 21 days
Wilkinson ES FM-200624139 06 6/13/06 First Floor/Parent Center Storage Rm. #86 - Re-key the lock to secure the math & reading materials. June 9, 2006 June 13, 2006 4 days
Wilkinson ES FM-200624140 06 6/13/06 First Floor/Kindergarden Area Left Entrance Door - Repair or replace the knob lock, it's loose. June 9, 2006 June 13, 2006 4 days
Merritt Middle School FM-200624214 06 6/13/06 Merritt Emergency Generator Room Repair rim cylinder lock to Emergency Generator Room . Unable to gain access to Generator, Key way has been clogged with debris. June 12, 2006 June 13, 2006 1 day
Reed LC FM-200623316 06 6/13/06 Second Floor-Glass Missing From Extinguisher Cabinet Outside, CAI Lab May 25, 2006 June 13, 2006 19 days
Nalle Elementary School FM-200623164 06 6/13/06 First Floor (old bldg.)-Glass cracked on classroom door #108 Asbestos Code A - Clear for repairs on 05/25/06. Tidewater - Carlos Vera (RG 05/30/06) May 23, 2006 June 13, 2006 21 days
Truesdell Elementary FM-200622929 06 6/13/06 Outside- Playground Remove Graffitti May 18, 2006 June 13, 2006 26 days
Bancroft Elementary School FM-200623044 06 6/13/06 1st Floor- Main Office (bathroom) Replace faucets (on porcelain sink) and flush valves (on toilets). May 19, 2006 June 13, 2006 25 days
Bancroft Elementary School FM-200622339 06 6/13/06 Ground Floor- Cafeteria (Main Bldg) There is no running hot water in the wash basin or sink. May 8, 2006 June 13, 2006 36 days
Bancroft Elementary School FM-200621404 06 6/13/06 1st Floor- Girls Bathroom (main building) Toilet needs to be replaced. It is leaking around the seat and will not flush. April 18, 2006 June 13, 2006 56 days
Bancroft Elementary School FM-200446502 04 6/13/06 Bancroft Room 215 main bldg. (science), Ground floor music room (100) and First floor room 110 main bldg art room Replace sink, no running water. April 8, 2004 June 13, 2006 796 days
Bancroft Elementary School FM-200621168 06 6/14/06 Third Floor-Girls Bathroom (Main Bldg.)-Replace entire flush valve assembly/stop valve. April 11, 2006 June 14, 2006 64 days
Bunker Hill Elementary School FM-200624348 06 6/14/06 Bunker Hill Boiler Room Repair rupture hot water line on domestic hot water line. June 14, 2006 June 14, 2006 0 days
Bancroft Elementary School FM-200619607 06 6/14/06 Third Floor-Girl's Bathroom (main bldg.) Replace 2 faucets on sink #1, water will not stop running. March 7, 2006 June 14, 2006 99 days
Shaw JHS FM-200624358 06 6/14/06 First floor, Main Office & Adjacent Offices. No lights in the above admin, offices. June 14, 2006 June 14, 2006 0 days
Bancroft Elementary School FM-200621134 06 6/14/06 Ground Floor-Cafeteria (main bldg.)-Replace water filter on water cooler. Water is not cold and barely comes out. April 10, 2006 June 14, 2006 65 days
Leckie Elementary School FM-200513993 /05 6/14/06 Third Floor - 1) Put new ceiling tile to secure the exit signs. New exit light that was installed damaged the ceiling tile. October 20, 2005 June 14, 2006 237 days
Shaw JHS FM-200623770 06 6/15/06 Basement 4 doors need new locks. June 2, 2006 June 15, 2006 13 days
Murch Elementary School FM-200624239 06 6/15/06 White Detached Building. (Demountable) Repair lock and furnish keys to entrance doors. June 13, 2006 June 15, 2006 2 days
Anacostia Senior High School FM-200623490 06 6/15/06 New Bldg./Rm. 412: Broken Door Arm Closer May 30, 2006 June 15, 2006 16 days
Anacostia Senior High School FM-200623471 06 6/15/06 Second Floor/Across From Room 239: Exit Light Is Not Properly Illuminated. May 30, 2006 June 15, 2006 16 days
Coolidge High School FM-200513565 05 6/15/06 Coolidge Stadium Area/ Irrigation rm. Repair Door October 6, 2005 June 15, 2006 252 days
Coolidge High School FM-200508512 05 6/16/06 Coolidge "Fire Code Violation" Second Floor Door #2 door missing (703.2.2) July 25, 2005 June 16, 2006 326 days
Backus Middle School FM-200509236 05 6/16/06 Backus "Fire Code Violation" Second Floor Missing ceiling tile in recreation area IFC 110.0 HA 027 Ceiling tile off white 12" X 12" with gouges No Asbestos HA 028 Ceiling tile white tile 2' X 4' gouged & pinholes No Asbestos HA 029 Ceiling tile white 2' X 4' with random gouges & pinhole No Asbestos HA 031 Ceiling tile white 2' X 2' with textured finish & pinholes No Asbestos Code A-clear for repair by DCPS Charles Buchanan on 8/3/05 August 1, 2005 June 16, 2006 319 days
Simon Elementary School FM-200509639 05 6/16/06 Simon Fire Code Violation First Floor Auditorium doors wont close properly 703.2.2 Asbestos Code A - Clear for repairs on 03/03/06 Tidewater - Shamika Parker (RG 03/07/05) August 5, 2005 June 16, 2006 315 days
Ballou Senior High School FM-200505127 05 6/16/06 (Ballou) First floor, Hall. Rehung wall hung drinking fountain. May 4, 2005 June 16, 2006 408 days
Roosevelt High School FM-200509412 05 6/16/06 Roosevelt Fire Code Violation Third Floor Missing Ceiling tile in #337-2003 DC Supp 110.1(1) Asbestos Code A - Clear for repairs on 08/04/05. Tidewater - Henry Addison (RG 08/09/05) August 3, 2005 June 16, 2006 317 days
Wilkinson ES FM-200621743 06 6/16/06 Garage Area Hose bib is leaking. Water is running onto the garage floor. April 25, 2006 June 16, 2006 52 days
Spingarn High School FM-200619561 06 6/18/06 First Floor-Teachers Bathroom Replace the broken toilet March 7, 2006 June 18, 2006 103 days
Ronald H. Brown MS FM-200622522 06 6/19/06 First Floor-Poor lighting in room #115 incinerator room May 11, 2006 June 19, 2006 39 days
Ronald H. Brown MS FM-200622518 06 6/19/06 First Floor/Boiler Room-Exit sign not maintained (hanging) & not illuminated May 11, 2006 June 19, 2006 39 days
Ronald H. Brown MS FM-200622498 06 6/19/06 Second Floor-Telephone room door missing in building #2 (door needs to be placed back). May 11, 2006 June 19, 2006 39 days
Barnard Elementary School FM-200514039 /05 6/19/06 Barnard Adult Mens restroom (Lobby) Repair battery operated fjlush valve October 20, 2005 June 19, 2006 242 days
Miner Elementary FM-200622807 06 6/19/06 Exit light not illuminated May 17, 2006 June 19, 2006 33 days
Reed LC FM-200623317 06 6/19/06 First Floor-Exit light not illuminated, Stairway 2 May 25, 2006 June 19, 2006 25 days
Young Elementary School FM-200618717 06 6/19/06 Kitchen-Replace lock on store room door Note: Need to be secure for computer & food. February 16, 2006 June 19, 2006 123 days
Draper Elementary School FM-200623252 06 6/19/06 First Floor/Exit light ont illuminated near room #111 May 24, 2006 June 19, 2006 26 days
Stoddert ES FM-200623810 06 6/19/06 First Floor/Exit light not illuminated June 5, 2006 June 19, 2006 14 days
Draper Elementary School FM-200623250 06 6/19/06 First Floor/Room 111 - Exit sign covered with tape (obscured) & not maintained. May 24, 2006 June 19, 2006 26 days
Drew Elementary School FM-200624248 06 6/19/06 First Floor/Rear parking lot exit door not latching June 13, 2006 June 19, 2006 6 days
Nalle Elementary School FM-200623688 06 6/19/06 Outside Grounds-Storage Door/Repair or Replace the Lock June 1, 2006 June 19, 2006 18 days
Turner Elementary School FM-200619815 06 6/19/06 Fire Code Violation First Floor-Exit light not iluminated Gym x4 March 14, 2006 June 19, 2006 97 days
Reed LC