Urgent Repair Requests Closed in July 2005 (82) | School | Description | Open Date | Close Date | Time Elapsed |
| Shaw JHS | FM-200507426 05 7/5/05 Shaw Boiler Room Repair or replace enterior door lock to boiler room. Door will not operate, entering or exit. Latch will not slide in or out. Urgent !!!! | July 5, 2005 | July 5, 2005 | 0 days |
| Dunbar High School | FM-200507413 05 7/5/05 Dunbar Business Suite Repair or replace lock on classroom vault. Lock inoperation and vault has Education materials ard in vault. Summer school suite. Urgent !!!! | July 5, 2005 | July 5, 2005 | 0 days |
| Reed LC | FM-200506896 05 7/6/05 (REED) Ground Floor - Pool-Male Locker Room 1) Repair or Replace the lock on the door. Note: Due to the safety of the public and students (This door will not lock) | June 17, 2005 | July 6, 2005 | 19 days |
| Randle-Highlands ES | FM-200507218 05 7/7/05 !!!!!VERY URGENT!!!!! Ground Floor - Custodian Closet in the Gym Repair or Replace lock on the door, the lock was tamperd with over the weekend | June 27, 2005 | July 7, 2005 | 10 days |
| Barnard Elementary School | FM-200507425 05 7/7/05 !!!!URGENT!!!! First Floor Main Office "Welcoming Center" The rear exit door located in the main office is not locking properly. The lock is sticking or not properly alligned this is a security issue. | July 5, 2005 | July 7, 2005 | 2 days |
| Moten Elementary School | FM-200506949 05 7/7/05 Moten URGENT!!!! Ground, First, Second, Third, and Fourth Floors 1) Water fountains are in need of repairs. | June 20, 2005 | July 7, 2005 | 17 days |
| Woodson High School | FM-200507307 05 7/8/05 URGENT!!!! Rm 312 Repair Door Lock | June 30, 2005 | July 8, 2005 | 8 days |
| Burrville Elementary School | FM-200505378 05 7/8/05 (BURRVILLE) URGENT!!! Second Floor - Multi-Purpose Room 1) Replace bulbs because ceilings are too high | May 11, 2005 | July 8, 2005 | 58 days |
| Shaw JHS | FM-200452414 04 7/11/05 Shaw Fire Code Violation Stairwell 6 Deffective hardware exit door. Asbestos Code A - Clear for repairs on 08/17/04. DCPS Safety - Leroy Minton Jr. (RG 08/18/04) | August 12, 2004 | July 11, 2005 | 333 days |
| Shaw JHS | FM-200452413 04 7/11/05 Shaw Fire Code Violation Gym lobby Door not closing properly. Asbestos Code A - Clear for repairs on 08/17/04. DCPS Safety - Leroy Minton Jr. (RG 08/18/04) | August 12, 2004 | July 11, 2005 | 333 days |
| Shaw JHS | FM-200452405 04 7/11/05 Shaw Fire Code Violation Second floor 9th grade teachers lounge door closer missing. Asbestos Code A - Clear for repairs on 08/17/04. DCPS Safety - Leroy Minton Jr. (RG 08/18/04) | August 12, 2004 | July 11, 2005 | 333 days |
| Marshall Educational Center | FM-200455121 04 7/11/05 Marshall, Thurgood Fire Code Violation First floor Stage # 1 boys bathroom missing ceiling tiles. Asbestos Code A - Clear for repairs on 09/20/04. DCPS Safety - Richard Gibson. (RG) | September 20, 2004 | July 11, 2005 | 294 days |
| Payne Elementary School | FM-200507449 05 7/12/05 Second floor, New Wing/Teachers' restroom. Replace flush valve on commode it constantly runs. Note: The custodian on site attempted to replace flush valve but he was unsuccessful. Asbestos Code A - Clear for repairs on 07/06/05. DCPS Safety - Richard Gibson (RG) | July 5, 2005 | July 12, 2005 | 7 days |
| Gibbs Elementary School | FM-200453256 04 7/13/05 Gibbs First floor cafeteria Ceiling tile is wet from roof leak, need to be replaced or repair.Front door needs repairing. Asbestos Code A - Clear for repairs on 08/26/04. DCPS Safety - Richard Gibson (RG 08/27/04) | August 24, 2004 | July 13, 2005 | 323 days |
| Hardy Middle School | FM-200507207 05 7/15/05 "Urgent" First and Second floor. Unstop (4) slop sinks on both floors also unstop (3) urinals on second floor in boys' restroom. | June 27, 2005 | July 15, 2005 | 18 days |
| Payne Elementary School | FM-200508079 05 7/19/05 (Payne) "Urgent" Old Building, Third floor/Custodian closet. Unclog slop sink. Note: Custodian foreman was unable to unclog sink he requested for the plumbers to bring a K-50. | July 19, 2005 | July 19, 2005 | 0 days |
| Cardozo High School | FM-200102379 /01 7/22/05 (CARDOZO) BOYS BATHROOM GYM: MAKE REPAIRS TO VANDALIZED BATHROOM. REPLACE URINALS AND FACE BOWLS. Asbsetos Code A - Clear for repairs 02/25/02 DCPS Safety - Ronald Edwards (RE | January 29, 2001 | July 22, 2005 | 1,635 days |
| Eliot Junior High School | FM-200102386 01 7/22/05 (ELIOT) BASEMENT LEVEL/STORAGE ROOM: 1) ASBESTOS ASSESSMENT REQUIRED. 2) REMOVE ALL MATERIAL FROM FLAMABLE STORAGE AREA, OUTSIDE INCINERATOR ROOM. REQUEST SAFETY INSPECTION OF MATERIAL. REQUEST SENT TO SAFETY. Asbestos Code A - Clear for repairs on 03/10/03. Horne Engineering - Philp Connolly (RG 03/11/03) | January 29, 2001 | July 22, 2005 | 1,635 days |
| Eastern High School | FM-200100625 01 7/22/05 EASTERN BOILER ROOM SURVEY & REPLACE METAL LOUVERS IN BACK OF BOILER ROOM WITH METAL OR WOODEN LOUVERS THAT WILL BE ABLE TO CLOSE. BY THE LOUVERS NOT BEING ABLE TO CLOSE, PIPES MAY BUSTED DURING FREEZING WEATHER. ASBESTOS CODE A - CLEAR FOR REPAIRS ON 11/16/01. LEROY MINTON - SAFETY (202)576-6691 (RG) | January 9, 2001 | July 22, 2005 | 1,655 days |
| Wilson J. O. ES | FM-200107943 01 7/22/05 WILSON, J.O. SECOND (2ND) AND THIRD (3RD) FLOOR 1) ASBESTOS ASSESSMENT REQUIRED. 2) REMOVE AND CAP OFF FLOOR MOUNTED ELECTRICAL OUTLETS TO THE FOLLOWING CLASSROOMS: #217, 203, 204, 205, 206, 207, 209, 317, 316, 315, 304, 305, 306, 308 AND 310. NOTE: OUTLETS ARE TRIPPING HAZARDS. Asbestos Code A - Abated and cleared for repairs on 02-26-03 by Leroy Minton Jr (LN/03-30-04) Safety Office. 202-576-6691. | April 9, 2001 | July 22, 2005 | 1,565 days |
| Thomas Elementary School | FM-200104496 01 7/22/05 N. THOMAS 2ND FLOOR ROOM 211 ASBESTOS ASSESSMENT REPLACE FLOOR TILE. TILE IS 9 x 9, AND IT IS BEING BROKEN BY STUDENTS DAILY. ASBESTOS CODE A - CLEAR FOR REPAIRS ON 02-25-03 BY LEROY MINTON JR. (LM/02-25-03) SAFETY OFFICE. 202-576-8962. NOTE: THIS WORK IS COMPLETE WITH NEW FLOOR TILE / ACKNOWLEDGED BY LEROY MINTON JR. 02-24-03. | February 28, 2001 | July 22, 2005 | 1,605 days |
| Eastern High School | FM-200100530 01 7/22/05 EASTERN SCHOOL PARKING LOT GATE - 17TH STREET ENTRANCE INSTALL NEW GATE TO PARKING LOT ENTRANCE ON 17TH STREET SIDE FOR SECURITY REASON TO PREVENT CAR THEFT. TWO CARS WERE STOLEN AND ONE CAR WAS VANDALIZED. PROPERTY DAMAGE ADN THEFT. URGENT. | January 9, 2001 | July 22, 2005 | 1,655 days |
| Stevens Elementary School | FM-200104771 /01 7/22/05 STEVENS WINDOW REPLACEMENT NEED COMPLETE. REPLACE MGJO OF ALL WINDOWS SECURITY & SAFETY. MOST ARE ORIGINAL WINDOWA WITH ROTTEN FRAMES. | March 2, 2001 | July 22, 2005 | 1,603 days |
| Macfarland Middle School | FM-200101965 1/23/01 7/22/05 MACFARLAND FIRST (1ST) AND SECOND (2ND) FLOOR - ROOF ROOF IS LEAKING WATER IS RUNNING INSIDE THE BUILDING SOME CHILD OR CHILDREN CAN SLIP. THIS A SAFETY CONCERN. | January 23, 2001 | July 22, 2005 | 1,641 days |
| Macfarland Middle School | FM-200102125 1/25/01 7/22/05 (MACFARLAND) TUNNEL AND CRAWL SPACE: INSTALL SAFETY LIGHT COVERS TO LIGHTS IN THE TUNNELL AND CRAWL SPACE. MT-20001435 | January 25, 2001 | July 22, 2005 | 1,639 days |
| Deal Junior High School | FM-200101183 01 7/22/05 DEAL NEW WING GYMNASIUM - SECOND (2ND) FLOOR BOYS AND GIRLS REPLACE CEILING TILES. TILES ARE OLD AND FALLING. (GLUED TO CONCRETE). SAFETY HAZARD. ASBESTOS ASSESSMENT REQUIRED | January 12, 2001 | July 22, 2005 | 1,652 days |
| Deal Junior High School | FM-200101176 01 7/22/05 DEAL GYMNASIUM - SECOND (2ND) FLOOR REPAIR OR REPLACE LIGHT FIXTURES IN BOTH GYMNASIUM, BOYS AND GIRLS. THE LIGHTING IS VERY DARK. GYMNASIUMS FOR BOYS AND GIRLS LIGHTING IS A SAFETY HAZARD. ASBESTOS ASSESSMENT REQUIRED. | January 9, 2001 | July 22, 2005 | 1,655 days |
| Davis Elementary School | FM-200101416 01 7/22/05 DAVIS FIRST (1ST) AND SECOND (2ND) FLOOR OLD WING BOYS RESTROOM BESIDE - 102 ROOM - 100, TEACHERS LOUNGE BESIDE ASST. PRINCIPAL OFFICE, BOTTOM STAIRWAY BY ROOM - 104 AND GIRLS RESTROOM ACROSS - 204. SAFETY TEST FOR OLD PEELING PAINT. ASBESTOS ASSESSMENT REQUIRED. MT-2001036 Hc-20000343 tracking # 109 | January 16, 2001 | July 22, 2005 | 1,648 days |
| Sousa Middle School | FM-200104658 01 7/22/05 SOUSA SECOND (2ND) FLOOR - ROOM 220/CLOSET 1) ASBESTOS ASSESSMENT REQUIRED 2) REPAIR OF REPLACE CLOSET HAS LARGE BREACH IN CEILING. SAFETY HAZARD. Asbestos Code A - Clear for Repair | March 1, 2001 | July 22, 2005 | 1,604 days |
| Park View ES | FM-200108091 01 7/22/05 PARKVIEW 1) TSI REMOVAL TUNNEL AREAS. # IT CORP. Code A - There was some materials removed during summer of 2002. This work order does not identify any specifics in any of the tunnels, so this work order will be cleared for confussion sake. (LM/01-13-04) Leroy Minton Jr, Safety Office. 202-576-8962. Note; Please ! Approasch any new work with extreme caution, notify Safety Office if there are any suspect materials observed. | April 11, 2001 | July 22, 2005 | 1,563 days |
| Cardozo High School | FM-200104225 01 7/22/05 CARDOZO NORTH & NORTHWEST ASBESTOS ASSESSMENT ASSESS PIPE WRAP MATERIAL FOR REMOVAL FOR PIPE STEAM LEAK REPAIR. ASBESTOS CODE A - CLEAR FOR REPAIRS ON 02/27/02. DCPS- SAFETY RONALD EDWARDS (202)576-6693 (RG 03/0102) | February 23, 2001 | July 22, 2005 | 1,610 days |
| Shaed Elementary School | FM-200103681 01 7/22/05 SHAED ROOM - 1F 1) ASBESTOS ASSESSMENT REQUIRED 2) REPAIR OR REPLACE CEILING PIPE, STEAM IS SEEKING THROUGH THE CEILING. 3) RE-INSULATE PIPE IN ROOM 121 AND CEILING OF CAFETERIA. 4) REPAIR PLASTER CEILING IN CAFETERIA. EMERGENCY HEALTH AND SAFETY HAZ Asbestos Code A - Clear for Repair | February 14, 2001 | July 22, 2005 | 1,619 days |
| Randle-Highlands ES | FM-200508158 05 7/25/05 (Randle-Highlands) "Urgent" Ground floor, Principal office. Replace lock on principal's office door. Note: This lock change is for security reasons. | July 20, 2005 | July 25, 2005 | 5 days |
| Backus Middle School | FM-200108471 01 7/25/05 BACKUS FIRST (1ST) AND SECOND (2ND) FLOOR CLASSROOMS FURNISH AND INSTALL SIXTY-FOUR (64) ELECTROIC INSTANT START 120 VOLTS 60 HZ BALLAST IN THE FOLLOWING LOCATION CLASSROOM. 102 - 2 202 - 12 208 - 4 105 - 4 204 - 10 210 - 8 106 - 12 206 - 8 212 - 4 SAFETY HAZARD. ASBESTOS CODE A - CLEAR FOR REPAIRS ON 05/02/01. | April 16, 2001 | July 25, 2005 | 1,561 days |
| Garrison ES | FM-200213904 02 7/25/05 Garrison 1. Asbestos Assessment Reqd. 1st-Floor Main Office/West Wing 2. Install a high-power electrical outlet. Asbestos Code A - Clear for repairs on 08/19/02. DCPS Safety - Leroy Minton Jr (RG 08/20/02) | August 8, 2002 | July 25, 2005 | 1,082 days |
| Ronald H. Brown MS | FM-200109879 01 7/25/05 BROWN, RON EXTERIOR - PARKING LOT REPLACE LIGHTS ON REAR PARKING LOT. CARS HAVE BEEN BROKEN INTO, STOLEN AND AREA IS TOO DARK. EMERGENCY! SAFETY AND SECURITY HAZARD. | May 9, 2001 | July 25, 2005 | 1,538 days |
| Backus Middle School | FM-200108277 01 7/25/05 BACKUS SECOND (2ND) FLOOR CLASSROOM 212 AND ASST. PRINCIPAL OFFICE 1) A/C UNIT IS TRIPPING THE BRAKER SYSTEM THIRD (3RD) FLOOR CLASSROOM 307 - SPOT COOLER AND CLASSROOM 316 - WINDOW A/C UNIT 1) ASBESTOS ASSESSMENT REQUIRED 2) REPLACE PLUGS, NEEDS MORE UPGRADE ELECTRICAL OUTLETS. URGENT! ASBESTOS CODE A - CLEAR FOR REPAIRS ON 04/23/01. | April 12, 2001 | July 25, 2005 | 1,565 days |
| Langdon Elementary School | FM-200102685 01 7/25/05 LANGDON BOILER ROOM WATER METER AREA SURVEY AND MAKE REPAIRS TO PREVENT WATER FROM FILLING UP IN AREA. WATER IS IN AREA ABOUT 6" OR MORE AND WHEN IT PASSES THE THRESHOLD, WATER RUNS ON BOILER ROOM FLOOR CAUSING SERIOUS SAFETY HAZARD IN AREA. | February 1, 2001 | July 25, 2005 | 1,635 days |
| Malcolm X ES | FM-200109766 01 7/25/05 MALCOLM X SECOND (2ND) FLOOR 1. BALLASTS IN CUSTODIAN CLOSET IS OUT. 2. BALLASTS OUT ON BACK STEP AREA. SAFETY HAZARD. | May 8, 2001 | July 25, 2005 | 1,539 days |
| Whittier Elementary School | FM-200103613 3/01 7/25/05 WHITTIER OUTSIDE SECURITY LIGHTS AROUND ENTIRE BUILDING (BACK & FRONT) ARE OUT. NEED REPAIRING OR REPLACING. SECURITY HAZARD, COMPLETE PARKING IN ALL AREAS OF EXITS. SAFETY HAZARD NOT SAFE FOR CHILDREN & PARENTS. | February 13, 2001 | July 25, 2005 | 1,623 days |
| Bruce-Monroe Elementary School | FM-200110707 01 7/25/05 BRUCE-MONROE 1) ASBESTOS ASSESSMENT REQUIRED 2) REPAIR WALL IN PARENT CENTER WALL IS A POTENTIAL SAFETY HAZARD COULD FALL ON SOMEONE ASBESTOS CODE A -CLEAR FOR REPAIRS ON 05/21/01. (THE CEILING TILE HAS ASBESTOS IN IT, SO NO WORK CAN BE DONE ABOVE THE CEILING WITH OUT AN ABATEMENT DONE FIRST) | May 21, 2001 | July 25, 2005 | 1,526 days |
| Whittier Elementary School | FM-200109546 01 7/25/05 (WHITTIER) 1. ASBESTOS ASSESSMENT REQUIRED. SEVERE LEAKING COMING FROM THROUGH HOLE IN WALL. FALLING PAINT AND PLASTER PRESENT. EXISTING CONDITION WARRANT HEALTH AND SAFETY HAZARD. ASBESTOS CODE A - CLEAR FOR REPAIRS ON 6/11/01 | May 3, 2001 | July 25, 2005 | 1,544 days |
| Bunker Hill Elementary School | FM-200108875 01 7/25/05 BUNKER HILL RM. 111, 115 AND 216 INSTALL AIR CONDITIONING UNITS 23,000 BUTS (OUTLETS ALREADY INSTALLED)IN THE AREAS INDICATED. Requester Phone: 576-6095 ASBESTOS CODE A - CLEAR FOR REPAIRS ON 05/02/01. MR. CHARLES BUCHANAN - SAFETY (202)439-7840 | April 6, 2001 | July 25, 2005 | 1,571 days |
| Young Elementary School | FM-200103274 01 7/25/05 YOUNG KINDERGARTEN 1ST FLOOR INSPECT BRICK WORK (POSSIBLE FUNGUS). BLACK SPOTS ARE PROTRUDING THROUGHOUT THE WALL. Code A - NO ACM IMPACT PER LEROY MINTON OF DCPS SAFETY 04-05-01 (DCPS SAFETY SHEILA R. HOWARD 11-29-01) | February 8, 2001 | July 25, 2005 | 1,628 days |
| Garrison ES | FM-200217462 02 7/25/05 Garrison Asbestos Assessment Reqd. West Wing Rooms. 106, 107 & 108; Library/East Wing & 2nd Floor Install 220v circuits to support air conditioners in the above areas. A/C units are on site. Asbestos Code A - Cleared for repairs 09-17-02 by Leroy Minton Jr. (LM / 09-19-02) Safety Office 202-576-8962. | September 13, 2002 | July 25, 2005 | 1,046 days |
| Garrison ES | FM-200110485 01 7/25/05 GARRISON FIRST FLOOR - BACK HALLWAY 1) REPLACE EXIT DOORS ,EAST WING UNDER STAIRCASE,VERMONT AVE BACK PLAYGROUND SIDE. DOOR IS DETERORATED. (METAL DOORS). Asbestos Code A - Clear for repairs on 04/30/02. DCPS Safety - Leroy Minton Jr. (RG 04/30/02) | May 17, 2001 | July 25, 2005 | 1,530 days |
| Garrison ES | FM-200218111 02 7/25/05 Garrison Asbestos Assessment Reqd. 1st Floor East Wing Teachers' Lounge Repair/replace burned out electrical outlet. Asbestos Code A - Cleared for repairs on 10-17-02 (LM / 10-18-02) Leroy Minton Jr. Safety Office 202-576-8962. | September 23, 2002 | July 25, 2005 | 1,036 days |
| Garrison ES | FM-200214256 02 7/25/05 Garrison 1. Asbestos Assessment Reqd. 1st Floor Main Office 2. Install an electrical outlets for new copiers (1) 220 or 240v and one 250v. Asbestos Code A - Clear for repairs on 08/19/02. DCPS Safety - Leroy Minton Jr (RG 08/19/02) | August 13, 2002 | July 25, 2005 | 1,077 days |
| Nalle Elementary School | FM-200108265 01 7/25/05 NALLE THIRD (3RD) FLOOR - TEACHER BATHROOM NEED TO HAVE TRAP DOOR SECURED AS SOON AS POSSIBLE. OPEN AREA IS EXPOSED TO THE PUBLIC. SAFETY HAZARD. ASBESTOS CODE A-CLEAR FOR REPAIR BY 11-16-01 HORNE ENGINEER: SHERYLL JAMES | April 12, 2001 | July 25, 2005 | 1,565 days |
| Garrison ES | FM-200217293 02 7/25/05 (Garrison) "URGENT" Teachers Parking Lot: Repair broken light in parking lot; light hanging by wire. | September 11, 2002 | July 25, 2005 | 1,048 days |
| West Elementary School | FM-200504485 05 7/25/05 ( WEST ) First Floor - Boys Bathroom on Left Side of the Learning Center 1) Repair urinal, it's leaking from the wall onto the floor. Asbestos Code A - Clear for repairs on 05/25/05. DCPS Safety - Leroy Minton Jr. (RG 05/25/05) | April 21, 2005 | July 25, 2005 | 95 days |
| Duke Ellington School | FM-200102723 01 7/25/05 ELLINGTON SUB-BASEMENT - DANCE STUDIO REPAIR OR REPLACE METAL BARS PULLING FROM THE WALLS. SAFETY HAZARD. Asbestos Code A - Clear for Repair ON 03/13/01. Horne Engineering - Dan Will | February 1, 2001 | July 25, 2005 | 1,635 days |
| Nalle Elementary School | FM-200110101 01 7/25/05 NALLE FIRST (1ST) FLOOR - NEW WING 1) ASBESTOS ASSESSMENT REQUIRED 2) PIECES OF THE CEILING ARE FALLING IN THE BOYS BATHROOM ON THE FIRST FLOOR. A WATER PIPE HAD BURST IN THE BOYS BATHROOM ON SECOND FLOOR OF THE NEW WING CAUSING WATER TO LEAK THROUGH THE FLOOR TO THE CEILING. THIS SITUATION IS A HEALTH HAZARD AND A DAMAGE PROPERTY. ALSO DANGER TO THE CHILDREN. ASBESTOS CODE A - CLEAR FOR REPAIRS ON 05/14/01. | May 11, 2001 | July 25, 2005 | 1,536 days |
| Hyde Elementary School | FM-200109622 01 7/25/05 HYDE CLASSROOM - 103 1) ASBESTOS ASSESSMENT REQUIRED. 2) AIR CONDITIONER IS BROKEN. REPLACE A NEW ONE. AIR CONDITIONER IS ON SITE (NEW ONE). ASBESTOS CODE A - CLEAR FOR REPAIRS ON 09/05/01. RONALD EDWARDS - SAFETY (202)576-6693 (RG) | May 7, 2001 | July 25, 2005 | 1,540 days |
| Eastern High School | FM-200456633 04 7/25/05 Eastern URGENT Sub-basement armory Repair hole in ceiling cause by roof leak- ceiling need to be repaired and painted. Asbestos Code A - Clear for repairs on 10/12/04. DCPS Safety -Leroy Minton Jr.(RG 10/12/04) | October 8, 2004 | July 25, 2005 | 290 days |
| Eastern High School | FM-200456632 04 7/25/05 Eastern URGENT B-77 Furnish and install electrical receptables in science labs-outlets and install missing covers over receptables. Power cut off to tables. Asbestos Code A - Clear for repairs on 10/12/04. DCPS Safety -Leroy Minton Jr.(RG 10/12/04) | October 8, 2004 | July 25, 2005 | 290 days |
| Peabody Elementary School | FM-200105908 01 7/26/05 PEABODY BASEMENT - CAFETERIA NEED TO UP-GRADE ELECTRICAL CIRCUIT BOX. REFRIGERATOR CONTINUES TO TRIP OUT. FOOD SPOILED TWO WEEK-ENDS STRAIGHT. NEED PROBLEM RESOLVED IMMEDIATELY. Asbestos Code A - Cleared for repairs on 03-18-03 by Leroy Minton Jr. (LM/03-18-03) Safety Office 202-576-8962. | March 15, 2001 | July 26, 2005 | 1,594 days |
| Cardozo High School | FM-200453776 04 7/26/05 Cardozo Ground floor kitchen Replace broken floor tiles. 32 avanti 7x7". Assbestos Code A - Clear for refpairs on 01/18/05. DCPS Safety - Leroy Minton JR (RG 01/31/05) | September 1, 2004 | July 26, 2005 | 328 days |
| Macfarland Middle School | FM-200453744 04 7/26/05 MacFarland Second floor room 213 Replace closet door in room 213. Asbestos Code A - Clear for repairs on 01/18/05. DCPS Safety - Leroy Minton (RG 01/31/05) | September 1, 2004 | July 26, 2005 | 328 days |
| Coolidge High School | FM-200105885 01 7/26/05 COOLIDGE 5TH ST. TUNNEL REPLACE TWO EXPANSION JOINTS LOCATED IN TUNNEL ON 5TH STREET SIDE OF BLDG. BOTH ARE LEAKING AND HAVE PACKING BOLTS THAT ARE FIXED TO HOUSING. 4 BOLT FLANGED. Asbestos Code A - Cleared for repairs on 03-18-03 by Leroy Minton Jr. (LM/03-18-03) Safety Office 202-576-8962. | March 15, 2001 | July 26, 2005 | 1,594 days |
| Merritt Middle School | FM-200501093 05 7/26/05 Merritt Throughout building Replace ceiling tile (2x4). Asbestos Code A - Clear for repairs on 02/01/05. DCPS Safety - Richard Gibson (RG 02/01/05) | February 1, 2005 | July 26, 2005 | 175 days |
| Eastern High School | FM-200106483 01 7/26/05 EASTERN BASEMENT - #96 FURNISH AND INSTALL A/C UNIT - 23,000 BTU IN B-96 OFFICE; NEEDS TO KEEP COMPUTER FROM OVER HEATING. SAFETY HAZARD. ASBESTOS CODE A - CLEAR FOR REPAIRS ON 06/28/01. | March 22, 2001 | July 26, 2005 | 1,587 days |
| Nalle Elementary School | FM-200107483 01 7/27/05 NALLE ASBESTOS ASSESSMENT REQUIRED REPAIR OR REPLACE 1) AUDITORIUM - FIRST FLOOR IF YOU CLOSE THE DOOR , YOU CANT OPEN IT WITH OUT A CLOTHES HANGER. ONCE YOU GET IN YOU CANT GET OUT. 2) BASEMENT LEVEL-OLD WING,LEADS OUT ONTO C. STREET WHEN THE CHILDREN GO OUT THE DOOR IT STAYS AJAR. IT IS HARD TO CLOSE AND WONT OPEN WHEN YOU HIT THE PANIC BAR. 2) NEW WING - FIRST FLOOR: LEADS TO 50TH STREET. WHEN THE CHILDREN GO OUT THE DOOR IT STAYS AJAR. IT IS HARD TO CLOSE AND WONT OPEN WHEN YOU HIT THE PANIC BAR. Asbestos Code A - Cleared for repairs on 05-13-03 by Leroy Minton Jr. (LM/05-08-03) Safety Office 202-576-8962. | April 5, 2001 | July 27, 2005 | 1,574 days |
| Ballou Senior High School | FM-200107175 01 7/27/05 BALLOU FIRST (1ST) FLOOR - CLASSROOMS 1) ASBESTOS ASSESSMENT REQUIRED 2) REPLACE LIGHT BALLASTS THROUGH OUT BUILDING. SAFETY HAZARD. ASBESTOS COBE A - CLEAR REPAIRS | April 2, 2001 | July 27, 2005 | 1,577 days |
| Ballou Senior High School | FM-200107176 01 7/27/05 BALLOU FIRST (1ST) FLOOR - HALLWAY 1) ASBESTOS ASSESSMENT REQUIRED 2) REPLACE ERISTINS ELECTRICAL PANEL. BREAKER AND BUS WITH NEW. 1 - 277/480V PANEL 1 - 120/208V PANEL SAFETY HAZARD. Asbestos Code A - Clear for Repair | April 2, 2001 | July 27, 2005 | 1,577 days |
| Thomas Elementary School | FM-200107133 01 7/27/05 THOMAS ROOMS 101, 102, 100 MAIN & PRINCIPALS OFFICE REPLACE AND INSTALL CARPET IN THE ABOVE ROOMS. CARPET IN SOME OF THE ROOMS ARE A SAFETY HAZARD. Asbestos Code A - Cleared for repairs on 04-01-03 by Leroy Minton Jr. (LM/04-01-03) Safety Office 202-576-8962. Note: Please be advised that this work order was cleared for the purpose of moving the work along when becomes a reality. At time of assessment the inspector could not determine the condition of the flooring under the carpet nor the impact it would have once removal of the carpet began. As a pre-cautionary measure we request that no carpet is to be taken up without contacting the Safety Office (202-576-8962) Repeat! No carpet is to removed by anyone! without first contacting the Safety Office. | April 2, 2001 | July 27, 2005 | 1,577 days |
| Takoma Educational Center | FM-200106957 01 7/27/05 TAKOMA SECOND (2ND) FLOOR - ROOM 166 - CLOSET 1) ASBESTOS ASSESSMENT REQUIRED 2) INSTALL OR REPAIR BILFOLD BRACKET HINGES ON DOORS. DOORS ARE OFF TRACK. 3) PROVIDE LOCKS ON DOORS SO STUDENTS CAN BE PREVENTED FROM TAMPERING WITH TELEPHONE LINE EQUIPMENT. SAFETY HAZARD. ASBESTOS CODE A - CLEAR FOR REPAIRS ON 04/11/01. | March 29, 2001 | July 27, 2005 | 1,581 days |
| Browne Junior High School | FM-200455699 04 7/27/05 Browne First floor old wing Back hall by room 112 door hinges need to be replaced. Asbestos Code A - Clear for repairs on 09/27/04. DCPS Safety Leroy Minton Jr. (RG 09/28/04) | September 24, 2004 | July 27, 2005 | 306 days |
| Browne Junior High School | FM-200458803 /04 7/27/05 BROWNE First floor (old wing) Stairwell 5 exit door need to be fixed, need door hinges. Asbestos Code A - Clear for repairs on 12/02/04. DCPS Safety - Leroy Minton Jr. (RG 12/02/04) | November 30, 2004 | July 27, 2005 | 239 days |
| Shaw JHS | FM-200107745 01 7/27/05 SHAW SITE LIBRARY UP DATE SITE LIGHTING IN AREAS LISTED. BELOW: 1. BASKETBALL AREA - POLE LIGHT 2. TENNIS COURT - POLE LIGHT 3. MULTI-PURPOSE - POLE LIGHT 4. FOOTBALL FIELD - POLE LIGHT (ELS) ASBESTOS CODE A - CLEAR FOR REPAIRS ON 02/28/02. DCPS- SAFETY RONALD EDWARDS (202)576-6693 (RG 03/0102) | April 7, 2001 | July 27, 2005 | 1,572 days |
| Roosevelt High School | FM-200454052 04 7/27/05 ROOSEVELT SHS Bilingual Dept Rooms 5 & 10 Do asbestos assessment on damaged and falling wall plaster in rooms # 10 (director's office) and room # 5 on the third floor. Asbestos Code A - Clear for repairs on 09/13/04. DCPS Safety - Ronald Edwards (RG 09/15/04) | September 8, 2004 | July 27, 2005 | 322 days |
| Park View ES | FM-200106571 26/01 7/27/05 PARKVIEW TUNNEL AREA UNDER HALLWAY BY CAFETERIA 1. ASBESTOS ASSESSMENT REQUIRED 2. REPLACE 16 FT. OF 3/4 RUPTURED STEAM LINE IN TUNNEL AREA UNDER HALLWAY BY CAFETERIA. TUNNEL IS RESTRICTED. Asbestos Code A - Cleared for repairs and abated on 11-03-02 by Leroy Minton Jr (LM/01-13-04) Safety Office 202-576-8962. | March 26, 2001 | July 27, 2005 | 1,584 days |
| Deal Junior High School | FM-200106628 01 7/27/05 DEAL EAST TUNNEL 1) ASBESTOS ASSESSMENT REQUIRED 2) SURVEY LEAK IN TUNNEL. POSSIBLY CAUSING WATER SEEPAGE IN CAFETERIA STORAGE AREA. Asbestos Code A - Cleared for repairs on 03-18-03 by Leroy Minton Jr. (LM/03-18-03) Safety Office 202-576-8962. | March 26, 2001 | July 27, 2005 | 1,584 days |
| Reed LC | FM-200106930 0 3/29/01 7/27/05 REED AUDITORIUM, GYM & STAIRWAY BASEMENT AN ELECTRICIAN IS NEEDED TO COME AND COMPLETE WORK ON LIGHTS. THIS WORK ORDER IS BEING RESUBMITTED. Asbestos Code A - Clear for repairs on 04/16/02. DCPS Safety - Richard Gibson | March 29, 2001 | July 27, 2005 | 1,581 days |
| Draper Elementary School | FM-200107138 01 7/27/05 DRAPER ENCLOSER EXISTING ELECTRIC PANELS BOXES ON FIRST FLOOR (4), SECOND FLOOR (2) AND THIRD FLOOR (2) PRIORITY (1) - URGENT ELS - CONTRACTOR ASBESTOS CODE A - CLEAR FOR REPAIRS ON 03/30/01. | April 2, 2001 | July 27, 2005 | 1,577 days |
| Kimball Elementary School | FM-200107163 /01 7/27/05 KIMBALL BASEMENT TUNNEL REPAIR OR REPLACE INLET AND OUTLET BY-PASS VALVE ON WATER METER. CITED BY WASA 3/29/01. ORIGINALLY CITED 9/12/00. URGENT CODE A - CLEAR FOR REPAIR AS OF 4/16/01. | April 2, 2001 | July 27, 2005 | 1,577 days |
| Browne Junior High School | FM-200501769 05 7/28/05 Browne First floor 112 Door knobs need to be replace aon both wood doors and fix locks and door hinges. Asbestos Code A - Clear for repairs on 02/18/05. DCPS Safety - Richard Gibson (RG) | February 18, 2005 | July 28, 2005 | 160 days |
| Browne Junior High School | FM-200453747 04 7/29/05 Browne Second floor room 204 Room door need door handle. Asbestos Code A - Clear for repairs on 09/01/04. DCPS Safety - Richard Gibson ( 09/01/04 ) | September 1, 2004 | July 29, 2005 | 331 days |
| Hendley Elementary School | FM-200509071 05 7/29/05 Hendley Play Grounds Replace Safety Turf due to fire | July 29, 2005 | July 29, 2005 | 0 days |
| Hendley Elementary School | FM-200508813 05 7/29/05 (HENDLEY) URGENT!!!! First Floor - Lobby Area. 1) Replace exterior doors panic bar it will not stay shut, hard to secure. Code A-clear for repair by DCPS Charles Buchanan on 6/23/05 | July 27, 2005 | July 29, 2005 | 2 days |
| Browne Junior High School | FM-200455693 04 7/29/05 Browne First floor rooms 109, 112, 115, 123, 124 and 132 Door hinges need to be fixed or replaced on the above rooms listed. Asbestos Code A - Clear for repairs on 09/27/04. DCPS Safety - Ricardo Eley (RG 09/27/04) | September 24, 2004 | July 29, 2005 | 308 days |
| Browne Junior High School | FM-200501697 05 7/29/05 Browne EMERGENCY Second floor 212 Need door handles. Asbestos Code A - Clear for repairs on 02/17/05. DCPS Safety - Leroy Minton Jr. (RG 02/18/05) | February 16, 2005 | July 29, 2005 | 163 days |
Routine Repair Requests Closed in July 2005 (357) | School | Description | Open Date | Close Date | Time Elapsed |
| Birney Elementary School | FM-200507348 05 7/1/05 First Floor - Restrooms (Boys restroom) pipe inside wall need to be repaired and sink needs to be installed (Girls restroom) old side, sink need to be installed on wall . (First floor mop closet) old side, drain need to be unclogged | June 30, 2005 | July 1, 2005 | 1 day |
| Aiton Elementary School | FM-200507326 05 7/1/05 Fourth fl. Custodian closet Repair Stopped-up Sink | June 30, 2005 | July 1, 2005 | 1 day |
| Amidon Elementary School | FM-200507362 05 7/1/05 (AMIDON) First Floor Near Main Office Water pressure is low in fountains. 1) Replace water cooler filter. 2) Replace defective water cooler in the Gym | July 1, 2005 | July 1, 2005 | 0 days |
| Reed LC | FM-200223621 03 7/1/05 (Reed) Grounds/Exterior walls: Please remove graffito from walls of school. | January 7, 2003 | July 1, 2005 | 906 days |
| Birney Elementary School | FM-200506773 05 7/1/05 (BIRNEY) Repair or Replace water coolers throughout (water cooler project summer school) | June 14, 2005 | July 1, 2005 | 17 days |
| Garnet-Patterson MS | FM-200507309 05 7/2/05 Garent-Patterson Boiler Room Unstop drain in boiler room. Will cause boiler room to be flooded, if not unclog. | June 30, 2005 | July 2, 2005 | 2 days |
| Moten Elementary School | FM-200505347 05 7/5/05 ( MOTEN ) EMERGENCY!!! First Floor - Kitchen 1) Flood in the kitchen. Floor drain stopped up. | May 11, 2005 | July 5, 2005 | 55 days |
| Wilkinson ES | FM-200507410 05 7/5/05 Wilkinson Second Floor - Boys Bathroom 1) Repair leaking sink. | July 5, 2005 | July 5, 2005 | 0 days |
| Savoy Elementary School | FM-200506244 05 7/5/05 ( SAVOY ) First Floor - Teachers Restroom 1) Needs new flush kit. (sloan royal flushometer) | June 2, 2005 | July 5, 2005 | 33 days |
| Harris, C.W. ES | FM-200507243 05 7/5/05 "Break In" First floor, Asst. Principal's Office. Lock is damaged on door due to break in. Note: Door cannot be secure. | June 28, 2005 | July 5, 2005 | 7 days |
| Burrville Elementary School | FM-200507235 05 7/5/05 Playground Area. Install locks and chains to prevent entry to playground. | June 28, 2005 | July 5, 2005 | 7 days |
| Merritt Middle School | FM-200506959 05 7/5/05 Merritt Generator Room Repair or replace exterior door. Lock on emergency generator room. Can not unlock door to operate emergency generator. | June 20, 2005 | July 5, 2005 | 15 days |
| John Burroughs ES | FM-200507116 05 7/6/05 First Floor - Mr. Taylor Room 7 Repair lock on the door it's broken. | June 23, 2005 | July 6, 2005 | 13 days |
| Macfarland Middle School | FM-200507488 05 7/6/05 MacFarland Room #208 1. Install new 208/230 volt line for Custodian Office on 2nd floor room #208. | July 6, 2005 | July 6, 2005 | 0 days |
| Seaton Elementary School | FM-200507105 05 7/6/05 Frist Second and Third floors/Rms. 101- 111- 103- 209-210-305-304 Repair or Replace Door Locks | June 22, 2005 | July 6, 2005 | 14 days |
| Moten Elementary School | FM-200505321 05 7/7/05 ( MOTEN ) EMERGENCY!!! First Floor - Kitchen 1) Flood in the kitchen, (Plumbers came out to fix the grease trap on 5/9/05) | May 10, 2005 | July 7, 2005 | 58 days |
| Whittier Elementary School | FM-200339114 /03 7/7/05 Whittier Lower level back of bldg. Unstop clogged drain outside the boiler room (back). Water goes to the boiler room everytime it rains. | October 17, 2003 | July 7, 2005 | 629 days |
| Shepherd ES | FM-200500158 05 7/7/05 Shepherd Library Remove sink cabinet, but keep small sink. | January 5, 2005 | July 7, 2005 | 183 days |
| Green Elementary School | FM-200507370 05 7/7/05 Rm 134 Repair door lock | July 1, 2005 | July 7, 2005 | 6 days |
| Sousa Middle School | FM-200507534 05 7/7/05 (Summer School Project) Repair or Replace all water coolers, and check all bathrooms in the building. | July 7, 2005 | July 7, 2005 | 0 days |
| Whittier Elementary School | FM-200341086 03 7/7/05 (Whittier) 1st Hallway/New Wing Repair or replace water fountain; the supply line is broken. | December 4, 2003 | July 7, 2005 | 581 days |
| Randle-Highlands ES | FM-200507409 05 7/7/05 Randle-Highland Fan Room Check and make repairs to air handler unit for gym. | July 5, 2005 | July 7, 2005 | 2 days |
| Stanton Elementary School | FM-200507521 05 7/7/05 Annex Classrooms Restore Electrical Service to (2) A/C Units | July 7, 2005 | July 7, 2005 | 0 days |
| Moten Elementary School | FM-200506953 05 7/7/05 Moten Second Floor - Custodian Closet 1) A 8" wall mount slop sink faucet need to be replaced | June 20, 2005 | July 7, 2005 | 17 days |
| Harris, C.W. ES | FM-200507338 05 7/7/05 First Floor - Room 146 Second Floor - Room 243 Classrooms door lock damaged. Repair or Replace the locks. | June 30, 2005 | July 7, 2005 | 7 days |
| Houston Elementary School | FM-200505706 05 7/8/05 Huston Auditoruim Relamp Entire Area | May 19, 2005 | July 8, 2005 | 50 days |
| Tubman Elementary School | FM-200506906 05 7/8/05 Tubman Boiler Room Repair or replace air compressor in boiler room. | June 17, 2005 | July 8, 2005 | 21 days |
| Webb Elementary School | FM-200505790 05 7/8/05 ( WEBB ) Unstop outside drain near Dom. | May 20, 2005 | July 8, 2005 | 49 days |
| Spingarn High School | FM-200505807 05 7/8/05 ( SPINGARN ) EMERGENCY!!! Basement 1) Unstop outside drain. water is flooding into the basement | May 20, 2005 | July 8, 2005 | 49 days |
| Macfarland Middle School | FM-200507557 05 7/8/05 By The Guidance Office Cap off line. | July 7, 2005 | July 8, 2005 | 1 day |
| Randle-Highlands ES | FM-200507407 05 7/8/05 Randle-Highland Room #2201 Check and make repairs to air handler unit for classroom #2201. | July 5, 2005 | July 8, 2005 | 3 days |
| King M L ES | FM-200507419 05 7/8/05 First Floor - Main Office Repair or Replace the loose lock on Main Office door. Code A-clear for repair by DCPS charles Buchanan on 7/05/05 | July 5, 2005 | July 8, 2005 | 3 days |
| Webb Elementary School | FM-200507551 05 7/8/05 Second fl. Custodian Closet Unstop the Sink | July 7, 2005 | July 8, 2005 | 1 day |
| Savoy Elementary School | FM-200506248 05 7/10/05 ( SAVOY ) Second Floor - Teachers Restroom (North End) 1) Needs new flush kit. | June 2, 2005 | July 10, 2005 | 38 days |
| Ballou Senior High School | FM-200455958 04 7/11/05 (Ballou) FIRE CODE VIOLATION: 1st Floor/Through-Out Hallways: Ceiling tile missing. HA 032 Ceiling Tile 1' X 1' with gouge and Pinholes NAD Code A-clear for repair by DCPS Charles Buchanan on 10/14/04 | September 28, 2004 | July 11, 2005 | 286 days |
| Sousa Middle School | FM-200454713 04 7/11/05 Sousa FIRE CODE VIOLATION Third floor Broken door closer on door, room 301. Code A-clear for repair by DCPS Charles Buchanan on 9/15/04 | September 14, 2004 | July 11, 2005 | 300 days |
| Sousa Middle School | FM-200454699 04 7/11/05 Sousa FIRE CODE VIOLATION Third floor Threshold plate missing at bottom of fire door 316. Code A-clear for repair by DCPS Charles Buchanan on 9/15/04 | September 14, 2004 | July 11, 2005 | 300 days |
| School WW High School | FM-200507637 05 7/11/05 (School Without Walls) EMERGENCY!!! Main entrance door can't be secured, center pice on panic bar is broken and need to be repaired. | July 11, 2005 | July 11, 2005 | 0 days |
| River Terrace ES | FM-200454583 04 7/11/05 River Terrace FIRE CODE VIOLATION: First floor Exit door will not close properly (by stage in multi purpose room). Code A-clear for repair by DCPS Charles Buchanan on 9/16/04 | September 14, 2004 | July 11, 2005 | 300 days |
| Sousa Middle School | FM-200454698 04 7/11/05 Sousa FIRE CODE VIOLATION Third floor Damaged fire door at stairwell 316. Code A-clear for repair by DCPS Charles Buchanan on 9/15/04 | September 14, 2004 | July 11, 2005 | 300 days |
| Kimball Elementary School | FM-200500446 05 7/11/05 Kimball Boiler Room Repair or replace automatic water feeder to boiler #4. Not getting proper amount of water back into boiler. | January 14, 2005 | July 11, 2005 | 178 days |
| Deal Junior High School | FM-200507451 05 7/12/05 First, Second, Third and Basement floors. Repair following restrooms, Boys' 1st fl., (1) commode (by 108) Girls' 1st fl., (3) flush valve assembly, bradley basin (repaired) (new wing) Boys' 2nd fl. (2) vacuum breakers, (1) flush valve assembly (new wing) Boys' 2nd fl. (1) flush valve kit (water closet), (1) spud washer (by 205) Girls' 2nd fl. (1) spud washer, (2) flush valve kits (water closet) (by 208) | July 5, 2005 | July 12, 2005 | 7 days |
| Cardozo High School | FM-200505383 05 7/12/05 (Cardozo) First, Second and Third floor. Repair or Replace Portable A/C units in the following areas: Rooms- 113, 117, 119, 121, 123, 125. Rooms- 201, 203, 205. Rooms- 306, 310, 312, 315. | May 11, 2005 | July 12, 2005 | 62 days |
| Cardozo High School | FM-200505384 05 7/12/05 (Cardozo) First, Second and Third floor. Replace Portable A/C units in the following areas: Rooms- 109, 113. Rooms- 206, 208, 210, 212, 222, 224, 220. Rooms- 318, 320, 316, 314. Note: Total 13 new units. | May 11, 2005 | July 12, 2005 | 62 days |
| Cardozo High School | FM-200506279 05 7/12/05 (CARGOZO) First Floor-Room 120(Biology lab) 1) Survey and install new electrical service for new air conditioner. 2) Install new air conditioner,classroom lab is connected to green house, temperatures of green house and classroom amke it very hard to efficiently maintain proper cooling of classroom. | May 26, 2005 | July 12, 2005 | 47 days |
| Payne Elementary School | FM-200455640 04 7/12/05 Payne Second floor old and new building Repair or replace urinal. (boys) flush valves. Attempt to unstop did not work. | September 24, 2004 | July 12, 2005 | 291 days |
| Reed LC | FM-200507591 05 7/12/05 First Floor - Exterior Front Entrance Door The cylinder is loose and it makes the door hard to open | July 8, 2005 | July 12, 2005 | 4 days |
| Deal Junior High School | FM-200507467 05 7/12/05 Second, Third and Basement floors. Girls' restroom 2nd floor (1) flush valve kit (water closet) (by 111) Girls' restroom 3rd floor (1) vacuum breaker, (1) spud washer (new wing) Bradley Basin Repair. Girls' restroom 3rd floor (1) flush valve kit (water closet), (1) spud washer (by 306) Boys' restroom 3rd floor (4) flush valve assembly (w/c) (BY 305) Basement Boys restroom (1) commode. | July 6, 2005 | July 12, 2005 | 6 days |
| Ballou Senior High School | FM-200501336 05 7/12/05 (Ballou) please sandblast/power-wash writing on north-west wall of small lot-see Atkinson. | February 7, 2005 | July 12, 2005 | 155 days |
| Ballou Senior High School | FM-200505020 05 7/13/05 (Ballou) locksmith nd.for restroom 2nd floor of a-wing students denied access. | May 2, 2005 | July 13, 2005 | 72 days |
| Browne Junior High School | FM-200507749 05 7/13/05 Brown Entrance Door to the Third fl. Repair Hinges and closers | July 13, 2005 | July 13, 2005 | 0 days |
| Hendley Elementary School | FM-200507412 05 7/13/05 Exterior Grounds Vandalism !!! 1) Remove playground equipment that was burnt up over the week end. | July 5, 2005 | July 13, 2005 | 8 days |
| Hendley Elementary School | FM-200507174 05 7/13/05 "Emergency" Outside Wash Room/Rear of building. Repair leaking faucet pipe, water is spraying everywhere. | June 24, 2005 | July 13, 2005 | 19 days |
| Payne Elementary School | FM-200455637 04 7/13/05 Payne First floor new wing boys restroom Commode need repairing or replacing. Attempt to unstop did not work. | September 24, 2004 | July 13, 2005 | 292 days |
| Payne Elementary School | FM-200455639 04 7/13/05 Payne New wing St. John Repair or replace flush valves and commode dose not want .Attempt to unstop. | September 24, 2004 | July 13, 2005 | 292 days |
| Cardozo High School | FM-200507558 05 7/13/05 Fan Rm Repair or Unstop Drain Line | July 7, 2005 | July 13, 2005 | 6 days |
| Ronald H. Brown MS | FM-200504830 05 7/14/05 Brown, Ron Cafeteria Rear Door Replace Door and install new Lock Code A-clear for repair by DSCPS Charles Buchanan on 5/10/05 | April 27, 2005 | July 14, 2005 | 78 days |
| Green Elementary School | FM-200507477 05 7/14/05 Third fl. Teachers Restroom Repair Spud and Stop Valve on the Commode | July 6, 2005 | July 14, 2005 | 8 days |
| Garnet-Patterson MS | FM-200505034 05 7/14/05 ( GARNET-PATTERSON ) Second Floor - Landing 1) Attach panic bar to door. | May 2, 2005 | July 14, 2005 | 73 days |
| Beers Elementary School | FM-200340404 /03 7/14/05 (Beers) Building #2 and #3: Hallway in bldg. 2 light fixture is not working, also bldg. 3 back stairs is dark-lights are not working. Also light fixture outside of Auditorium in hallway . Code A-clear for repair by DCPS Charles Buchanan on 11-20-03 | November 18, 2003 | July 14, 2005 | 604 days |
| Cardozo High School | FM-200506280 05 7/14/05 (CARDOZO) First Floor-Girls Gym 1) furnish and install new door lock. | May 26, 2005 | July 14, 2005 | 49 days |
| Deal Junior High School | FM-200507826 05 7/15/05 Deal School Repair Fence | July 13, 2005 | July 15, 2005 | 2 days |
| Stanton Elementary School | FM-200507825 05 7/15/05 Stanton School Repair Fence | July 13, 2005 | July 15, 2005 | 2 days |
| Beers Elementary School | FM-200443163 04 7/15/05 Beers Second floor bldg. 3 Electrical backstairs are dark. Please install flourescent lights. I have parts in house. Asbestos Code A - Clear for repairs on 02/02/04. Horne Engineering - Troy Wilcome (RG 02/03/04) | January 23, 2004 | July 15, 2005 | 539 days |
| Shepherd ES | FM-200507840 05 7/16/05 Shepherd School Repair Fence | July 14, 2005 | July 16, 2005 | 2 days |
| Deal Junior High School | FM-200507839 05 7/16/05 Deal School Repair Fence | July 14, 2005 | July 16, 2005 | 2 days |
| Jefferson JHS | FM-200507049 05 7/18/05 (Jefferson) Outside Gate, Rear of building. Gate is currently off of track, it needs to be put back on. | June 21, 2005 | July 18, 2005 | 27 days |
| Watkins Elementary School | FM-200341499 /03 7/18/05 Watkins First Floor - Teachers Restroom, Second and Fourth Floor - Male Restrooms 1) The last toilets in all restrooms need a flush valve kit. Teachers restroom sink needs a new faucet set for hot water. | December 12, 2003 | July 18, 2005 | 584 days |
| Watkins Elementary School | FM-200507324 05 7/18/05 Fourth floor, Teachers' restroom. No Hot Water. | June 30, 2005 | July 18, 2005 | 18 days |
| Langdon Elementary School | FM-200507912 05 7/18/05 Langdon Second fl Boys Restroom Repair Partition that is Hanging loose from wall Hanging | July 15, 2005 | July 18, 2005 | 3 days |
| Bowen Elementary School | FM-200451859 04 7/18/05 (Bowen) Kitchen: Install appropriate electrical plug for a/c unit. | August 9, 2004 | July 18, 2005 | 343 days |
| Webb Elementary School | FM-200507945 05 7/18/05 Webb First Floor - Boys Bathroom 1) Four urinals need to be unstopped. | July 18, 2005 | July 18, 2005 | 0 days |
| Watkins Elementary School | FM-200507292 05 7/18/05 Ground floor. Repair or Replace wall hung water cooler by recreation center. | June 30, 2005 | July 18, 2005 | 18 days |
| Watkins Elementary School | FM-200341500 /03 7/18/05 Watkins Kitchen Sink not working, faucets decayed and need replacing. | December 12, 2003 | July 18, 2005 | 584 days |
| Malcolm X ES | FM-200508037 05 7/18/05 Malcolm X Multi-purpose Room Repair or replace parts or service rooftop unit #2. * Unit continuously trips out. | July 18, 2005 | July 18, 2005 | 0 days |
| Watkins Elementary School | FM-200507321 05 7/18/05 Second floor, Teachers' restroom. Unclog sink. | June 30, 2005 | July 18, 2005 | 18 days |
| Savoy Elementary School | FM-200507986 05 7/19/05 Savoy Second fl Area Repair Leaking Fixture | July 18, 2005 | July 19, 2005 | 1 day |
| Deal Junior High School | FM-200507921 05 7/19/05 (Deal) Exterior, front of building. Remove dead tree from in front of the building. | July 15, 2005 | July 19, 2005 | 4 days |
| Kramer Middle School | FM-200454891 04 7/20/05 Kramer First floor porch light front Lights on front of building out. Please replace or repair. | September 16, 2004 | July 20, 2005 | 307 days |
| Bancroft Elementary School | FM-200508043 05 7/20/05 Bancroft First Floor - By Main Office 1) Repair Bradley Basin. | July 19, 2005 | July 20, 2005 | 1 day |
| Miner Elementary | FM-200508192 05 7/20/05 Miner School Repair rolling gate on 16th Street side | July 20, 2005 | July 20, 2005 | 0 days |
| Bowen Elementary School | FM-200459173 04 7/21/05 Bowen Two learning center on first floor There is no lights. | December 6, 2004 | July 21, 2005 | 227 days |
| Young Elementary School | FM-200104584 01 7/22/05 YOUNG FRONT ENTRANCE ROOF AROUND BUILDING REPLACE MISSING DOWN SPOUT ON ROOF BY KINDERGARDEN AND CLEAN OUT GUTTERS. | March 1, 2001 | July 22, 2005 | 1,604 days |
| Garfield ES | FM-200104318 01 7/22/05 GARFIELD OUTSIDE ALL CATCH BASIN NEED TO BE CLEANED AND SNAKED OUT, THERE ARE THREE IN ALL. 1 IN FRONT OF TEACHERS LOUNGE, 1 BEHIND THE DEMAMABLES & 1 BEHING THE CAFETERIA. | February 26, 2001 | July 22, 2005 | 1,607 days |
| Garfield ES | FM-200101622 9/01 7/22/05 (Garfield) CAFETERIA AND TWO ROOMS WATER MAY BE COMING FROM ROOF DRAIN. WATER IS COMING OUT OF THE ROOM WALL. POC: GARY RUCKER (202) 438-9018 CODE A - ASBESTOS ABATED ON 11/01/01 PER SHEILA R. HOWARD CONFIRMED 02/26/02.(RG02/26/02) | January 19, 2001 | July 22, 2005 | 1,645 days |
| Francis Junior High School | FM-200100570 01 7/22/05 FRANCIS, THIRD (3RD) FLOOR HALLWAY, OUTSIDE OF ROOM 310 SECURE LOCKERS TO WALL GR-20000041 | January 9, 2001 | July 22, 2005 | 1,655 days |
| Ferebee-Hope Elementary School | FM-200105282 01 7/22/05 FEREBEE HOPE BOILER ROOM REPAIR INOPERABLE SUMP PUMP. | March 8, 2001 | July 22, 2005 | 1,597 days |
| Gibbs Elementary School | FM-200103661 01 7/22/05 GIBBS CORRIDOR REMOVE & REPLACE BROKEN FLOOR TILE IN FRONT OF ROOM 130. Code A-clear for repair by Horne Engineer ( Philip Connolly) on 3/25/02 (CEB) | February 14, 2001 | July 22, 2005 | 1,619 days |
| Ferebee-Hope Elementary School | FM-200105267 01 7/22/05 FEREBEE-HOPE 4TH FL. R/R COIL IN CEILING HEAT UP UNIVENT. | March 8, 2001 | July 22, 2005 | 1,597 days |
| Green Elementary School | FM-200104833 01 7/22/05 GREEN 1ST, 2ND & 3RD FLOOR ROOMS 102, 128, 130, 201, 202, 208, 209, 215, 219, 303 & 304 REPLACE (12) TWELVE MOTION DETECTOR LIGHT SWITCHES IN THE THE ROOM ABOVE. | March 2, 2001 | July 22, 2005 | 1,603 days |
| Emery Elementary School | FM-200105374 01 7/22/05 EMERY MAIN OFFICE FURNISH MATERIAL TO REPAIR MAIN OFFICE AREAS AND REWIRE AS NECESSARY. | March 9, 2001 | July 22, 2005 | 1,596 days |
| Hardy Middle School | FM-200102367 01 7/22/05 (HARDY) 2ND FLOOR GYM: REPAIR BREECH IN WALLS IN GYM AREA AFTER ROOF LEAK. DRAIN WAS REPAIRED. (FIRE CODE VIOLATION) ASBESTOS CODE A - CLEAR FOR REPAIRS ON 05/23/01. | January 29, 2001 | July 22, 2005 | 1,635 days |
| Hardy Middle School | FM-200105524 01 7/22/05 HARDY FIRST FLOOR - ROOM 101 1) INSTALL (4) BALLASTS IN CLASSROOM. ASBESTOS CODE A - CLEAR FOR REPAIRS ON 11/21/01. HORNE ENGINEERING - BILL CAMPION (RG) | March 12, 2001 | July 22, 2005 | 1,593 days |
| Emery Elementary School | FM-200100431 01 7/22/05 OUTSIDE OF CAFETERIA ON EAST SIDE OF BUILDING INSTALL FENCE ADJACENT TO HOMELESS SHELTER NOTE: FENCE SIZE APPROXIMATELY 8 FEET FORMERLY GR-20000110 | January 9, 2001 | July 22, 2005 | 1,655 days |
| Duke Ellington School | FM-200101841 01 7/22/05 (ELLINGTON) COMPUTER ROOM #24: PIECES OF CEILING FALLING FROM ABOVE AND CHIPPED PAINT FALLING FROM WALL IMPROPERLY WRAPPED PIPE EXPOSED IN CEILING. MT-20001325 ASBESTOS CODE A - CLEAR FOR REPAIRS ON 04/02/01. | January 22, 2001 | July 22, 2005 | 1,642 days |
| Patricia R Harris Ed Center | FM-200100082 01 7/22/05 HARRIS, P.R. MECHANICAL ROOM, STAIR #5: REPLACE LEAKING MECHANICAL WATER SEAL ON TACO HOT WATER CIRCULATION PUMP. TACO MOD. #A5B2C2T,SER. #BB3006-5-6, RPM 1750, GPM 130, FRAM A5, N.O. FT 25, HP 1-1/2 , MGG. DATE 7.74. (PUMP IS LEAKING AN EXCESSIVE AMOUNT OF WATER ON FLOOR. HC-20000678 | January 7, 2001 | July 22, 2005 | 1,657 days |
| Patricia R Harris Ed Center | FM-200102289 01 7/22/05 HARRIS, P.R. ROOMS 219-220 FIRST (1ST) FLOOR NEED A 3/4 INCH HOLE DRILLED INTO WALL FOR BELL ATLANTIC PHONE COMPANY TO INSTALL PHONE WIRES AND NEW PHONES. (NOTE: PLEASE CONTACT MR. JAMES TAYLOR FOR WORK REQUEST NUMBER AT 442-5533) MT-20001338 | January 26, 2001 | July 22, 2005 | 1,638 days |
| Patricia R Harris Ed Center | FM-200126736 02 7/22/05 (HARRIS, P.R.) !!! EMERGENCY !!! EXTERIOR LIGHTS ALL EXTERIOR LIGHTING BLDG. BUILDING LIGHTS DONT COME ON. TO DARK IN AREA. REPAIR OR REPLACE EXTERIOR LIGHTING. | January 4, 2002 | July 22, 2005 | 1,295 days |
| Hart Middle School | FM-200100225 01 7/22/05 (hart) REMOVE DRINKING FOUNTAIN AND REPLACE WITH A NEW WATER COOLER IN BASEMENT CAFETERIA. | January 8, 2001 | July 22, 2005 | 1,656 days |
| Hearst Elementary School | FM-200103772 01 7/22/05 HEARST 1ST & 2ND FLOOR ROOMS 099, 102, 104, 106, 108, 110, 112, 200, 201, 204, 206, 208 (A&B), 210 & 212 REPLACEMENT OF CARPETING AS NEEDED. PLEASE START WITH ROOM 210 - LIBRARY. INSTALL CARPETING IN MAIN OFFICE (ROOM 110). ASBESTOS CODE A - CLEAR FOR REPAIRS ON 12/28/01. HORNE ENGINEERING - BILL CAMPION (RE) | February 16, 2001 | July 22, 2005 | 1,617 days |
| Hearst Elementary School | FM-200103775 01 7/22/05 HEARST 1ST & 2ND FLOOR, ROOF, GUTTERS & WALLS THE ROOF LEAKS INTO ROOM 201 & 099. THERE IS ALSO DAMAGE TO THE WALLS IN THE PRINCIPALS OFFICE (112) AND THE MAIN OFFICE (110). ASBESTOS CODE A - CLEAR FOR REPAIRS ON 12/28/01. HORNE ENGINEERING - BILL CAMPION (RE) | February 16, 2001 | July 22, 2005 | 1,617 days |
| Hearst Elementary School | FM-200103776 01 7/22/05 HEARST 1ST & 2ND FLOOR ROOMS 099, 102, 104, 106, 108, 110, 112, 200, 201, 204, 206, 208 (A&B), 210 & 212, HALLWAYS & FOYERS LEAD ASSESSMENT REQUIRED THE PAINT IS DULL AND PEELING. THE P.T.A. IS PROVIDING NEW SHELVING FOR THE LIBRARY. PAINTING IS NEEDED I Lead Code A - Clear to paint surface with a non-license personnel, but their can absolutely be no scraping, sanding, or abraiding any of these surfaces. Asbestos Code A - Clear For Repairs On 04/01/02. Horne Engineering - Edward Rodriguez (RG 04/02/02) | February 16, 2001 | July 22, 2005 | 1,617 days |
| Hendley Elementary School | FM-200104000 01 7/22/05 HENDLEY KITCHEN AREA 1) ASBESTOS ASSESSMENT REQUIRED 2) CEILING NEEDS PLASTERING 2ND AND FINAL NOTICE FOR COMPLIANCE AS REQUESTED BY DEPT. OF HEALTH AND AS LISTED ON FOOD INSPECTION REPORT EMERGENCY Asbestos Code A - Clear for Repair | February 21, 2001 | July 22, 2005 | 1,612 days |
| Duke Ellington School | FM-200101821 01 7/22/05 GROUND FLOOR AREA ROOM #24 FORMERLY - MT-20001449 PLASTER CEILING AND WALL IN ROOM #24. Lead & Asbestos Code A - Clear for repairs on 02/20/03. Horne Engineering - Edward Rodriguez (RG 02/20/03) | January 22, 2001 | July 22, 2005 | 1,642 days |
| Duke Ellington School | FM-200100930 01 7/22/05 ELLINGTON TEACHERS LOUNGE NEED ASBESTOS ABATEMENT. BEFORE WORKING PLASTERS CAN START. MT-20000733 Asbestos Code A - Clear for Repair. Tracking No. 3251 | January 11, 2001 | July 22, 2005 | 1,653 days |
| Eliot Junior High School | FM-200102416 01 7/22/05 (ELIOT) 1ST FLOOR, NEAR ROOM #108: REPAIR STUDENT LOCKERS IN HALLWAY OUTSIDE ROOM #108, AND SOME LOCKERS HAVE BEEN PULLED FROM WALL. | January 29, 2001 | July 22, 2005 | 1,635 days |
| Eliot Junior High School | FM-200102090 01 7/22/05 (ELIOT) 2ND FLOOR, ROOM #204: REPAIR PLASTER CEILING IN ROOM #204, PLASTER HAS FALLEN DUE TO RADIATOR FROM THE CLASSROOM ABOVE. MT-20001320 Asbestos/Lead Code A-clear for repair by Horne Engineer ( Bipin Nanavaty ) on 4/17/02 (CEB) | January 25, 2001 | July 22, 2005 | 1,639 days |
| Eliot Junior High School | FM-200100999 01 7/22/05 ROOM 104 SPECIAL EDUCATION CENTER - REPAIR LARG BREACH IN WALL ON LEFT SIDE OF DOOR UPON ENTRANCE. FORMERLY -MT-20001627 - SENT TO MS. SHEILA HOWARD 01/11/00 FOR ASSESSMENT. Code A-clear for repair by Horne Engineer (Bipin Nanavaty) 0n 3/22/02 (CEB) | January 11, 2001 | July 22, 2005 | 1,653 days |
| Jefferson JHS | FM-200104057 01 7/22/05 JEFFERSON BASEMENT WEST TUNNE - MAIN BLDG. 1. ASBESTOS ASSESSMENT REQUIRED - ACCESS INSULATING MATERIAL ON STEAM SUPPLY LINE, 3 PCS. - 1 - 6" STRAIGHT SECTION, 1 - 4" STRAIGHT SECTION, 1 ELBOW ON 2" PIPE. 2. REPLACE LEAKING 2" STEAM SUPPLY LINE (BLACK PIPE). | February 21, 2001 | July 22, 2005 | 1,612 days |
| Jefferson JHS | FM-200104344 01 7/22/05 JEFFERSON SECOND (2ND) FLOOR - CLASSROOM 209 1) ASBESTOS ASSESSMENT REQUIRED. 2) REPAIR OR REPLACE BREACH IN CEILING. ASBESTOS ASSESSMENT COMPLETED 02-27-01 Asbestos Code A - Clear for Repair | February 26, 2001 | July 22, 2005 | 1,607 days |
| Jefferson JHS | FM-200104778 01 7/22/05 Jefferson 1) Replace outside security lights . There are no lights!!! Asbestos Code A - Clear for repairs on 03/10/03. Horne Engineering - Troy Wilcome (RG 03/11/03) | March 2, 2001 | July 22, 2005 | 1,603 days |
| Jefferson JHS | FM-200104780 01 7/22/05 JEFFERSON 1ST FLOOR AUDITORIUM REPLACE 12 BREAKERS FOR HOUSE LIGHTS, FOOT LIGHTS AND STAGE LIGHTS. | March 2, 2001 | July 22, 2005 | 1,603 days |
| Eliot Junior High School | FM-200100977 01 7/22/05 ->Consolidated task items: EHS03 - ASBESTOS ASSESSMENT REQUIRED SMI03 - PLASTERING - <- ELIOT ROOM 104 REPAIR LARGE BREACH IN WALL ON LEFT SIDE OF DOOR, UNPON ENTRANCE. MT-20001627 | January 11, 2001 | July 22, 2005 | 1,653 days |
| Johnson JHS | FM-200108000 01 7/22/05 JOHNSON 1) INSTALL LIGHTS ACCORDING TO SCOPE. # ELS CONTRACTING , INC. code A-clear for repair by DCPS Charles Buchanan on 4/02/03 | April 10, 2001 | July 22, 2005 | 1,564 days |
| Kenilworth ES | FM-200103850 /20/01 7/22/05 Kenilworth Mechanical Room (auditorium) Replace defective air handler shaft and bearings. | February 20, 2001 | July 22, 2005 | 1,613 days |
| Kenilworth ES | FM-200103854 /20/01 7/22/05 Kenilworth Boiler Room Replace missing sump pump and motor. | February 20, 2001 | July 22, 2005 | 1,613 days |
| Kenilworth ES | FM-200104255 /23/01 7/22/05 KENILWORTH LISTED BELOW REPLACE BALLASTS & TIPS IN THE FOLLOWING LOCATIONS. NOTE THAT ROOM 108 IS BEING LIT BY LAMPS. TIPS - ROOMS 108, 106, 223, 218, 219, 216, & 214. BALLASTS - ROOMS 313, 302, 303, 310, 3RD FLOOR HALLWAY, 202, 212, 147, 100 Asbestos Code A - Clear for repairs on 03/10/03. Horne Engineering - Sharon Voss (RG 03/11/03) | February 23, 2001 | July 22, 2005 | 1,610 days |
| Key Elementary School | FM-200104238 01 7/22/05 KEY OUTSIDE BUSTED DRAIN LINE (PIPES) TWO (2) DOMESTIC WATER IS FLUSHING OUT. EMERGENCY. | February 23, 2001 | July 22, 2005 | 1,610 days |
| Kimball Elementary School | FM-200100885 /01 7/22/05 KIMBALL ROOMS 001, 004, 005, 101, 104, 109, 112, 200, 203, 210, AND 212 REPLACE WINDOW PANES. MT 20001609 | January 11, 2001 | July 22, 2005 | 1,653 days |
| Eliot Junior High School | FM-200100936 01 7/22/05 ELIOT ROOM 105 MISSING SQUIRREL CAGE AND BLOWER FAN. REPAIR OR REPLACE. NO HEAT. | January 11, 2001 | July 22, 2005 | 1,653 days |
| Eaton Elementary School | FM-200104878 01 7/22/05 Eaton Boiler Room Repair heating/cooling circulating pump #3. Bearings appear to be going bad. Armstrong pump, model #4030, size: 4, Motor: Marathon, model #KVJ215TTDR7359BBW, Type: TDR, V-200, Fr: 215T, HP: -10, A: 30.6, Cyc: 60, Ph: 3, RPM: 1745, Design B-Code H, Shaft end, Bearing 207, 207, Opp.End Bearing 205. | March 5, 2001 | July 22, 2005 | 1,600 days |
| Lafayette Elementary School | FM-200103794 01 7/22/05 LAFAYETTE 1ST FLOOR EARLY CHILDHOOD PLAY AREA REPLACE SKYLIGHT COVER (PLEXY) IN PLAYGROUND PLAY AREA. | February 16, 2001 | July 22, 2005 | 1,617 days |
| Eastern High School | FM-200108005 01 7/22/05 EASTERN 1) INSTALL LIGHTS ACCORDING TO SCOPE. # ELS CONTRACTING , INC. | April 10, 2001 | July 22, 2005 | 1,564 days |
| Langdon Elementary School | FM-200104189 01 7/22/05 LANGDON LEARNING CENTER INSTALL NEW OUTLETS IN CLASSROOM | February 22, 2001 | July 22, 2005 | 1,611 days |
| Leckie Elementary School | FM-200103985 01 7/22/05 LECKIE MAIN ROOF TOP R/R EXHAUST FAN MOTOR FOR HALLWAYS AND STORGE ROOMS MOTOR LOCK UP. MOTOR = G.E. AC MOTOR, HP 1-1/2, FRAM 145T, PH 3, AMP 5.8/5.6/2.8, VOLT 208/230/460, MODEL #5K45P68004, RPM 1725. ODOR (ENVIRONMENT HEALTH) & FIRE CODE (SMOKE). | February 21, 2001 | July 22, 2005 | 1,612 days |
| Leckie Elementary School | FM-200103986 01 7/22/05 LECKIE ROOF EXHAUST FOR RESTROOM #2 R/R BAD SHAFT BEARING AND LOCK UP MOTOR TO ALL RESTROOMS ON ROOF. G.E. MOTOR, MODE #5K45P68004, PH 3, AMP 5.8/5.6/2.8, HP 1-1/2, FRAM 145T, RPM 1725, VOLT 208/230/460. ODOR COMPLAINT AND FIRE CODE. | February 21, 2001 | July 22, 2005 | 1,612 days |
| Ludlow-Taylor ES | FM-200101356 1/16/01 7/22/05 LUDLOW-TAYLOR RESTROOMS ASBESTOS ASSESSMENT REQUIRED. MT-20001785 ORIGINAL REQUEST DATE 01-16-01 (FJ) Code A - Same as WO MT-20001785 Horne Engineering - Roger Kager (RG 02/11/03) | January 16, 2001 | July 22, 2005 | 1,648 days |
| Horace Mann Elementary School | FM-200101440 01 7/22/05 MANN 2ND FLOOR PLASTER & PAINT PEELING CEILING ABOVE PANEL BOX MT-20001810 Asbestos/Lead Code A-clear for repair by Horne Engineer (Stephen Caldwell) on 4/01/02 (CEB) | January 17, 2001 | July 22, 2005 | 1,647 days |
| Horace Mann Elementary School | FM-200102366 01 7/22/05 MANN EXTERIOR SERAPE AND PAINT WOOD TRIM AROUND ENTIRE BUILDING. (MAIN) AT ROOF AND BELOW. PEELING AND CRACKING PAINT IS EXPOSING THE WOOD BENEATH TO THE ELEMENTA. Lead Code B Asbestos Code A - Clear for repairs on 03/07/03. Horne Engineering - Edward Rodriguez (RG 03/10/03) | January 29, 2001 | July 22, 2005 | 1,635 days |
| Horace Mann Elementary School | FM-200102368 01 7/22/05 MANN 1ST FLOOR = ROOM 11 PAINT NEW DOOR & FRAMES. DOORS INSTALLED AUGUST 2000. NEW METAL DOOR WILL NEED TO BE PRIMED PRIOR TO PAINTING. LEAD BASED PAINT ASSESSMENT ON 02-15-01 PER SHEILA R. HOWARD SEND TO HORNE ENG. | January 29, 2001 | July 22, 2005 | 1,635 days |
| Horace Mann Elementary School | FM-200104334 01 7/22/05 MANN SECOND (2ND) FLOOR - MAIN BUILDING STORAGE ROOM 1) ASBESTOS ASSESSMENT REQUIRED 2) CHECK FOR PEEL AND PAINTING CEILING ASBESTOS CODE A - CLEAR FOR REPAIRS ON 04/26/01. | February 26, 2001 | July 22, 2005 | 1,607 days |
| Horace Mann Elementary School | FM-200104913 01 7/22/05 MANN FIRST (1ST) FLOOR - CORRIDOR #25 #23, 24, 25, 26 AND 27 INCLUSIVE 1) ASBESTOS ASSESSMENT REQUIRD 2) PAINT WALLS ON FIRST (1ST) FLOOR CORRIDOR AND STAIRWELL AND VESTIBULES. ASBESTOS CODE A - CLEAR FOR REPAIRS ON 04/26/01. | March 4, 2001 | July 22, 2005 | 1,601 days |
| Maury Elementary School | FM-200103705 01 7/22/05 MAURY (ROOF OVER KITCHEN) 1) ASBESTOS ASSESSMENT REQUIRED 2) REPAIR/REPLACE BURNED OUT MOTOR (NO INFORMATIOON IS ON DATA TAG) ASBESTOS CODE A - CLEAR FOR REPAIRS ON 10/01/01. HORNE ENGINEERING - BILL CAMPION (RG) | February 15, 2001 | July 22, 2005 | 1,618 days |
| Merritt Middle School | FM-200100919 /01 7/22/05 MERRITT EAST LOCKER CORRIDOR BOYS RESTROOM REPAIR LEAK IN URINAL NEXT TO STALLS DUE TO CRACK BESIDE WALL MOUNTING BOLT ON RIGHT SIDE. REPLACE URINAL. MT-20001599 | January 11, 2001 | July 22, 2005 | 1,653 days |
| Eastern High School | FM-200102372 01 7/22/05 EASTERN BASEMENT - BAND ROOM SURVEY & INSTALL TWO (2) UNIVENT HEATERS TO PROVIDE HEAT TI THIS AREA. THE TWO (2) EXISTING UNITS ARE TO SMALL TO PROVIDE ADEQUATE HEATING FOR THE ROOM. | January 29, 2001 | July 22, 2005 | 1,635 days |
| Eastern High School | FM-200100425 01 7/22/05 EASTERN GYMNASIUM #1 REHANG BASKETBALL GOAL #2 REPAIR/REPLACE ROUET WHEELS ON ONE SECTION OF BLEACHERS--SCARRING FLOOR EVERYTIME USED #3 REPLACE LIGHTS IN CEILING OF GYMNASIUM FORMERLY GR-20000113 | January 9, 2001 | July 22, 2005 | 1,655 days |
| Moten Elementary School | FM-200101040 01 7/22/05 MOTEN SECOND (2ND) AND THIRD (3RD) FLOOR BOYS AND GIRLS RESTROOMS RESTORE CEILING AND LIGHTS. | January 11, 2001 | July 22, 2005 | 1,653 days |
| Moten Elementary School | FM-200105435 01 7/22/05 MOTEN FIRST,SECOND,THIRD,FORTH FLOORS. 1) ASBESTOS ASSESSMENT REQUIRED 2) MAKE REPAIRS TO CORRECT DEFICIENCIES. 3) DUE: MONDAY, MARCH 26, 2001. POINT OF CONTACT DCPS: GREGORY BRYANT (202)438-2829 AND GOERGE MOODY (202) 4398272. | March 9, 2001 | July 22, 2005 | 1,596 days |
| Eastern High School | FM-200100145 /01 7/22/05 EASTERN TUNNEL FAN ROOM: REMOUNT MOTOR TO CONDENSATE TANK IN ORDER TO OPERATE. MOTOR ON-SITE. HC-20000667 | January 7, 2001 | July 22, 2005 | 1,657 days |
| Eastern High School | FM-200100073 /01 7/22/05 EASTERN AUDITORIUM REPACE TWELVE (12) EACH 150 WATT SPOTLIGHTS IN CEILING OF AUDITORIUM NOTE: CEILING IS AT LEAST FORTY (40) FEET UP---CHERRY PICKER IS NECESSARY TO REPLACE LIGHT BULBS FORMERLY GR-20000009 | January 6, 2001 | July 22, 2005 | 1,658 days |
| Dunbar High School | FM-200105115 01 7/22/05 DUNBAR A-BLDG. - MECHANICAL ROOM PLEASE SURVEY & REPAIR ROOF LEAK WHEN IT RAINS., WATER WILL DAMAGE MOTOR FOR AIR HANDLER A-2. THE CEILING HAS SPRAYED ON INSULATION. | March 6, 2001 | July 22, 2005 | 1,599 days |
| Dunbar High School | FM-200104510 01 7/22/05 DUNBAR BOILER ROOM REPAIR LEAKING SEALS FOR HEATING CIRC. PUMPS, # 6, 7, 8 AND 9. | February 28, 2001 | July 22, 2005 | 1,605 days |
| Macfarland Middle School | FM-200100523 1/9/01 7/22/05 MACFARLAND, FRONT STEPS REPAIR CENTER RAILING ON STEPS NOTE: RAILING IS LOOSE AROUND CONCRETE AT BASE OF STEPS AND TOPS OF STEPS GR-20000015 | January 9, 2001 | July 22, 2005 | 1,655 days |
| Drew Elementary School | FM-200100124 01 7/22/05 DREW STATIONERY PLATFORM REPAIR/REPLACE BOARD ON STATIONERY PLATFORM--WOODEN BOARD APROXIMATELY 6" X 36" FORMERLY GR-20000298 | January 6, 2001 | July 22, 2005 | 1,658 days |
| Draper Elementary School | FM-200101836 01 7/22/05 DRAPER BASEMENT TUNNEL FALL OUT SHELTER REPAIR OR REPLACE BAD WATER METER VALVE. OUTLET VALVE. | January 22, 2001 | July 22, 2005 | 1,642 days |
| Draper Elementary School | FM-200100985 01 7/22/05 DRAPER BASEMENT CLOSET BY BOYS, REPAIR OR REPLACE CAFE DOOR, 100, 103, 204, 205, 206, 207, 308, CLOSET BY 304 AND 317. | January 11, 2001 | July 22, 2005 | 1,653 days |
| Deal Junior High School | FM-200107831 01 7/22/05 DEAL AUDITORIUM 1) ALTER DRAPES SO A/C CAN BE INSTALLED. | April 9, 2001 | July 22, 2005 | 1,565 days |
| Deal Junior High School | FM-200100491 01 7/22/05 DEAL FIRST (1ST), SECOND (2ND), THIRD (3RD) AND BASEMENT HALLWAYS SCRAPE, PLASTER AND PAINTING HALLWAYS WALLS. DEAL SCHOOL PAINT ASSESSMENT REQUIRED AND ASBESTOS ASSESSMENT PER SHEILA R. HOWARD ASBESTOS CODE A - CLEAR FOR REPAIR SEE ATTACHED ASBESTOS COD | January 9, 2001 | July 22, 2005 | 1,655 days |
| Orr Elementary School | FM-200102069 01 7/22/05 ORR 1ST FL. KITCHEN REPLACE 2 UNIT HEATER MOTORS OR FANS IN KITCHEN. TRANE UNIT HEATER, MODEL S-CU TYPE AND SIZE 20WF - MOTOR UNIVERSAL ELECTRIC CO., SER. 9GF 78676, MOD. C A3D003, 115V, 60 HZ, .78A, 1050. | January 25, 2001 | July 22, 2005 | 1,639 days |
| Coolidge High School | FM-200104373 01 7/22/05 COOLIDGE OUTSIDE FRONT SIDE OF BLDG. FABRICATE NEW FRAME AND INSTALL NEW DOOR. OLD WOODEN DOOR WONT CLOSE PROPERLY. | February 27, 2001 | July 22, 2005 | 1,606 days |
| Coolidge High School | FM-200101269 01 7/22/05 COOLIDGE 1ST FL. BOYS & GIRLS GYM (1) ASBESTOS ASSESSMENT REQUIRED (2) INSTALL 4 CEILING MOUNTED, ELECTRIC RESISTANCE HEATERS WITH DEDICATED 30 AMP CIRCUITS IN EACH GYM. THIS WOULD SUPPLEMENT THE EXISTING HEATING EQUIPMENT DURING DOWN TIME AND/OR EXTREMELY COLD DAYS. ASBESTOS CODE A-CLEAR FOR REPAIR ASSESSED BY HORNE ENG ON 7/24/01. | January 13, 2001 | July 22, 2005 | 1,651 days |
| Payne Elementary School | FM-200108113 01 7/22/05 (PAYNE) 1ST FLOOR/KITCHEN: (1) ASBESTOS ASSESSMENT REQUIRED. Asbestos Code A - Clear for repairs on 03/10/03. Horne Engineering - Edward Rodriguez (RG 03/11/03) | April 11, 2001 | July 22, 2005 | 1,563 days |
| Cook J.F. Elementary School | FM-200105342 3/8/01 7/22/05 (COOKE, J.F.) 1. ASBESTOS ASSESSMENT REQUIRED 1ST FLOOR/CAFETERIA: INSTALL UTILITY SINK FOR SANITARY PURPOSES. ASBESTOS ASSESSMENT REQUIRED TO DO THE WORK. POC: BEN PETTIFORD/MR. GREENE BLDG. PERSONNEL (202) 673-7221 SCHOOL OFFICE HEALTH CODE. | March 8, 2001 | July 22, 2005 | 1,597 days |
| Clark Elementary School | FM-200104416 01 7/22/05 Clark Boiler Room Replace leaking mechanical seals for circulating pump #1. | February 27, 2001 | July 22, 2005 | 1,606 days |
| Peabody Elementary School | FM-200100036 /01 7/22/05 PEABODY BOILER ROOM 1. ASBESTOS ASSESSMENT REQUIRED. 2. UNSTOP FLOOR DRAIN IN BOILER ROOM. FLOOR DRAIN MUST BE DUG UP. HEALTH HAZARD. POC MR. JOSEPH SAUNDERS CELL #439-7848 | January 7, 2001 | July 22, 2005 | 1,657 days |
| Powell Elementary School | FM-200101646 01 7/22/05 POWELL ROOF OF THE NEW ADDITION REPAIR OR REPLACE EXHAUST FAN THAT IS INOPERABLE AND OUTDATED. THERE IS NO INFORMATION ON UNIT DUE TO OUDATED EQUIPMENT. EXHAUST FAN IS NEEDED TO PULL EXHAUST FROM BATHROOMS NEW ADDITION. | January 19, 2001 | July 22, 2005 | 1,645 days |
| Cardozo High School | FM-200104495 01 7/22/05 CARDOZO BASEMENT FAN ROOM REPLACE OIL BEARINGS ON HEATING FANS #1, 2, 4 WITH GREASE BEARINGS, SEALS ON THE PULLEY SIDE WILL NOT HOLD OIL. MOTOR MFR. PEERLESS, MFR. ELLIOTT CO., HP 30, VOLTS 208/416, RPM 879, AMPS 86/43, PH 3. | February 28, 2001 | July 22, 2005 | 1,605 days |
| Cardozo High School | FM-200104222 01 7/22/05 CARDOZO FAN ROOM TUNNEL ASBESTOS ASSESSMENT ASSESS PIPE WRAP MATERIAL FOR REMOVAL, IN THESE AREAS NORTH , WEST, SOUTH AND EAST. | February 23, 2001 | July 22, 2005 | 1,610 days |
| Cardozo High School | FM-200104219 01 7/22/05 CARDOZO SB ROOM 22 & 20 ASBESTOS ASSESSMENT ASSESS PIPE WRAP MATERIAL FOR REMOVAL, FOR LEAKING GALVANIZED DOMESTIC COLD WATER PIPE. | February 23, 2001 | July 22, 2005 | 1,610 days |
| Cardozo High School | FM-200104208 01 7/22/05 CARDOZO ROOM 82 - 104 FURNISH & INSTALL ELECTRIC OVER HEAD HEATERS IN AREAS THAT CANNOT BE HEATED EFFICIENTLY BY BOILERS. ROOM 9, CUSTODIAN MAINTENANCE OFFICE, | February 23, 2001 | July 22, 2005 | 1,610 days |
| Cardozo High School | FM-200104204 01 7/22/05 CARDOZO 1 NORTH WEST ASBESTOS ASSESSMENT ASSESS PIPE WRAP MATERIALS FOR REMOVAL, FOR DOMESTIC COLD WATER SUPPLY PIPE LEAK. GALVANIZED. APPOX. 20" - 30" LONGx 3/4 " OR 1". ASBESTOS CODE A - CLEAR FOR REPAIR ON 07/20/01. | February 23, 2001 | July 22, 2005 | 1,610 days |
| Roosevelt High School | FM-200101006 01 7/22/05 (ROOSEVELT) LIBRARY 2ND FLOOR LEVEL - PLASTER WALLS IN THE LIBRARY THAT WAS DAMAGE BY LEAKING GUTTERS, GUTTERS HAVE BEEN REPAIRED. FORMERLY - MT-20001169 Code A-clear for repair by Horne Egineer on ( ) 3/13/02 (CEB) Abatement code D Chase to code A- clear for repair by SR (CEB) | January 11, 2001 | July 22, 2005 | 1,653 days |
| Rudolph Elementary School | FM-200104851 01 7/22/05 RUDOLPH 2ND FL. OUTS OF BOYS RESTROOM WINDOW REPAIR NOISY EXHAUST FAN MOTOR. EXHAUST. EXHAUST FAN IS EXCESSABLE THROUGH WINDOW. BUT SCAFFOLD OR EXTENSION LADDER MAY BE NEEDED. DUE TO LOCATION THE NOMENCLATURE IS NOT AVAILABLE. | March 5, 2001 | July 22, 2005 | 1,600 days |
| Cardozo High School | FM-200102293 /01 7/22/05 CARDOZO BASEMENT - FAN ROOM - WEST SIDE REMOVE ASBESTOS PIPE INSULATION ON 1 1/4 COPPER PIPE, WATER SUPPLY PIPE APPROXIMATELY 10" - 12". ASBESTOS ASSESSMENT REQUIRED. | January 26, 2001 | July 22, 2005 | 1,638 days |
| Bunker Hill Elementary School | FM-200101189 01 7/22/05 BUNKER HILL BOILER ROOM THE B & G MOTOR AND PUMP HAVE BEEN REMOVED AND NOT REPLACED. VOLTAGE 115, 2 BOLT FLANGE PIPING 3/4 BY 1 IN. HC-2000103 | January 12, 2001 | July 22, 2005 | 1,652 days |
| Shaed Elementary School | FM-200101793 01 7/22/05 SHAED THROUGHOUT SCHOOL PRINCIPALS OFFICE & CLASSROOMS REKEY CLASS ROOMS (26) TO HAVE EACH ROOM THERE OWN KEY, AND 3 MASTER KEYS. | January 22, 2001 | July 22, 2005 | 1,642 days |
| Bunker Hill Elementary School | FM-200100849 1/11/01 7/22/05 BUNKER HILL CAFETERIA STORAGE ROOM REPLACE CIRCULATING MOTOR ON HEAT EXCHANGER IN CEILING REAR AT CAFETERIA STORAGE ROOM. MOTOR HAS BEEN REMOVED BY MR. HOUSTON. HC-20000349 | January 11, 2001 | July 22, 2005 | 1,653 days |
| Shaed Elementary School | FM-200104069 01 7/22/05 Shaed Boiler Room Survey, upgrade existing lighting in boiler room. Currently existing lighting is very poor. | February 21, 2001 | July 22, 2005 | 1,612 days |
| Shaw JHS | FM-200100294 01 7/22/05 (SHAW) INTERIOR DOORS THROUGHOUT BUILDING NEED LOCKS KEYED TO ONE (1) MASTER KEY TO INTERIOR DOORS TO SCHOOL FORMERLY CF-20000193 | January 8, 2001 | July 22, 2005 | 1,656 days |
| Bunker Hill Elementary School | FM-200100846 1/11/01 7/22/05 BUNKER HILL EAST WING BOYS RESTROOM ROOF REPLACE EXHAUST FAN MOTOR ON ROOF (NEW BLDG.) MOTOR HAS BEEN REMOVED. HC-20000407 | January 11, 2001 | July 22, 2005 | 1,653 days |
| Ronald H. Brown MS | FM-200105301 01 7/22/05 BROWN, RON FIRST (1ST) FLOOR - AUDITORIUM MULFUNCTION OF LIGHTS ON THE CONTROL PANEL. WANT TO CELERBRATE RON BROWN BRITHDAY WITH PROGRAM, MARCH 22, 2001. | March 7, 2001 | July 22, 2005 | 1,598 days |
| Shepherd ES | FM-200101417 01 7/22/05 SHEPHERD MAIN ENTRANCE LEAD ASSESSMENT FOR REPAINTING OF MAIN ENTRANCE DOORS FOR REPAINTING PURPOSES. (RESTORATION: REPAINT) ASBESTOS ASSESSMENT REQUIRED. MT-20001038 ASBESTOS CODE A-CLEAR FOR REPAIR NO 2/19/02 HORNE ENGINEER: ROGER KAGER LEAD CODE A-CLEAR FOR REPAIR NO 2/19/02 HORNE ENGINEER: ROGER KAGER | January 16, 2001 | July 22, 2005 | 1,648 days |
| Shepherd ES | FM-200102102 01 7/22/05 SHEPHERD GROUND FLOOR - OLD WING ROOM #101 RESTROOM REPAIR HOLE IN WALLS IN ROOM #101 RESTROOM ASBESTOS ASSESSMENT REQUIRED MT-20001382 ASBESTOS CODE A - CLEAR FOR REPAIR | January 25, 2001 | July 22, 2005 | 1,639 days |
| Shepherd ES | FM-200107776 01 7/22/05 SHEPHERD ASBESTOS ASSESSMENT REQUIRED 1) FURNISH AND INSTALL CARPET IN ROOMS: 101, 103, 105, 132, 134, 212, 214 216, AND LIBRARY. # CB FLOORING, LLC | April 7, 2001 | July 22, 2005 | 1,567 days |
| Ronald H. Brown MS | FM-200105187 01 7/22/05 BROWN, RON PRINCIPAL CARRIES ABOUT 30 KEYS FOR THE CLASSROOMS AND WANTS THE LOCKSMITH TO RE-KEY THE ROOMS TO ONE (1) MASTER KEY. | March 7, 2001 | July 22, 2005 | 1,598 days |
| Ronald H. Brown MS | FM-200100840 1/11/01 7/22/05 BROWN, RON ROOF AREA ALL BOYS AND GIRLS EXHAUST FAN MOTORS LOCKING. HC-20000183 | January 11, 2001 | July 22, 2005 | 1,653 days |
| Brightwood Elementary School | FM-200100310 1/8/01 7/22/05 BRIGHTWOOD THROUGHOUT BUILDING MAKE ONE (1) MASTER KEY FOR ALL CLASSROOMS FORMERLY CF-20000205 | January 8, 2001 | July 22, 2005 | 1,656 days |
| Spingarn High School | FM-200104673 1/01 7/22/05 SPINGARN OUTDIE MECH. ROOM FOR THE GREENHOUSE SURVEY AND MAKE NECESSARY REPAIRS TO THE PEERLESS GAS BOILER. THE BOILER WILL NOT START, WILL NOT STAY LIT. | March 1, 2001 | July 22, 2005 | 1,604 days |
| Spingarn High School | FM-200104716 2/01 7/22/05 SPINGARN BASEMENT NORTH TUNNEL SURVEY & RECONNECT STEAM OR RETURN LINES THAT WERE CAPPED ON VALVE OFF BY STEAM REPAIR SHOP. LINES ARE FOR 3/4" TO 2". | March 2, 2001 | July 22, 2005 | 1,603 days |
| Birney Elementary School | FM-200101102 01 7/22/05 BIRNEY THIRD FLOOR - ROOM 308,COMPUTER ROOM SECOND FLOOR - ROOM 215 AND EXIT (6). FIRST FLOOR - GIRLS BATHROOM REPLACE BROKEN GLASS.... | January 12, 2001 | July 22, 2005 | 1,652 days |
| Stuart-Hobson Middle School | FM-200101419 1/16/01 7/22/05 STUART-HOBSON FIRST (1ST) FLOOR - AUDITORIUM PLASTER FALLING FROM CEILING ON TO THE STAGE. ASBESTOS ASSESSMENT REQUIRED. - ASBESTOS CODE A - CLEAR FOR REPAIR (SEE ATTACHED SHEET) MT-20001147 | January 16, 2001 | July 22, 2005 | 1,648 days |
| Takoma Educational Center | FM-200103877 01 7/22/05 TAKOMA 3RD FLOOR ROOM 208 & 2ND FLOOR ROOM 163 REPLACE 8IN. FAUCET SPREAD DUE TO WATER CONSTANTLY DRIPS WATER. | February 20, 2001 | July 22, 2005 | 1,613 days |
| Takoma Educational Center | FM-200104297 01 7/22/05 TAKOMA 1) LIGHTS AND BALLAST REPLACEMENT, 277 VOLTS 2-TUBE BALLAST, 1 TUBE BALLAST, LONG LIFE ENERGY SAVER; F40CW/ES 1ST FL. RM#56, 73, 76, 72, 32, 13, 46, 1, 13, 35, 46 2ND FL. RM #113, 124, 143, 134, 154, 160,169,165, 167, 161, 62, 156, 152, 153, 155, 164, 172, 137, 145, 116 3RD FL. RM #186, 183, 196, 217, 226, 235, 233, 211, 219, 213, 232, 190 RM #101, 95,96,93,108, 86, 94, 90, 87, 88 ASBESTOS CODE A -CLEAR FOR REPAIRS ON 05/21/01. | February 23, 2001 | July 22, 2005 | 1,610 days |
| Takoma Educational Center | FM-200508141 05 7/22/05 Takoma First fl. Trashroom Unstop. fl. Drain | July 20, 2005 | July 22, 2005 | 2 days |
| Thomas Elementary School | FM-200100853 01 7/22/05 THOMAS BOILER ROOM REPLACE BURNED OUT STARTER CONTROL ON VACUUM PUMP #2. CONTROL IS NEEDED TO ENSURE PROPER OPERTION OF CONDENSATION SYSTEM. HC-20000476 | January 11, 2001 | July 22, 2005 | 1,653 days |
| Thomas Elementary School | FM-200103838 01 7/22/05 Thomas Boiler Room Replace defective soleniod valve for make-up water supply for condensate return tank. automatic switch Co. cat. #8210D4, serial #R93018S, Rebuild Kit #302280, air insert Gas-5-125psi, water -5-125/psi, Lt. oil-5-100psi, volts: 208, Hz: 60, Watts: 6, Dia: 1", Ph: 1 | February 20, 2001 | July 22, 2005 | 1,613 days |
| Truesdell Elementary | FM-200105333 01 7/22/05 TRUESDELL FIRST (1ST) FLOOR - MAIN LOBBY 1) ASBESTOS ASSESSMENT REQUIRED. 2) INSTALL A OUTLET IN WALL FOR THE METAL DETECTOR MACHINE. INSPECTOR: FIRE CODE VIOLATION 3) Asbestos Code A - Clear for Repair ON 03/13/01. Note: material in stock-Sheila H. | March 8, 2001 | July 22, 2005 | 1,597 days |
| Tubman Elementary School | FM-200108156 01 7/22/05 (TUBMAN) (1) ASBESTOS ASSESSMENT REQUIRED. 1ST FLOOR/MAIN OFFICE: REPAIR OR REPLACE LIGHT FIXTURES. ASBESTOS CODE A - CLEAR FOR REPARS ON 06/11/01. | April 11, 2001 | July 22, 2005 | 1,563 days |
| Bancroft Elementary School | FM-200101091 01 7/22/05 BANCROFT ROOM 200B REPAIR UNIVENT HEATER THAT IS NOT WORKING. BEARING ASSEMBLY WORN TOTALLY OUT. CAN NOT BLOW HEAT OUT INTO THE ROOM. HC-20000599 | January 12, 2001 | July 22, 2005 | 1,652 days |
| Ballou Senior High School | FM-200508375 05 7/22/05 Ballou Room #308, #309 and #310 Check and repair breaker for the following classrooms: #308, #309 and #310. Breakers for these rooms operate A/C window units are drawing high amos causing breaker to trip. (3) Three General electric 20 amp circuit breakers | July 22, 2005 | July 22, 2005 | 0 days |
| Ballou Senior High School | FM-200508374 05 7/22/05 Ballou Hallway Panel Box Replace (2) two bad general electric 20 amp circuit breakers for operation of A/C window units in rooms #309 and #315. | July 22, 2005 | July 22, 2005 | 0 days |
| Watkins Elementary School | FM-200455089 04 7/22/05 Watkins First Floor There is a busted pipe to urinal flooding the floor it needs to be replaced. Teachers restroom last toilet needs a flush valve kit. | September 20, 2004 | July 22, 2005 | 305 days |
| Ballou Senior High School | FM-200508335 05 7/22/05 Ballou High School Repair 100 feet of fence on stadium | July 21, 2005 | July 22, 2005 | 1 day |
| Watkins Elementary School | FM-200507319 05 7/22/05 Watkins First through Fourth floors. Repair Bradley Basins. | June 30, 2005 | July 22, 2005 | 22 days |
| Ballou Senior High School | FM-200108002 01 7/22/05 BALLOU 1) INSTALL LIGHTS ACCORDING TO SCOPE. # ELS CONTRACTING , INC. | April 10, 2001 | July 22, 2005 | 1,564 days |
| Webb Elementary School | FM-200101945 01 7/22/05 (WEBB) 1ST FLOOR: ELECTRICAL OUTLETS NEED TO BE INSTALLED FOR AIR CONDITIONERS WINDOW UNITS. Asbestos Code A - Clear for repairs on 03/10/03.- However CAUTION shall be use when installing A/C window unit as Ceiling isasbestos containing. Horne Engineering - Sharon Voss (RG 03/11/03) Tracking # 17524 | January 23, 2001 | July 22, 2005 | 1,641 days |
| Webb Elementary School | FM-200104932 01 7/22/05 WEBB KITCHEN PAINT KITCHEN, CEILING, WALLS, WINDOWS, OFFICE, LOCKERS, RESTROOM, DOORS AND TRIM. AVA CONTRACTOR Lead Code B Asbestos Code A - Clear for repairs on 02/19/03. Horne Engineering - Edward Rodriguez (RG 02/20/03) | March 5, 2001 | July 22, 2005 | 1,600 days |
| Ballou Senior High School | FM-200107970 01 7/22/05 BALLOU OUTSIDE REPLACE EXTERIOR LIGHTS AROUND SCHOOL ASBESTOS CODE A-CLREAR FOR REPAIR BY CHARLES E BUCHANAN 6/28/01 | April 9, 2001 | July 22, 2005 | 1,565 days |
| West Elementary School | FM-200102141 01 7/22/05 WEST 2ND FL. MECH. ROOM #7/8 REPLACE UNIT HEATER MOTORS. NAME TRANE SER #7JF85741K, VOLTS 115, HZ 60, AMPS 1.80, RPM 1550. HEATER UNITS WILL NOT RUN TO MECH. ROOMS 7 & 8. | January 25, 2001 | July 22, 2005 | 1,639 days |
| West Elementary School | FM-200105078 01 7/22/05 WEST BOILER ROOM R/R MOTOR TO HOT WATER HEATING CIRCULATOR PUMP #3. NAME BALDOR, PH 3, AMPS 21.5, CAT - M3710T, SPEC 37A073W452, FRAMER 213T, SER. F792, RPM 1725, HP 7-1/2. MOTOR IS INOPERABLE. | March 7, 2001 | July 22, 2005 | 1,598 days |
| Ballou Senior High School | FM-200101667 01 7/22/05 BALLOU 1)MAIN OFFICE, PRINICIPAL, ASSISTANT PRINCIPALS OFFICE, ROOM A116, 126, A127, COUNSELORS OFFICE AND LIBRARY 2) ASBESTOS ASSESSMENT REQUIRED 3) REPAIR/REPLACE FLOORING MATERIAL MT-20001861 ASBESTOS CODE A-CLEAR FOR REPAIRS | January 19, 2001 | July 22, 2005 | 1,645 days |
| Whittier Elementary School | FM-200101315 6/01 7/22/05 WHITTIER ADUITORIUM, CLASSROOMS, HALLWAYS, BATHROOM AND MULTI-PURPOSE FLOORING ASBESTOS ASSESSMENT REQUIRED. MT-20001752 ORIGINAL REQUEST DATE 01-16-01(FJ) | January 16, 2001 | July 22, 2005 | 1,648 days |
| Ballou Senior High School | FM-200101372 01 7/22/05 BALLOU AUDITORIUM AND FIRST FLOOR- A- WING ASBESTOS ASSESSMENT REPLACE LIGHT FIXTURE, PAINT FIRST MT-20001784 ABS MGR. ADDED - ORIGINAL INITIATED 1/16/01 (FJ) INSTALL FLORESCENT TUBES IN (25) LIGHT FIXTURES. 5/29/01 | January 16, 2001 | July 22, 2005 | 1,648 days |
| Ballou Senior High School | FM-200101357 01 7/22/05 BALLOU AUDITORIUM PAINT RENOVATION ASBESTOS ASSESSMENT REQUIRED MT-20001788 ORIGINAL REQUEST DATE 01-16-01(FJ) | January 16, 2001 | July 22, 2005 | 1,648 days |
| Aiton Elementary School | FM-200105043 01 7/22/05 AITON INSTALL ASPHALT OVER EXISTING SURFACE, NO ACM TEST NEEDED HRGM CONTRACTOR Asbestos Code A - Clear for repairs on 03/10/03. Horne Engineering - Sharon Voss (RG 03/11/03) | March 6, 2001 | July 22, 2005 | 1,599 days |
| Aiton Elementary School | FM-200101444 01 7/22/05 AITON KITCHEN REPLACE BROKEN AND MISSING (9x9) FLOOR TILE. MT-20001871 ASBESTOS ASSESSMENT REQUIRED. ORIGINAL REQUEST DATE 01-17-01 (FJ) | January 17, 2001 | July 22, 2005 | 1,647 days |
| Wilson High School | FM-200102431 01 7/22/05 WILSON, W. TUNNEL BY PUMP ROOM & SEC B 1. ASBESTOS ASSESSMENT REQUIRED. 2. REPAIR LEAK ON 3/4" LINE TO DOMESTIC HOT WATER TANK BY PUMP ROOM IN STEAM TUNNEL AND LEAK ON 1-1/4" BLACK IRON PIPE IN STEAM TUNNEL B. BOTH AREAS CONTAIN ASBESTOS. POC MR. J. SAUNDERS OFFICE #698-1750. | January 30, 2001 | July 22, 2005 | 1,634 days |
| Wilson High School | FM-200507841 05 7/22/05 W. Wilson School Repair Fence | July 14, 2005 | July 22, 2005 | 8 days |
| Woodson High School | FM-200104603 01 7/22/05 WOODSON, H.D. GYM - 1ST FLOOR 1) ASBESTOS ASSESSMENT REQUIRED 2) NEED HELP TO SCRAP CEILING IN THE GYM. PLASTER IS PEELING FROM THE CEILING. BUILDING STAFF NEEDS A CHERRY PICKER OR A SCAFFOLD. CEILING IS APPROX. 40 FEET HIGH. STAFF WILL SCRAPE CEILING WITH PROPER EQUIPMENT. Lead & Asbestos Code A - Clear For Repairs On 03/11/02. Horne Engineering - Edward Rodriuez (RG 03/11/02) | February 28, 2001 | July 22, 2005 | 1,605 days |
| Woodson High School | FM-200104886 01 7/22/05 Woodson, HD Boiler Room Repair leaking mechanical seals on feed water pumps for boilers #1 and #2. | March 5, 2001 | July 22, 2005 | 1,600 days |
| Young Elementary School | FM-200100806 01 7/22/05 YOUNG 1ST FL CAFETERIA SURVEY AND REPAIR 2 WALL MOUNTED UNIVENTS THAT ARE NOT WORKING. THE CENTER UNIVENT HAS A BAD MOTOR (G.E. PART #274792). THE UNIVENT LEFT OF CENTER HAS VANDALIZED CONTROLS. THE CAFETERIA IS COLD. HC-20001194 | January 10, 2001 | July 22, 2005 | 1,654 days |
| Adams Elementary | FM-200104063 01 7/22/05 BASEMENT PUMP ROOM REPAIR OR REPLACE LEAKING 6" MAIN SHUT OFF VALVE. | February 21, 2001 | July 22, 2005 | 1,612 days |
| Aiton Elementary School | FM-200108603 01 7/25/05 AITON STAGE 1) REFINISHING THE STAGE TEST FOR LEAD LEAD CODE A - CLEAR FOR REPAIRS ON 04/27/01. | April 18, 2001 | July 25, 2005 | 1,559 days |
| Oyster Elementary School | FM-200102753 01 7/25/05 OYSTER - REPAIR OR REPLACE MASONRY BLOCK WERE ELECTRICAL WORK WAS DONE. | February 1, 2001 | July 25, 2005 | 1,635 days |
| Ferebee-Hope Elementary School | FM-200108259 01 7/25/05 FEREBEE-HOPE THIRD (3RD) FLOOR - ALL OPEN SPACE 1) ASBESTOS ASSESSMENT REQUIRED 2) CARPET REPAIRS: RE-GLUE CARPET SEAMS, ENTIRE AREA 23,430 SQIARE FEET. (DO TO FLOOD) Asbestos Code A - Clear For Repairs On 11/14/01. Horne Engineering - Bipin Nanavaty (RG 03/20/02) | April 12, 2001 | July 25, 2005 | 1,565 days |
| Gibbs Elementary School | FM-200109683 01 7/25/05 GIBBS RM. 101, 102, 129, 310 1. ASBESTOS ASSESSMENT REQUIRED. 2. PURCHASE AND INSTALL 18,000 BTU AC WINDOW UNIT. Multi-Trade lead trade electrical/welding/carpentry. Need to determine fund to purchase AC's. 5-21-02. 3. INSTALL ELECTRICAL SERVICE TO EACH ONE. Requestor Phone: 698-1750 ASBESTOS CODE A-CLEAR FOR REPAIR ON 9/25/01BY HORNE ENGINEER: SAM EBRAHIM | May 4, 2001 | July 25, 2005 | 1,543 days |
| Raymond Elementary School | FM-200103052 /01 7/25/05 RAYMOND 1ST FL. BOILER ROOM REPAIR OR REPLACE STARTER CONTROL TO #2 HOT WATER HEATING CIRCULATING PUMP. NAME - CUTLER HAMER, SIZE -2, VOLTS 220, AMPS 45, SERIES B1, SER. # AN16GNO. COIL WILL NOT PULL IN TO OPERATE MOTOR OR THE CIRCULATING PUMP. | February 6, 2001 | July 25, 2005 | 1,630 days |
| Emery Elementary School | FM-200103345 01 7/25/05 EMERY ENTIRE BUILDING RE-KEY THE BUILDING. | February 8, 2001 | July 25, 2005 | 1,628 days |
| Woodson High School | FM-200109343 01 7/25/05 WO0DSON, H.D. FIRST (1ST) FLOOR - CORRIDOR OUTSIDE MEDIA CTR. 1) ASBESTOS ASSESSMENT REQUIRED. 2) CEILING IS BADLY DAMAGED DUE TO FLOODING. LEAK HAS BEEN FIXED CEILINGS NEEDS REPAIR. ASBESTOS CODE A - CLEAR FOR REPAIRS ON 05/15/01. | April 30, 2001 | July 25, 2005 | 1,547 days |
| Duke Ellington School | FM-200103660 01 7/25/05 ELLINGTON 1ST FL, BASEMENT REPLACE/INSTALL THERMOSTATIC VALVES IN THE ABOVE LOCATIONS. THE FOLLOWING LOCATIONS NEED 1: 101, 103, 105, 115, 118, 3, 5, 41, 10. THE FOLLOWING LOCATIONS NEED 2: 108, 117, 120, 1, 2, CAFETERIA, DANCE ROOM, NURSE OFFICE, 24, GUIDANCE COUNSELOR. HALLWAY NEEDS 10, BASEMENT HALLWAY NEEDS 6, GYM NEEDS 14. 2ND. FL. REPLACE/INSTALL THERMOSTATIC VALVE ON RADIATORS IN THE ABOVE LOCATIONS 217,217A,200,252B,251,251A,252,254,264A,201A,220,216,205,208,201,250,260,262,264,265 THE LIBRARY NEEDS 4, HALLWAY NEEDS 3. 3RD. FLOOR REPLACE/INSTALL THERMOSTATIC VALVES ON RADIATORS IN CLASSROOMS THE FOLLOWING LOCATIONS NEED 1: 301,301A,313,317,318,320 AND HALLWAY ROOM 309 NEEDS 4. ROOM 314 NEEDS 3. | February 14, 2001 | July 25, 2005 | 1,622 days |
| Cardozo High School | FM-200103353 01 7/25/05 CARDOZO NORTH WEST TUNNEL 1. ASBESTOS ASSESSMENT REQUIRED 2. REPLACE LEAKING STEAM RETURN BLACK PIPE. PIPE IS 1-1/4" BY APPROX. 10 FT. LONG. | February 8, 2001 | July 25, 2005 | 1,628 days |
| Patricia R Harris Ed Center | FM-200108925 01 7/25/05 (HARRIS, P.R.) 1. ASBESTOS ASSESSMENT REQUIRED. EXTERIOR EXIT: PAINT ALL EXTERIOR DOORS AROUND THE ENTIRE BUILDING. ASBESTOS CODE A - CLEAR FOR REPAIRS ON 05/14/01. | April 20, 2001 | July 25, 2005 | 1,557 days |
| Roosevelt High School | FM-200507724 05 7/25/05 Roosevelt SHS - Stay Office 1. Perform electrical load survey iand install 1 20amp/208 plug for 24,000btu window a/c unit. 2. After approval by the Electrical Shop - Install 1 - 24,000btu window a/c unit. (Carpentry Shop) | July 13, 2005 | July 25, 2005 | 12 days |
| Rudolph Elementary School | FM-200102569 01 7/25/05 (RUDOLPH) 2nd floor, Library: Library to be converted to computer lab. Security doors need to be installed. NOTE: FM-200105362 WAS SENT TO THE WELDERS ON 3-8-01 Asbestos Code A - Clear for repairs on 04/16/03. Horne Engineering - Sharon Voss (RG 04/17/03) | January 31, 2001 | July 25, 2005 | 1,636 days |
| Hart Middle School | FM-200103072 01 7/25/05 HART 3RD FL. HALLWAY REPLACE SHAFT IN UNIVENT (HERMAN & NELSON) SHAFT SIZE: 2 FT. 1 INCH. 3 SQUIRREL CAGES AND MOTOR (HP 1/8, RPM 700, V 115, 200 SHAFT: 1-1/2" X 1/2". 5KCP39KGB909S. LUNCH ROOM - REPLACE 4 SQUIRREL CAGES UNIVENT LUNCH ROOM. | February 6, 2001 | July 25, 2005 | 1,630 days |
| Hart Middle School | FM-200103076 01 7/25/05 HART THROUGHOUT BLDG. REPLACE UNIVENT COVERS IN ROOMS: 124, 123, 207, 206, 319, 317, 133, LOCKER ROOMS, AND HALLWAYS 1ST, 2ND AND 3RD FLOORS. HERMAN & NELSON UNIVENTS SIZE OF COVERS: 7-1/2" X 6-3/4". TOTAL NEEDED 35 COVERS. | February 6, 2001 | July 25, 2005 | 1,630 days |
| Cardozo High School | FM-200103352 01 7/25/05 CARDOZO NORTH WEST TUNNEL 1. ASBESTOS ASSESSMENT IS NEEDED. 2. REPLACE DETERIORATING BLACK PIPE FOR STEAM SUPPLY. PIPE IS 3/4" X 10 FT. LONG AND IS LEAKING. | February 8, 2001 | July 25, 2005 | 1,628 days |
| Hearst Elementary School | FM-200109052 01 7/25/05 HEARST ENTIRE BUILDING NEEDS TO BE PAINTED (INTERIOR) 1) ASBESTOS ASSESSMENT REQUIRED 2) THE PAINT IS DULL AND PEELING. THE P.T.A. IS PROVIDING NEW SHELVING FOR THE LIBRARY. PAINTING IS NEEDED IMMEDIATELY, IF POSSIBLE. THE ENHANCEMENT WILL IMPROVE THE SHCOOL CLIMATE. ASBESTOS CODE A -CLEAR FOR REPAIRS ON 05/09/01. | April 24, 2001 | July 25, 2005 | 1,553 days |
| Woodson High School | FM-200110226 01 7/25/05 WOODSON, H.D. FIRST (1ST) FLOOR - AUDITORIUM BUILD A SCALFOLD TO REPLACE EIGHT (8) LIGHTS. | May 14, 2001 | July 25, 2005 | 1,533 days |
| Adams Elementary | FM-200102674 01 7/25/05 ADAMS BASEMENT PUMP ROOM REPAIR OR REPLACE LEAKING 6" MAIN BLDG. SHUT-OFF VALVE. | February 1, 2001 | July 25, 2005 | 1,635 days |
| Hendley Elementary School | FM-200508588 05 7/25/05 Hendley Second fl. Annex Repair Lights in the Area | July 25, 2005 | July 25, 2005 | 0 days |
| School WW High School | FM-200108252 01 7/25/05 (SCHOOL WITHOUT WALLS) 1ST FLOOR/ROOM #107: (ASBESTOS ASSESSMENT REQUIRED.) REPAIR LARGE STRUCTURAL CRACK IN WALL OF CLASSROOM. ASBESTOS CODE A -CLEAR FOR REPAIRS ON 05/08/01. | April 12, 2001 | July 25, 2005 | 1,565 days |
| John Burroughs ES | FM-200506472 05 7/25/05 Burroughs First fl. Boys Restroom /Lower level Water Fountain Unstop Urinals/ Change Battery Operrated Flush Valves to Manual/ Unstop water Fountian | June 7, 2005 | July 25, 2005 | 48 days |
| Johnson JHS | FM-200102634 /01 7/25/05 JOHNSON GYMNASIUM - FIRST (1ST) FLOOR SOME AREA OF THE GYMNASIUM FLOOR NEED TO BE REPAIR. DUE TO WATER DAMAGE. ASBESTOS ASSESSMENT REQUIRED MT- 20001555 Asbestos Code A - Clear for repairs on 03/10/03. Horne Engineering - Bipin Nanavaty (RG 03/11/03) | January 31, 2001 | July 25, 2005 | 1,636 days |
| Shaw JHS | FM-200102486 01 7/25/05 SHAW BOILER ROOM REPAIR OR REPLACE BELL AND GOSSETT CIRCULATING PUMP TO CONVERTER THAT SERVICES REHEAT COILS AND CONVECTORS. MAKE: BELL & GOSSETT, 153.1, RPM, MODEL 2-1/2 AB, SER., #147483, HP 2. | January 30, 2001 | July 25, 2005 | 1,637 days |
| Shaw JHS | FM-200102488 01 7/25/05 SHAW BOILER ROOM REPLACE STARTER CONTROL TO HOT WATER SYSTEM CIRCULATING PUMP THAT SERVICE REHEATER COILS AND CONVECTOR. CONTROLS HAVE BEEN PULLED BUT NEVER REPLACED. MAKE: WESTINGHOUSE, COIL #480U, A200M2CX, 60 HZ, STYLE 765A842609, 44U, VOLTS 200 230 460/97S, 50SCB86G13, CWTEA. | January 30, 2001 | July 25, 2005 | 1,637 days |
| Shaw JHS | FM-200109961 01 7/25/05 SHAW SECURE DOOR THAT LEADS TO GARAGE FROM ROOF OF DAY CARE CENTER. BREAK IN 5/4/01. SECURITY HAZARD. | May 10, 2001 | July 25, 2005 | 1,537 days |
| Key Elementary School | FM-200110511 01 7/25/05 KEY TUNNEL AREA 1. ASBESTOS ASSESSMENT REQUIRED. 2. REPLACE RUPTURED 2" HEATING LINE (BLACK PIPE) IN CRAWL SPACE. | May 17, 2001 | July 25, 2005 | 1,530 days |
| Ronald H. Brown MS | FM-200108371 01 7/25/05 RON BROWN TEACHERS DINING ROOM 1ST FL. 2. REPLACE WINDOW AC UNIT. COMPRESSOR MAY BE DEFECTIVE, TRIPS CIRCUIT BREAKER UPON CLOSING CIRCUIT. QUIETMASTER - 24, 000 BTU. ASBESTOS CODE A -CLEAR FOR REPAIRS ON 05/22/01. | April 13, 2001 | July 25, 2005 | 1,564 days |
| Kimball Elementary School | FM-200102570 /01 7/25/05 KIMBALL MIDDLE WING, NORTH WING, NEW WING, CAFETERIA OFFICE AND MAIN. OFFICE. REPLACE GLASS IN GIRLS BATHRIOOM-(MIDDLE WING), GIRLS BATHROOM - (NORTH WING), MAIN OFFICE- (MIDDLE WING), CAFETERIA OFFICE, (MIDDLE WING) AND CLASSROOMS - 112,105,005,104,212,210,106 AND 002. | January 31, 2001 | July 25, 2005 | 1,636 days |
| Kimball Elementary School | FM-200109778 01 7/25/05 KIMBALL OUTSIDE EXTERIOR EXTERIOR BAY WINDOW OUTSIDE OF CLASSROOM #102 NORTH WING MONTOSORI NEEDS TO BE SCRAPE AND PAINTING. (METAL FRAME) | May 8, 2001 | July 25, 2005 | 1,539 days |
| King M L ES | FM-200102643 01 7/25/05 KING KING THIRD (3RD) FLOOR LEAK IN GIRLS RESTROOM ON THE 3RD FLOOR WATER IS FLOODING THE FLOOR. (POSSIBLE ROOF LEAK) MT-20001575 | January 31, 2001 | July 25, 2005 | 1,636 days |
| Eastern High School | FM-200456630 04 7/25/05 Eastern EMERGENCY Sub-basement outside locker room Unstop outside drain outside of boys locker room and unstop toilet across from gym. Football game 10/08/04 team has to jump or track over water outside. | October 8, 2004 | July 25, 2005 | 290 days |
| Lafayette Elementary School | FM-200103626 01 7/25/05 LAFAYETTE FIRST (1ST) FLOOR - MAIN OFFICE AREA 1) ASBESTOS ASSESSMENT REQUIRED 2) INSTALLED CARPET TO GRAND HALL BY MAIN OFFICE AREA Asbestos Code A - Clear for repairs on 03/10/03. Horne Engineering - Troy Wilcome (RG 03/11/03) | February 13, 2001 | July 25, 2005 | 1,623 days |
| Turner Elementary School | FM-200109983 01 7/25/05 TURNER SECOND (2ND) FLOOR - TEACHERS LOUNGE 1) ASBESTOS ASSESSMENT REQUIRED. 2) INSTALL NEW SECURITY DOOR IN ROOM #200; SEE PRINCIPAL ABOUT DETAILS. Code A-clear for repair by Horne Egineer on ( Sam Ebrahim ) 3/13/02 (CEB | May 10, 2001 | July 25, 2005 | 1,537 days |
| Marshall Educational Center | FM-200109499 01 7/25/05 MARSHALL ASBESTOS AND LEAD ASSESSMENT REQUIRED 1) SWIMMING POOL/ELECTRICAL POC - RAJ SKULA/TIM KEENE -202-889-8400 ASBESTOS CODE A-CLEAR FOR REPAIR 6/9/01 | May 3, 2001 | July 25, 2005 | 1,544 days |
| Woodson High School | FM-200102782 2/2/01 7/25/05 WOODSON, H.D. OUTSIDE PLAZA 1. ASBESTOS ASSESSMENT REQUIRED TO CONCRETE CEILING AND PIPE INSULATION. 2. REPAIR RUPTURED LINE. 3. INSULATE PIPE ( SIZE TO BE DETERMINED) 4. PLASTER WORK NEEDED. POC MR. BRADLEY CELL #438-7437 ASBESTOS CODE A - CLEAR FOR REPAIR (SEE ATTACHED SHEET) | February 2, 2001 | July 25, 2005 | 1,634 days |
| Leckie Elementary School | FM-200110000 01 7/25/05 LECKIE OUTSIDE STRUCTURE IS NEEDED FOR REPAIR AROUND BUILDING. PLASTERING FALLING FROM BUILDING AND CRACKING. | May 10, 2001 | July 25, 2005 | 1,537 days |
| Eastern High School | FM-200103411 01 7/25/05 EASTERN GROUND FLOOR AREA GREEN HOUSE AND CORRIDOR WINDOWS 1) REPAIR THE WINDOWS IN THE GREEN HOUSE AND THE WINDOWS IN THE CORRIDOR ON THE GYM HALLWAY. | February 9, 2001 | July 25, 2005 | 1,627 days |
| Eastern High School | FM-200102863 01 7/25/05 EASTERN BASEMENT GREENHOUSE REPLACE (5) 2X8 PIECES OF LEXON . | February 5, 2001 | July 25, 2005 | 1,631 days |
| West Elementary School | FM-200507894 05 7/25/05 (West) Unclog toilets, to identify areas see building personell | July 15, 2005 | July 25, 2005 | 10 days |
| Adams Elementary | FM-200108374 01 7/25/05 ADAMS BASEMENT PUMP ROOM 1. ASBESTOS ASSESSMENT REQUIRED IN ORDER TO RECEIVE WORK PERMIT. 2. R/R LEAKING 6" MAIN BUILDING SHUT OFF VALVE. Asbestos Code A - Clear for repairs on 03/06/03. Horne Engineering - Tony Marcolin (RG 03/07/03) | April 13, 2001 | July 25, 2005 | 1,564 days |
| Smothers ES | FM-200103203 01 7/25/05 SMOTHERS - PLAYGROUND (WIN PROJECT) PROVIDE AND INSTALL PLAYGROUND EQUIPMENT. | February 7, 2001 | July 25, 2005 | 1,629 days |
| Brightwood Elementary School | FM-200103023 2/5/01 7/25/05 BRIGHTWOOD FIRST (1ST) FLOOR - CLASSROOM 106, 107 AND 109. 1) ASBESTOS ASSESSMENT REQUIRED 2) THE DOORS IN CLASSROOM NEEDS TO BE RELINE OR REPLACE. *FIRE CODE VIOLATION. Code A-clear for repair by Horne Engineer (Philip Connolly ) on 4/01/02 (CEB) | February 5, 2001 | July 25, 2005 | 1,631 days |
| Horace Mann Elementary School | FM-200110084 01 7/25/05 MANN MAIN BUILDING AT ROOF LINE REPLACE ALL EXISTING EXTERIOR LIGHTS AT ROOF LINE. INADEQUATE LIGHTS AND BROKEN COVER PLATS. | May 11, 2001 | July 25, 2005 | 1,536 days |
| Sousa Middle School | FM-200109609 01 7/25/05 SOUSA 1) Asbestos Assessment Required. 2) Basement Floor - Girls Restroom Water Leaking in Bathroom. Fixture removed several weeks ago and it is leaking from hole in wall. Exp Demo ENVIROBATE (IT GROUP) 703-461-6848 CODE A - ASBESTOS ABATED ON 6/8/01 (SG) PER LEROY MINTONS CONFIRMATION. | May 4, 2001 | July 25, 2005 | 1,543 days |
| Brent Elementary School | FM-200110026 01 7/25/05 BRENT FIRST (1ST) FLOOR - KITCHEN REPAIR FREEZER - VERY NOISY AND WHEN CUT OFF AND TURNED BACK ON, CAUSES BREAKER TO TRIPS. (SEND TO FOOD SERVICES) | May 11, 2001 | July 25, 2005 | 1,536 days |
| Garnet-Patterson MS | FM-200110525 01 7/25/05 GARNET-PATTERSON KITCHEN SURVEY AND INSTALL INDEPENDENT HOT WATER HEATER FOR KITCHEN AREA. WP-200108858 | May 17, 2001 | July 25, 2005 | 1,530 days |
| Bowen Elementary School | FM-200103493 01 7/25/05 BOWEN BOILER ROOM REPAIR STEAM LEAK IN TUNNEL ON SUPPLY LINE. 2 " PIPE. | February 10, 2001 | July 25, 2005 | 1,626 days |
| Moten Elementary School | FM-200108613 01 7/25/05 MOTEN FOUR (4TH) FLOOR - ROOMS#415A, 418 AND 420 ,421,417,413,&4 TH FLOOR HALLWAY OF THE OLD AND NEW WING. 1) ASEBESTOS ASSESSMENT REQUIRED 2) CEILING TILE REQUESTED BY RICK ELEY AFTER A SITE VISIT WITH JEFFERY EDWARDS (4/18/01). Code A-clear for repair by Horne Engineer ( Shoron Voss ) 0n 3/20/02 (CEB) | April 18, 2001 | July 25, 2005 | 1,559 days |
| Spingarn High School | FM-200108410 01 7/25/05 SPINGARN S. TUNNEL 1. ASBESTOS ASSESSMENT IS REQUIRED 2. REPAIR LEAKING 1" LINE, REPAIR LEAKING 2" LINE LEAKING IN THREE PLACES, REPAIR LEAKING 3/4" DRIP LEG. | April 13, 2001 | July 25, 2005 | 1,564 days |
| Spingarn High School | FM-200110420 01 7/25/05 (SPINGARN) HEALTH CODE VIOLATION: KITCHEN: NEED GARBAGE DISPOSAL IN THE CAFETERIA TO DISPOSE OF FOOD WASTE. | May 16, 2001 | July 25, 2005 | 1,531 days |
| Spingarn High School | FM-200110438 01 7/25/05 SPINGARN 1) ASBESTOS ASSESSMENT REQUIRED 2) EA ENGINEERING NEEDS LOCKSMITH SHOP ASSISTANCE FOR 6 MONTH PERIODIC SUVEILLANCE FOR THRU OUT THE BUILDING FRIDAY, MAY 18, 2001 AND MONDAY, MAY 21, 2001, MAY HAVE TO DRILL OUT LOCKS. POC: MR. ABDULLAH 202-438-7124 ( CODE A FOR WORK PERMIT ONLY) | May 16, 2001 | July 25, 2005 | 1,531 days |
| Draper Elementary School | FM-200108818 01 7/25/05 DRAPER 1. ASBESTOS ASSESSMENT REQUIRED IN ORDER TO RECEIVE WORK PERMIT. 2. PERFORM ON GOING REPAIRS TO HVAC EQUIPMENT SUCH AS: BURNERS, BOILER AUXILARY EQUIPMENT, CONDENSATE/CIRCULATING PUMPS, PNUEMATIC CONTROLS, COMPRESSORS, CHILLERS, ROOFTOP AC UNITS, WINDOW AC UNITS, SUMP PUMPS, AIR HANDLER UNITS, RETURN AIR FANS, DOMESTIC HOT WATER HEATERS, EXHAUST FANS, UNIT VENTILATORS, ELECTRIC HEATERS, COOLING TOWERS AND UNSTOP DRAINS. CODE A - CLEAR FOR REPAIR AS OF 4/20/01 | April 20, 2001 | July 25, 2005 | 1,557 days |
| Macfarland Middle School | FM-200103516 2/12/01 7/25/05 MACFARLAND EXTERIOR REPAIR OR REPLACE EXTERIOR LIGHTS ON THE END OF BUILDING NESR THE BALL PARK. STUDENTS ENTER AND EXIT DURING NIGHT PROGRAMS. | February 12, 2001 | July 25, 2005 | 1,624 days |
| Draper Elementary School | FM-200103572 01 7/25/05 DRAPER BOILER ROOM 1. ASBESTOS ASSESSMENT REQUIRED. 2. CHECK RETURN STORAGE TANK FOR LEAK. | February 13, 2001 | July 25, 2005 | 1,623 days |
| Bowen Elementary School | FM-200103491 01 7/25/05 BOWEN 2ND FL ELECTRIC ROOM 1. ASBESTOS ASSESSMENT REQUIRED. 2. REPAIR STEAM LEAK INSIDE WELL. NEW SIDE OF BLDG. | February 10, 2001 | July 25, 2005 | 1,626 days |
| Ballou Senior High School | FM-200109571 01 7/25/05 (BALLOU-STAY) 1. ASBESTOS ASSESSMENT REQUIRED. SUB-BASEMENT/ALL CLASSROOMS: ELECTRICAL UPGRADE IN NEEDED ON LIGHTS. ASBESTOS CODE A -CLEAR FOR REPAIRS ON 05/09/01. | May 3, 2001 | July 25, 2005 | 1,544 days |
| Reed LC | FM-200109614 01 7/25/05 REED BASEMENT CHILLER ROOM CHILL H20 PUMP #1 GASKET OR SEELS NEED TO BE REPLACED. PUMP IS CORRODING AND LEAKING. WP-200108831 | May 7, 2001 | July 25, 2005 | 1,540 days |
| Bell High School | FM-200109615 01 7/25/05 BELL ROOF PROVIDE ELECTRICAL SERVICE TO RECEPTICAL ON ROOF NEAR COOLING TOWER, 120 VOLTS. UNABLE TO LOCATE POWER SOURCE. REPAIR ELEC. RECPTICAL, IF NEEDED. Requester Phone: 576-5316 Requestor Phone: 576-5316 ASBESTOS CODE A - CLEAR FOR REPAIRS ON 07/03/01. | April 16, 2001 | July 25, 2005 | 1,561 days |
| Davis Elementary School | FM-200110406 01 7/25/05 DAVIS OUTSIDE REPAIR TWO (2) EXTERIOR LIGHT FIXTURES. NO ASBESTOS IMPACT!! DANNY HUDSON: 576-8045 | May 16, 2001 | July 25, 2005 | 1,531 days |
| Coolidge High School | FM-200110581 01 7/25/05 COOLIDGE STAIRWELLS - 2,3,4, AND 5 1) REPLACE (8) DOOR GLASSES ON THE FOLLOWING STAIRWELLS. | May 18, 2001 | July 25, 2005 | 1,529 days |
| Coolidge High School | FM-200109916 01 7/25/05 COOLIDGE REPAIR LIGHTS ON FRONT OF SCHOOL PROVIDE NEW POWER SOURCE AND DISCONNECT FROM EXISTING HALLWAY CIRCUIT. | May 10, 2001 | July 25, 2005 | 1,537 days |
| Coolidge High School | FM-200109577 01 7/25/05 COOLIDGE GROUND FL. B101 OFFICE 1. ASBESTOS ASSESSMENT REQUIRED. PROVIDE DEDICATED ELECTRICAL POWER SUPPLY LINE FOR AC UNIT THAT IS TO BE INSTALLED IN OFFICE WINDOW. Requester Phone: 576-6150 Requestor Phone: 576-6150 Asbestos Code A - Clear for repairs on 03/06/03. Horne Engineering -Edward Rodriguez (RG 03/07/03) | April 16, 2001 | July 25, 2005 | 1,561 days |
| Nalle Elementary School | FM-200108269 01 7/25/05 NALLE SECOND (2ND) FLOOR - CLASSROOM 226 PARENT RESOURCE ROOM 1) ASBESTOS ASSESSMENT REQUIRED 2) REPAIR LEAKING ROOF IN THIS CLASS ASBESTOS CODE A - CLEAR FOR REPAIRS ON 04/12/01. | April 12, 2001 | July 25, 2005 | 1,565 days |
| Nalle Elementary School | FM-200109539 01 7/25/05 (NALLE) 1. ASBESTOS ASSESSMENT REQUIRED. MAIN ENTRANCE. CUSTODIAN STATES, KEYS ARE MISPLACED FOR MAIN ENTRANCE DOORS. ASBESTOS CODE A-CLEAR FOR REPAIR BY HORNE ENGINEER: RAY AGNANT | May 3, 2001 | July 25, 2005 | 1,544 days |
| Cooke H.D. Elementary School | FM-200109706 01 7/25/05 COOKE, H.D. PLAYGROUND LOCATION: SMALL PLAYGROUND AREA, BROKEN SWINGS TWO (2) NEEDS REPAIR OR REPLACE | May 8, 2001 | July 25, 2005 | 1,539 days |
| Beers Elementary School | FM-200508109 05 7/25/05 Beers Second Floor - Building (3) 1) Slop sink leaking, can not cut water off, water is flooding the floor. | July 20, 2005 | July 25, 2005 | 5 days |
| Woodson High School | FM-200108532 01 7/25/05 (H.D. WOODSON) 3RD FLOOR/GIRLS RESTROOM: WATER BACKING UP THROUGH SINK AND DRINKING FOUNTAIN, FLOODING THE FLOORS. # DO NOT REMOVE FROM WALL WITHOUT AN ABESTOS ASSESSMENT. | April 17, 2001 | July 25, 2005 | 1,560 days |
| Peabody Elementary School | FM-200103032 01 7/25/05 PEABODY THIRD FLOOR - MATERIAL ROOM II 1) ASBESTOS ASSESSMENT REQUIRED (CEILING) 2) PLASTER ASBESTOS CODE A - CLEAR FOR REPAIRS ON 05/18/01. | February 6, 2001 | July 25, 2005 | 1,630 days |
| Garfield ES | FM-200103402 9/01 7/25/05 GARFIELD LL1 - BOYS BATHROOM A COMPLETE RENOVATION IS NEEDED DUE TP PLUMMING PROBLEMS TO SINK, TOILETS AND URINALS. BATHROOM HAS NOT BEEN USE SINCE AUGUST. Asbestos Code A - Clear for repairs on 03/10/03. Horne Engineering - Bipin Nanavaty (RG 03/11/03) | February 9, 2001 | July 25, 2005 | 1,627 days |
| Garfield ES | FM-200103399 9/01 7/25/05 GARFIELD 1ST & 2ND FLOOR MAIN BLDG. 73 WINDOWS NEED SERVICING BALLAST NEEDED. ALL WINDOWS ARE VERY, VERY HARD TO OPEN. BSM HAS LIST. | February 9, 2001 | July 25, 2005 | 1,627 days |
| Garrison ES | FM-200201279 02 7/25/05 (GARRISON) ASBESTOS ASSESSMENT REQ. 1ST FLOOR/ EAST WING UNDER STAIR CASE VERMONT AVE.BACK PLAYGROUND REPLACE EXIT DOORS, DOORS ARE DETERIORATED. | January 17, 2002 | July 25, 2005 | 1,285 days |
| Garrison ES | FM-200201288 02 7/25/05 (GARRISON) 2ND FLOOR/ ROOMS 201 AND 203 REPAIR THUMB KNOBS. | January 17, 2002 | July 25, 2005 | 1,285 days |
| Garrison ES | FM-200202098 02 7/25/05 (GARRISON) ASBESTOS ASSESSMENT REQUIRED NEED ASBESTOS CHECK OF THE EAST-SIDE STAIRS & VERMONT AVENUE WEST-SIDE STAIRS IN PREPARATION FOR PAINTING. ASBESTOS CODE A-CLEAR FOR REPAIR ON 2/04/02 BY HORNE ENGINEER: EDWARD RODRIGUEZ LEAD CODE B- DO NOT SCRAPE CHIP OR PEEL ANY OF THIS PAINT SURFACE RE-PAINT OVER ONLY. | January 30, 2002 | July 25, 2005 | 1,272 days |
| Garrison ES | FM-200203358 02 7/25/05 (Garrison) 1. Asbestos Assessment Required. Computer Lab: Pan cake plug on floor, remove. ASBESTOS CODE A-CLEAR FOR REPAIR NO 2/26/02 HORNE ENGINEER: SHARON VOSS | February 22, 2002 | July 25, 2005 | 1,249 days |
| Garrison ES | FM-200203564 02 7/25/05 (Garrison) Asbestos Assessment Required 2nd Floor Computer Lab Room 202 Furnish & install power-plug poles for the computer lab [Rm. 202] CODE A- CLEAR FOR REPAIR BY HORNE ENGINEER (Z MAHMOOD) ON3/01/02 (CEB) | February 27, 2002 | July 25, 2005 | 1,244 days |
| Garrison ES | FM-200204481 02 7/25/05 Garrison 2nd Fl. Room 210 West Wing 1. Asbestos assessment required. 2. Replace thermostat on unit heater in room 210 "room overheating". | March 15, 2002 | July 25, 2005 | 1,228 days |
| Garrison ES | FM-200206822 02 7/25/05 Multi-purpose Room Repair broken circuit-breaker. Multi-purpose area is too dark for lunch to be served. | April 29, 2002 | July 25, 2005 | 1,183 days |
| Garrison ES | FM-200206824 02 7/25/05 Asbestos Assessment Reqd. Install 220V lines in the following areas to support A/C units for summer school session: Health Suite; Library II, Rooms 221 & 222. Code A-clear for repair by Horne Engineer by (Sam Ebrahim ) on 5/01/02( CEB ) | April 29, 2002 | July 25, 2005 | 1,183 days |
| Garrison ES | FM-200211135 02 7/25/05 Garrison 1. Asbestos Assessment Reqd. 1t Floor Room 105 [Ms. Iverson's Classroom] 2. Install an electrical outlet in room 105 by the sink area. Asbestos/Lead Code A-clear for repair by Horne Engineer (Shephen Caldwell) on 7/16/02 Charles E. Buchanan DPCS | July 12, 2002 | July 25, 2005 | 1,109 days |
| Beers Elementary School | FM-200109387 01 7/25/05 BEERS SECOND (2ND) FLOOR - BLDG. #1/SOCIAL WORKER ROOM 1) ASBESTOS ASSESSMENT REQUIRED 2) ELECTRICAL: SUPPLY POWER FOR AIR CONDITIONER 208 VOLTS, A/C MOUNTED IN WINDOW. (HEALTH HAZARD). | May 1, 2001 | July 25, 2005 | 1,546 days |
| Garfield ES | FM-200108525 01 7/25/05 (GARFIELD) 1ST FLOOR/MAIN BUILDING: 1. ASBESTOS ASSESSMENT REQUIRED. HEAT PIPE IN HEALTH SUITE, & ROOMS #1-A, 1-B, 1-C, 1-3, & 1-G NEED TO BE SCRAPED AND RE-PAINTED. PAINT IS PEELING AND FALLING. | April 17, 2001 | July 25, 2005 | 1,560 days |
| Garrison ES | FM-200216743 02 7/25/05 Garrison Paint interior doors same color. Need work order permit. | September 6, 2002 | July 25, 2005 | 1,053 days |
| Ferebee-Hope Elementary School | FM-200109820 01 7/25/05 FEREBEE-HOPE 3RD FL. UNIT #1 1. ASBESTOS ASSESSMENT REQUIRED. 2. REPAIR OR REPLACE COIL UNIT #1 LEAKING FROM CEILING. | May 9, 2001 | July 25, 2005 | 1,538 days |
| Garnet-Patterson MS | FM-200457189 /04 7/26/05 Garnet-Patterson Boiler Room Boilers #1 thur #5 check the pump control. Water is not going into Boilers. | October 20, 2004 | July 26, 2005 | 279 days |
| Woodson High School | FM-200105991 01 7/26/05 WOODSON, HD GROUND REPLACE DOORS. HOSPITALITY SUITE DOUBLE DOORS 32 x 81. AUDITORIUM DOUBLE DOORS 36 x 81 3/4, EXTERIOR 35 3/4 x 88, WEIGHT ROOM 31 3/4 x 81 3/4 , 31 3/4 x 81 3/4 ,MAIN LOBBY BY GYM DOUBLE DOORS 36 x 81. POOL DOORS INSIDE 5 SETS 35 #/4 x 81. ACTIVITY ROOM 2 SETS DOUBLE DOORS 31 #/4 x 81 3/4. Asbestos Code A - Clear for repairs on 03/06/03. Horne Engineering - Bipin Nanavaty (RG 03/07/03) | March 16, 2001 | July 26, 2005 | 1,593 days |
| Ballou Senior High School | FM-200105849 01 7/26/05 BALLOU FITNESS CTR. 122 REPLACE MISSING AHU MOTOR (CEILING AREA) NOTE: AHU MOTR WAS TAKEN AWAY FROM SITE 2 YRS. AGO AND NEVER REPLACED (MECH. MAINT. SHOP). | March 15, 2001 | July 26, 2005 | 1,594 days |
| Merritt Middle School | FM-200334812 03 7/26/05 Merritt East entrance to building Replace damage ceiling tile and grides by fire department. Asbestos Code A - Clear for repairs on 09/12/03. Horne Engineering - Edward Rodriguez (RG 09/16/03) | August 11, 2003 | July 26, 2005 | 715 days |
| Garnet-Patterson MS | FM-200457190 /04 7/26/05 Garnet-Patterson Boiler Room Replace 1/4" copper line on Vacuum pump cooling line for pumps. | October 20, 2004 | July 26, 2005 | 279 days |
| Kimball Elementary School | FM-200106417 /01 7/26/05 KIMBALL OUTSIDE WE NEED A FENCE PUT AROUND THE BUILDING, TO SECURE PROPERTY FROM TRASH, PETS, OFF THE GRASS OUTSIDE. DAMAGE TO PROPERTY. FOR MAINTAINING THE GROUNDS. 4 FT. CHANGE LINK FENCE. | March 21, 2001 | July 26, 2005 | 1,588 days |
| Roosevelt High School | FM-200457191 /04 7/26/05 Roosevelt Boiler Room Boiler #3 Check short in control panel fuse holder. | October 20, 2004 | July 26, 2005 | 279 days |
| Eliot Junior High School | FM-200105847 01 7/26/05 ELIOT 1ST FLOOR REMOVE & REPLACE BROKEN TILE OUTSIDE BOYS GYM FLOOR (9x9) . TILE DAMAGED BY LEAKING UNIVENT. ASBESTOS CODE A - CLEAR FOR REPAIRS ON 11/15/01. HORNE ENGINEERING - ROGER KAGER | March 15, 2001 | July 26, 2005 | 1,594 days |
| Raymond Elementary School | FM-200507609 05 7/26/05 First floor, New Wing/Boys' & Girls' toilet. Repair leaking toilets in boys' and girls' restroom water is leaking on the floor. | July 8, 2005 | July 26, 2005 | 18 days |
| Ballou Senior High School | FM-200105844 01 7/26/05 BALLOU AUTO SHOP CEILING REPLACE (4) FOUR SHAFT BEARING ASSEMBLIES ON (2) TWO CEILING A.H.U. INFO: 1" SHAFT BEARINGS (4) FOUR. NOTE: MECHANICAL MAINTENANCE DIVISION HAS SAMPLE THAT WAS TAKEN AWAY AT SITE ALSO AHU IS 15 FT. IN THE CEILING AREA. | March 15, 2001 | July 26, 2005 | 1,594 days |
| Shaw JHS | FM-200453797 04 7/26/05 Shaw Auditorium Replace broken fan shaft for air handler unit #2 in Auditorium Mach. room. | September 1, 2004 | July 26, 2005 | 328 days |
| Truesdell Elementary | FM-200106470 01 7/26/05 TRUESDELL FIRST (1ST) FLOOR - KITCHEN 1) ASBESTOS ABATEMENT AND RESTORE REQUIRED 2) THE CEILING PAINT IS PEELING AND NEED TO REPAINT. 3) ASBESTOS CODE A - CLEAR FOR REPAIRS ON 03/28/01. | March 22, 2001 | July 26, 2005 | 1,587 days |
| Hardy Middle School | FM-200457186 /04 7/26/05 Filmore- Hardy Boiler Room Asbestos assessment may be required. Repair or replace rupture return line in turnell area. (Heating) Hot !!!! | October 20, 2004 | July 26, 2005 | 279 days |
| Roosevelt High School | FM-200105550 01 7/26/05 ROOSEVELT FIRST (1ST), SECOND (2ND), THIRD (3RD) AND GROUND FLOORS FLOOR, REMOVE GRAFFITI FROM WALLS, DOORS, STAIRWALL, RESTROOM. THROUGH - OUT THE BUILDING (INTERIOR) | March 12, 2001 | July 26, 2005 | 1,597 days |
| Reed LC | FM-200106423 3 3/21/01 7/26/05 REED PLAYGROUND - SIDE OF 18TH STREET SUPPLY AND INSTALL HANDRAIL NEAR TENNIS COURTS | March 21, 2001 | July 26, 2005 | 1,588 days |
| Malcolm X ES | FM-200105815 14/01 7/26/05 MALCOLM-X REPAIR ELECTRICAL SERVICE TO OUTSIDE SCHOOL SIGN. | March 14, 2001 | July 26, 2005 | 1,595 days |
| Tubman Elementary School | FM-200127035 02 7/26/05 (TUBMAN) 3RD FLOOR/ ROOM #302 CLASSROOM ENTRANCE DOOR NEEDS TO BE ALIGNED WITH THE DOOR FRAME. | January 8, 2002 | July 26, 2005 | 1,295 days |
| Shepherd ES | FM-200457222 /04 7/26/05 (Sheperd) HEALTH CODE VIOLATION: Kitchen: Keep exterior roof clean. | October 21, 2004 | July 26, 2005 | 278 days |
| Hart Middle School | FM-200105889 01 7/26/05 HART BASEMENT WOOD SHOP REPLACE 1/4" PIPE ABOUT 3" LONG ON BLEED VALVE ON COIL IN UNIVENT IN WOOD SHOP PIPE IS LEAKING (HOT WATER BOILERS). | March 15, 2001 | July 26, 2005 | 1,594 days |
| Shaw JHS | FM-200508731 05 7/26/05 Shaw First fl Millieium Rm Repair Lighting in the Area | July 26, 2005 | July 26, 2005 | 0 days |
| Garfield ES | FM-200105391 01 7/26/05 GARFIELD ASBESTOS AND PAINT ASSESSMENT AUDITORIUM PLASTERING NEEDED IN AUDITORIUM NEAR EXIT DOORS WALL CRUMBLING DUE TO WATER DAMAGE, AND PAINTING NEEDED ALSO. ASBESTOS CODE A-CLEAR FOR REPAIR ON 9/26/01 BY HORNE ENGINEER: TROY WILCOME | March 9, 2001 | July 26, 2005 | 1,600 days |
| Spingarn High School | FM-200227548 03 7/26/05 Eastern Tunnel-Eaatside & 21B Replace approximately 7" (Ft) of 1-1/2" steam raiser in tunnel and in B31the piping is corroded and leaking bad. POC: Sylvia Grimes | March 24, 2003 | July 26, 2005 | 855 days |
| Hine JHS | FM-200105875 01 7/26/05 HINE 1ST FL. ROOM 107 UNIVENT NEEDS TO BE HARD WIRED FROM PANEL BOX TO HEAT UNIT. (ELECTRICIANS) Requester Phone: 698-1750 Requestor Phone: 698-1750 | March 15, 2001 | July 26, 2005 | 1,594 days |
| Moten Elementary School | FM-200105685 01 7/26/05 MOTEN 4TH FLOOR SCRAPE, PLASTER AND PAINT CORRIDOR AT SOUTH END OF BUILDING. Lead Code A-clear for repair by Horne Engineer (Bipin Nanavaty) 0n 3/22/02 (CEB Do not scrape, chip, or peel any of this painted surface-- repaint over only. | March 13, 2001 | July 26, 2005 | 1,596 days |
| Nalle Elementary School | FM-200105753 01 7/26/05 NALLE FIRST (1ST) FLOOR - EXTERIOR DOOR BY PLAYGROUND REPLACE EXTERIOR DOOR ON 1ST FLOOR LEAVING UNTO PLAYGROUND. DOOR NEEDS REPLACING DUE TO VANDALISM. EMERGENCY. FIRE CODE Asbestos Code A - Clear for repairs on 03/07/03. Horne Engineering - Philp Connolly (RG 03/10/03) | March 13, 2001 | July 26, 2005 | 1,596 days |
| Bancroft Elementary School | FM-200106284 01 7/26/05 BANCROFT 1ST FL. ROOM 212 MAIN BLDG. INSTALL NEW VARIABLE SPEED CONTROL UNIT TO CONTROL UNIVENT HEATER MOTOR. EXISTING CONTROL KNOB & ITS MOUNT ARE BROKEN OFF: HERMAN NELSON, MODEL #1001DJ, 60 CY, 110/220 VOLTS. | March 21, 2001 | July 26, 2005 | 1,588 days |
| Slowe Elementary School | FM-200508336 05 7/26/05 Slowe School Repair 20 feet of fence on school hill | July 21, 2005 | July 26, 2005 | 5 days |
| Browne Junior High School | FM-200106102 01 7/26/05 BROWNE 2ND FLOOR ROOM 211 BURN ROOM. REPAIR WALLS, CEILING AND FLOOR. NEED NEW LIGHTS AND ELECTRICAL OUTLETS. ROOM HAS BEEN VACANT FOR TWO YEARS. | March 19, 2001 | July 26, 2005 | 1,590 days |
| Moten Elementary School | FM-200107326 01 7/27/05 MOTEN NEW WING AND FIRST FLOOR BATHROOM (GIRLS AND BOYS) 1) INSTALL PARTITIONS. SCOPE- TO SUPPLY ALL LABOR,MATERIALS,EQUIPMENT AND SUPERVISION TO PERFORM WORK. HRGM CORP. THE PARTITION REPLACEMENT IN COMPLETED. Asbestos Code A - Clear for repairs on 03/06/03. Horne Engineering - Bipin Nanavaty (RG 03/07/03) | April 3, 2001 | July 27, 2005 | 1,576 days |
| Wilkinson ES | FM-200107368 /4/01 7/27/05 WILKINSON FIRST FLOOR ASBESTOS ASSESSMENT REQUIRED. REPLACE DOOR CLOSURES. | April 4, 2001 | July 27, 2005 | 1,575 days |
| Woodson High School | FM-200106652 01 7/27/05 WOODSON, H.D. 1) ASBESTOS AND LEAD ASSESSMENT REQUIRED 2) COSMETOLOGY LAB - SEE SCOPE OF WORK. CEILING, DOORS, FLOOR, PIPES, PLASTER AND WALLS.. TIMKLINE (202) 253-2384 RAJ SKUKLA (202) 329-8047 HRGM CONTRACTOR (202) 889-8400 Cole A for asbestos/lead and clear for repair by Horne Engineer on 3/12/03 Charles Buchanan | March 26, 2001 | July 27, 2005 | 1,584 days |
| Takoma Educational Center | FM-200106818 01 7/27/05 TAKOMA (EMERGENCY) 3RD FLOOR -200 GIRLS RESTROOM REPLACE COMMODE . THE COMMODE IS POSSIBLE CRACK CAUSING THE CEILING ON THE 2ND FLOOR TO BE DAMAGE. | March 28, 2001 | July 27, 2005 | 1,582 days |
| Clark Elementary School | FM-200107549 01 7/27/05 (CLARK) (1) ASBESTOS ASSESSMENT REQUIRED. TOILET ROOM: REPAIR TOILET ROOM LOCKS, DOOR UNABLE TO CLOSE. | April 6, 2001 | July 27, 2005 | 1,573 days |
| Takoma Educational Center | FM-200332798 03 7/27/05 (Takoma) Through-Out the Building: Plumbing work is requested for all restrooms due to new school year coming in effect, and water fountains. 1st fl. #55, 2nd fl. #127, 128, 148, & 147. 3rd fl. #199, 200, 207, 221 & 222. Gym #87, & 94. Water fountains #83 & 101. | July 1, 2003 | July 27, 2005 | 757 days |
| Powell Elementary School | FM-200106968 01 7/27/05 POWELL BOILER ROOM REPLACE THREE (3/4") GATE VALVES AND FEED WATER REGULATOR THAT FEEDS THE HOT WATER HEATING SYSTEM. VALVES ARE BROKEN IN THE CLOSED POSITION. BY-PASS VALVE IS CRACKED TO KEEP THE SYSTEM FULL. NO INFORMATION IS ON THE REGULATOR. ASBESTOS CODE A-CLEAR FOR REPAIR ON 12-10-01 BY HORNE ENGINEER : TROY WILCOME | March 30, 2001 | July 27, 2005 | 1,580 days |
| Seaton Elementary School | FM-200106980 01 7/27/05 SEATON ROOF ROOF LEAKING IN ALL PURPOSE ROOM. HEAVY RAIN CODE A - ASBESTOS ABATED ON 7/9/01 (SG) PER LEROY MINTONS CONFIRMATION. | March 30, 2001 | July 27, 2005 | 1,580 days |
| Tubman Elementary School | FM-200444776 04 7/27/05 Tubman First floor Rec center Replace missing door knobs (2). Asbestos Code A - Clear for repairs on 03/08/04. Horne Engineering - Bjame Smuth (RG 03/09/04) | March 3, 2004 | July 27, 2005 | 511 days |
| Johnson JHS | FM-200107180 01 7/27/05 JOHNSON GYM FURNISH ELECTRICAL OUTLETS AND LINES FOR SIX AIR CONDITIONS FOR THE GYM. INSTALL SIX AIR CONDITIONS FOR THE GYM. ASBESTOS CODE A- CLEARED FOR REPAIRS ON 06/05/01. | April 2, 2001 | July 27, 2005 | 1,577 days |
| Oyster Elementary School | FM-200106960 01 7/27/05 OYSTER 1) CLASSROOM - 101 DOOR WONT CLOSE PROPERTY. REPAIR ALIGNMENT ON DOOR. 2) LIBRARIAN ROOM BROKEN DOOR NEEDS CLOSER. FIRE CODE VIOLATION Asbestos Code A - Clear for repairs on 03/01/03. Horne Engineering - Richard Byrd (RG 03/27/03) | March 29, 2001 | July 27, 2005 | 1,581 days |
| Coolidge High School | FM-200107041 01 7/27/05 COOLIDGE outside of auditorium UNSTOP EXTERIOR DRAINS ON THE NORTHEAST & NORTHWEST SIDE OF AUDITORIUM. | March 30, 2001 | July 27, 2005 | 1,580 days |
| Amidon Elementary School | FM-200107755 01 7/27/05 AMIDON HALLWAYS REPLACE ALL HALLWAYS LIGHTS ON BOTH HALLS OF SECOND FLOOR. (ELS) ASBESTOS CODE A - CLEAR FOR REPAIRS ON 11/15/01. HORNE ENGINEERING - SHERYLL JAMES | April 7, 2001 | July 27, 2005 | 1,572 days |
| Ronald H. Brown MS | FM-200107512 01 7/27/05 RON BROWN ASBESTOS ASSESSMENT REQUIRED BOY BATHROOM - 2ND AND 3RD FLOOR 1) 2ND FLOOR - PIPE LEAKING BEHIND WALL. (URINAL) 2) 3RD FLOOR - URINAL DRAINS VERY SLOW, KEEPS FLOODING FLOOR. | April 6, 2001 | July 27, 2005 | 1,573 days |
| Sousa Middle School | FM-200106587 01 7/27/05 SOUSA MECHANICAL EQUIPMENT ROOM REPLACE CIRCULATING PUMP NOT WORKING. GYM AREA NEEDS HEAT. BELL GOSSETT 209157000, SERIAL #189101 225 FH58. | March 26, 2001 | July 27, 2005 | 1,584 days |
| Maury Elementary School | FM-200506683 05 7/27/05 Maury ES Install window air conditioning unit computer room | June 13, 2005 | July 27, 2005 | 44 days |
| Roosevelt High School | FM-200107470 01 7/27/05 ROOSEVELT CUPOLA 1) ERECT SCAFFOLD ON EXTERIOR CUPOLA TO ACCESS FACADE (60) FEET. 2)REMOVE ALL SIDING AND REPAIR ALL DETERIORATED FACADE. 3) INSTALL NEW HARDY PLANK SIDING WHERE APPLICABLE AND REPAIR ALL VISIBLE DEFECTS ON DAMAGED WOOD. 4) PREP ALL SURFACES TO INCLUDE CAULKING AND PRIME WITH ONE COAT OF PRIMER AND (2) COATS TO ALL OTHER SURFACES. 5) REPAIR ANY DAMAGE TO SURFACE TO SLATE ROOF SIX FEET OUT FROM ROOF. | April 5, 2001 | July 27, 2005 | 1,574 days |
| Tubman Elementary School | FM-200106655 01 7/27/05 TUBMAN 1) ASBESTOS ASSESSMENT REQUIRED 2) INSTALL WINDOW A/C IN THE FOLLOWING AREAS: TEACHERS LOUNGE, HEALTH SUITE, ASSISTANT PRINCIPALS OFFICE, KINDERGARTEN AND COMPUTER ROOM. HRGM CONTRACTOR: RAJ SKUKLA (202 329-8047 TIM KLINE (202) 253-2384 ASBESTOS CODE A - CLEAR FOR REPAIRS ON 04/19/01. | March 26, 2001 | July 27, 2005 | 1,584 days |
| Eastern High School | FM-200106737 01 7/27/05 EASTERN SUB-BASEMENT - KITCHEN REPLACE LIGHT FIXTURE (4) TUBE FLORESENT IN KITCHEN FIRE CODE VIOLATION ASBESTOS CODE A-CLEAR FOR REPAIR ON 12/12/01 BY HORNE ENGINEER: SHARON VOSS | March 27, 2001 | July 27, 2005 | 1,583 days |
| Benning Elementary School | FM-200106937 /01 7/27/05 BENNING LEARNING CENTER #1 1ST FLOOR ASSESS PLASTER & PEELING PAINT ON WALL IN MEDIA ROOM. WATER IS PENETRATING WALL FROOM OUTSIDE CAUSING DETERIORATION. | March 29, 2001 | July 27, 2005 | 1,581 days |
| Meyer Elementary School | FM-200106904 01 7/27/05 MEYER KITCHEN SIX LIGHTS IN THE KITCHEN AREA WILL NOT COME ON. ENTIRE ROW OF LIGHT TUBES ARE OUT DIRECTLY OVER SERVING TABLES. BULB & BALLASTS HAS BENN CHANGED. NEED A ELECTRICIAN TO COME OUT. Code A-clear for repair by Horne Engineer ( Sharon Voss ) 0n 3/22/02 (CEB | March 29, 2001 | July 27, 2005 | 1,581 days |
| Savoy Elementary School | FM-200508823 05 7/27/05 (Savoy) Kitchen. Install kline drain twist handle on pot sink in kitchen. | July 27, 2005 | July 27, 2005 | 0 days |
| Tubman Elementary School | FM-200453272 04 7/28/05 (Tubman) 1st Floor/South Exit Door: Exit door is metal No asbestos Repair door frame, and closer. Cole A-clear for repair by DCPS Charles Buchanan on 9/01/04 | August 24, 2004 | July 28, 2005 | 338 days |
| Tubman Elementary School | FM-200448445 04 7/28/05 Tubman First floor south corridor exit door Exit door will not close shut when exiting. Asbestos Code A - Clear for repairs on 06/03/04. Horne Engineering - Tony Marcolin ( RG 03/06 ) | May 25, 2004 | July 28, 2005 | 429 days |
| Tubman Elementary School | FM-200445040 04 7/28/05 Tubman First floor hallway Install bulletin board (2) in cafeteria hallway. Asbestos Code A - Clear for repairs on 03/09/04. Horne Engineering - Philp Connolly (RG 03/09/04) | March 9, 2004 | July 28, 2005 | 506 days |
| Cardozo High School | FM-200507680 05 7/28/05 Cardozo SHS Rooms# 116 & 120 1. Survey window a/c units - units are 115amp/208volts 2. Units will be upgraded to 20amps/230volts | July 12, 2005 | July 28, 2005 | 16 days |
| Harris, C.W. ES | FM-200454148 04 7/28/05 Harris, C.W. Room #149 Frabricate and instll drip pan in univent to collect condensation that drips from coil. | September 9, 2004 | July 28, 2005 | 322 days |
| Cardozo High School | FM-200507698 05 7/28/05 Cardozo SHS, Rm. 117, 217, 219, 305,307, 309, 311, 316, 320, 315, 317, 1. Electrical work is required for each room. 2. Install 1 ---- 20 amps - 230 volt window air conditioner units in each room listed 3. Room # 300 install 2 - 20amp / 230volt window a/c units 3. Room # 116 & 120 replace 2 - 24,000 btu window a/c units Asbestos Code A - Clear for repairs on 07/21/05. Tidewater - Tony Marcolin (RG 07/26/05) | July 6, 2005 | July 28, 2005 | 22 days |
| Thomas Elementary School | FM-200454214 04 7/28/05 Nevel Thomas Exterior Grounds 1) Set up Air Pollution Equipment. | September 9, 2004 | July 28, 2005 | 322 days |
| Tyler Elementary School | FM-200509058 05 7/29/05 repair down fence on baseball field | July 29, 2005 | July 29, 2005 | 0 days |
| Randle-Highlands ES | FM-200508787 05 7/29/05 Randle-Highland Emergency !!! Exterior Grounds 1) Cap field pole knocked over by truck. | July 27, 2005 | July 29, 2005 | 2 days |
| Hardy Middle School | FM-200508819 05 7/29/05 (Hardy) Main entrance door. Repair or Replace lock on main entrance door staff are unable to lock door and secure building. | July 27, 2005 | July 29, 2005 | 2 days |
| Randle-Highlands ES | FM-200508818 05 7/29/05 Randle-Highlands Exterior Grounds Repair Exposed Electrical Wires | July 27, 2005 | July 29, 2005 | 2 days |
| Savoy Elementary School | FM-200447470 04 7/29/05 Savoy EMERGENCY First floor kitchen J-trap needs to be replaced under sink in kitchen, has been labeled health hazard by health inspector. Also leaking ceiling in kitchen is declared health hazard by the health inspector. Asbestos Code A - Clear for repairs on 05/06/04. Horne Engineering - Philp Connolly (RG 05/06/04) | May 4, 2004 | July 29, 2005 | 451 days |