Routine Repair Requests Closed in July 2006 (93)
| School |
Description |
Open Date |
Close Date |
Time Elapsed |
| Tyler Elementary School |
FM-200621493 06 7/3/06 1st Floor- Girls Bathroom & Boys Bathroom Replace handle assembly on toilets. Asbestos Code A - Clear for repairs on 04/21/06. Tidewater - Kenny Belton (RG 04/24/06) |
April 19, 2006 |
July 3, 2006 |
75 days |
| Young Elementary School |
FM-200621144 06 7/5/06 Second Floor-Boy's Restroom-Repair or replace urinal that has been pulled from the wall. |
April 10, 2006 |
July 5, 2006 |
86 days |
| Young Elementary School |
FM-200620295 06 7/5/06 Second Floor-Teachers Lounge-Repair or replace flush valve. |
March 24, 2006 |
July 5, 2006 |
103 days |
| Young Elementary School |
FM-200621673 06 7/5/06 Kindergarten Need plumber to repair teachers toilet. |
April 24, 2006 |
July 5, 2006 |
72 days |
| Duke Ellington School |
FM-200625315 06 7/6/06 Basement Area. Need electricians to assess and repair electrical issue, currently there is no power or lights in this area. Note: The security checkpoint in this area has no power to the metal detectors or x-ray machine. |
July 6, 2006 |
July 6, 2006 |
0 days |
| Merritt Middle School |
FM-200618267 06 7/6/06 Third Floor-Library Electrical outlet not working. |
February 3, 2006 |
July 6, 2006 |
153 days |
| Oyster Elementary School |
FM-200625373 /6/06 7/6/06 Room 403- The outlet shot sparks out of it and shorted everything in the room. Room 303- The switch is also sparking. |
July 6, 2006 |
July 6, 2006 |
0 days |
| Brookland Elementary |
FM-200625108 06 7/6/06 Brookland Rooftop unit Repair or replace cooling tower starter control. Repair or replace deteriorated wiring (Elec.) in disconnect box for cooling tower. |
July 3, 2006 |
July 6, 2006 |
3 days |
| Merritt Middle School |
FM-200622858 06 7/6/06 Fourth floor, Open Space Area. Need electricians to survey and repair smoking intercom. |
May 17, 2006 |
July 6, 2006 |
50 days |
| Houston Elementary School |
FM-200623432 06 7/6/06 Entire Interior of Building. No lights throughout building/power outage. Note: This is as a result of "Pepco" working on a blown transformer. |
May 26, 2006 |
July 6, 2006 |
41 days |
| Stoddert ES |
FM-200624691 06 7/7/06 Outside drain clogged on the North side of the Building. There is about 2 feet of standing water. |
June 23, 2006 |
July 7, 2006 |
14 days |
| Gibbs Elementary School |
FM-200624963 06 7/7/06 3rd Floor- Boy's Restroom Unstop commode; there is an object in it that cannot be removed. |
June 28, 2006 |
July 7, 2006 |
9 days |
| Wilson High School |
FM-200625235 06 7/7/06 Wilson, W. Gym Building- Room #152 & Girls Restroom Make necessary electrical connections to provide power to univents replaced in room #152 and Girls Restroom in Gym Building. |
July 4, 2006 |
July 7, 2006 |
3 days |
| Duke Ellington School |
FM-200625316 06 7/8/06 Exterior of Building R Street Side. Repair or Replace service light. |
July 6, 2006 |
July 8, 2006 |
2 days |
| Houston Elementary School |
FM-200501702 05 7/8/06 (Houston) Asbestos Assessment Required. Through-Out the Building: Light ballast need to be installed. Code A-clear for repair by DCPS Charles Buchanan on on 2/18/05 |
February 16, 2005 |
July 8, 2006 |
507 days |
| Houston Elementary School |
FM-200621469 06 7/8/06 Cafeteria- All Purpose Room A floresent light needs to be put up in the all purpose room. There is no light. |
April 19, 2006 |
July 8, 2006 |
80 days |
| Houston Elementary School |
FM-200621475 06 7/8/06 Hallway Stairwell 200 Watt bulbs are needed for the hallway stairwell fixture. |
April 19, 2006 |
July 8, 2006 |
80 days |
| West Elementary School |
FM-200330413 03 7/8/06 West Mech. Room #7 Correct problem with return air fan motor it appears to be the bearing. Motor GE-serial #-NMY200; model #5k184AB205; HP-50;Cat. #N631 R.P.M. 1745; HZ-60 PH-30 Type-K Volts-200-230/460 AMP-15.2-14.4/7.2 Frame-184T. |
May 20, 2003 |
July 8, 2006 |
1,145 days |
| Moten Elementary School |
FM-200625468 06 7/10/06 Repair fixtures in the following restrooms: - 1st Floor- Boy's Restroom - 3rd Floor- Girl's Restroom - 2nd Floor- Boy's Restroom. |
July 10, 2006 |
July 10, 2006 |
0 days |
| Tyler Elementary School |
FM-200506254 05 7/10/06 (TYLER) Basement Cafeteria - Restroom 1) Repair/Replace two urinals and two toilets. |
June 2, 2005 |
July 10, 2006 |
403 days |
| Garfield ES |
FM-200622197 06 7/10/06 Lower Level, Kitchen Area. Unclog pot sink in kitchen. |
May 4, 2006 |
July 10, 2006 |
67 days |
| Reed LC |
FM-200624957 06 7/10/06 Repair ruptured pipe above suspended ceiling tile in library. Code A-clear for repair by DCPS Charles Buchanan on 6/28/06 |
June 28, 2006 |
July 10, 2006 |
12 days |
| River Terrace ES |
FM-200625556 11/06 7/11/06 First floor, Boys' Restroom/Intermediate Side. Repair ruptured supply line in boys' restroom. Note: Housekeepings assistance will be needed to get the water up, refer to FM-200625585. Asbestos Code A - Clear for repairs on 07/13/06. Tidewater - Shamika Perker (RG 07/14/06) SEE ASSESSMENTS |
July 11, 2006 |
July 11, 2006 |
0 days |
| Tyler Elementary School |
FM-200623027 06 7/11/06 Basement- Kitchen Right sink needs to be repaired. Seal underneath the drain is extremely worn. |
May 19, 2006 |
July 11, 2006 |
53 days |
| Bowen Elementary School |
FM-200625563 06 7/11/06 Repair/Replace leaking gas line in the kitchen. |
July 11, 2006 |
July 11, 2006 |
0 days |
| Browne Junior High School |
FM-200625481 06 7/11/06 Second floor, Pre-Wing/Boys' Restroom. Repair or Replace flush valve that's leaking. Note: The water cannot be completely isolated. |
July 10, 2006 |
July 11, 2006 |
1 day |
| Kramer Middle School |
FM-200625419 06 7/11/06 There is a stop up. When you use the sink, the water comes out of the urinals. |
July 7, 2006 |
July 11, 2006 |
4 days |
| Benjamin Banneker Academic HS |
FM-200625094 06 7/11/06 Third Floor/315 - All Sinks in this room are clogged up. |
June 30, 2006 |
July 11, 2006 |
11 days |
| Savoy Elementary School |
FM-200625079 6/30/06 7/12/06 Turn Water Meter On, To Supply Building With Water. Note: Water has been supplied to the building by WASA, the water pressure may have been too high - A pipe burst and water is flooding the Second Floor/Boy's Restroom and running down to the First Floor causing damage to ceiling tiles - The cut off valve does not work. (Mr. Johnson called it in on 6/30/06 at 8.00 AM) |
June 30, 2006 |
July 12, 2006 |
12 days |
| Burrville Elementary School |
FM-200625575 06 7/13/06 Burrville Boiler room Investigate and correct burning smell in the electric panel in the boiler room. |
July 12, 2006 |
July 13, 2006 |
1 day |
| Young Elementary School |
FM-200625059 06 7/13/06 1st Floor- Kindergarten (open space) Repair/replace sink. |
June 29, 2006 |
July 13, 2006 |
14 days |
| Patricia R Harris Ed Center |
FM-200624763 06 7/14/06 Outside- Patio Area Create a guard to prevent children from falling over the patio. Please attach it to the wall. |
June 26, 2006 |
July 14, 2006 |
18 days |
| Young Elementary School |
FM-200625064 06 7/14/06 1st Floor- Center 1 Repair/replace sink; a knob is missing. |
June 29, 2006 |
July 14, 2006 |
15 days |
| Young Elementary School |
FM-200625058 06 7/14/06 1st Floor- Kindergarten (Girl's Bathroom) Flush valve is needed, and the sink is coming off of the wall. |
June 29, 2006 |
July 14, 2006 |
15 days |
| Young Elementary School |
FM-200625061 06 7/16/06 1st Floor- Men's Hallway Bathroom Both the toilet and sink do not work. |
June 29, 2006 |
July 16, 2006 |
17 days |
| River Terrace ES |
FM-200620124 06 7/17/06 -Replace or repair water coolers near room 15, room 23, and across from office. Asbestos Code A - Clear for repairs on 03/24/06. Tidewater - Tony Marcolin (RG 03/30/06) |
March 21, 2006 |
July 17, 2006 |
118 days |
| Young Elementary School |
FM-200625070 06 7/17/06 1st Floor- Gym (Girl's Bathroom) The toilet needs to be snaked out. |
June 29, 2006 |
July 17, 2006 |
18 days |
| Wilson High School |
FM-200625737 06 7/17/06 Boy's Locker Rm. - Install Urinal |
July 17, 2006 |
July 17, 2006 |
0 days |
| Reed LC |
FM-200515701 /05 7/17/06 Basement Area. Repair ruptured 4" domestic water line that is broken on exterior of wall and leaking into building. Note: This is a ruptured city line. Asbestos Code A - Clear for repairs on 11/29/05. Tidewater - Tony Marcolin (RG 11/30/05) SEE ASSESSMENTS |
November 22, 2005 |
July 17, 2006 |
237 days |
| Tyler Elementary School |
FM-200339766 /03 7/17/06 Tyler Throughout building Replace wax rings on all toilets and urinals. |
October 31, 2003 |
July 17, 2006 |
990 days |
| Wilson High School |
FM-200502450 05 7/17/06 Wilson, W. First floor boys locker room Replace missing urinals in bathroom. |
March 9, 2005 |
July 17, 2006 |
495 days |
| Young Elementary School |
FM-200625068 06 7/18/06 1st Floor- Gym Repair/replace water cooler; no water is coming out. |
June 29, 2006 |
July 18, 2006 |
19 days |
| Young Elementary School |
FM-200625072 06 7/18/06 1st Floor- Gym Office Mens toilet in gym office needs s flush valve. |
June 29, 2006 |
July 18, 2006 |
19 days |
| River Terrace ES |
FM-200507354 05 7/18/06 Water cooler project summer school Throughout Repair or Replace water coolers and check all bathrooms. |
June 30, 2005 |
July 18, 2006 |
383 days |
| Patterson ES |
FM-200625734 06 7/19/06 PATTERSON WB roof Survey and repair (VU) ventilatiing unit will not start up properly. Also check freeze stat. (filters have been changed by engineer) |
July 17, 2006 |
July 19, 2006 |
2 days |
| Bunker Hill Elementary School |
FM-200622180 06 7/19/06 Basement-Cafeteria/Girls Restroom: Commode has cracked in half. |
May 4, 2006 |
July 19, 2006 |
76 days |
| Clark Elementary School |
FM-200624782 06 7/19/06 Broken Door Hardware By Second Floor Store Room Note: Abated On 6-22-06 |
June 26, 2006 |
July 19, 2006 |
23 days |
| Garfield ES |
FM-200624829 06 7/19/06 First Floor/Door closer OOS (exit 5) (rm. 102) |
June 27, 2006 |
July 19, 2006 |
22 days |
| Kenilworth ES |
FM-200625480 06 7/19/06 1st Floor- Teacher's Lounge An outlet is needed for the copier. |
July 10, 2006 |
July 19, 2006 |
9 days |
| Truesdell Elementary |
FM-200625792 06 7/19/06 Basement/Electrical Room: Missing light switch cover and light switch is not working. (unsecure) New Wing - Light switch repaired. Single switch cover plate missing. |
July 17, 2006 |
July 19, 2006 |
2 days |
| Marshall Educational Center |
FM-200625977 06 7/19/06 Marshall Boiler Room #12 compressor on the multistack will not reset and #11 compressor keep tripping out. |
July 17, 2006 |
July 19, 2006 |
2 days |
| Patterson ES |
FM-200625730 06 7/19/06 PATTERSON WB RM - A125 (1-6 W.SHP) Engineer request fuses for water source heat pumps 600V 20A time delay Sample was given to HVAC shop |
July 17, 2006 |
July 19, 2006 |
2 days |
| Walker-Jones EC |
FM-200212125 02 7/20/06 Walker-Jones Open Space Area Replace electric ballasts [as needed] in the open space area. |
July 16, 2002 |
July 20, 2006 |
1,465 days |
| Shaw JHS |
FM-200623639 06 7/20/06 Care Center/Exit light out |
May 31, 2006 |
July 20, 2006 |
50 days |
| Young Elementary School |
FM-200623791 06 7/20/06 Outside/Check & Make Repairs To The Busted Pipe On The Top Parking Lot By Drain |
June 5, 2006 |
July 20, 2006 |
45 days |
| Young Elementary School |
FM-200621147 06 7/20/06 Need eight toilet seats replaced for each restroom in the building-Some are cracked and/or worn. |
April 10, 2006 |
July 20, 2006 |
101 days |
| Wilkinson ES |
FM-200622245 06 7/20/06 First Floor-Health Suite: Sink faucet keeps dripping, can't cut the water off, need to have the faucet replaced. |
May 5, 2006 |
July 20, 2006 |
76 days |
| River Terrace ES |
FM-200618599 06 7/20/06 Ground floor, Girls restroom, Boys' restroom & Maintenance office. "Emergency" Rehang sink in girls' restroom and repair flush valves in maintenance office and boys' restroom on the ground floor. |
February 13, 2006 |
July 20, 2006 |
157 days |
| Shaw JHS |
FM-200623638 06 7/20/06 Multipurpose-Vertical Penetration Asbestos Code A - Clear for repairs on 06/01/06. Tidewater - Samuel May (RG 06/02/06) |
May 31, 2006 |
July 20, 2006 |
50 days |
| Walker-Jones EC |
FM-200621082 06 7/21/06 Second Floor-Open Space Classroom-Ceiling tile missing-High ceilings approx. 16 feet, various sizes tiles, 7 areas missing tile and some metal track. Asbestos Code A - Clear for repairs on 04/12/06 Tidewater - Shamika Parker (RG 04/13/06) |
April 7, 2006 |
July 21, 2006 |
105 days |
| Ferebee-Hope Elementary School |
FM-200626042 06 7/22/06 1st Floor- F.H. Community Center Replace lock; inspected by Mr. Reddis. |
July 20, 2006 |
July 22, 2006 |
2 days |
| Ketcham Elementary School |
FM-200621333 06 7/24/06 Old Wing- Throughout Building Exit lights are not working. Breaker switch is not working. |
April 13, 2006 |
July 24, 2006 |
102 days |
| Ketcham Elementary School |
FM-200216617 02 7/24/06 Ketcham East Stairwell Near Auditorium & Cafeteria Replace light fixture in east stairwell. The stairwell is very dark. |
September 5, 2002 |
July 24, 2006 |
1,418 days |
| Ketcham Elementary School |
FM-200623726 06 7/24/06 First Floor (New Bldg.)/Both Reading Resource Rooms - No Electricity |
June 1, 2006 |
July 24, 2006 |
53 days |
| King M L ES |
FM-200617941 06 7/25/06 Health Suite - Water fountain not working. Clifton C. Purks, III Code & Compliance Officer (202) 576-6049 |
January 27, 2006 |
July 25, 2006 |
179 days |
| Francis Junior High School |
FM-200617715 06 7/25/06 No Hot Water In Health Suite |
January 23, 2006 |
July 25, 2006 |
183 days |
| Ferebee-Hope Elementary School |
FM-200617939 06 7/25/06 Health Suite - Water not hot only warm Clifton C. Purks, III Code & Compliance Officer (202) 576-6049 |
January 27, 2006 |
July 25, 2006 |
179 days |
| Thomas Elementary School |
FM-200617858 06 7/25/06 Thomas Health Suite - No hot water Clifton C. Purks, III Code & Compliance Officer (202) 576-6049 |
January 26, 2006 |
July 25, 2006 |
180 days |
| Thomas Elementary School |
FM-200626301 /06 7/25/06 Across from 109, exit light out - Repair completed by building staff. 7/24/06 |
July 25, 2006 |
July 25, 2006 |
0 days |
| John Burroughs ES |
FM-200617712 06 7/25/06 Health Suite. 1.) Furnish hot water service. |
January 23, 2006 |
July 25, 2006 |
183 days |
| Tubman Elementary School |
FM-200618019 06 7/25/06 Health Suite - Provide hot water service. |
January 30, 2006 |
July 25, 2006 |
176 days |
| Draper Elementary School |
FM-200625144 06 7/25/06 Draper Boiler Room Repair or replace domestic hot water heater. No hot water in building. |
July 3, 2006 |
July 25, 2006 |
22 days |
| Draper Elementary School |
FM-200617938 06 7/25/06 Health Suite - No hot water. Clifton C. Purks, III Code & Compliance Officer (202) 576-6049 |
January 27, 2006 |
July 25, 2006 |
179 days |
| Deal Junior High School |
FM-200626133 06 7/25/06 Repair IT equipment lines. |
July 21, 2006 |
July 25, 2006 |
4 days |
| Bancroft Elementary School |
FM-200446495 04 7/25/06 Bancroft EMERGENCY Basement boys bathroom near music room Unstop six (6) urinals, backing up very badly. |
April 8, 2004 |
July 25, 2006 |
838 days |
| John Burroughs ES |
FM-200623656 06 7/25/06 Borroughs Boiler room Replace the relief valve on the domestic hot water heater ,valve will not reseat. NO Hot Water |
June 1, 2006 |
July 25, 2006 |
54 days |
| Wilkinson ES |
FM-200617863 06 7/25/06 Health Suite - No hot water in main sink. Clifton C. Purks, III Code & Compliance Officer (202) 576-6049 |
January 26, 2006 |
July 25, 2006 |
180 days |
| Maury Elementary School |
FM-200225623 03 7/25/06 Maury First floor Unstop toilet and shower in P.E. lavatory. |
February 11, 2003 |
July 25, 2006 |
1,260 days |
| Maury Elementary School |
FM-200222321 /02 7/25/06 (Maury) 1st Floor/P.E. Office: Repair leaking sink in the P.E. office lavatory, replace housing. |
December 10, 2002 |
July 25, 2006 |
1,323 days |
| Deal Junior High School |
FM-200626132 06 7/26/06 Repair outlet for security equipment at front door. |
July 21, 2006 |
July 26, 2006 |
5 days |
| Garfield ES |
FM-200626157 06 7/26/06 Auditorium Area - Repair Boys Bathroom toilets and urinals. |
July 24, 2006 |
July 26, 2006 |
2 days |
| Dunbar High School |
FM-200626364 06 7/26/06 Snake out sewage drain located on the lower garage level in the mechanical room.. |
July 26, 2006 |
July 26, 2006 |
0 days |
| Seaton Elementary School |
FM-200213888 02 7/26/06 Seaton 2nd Floor Teachers' Lounge Cap off gas stove and remove. The stove had a leak at the oven control and the gas was turned off and tagged by the gas company. |
August 8, 2002 |
July 26, 2006 |
1,448 days |
| River Terrace ES |
FM-200625602 12/06 7/26/06 Unclog 2 toilets and 2 urinals in the Boy's Bathroom. Also install a wall hung lavatory in the same location. |
July 12, 2006 |
July 26, 2006 |
14 days |
| River Terrace ES |
FM-200332935 03 7/26/06 (River Terrace) Remount wash basin in boys' restroom near room 13. |
July 1, 2003 |
July 26, 2006 |
1,121 days |
| Garfield ES |
FM-200626156 06 7/26/06 Basement - Girls and Boys Bathroom - Repair (3) toilets in Girls Bathroom and Toilets and Urinals in Boys Bathroom. |
July 24, 2006 |
July 26, 2006 |
2 days |
| Slowe Elementary School |
FM-200501141 05 7/27/06 SLOWE ES Furnish belts, bearings and motors for the following room for replacement. Room 100, 101, 126, 107, 117, 219, 125, 213, 220 Motor: Magnetek 89 RPM: 1050 volts:115 motor: GE 4319 hp: 1/3 - 1/9 v 115 ph 1 A 6.30/3.10 Fr: 48 RPM: 1725/1140 hz 60 Bearings BRG 0128 Trane bearing kits .94 bore 270-3824-01-07 Bearing BRG 0115 Trane bearing kits 2701-3284-02-07 Belts size 3L240 |
February 2, 2005 |
July 27, 2006 |
540 days |
| Truesdell Elementary |
FM-200516986 /05 7/27/06 Floor tiles comming apart in rm. 307 on the third floor. Asbestos Code A - Clear for repairs on 01/03/06. Tidewater - Philp Connolly (RG 01/04/06) |
December 28, 2005 |
July 27, 2006 |
211 days |
| Turner Elementary School |
FM-200626458 06 7/28/06 Basement Level, Kitchen Lockerroom Restroom. Repair leak around wax ring at the bottom of the commode. This leak is causing the area to flood. Note : The staff are unable to isolate leak. |
July 27, 2006 |
July 28, 2006 |
1 day |
| Cardozo High School |
FM-200626357 06 7/28/06 Basement Area. Replace valves in basement area, so contractors can turn off water to install plumbing fixtures. |
July 25, 2006 |
July 28, 2006 |
3 days |
| Patterson ES |
FM-200626431 06 7/28/06 PATTERSON WB Roof near parking lot Request for 2" blowdown valve on cooling tower found crack on valve. |
July 26, 2006 |
July 28, 2006 |
2 days |
| Watkins Elementary School |
FM-200336821 03 7/31/06 Watkins Nurse suite Need to install a sink for running water. Asbestos Code A - Clear for repairs on 09/04/03. Horne Engineering - Bipin Nanavaty (RG09/08/03) |
September 4, 2003 |
July 31, 2006 |
1,061 days |
| Watkins Elementary School |
FM-200500034 05 7/31/06 WATKINS FIRST FL. LOBBY & HALLWAY WATER FOUNTIANS LEAKING WILL NOT TURN OFF |
January 3, 2005 |
July 31, 2006 |
574 days |