Urgent Repair Requests Closed in September 2006 (158)
| School |
Description |
Open Date |
Close Date |
Time Elapsed |
| School WW High School |
FM-200622728 06 9/1/06 Third Floor/Room 304. URGENT! Health issue. Install seven ac-window units with trays and legs and lexan. |
May 16, 2006 |
September 1, 2006 |
108 days |
| Maury Elementary School |
FM-200216640 02 9/4/06 Maury Asbestos Assessment Reqd. 1st Floor Kitchen Install an electrical line for the icemaker on the refrigerator. Asbestos Code A - Clear for repairs on 09/06/02. DCPS Safety - Leroy Minton Jr. (RG 09/09/02) |
September 5, 2002 |
September 4, 2006 |
1,460 days |
| Draper Elementary School |
FM-200514709 /05 9/5/06 Draper Urgent Cafeteria-Kitchen Hot water booster needed in for sink. |
October 27, 2005 |
September 5, 2006 |
313 days |
| Harris, C.W. ES |
FM-200625529 06 9/5/06 Exterior of Building/Playground Area. Install trim around safety turf. |
July 11, 2006 |
September 5, 2006 |
56 days |
| Hardy Middle School |
FM-200513091 05 9/7/06 Hardy Urgent On 35th St. Side Entrance Bulk Trash Pick Up On The Grass. |
September 23, 2005 |
September 7, 2006 |
349 days |
| Clark Elementary School |
FM-200627951 06 9/7/06 Urgent !!! First Floor - Pre-K - Repair or replace busted 3/4 inch black pipe in bathroom. Convector over supply line and piping is in a sleeve in the floor. No insulation is on the pipe. Exploratory Required. Asbestos Code A - Clear for repairs on 08/22/06. Tidewater - Roger Small (RG 08/24/06) SEE ASSESSMENTS |
August 21, 2006 |
September 7, 2006 |
17 days |
| Shaw JHS |
FM-200206958 02 9/11/06 !!!Very Urgent!!! Auditorium: 1. Asbestos assessment required The handicap lift is broken, please repair. Asbestos Code A - Clear for repairs on 05/01/02. DCPS Safety - Richard Gibson (RG 05/01/02) |
May 1, 2002 |
September 11, 2006 |
1,594 days |
| Shaw JHS |
FM-200217432 02 9/11/06 (Shaw) First floor commons/rec area both these restrooms need door closers. Please send someone to fix problem. THANKS Asbestos Code A - Cleared for repairs on 04-28-03 by Leroy Minton Jr. (LM/04-08-03) the Safety Office 202-576-8962. |
September 11, 2002 |
September 11, 2006 |
1,461 days |
| Bancroft Elementary School |
FM-200625697 06 9/11/06 Bancroft Mechanical Room Asbestos assessment required Correct flow problem to air handler unit. Possible stoppage. Also replace supply and return valves. Urgent !!!!! Valves are approx. 2" Asbestos Code A - Clear for Repairs on 07/17/06. Tidewater - Shamika Parker (RG 07/21/06) |
July 14, 2006 |
September 11, 2006 |
59 days |
| Johnson JHS |
FM-200509106 05 9/11/06 Johnson "Fire Code Violation" First Floor Ceiling tile missing in library Asbestos Code A - Clear for repairs on 08/08/05. DCPS Safety - Richard Gibson (RG) |
July 29, 2005 |
September 11, 2006 |
409 days |
| Francis Junior High School |
FM-200459575 /04 9/11/06 Francis First floor boiler room door Replace boiler door lead down to the boiler room out in hallway next to room 11. Asbestos Code A - Clear for repairs on 03/14/05. DCPS Safety - Leroy Minton Jr. (RG 03/15/05) |
December 14, 2004 |
September 11, 2006 |
636 days |
| Johnson JHS |
FM-200509102 05 9/11/06 Johnson "Fire Code Violation" First Floor Ceiling tile missing (hallway outside of gym) Asbestos Code A - Clear for repairs on 08/08/05. DCPS Safety - Richard Gibson (RG) |
July 29, 2005 |
September 11, 2006 |
409 days |
| Francis Junior High School |
FM-200450159 04 9/11/06 Francis Replace light ballasts (2) in room 211, 207 and boys restroom second floor, (10) light ballasts in room 209, and (3) light ballasts in room 203, 120v 60Hz rapid start ballasts for use with (2) F40T 12 lamps. Asbestos Code A - Clear for repairs on 07/12/04. DCPS Safety - Leroy Minton Jr. (RG 07/14/04) |
July 13, 2004 |
September 11, 2006 |
790 days |
| Francis Junior High School |
FM-200450152 04 9/11/06 Francis Replace light ballasts (6) in room 200, 3 ballasts in room 210, 300, (4) ballasts in room 301, Kids lunch room first floor and 310 ea., (1) ballast in rooms 112, 303, 309, 302, 308, teachers lunch room on first floor and 312 ea. replace (2) ballasts in room 311 and 6 ballasts in room 307, (5) ballasts on first floor library. Replace (7) ballasts in room 110. Replace (8) light ballasts in room 116 and 105. (9) ballasts in room 109. 120v 60Hz rapid start ballasts for use with (2) F40T 12 lamps. Asbestos Code A - Clear for repairs on 07/12/04. DCPS Safety - Leroy Minton Jr. (RG 07/14/04) |
July 13, 2004 |
September 11, 2006 |
790 days |
| Francis Junior High School |
FM-200450028 04 9/11/06 Francis Replace fluorescent tubes and light ballasts all over the building (70) are out. Asbestos Code A - Clear for repairs on 07/12/04. DCPS Safety - Leroy Minton Jr. (RG 07/14/04) |
July 8, 2004 |
September 11, 2006 |
795 days |
| Johnson JHS |
FM-200509110 05 9/11/06 Johnson "Fire Code Violation" First Floor Ceiling tile missing (room 104 head start) Asbestos Code A - Clear for repairs on 08/08/05. DCPS Safety - Richard Gibson (RG) |
July 29, 2005 |
September 11, 2006 |
409 days |
| Coolidge High School |
FM-200508528 05 9/11/06 Coolidge "Fire Code Violation" Basement New gym tiles missing throughout (110.1.1) Code A - clear for repairs as of 8/3/05 by Tidewater. Sylvia Grimes safety office. |
July 25, 2005 |
September 11, 2006 |
413 days |
| Coolidge High School |
FM-200508519 05 9/11/06 Coolidge "Fire Code Violation" First Floor Ceiling tile missing chemistry store room (110.1.1) Asbestos Code A - Clear for repairs on 07/26/05. DCPS Safety - Richard Gibson (RG ) |
July 25, 2005 |
September 11, 2006 |
413 days |
| Johnson JHS |
FM-200509109 05 9/11/06 Johnson "Fire Code Violation" First Floor Ceiling tile missing in first floor hallway (thru-out) Asbestos Code A - Clear for repairs on 08/08/05. DCPS Safety - Richard Gibson (RG) |
July 29, 2005 |
September 11, 2006 |
409 days |
| Francis Junior High School |
FM-200628213 06 9/11/06 Francis Boiler Room Check and correct domestic hot water system in Building. No hot water in Kitchen and no hot water going to upper lever. Hot water at tank. Urgent !!!! |
August 24, 2006 |
September 11, 2006 |
18 days |
| Johnson JHS |
FM-200509107 05 9/11/06 Johnson "Fire Code Violation" First Floor Ceiling tile missing in library Asbestos Code A - Clear for repairs on 08/08/05. DCPS Safety - Richard Gibson (RG) |
July 29, 2005 |
September 11, 2006 |
409 days |
| Ballou Senior High School |
FM-200625564 06 9/11/06 Ballou Boiler Room Replace safety valve on Boiler #1 and #3 Boiler #1 fail hydro DC Boiler Inspector |
July 12, 2006 |
September 11, 2006 |
61 days |
| Raymond Elementary School |
FM-200510797 05 9/11/06 Raymond Fire code Violation First Floor-Mlissing ceiling tile at entrance of school/security desk-2003 DC Supp. 110.1 Asbestos Code A - Clear for repairs on 08/19/05. DCPS Safety - Richard Gibson (RG 08/19/05) |
August 19, 2005 |
September 11, 2006 |
388 days |
| Raymond Elementary School |
FM-200510759 05 9/11/06 Raymond Fire code Violation Second Floor-Missing ceiling tile in 29A-2003 DC Supp. 110.1 Asbestos Code A - Clear for repairs on 08/19/05. DCPS Safety - Richard Gibson (RG) |
August 18, 2005 |
September 11, 2006 |
389 days |
| Browne Junior High School |
FM-200625948 06 9/11/06 Browne Girls Locker Room Asbestos assessment required Repair or replace leaking line, 2"line 90 elbow; Supply return line not holding and return supply line not holding-4" line. Urgent !!!! Asbestos Code A - Clear for repairs on 07/25/06. Tidewater - Kenny Long (RG 07/26/06) |
July 19, 2006 |
September 11, 2006 |
54 days |
| Brookland Elementary |
FM-200626559 06 9/11/06 1st Floor- Kitchen Asbestos assessment required Repair leaking pipe in ceiling. It is damaging the floor. Asbestos Code A - Cleared for repairs on 08/01/06 by tidewater/Kenny Long (LM-08/01/06) Safety Office 202-576-8962. |
July 31, 2006 |
September 11, 2006 |
42 days |
| Tyler Elementary School |
FM-200625445 06 9/11/06 Tyler Boiler room URGENT!!!!!!!!! Replace in line flow meter that ruptured at the well let, on the chill water side. |
July 8, 2006 |
September 11, 2006 |
65 days |
| Francis Junior High School |
FM-200502532 05 9/11/06 (Francis) "Urgent" Asbestos Assessment Required. First floor/Boiler room. Repair or Replace door leading down steps to the boiler room. Existing door cannot be secured. Note: This a safety and security concern Asbestos Code A - Clear for repairs on 03/14/05. DCPS Safety - Leroy Minton Jr. (RG 03/15/05) |
March 10, 2005 |
September 11, 2006 |
550 days |
| Shaw JHS |
FM-200203195 02 9/11/06 (Shaw) 1. Asbestos Assessment Required. Recreation Area: Boys bathroom door header on both doors need to be repaired or replaced. Asbestos Code A - Clear for repairs on 05/10/02. DCPS Safety - Leroy Minton Jr.(RG 05/10/02) |
February 19, 2002 |
September 11, 2006 |
1,665 days |
| Sousa Middle School |
FM-200513253 05 9/13/06 (Sousa) "Urgent" Asbestos Assessment Required. Stairwell near room 116 between basement & first floor up side. Reattach handrail to wall. Asbestos Code A - Clear for repairs on 09/30/05. Tidewater - Carlos Vera (RG 10/04/05) |
September 28, 2005 |
September 13, 2006 |
350 days |
| Sousa Middle School |
FM-200514362 /05 9/13/06 Sousa Third Floor - Boys Restroom 1) Furnish and install missing partition door. Asbestos Code A - Clear for repairs on 10/25/05. DCPS Safety - Richard Gibson (RG) |
October 23, 2005 |
September 13, 2006 |
325 days |
| Sousa Middle School |
FM-200514360 /05 9/13/06 Sousa Basement - Room 11b and 9a 1) Furnish and install safety glass in door frame. Asbestos Code A - Clear for repairs on 10/25/05. Tidewater -Rodney distance (RG 10/28/05) |
October 23, 2005 |
September 13, 2006 |
325 days |
| Sousa Middle School |
FM-200514033 /05 9/13/06 Sousa Urgent First Floor-Stairwell near rm. 110 Repair stairs, treads, plates, and rails, Due to removal of furniture. stairs will be used for main entrance for children. Asbestos Code A - Clear for repairs on 10/24/05. Tidewater - Kenny Long(RG 10/25/05) |
October 20, 2005 |
September 13, 2006 |
328 days |
| Sousa Middle School |
FM-200514032 /05 9/13/06 Sousa Urgent First Floor-Near Rm. 116 Repair Exit door exit door will not open properly or close, door will be used for emergency exit due to construction work. Asbestos Code A - Clear for repairs on 10/24/05. Tidewater - Kenny Long(RG 10/25/05) |
October 20, 2005 |
September 13, 2006 |
328 days |
| Sousa Middle School |
FM-200514028 /05 9/13/06 Sousa Urgent Second Floor-Rm. 210 Furnish and Replace Window Pane Lead & Asbestos Code A - Clear for repairs on 10/27/05. Tidewater - Rodney Distance (RG 10/28/05) |
October 20, 2005 |
September 13, 2006 |
328 days |
| Sousa Middle School |
FM-200514027 /05 9/13/06 Sousa Urgent First Floor-Rms. 116, 110, and 109 Furnish and Replace Window Pane Lead & Asbestos Code A - Clear for repairs on 10/27/05. Tidewater - Rodney Distance (RG 10/28/05) |
October 20, 2005 |
September 13, 2006 |
328 days |
| Sousa Middle School |
FM-200514025 /05 9/13/06 Sousa Urgent Third Floor-Stairwell Near Rm. 116 Repair floor tile, missing and some cracked. (the stairs are being used) Asbestos Code A - Clear for repairs on 10/25/05. Tidewater -Rodney distance (RG 10/28/05) |
October 20, 2005 |
September 13, 2006 |
328 days |
| Sousa Middle School |
FM-200514020 /05 9/13/06 Sousa Urgent Repair water fountain on the first floor by main office. All other water fountains are not working. |
October 20, 2005 |
September 13, 2006 |
328 days |
| Sousa Middle School |
FM-200217563 02 9/13/06 Sousa First floor men teachers lavatory Light fixture is hanging from ceiling by a wire. Asbestos Code A - Clear for repairs on 09/20/02. DCPS Safety - Leroy Minton Jr. (RG 09/24/02) |
September 16, 2002 |
September 13, 2006 |
1,458 days |
| Sousa Middle School |
FM-200217539 02 9/13/06 Sousa Basement exit door near Room 116 Door wiil not open or shut properly. Asbestos Code A - Clear for repairs on 09/20/02. DCPS Safety - Leroy Minton Jr. (RG 09/24/02) |
September 16, 2002 |
September 13, 2006 |
1,458 days |
| Sousa Middle School |
FM-200339892 03 9/13/06 Sousa Second floor room 216 Room 216 has no electricty in outlet need electrician to fix and look at it. Asbestos Code A - Clear for repairs on 11/04/03. DCPS Safety - Richard Gibson (RG) |
November 4, 2003 |
September 13, 2006 |
1,044 days |
| Sousa Middle School |
FM-200339961 03 9/13/06 (Sousa) !!!URGENT!!! 2nd Floor/Through-Out: No electricity in eight (8) classrooms. |
November 5, 2003 |
September 13, 2006 |
1,043 days |
| Sousa Middle School |
FM-200337338 03 9/13/06 (Sousa) !!!VERY URGENT!!! 2nd Floor Classroom: Sink is backing up with a sewage smell. |
September 11, 2003 |
September 13, 2006 |
1,098 days |
| Sousa Middle School |
FM-200444493 04 9/13/06 (Sousa) !!!VERY URGENT!!! Ground Floor/Kitchen: Very low water pressure. |
February 26, 2004 |
September 13, 2006 |
930 days |
| Sousa Middle School |
FM-200444674 04 9/13/06 (Sousa) !!!VERY URGENT!!! 2nd Floor/Boys Restroom: Water runs out at the bottom of toilet while flushing, repair wax ring. |
March 2, 2004 |
September 13, 2006 |
925 days |
| Sousa Middle School |
FM-200447225 04 9/13/06 (Sousa) !!!VERY URGENT!!! Basement/Fan Room: Sump pump is not working properly, water backing up in cafeteria, and kitchen with a foul odor. |
April 27, 2004 |
September 13, 2006 |
869 days |
| Sousa Middle School |
FM-200455036 04 9/13/06 Sousa Third floor room 312 Furnish and replace fire glass in door. Code A - clear for repairs as of 10/12/04 safety Sylvia. |
September 17, 2004 |
September 13, 2006 |
726 days |
| Sousa Middle School |
FM-200455038 04 9/13/06 Sousa Second floor room 220 Third floor room 322 Replace fire safety glass in doors. Code A - clear for repairs as of 10/12/04 safety Sylvia. |
September 17, 2004 |
September 13, 2006 |
726 days |
| Sousa Middle School |
FM-200458841 /04 9/13/06 Sousa Ground floor turning point Carpet install on one section. Asbestos Code A - Clear for repairs on 12/02/04. DCPS Safety - Leroy Minton Jr. (RG 12/03/04) |
November 30, 2004 |
September 13, 2006 |
652 days |
| Sousa Middle School |
FM-200458849 /04 9/13/06 SOUSA BASEMENT-REC.RM.LINK SIDE FURNISH AND INSTALL CARPET. Asbestos Code A - Clear for repairs on 12/02/04. DCPS Safety - Leroy Minton Jr. (RG 12/03/04) |
November 30, 2004 |
September 13, 2006 |
652 days |
| Cooke H.D. Elementary School |
FM-200212296 02 9/13/06 Cooke,H.D. Library Exterior The handrail on the outside of the library is detached from the cement base in four places posing a safety problem. If someone happens to lean on the rail--they might fall and injure themselves. Asbestos Code A - Clear for repairs on 01/31/03. Horne Engineering - Troy Wilcome (RG 02/04/03) |
July 16, 2002 |
September 13, 2006 |
1,520 days |
| Cooke H.D. Elementary School |
FM-200215215 02 9/13/06 Cooke,H.D. 1. Asbestos Assessment Reqd. 2nd Floor Classroom 200 2. When the new fire door was installed at classroom 200, no frame to hold the safety glass was installed and, therefore, we cannot see into the classroom. Install frame and safety glass in the new fire door. Asbestos Code A - Clear for repairs on 08/22/02. DCPS Safety - Leroy Minton Jr. (RG 08/26/02) |
August 21, 2002 |
September 13, 2006 |
1,484 days |
| Cooke H.D. Elementary School |
FM-200217283 02 9/13/06 Cooke, H.D. Asbestos Assessment Req. Basement Art Room 102 Install electric outlet for a kiln [pottery oven] 34x29x31/voltage & phase 208 sp. Asbestos Code A - Cleared for repairs on 04-28-03 by Leroy Minton Jr. (LM/04-08-03) the Safety Office 202-576-8962. |
September 11, 2002 |
September 13, 2006 |
1,463 days |
| Cooke H.D. Elementary School |
FM-200218123 02 9/13/06 Cooke,H.D. Asbestos Assessment Reqd. 2nd Floor Room 201 The entrance door does not close properly---the door is not level. Asbestos Code A - Cleared for repairs on 02-04-03 by Leroy Minton Jr (LM/02-05-03) Safety Office (202) 576-8962. |
September 23, 2002 |
September 13, 2006 |
1,451 days |
| Cooke H.D. Elementary School |
FM-200218791 02 9/13/06 Cooke, H.D. Basement - Girls bathroom Repair ceiling and area about one foot by two feet has fallen due to age. Asbestos Code A - Clear for repairs on 10/16/02. DCPS-Safety - Leroy Minton Jr. (RG 10/17/02) |
October 3, 2002 |
September 13, 2006 |
1,441 days |
| Cooke H.D. Elementary School |
FM-200220512 02 9/13/06 Cooke, H.D. T-9 First floor new wing exit hall Flourescent light fixture has electrical malfunction. Exit hallway is dark causing a safety and security risk. |
November 1, 2002 |
September 13, 2006 |
1,412 days |
| Cooke H.D. Elementary School |
FM-200220909 /02 9/13/06 Cooke, H.D. - T-9 Ground floor - Hall South side 12 x 12 tile is breakin-up, three pieces missing has left a hole in floor. Safety Hazard in hall. Asbestos Code A-clear for repair by Horne Engineer Troy Wilcome on 11/15/02 DCPS Charles E. Buchanan |
November 13, 2002 |
September 13, 2006 |
1,400 days |
| Cooke H.D. Elementary School |
FM-200221150 /02 9/13/06 Cooke, H.D. Third floor - Room 303 Re-anchor electrical outlet to wall. Outlet hasbeen pull from wall. Asbestos Code A-clear for repair by Horne Engineer Bipin Nanavaty DCPS Safety on 11/21/02 Charles E. Buchanan |
November 18, 2002 |
September 13, 2006 |
1,395 days |
| Cooke H.D. Elementary School |
FM-200221206 /02 9/13/06 Cooke, H.D. - T-9 Basement stage Pipe leaking from ceiling. The ceiling is leaking water on stage, causing damage to the floor. Asbestos Code A-clear for repair by Horne Engineer Bipin Nanavaty DCPS Safety on 11/21/02 Charles E. Buchanan |
November 18, 2002 |
September 13, 2006 |
1,395 days |
| Cooke H.D. Elementary School |
FM-200226873 03 9/13/06 (Cooke, H.D.) !!!IURGENT!!! New side/Room #213: Replace or remount class room door that has fallen off door frame. Concern for Pre-K students walking through this door. Asbestos Code A - Clear for repairs on 03/12/03. Hone Engineering - Bipin Nanavaty (RG 03/13/03) |
March 11, 2003 |
September 13, 2006 |
1,282 days |
| Cooke H.D. Elementary School |
FM-200226941 03 9/13/06 (Cooke, H.D.) !!!URGENT!!! Room #213: Very old door has fallen, and removed from the area. (This is a very old door that did not require hinges, door is held by pins) Asbestos Code A-clear for repair by DCPS charles Buchanan on 3/19/03 |
March 12, 2003 |
September 13, 2006 |
1,281 days |
| Cooke H.D. Elementary School |
FM-200330320 03 9/13/06 (Cooke, H.D.) !!!VERY URGENT!!! 2nd Floor/Parent Center: Drains backing up, Hot water running downstairs in the custodial office, flooding the floors. |
May 19, 2003 |
September 13, 2006 |
1,213 days |
| Cooke H.D. Elementary School |
FM-200443396 04 9/13/06 Cooke, H.D. Multi-purpose Room Repair 1 1/2" leaking return line. Urgent !! |
January 30, 2004 |
September 13, 2006 |
957 days |
| Cooke H.D. Elementary School |
FM-200448119 04 9/13/06 Cooke, H.D. Boiler Room Repair or replace B & G Serial #100 Circulating pump motor for hot water. Motor is bad. No hot water in Building. Urgent !!!! |
May 19, 2004 |
September 13, 2006 |
847 days |
| Sousa Middle School |
FM-200503494 05 9/13/06 ( SOUSA ) Asbestos Assessment Required (Second floor) 1) Furnish and Replace window pane. Rooms: 222 - (20) on front brown, 220 - (20) on front brown, 221 - (20) brown, 219 - (20), Teachers Lounge - (8) on front brown-two in restroom brown, Girsl Restroom on front brown, Library - (48) brown on front, (4) in office. Asbestos Code A - Cleared for repairs on 04/12/05. DCPS Safety - Leroy Minton Jr. (RG 04/12/05) |
April 1, 2005 |
September 13, 2006 |
530 days |
| Sousa Middle School |
FM-200503496 05 9/13/06 ( SOUSA ) Asbestos Assessment Required ( First Floor ) 1) Furnish and Replace window pane. Rooms: 109 - (1) brown +two will not close properly, 112 - (3) brown, 122 - (20) brown + (1) broken, 120 - (20) brown + (1) broken , 114 - (1) broken, 111 - (1) brown, Nurse Office - (8) brown, Main Office - (35) broken + brown, Principal Office - (4) brown. Asbestos Code A - Cleared for repairs on 04/12/05. DCPS Safety - Leroy Minton Jr. (RG 04/12/05) |
April 1, 2005 |
September 13, 2006 |
530 days |
| Sousa Middle School |
FM-200503537 05 9/13/06 (Sousa) Basement Area/Third floor/Penthouse. Repair or Replace window panes Rm. 11 (40) Stained, (2) Cracked, Rm. 12 (24) paint over, Rm. 13 (3) Stained, (8) Cracked, Rm. 9 (40) stained, Rec. Rm. (3) missing, (23) stained, Kitchen (20) stained, Teachers' Cafe (24) stained where reception is , Turning Portside (3) missing, (38) stained on front of building also Exercise Rm. (1) missing, (19) stained a smaller in four pieces, Penthouse (12) stained and (4) missing. Asbestos Code A - Cleared for repairs on 04/12/05. DCPS Safety - Leroy Minton Jr. (RG 04/12/05) |
April 4, 2005 |
September 13, 2006 |
527 days |
| Cooke H.D. Elementary School |
FM-200505922 05 9/13/06 (Cooke, H.D.) "Urgent" First floor, Cafeteria/Auditorium. Remove curtains from H.D. Cooke and hang them at K.C. Lewis, where H.D. Cooke is now being housed. Note: Need by June 1, 2005. |
May 24, 2005 |
September 13, 2006 |
477 days |
| Sousa Middle School |
FM-200503586 05 9/13/06 ( SOUSA ) (Third Floor) 1) Replace broken and missing window pane in rooms 319 - 10 brown, 320 - 120 brown, 321 - 16 brown, 322 - 18 brown, 303 band room - 12 brown security room - 4 brown, girls bathroom - 4 brown, boys bathroom - 4 brown, 309 - 12 brown, 310 - 12 brown - 2 broken, 311 - 12 brown 312 - 12 brown - 1 broken, 313 - 12 brown, 314 - 12 brown - 1 broken, 315 - 10 brown - 2 clear plexiglass, 316 - 12 brown. Asbestos Code A - Cleared for repairs on 04/12/05. DCPS Safety - Leroy Minton Jr. (RG 04/12/05) |
April 5, 2005 |
September 13, 2006 |
526 days |
| Sousa Middle School |
FM-200620500 06 9/13/06 Basement-Music Rm. Furnish and replace safety glass, music equipment is in the rm. window was broken. Asbestos Code A - Clear for repairs on 03/30/06. Tidewater - Carlos Vera (RG 03/31/06) |
March 29, 2006 |
September 13, 2006 |
168 days |
| Sousa Middle School |
FM-200617833 06 9/13/06 First Floor-Rm. 114 Very Urgent Furnish and replace lock on the door, the key was stolen and items are missing every day. |
January 25, 2006 |
September 13, 2006 |
231 days |
| Sousa Middle School |
FM-200517054 /05 9/13/06 Exterior Grounds - Service Entrance Well - Drain is stopped up and if it rains water will flood the building. Urgent !!! |
December 30, 2005 |
September 13, 2006 |
257 days |
| Sousa Middle School |
FM-200225839 03 9/13/06 (Sousa) !!!VERY URGENT!!! 3rd Floor/Room #319: Instructors contnues to pour paint in sink, sink is stopped up. |
February 14, 2003 |
September 13, 2006 |
1,307 days |
| Sousa Middle School |
FM-200504351 05 9/13/06 (Sousa) " Urgent" Second and Third floor. Unstop custodian slop sinks in the custodial closets on the 2nd and 3rd floors. |
April 20, 2005 |
September 13, 2006 |
511 days |
| Sousa Middle School |
FM-200516325 /05 9/13/06 Urgent: Place banister back on the wall in the middle stairwell on the third floor. (Banister is on the property) Asbestos Code A - Clear for repairs on 12/13/05. Tidewater - Tony Marcolin (RG 12/14/05) |
December 12, 2005 |
September 13, 2006 |
275 days |
| Sousa Middle School |
FM-200515857 /05 9/13/06 Urgent: Replace the pole at the parking lot entrance, a car ran into it. The parking lot entrance is now the students entrance and the pole is needed to put up a chain to keep the cars from coming in the parking lot. (See Mr. Holloman) |
November 29, 2005 |
September 13, 2006 |
288 days |
| Sousa Middle School |
FM-200504922 05 9/13/06 ( SOUSA ) URGENT!!!! Third Floor - Custodian Closet 1) Unstopp slop sink, plummers came out to unstopp it but it stopped up again. |
April 29, 2005 |
September 13, 2006 |
502 days |
| Sousa Middle School |
FM-200226951 03 9/13/06 (Sousa) !!!VERY URGENT!!! Gym on Ely Place: Stagnant water with raw sewage present under window. Staff indicated possible coming from the gym bathroom. |
March 12, 2003 |
September 13, 2006 |
1,281 days |
| Sousa Middle School |
FM-200228395 03 9/13/06 (Sousa) Door to copy room need to be repaired Asbestos Code A-clear for repair by DCPS Safety Office Charles Buchanan on 5/08/03 |
March 13, 2003 |
September 13, 2006 |
1,280 days |
| Sousa Middle School |
FM-200228396 03 9/13/06 (Sousa) Lobby exterior door need to be repaired Asbestos Code A-clear for repair by DCPS Safety Office Charles Buchanan on 5/08/03 |
March 13, 2003 |
September 13, 2006 |
1,280 days |
| Sousa Middle School |
FM-200515707 /05 9/13/06 Sousa Boiler Room Repair or replace sump pump. Water on Boiler Room flooded. Urgent !!!! |
November 23, 2005 |
September 13, 2006 |
294 days |
| Sousa Middle School |
FM-200515040 05 9/13/06 Urgent:Furnish meterial and close gap on the second floor-entrance from hall to library. Kids are squeezing threw the opening, The gap is too large between the door and the wall Asbestos Code A - Clear for repairs on 11/04/05. Tidewater - Rodney Distance (RG 11/07/05) |
November 3, 2005 |
September 13, 2006 |
314 days |
| Sousa Middle School |
FM-200515039 05 9/13/06 Urgent:Repair or replace doors that students use on the first floor parking lot entrance. They will not close properly. Asbestos Code A - Clear for repairs on 11/04/05. Tidewater - Rodney Distance (RG 11/07/05) |
November 3, 2005 |
September 13, 2006 |
314 days |
| Sousa Middle School |
FM-200515038 05 9/13/06 Urgent:Stairwell near principal office on the first floor has a window broken out. Furnish and Replace window pane. Asbestos Code A - Clear for repairs on 11/04/05. Tidewater - Rodney Distance (RG 11/07/05) |
November 3, 2005 |
September 13, 2006 |
314 days |
| Sousa Middle School |
FM-200515037 05 9/13/06 Urgent: First Floor-Rm. 114: Univent leaking, very hot water to rm. under vent rm. 12B causing carpet damage. |
November 3, 2005 |
September 13, 2006 |
314 days |
| Sousa Middle School |
FM-200512034 05 9/13/06 Sousa Boiler room URGENT Repair or replace sump pumps in the boiler room , bad float switch, rod sticking, pump will run , but will not discharge. |
September 8, 2005 |
September 13, 2006 |
370 days |
| Sousa Middle School |
FM-200514568 /05 9/13/06 Sousa Urgent Basement Kitchen Garbage disposal not working properly and will not reset. |
October 24, 2005 |
September 13, 2006 |
324 days |
| Sousa Middle School |
FM-200513089 05 9/13/06 Sousa Very Urgent Plumbing repairs needed in the following areas: Third Floor-2 girls toilets leaking, 4 boys toilet leaking, 1 urinal stopped up, and 1 partition door missing. Second Floor-2 boys toilets are broken and 2 girls toilets leaking. First Floor-3 girls toilets not flushing properly. "Contractor didn't completer work" |
September 23, 2005 |
September 13, 2006 |
355 days |
| Sousa Middle School |
FM-200513090 05 9/13/06 Sousa Very Urgent Plumbing repairs needed in the following areas: First Floor-sink needs faucet and line connected. Basement-girls toilet missing, boys-1 urinal stopped up, 2 faucets leaking, 1 faucet need a head "Contractor didn't complete work" |
September 23, 2005 |
September 13, 2006 |
355 days |
| Sousa Middle School |
FM-200513092 05 9/13/06 Sousa Very Urgent First Floor-Repair light fixture in girls lavatory. |
September 23, 2005 |
September 13, 2006 |
355 days |
| Shaw JHS |
FM-200502741 05 9/14/06 (Shaw) "Urgent" Asbestos Assessment Required. Basement/Stairwell #2 Stairwell door needs to be re-hung due to vadalism by students. Note: Door is completely off the hinges (Fire Code) Asbestos Code A - Clear for repairs on 03/16/05. DCPS Safety - Richard Gibson (RG) |
March 15, 2005 |
September 14, 2006 |
548 days |
| Shaw JHS |
FM-200450434 04 9/14/06 Shaw The grade house Electrical panel (breaker shortage) URGENT half of the lights not working, summer cleaning in this area that includes light ballast. Can not change ballast if there is no power. |
July 19, 2004 |
September 14, 2006 |
787 days |
| Shaw JHS |
FM-200448732 04 9/14/06 (Shaw) !!!URGENT!!! 1st Floor: Restore electrical power to lights through-out the 1st floor. |
June 2, 2004 |
September 14, 2006 |
834 days |
| Shaw JHS |
FM-200227103 03 9/14/06 Shaw First floor common area Repair or replace three (3) outlets on back wall of common area. Wires are exposed and outlet were sparking. Asbestos Code A - Clear for repairs on 03/14/03. DCPS Safety - Richard Gibson (RG) |
March 14, 2003 |
September 14, 2006 |
1,280 days |
| Shaw JHS |
FM-200500039 05 9/14/06 Shaw Repair and refinish gym floor. Asbestos Code A - Clear for repairs on 01/03/05. DCPS Safety - Richard Gibson (RG 01/04/05) |
January 3, 2005 |
September 14, 2006 |
619 days |
| Shaw JHS |
FM-200506575 05 9/14/06 (Shaw) "Urgent" Second floor, Blue House. Replace window that fell out. Code A-clear for repair by DCPS Charles Buchanan on 6/13/05 |
June 9, 2005 |
September 14, 2006 |
462 days |
| Spingarn High School |
FM-200624612 06 9/15/06 Second Floor/Window Broken In Front Of Stairwel #5 Asbetos Code A = Cleared for repairs on 06/30/06 by Tidewater (LM/06-30-06) Safety Office 202-468-6269. |
June 21, 2006 |
September 15, 2006 |
86 days |
| Shaw JHS |
FM-200623653 06 9/15/06 URGENT: Bottom of 7/8th grade stairwell replace door glass due to student vandalisim. A.S.A.P. 5/30/06 Asbestos Code A - Clear for repairs on 06/01/06. Tidewater - Samuel May (RG 06/02/06) |
May 30, 2006 |
September 15, 2006 |
108 days |
| Spingarn High School |
FM-200624656 06 9/15/06 First Floor/Stairwell #6 Safety Glass Missing Asbetos Code A = Cleared for repairs on 06/30/06 by Tidewater (LM/06-30-06) Safety Office 202-468-6269. |
June 22, 2006 |
September 15, 2006 |
85 days |
| Browne Junior High School |
FM-200512660 05 9/15/06 Browne Main Office Repair or replace inoperable heat pump. Unit will not come on. Urgent !!!! |
September 16, 2005 |
September 15, 2006 |
364 days |
| Shaw JHS |
FM-200511708 05 9/15/06 Shaw Urgent Second Floor-Girsl Restroom Replace sink back on wall (Vandalism) |
September 1, 2005 |
September 15, 2006 |
379 days |
| Shaw JHS |
FM-200513840 /05 9/15/06 Shaw Emergency Second Floor-Girls Restroom Repair cinder block wall that was opened to resolve emergency plumbing issue. Code A- clear for repairs as of 10/13/05 by Sylvia Grimes safety. |
October 13, 2005 |
September 15, 2006 |
337 days |
| Shaw JHS |
FM-200621812 06 9/15/06 Urgent:At the request of the C.A.R.E. CENTER Locks on all five doors needs to be replaced with new locks. Basement area.4/24/06 |
April 24, 2006 |
September 15, 2006 |
144 days |
| Shaed Elementary School |
FM-200624933 06 9/15/06 Third Floor/East Stairwell: Cracked safety glass Asbestos Code A - Clear for repairs on 07/03/06. Tidewater - Kenny Long (RG 07/05/06) |
June 28, 2006 |
September 15, 2006 |
79 days |
| Shaw JHS |
FM-200620043 06 9/15/06 URGENT:130ft of flag rope needed to hang flag.Rope issued by BMS is to short and too thick.This rope does not work for the fire dept. |
March 16, 2006 |
September 15, 2006 |
183 days |
| Shaw JHS |
FM-200516957 /05 9/15/06 "Urgent" NO LIGHTS VERY DARK IN STAIRWELL. LIGHTS OUTDATED NEEDS TO BE REPLACED THIS STAIRWELL IS USED BY STAFF COMING TO AND FROM GARAGE SAFETY AND SECURITY HAZARD!! |
December 22, 2005 |
September 15, 2006 |
267 days |
| Shaw JHS |
FM-200619953 06 9/15/06 Urgent:Safety Hazard outside doors both sides repair or replace. See Mr.Smith 3/14/06 Asbestos Code A - Clear for repairs on 03/20/06. Tidewater - Kenny Long (RG 03/22/06) |
March 14, 2006 |
September 15, 2006 |
185 days |
| Shaed Elementary School |
FM-200624942 06 9/15/06 Third Floor/West stairwell safety glass missing from Doors Asbestos Code A - Clear for repairs on 07/03/06. Tidewater - Kenny Long (RG 07/05/06) |
June 28, 2006 |
September 15, 2006 |
79 days |
| Shaw JHS |
FM-200621814 06 9/15/06 URGENT:New lock needed for door staff cannot secure. SAFETY/SECURITY HAZARD!!!4/24/06 |
April 24, 2006 |
September 15, 2006 |
144 days |
| Horace Mann Elementary School |
FM-200513009 05 9/15/06 Mann Boiler Room Repair or replace sub-pumps. Pumps will not empty pitt causing maintenance office and Boiler Room to flood. Urgent !!!!! |
September 22, 2005 |
September 15, 2006 |
358 days |
| Shaed Elementary School |
FM-200624924 06 9/15/06 First Floor/Broken Safety Glass In Door (Near Stairwell East) Asbestos Code A - Clear for repairs on 07/03/06. Tidewater - Kenny Long (RG 07/05/06) |
June 28, 2006 |
September 15, 2006 |
79 days |
| Shaw JHS |
FM-200515743 /05 9/15/06 Basement, Ms Walton's classroom. "Urgent" Repair or Replace door that is off track. Note: Staff cannot secure room . SAFETY HAZARD!!!! Asbestos Code A - Clear for repairs on 11/29/05. Tidewater - Roger SmallPhilp Connolly (RG 11/30/05) |
November 22, 2005 |
September 15, 2006 |
297 days |
| Anacostia Senior High School |
FM-200509297 05 9/20/06 Anacostia Closet Under Southwest Stairwell Gas leaking from 4" reduce to 2" elbow, house side. Urgent !!!!! |
August 2, 2005 |
September 20, 2006 |
414 days |
| Merritt Middle School |
FM-200515044 05 9/20/06 Urgent: Repair electrical problem with three outlets that are not working in the library on the third floor. In the electrical closet the circuit breaker keeps going off and making some strange noise. |
November 3, 2005 |
September 20, 2006 |
321 days |
| Smothers ES |
FM-200455244 04 9/20/06 Smothers Boiler room Replace safety valves on boilers # 1 &2 as per boiler Inspector's request |
September 21, 2004 |
September 20, 2006 |
729 days |
| Anacostia Senior High School |
FM-200511731 05 9/20/06 Anacostia Cafeteria Supply Room Univent leaking in ceiling, tried to cut off, still lacking. Urgent !!!!! |
September 1, 2005 |
September 20, 2006 |
384 days |
| Rudolph Elementary School |
FM-200446671 04 9/21/06 Rudolph Pump Room Replace leaking by pass valve on circulating hot water heating system for main building and south wing (Two valves), valve not holding. Repair or replace defection isolation valve, before regulator and by pass. (Main Building) No islation. This is causing system to over fill and leaking on ceiling tiles in hallways. Urgent !!!!!! |
April 13, 2004 |
September 21, 2006 |
891 days |
| Roosevelt High School |
FM-200456879 /04 9/21/06 ROOSEVELT SHS B55 mech room URGENT URGENT Repair leaking 1-1/4 " gas line in tunnel near mech room B55. |
October 15, 2004 |
September 21, 2006 |
706 days |
| Wilkinson ES |
FM-200506044 05 9/21/06 (Wilkinson) "Urgent" Asbestos Assessment Required. Second floor, Boys' restroom. Repair or Replace radiator, a student ripped it off the wall. Note: The staff was unable to remount radiator to wall. Asbestos Code A - Clear for repairs on 05/27/05. Tidewater - Sheryll James (RG 05/27/05) |
May 26, 2005 |
September 21, 2006 |
483 days |
| Kramer Middle School |
FM-200505852 05 9/21/06 Kramer Boiler Room Boiler #1 Replace Safety valve, Kunkle Valve co. Black mountain, NC Cleaver Brooks - 940-039-24 Size 3" Set 15 Lbs PSI X FIG 920-1 |
May 23, 2005 |
September 21, 2006 |
486 days |
| Kimball Elementary School |
FM-200502280 05 9/21/06 Kimball !!!VERY URGENT!!! Asbestos assessment required on ceiling tile Basement ceiling new wing by the library Repair leaking 2 1/2"- 3" valve. A call came in from plumbers indicating this is a repair for the steamfitters. 3 inch gate valve leaking around gasket on-to floor, damaging ceiling tile. |
March 7, 2005 |
September 21, 2006 |
563 days |
| Webb Elementary School |
FM-200501207 05 9/21/06 Webb Rooftop Unit Repair or replace 2 out of 4 rooftop units. Units blowing cold air, which control open space area. Unit will not lit. Urgent !!!!! |
February 4, 2005 |
September 21, 2006 |
594 days |
| Ketcham Elementary School |
FM-200506314 05 9/22/06 Ketcham Plazza Repair or replace leaking line inside of ceiling of Plazza water is leaking back into Asst. Principal's office. Urgent !!!!! |
June 2, 2005 |
September 22, 2006 |
477 days |
| Cook J.F. Elementary School |
FM-200505456 05 9/22/06 Emery Boiler Room Pipe down blow down lines on Boiler #1 and #2. Safety Factor. |
May 13, 2005 |
September 22, 2006 |
497 days |
| Cook J.F. Elementary School |
FM-200619644 06 9/22/06 Very Urgent First Floor-101 Repair or replace the stop controll valve to the flush valve. Note: Water leaking, can't cut it off |
March 8, 2006 |
September 22, 2006 |
198 days |
| Ballou Senior High School |
FM-200218641 02 9/22/06 Ballou Ground floor - Locker room Shower not working no water (possible the mixing valve). Asbestos Code A - Cleared for repairs on 10-02-02 (LM/10-02-02) Leroy Minton Jr. Safety Office (202-) 576-8962. |
October 1, 2002 |
September 22, 2006 |
1,452 days |
| Shaw JHS |
FM-200617989 06 9/22/06 URGENT: Asbestos Assessment Required. Strucual water damage to stairwell in gym caused by leaking roof. Upon entering the gym its the first stairwell to the left. SAFETY HAZARD!!! Asbestos Code A - Clear for repairs on 02/01/06 Tidewater - Carlos Vera (RG 02/08/06) |
January 24, 2006 |
September 22, 2006 |
241 days |
| Shaw JHS |
FM-200617988 06 9/22/06 URGENT:There are two roof drains in the gym that is leaking onto the wood flooring. This floor will be replaced soon.Can someone take care of the leaks before the new floor is put down |
January 24, 2006 |
September 22, 2006 |
241 days |
| Beers Elementary School |
FM-200620186 06 9/22/06 First Floor-Building 3 Urgent Water fountain leaking from the wall and its leaning from the wall Asbestos Code A - Clear for repairs on 03/23/06. Tidewater - Roger May (RG 03/24/06) |
March 22, 2006 |
September 22, 2006 |
184 days |
| Brent Elementary School |
FM-200514836 /05 9/22/06 Urgent-Third Floor Teacher Restroom Replace flush valve, can not flush toilet, teachers have no restroom. |
October 31, 2005 |
September 22, 2006 |
326 days |
| Brent Elementary School |
FM-200514671 /05 9/22/06 Brent Urgent Second Floor - Boys and Girls Restroom Boys - Broken flush valves - 2 Girls - Broken flush valves - 2 |
October 26, 2005 |
September 22, 2006 |
331 days |
| Webb Elementary School |
FM-200505804 05 9/22/06 (Webb) HEALTH CODE VIOLATION: Asbestos Assessment Required. Kitchen Area: Provide mixing hot, and cold water in the prep area also, install sink. Mixing hot, and cold in restroom. Asbestos Code A - Clear for repairs on 05/24/05. DCPS Safety - Leroy Minton Jr. (RG 05/24/05) |
May 20, 2005 |
September 22, 2006 |
490 days |
| Ketcham Elementary School |
FM-200502436 05 9/22/06 Ketcham EMERGENCY Front entrance steps Requesting repairs for they are broken up and becoming increaseing dangerous fir the kids! |
March 9, 2005 |
September 22, 2006 |
562 days |
| Ballou Senior High School |
FM-200205654 02 9/22/06 Ballou ****Urgent**** Main Floor Security Office Hand sink is backed up and the commode will not flush. |
April 9, 2002 |
September 22, 2006 |
1,627 days |
| Brent Elementary School |
FM-200514948 05 9/22/06 Urgent: Third Floor-Boys' Restroom: Urinal is leaking, it's cracked. Repair Urinal. |
November 1, 2005 |
September 22, 2006 |
325 days |
| Shaed Elementary School |
FM-200500646 05 9/26/06 SHEAD CUSTODIAN OFFICE REPLACE CEILING TILE IN OFFICE Asbestos Code A - Clear for repairs on 06/27/05. DCPS Safety - Leroy Minton Jr. (RG 06/27/05) |
January 19, 2005 |
September 26, 2006 |
615 days |
| Janney Elementary School |
FM-200619786 13/06 9/26/06 Very Urgent First Floor-Boys Bathroom-Unstop urinal |
March 13, 2006 |
September 26, 2006 |
197 days |
| Nalle Elementary School |
FM-200629173 06 9/26/06 Replace missing piece of wood on the bridge between two sections of play equipment (2" X 4" X 4'). This is a safety hazard, this equipment cannot be used without this piece of wood. |
September 12, 2006 |
September 26, 2006 |
14 days |
| Webb Elementary School |
FM-200500315 05 9/26/06 Webb Second floor Boys restroom Need a door knob the boys can not get out of the bathroom. Asbestos Code A - Clear for repairs on 01/11/04. DCPS Safety - Richard Gibson (RG) |
January 11, 2005 |
September 26, 2006 |
623 days |
| Brookland Elementary |
FM-200227848 03 9/26/06 Brookland Front lawn Install new marquee sign on front lawn of building. Asbestos Code A - Cleared for repairs on 04-22-03 by Leroy Minton Jr. (LM/04-08-03) the Safety Office 202-576-8962. |
March 28, 2003 |
September 26, 2006 |
1,278 days |
| Shaed Elementary School |
FM-200515559 /05 9/26/06 Shaed Special Ed asbestos assessment required Repair ruptured line in ceiling of Special Ed Room. No heat in classroom Urgent !!! Asbestos Code C - on 11/17/05. Tidewater - Tony Marcolin (RG 11/17/05) Code A - abeted byGoel Contractors per Ricardo Eley comfrmed (RG 03/13/06) |
November 17, 2005 |
September 26, 2006 |
313 days |
| Brightwood Elementary School |
FM-200628264 06 9/26/06 Playground Area. 1.) Remove playground equipment from Brightwood Elementary School. 2.) Transfer Brightwood's playground equipment to Walker Jones Elementary playground. 3.) Remove/Discard Walker Jones' playground equipment. 4.) Install Brightwood's playground equipment on Walker Jones' playground. The following components could be relocated to Walker Jones ES: spiral slide, double wide straight slide, double wide tot slide, 7 metal decks, 4 safety barriers, 7 rung ladders. Note: Safety has already done an assessment and cleared. |
August 24, 2006 |
September 26, 2006 |
33 days |
| Webb Elementary School |
FM-200450548 04 9/26/06 Webb First floor room 141B, 141A and 142 Repair ceiling, ceiling is in very bad condition. Safety hazard HA 003 Plaster White Textured ceiling plaster NAD HA 703 Brown Coat with HA 003 NAD Code A-clear for repair by DCPS Charles Buchan on 7/10/04 |
July 20, 2004 |
September 26, 2006 |
798 days |
| Merritt Middle School |
FM-200513581 05 9/27/06 Merritt Urgent First Floor Teachers lounge stove need to be disconnected by an electrician |
October 6, 2005 |
September 27, 2006 |
356 days |
| Merritt Middle School |
FM-200513582 05 9/27/06 Merritt Urgent Five outlets in the gym need to be replaced with new ones. |
October 6, 2005 |
September 27, 2006 |
356 days |
| Merritt Middle School |
FM-200513580 05 9/27/06 Merritt Urgent First Floor Custodial Closet need new lighting fixtures |
October 6, 2005 |
September 27, 2006 |
356 days |
| Bunker Hill Elementary School |
FM-200621833 06 9/28/06 Pipe burst in the boy's restroom inside the cafeteria. Note: the water was shut off to the toilet. Very Urgent |
April 26, 2006 |
September 28, 2006 |
155 days |
| Walker-Jones EC |
FM-200515536 /05 9/28/06 Urgent: Need to have a key and master key made for the principal office inside the main office on the first floor. |
November 16, 2005 |
September 28, 2006 |
316 days |
| Walker-Jones EC |
FM-200620187 06 9/28/06 Very Urgent First Floor-Storage Closet Across from Main Office Replace sink in storage closet, sink is cracked at the bottom. |
March 22, 2006 |
September 28, 2006 |
190 days |
| Walker-Jones EC |
FM-200214889 02 9/28/06 Walker-Jones ****Urgent**** 1. Asbestos Assessment Reqd. Basement Cafeteria 2. Replace or remove all broken floor tiles from five (5) steps leading to the cafeteria. The broken tiles poses a safety problem to students/ others using the steps. |
August 16, 2002 |
September 28, 2006 |
1,504 days |
| Bunker Hill Elementary School |
FM-200619044 06 9/28/06 Basement-Cafeteria (Girls Restroom) Replace the toilet bowl, it's cracked The water to the toilet was cut off and a plastic bag was placed over it. URGENT!! |
February 23, 2006 |
September 28, 2006 |
217 days |
| Reed LC |
FM-200516865 /05 9/29/06 Reed Boiler Room Repair or replace defected safety relief valve on #2 low pressure hot water Boiler. This valve is malfunctioning causing hot water from the interior of the Boiler to constantly dump onto the floor direty by the gas line, this is a dangerous situation. |
December 22, 2005 |
September 29, 2006 |
281 days |
| Kimball Elementary School |
FM-200626768 06 9/29/06 Kimball Boiler Room Boiler #4 replace safety valve |
August 3, 2006 |
September 29, 2006 |
57 days |
| Brightwood Elementary School |
FM-200626846 06 9/29/06 Brightwood Boiler Room Repair or replace (3) LWCO on boilers #1,#2 and #3 (one each) missing parts. Urgent !!!!! |
August 5, 2006 |
September 29, 2006 |
55 days |
| Francis Junior High School |
FM-200625893 06 9/29/06 Francis Boiler Room Repair or replace leaking McDonald Miller #150 (Linkage leaking badly) on boilers #1,#2 and #5 Urgent !!!!! |
July 19, 2006 |
September 29, 2006 |
72 days |
| Reed LC |
FM-200629543 06 9/29/06 Reed Boiler Room Repair or replace defected safety relief valve on boiler #1 |
September 15, 2006 |
September 29, 2006 |
14 days |
| Dunbar High School |
FM-200622013 06 9/29/06 Dunbar Cooling Tower Supply starter control for repairs to tower tech cooling tower. Urgent !!!!! |
May 1, 2006 |
September 29, 2006 |
151 days |
| Clark Elementary School |
FM-200628603 06 9/29/06 Field- Remove bleachers. Note: This is a safety hazard. |
August 31, 2006 |
September 29, 2006 |
29 days |
Routine Repair Requests Closed in September 2006 (813)
| School |
Description |
Open Date |
Close Date |
Time Elapsed |
| Winston EC |
FM-200446809 04 9/1/06 (Winston) Playground/Parking Lot: Remove bulk trash around dumpster. |
April 16, 2004 |
September 1, 2006 |
868 days |
| Shaed Elementary School |
FM-200622946 06 9/1/06 Outside, Loading Dock. Remove bulk trash (wood that neighbors put there) |
May 18, 2006 |
September 1, 2006 |
106 days |
| Benning Elementary School |
FM-200628687 06 9/1/06 Benning Chiller Check and repair chiller, reading low evaporator Refrigerate. Not working |
September 1, 2006 |
September 1, 2006 |
0 days |
| Shaed Elementary School |
FM-200626562 06 9/1/06 Remove bulk trash (illegal dumping) from school grounds. |
July 31, 2006 |
September 1, 2006 |
32 days |
| Shaed Elementary School |
FM-200627010 06 9/1/06 Remove bulk trash from the loading dock area. |
August 8, 2006 |
September 1, 2006 |
24 days |
| Tubman Elementary School |
FM-200628576 06 9/1/06 2nd Floor- Room 203 Troubleshoot electrical problem; there is no power for half of this room. |
August 30, 2006 |
September 1, 2006 |
2 days |
| Francis Junior High School |
FM-200624672 06 9/1/06 Second Floor/Outside Room 204 - Replace wall mount water cooler |
June 22, 2006 |
September 1, 2006 |
71 days |
| Webb Elementary School |
FM-200624561 06 9/1/06 Bulk Trash Pick Up/At Parking Lot Gates (Furniture) |
June 21, 2006 |
September 1, 2006 |
72 days |
| Marshall Educational Center |
FM-200459670 /04 9/1/06 Marshall, Thurgood Need bulk trash pick-up. |
December 15, 2004 |
September 1, 2006 |
625 days |
| Walker-Jones EC |
FM-200624119 06 9/1/06 BULK TRASH PICK UP |
June 9, 2006 |
September 1, 2006 |
84 days |
| Benjamin Banneker Academic HS |
FM-200628578 /06 9/1/06 Basement- Cafeteria Troubleshoot electrical problem; soda machine is tripping breaker. |
August 30, 2006 |
September 1, 2006 |
2 days |
| Wilson J. O. ES |
FM-200624126 06 9/1/06 BULK TRASH PICK UP |
June 9, 2006 |
September 1, 2006 |
84 days |
| Maury Elementary School |
FM-200215138 02 9/4/06 Maury 1. Asbestos Assessment Reqd. 1st Floor Kitchen 2. Run electrical line for ice-maker refrigerator. Asbestos Code A Clear for repair by DCPS Charles E Buchanan |
August 20, 2002 |
September 4, 2006 |
1,476 days |
| Turner Elementary School |
FM-200625249 06 9/5/06 Change locks on the supply room#116-B, and book room#116-A. |
July 5, 2006 |
September 5, 2006 |
62 days |
| Brookland Elementary |
FM-200626529 06 9/5/06 Ground Floor- Repair/replace locks on 2 interior doors. |
July 31, 2006 |
September 5, 2006 |
36 days |
| Brookland Elementary |
FM-200626530 06 9/5/06 Ground Floor- Repair/replace locks on 1 exterior door. |
July 31, 2006 |
September 5, 2006 |
36 days |
| Wilson High School |
FM-200623403 06 9/5/06 Marking of field for baseball game on 5/26/06 |
May 26, 2006 |
September 5, 2006 |
102 days |
| Ronald H. Brown MS |
FM-200627953 06 9/5/06 make repair to wall in grils restroom |
August 21, 2006 |
September 5, 2006 |
15 days |
| Browne Junior High School |
FM-200444749 04 9/5/06 Browne Grounds outside steps and sidewalk Repair both set of steps and sidewalk at top of steps in front of building.(cement breaking up) |
March 3, 2004 |
September 5, 2006 |
916 days |
| Browne Junior High School |
FM-200624572 06 9/5/06 Second Floor/Rm. 214 - Repair Or Replace The Door Lock, It Wont Unlock. |
June 21, 2006 |
September 5, 2006 |
76 days |
| Tubman Elementary School |
FM-200517064 06 9/5/06 Remove Graffiti from the outside walls on the playground side of the building. |
January 3, 2006 |
September 5, 2006 |
245 days |
| Truesdell Elementary |
FM-200625337 06 9/5/06 First Floor Annex/Boy's Restroom - 1 Urinal & 1Toilet |
July 6, 2006 |
September 5, 2006 |
61 days |
| Takoma Educational Center |
FM-200623683 06 9/5/06 Marking of field for baseball game on 5/18/06 |
June 1, 2006 |
September 5, 2006 |
96 days |
| John Burroughs ES |
FM-200501693 05 9/5/06 Burroughs Outside Graffitti remove on sheild. |
February 16, 2005 |
September 5, 2006 |
566 days |
| Takoma Educational Center |
FM-200623681 06 9/5/06 Marking of field for baseball game on 5/18/06 |
June 1, 2006 |
September 5, 2006 |
96 days |
| Takoma Educational Center |
FM-200623667 06 9/5/06 Marking of field for baseball game on 5/19/06 |
June 1, 2006 |
September 5, 2006 |
96 days |
| Kimball Elementary School |
FM-200626070 06 9/5/06 106/Repair or replace lock |
July 20, 2006 |
September 5, 2006 |
47 days |
| School WW High School |
FM-200627165 5 8/10/06 9/5/06 Exterior of Building, Parking Lot Area. Cement around exterior water drain grate. This grate was replaced by the welders and need to be cemented to keep grate in place. |
August 10, 2006 |
September 5, 2006 |
26 days |
| Wilson High School |
FM-200627921 06 9/5/06 Parking Lot & Sidewalk on Chesapeake St., Side. Remove fallen tree, thats blocking (3) parking spaces and part of sidewalk. |
August 18, 2006 |
September 5, 2006 |
18 days |
| Burrville Elementary School |
FM-200628245 06 9/5/06 Playground Area. Seal all holes where playground equipment was removed. |
August 24, 2006 |
September 5, 2006 |
12 days |
| Cardozo High School |
FM-200626941 06 9/5/06 CARDOZO- 1ST FLOOR, 114-A ,REPLACE DOOR KNOB LOCK -LOCK HARD TO OPEN, FOR SECURITY OF EQUIPMENT . |
August 1, 2006 |
September 5, 2006 |
35 days |
| Stanton Elementary School |
FM-200627210 06 9/5/06 repair or replace gate,s on rear side iof biulding |
August 11, 2006 |
September 5, 2006 |
25 days |
| Anacostia Senior High School |
FM-200623489 06 9/5/06 New Bldg./Rm. 414: Exposed Electrical Wiring. |
May 30, 2006 |
September 5, 2006 |
98 days |
| Plummer Elementary School |
FM-200627709 06 9/5/06 repair gate to parking lot or replace it. |
August 16, 2006 |
September 5, 2006 |
20 days |
| Kimball Elementary School |
FM-200626069 06 9/5/06 107/Repair or replace lock |
July 20, 2006 |
September 5, 2006 |
47 days |
| Clark Elementary School |
FM-200627826 06 9/5/06 Playground- Remove vandalized playground equipment parts. |
September 5, 2006 |
September 5, 2006 |
0 days |
| Clark Elementary School |
FM-200628093 06 9/5/06 Playground Area/Seal mats under playground equipment |
August 22, 2006 |
September 5, 2006 |
14 days |
| Hendley Elementary School |
FM-200620837 06 9/5/06 First Floor-Health Suite-Make Keys For Door. |
April 4, 2006 |
September 5, 2006 |
154 days |
| Cleveland Elementary School |
FM-200626880 06 9/5/06 Ground Floor/Rm. G7 - Repair Lock, Cylinder Keeps Spinning. |
August 7, 2006 |
September 5, 2006 |
29 days |
| Noyes Elementary School |
FM-200626552 06 9/5/06 1st Floor- Room 133 A-Wing Supply/install lock on new door. |
July 31, 2006 |
September 5, 2006 |
36 days |
| Noyes Elementary School |
FM-200621858 06 9/5/06 Outside- Playground The basketball court needs to be repaired. |
April 26, 2006 |
September 5, 2006 |
132 days |
| Harris, C.W. ES |
FM-200621351 06 9/5/06 First floor, Kitchen. Install lock on kitchen restroom door. |
April 13, 2006 |
September 5, 2006 |
145 days |
| Macfarland Middle School |
FM-200623684 06 9/5/06 Marking of field for baseball game on 5/18/06 |
June 1, 2006 |
September 5, 2006 |
96 days |
| Macfarland Middle School |
FM-200623682 06 9/5/06 Marking of field for baseball game on 5/18/06 |
June 1, 2006 |
September 5, 2006 |
96 days |
| Harris, C.W. ES |
FM-200624513 06 9/5/06 Rm. 153/Repair or replace lock on exterior door to the playground. |
June 20, 2006 |
September 5, 2006 |
77 days |
| Macfarland Middle School |
FM-200623392 06 9/5/06 Marking of field for baseball game on 5/24/06 |
May 26, 2006 |
September 5, 2006 |
102 days |
| Murch Elementary School |
FM-200618405 06 9/5/06 Inspection or preventive maintenance on playground equipment. |
February 7, 2006 |
September 5, 2006 |
210 days |
| Hearst Elementary School |
FM-200626763 06 9/5/06 Inspect/Repair playground equipment |
August 3, 2006 |
September 5, 2006 |
33 days |
| Moten Elementary School |
FM-200625341 06 9/5/06 Fourth Floor/Rm. 410 - Repair or replace the door lock. |
July 6, 2006 |
September 5, 2006 |
61 days |
| Moten Elementary School |
FM-200625339 06 9/5/06 Fourth Floor/Rm. 415 - Repair or replace the door lock. |
July 6, 2006 |
September 5, 2006 |
61 days |
| Moten Elementary School |
FM-200621411 06 9/5/06 Fourth floor, New Side/Custodian's Office. Install knob lock on door to custodian's office. |
April 18, 2006 |
September 5, 2006 |
140 days |
| Kimball Elementary School |
FM-200626068 06 9/5/06 202/Repair or replace lock |
July 20, 2006 |
September 5, 2006 |
47 days |
| Woodson High School |
FM-200625009 06 9/5/06 Seventh floor, Principal's Office. Repair or Replace door knob lock. |
June 29, 2006 |
September 5, 2006 |
68 days |
| Gage-Eckington ES |
FM-200626471 06 9/5/06 First Floor/Maintenance Closet - Install Door Knob. Note door knob was removed and placed elsewhere in the building for security reasons. |
July 27, 2006 |
September 5, 2006 |
40 days |
| Gage-Eckington ES |
FM-200626554 06 9/5/06 Breach in walls in bathrooms: - 3 on first floor - 1 on second floor (near main office) |
July 31, 2006 |
September 5, 2006 |
36 days |
| Merritt Middle School |
FM-200621408 06 9/5/06 1st Floor- Cafeteria Kitchen lock is broken. It needs to be repaired by the end of the day, because the kitchen will not be secured. |
April 18, 2006 |
September 5, 2006 |
140 days |
| Simon Elementary School |
FM-200623396 06 9/5/06 Marking of field for baseball game on 5/24/06 |
May 26, 2006 |
September 5, 2006 |
102 days |
| Shaw JHS |
FM-200626455 7/06 9/5/06 Basement- Band Area Repair/replace the panic bars and locks on the 4 doors leading to the band area. Note: Band equipment was stolen. |
July 27, 2006 |
September 5, 2006 |
40 days |
| Houston Elementary School |
FM-200626993 06 9/5/06 Playground- Remove vandalized playground equipment. |
August 8, 2006 |
September 5, 2006 |
28 days |
| Davis Elementary School |
FM-200625252 06 9/5/06 Basement- New Wing Storage Room Change locks changed; some children stole the keys. |
July 5, 2006 |
September 5, 2006 |
62 days |
| McKinley Technology High |
FM-200625260 06 9/5/06 Cafeteria The refrigerator is locked and will not open. |
July 5, 2006 |
September 5, 2006 |
62 days |
| Maury Elementary School |
FM-200627559 06 9/5/06 repair three holds in fence on playground at rear of school |
August 15, 2006 |
September 5, 2006 |
21 days |
| Anacostia Senior High School |
FM-200625308 06 9/5/06 Change or re-key two knob locks /keyed alike. |
July 5, 2006 |
September 5, 2006 |
62 days |
| Deal Junior High School |
FM-200623389 06 9/5/06 Marking of field for baseball game on 5/24/06 |
May 26, 2006 |
September 5, 2006 |
102 days |
| Draper Elementary School |
FM-200444399 04 9/5/06 Draper Kitchen Drains in floor are backing up. |
February 24, 2004 |
September 5, 2006 |
924 days |
| Draper Elementary School |
FM-200448442 04 9/5/06 Draper Health Hazard Cafeteria - kitchen area Drains are backing up in kitchen area where food is prepared. 05/27/2004: PRINCIPAL CALLED IN TODAY. (PLEASE GIVE THIS REQUEST IMMEDIATE ATTENTION) EMERGENCY |
May 25, 2004 |
September 5, 2006 |
833 days |
| Draper Elementary School |
FM-200503768 05 9/5/06 (Draper) First floor/Room 111. Install wall hung lavatory. |
April 8, 2005 |
September 5, 2006 |
515 days |
| Jefferson JHS |
FM-200623390 06 9/5/06 Marking of field for baseball game on 5/24/06 |
May 26, 2006 |
September 5, 2006 |
102 days |
| Ketcham Elementary School |
FM-200625283 06 9/5/06 1st Floor- Teacher's Restroom Lock needs to be replaced; the only key was lost. |
July 5, 2006 |
September 5, 2006 |
62 days |
| Ketcham Elementary School |
FM-200625161 06 9/5/06 Old Wing/New wing - Door Locks Broken And Need To Be Replaced In Rm. 205A, Counselors Rm. Needs To Have A Different Key For Security Reasons And The Bathroom On The New Wing Needs A Key Made. |
July 3, 2006 |
September 5, 2006 |
64 days |
| Horace Mann Elementary School |
FM-200618211 06 9/5/06 Inspection or preventive maintenance on playground equipment. |
February 2, 2006 |
September 5, 2006 |
215 days |
| Leckie Elementary School |
FM-200623406 06 9/5/06 Marking of field for baseball game on 5/26/06 |
May 26, 2006 |
September 5, 2006 |
102 days |
| Leckie Elementary School |
FM-200623399 06 9/5/06 Marking of field for baseball game on 5/25/06 |
May 26, 2006 |
September 5, 2006 |
102 days |
| Eastern High School |
FM-200622478 06 9/5/06 1. Make keys for Band Room (3 rooms keyes to master) 2. Tighten cylinder on B-100 on metal vault door 3. Make keys for Room 149 (no keys at all) 4. Replace door knob inside vault door in kitchen area of cafeteria (People keep getting locked in)* |
May 11, 2006 |
September 5, 2006 |
117 days |
| Eastern High School |
FM-200627591 06 9/5/06 Need key's made for rm. 156 when the lock is repaired. |
August 15, 2006 |
September 5, 2006 |
21 days |
| Eastern High School |
FM-200627592 06 9/5/06 Rm. 103/Repair door lock on key knob due to vandalism |
August 15, 2006 |
September 5, 2006 |
21 days |
| Eastern High School |
FM-200627593 06 9/5/06 Rm. 156/Repair door lock on key knob due to vandalism. |
August 15, 2006 |
September 5, 2006 |
21 days |
| Eastern High School |
FM-200627594 06 9/5/06 Rm. 341/Repair door lock on key knob due to vandalism. |
August 15, 2006 |
September 5, 2006 |
21 days |
| Eastern High School |
FM-200627620 06 9/5/06 B103/ Repair or replace key knob lock on Band Room Office. |
August 15, 2006 |
September 5, 2006 |
21 days |
| Jessie LaSalle Elementary |
FM-200627667 06 9/5/06 Requesting to have locks rekeyed to areas listed below. 1. Storageroom door and we need (3)keys. 2. The door leading to the auditorium and keyed to the master. |
August 14, 2006 |
September 5, 2006 |
22 days |
| Eaton Elementary School |
FM-200618197 06 9/5/06 Inspection or preventive maintenance on playground equipment. |
February 2, 2006 |
September 5, 2006 |
215 days |
| Jessie LaSalle Elementary |
FM-200627281 06 9/5/06 Need an additional key made for the front entry door. |
August 11, 2006 |
September 5, 2006 |
25 days |
| Lafayette Elementary School |
FM-200623793 06 9/5/06 Main Office/Bathroom - Toilet Clogged |
June 5, 2006 |
September 5, 2006 |
92 days |
| Lafayette Elementary School |
FM-200618208 06 9/5/06 Inspection or preventive maintenance on playground equipment. |
February 2, 2006 |
September 5, 2006 |
215 days |
| Harris, C.W. ES |
FM-200626637 06 9/5/06 1st Floor- Room 153 Replace lock on exterior door leading to the playground. |
August 1, 2006 |
September 5, 2006 |
35 days |
| Kramer Middle School |
FM-200627744 06 9/5/06 Ground floor, Cafeteria Area. Repair or Replace lock on cafeteria door, it is locked and the lock was damaged by vandals. |
August 16, 2006 |
September 5, 2006 |
20 days |
| Anacostia Senior High School |
FM-200627664 06 9/5/06 Re-key locks on assistant principal office # 102, 300 and 204. |
August 11, 2006 |
September 5, 2006 |
25 days |
| Harris, C.W. ES |
FM-200626638 06 9/5/06 1st Floor- Room 146 Repair/Replace lock. |
August 1, 2006 |
September 5, 2006 |
35 days |
| Patricia R Harris Ed Center |
FM-200620700 06 9/5/06 Change lock to the Managers Office in the Cafeteria Kitchen-No Key-Door Can't Be Locked. |
March 31, 2006 |
September 5, 2006 |
158 days |
| West Elementary School |
FM-200621108 06 9/5/06 First Floor-Kitchen-Need key entry lock for the bathroom and locker room. |
April 7, 2006 |
September 5, 2006 |
151 days |
| Benjamin Banneker Academic HS |
FM-200621801 06 9/5/06 Side of Building- Field Graffiti needs to be removed from the brick wall. |
April 26, 2006 |
September 5, 2006 |
132 days |
| Benjamin Banneker Academic HS |
FM-200623388 06 9/5/06 Marking of field for baseball game on 5/24/06 |
May 26, 2006 |
September 5, 2006 |
102 days |
| Watkins Elementary School |
FM-200618402 06 9/5/06 Inspection or preventive maintenance on playground equipment. |
February 7, 2006 |
September 5, 2006 |
210 days |
| Tyler Elementary School |
FM-200626499 06 9/5/06 1st Floor- Room 134 Repair/replace lock. |
July 28, 2006 |
September 5, 2006 |
39 days |
| Birney Elementary School |
FM-200624908 06 9/5/06 Basement- Maintenance Office/Boys Bathroom Repair/replace locks. |
June 27, 2006 |
September 5, 2006 |
70 days |
| Birney Elementary School |
FM-200624909 06 9/5/06 1st Floor- Teacher's Bathroom & Room 106 The locks need to be replaced. |
June 27, 2006 |
September 5, 2006 |
70 days |
| Birney Elementary School |
FM-200624911 06 9/5/06 3rd Floor- Rooms 315, 323, 304, Boys Bathroom's Old & New Side Classrooms need locks repaired or replaced. |
June 27, 2006 |
September 5, 2006 |
70 days |
| Tyler Elementary School |
FM-200625180 06 9/5/06 Kitchen/Storage - Replace Lock |
July 3, 2006 |
September 5, 2006 |
64 days |
| Tyler Elementary School |
FM-200623401 06 9/5/06 Marking of field for baseball game on 5/26/06 |
May 26, 2006 |
September 5, 2006 |
102 days |
| Tyler Elementary School |
FM-200623394 06 9/5/06 Marking of field for baseball game on 5/24/06 |
May 26, 2006 |
September 5, 2006 |
102 days |
| Kimball Elementary School |
FM-200626073 06 9/5/06 103/Replace key |
July 20, 2006 |
September 5, 2006 |
47 days |
| Jefferson JHS |
FM-200625978 06 9/5/06 Lower Basement - Under Library - Classroom 442 - Cylinder keeps turning around, can not get into room. |
July 20, 2006 |
September 5, 2006 |
47 days |
| Smothers ES |
FM-200626563 06 9/5/06 Exterior of Building. Remove graffitti from off the entire exterior of building. |
July 31, 2006 |
September 5, 2006 |
36 days |
| Turner Elementary School |
FM-200628827 06 9/6/06 Second Floor (old + new side) - No Power. |
September 6, 2006 |
September 6, 2006 |
0 days |
| Beers Elementary School |
FM-200628418 06 9/6/06 Basement floor, Kitchen Area. Need electrician to assess and repair electrical issue there is no power to (2) ovens. Note: This hinders the preparation of meals. |
August 28, 2006 |
September 6, 2006 |
9 days |
| Browne Junior High School |
FM-200627305 06 9/7/06 Second Floor/Storage Rm. 225 unable to access due to defected lock. |
August 11, 2006 |
September 7, 2006 |
27 days |
| Young Elementary School |
FM-200623437 06 9/7/06 Gym door lock was broken during a break in. |
May 30, 2006 |
September 7, 2006 |
100 days |
| Benning Elementary School |
FM-200624366 06 9/7/06 Learning Center 2/Science Area: Need Storage Closet Door Opened And Keys Made, Can't Get Into The Room. |
June 15, 2006 |
September 7, 2006 |
84 days |
| Patterson ES |
FM-200623420 06 9/7/06 Outside- Elmira Street Gate Repair/Replace the lock on the gate. |
May 26, 2006 |
September 7, 2006 |
104 days |
| Plummer Elementary School |
FM-200623206 06 9/7/06 Main Office/Principal Office-Can't Secure The Door's, Locks Are Broken |
May 23, 2006 |
September 7, 2006 |
107 days |
| Browne Junior High School |
FM-200624075 06 9/7/06 1st Floor- New Wing The mechanical room needs to be opened. The engineers need to get inside to fix the a/c. |
June 8, 2006 |
September 7, 2006 |
91 days |
| Browne Junior High School |
FM-200621142 06 9/7/06 Need new door handle. 1st Floor- Room 114 Old Wing |
April 10, 2006 |
September 7, 2006 |
150 days |
| Eaton Elementary School |
FM-200626398 06 9/7/06 Eaton Boiler Room Boiler #1 Repair or replace 3 to 4 leaking 2-1/2" tubes. |
July 26, 2006 |
September 7, 2006 |
43 days |
| Backus Middle School |
FM-200460112 /04 9/7/06 BACKUS GROUNDS PICK UP BULK TRASH |
December 29, 2004 |
September 7, 2006 |
617 days |
| Ronald H. Brown MS |
FM-200628427 06 9/7/06 Room - 213 and Hallway Near - 213 - Replace rupture chill water line in ceiling . |
August 29, 2006 |
September 7, 2006 |
9 days |
| Hart Middle School |
FM-200445736 04 9/7/06 Hart School Bulk trash pick-up |
March 23, 2004 |
September 7, 2006 |
898 days |
| Woodson High School |
FM-200627769 06 9/7/06 Ground Floor/Room in Kitchen area remove bulk trash. |
August 16, 2006 |
September 7, 2006 |
22 days |
| Brookland Elementary |
FM-200625000 06 9/7/06 Kitchen Area. Repair or Replace lock and furnish new keys. The food service manager's key is broken of in the lock. Note: The staff are unable gain assess to the kitchen to distributed breakfast or lunch!! |
June 29, 2006 |
September 7, 2006 |
70 days |
| Brent Elementary School |
FM-200624123 06 9/7/06 BULK TRASH PICK UP |
June 9, 2006 |
September 7, 2006 |
90 days |
| Browne Junior High School |
FM-200627361 06 9/7/06 Basement/Panic Bar Missing Exit Door #1 |
August 14, 2006 |
September 7, 2006 |
24 days |
| Hart Middle School |
FM-200623241 06 9/7/06 Second Floor-Girl's Bathroom (old wing): Install key lock on the door |
May 24, 2006 |
September 7, 2006 |
106 days |
| Dunbar High School |
FM-200626222 06 9/7/06 First Floor/Panic Bar Missing A Bldg. 1st Fl. |
July 24, 2006 |
September 7, 2006 |
45 days |
| Dunbar High School |
FM-200626244 06 9/7/06 Ground Floor/Panic bar missing by brown tile |
July 24, 2006 |
September 7, 2006 |
45 days |
| Dunbar High School |
FM-200626246 06 9/7/06 First Floor/Exit sign missing in Kennedy Institute rm. |
July 24, 2006 |
September 7, 2006 |
45 days |
| Clark Elementary School |
FM-200622130 06 9/7/06 Exterior/Rear of Building Near Shed. Remove bulk trash in rear of building |
May 2, 2006 |
September 7, 2006 |
128 days |
| Watkins Elementary School |
FM-200626617 06 9/7/06 1st Floor, Cafeteria door is not closing properly, stage right side - Metal door hinge sprung. |
August 1, 2006 |
September 7, 2006 |
37 days |
| Turner Elementary School |
FM-200624355 06 9/7/06 Second floor, New Side. Repair broken lock cylinder in 2nd floor new side teacher's restroom, |
June 14, 2006 |
September 7, 2006 |
85 days |
| Emery Elementary School |
FM-200458510 /04 9/7/06 Emery First Floor-Ladies Restroom Key broken-off in restroom Door. Please Repair Code A asbestos abated on 11/19/04 by Goel Construction/USA Environmental per Ronald Ed |