| School |
Description |
Open Date |
Close Date |
Time Elapsed |
| Lincoln Middle School |
FM-200106569 01 8/23/01 LINCOLN BOILER ROOM R/R TWO SEWER EJECTOR UNITS THAT ARE NOT WORKING. (NO INFORMATION AVAILABLE). |
March 26, 2001 |
August 23, 2001 |
150 days |
| Stuart-Hobson Middle School |
FM-200115162 01 8/23/01 STUART-HOBSON BOILER ROOM 1. ASBESTOS ASSESSMENT REQUIRED. 2. REPAIR CRACKED SHELL IN #2 BOILER. CODE A-CLEAR FOR REPAER BY HORNE ENG 8/8/01 |
July 12, 2001 |
August 23, 2001 |
42 days |
| Truesdell Elementary |
FM-200116795 01 8/23/01 TRUESDELL BOILER ROOM REPAIR OR REPLACE MAIN CURCUIT BREAKER FOR #1 BOILERS. BREAKER IS STUCK IN THE OFF POSITION. NOTE: FOUR (4) 20 AMP BREAKERS. |
August 6, 2001 |
August 23, 2001 |
17 days |
| Bruce-Monroe Elementary School |
FM-200106071 01 8/23/01 BRUCE MONROE BOILER ROOM 1. ASBESTOS ASSESSMENT REQUIRED. 2. REPLACE LEAKING 4" GATE VALVE. 3. Asbestos Code A - Clear for Repair On 03/23/01. |
March 19, 2001 |
August 23, 2001 |
157 days |
| Montgomery ES |
FM-200118276 01 8/24/01 (MONTGOMERY) OUTSIDE BOILER ROOM: UNSTOP DRAIN, MOSQUITOS AND BUGS ARE SURROUNDING THE STAGNANT WATER. |
August 23, 2001 |
August 24, 2001 |
1 day |
| Gibbs Elementary School |
FM-200116023 01 8/24/01 GIBBS BOILER ROOM 1. ASBESTOS ASSESSMENT REQUIRED. 2. REPAIR FIRE DOOR INSULATION ON #1 & 2 BOILER. BOILERS FAILED INSPECTION. CODE A-CLEAR FOR REPAER BY HORNE ENG 8/8/01 |
July 27, 2001 |
August 24, 2001 |
28 days |
| Langdon Elementary School |
FM-200102438 /01 8/24/01 LANGDON BOILER ROOM REPAIR LOCHINVAR BOILER (HOT WATER HEATER), MUST BE RESET EVERYDAY. DOMESTIC HOT WATER TEMPATURE IS 80 DEGRESS. |
January 30, 2001 |
August 24, 2001 |
206 days |
| Dunbar High School |
FM-200117008 01 8/27/01 DUNBAR BOILER ROOM 1. ASBESTOS ASSESSMENT REQUIRED. 2. REPLACE A PIECE IF 2 INCH X 41 INCH LONG THREADED PIPE FOR NO. 4 RELIEF VALVE TO THE DRAIN. 3. REPLACE A LEAKING FIRE TUBE IN BOILER #2, SECOND ROW FROM TOP, NO. 11 TUBE FROM LEFT TO RIGHT. ASBESTOS CODE A - CLEAR FOR REPAIRS ON 08/22/01. HORNE ENGINEERS - STEPHEN CALDWELL |
August 9, 2001 |
August 27, 2001 |
18 days |
| Dunbar High School |
FM-200117079 01 8/27/01 DUNBAR BOILER ROOM (1) ASBESTOS ASSESSMENT IS REQUIRED (2) BOILER # 1 REPLACE 6 TUBES ASBESTOS CODE A - CLEAR FOR REPAIRS ON 08/21/01. HORNE ENGINEERS - STEPHEN CALDWELL |
August 10, 2001 |
August 27, 2001 |
17 days |
| Orr Elementary School |
FM-200110494 01 8/27/01 ORR BASEMENT BOILER ROOM 1. ASBESTOS ASSESSMENT REQUIRED. 2. REPLACE 4 5" OSY VALVE ON THE SUPPLY AND RETURN LINE FOR BOILER #1 & 2. ASBESTOS CODE A - CLEAR FOR REPAIRS ON 07/06/01. |
May 17, 2001 |
August 27, 2001 |
102 days |
| Backus Middle School |
FM-200116243 01 8/27/01 BACKUS BOILER ROOM ASBESTOS ASSESSMENT IS REQUIRED. REPLACE LEAKING TUBES IN BOILER #2. CODE ACLEAR FOR REPAIR BY HORNE ENG. 8/7/01. |
July 31, 2001 |
August 27, 2001 |
27 days |
| Cook J.F. Elementary School |
FM-200117127 01 8/28/01 J.F. COOK BOILER ROOM SEND BURNER TECHNICIAN WITH CALIBRATION INSTRUMENTS TO PROPERLY CALIBRATION BURNERS ON BOILERS #1 AND #2. BURNERS NEED TO BE CALIBRATED PERIODICALLY TO ENSURE PROPER OPERATION AT ALL MODUCATION LEVELS. |
August 10, 2001 |
August 28, 2001 |
18 days |
| Webb Elementary School |
FM-200113825 01 8/29/01 WEBB BOILER ROOM 1. ASBESTOS ASSESSMENT REQUIRED 2. REMOVE CHECK VALVE CAPS AND REPAIR LINES AS NEEDED ON #1 AND #2 BOILERS IN THE BACK. (3/4" LINE) ASBESTOS CODE A - CLEAR FOR REPAIRS ON 07/16/01. |
June 22, 2001 |
August 29, 2001 |
68 days |
| Hart Middle School |
FM-200104883 01 8/30/01 Hart Boiler Room Replace leaking tubes in boiler #1 and #3. Tubes are leaking in the front of the boiler onto the burners. ASBESTOS CODE A - CLEAR FOR REPAIRS ON 06/18/01. |
March 5, 2001 |
August 30, 2001 |
178 days |
| Montgomery ES |
FM-200115974 01 8/30/01 MONGOMERY BOILER ROOM 1. ASBESTOS ASSESSMENT REQUIRED. 2. REMOVE MANHOLE COVERS FROM BOILERS NUMBER 1 & 2. COVERS HAVE NOT BEEN REMOVED SINCE INSTALLATION AND CANNOT BE REMOVED BY ENGINEERS. NOTE: THIS WORK IS NEEDED SO BOILER CAN BE INSPECTED. ASBESTOS CODE A - CLEAR FOR REPAIRS ON 08/21/01 HORNE ENGINEERS- R AGNANT |
July 26, 2001 |
August 30, 2001 |
35 days |
| Meyer Elementary School |
FM-200114886 01 8/31/01 MEYER BASEMENT BOILER ROOM 1. ASBESTOS ASSESSMENT REQUIRED. 2. REPAIR OR REPLACE 2" COPPER PIPE THAT HAS CORRODED ON FLANGE - 2" X 1-1/2" FEMALE ADAPTERS AND 2" COUPLINGS. ASBESTOS CODE A - CLEAR FOR REPAIRS ON 07/13/01. |
July 9, 2001 |
August 31, 2001 |
53 days |
| Patricia R Harris Ed Center |
FM-200116950 01 9/5/01 HARRIS, P.R. BOILER ROOM (1) ASBESTOS ASSESSMENT REQUIRED (2) REPAIR ONE (1) CONDENSER PUMP FOR COOLING TOWER. ASBESTOS CODE A -CLEAR FOR REPAIRS ON 08/13/01. HORNE ENGINEERS |
August 8, 2001 |
September 5, 2001 |
28 days |
| Wilson High School |
FM-200116257 01 9/7/01 W. WILSON BOILER ROOM AREA PUMP ROOM 1. ASBESTOS ASSESSMENT REQUIRED. 2. REPLACE 9 FT. OF SCHEDULE 80 HIGH PRESSURE STEAM SUPPLY LINE (BLACK IRON) TO STEAM RECIPROCATING PUMPS. (2" PIPE). ASBESTOS CODE A - CLEAR FOR REPAIRS ON 08/23/01 HORNE ENGINEERS- TROY WILCOME |
July 31, 2001 |
September 7, 2001 |
38 days |
| Takoma Educational Center |
FM-200106245 01 9/7/01 TAKOMA BOILER ROOM FURNISH HVAC SHOP WITH (2) 8" 8 BOLTS FLANGE OS&Y VALVE FOR CHILL WATER LINE IN BOILER ROOM. VALVES ARE NOT HOLDING LETTING CHILL WATER AND HOT WATER GOT TO CONDENSOR. |
March 21, 2001 |
September 7, 2001 |
170 days |
| Orr Elementary School |
FM-200119355 01 9/7/01 QRR BOILER ROOM CHANGE CHILLER RUPTURE DISC WAS BLOWN DUE TO HIGH WATER TEMPERTURE GOING THROUGH CHILLER. |
September 7, 2001 |
September 7, 2001 |
0 days |
| Takoma Educational Center |
FM-200105079 01 9/7/01 TAKOMA BOILER ROOM REPLACE DEFECTIVE FEEDWATER REGULATOR ON HVAC WATER SYSTEM. RE: BOILERS TAKE ON WATER DURING OPERATION REDUCING HEAT TRANSFER AND FUE ECONOMY. |
March 7, 2001 |
September 7, 2001 |
184 days |
| Tubman Elementary School |
FM-200112619 01 9/7/01 TUBMAN FIRST FLOOR BOILER ROOM 1) REPLACE DOOR ASBESTOS CODE A - CLEAR FOR REPARS ON 06/11/01. |
June 6, 2001 |
September 7, 2001 |
93 days |
| Garfield ES |
FM-200113483 01 9/7/01 GARFIELD BOILER ROOM ASSESSMENT REQUIRED REPLACE ONE (1) FIRE TUBE IN BOILER #2, TUBE IS LEAKING AROUND FLANGE. ASBESTOS CODE A-CLEAR FOR REPAIRS ON 06/21/01. |
June 18, 2001 |
September 7, 2001 |
81 days |
| Harris, C.W. ES |
FM-200119345 01 9/8/01 C. W. HARRIS BOILER ROOM REPAIR LEAKING CONDENSOR LINE AND START A/C CHILLER. WP-200108644 |
September 6, 2001 |
September 8, 2001 |
2 days |
| Sousa Middle School |
FM-200100897 01 9/10/01 SOUSA BOILER ROOM OIL PUMP IS NOT WORKING PROPERLY. THE OIL IS NOT MOVING THROUGHOUT THE SYSTEM LIKE IT SHOULD BE. HC-20000172 |
January 11, 2001 |
September 10, 2001 |
242 days |
| Savoy Elementary School |
FM-200109234 01 9/10/01 SAVOY BOILER ROOM REPLACE ELECTRICAL CONTROL SWITCH FOR AC CONDENSOR PUMP. PART PUB A10D-1, CONTACT KIT 6-24-2, NEMA SIZE 2, PH-3, AMP 45, V-230, HP-15.; COIL NUMBER C-H 1889-13, 208V, 60 CYC. WP-200108683 |
April 30, 2001 |
September 10, 2001 |
133 days |
| Hart Middle School |
FM-200103074 01 9/10/01 HART BOILER ROOM REPAIR #2 BURNER. BURNER WILL NOT START. |
February 6, 2001 |
September 10, 2001 |
216 days |
| Orr Elementary School |
FM-200119051 01 9/11/01 ORR BOILER ROOM NEED TO REPLACE 50 AMP BREAKER FOR COOLING TOWER MOTOR. CURRENT CAN NOT FEED TO MOTOR. |
September 4, 2001 |
September 11, 2001 |
7 days |
| Shaw JHS |
FM-200119480 01 9/12/01 SHAW BOILER ROOM REPAIR BURNER ON #4 BOILER - WILL NOT START. WP-200108884 |
September 10, 2001 |
September 12, 2001 |
2 days |
| Backus Middle School |
FM-200104065 01 9/13/01 Backus Boiler Room Replace safety valve on boiler #1, existing valve will not reset properly. ASBESTOS CODE A - CLEAR FOR REPAIRS ON 05/24/01. |
February 21, 2001 |
September 13, 2001 |
204 days |
| Deal Junior High School |
FM-200104409 01 9/13/01 Deal Boiler Room Replace hartford loop on boiler #2. Temporary repairs were made. ASBESTOS CODE A - CLEAR FOR REPAIRS ON 06/15/01. |
February 27, 2001 |
September 13, 2001 |
198 days |
| Dunbar High School |
FM-200103300 01 9/13/01 DUNBAR BOILER ROOM ON THE 6TH FLOOR AUTOMATIC DRAIN VALVE IS BROKEN NEED TO BE REPLACE. |
February 8, 2001 |
September 13, 2001 |
217 days |
| Coolidge High School |
FM-200104023 01 9/13/01 COOLIDGE BOILER ROOM REPLACE QUICK OPEN AND SLOW OPEN VALVES ON SURFACE BLOW DOWN LINE TO #3 BOILER. |
February 21, 2001 |
September 13, 2001 |
204 days |
| Amidon Elementary School |
FM-200102659 01 9/13/01 AMIDON BOILER ROOM #1 BOILER HAS LEAKING TUBES (2). |
February 1, 2001 |
September 13, 2001 |
224 days |
| Coolidge High School |
FM-200104074 01 9/13/01 COOLIDGE GROUND FL. BOILER ROOM REPLACE LEAKING BLOW DOWN VALVE ON #3 BOILER SURFACE BLOW LINE. REPLACE ON E QUICK OPEN AND ONE SLOW OPEN VALVE. REPLACE THE FOLLOWING VALVES ON SURFACE BLOW DOWN LINES: ONE QUICK OPEN AND ONE SLOW OPEN. EXISTING VALVES ARE LEAKING. |
February 21, 2001 |
September 13, 2001 |
204 days |
| Bruce-Monroe Elementary School |
FM-200104343 01 9/13/01 Bruce Monroe Boiler Room Replace (2) defective control valves to water regulators on both boilers. Valves are faulty and leaks water uncontrolled into system. Valve Size: 1/2" |
February 26, 2001 |
September 13, 2001 |
199 days |
| Eliot Junior High School |
FM-200100191 01 9/13/01 ELIOT BOILER ROOM: REPAIR OR REPLACE 10 SECTIONS OF 4" RETURN LINE IN THE BOILER ROOM OVER DOOR, LEADING TO THE BUILDING. THE LINE HAS NEW INSULATION ON IT. SAFETY AND HEALTH HAZARD. HC-20000750 |
January 7, 2001 |
September 13, 2001 |
249 days |
| Takoma Educational Center |
FM-200102639 01 9/13/01 TAKOMA BOILER ROOM 1. ASBESTOS ASSESSMENT REQUIRED ON CHILL WATER LINE OVER CHILLER AND AT PUMP VALVES (MARKED & TAGGED FOR IDENTIFICATION). REMOVE IF ASSESSED ASBESTOS. 2. REPLACE VALVES. POC: MR. TEMPLE CELL #345-1572 ASBESTOS CODE A - CLEAR FOR REPAIRS |
January 31, 2001 |
September 13, 2001 |
225 days |
| Cardozo High School |
FM-200104670 01 9/13/01 CARDOZO BASEMENT ROOM 19 REPLACE YARWAY SEATLESS VALVE ON #2 BOILER, REAR BLOW DOWN, 1-1/4" - TYPE B - FIG. 3484 - BASIC PRESS RATING 250 - BLOW OFF SERVICE 200. "VALVES NOT HOLDING" |
March 1, 2001 |
September 13, 2001 |
196 days |
| Coolidge High School |
FM-200104022 01 9/13/01 COOLIDGE GROUND FL. BOILER ROOM REPLACE QUICK OPENER AND SLOW OPENING VALVE ON BOTTOM BLOW DOWN LINE TO #2 BOILER, VALVES ARE LEAKING. |
February 21, 2001 |
September 13, 2001 |
204 days |
| Slowe Elementary School |
FM-200104072 01 9/13/01 Slowe Boiler Room Repair Leaking water leg on boiler #2. Note: Shclosser Contractors are working on request. |
February 21, 2001 |
September 13, 2001 |
204 days |
| Jefferson JHS |
FM-200104071 01 9/13/01 JEFFERSON BASEMENT EAST TUNNEL MAIN BLDG. REPLACE 3/4" NIPPLE ON STEAM SUPPLY LINE (BLACK PIPE). PIPE IS LEAKING IN TUNNEL, FLOODING THE TUNNEL & BOILER ROOM. |
February 21, 2001 |
September 13, 2001 |
204 days |
| Coolidge High School |
FM-200104665 01 9/13/01 COOLIDGE BOILER ROOM INSTALL A BYPASS LINE AROUND SOLENOID VALVE MOUNTED ON TOP OF VACUUM RECEIVER ON THE FRESH WATER SUPPLY LINE WITH A GATE VALVE, TO BE USED IN CASE THE SOLENOID FAILS TO WORK. INSTALL ON BOTH NEW VACUUM CONDENSATE RECEIVERS IN BOILER ROOM |
March 1, 2001 |
September 13, 2001 |
196 days |
| Shaw JHS |
FM-200104078 01 9/13/01 Shaw Boiler Room Replace corroded exterior shell and reinsulate boiler. |
February 21, 2001 |
September 13, 2001 |
204 days |
| Orr Elementary School |
FM-200101982 01 9/13/01 ORR BOILER ROOM BOILER #2, SURVEY TO REPAIR LEAKING SHELLS STAY BOLTS & TUBES. |
January 24, 2001 |
September 13, 2001 |
232 days |
| Garnet-Patterson MS |
FM-200100061 1/7/01 9/13/01 GARNET-PATTERSON BOILER ROOM REPAIR/REPLACE 20" PULL CHAIN-OS & Y ON HEADER TO #3 BOILER. HS-20000988 ASBESTOS CODE A - CLEAR FOR REPAIRS ON 06/15/01 |
January 7, 2001 |
September 13, 2001 |
249 days |
| Bruce-Monroe Elementary School |
FM-200104352 01 9/13/01 Bruce Monroe Boiler Room (1) Asbestos Assessment Required (2) Replace (6) malfunctioning hot water supply, return and isolation valves (two of each). Valves are not holding. NEED ANOTHER ASSESSMENT PER C. BRADLEY 5/21/01 ASBESTOS CODE A -CLEAR FOR REPAIRS ON 03/06/01. |
February 26, 2001 |
September 13, 2001 |
199 days |
| Reed LC |
FM-200104192 2 2/23/01 9/13/01 REED BOILER ROOM REPAIR OR REPLACE LEAKING SAFETY VALVE ON ALL (3) BOILERS. ASBESTOS CODE A - CLEAR FOR REPAIRS ON 06/15/01 |
February 23, 2001 |
September 13, 2001 |
202 days |
| Deal Junior High School |
FM-200104410 01 9/13/01 Deal Boiler Room Repair/replace ruptured blowdown line of boiler #3. Line size: approximately 1 1/2" ASBESTOS CODE A - CLEAR FOR REPAIRS ON 06/15/01. |
February 27, 2001 |
September 13, 2001 |
198 days |
| Shaw JHS |
FM-200115782 01 9/14/01 SHAW BOILER ROOM 1. ASBESTOS ASSESSMENT NEEDED. 2. REPLACE FRONT REFRACTOR TO #4 BOILER. CODE A CLEAR FOR REPAIR DCPS SAFETY SRH 08-10-01 |
July 24, 2001 |
September 14, 2001 |
52 days |
| Hearst Elementary School |
FM-200104944 01 9/14/01 Hearst Boiler Room (1) Asbestos Assessment Required (2) Replace leaking elbow on 2" condensate line. (3) Asbestos Code A - Clear for Repair ON 03/12/01. |
March 5, 2001 |
September 14, 2001 |
193 days |
| West Elementary School |
FM-200107349 01 9/14/01 WEST BASEMENT BOILER ROOM REPLACE A 3" COOPER ELBOW ON CITY WATER LINE LOCATED IN CEILING ABOVE BOILER #2. ELBOW IS LEAKING. ASBESTOS CODE A - CLEAR FOR REPAIRS ON 04/18/01. |
April 4, 2001 |
September 14, 2001 |
163 days |
| Orr Elementary School |
FM-200109797 01 9/14/01 ORR BOILER ROOM 1. ASBESTOS ASSESSMENT REQUIRED IN ORDER TO RECEIVE WORK PERMIT. 2 REPLACE ALL LEAKING AND BADLY PITTED TUBES IN BOILER #1. WATER HAS FILLED FIRE BOX AND MAY HAVE CAUSE DAMAGE TO NEW BURNER ASBESTOS CODE A - CLEAR FOR REPAIRS ON 07/06/01. |
May 9, 2001 |
September 14, 2001 |
128 days |
| Bancroft Elementary School |
FM-200104917 01 9/14/01 Bancroft Boiler Room Pipe four (4) blowdown lines from boiler#1 and #2 water column to floor drains. (approximately 3/4). |
March 5, 2001 |
September 14, 2001 |
193 days |
| Rudolph Elementary School |
FM-200104947 01 9/14/01 Rudolph Boiler Room (1) Asbestos Assessment Required (2) Repair ruptured and leaking 1 1/2" line coming from bottom of heat exchanger in pump room. CODE A - ASBESTOS ABATED ON 5/2/01 |
March 5, 2001 |
September 14, 2001 |
193 days |
| Takoma Educational Center |
FM-200106237 01 9/14/01 TAKOMA BOILER ROOM 1. ASBESTOS ASSESSMENT REQUIRED. 2. REPLACE DEFECTIVE BYPASS AND ISOLATION VALVES ON CITY WATER MAKE-UP TO #1 & 2 BOILERS. VALVES ARE SIZE 1". VALVES WONT HOLD AND CAUSES WATER TO CONSTANTLY FILL WATER SYSTEM. 3. Asbestos Code A - Clear for Repair On 03/23/01. |
March 21, 2001 |
September 14, 2001 |
177 days |
| Amidon Elementary School |
FM-200106871 01 9/14/01 AMIDON BOILER ROOM REPLACE PRESSURE RELIEF VALVE ON #2 BOILER. NO. 174A, SIZE 2", SET 30 LBS., BTU/HR 381500, NAME IS WATTS. ASBESTOS CODE A - CLEAR FOR REPAIRS ON 04/19/01. |
March 29, 2001 |
September 14, 2001 |
169 days |
| Young Elementary School |
FM-200109818 01 9/14/01 YOUNG BASEMENT BOILER ROOM 1. ASBESTOS ASSESSMENT REQUIRED. 2. REMOVE 3 - THREE PLUGS FROM BOILER #1 AND REMOVE 3 THREE BOLTS FROM BOILER #2 FOR INSPECTION. NEED TO BE HEATED BY TORCH. ASBESTOS CODE A - CLEAR FOR REPAIRS ON 06/04/01. |
May 9, 2001 |
September 14, 2001 |
128 days |
| Barnard Elementary School |
FM-200104740 /01 9/14/01 BARNARD BOILER ROOM PIPE FOUR FLOW DOWN LINE FROM BOILER #1 & 2 WATER COLUMN TO FLOOR DRAIN. (APPROX. 3/4" LINES). |
March 2, 2001 |
September 14, 2001 |
196 days |
| Stuart-Hobson Middle School |
FM-200105917 01 9/14/01 STUART-HOBSON BOILER ROOM TUNNEL AREA REPAIR ALL STEAM LEAKS IN TUNNELS. R/R 4" RETURN LINE LEAKING WATER ON FLOOR IN STORE ROOM AREA. |
March 15, 2001 |
September 14, 2001 |
183 days |
| Harris, C.W. ES |
FM-200110045 01 9/14/01 C.W. HARRIS BOILER ROOM 1. REPAIR RUPTURED PIPE LINE ABOVE CIRCULATOR PUMP TO BUILDING (PUMP #2). THIS WILL PROVIDE COOLING FOR THE BUILDING. ASBESTOS CODE A - CLEAR FOR REPAIRS ON 05/15/01. |
May 11, 2001 |
September 14, 2001 |
126 days |
| Coolidge High School |
FM-200104753 01 9/15/01 COOLIDGE BOILER ROOM & TUNNEL ENTRANCE 1. ASBESTOS ASSESSMENT REQUIRED. 2. R/R LEAKING STEAM LINE IN TUNNEL EMTRANCE BY BOILER ROOM. ASBESTOS ABATED ON 3/21/01. CODE A. |
March 2, 2001 |
September 15, 2001 |
197 days |
| Ballou Senior High School |
FM-200102666 01 9/15/01 BALLOU 1ST FL. ROOM 105 GREENHOUSE REPAIR OR REPLACE INTERNAL ELECTRICAL COMPONENT ON #5 BOILER. NOTE: BOILER WILL NOT IGNITE. INFO: GAMA FURNACE (GAS) #5 BOILER. MOD. # GMP150-5, SER. #5808604994, PART IGNITION IGNITER - NORTON 982, B1401015, MOD # 27 1 NW (SOLENOID & ELECRODE TEXAS INST. INT 21GL-2670, L220F30. B13709-14). |
February 1, 2001 |
September 15, 2001 |
226 days |
| Browne Junior High School |
FM-200103510 01 9/15/01 BROWNE BOILER ROOM SWITCH IS GONE AND THE BOILER IS FULL OF WATER. NEED A NEW SUMP PUMP. |
February 12, 2001 |
September 15, 2001 |
215 days |
| Brookland Elementary |
FM-200116656 01 9/15/01 BROOKLAND BOILER ROOM R/R CONDENSER PUM MOTOR. MOTOR HAS AN ELECTRICAL SHORT. WP-200108667 |
August 3, 2001 |
September 15, 2001 |
43 days |
| Brookland Elementary |
FM-200102682 /1/01 9/15/01 BROOKLAND BOILER ROOM R/R SUMP PUMP MOTOR IN THE BOILER, MOTOR IS BURNED OUT. WATER IS BACKING UP IN THE BOILER ROOM FROM PUMP PIT. INFORMATION ON THE MOTOR IS NOT VISIBLE. |
February 1, 2001 |
September 15, 2001 |
226 days |
| Brookland Elementary |
FM-200102681 /1/01 9/15/01 BROOKLAND BOILER ROOM R/R SEWAGE EJECTOR PUMP - MOTOR IN THE BOILER. INFORMATION IS AVAILABLE. |
February 1, 2001 |
September 15, 2001 |
226 days |
| Cardozo High School |
FM-200103675 01 9/15/01 CARDOZO BOILER ROOM REPLACE WATER FEEDERS ON BOILERS #1, 2 & 3. FEEDERS ARE MALFUNCTIONING. MCDONNELL & MILLER BOILER CONTROL M#151 MAX. BOILER PRESS 35 PSI. |
February 14, 2001 |
September 15, 2001 |
213 days |
| Ballou Senior High School |
FM-200118280 01 9/15/01 BALLOU BOILER ROOM REPLACE (2) FLOW SWITCHES ON THE CHILL-WATER AND CONDENSOR SW-LINES. INFO: MCDONNELL & MILLER FLOW SWITCH, FS 82. WP-200108521 |
August 23, 2001 |
September 15, 2001 |
23 days |
| Ballou Senior High School |
FM-200116922 01 9/15/01 BALLOU BOILER ROOM (1) ASBESTOS ASSESSMENT REQUIRED (2) DISASSEMBLE END BELLS ON CENTRIFUGAL A/C CHILLER. CODE A-CLEAR FOR REPAIR BY HORNE ENG. 8/12/01. (CEB) |
August 8, 2001 |
September 15, 2001 |
38 days |
| Bunker Hill Elementary School |
FM-200100718 1/10/01 9/15/01 BUNKER HILL BOILER ROOM REPLACE B56 REDUCING VALVE MODEL NO. B7, SEO OF 12, 12 LBS., TEMP. 225, MAX 125. HC-20000348 |
January 10, 2001 |
September 15, 2001 |
248 days |
| Eliot Junior High School |
FM-200117168 01 9/15/01 ELIOT BASEMENT BOILER ROOM BOILER #1 WILL NOT START OUT ON LOW GASLOCKOUT. WP-200108854 |
August 13, 2001 |
September 15, 2001 |
33 days |
| Ballou Senior High School |
FM-200100934 01 9/15/01 BALLOU BOILER ROOM FURNISH AC SHOP WITH (3) 10" 12 BOLT GATE VALVES AND (1) 2" VALVE FOR CHILL WATER LINE THIT IS NOT HOLDING AND IS LETTING HOT WATER GO INTO CHILLER. |
January 11, 2001 |
September 15, 2001 |
247 days |
| Cardozo High School |
FM-200103677 01 9/15/01 CARDOZO BOILER ROOM INSTALL ELECTRICAL SERVICE FOR BOILERS PUMP CONTROLS TO RETURN PUMPS AND TANK. MECDONNEL & MILLER - 150, BOILER #1, 2 & 3. |
February 14, 2001 |
September 15, 2001 |
213 days |
| Cardozo High School |
FM-200103999 01 9/15/01 CARDOZO GROUND FL. ROOMS 82 - 104 FURNISH AND INSTLL ELECTRIC OVER HEAD HEATERS IN FOLLOWING ARES THAT CANNOT BE HEATED EFFICICENTLY BY BOILERS: ROOM #9, CUSTODIAN MAINTENANCE OFFICE. TYPE: ELECTRIC RESISTANCE, FORCED AIR, 220 VOLTS 30 AMPS, VENDOR - GRAINGER. |
February 21, 2001 |
September 15, 2001 |
206 days |
| Birney Elementary School |
FM-200118197 01 9/15/01 BIRNEY BOILER ROOM REPAIR MAIN BURNER CONTACTOR. WP-200108639 |
August 23, 2001 |
September 15, 2001 |
23 days |
| Cardozo High School |
FM-200108379 01 9/15/01 CARDOZO BASEMENT BOILER ROOM 1. ASBESTOS ASSESSMENT REQUIRED IN ORDER TO RECEIVE WORK PERMIT. 2. SURVEY AND CORRECT NON WORKING DAMPER CONTROLS ON BOILERS #1, #2, #3. ASBESTOS CODE A - CLEAR FOR REPAIRS ON 05/07/01. |
April 13, 2001 |
September 15, 2001 |
155 days |
| Emery Elementary School |
FM-200118198 01 9/15/01 EMERY BOILER ROOM REPAIR BOILER #1 AND #2 WILL NOT START. |
August 23, 2001 |
September 15, 2001 |
23 days |
| John Burroughs ES |
FM-200108400 01 9/15/01 BURROUGHS BOILER ROOM 1. ASBESTOS ASSESSMENT REQUIRED IN ORDER TO RECEIVE WORK PERMIT. 2. R/R CONTROL SWITCH ON #1 RETURN PUMP. PUMP WILL NOT CUT OFF. ASBESTOS CODE A - CLEAR FOR REPAIRS ON 05/02/01. |
April 13, 2001 |
September 15, 2001 |
155 days |
| Green Elementary School |
FM-200119295 01 9/15/01 GREEN BOILER ROOM REPAIR A/C UNIT, WILL NOT START. WP-200108643 |
September 6, 2001 |
September 15, 2001 |
9 days |
| Harris, C.W. ES |
FM-200110039 01 9/17/01 C.W. HARRIS BOILER ROOM REPLACE TRANSFORMER TO CIRCULATOR PUMP #1 (ELECTRICAL CONTROL PANEL). THIS WILL PROVIDE COOLING FOR THE BUILDING WP-200108644 |
May 11, 2001 |
September 17, 2001 |
129 days |
| Woodson High School |
FM-200114357 01 9/17/01 WOODSON H. D. BOILER ROOM ASBESTOS ASSESSMENT REQUIRED (1) ASBESTOS ASSESSMENT NEEDED ON INSULATION ON SUPPLY LINE 2 1/2" PIPE ON DOMESTIC HOT WATER TANK IN THE BOILER ROOM. (2) REPLACE 2 1/2" LEAKING SUPPLY LINE TO DOMESTIC HOT WATER TANK IN BOILER ROOM. ASBESTOS CODE A - CLEAR FOR REPAIRS ON 07/06/01. |
June 29, 2001 |
September 17, 2001 |
80 days |
| Woodson High School |
FM-200113806 01 9/17/01 H.D. WOODSON BOILER ROOM 1. ASBESTOS ASSESSMENT REQUIRED. 2. REPLACE PIPE THERMAL INSULATION ON HVAC EQUIPMENT AND LINES. BOILER NO. 1 12" X 3 FT., HARTFORD LOOP 10" X 3 FT., DOMESTIC TANK 4 FT. X 7 FT. JACKET, STEAM SUPPLY 10" X 7 FT., SIX (6) CHW PUMPS, 3 TO 10" DIA. JACKETS, STEAM CONVERTER NO 1 & 2, 20" X 12 FT. JACKETS, CAFE ABOVE CEILING UNITS NO 3 THRU 7, 1-1/4" X 50 FT. ASBESTOS CODE A - CLEAR FOR REPAIRS ON 06/28/01. |
June 22, 2001 |
September 17, 2001 |
87 days |
| Ballou Senior High School |
FM-200115156 01 9/17/01 BALLOU BOILER ROOM 1. ASBESTOS ASSESSMENT REQUIRED. 2. INSULATE ALL BOILER DOORS. REFRACTORY IN BOILER DOORS #1, 2, 3 AND 4. CODE A-CLEAR FOR REPAIR BY DCPS SAFETY SG 8/10/01. |
July 12, 2001 |
September 17, 2001 |
67 days |
| Plummer Elementary School |
FM-200116029 01 9/17/01 PLUMMER BOILER ROOM 1. ASBESTOS ASSESSMENT REQUIRED. 2. INSULATE FRONT DOORS OF BOILER #1 & 2. DOORS HAVE NO INSULATION. CODE A-CLEAR FOR REPAIR BY DCPS SAFETY CEB 8/6/01. |
July 27, 2001 |
September 17, 2001 |
52 days |
| Patricia R Harris Ed Center |
FM-200113464 01 9/17/01 P.R. HARRIS BOILER ROOM GROUND FLOOR 1. ASSESSMENT REQUIRED 2. REPAIR REFACTORY INSIDE FIRE BOX AND FRONT TUBE SHEET DOOR TO BOILER #1;#2; #3.REFACTORY IS CRACKING AND NEED REPLACING. ASBESTOS CODE A- CLEAR FOR REPAIRS ON 06/22/01. |
June 18, 2001 |
September 17, 2001 |
91 days |
| Browne Junior High School |
FM-200109822 01 9/17/01 BROWNE BOILER ROOM REPLACE MECHANICAL SEALS TO CONDENSER PUMP, LEAKING BADLY. WP-200108852 |
May 9, 2001 |
September 17, 2001 |
131 days |
| Benjamin Banneker Academic HS |
FM-200104435 01 9/17/01 Banneker Boiler Room Repair leaking chemical tank for boiler #3. The leak is on the small tank before going into the boiler. |
February 27, 2001 |
September 17, 2001 |
202 days |
| Gibbs Elementary School |
FM-200111948 01 9/17/01 GIBBS BASEMENT BOILER ROOM 1. ASBESTOS ASSESSMENT REQUIRED. 2. REPLACE DEFECTIVE RELIEF VALVE ON BOILER #1. MAKE: WATTS, MODEL - M, NO. 740, SIZE 2", SET 30 LBS., BTU RANGE 5,250.000. CODE A-CLEAR FOR REPAER BY HORNE ENG 8/8/01 |
June 1, 2001 |
September 17, 2001 |
108 days |
| Stuart-Hobson Middle School |
FM-200115161 01 9/17/01 STUART-HOBSON BOILER ROOM 1. ASBESTOS ASSESSMENT REQUIRED. 2. REPAIR REFRACTORY IN FIRE BOXES OF @1, #2, AND #3 BOILERS. ASBESTOS CODE A-CLEAR ASSESSED BY HORNE ENG ON 7/24/01 |
July 12, 2001 |
September 17, 2001 |
67 days |
| Gibbs Elementary School |
FM-200113544 01 9/17/01 GIBBS BASEMENT BOILER ROOM 1.ASSESSMENT REQUIRED 2.REPAIR OR REPLACE BOILER CLEAN OUT DOOR. INSULATION ON BOTH BOILER . ASBESTOS CODE A - CLEAR FOR REPAIRS ON 06/28/01. |
June 19, 2001 |
September 17, 2001 |
90 days |
| Johnson JHS |
FM-200119363 01 9/17/01 JOHNSON BOILER ROOM CHILLER OUT, PNEUMATIC PROBLEM. |
September 7, 2001 |
September 17, 2001 |
10 days |
| Adams Elementary School |
FM-200115759 01 9/17/01 ADAMS BOILER ROOM 1. ASBESTOS ASSESSMENT REQUIRED. 2. RETHREAD BOILER #1 PIPING AS NEEDED. PIPE IS 2" BLACK IRON. CODE A-CLEAR FOR REPAER BY HORNE ENG 8/8/01 |
July 24, 2001 |
September 17, 2001 |
55 days |
| Webb Elementary School |
FM-200114034 01 9/17/01 WEBB BOILER ROOM 1. ASBESTOS ASSESSMENT IS REQUIRED. 2. REPLACE MISSING REFRACTORY IN FIREBOX OF #1 BOILER, AND BRICK WORK. ASBESTOS CODE A - CLEAR FOR REPAIRS ON 07/12/01. |
June 26, 2001 |
September 17, 2001 |
83 days |
| Spingarn High School |
FM-200115750 01 9/17/01 SPINGARN STADIUM 1. ASBESTOS ASSESSMENT REQUIRED. 2. REPLACE RAY-PAC GAS BOILER RUPTURED CAST IRON HEADER. |
July 24, 2001 |
September 17, 2001 |
55 days |
| Sousa Middle School |
FM-200114914 01 9/17/01 SOUSA BASEMENT BOILER ROOM 1. ASBESTOS ASSESSMENT REQUIRED. 2. REPLACE (2) SAFETY VALVES LEAKING ON BOILER #1, SET 15 PSI, 2-1/2", CAP. 4497, KUNKLE MODEL 930. CAST IRON BOILER BOILER FAILED D.C. INSPECTION. ASBESTOS CODE A - CLEAR FOR REPAIRS ON 07/10/01. |
July 9, 2001 |
September 17, 2001 |
70 days |
| Benning Elementary School |
FM-200116024 01 9/17/01 BENNING BOILER ROOM 1. ASBESTOS ASSESSMENT REQUIRED. 2. REPLACE INSULATION ON FRON DOORS OF BOILER #1 & 2. INSULATION ON BOILER DOORS DID NOT PASS BOILER INSPECTION. CODE A-CLEAR FOR REPAIR BY DCPS SAFETY CEB 8/6/01 |
July 27, 2001 |
September 17, 2001 |
52 days |
| Brookland Elementary |
FM-200115764 01 9/17/01 BROOKLAND BOILER ROOM 1. ASBESTOS ASSESSMENT REQUIRED. 2. REPAIR 3" CHILL WATER LINE IN BOILER ROOM (RUPTURE). CODE A-CLEAR FOR REPAIR BY HORNE ENG 8/1/01. |
July 24, 2001 |
September 17, 2001 |
55 days |
| Harris, C.W. ES |
FM-200100118 1/7/01 9/17/01 HARRIS, C.W. BOILER ROOM REPLACE TWO (2) PRESSURE GAUGES LOCATED ON THE CIRCULATING PIPE LINE. HC-20000957 |
January 7, 2001 |
September 17, 2001 |
253 days |
| Coolidge High School |
FM-200120029 01 9/18/01 COOLIDGE TUNNEL AREA BY BOILER ROOM REPLACE LEAKING 2 1/2 " RETURN LINE LOCATED IN TUNNEL AREA BY BOILER ROOM. ABOUT 20 FT. NEEDS TO BE REMOVED AND REPLACED. |
September 18, 2001 |
September 18, 2001 |
0 days |
| Coolidge High School |
FM-200108762 01 9/18/01 COOLIDGE BOILER ROOM 1. ASBESTOS ASSESSMENT REQUIRED IN ORDER TO RECEIVE WORK PERMIT. 2. REPAIR AND MAKE OPERABLE AIR COMPRESSOR FOR AC UNITS FOR NEW SCIENCE LABS. SUSPECT EITHER BENT CRANK SHAFT OR WARPED CONE BEARING. ASBESTOS CODE A - CLEAR FOR REPAIRS ON 05/04/01. |
April 19, 2001 |
September 18, 2001 |
152 days |
| Cleveland Elementary School |
FM-200108817 20/01 9/18/01 CLEVELAND 1. ASBESTOS ASSESSMENT REQUIRED IN ORDER TO RECEIVE WORK PERMIT. 2. PERFORM ON GOING REPAIRS TO HVAC EQUIPMENT SUCH AS: BURNERS, BOILER AUXILARY EQUIPMENT, CONDENSATE/CIRCULATING PUMPS, PNUEMATIC CONTROLS, COMPRESSORS, CHILLERS, ROOFTOP AC UNITS, WINDOW AC UNITS, SUMP PUMPS, AIR HANDLER UNITS, RETURN AIR FANS, DOMESTIC HOT WATER HEATERS, EXHAUST FANS, UNIT VENTILATORS, ELECTRIC HEATERS, COOLING TOWERS AND UNSTOP DRAINS. CODE A - CLEAR FOR REPAIRS AS OF 4/20/01 |
April 20, 2001 |
September 18, 2001 |
151 days |
| Whittier Elementary School |
FM-200120148 01 9/19/01 WHITTIER BOILER ROOM REPAIR BURNER ON #2 BOILER WILL NOT IGNITE. WP-200108692 |
September 19, 2001 |
September 19, 2001 |
0 days |
| Wilson High School |
FM-200119398 01 9/19/01 W. WILSON BOILER ROOM 1. ASBESTOS ASSESSMENT REQUIRED. 2. REPLACE 2" X 8" SCHEDULE 80 BLACK IRON NIPPLE AND 2" UNION AT WATER COLUMN ON NO. 1 BOILER. ASBESTOS CODE A - CLEAR FOR REPAIRS ON 09/19/01. HORNE ENGINEER ROGER KAGER |
September 7, 2001 |
September 19, 2001 |
12 days |
| Malcolm X ES |
FM-200119053 01 9/19/01 MALCOLM X BOILER ROOM CHILLER KEEP GOING OUT ON LOW EVAPORATER PRESSURE. |
September 4, 2001 |
September 19, 2001 |
15 days |
| Harris, C.W. ES |
FM-200108644 01 9/20/01 C.W. HARRIS 1. ASBESTOS ASSESSMENT REQUIRED IN ORDER TO RECEIVE WORK PERMIT. 2. PERFORM ON GOING REPAIRS TO HVAC EQUIPMENT SUCH AS: BURNERS, BOILER AUXILARY EQUIPMENT, CONDENSATE/CIRCULATING PUMPS, PNUEMATIC CONTROLS, COMPRESSORS, CHILLERS, ROOFTOP AC UNITS, WINDOW AC UNITS, SUMP PUMPS, AIR HANDLER UNITS, RETURN AIR FANS, DOMESTIC HOT WATER HEATERS, EXHAUST FANS, UNIT VENTILATORS, ELECTRIC HEATERS, COOLING TOWERS AND UNSTOP DRAINS. CODE A - CLEAR FOR REPAIR AS OF 4/19/01 |
April 18, 2001 |
September 20, 2001 |
155 days |
| Cook J.F. Elementary School |
FM-200108641 /18/01 9/20/01 J.F. COOK 1. ASBESTOS ASSESSMENT REQUIRED IN ORDER TO RECEIVE WORK PERMIT. 2. PERFORM ON GOING REPAIRS TO HVAC EQUIPMENT SUCH AS: BURNERS, BOILER AUXILARY EQUIPMENT, CONDENSATE/CIRCULATING PUMPS, PNUEMATIC CONTROLS, COMPRESSORS, CHILLERS, ROOFTOP AC UNITS, WINDOW AC UNITS, SUMP PUMPS, AIR HANDLER UNITS, RETURN AIR FANS, DOMESTIC HOT WATER HEATERS, EXHAUST FANS, UNIT VENTILATORS, ELECTRIC HEATERS, COOLING TOWERS AND UNSTOP DRAINS. |
April 18, 2001 |
September 20, 2001 |
155 days |
| Nalle Elementary School |
FM-200108653 01 9/20/01 NALLE 1. ASBESTOS ASSESSMENT REQUIRED IN ORDER TO RECEIVE WORK PERMIT. 2. PERFORM ON GOING REPAIRS TO HVAC EQUIPMENT SUCH AS: BURNERS, BOILER AUXILARY EQUIPMENT, CONDENSATE/CIRCULATING PUMPS, PNUEMATIC CONTROLS, COMPRESSORS, CHILLERS, ROOFTOP AC UNITS, WINDOW AC UNITS, SUMP PUMPS, AIR HANDLER UNITS, RETURN AIR FANS, DOMESTIC HOT WATER HEATERS, EXHAUST FANS, UNIT VENTILATORS, ELECTRIC HEATERS, COOLING TOWERS AND UNSTOP DRAINS. |
April 18, 2001 |
September 20, 2001 |
155 days |
| Patricia R Harris Ed Center |
FM-200119263 01 9/20/01 HARRIS BOILER ROOM REPAIR #2 AIR COMPRESSOR MOTOR. MOTOR KEEP TRIPPING OUT ON OVER LOAD. OVER LOAD RELAY ARE SQUARE-O. SIZE -B15-5 |
September 6, 2001 |
September 20, 2001 |
14 days |
| Emery Elementary School |
FM-200108642 01 9/20/01 EMERY 1. ASBESTOS ASSESSMENT REQUIRED IN ORDER TO RECEIVE WORK PERMIT. 2. PERFORM ON GOING REPAIRS TO HVAC EQUIPMENT SUCH AS: BURNERS, BOILER AUXILARY EQUIPMENT, CONDENSATE/CIRCULATING PUMPS, PNUEMATIC CONTROLS, COMPRESSORS, CHILLERS, ROOFTOP AC UNITS, WINDOW AC UNITS, SUMP PUMPS, AIR HANDLER UNITS, RETURN AIR FANS, DOMESTIC HOT WATER HEATERS, EXHAUST FANS, UNIT VENTILATORS, ELECTRIC HEATERS, COOLING TOWERS AND UNSTOP DRAINS. CODE A- CLEAR FOR REPAIR AS OF 4/19/01 |
April 18, 2001 |
September 20, 2001 |
155 days |
| Adams Elementary School |
FM-200108634 01 9/20/01 ADAMS 1. ASBESTOS ASSESSMENT REQUIRED IN ORDER TO RECEIVE WORK PERMIT. 2. PERFORM ON GOING REPAIRS TO HVAC EQUIPMENT SUCH AS: BURNERS, BOILER AUXILARY EQUIPMENT, CONDENSATE/CIRCULATING PUMPS, PNUEMATIC CONTROLS, COMPRESSORS, CHILLERS, ROOFTOP AC UNITS, WINDOW AC UNITS, SUMP PUMPS, AIR HANDLER UNITS, RETURN AIR FANS, DOMESTIC HOT WATER HEATERS, EXHAUST FANS, UNIT VENTILATORS, ELECTRIC HEATERS, COOLING TOWERS AND UNSTOP DRAINS. CODE A - CLEAR FOR REPAIRS AS OF 4/20/01. |
April 18, 2001 |
September 20, 2001 |
155 days |
| Meyer Elementary School |
FM-200108652 01 9/20/01 MEYER 1. ASBESTOS ASSESSMENT REQUIRED IN ORDER TO RECEIVE WORK PERMIT. 2. PERFORM ON GOING REPAIRS TO HVAC EQUIPMENT SUCH AS: BURNERS, BOILER AUXILARY EQUIPMENT, CONDENSATE/CIRCULATING PUMPS, PNUEMATIC CONTROLS, COMPRESSORS, CHILLERS, ROOFTOP AC UNITS, WINDOW AC UNITS, SUMP PUMPS, AIR HANDLER UNITS, RETURN AIR FANS, DOMESTIC HOT WATER HEATERS, EXHAUST FANS, UNIT VENTILATORS, ELECTRIC HEATERS, COOLING TOWERS AND UNSTOP DRAINS. |
April 18, 2001 |
September 20, 2001 |
155 days |
| Birney Elementary School |
FM-200108639 01 9/20/01 BIRNEY 1. ASBESTOS ASSESSMENT REQUIRED IN ORDER TO RECEIVE WORK PERMIT. 2. PERFORM ON GOING REPAIRS TO HVAC EQUIPMENT SUCH AS: BURNERS, BOILER AUXILARY EQUIPMENT, CONDENSATE/CIRCULATING PUMPS, PNUEMATIC CONTROLS, COMPRESSORS, CHILLERS, ROOFTOP AC UNITS, WINDOW AC UNITS, SUMP PUMPS, AIR HANDLER UNITS, RETURN AIR FANS, DOMESTIC HOT WATER HEATERS, EXHAUST FANS, UNIT VENTILATORS, ELECTRIC HEATERS, COOLING TOWERS AND UNSTOP DRAINS. CODE A- CLEAR FOR REPAIR AS OF 4/19/01 |
April 18, 2001 |
September 20, 2001 |
155 days |
| Harris, C.W. ES |
FM-200110040 01 9/20/01 C.W. HARRIS BOILER ROOM REPAIR MECH. SEAL LEAK ON THE TOWER PUMP. THIS WILL PROVIDE COOLING FOR THE BUILDING WP-200108644 |
May 11, 2001 |
September 20, 2001 |
132 days |
| Kenilworth ES |
FM-200108646 01 9/20/01 KENILWORTH 1. ASBESTOS ASSESSMENT REQUIRED IN ORDER TO RECEIVE WORK PERMIT. 2. PERFORM ON GOING REPAIRS TO HVAC EQUIPMENT SUCH AS: BURNERS, BOILER AUXILARY EQUIPMENT, CONDENSATE/CIRCULATING PUMPS, PNUEMATIC CONTROLS, COMPRESSORS, CHILLERS, ROOFTOP AC UNITS, WINDOW AC UNITS, SUMP PUMPS, AIR HANDLER UNITS, RETURN AIR FANS, DOMESTIC HOT WATER HEATERS, EXHAUST FANS, UNIT VENTILATORS, ELECTRIC HEATERS, COOLING TOWERS AND UNSTOP DRAINS. CODE A - CLEAR FOR REPAIRS AS OF 4/19/01. |
April 18, 2001 |
September 20, 2001 |
155 days |
| Bruce-Monroe Elementary School |
FM-200108640 01 9/20/01 BRUCE-MONROE 1. ASBESTOS ASSESSMENT REQUIRED IN ORDER TO RECEIVE WORK PERMIT. 2. PERFORM ON GOING REPAIRS TO HVAC EQUIPMENT SUCH AS: BURNERS, BOILER AUXILARY EQUIPMENT, CONDENSATE/CIRCULATING PUMPS, PNUEMATIC CONTROLS, COMPRESSORS, CHILLERS, ROOFTOP AC UNITS, WINDOW AC UNITS, SUMP PUMPS, AIR HANDLER UNITS, RETURN AIR FANS, DOMESTIC HOT WATER HEATERS, EXHAUST FANS, UNIT VENTILATORS, ELECTRIC HEATERS, COOLING TOWERS AND UNSTOP DRAINS. CODE A- CLEAR FOR REPAIRS AS OF 4/19/01 |
April 18, 2001 |
September 20, 2001 |
155 days |
| Hendley Elementary School |
FM-200108645 01 9/20/01 HENDLEY 1. ASBESTOS ASSESSMENT REQUIRED IN ORDER TO RECEIVE WORK PERMIT. 2. PERFORM ON GOING REPAIRS TO HVAC EQUIPMENT SUCH AS: BURNERS, BOILER AUXILARY EQUIPMENT, CONDENSATE/CIRCULATING PUMPS, PNUEMATIC CONTROLS, COMPRESSORS, CHILLERS, ROOFTOP AC UNITS, WINDOW AC UNITS, SUMP PUMPS, AIR HANDLER UNITS, RETURN AIR FANS , DOMESTIC HOT WATER HEATERS, EXHAUST FANS, UNIT VENTILATORS, ELECTRIC HEATERS, COOLING TOWERS AND UNSTOP DRAINS. |
April 18, 2001 |
September 20, 2001 |
155 days |
| Lafayette Elementary School |
FM-200108648 01 9/20/01 LAFAYETTE 1. ASBESTOS ASSESSMENT REQUIRED IN ORDER TO RECEIVE WORK PERMIT. 2. PERFORM ON GOING REPAIRS TO HVAC EQUIPMENT SUCH AS: BURNERS, BOILER AUXILARY EQUIPMENT, CONDENSATE/CIRCULATING PUMPS, PNUEMATIC CONTROLS, COMPRESSORS, CHILLERS, ROOFTOP AC UNITS, WINDOW AC UNITS, SUMP PUMPS, AIR HANDLER UNITS, RETURN AIR FANS, DOMESTIC HOT WATER HEATERS, EXHAUST FANS, UNIT VENTILATORS, ELECTRIC HEATERS, COOLING TOWERS AND UNSTOP DRAINS. CODE A - CLEAR FOR REPAIR AS OF 4/19/01. |
April 18, 2001 |
September 20, 2001 |
155 days |
| Woodson High School |
FM-200117541 01 9/20/01 WOODSON SHS BASEMENT LEVEL- BOILER ROOM 1) SNAKE OUT DRAIN LINES, BOILER ROOM IS FLOODED. CODE A - CLEAR FOR REPAIRS AS OF 8/16/01 SYLVIA GRIMES 202 576-5583. |
August 15, 2001 |
September 20, 2001 |
36 days |
| Key Elementary School |
FM-200108647 01 9/20/01 KEY 1. ASBESTOS ASSESSMENT REQUIRED IN ORDER TO RECEIVE WORK PERMIT. 2. PERFORM ON GOING REPAIRS TO HVAC EQUIPMENT SUCH AS: BURNERS, BOILER AUXILARY EQUIPMENT, CONDENSATE/CIRCULATING PUMPS, PNUEMATIC CONTROLS, COMPRESSORS, CHILLERS, ROOFTOP AC UNITS, WINDOW AC UNITS, SUMP PUMPS, AIR HANDLER UNITS, RETURN AIR FANS, DOMESTIC HOT WATER HEATERS, EXHAUST FANS, UNIT VENTILATORS, ELECTRIC HEATERS, COOLING TOWERS AND UNSTOP DRAINS. CODE A - CLEAR FOR REPAIR AS OF 4/19/01. |
April 18, 2001 |
September 20, 2001 |
155 days |
| Orr Elementary School |
FM-200108654 01 9/20/01 ORR 1. ASBESTOS ASSESSMENT REQUIRED IN ORDER TO RECEIVE WORK PERMIT. 2. PERFORM ON GOING REPAIRS TO HVAC EQUIPMENT SUCH AS: BURNERS, BOILER AUXILARY EQUIPMENT, CONDENSATE/CIRCULATING PUMP, PNUEMATIC CONTROLS, COMPRESSORS, CHILLERS, ROOFTOP AC UNITS, WINDOW AC UNITS, SUMP PUMPS, AIR HANDLER UNITS, RETURN AIR FANS, DOMESTIC HOT WATER HEATERS, EXHAUST FANS, UNIT VENTILATORS, ELECTRIC HEATERS, COOLING TOWERS AND UNSTOP DRAINS. |
April 18, 2001 |
September 20, 2001 |
155 days |
| Green Elementary School |
FM-200108643 01 9/20/01 GREEN 1. ASBESTOS ASSESSMENT REQUIRED IN ORDER TO RECEIVE WORK PERMIT. 2. PERFORM ON GOING REPAIRS TO HVAC EQUIPMENT SUCH AS: BURNERS, BOILER AUXILARY EQUIPMENT, CONDENSATE/CIRCULATING PUMPS, PNUEMATIC CONTROLS, COMPRESSORS, CHILLERS, ROOFTOP AC UNITS, WINDOW AC UNITS, SUMP PUMPS, AIR HANDLER UNITS, RETURN AIR FANS, DOMESTIC HOT WATER HEATERS, EXHAUST FANS, UNIT VENTILATORS, ELECTRIC HEATERS, COOLING TOWERS AND UNSTOP DRAINS. CODE A- CLEAR FOR REPAIR AS OF 4/19/01 |
April 18, 2001 |
September 20, 2001 |
155 days |
| Malcolm X ES |
FM-200108649 01 9/20/01 MALCOLM X 1. ASBESTOS ASSESSMENT REQUIRED IN ORDER TO RECEIVE WORK PERMIT. 2. PERFORM ON GOING REPAIRS TO HVAC EQUIPMENT SUCH AS: BURNERS, BOILER AUXILARY EQUIPMENT, CONDENSATE/CIRCULATING PUMPS, PNUEMATIC CONTROLS, COMPRESSORS, CHILLERS, ROOFTOP AC UNITS , WINDOW AC UNITS, SUMP PUMPS, AIR HANDLER UNITS, RETURN AIR FANS, DOMESTIC HOT WATER HEATERS, EXHAUST FANS, UNIT VENTILATORS, ELECTRIC HEATERS, COOLING TOWERS AND UNSTOP DRAINS. CODE A - CLEAR FOR REPAIR AS OF 4/19/01. |
April 18, 2001 |
September 20, 2001 |
155 days |
| Barnard Elementary School |
FM-200108637 01 9/20/01 BARNARD 1. ASBESTOS ASSESSMENT REQUIRED IN ORDER TO RECEIVE WORK PERMIT. 2. PERFORM ON GOING REPAIRS TO HVAC EQUIPMENT SUCH AS: BURNERS, BOILER AUXILARY EQUIPMENT, CONDENSATE/CIRCULATING PUMPS, PNUEMATIC CONTROLS, COMPRESSORS, CHILLERS, ROOFTOP AC UNITS, WINDOW AC UNITS, SUMP PUMPS, AIR HANDLER UNITS, RETURN AIR FANS, DOMESTIC HOT WATER HEATERS, EXHAUST FANS, UNIT VENTILATORS, ELECTRIC HEATERS, COOLING TOWERS AND UNSTOP DRAINS. CODE A - CLEAR FOR REPAIR AS OF 4/19/01 |
April 18, 2001 |
September 20, 2001 |
155 days |
| Bancroft Elementary School |
FM-200108636 01 9/20/01 BANCROFT 1. ASBESTOS ASSESSMENT REQUIRED IN ORDER TO RECEIVE WORK PERMIT. 2. PERFORM ON GOING REPAIRS TO HVAC EQUIPMENT SUCH AS: BURNERS, BOILER AUXILARY EQUIPMENT, CONDENSATE/CIRCULATING PUMPS, PNUEMATIC CONTROLS, COMPRESSORS, CHILLERS, ROOFTOP AC UNITS, WINDOW AC UNITS, SUMP PUMPS, AIR HANDLER UNITS, RETURN AIR FANS, DOMESTIC HOT WATER HEATERS, EXHAUST FANS, UNIT VENTILATORS, ELECTRIC HEATERS, COOLING TOWERS AND UNSTOP DRAINS. CODE A - CLEAR FOR REPAIR AS OF 4/20/01. |
April 18, 2001 |
September 20, 2001 |
155 days |
| Beers Elementary School |
FM-200108638 01 9/20/01 BEERS 1. ASBESTOS ASSESSMENT REQUIRED IN ORDER TO RECEIVE WORK PERMIT. 2. PERFORM ON GOING REPAIRS TO HVAC EQUIPMENT SUCH AS: BURNERS, BOILER AUXILARY EQUIPMENT, CONDENSATE/CIRCULATING PUMPS, PNUEMATIC CONTROLS, COMPRESSORS, CHILLERS, ROOFTOP AC UNITS, WINDOW AC UNITS, SUMP PUMPS, AIR HANDLER UNITS, RETURN AIR FANS, DOMESTIC HOT WATER HEATERS, EXHAUST FANS, UNIT VENTILATORS, ELECTRIC HEATERS, COOLING TOWERS AND UNSTOP DRAINS. CODE A- CLEAR FOR REPAIR AS OF 4/19/01 |
April 18, 2001 |
September 20, 2001 |
155 days |
| Noyes Elementary School |
FM-200108727 01 9/21/01 NOYES 1. ASBESTOS ASSESSMENT REQUIRED IN ORDER TO RECEIVE WORK PERMIT. 2. PERFORM ON GOING REPAIRS TO HVAC EQUIPMENT SUCH AS: BURNERS, BOILER AUXILARY EQUIPMENT, CONDENSATE/CIRCULATING PUMPS, PNUEMATIC CONTROLS, COMPRESSORS, CHILLERS, ROOFTOP AC UNITS, WINDOW AC UNITS, SUMP PUMPS, AIR HANDLER UNITS, RETURN AIR FANS, DOMESTIC HOT WATER HEATERS, EXHAUST FANS, UNIT VENTILATORS, ELECTRIC HEATERS, COOLING TOWERS AND UNSTOP DRAINS. CODE A- CLEAR FOR REPAIR AS OF 4/19/01. |
April 19, 2001 |
September 21, 2001 |
155 days |
| Takoma Educational Center |
FM-200108805 01 9/21/01 TAKOMA 1. ASBESTOS ASSESSMENT REQUIRED IN ORDER TO RECEIVE WORK PERMIT. 2. PERFORM ON GOING REPAIRS TO HVAC EQUIPMENT SUCH AS: BURNERS, BOILER AUXILARY EQUIPMENT, CONDENSATE/CIRCULATING PUMPS , PNUEMATIC CONTROLS, COMPRESSORS, CHILLERS, ROOFTOP AC UNITS, WINDOW AC UNITS, SUMP PUMPS, AIR HANDLER UNITS, RETURN AIR FANS, DOMESTIC HOT WATER HEATERS, EXHAUST FANS, UNIT VENTILATORS, ELECTRIC HEATERS, COOLING TOWERS AND UNSTOP DRAINS. CODE A - CLEAR FOR REPAIRS AS OF 4/20/01 |
April 20, 2001 |
September 21, 2001 |
154 days |
| Watkins Elementary School |
FM-200108661 01 9/21/01 WATKINS 1. ASBESTOS ASSESSMENT REQUIRED IN ORDER TO RECEIVE WORK PERMIT. 2. PERFORM ON GOING REPAIRS TO HVAC EQUIPMENT SUCH AS: BURNERS, BOILER AUXILARY EQUIPMENT, CONDENSATE/CIRCULATING PUMPS, PNUEMATIC CONTROLS, COMPRESSORS, CHILLERS, ROOFTOP AC UNITS, WINDOW AC UNITS, SUMP PUMPS, AIR HANDLER UNITS, RETURN AIR FANS, DOMESTIC HOT WATER HEATERS, EXHAUST FANS, UNIT VENTILATORS, ELECTRIC HEATERS, COOLING TOWERS AND UNSTOP DRAINS. CODE A CLEAR FOR REPAIR AS OF 4/21/01 |
April 18, 2001 |
September 21, 2001 |
156 days |
| Payne Elementary School |
FM-200108680 01 9/21/01 PAYNE 1. ASBESTOS ASSESSMENT REQUIRED IN ORDER TO RECEIVE WORK PERMIT. 2. PERFORM ON GOING REPAIRS TO HVAC EQUIPMENT SUCH AS: BURNERS, BOILER AUXILARY EQUIPMENT, CONDENSATE/CIRCULATING PUMPS, PNUEMATIC CONTROLS, COMPRESSORS, CHILLERS, ROOFTOP AC UNITS, WINDOW AC UNITS, SUMP PUMPS, AIR HANDLER UNITS, RETURN AIR FANS, DOMESTIC HOT WATER HEATERS, EXHAUST FANS, UNIT VENTILATORS, ELECTRIC HEATERS, COOLING TOWERS AND UNSTOP DRAINS. CODE A CLEAR FOR REPAIR AS OF 4/20/01 |
April 18, 2001 |
September 21, 2001 |
156 days |
| Park View ES |
FM-200108729 01 9/21/01 PARK VIEW 1. ASBESTOS ASSESSMENT REQUIRED IN ORDER TO RECEIVE WORK PERMIT. 2. PERFORM ON GOING REPAIRS TO HVAC EQUIPMENT SUCH AS: BURNERS, BOILER AUXILARY EQUIPMENT, CONDENSATE/CIRCULATING PUMPS, PNUEMATIC CONTROLS, COMPRESSORS, CHILLERS, ROOFTOP AC UNITS, WINDOW AC UNITS, SUMP PUMPS, AIR HANDLER UNITS, RETURN AIR FANS, DOMESTIC HOT WATER HEATERS, EXHAUST FANS, UNIT VENTILATORS, ELECTRIC HEATERS, COOLING TOWERS AND UNSTOP DRAINS. CODE A - CLEAR FOR REPAIR AS OF 4/19/01. |
April 19, 2001 |
September 21, 2001 |
155 days |
| Ketcham Elementary School |
FM-200108676 01 9/21/01 KETCHAM 1. ASBESTOS ASSESSMENT REQUIRED IN ORDER TO RECEIVE WORK PERMIT. 2. PERFORM ON GOING REPAIRS TO HVAC EQUIPMENT SUCH AS: BURNERS, BOILER AUXILARY EQUIPMENT, CONDENSATE/CIRCULATING PUMPS, PNUEMATIC CONTROLS, COMPRESSORS, CHILLERS, ROOFTOP AC UNITS, WINDOW AC UNITS, SUMP PUMPS, AIR HANDLER UNITS, RETURN AIR FANS, DOMESTIC HOT WATER HEATERS, EXHAUST FANS, UNIT VENTILATORS, ELECTRIC HEATERS, COOLING TOWERS AND UNSTOP DRAINS. CODE A CLEAR FOR REPAIR AS OF 4/20/01 |
April 18, 2001 |
September 21, 2001 |
156 days |
| Drew Elementary School |
FM-200108671 01 9/21/01 DREW 1. ASBESTOS ASSESSMENT REQUIRED IN ORDER TO RECEIVE WORK PERMIT. 2. PERFORM ON GOING REPAIRS TO HVAC EQUIPMENT SUCH AS: BURNERS, BOILER AUXILARY EQUIPMENT, CONDENSATE/CIRCULATING PUMPS, PNUEMATIC CONTROLS, COMPRESSORS, CHILLERS, ROOFTOP AC UNITS, WINDOW AC UNITS, SUMP PUMPS, AIR HANDLER UNITS, RETURN AIR FANS, DOMESTIC HOT WATER HEATERS, EXHAUST FANS, UNIT VENTILATORS, ELECTRIC HEATERS, COOLING TOWERS AND UNSTOP DRAINS. CODE A CLEAR FOR REPAIR AS OF 4/21/01 |
April 18, 2001 |
September 21, 2001 |
156 days |
| Brookland Elementary |
FM-200108667 01 9/21/01 BROOKLAND 1. ASBESTOS ASSESSMENT REQUIRED IN ORDER TO RECEIVE WORK PERMIT. 2. PERFORM ON GOING REPAIRS TO HVAC EQUIPMENT SUCH AS: BURNERS, BOILER AUXILARY EQUIPMENT, CONDENSATE/CIRCULATING PUMPS, PNUEMATIC CONTROLS, COMPRESSORS, CHILLERS, ROOFTOP AC UNITS, WINDOW AC UNITS, SUMP PUMPS, AIR HANDLER UNITS, RETURN AIR FANS, DOMESTIC HOT WATER HEATERS, EXHAUST FANS, UNIT VENTILATORS, ELECTRIC HEATERS, COOLING TOWERS AND UNSTOP DRAINS. CODE A CLEAR FOR REPAIR AS OF 4/21/01 |
April 18, 2001 |
September 21, 2001 |
156 days |
| Randle-Highlands ES |
FM-200108657 01 9/21/01 RANDLE HIGHLANDS 1. ASBESTOS ASSESSMENT REQUIRED IN ORDER TO RECEIVE WORK PERMIT. 2. PERFORM ON GOING REPAIRS TO HVAC EQUIPMENT SUCH AS: BURNERS, BOILER AUXILARY EQUIPMENT, CONDENSATE/CIRCULATING PUMPS, PNUEMATIC CONTROLS, COMPRESSORS, CHILLERS, ROOFTOP AC UNITS, WINDOW AC UNITS, SUMP PUMPS, AIR HANDLER UNITS, RETURN AIR FANS, DOMESTIC HOT WATER HEATERS, EXHAUST FANS, UNIT VENTILATORS, ELECTRIC HEATERS, COOLING TOWERS AND UNSTOP DRAINS. CODE A- CLEAR FOR REPAIR AS OF 4/18/01. |
April 18, 2001 |
September 21, 2001 |
156 days |
| Plummer Elementary School |
FM-200108800 /01 9/21/01 PLUMMER 1. ASBESTOS ASSESSMENT REQUIRED IN ORDER TO RECEIVE WORK PERMIT. 2. PERFORM ON GOING REPAIRS TO HVAC EQUIPMENT SUCH AS: BURNERS, BOILER AUXILARY EQUIPMENT, CONDENSATE/CIRCULATING PUMPS, PNUEMATIC CONTROLS, COMPRESSORS, CHILLERS, ROOFTOP AC UNITS, WINDOW AC UNITS, SUMP PUMPS, AIR HANDLER UNITS, RETURN AIR FANS, DOMESTIC HOT WATER HEATERS, EXHAUST FANS, UNIT VENTILATORS, ELECTRIC HEATERS, COOLING TOWERS AND UNSTOP DRAINS. CODE A - CLEAR FOR REPAIR AS OF 4/20/01 . |
April 20, 2001 |
September 21, 2001 |
154 days |
| Shepherd ES |
FM-200108686 01 9/21/01 SHEPHERD 1. ASBESTOS ASSESSMENT REQUIRED IN ORDER TO RECEIVE WORK PERMIT. 2. PERFORM ON GOING REPAIRS TO HVAC EQUIPMENT SUCH AS: BURNERS, BOILER AUXILARY EQUIPMENT, CONDENSATE/CIRCULATING PUMPS, PNUEMATIC CONTROLS, COMPRESSORS, CHILLERS, ROOFTOP AC UNITS, WINDOW AC UNITS, SUMP PUMPS, AIR HANDLER UNITS, RETURN AIR FANS, DOMESTIC HOT WATER HEATERS, EXHAUST FANS, UNIT VENTILATORS, ELECTRIC HEATERS, COOLING TOWERS AND UNSTOP DRAINS. CODE A CLEAR FOR REPAIR AS OF 4/20/01 |
April 18, 2001 |
September 21, 2001 |
156 days |
| Wilkinson ES |
FM-200108693 01 9/21/01 WILKINSON 1. ASBESTOS ASSESSMENT REQUIRED IN ORDER TO RECEIVE WORK PERMIT. 2. PERFORM ON GOING REPAIRS TO HVAC EQUIPMENT SUCH AS: BURNERS, BOILER AUXILARY EQUIPMENT, CONDENSATE/CIRCULATING PUMPS, PNUEMATIC CONTROLS, COMPRESSORS, CHILLERS, ROOFTOP AC UNITS, WINDOW AC UNITS, SUMP PUMPS, AIR HANDLER UNITS, RETURN AIR FANS , DOMESTIC HOT WATER HEATERS, EXHAUST FANS, UNIT VENTILATORS, ELECTRIC HEATERS, COOLING TOWERS AND UNSTOP DRAINS. CODE A CLEAR FOR REPAIRS AS OF 4/20/01 |
April 18, 2001 |
September 21, 2001 |
156 days |
| Winston EC |
FM-200108664 /01 9/21/01 WINSTON 1. ASBESTOS ASSESSMENT REQUIRED IN ORDER TO RECEIVE WORK PERMIT. 2. PERFORM ON GOING REPAIRS TO HVAC EQUIPMENT SUCH AS: BURNERS, BOILER AUXILARY EQUIPMENT, CONDENSATE/CIRCULATING PUMPS, PNUEMATIC CONTROLS, COMPRESSORS, CHILLERS, ROOFTOP AC UNITS, WINDOW AC UNITS, SUMP PUMPS, AIR HANDLER UNITS, RETURN AIR FANS, DOMESTIC HOT WATER HEATERS, EXHAUST FANS, UNIT VENTILATORS, ELECTRIC HEATERS, COOLING TOWERS AND UNSTOP DRAINS. CODE A CLEAR FOR REPAIRS AS OF 4/21/01 |
April 18, 2001 |
September 21, 2001 |
156 days |
| Walker-Jones EC |
FM-200108690 4/18/01 9/21/01 WALKER JONES 1. ASBESTOS ASSESSMENT REQUIRED IN ORDER TO RECEIVE WORK PERMIT. 2. PERFORM ON GOING REPAIRS TO HVAC EQUIPMENT SUCH AS: BURNERS, BOILER AUXILARY EQUIPMENT, CONDENSATE/CIRCULATING PUMP, PNUEMATIC CONTROLS, COMPRESSORS, CHILLERS, ROOFTOP AC UNITS, WINDOW AC UNITS, SUMP PUMPS, AIR HANDLER UNITS, RETURN AIR FANS, DOMESTIC HOT WATER HEATERS, EXHAUST FANS, UNIT VENTILATORS, ELECTRIC HEATERS, COOLING TOWERS AND UNSTOP DRAINS. CODE A CLEAR FOR REPAIRS AS OF 4/20/01 |
April 18, 2001 |
September 21, 2001 |
156 days |
| Bowen Elementary School |
FM-200108694 01 9/21/01 BOWEN 1. ASBESTOS ASSESSMENT REQUIRED IN ORDER TO RECEIVE WORK PERMIT. 2. PERFORM ON GOING REPAIRS TO HVAC EQUIPMENT SUCH AS: BURNERS, BOILER AUXILARY EQUIPMENT, CONDENSATE/CIRCULATING PUMPS, PNUEMATIC CONTROLS, COMPRESSORS, CHILLERS, ROOFTOP AC UNITS, WINDOW AC UNITS, SUMP PUMPS, AIR HANDLER UNITS, RETURN AIR FANS DOMESTIC HOT WATER HEATERS, EXHAUST FANS, UNIT VENTILATORS, ELECTRIC HEATERS, COOLING TOWERS AND UNSTOP DRAINS. CODE A CLEAR FOR REPAIR AS OF 4/20/01 |
April 18, 2001 |
September 21, 2001 |
156 days |
| Moten Elementary School |
FM-200108679 01 9/21/01 MOTEN 1. ASBESTOS ASSESSMENT REQUIRED IN ORDER TO RECEIVE WORK PERMIT. 2. PERFORM ON GOING REPAIRS TO HVAC EQUIPMENT SUCH AS: BURNERS, BOILER AUXILARY EQUIPMENT, CONDENSATE/CIRCULATING PUMPS, PNUEMATIC CONTROLS, COMPRESSORS, CHILLERS, ROOFTOP AC UNITS, WINDOW AC UNITS, SUMP PUMPS, AIR HANDLER UNITS, RETURN AIR FANS, DOMESTIC HOT WATER HEATERS, EXHAUST FANS, UNIT VENTILATORS, ELECTRIC HEATERS, COOLING TOWERS AND UNSTOP DRAINS. CODE A - CLEAR FOR REPAIR AS OF 4/20/01 |
April 18, 2001 |
September 21, 2001 |
156 days |
| Murch Elementary School |
FM-200108726 01 9/21/01 MURCH 1. ASBESTOS ASSESSMENT REQUIRED IN ORDER TO RECEIVE WORK PERMIT. 2. PERFORM ON GOING REPAIRS TO HVAC EQUIPMENT SUCH AS: BURNERS, BOILER AUXILARY EQUIPMENT, CONDENSATE/CIRCULATING PUMPS, PNUEMATIC CONTROLS, COMPRESSORS, CHILLERS, ROOFTOP AC UNITS, WINDOW AC UNITS, SUMP PUMPS, AIR HANDLER UNITS, RETURN AIR FANS, DOMESTIC HOT WATER HEATERS, EXHAUST FANS, UNIT VENTILATORS, ELECTRIC HEATERS, COOLING TOWERS AND UNSTOP DRAINS. CODE A - CLEAR FOR REPAIR AS OF 4/19/01. |
April 19, 2001 |
September 21, 2001 |
155 days |
| Smothers ES |
FM-200108803 01 9/21/01 SMOTHERS 1. ASBESTOS ASSESSMENT REQUIRED IN ORDER TO RECEIVE WORK PERMIT. 2. PERFORM ON GOING REPAIRS TO HVAC EQUIPMENT SUCH AS: BURNERS, BOILER AUXILARY EQUIPMENT, CONDENSATE/CIRCULATING PUMPS, PNUEMATIC CONTROLS, COMPRESSORS, CHILLERS, ROOFTOP AC UNITS, WINDOW AC UNITS, SUMP PUMPS, AIR HANDLER UNITS, RETURN AIR FANS , DOMESTIC HOT WATER HEATERS, EXHAUST FANS, UNIT VENTILATORS, ELECTRIC HEATERS, COOLING TOWERS AND UNSTOP DRAINS. CODE A - CLEAR FOR REPAIRS AS OF 4/20/01 |
April 20, 2001 |
September 21, 2001 |
154 days |
| Stevens Elementary School |
FM-200108804 01 9/21/01 STEVENS 1. ASBESTOS ASSESSMENT REQUIRED IN ORDER TO RECEIVE WORK PERMIT. 2. PERFORM ON GOING REPAIRS TO HVAC EQUIPMENT SUCH AS: BURNERS, BOILER AUXILARY EQUIPMENT, CONDENSATE/CIRCULATING PUMPS, PNUEMATIC CONTROLS, COMPRESSORS, CHILLERS, ROOFTOP AC UNITS, WINDOW AC UNITS, SUMP PUMPS, AIR HANDLER UNITS, RETURN AIR FANS, DOMESTIC HOT WATER HEATERS, EXHAUST FANS, UNIT VENTILATORS, ELECTRIC HEATERS, COOLING TOWERS AND UNSTOP DRAINS. CODE A - CLEAR FOR REPAIRS AS OF 4/20/01 |
April 20, 2001 |
September 21, 2001 |
154 days |
| Thomson Elementary School |
FM-200108658 01 9/21/01 THOMSON 1. ASBESTOS ASSESSMENT REQUIRED IN ORDER TO RECEIVE WORK PERMIT. 2. PERFORM ON GOING REPAIRS TO HVAC EQUIPMENT SUCH AS: BURNERS, BOILER AUXILARY EQUIPMENT, CONDENSATE/CIRCULATING PUMPS, PNUEMATIC CONTROLS, COMPRESSORS, CHILLERS, ROOFTOP AC UNITS, WINDOW AC UNITS, SUMP PUMPS, AIR HANDLER UNITS, RETURN AIR FANS, DOMESTIC HOT WATER HEATERS, EXHAUST FANS, UNIT VENTILATORS, ELECTRIC HEATERS, COOLING TOWERS AND UNSTOP DRAINS. CODE A - CLEAR FOR REPAIR AS OF 4/18/01. |
April 18, 2001 |
September 21, 2001 |
156 days |
| Whittier Elementary School |
FM-200108692 01 9/21/01 WHITTIER 1. ASBESTOS ASSESSMENT REQUIRED IN ORDER TO RECEIVE WORK PERMIT. 2. PERFORM ON GOING REPAIRS TO HVAC EQUIPMENT SUCH AS: BURNERS, BOILER AUXILARY EQUIPMENT, CONDENSATE/CIRCULATING PUMPS, PNUEMATIC CONTROLS, COMPRESSORS, CHILLERS, ROOFTOP AC UNITS, WINDOW AC UNITS, SUMP PUMPS, AIR HANDLER UNITS, RETURN AIR FANS, DOMESTIC HOT WATER HEATERS, EXHAUST FANS, UNIT VENTILATORS, ELECTRIC HEATERS, COOLING TOWERS AND UNSTOP DRAINS. CODE A CLEAR FOR REPAIRS AS OF 4/20/01 |
April 18, 2001 |
September 21, 2001 |
156 days |
| Slowe Elementary School |
FM-200108689 01 9/21/01 SLOWE 1. ASBESTOS ASSESSMENT REQUIRED IN ORDER TO RECEIVE WORK PERMIT. 2. PERFORM ON GOING REPAIRS TO HVAC EQUIPMENT SUCH AS: BURNERS, BOILER AUXILARY EQUIPMENT, CONDENSATE/CIRCULATING PUMPS, PNUEMATIC CONTROLS, COMPRESSORS, CHILLERS, ROOFTOP AC UNITS, WINDOW AC UNITS, SUMP PUMPS, AIR HANDLER UNITS, RETURN AIR FANS, DOMESTIC HOT WATER HEATERS, EXHAUST FANS, UNIT VENTILATORS, ELECTRIC HEATERS, COOLING TOWERS AND UNSTOP DRAINS. CODE A CLEAR FOR REPAIRS AS OF 4/20/01 |
April 18, 2001 |
September 21, 2001 |
156 days |
| Ross Elementary School |
FM-200108802 01 9/21/01 ROSS 1. ASBESTOS ASSESSMENT REQUIRED IN ORDER TO RECEIVE WORK PERMIT. 2. PERFORM ON GOING REPAIRS TO HVAC EQUIPMENT SUCH AS: BURNERS, BOILER AUXILARY EQUIPMENT, CONDENSATE/CIRCULATING PUMPS, PNUEMATIC CONTROLS, COMPRESSORS, CHILLERS, ROOFTOP AC UNITS, WINDOW AC UNITS, SUMP PUMPS, AIR HANDLER UNITS, RETURN AIR FANS, DOMESTIC HOT WATER HEATERS, EXHAUST FANS, UNIT VENTILATORS, ELECTRIC HEATERS, COOLING TOWERS AND UNSTOP DRAINS. CODE A - CLEAR FOR REPAIRS AS OF 4/20/01 |
April 20, 2001 |
September 21, 2001 |
154 days |
| Wilson J. O. ES |
FM-200108813 01 9/21/01 J.O. WILSON 1. ASBESTOS ASSESSMENT REQUIRED IN ORDER TO RECEIVE WORK PERMIT. 2. PERFORM ON GOING REPAIRS TO HVAC EQUIPMENT SUCH AS: BURNERS, BOILER AUXILARY EQUIPMENT, CONDENSATE/CIRCULATING PUMPS , PNUEMATIC CONTROLS, COMPRESSORS, CHILLERS, ROOFTOP AC UNITS, WINDOW AC UNITS, SUMP PUMPS, AIR HANDLER UNITS, RETURN AIR FANS, DOMESTIC HOT WATER HEATERS, EXHAUST FANS, UNIT VENTILATORS, ELECTRIC HEATERS, COOLING TOWERS AND UNSTOP DRAINS. CODE A - CLEAR FOR REPAIR AS OF 4/20/01 |
April 20, 2001 |
September 21, 2001 |
154 days |
| Webb Elementary School |
FM-200108691 01 9/21/01 WEBB 1. ASBESTOS ASSESSMENT REQUIRED IN ORDER TO RECEIVE WORK PERMIT. 2. PERFORM ON GOING REPAIRS TO HVAC EQUIPMENT SUCH AS: BURNERS, BOILER AUXILARY EQUIPMENT, CONDENSATE/CIRCULATING PUMPS, PNUEMATIC CONTROLS, COMPRESSORS, CHILLERS, ROOFTOP AC UNITS, WINDOW AC UNITS, SUMP PUMPS, AIR HANDLER UNITS, RETURN AIR FANS, DOMESTIC HOT WATER HEATERS, EXHAUST FANS, UNIT VENTILATORS, ELECTRIC HEATERS, COOLING TOWERS AND UNSTOP DRAINS. CODE A CLEAR FOR REPAIRS AS OF 4/20/01 |
April 18, 2001 |
September 21, 2001 |
156 days |
| Kimball Elementary School |
FM-200108722 01 9/21/01 KIMBALL 1. ASBESTOS ASSESSMENT REQUIRED IN ORDER TO RECEIVE WORK PERMIT. 2. PERFORM ON GOING REPAIRS TO HVAC EQUIPMENT SUCH AS: BURNERS, BOILER AUXILARY EQUIPMENT, CONDENSATE/CIRCULATING PUMPS, PNUEMATIC CONTROLS, COMPRESSORS, CHILLERS, ROOFTOP AC UNITS, WINDOW AC UNITS, SUMP PUMPS, AIR HANDLER UNITS, RETURN AIR FANS, DOMESTIC HOT WATER HEATERS, EXHAUST FANS, UNIT VENTILATORS, ELECTRIC HEATERS, COOLING TOWERS AND UNSTOP DRAINS. CODE A - CLEAR FOR REPAIR AS OF 4/19/01. |
April 19, 2001 |
September 21, 2001 |
155 days |
| Powell Elementary School |
FM-200108801 01 9/21/01 POWELL 1. ASBESTOS ASSESSMENT REQUIRED IN ORDER TO RECEIVE WORK PERMIT. 2. PERFORM ON GOING REPAIRS TO HVAC EQUIPMENT SUCH AS: BURNERS, BOILER AUXILARY EQUIPMENT, CONDENSATE/CIRCULATING PUMPS, PNUEMATIC CONTROLS, COMPRESSORS, CHILLERS, ROOFTOP AC UNITS, WINDOW AC UNITS, SUMP PUMPS, AIR HANDLER UNITS, RETURN AIR FANS, DOMESTIC HOT WATER HEATERS, EXHAUST FANS, UNIT VENTILATORS, ELECTRIC HEATERS, COOLING TOWERS AND UNSTOP DRAINS. CODE A - CLEAR FOR REPAIR AS OF 4/20/01 |
April 20, 2001 |
September 21, 2001 |
154 days |
| Ferebee-Hope Elementary School |
FM-200108673 01 9/21/01 FEREBEE-HOPE 1. ASBESTOS ASSESSMENT REQUIRED IN ORDER TO RECEIVE WORK PERMIT. 2. PERFORM ON GOING REPAIRS TO HVAC EQUIPMENT SUCH AS: BURNERS, BOILER AUXILARY EQUIPMENT, CONDENSATE/CIRCULATING PUMPS, PNUEMATIC CONTROLS, COMPRESSORS, CHILLERS, ROOFTOP AC UNITS, WINDOW AC UNITS, SUMP PUMPS, AIR HANDLER UNITS, RETURN AIR FANS, DOMESTIC HOT WATER HEATERS, EXHAUST FANS, UNIT VENTILATORS, ELECTRIC HEATERS, COOLING TOWERS AND UNSTOP DRAINS. CODE A CLEAR FOR REPAIR AS OF 4/20/01 |
April 18, 2001 |
September 21, 2001 |
156 days |
| Truesdell Elementary |
FM-200108807 01 9/21/01 TRUESDELL 1. ASBESTOS ASSESSMENT REQUIRED IN ORDER TO RECEIVE WORK PERMIT. 2. PERFORM ON GOING REPAIRS TO HVAC EQUIPMENT SUCH AS: BURNERS, BOILER AUXILARY EQUIPMENT, CONDENSATE/CIRCULATING PUMPS, PNUEMATIC CONTROLS, COMPRESSORS, CHILLERS, ROOFTOP AC UNITS, WINDOW AC UNITS, SUMP PUMPS, AIR HANDLER UNITS, RETURN AIR FANS, DOMESTIC HOT WATER HEATERS, EXHAUST FANS, UNIT VENTILATORS, ELECTRIC HEATERS, COOLING TOWERS AND UNSTOP DRAINS. CODE A - CLEAR FOR REPAIRS AS OF 4/20/01 |
April 20, 2001 |
September 21, 2001 |
154 days |
| Hyde Elementary School |
FM-200108721 01 9/21/01 HYDE 1. ASBESTOS ASSESSMENT REQUIRED IN ORDER TO RECEIVE WORK PERMIT. 2. PERFORM ON GOING REPAIRS TO HVAC EQUIPMENT SUCH AS: BURNERS, BOILER AUXILARY EQUIPMENT, CONDENSATE/CIRCULATING PUMPS, PNUEMATIC CONTROLS, COMPRESSORS, CHILLERS, ROOFTOP AC UNITS, WINDOW AC UNITS, SUMP PUMPS, AIR HANDLER UNITS, RETURN AIR FANS, DOMESTIC HOT WATER HEATERS, EXHAUST FANS, UNIT VENTILATORS, ELECTRIC HEATERS, COOLING TOWERS AND UNSTOP DRAINS. CODE A- CLEAR FOR REPAIR AS OF 4/19/01. |
April 19, 2001 |
September 21, 2001 |
155 days |
| Benning Elementary School |
FM-200108666 01 9/21/01 BENNING 1. ASBESTOS ASSESSMENT REQUIRED IN ORDER TO RECEIVE WORK PERMIT. 2. PERFORM ON GOING REPAIRS TO HVAC EQUIPMENT SUCH AS: BURNERS, BOILER AUXILARY EQUIPMENT, CONDENSATE/CIRCULATING PUMPS, PNUEMATIC CONTROLS, COMPRESSORS, CHILLERS, ROOFTOP AC UNITS, WINDOW AC UNITS, SUMP PUMPS, AIR HANDLER UNITS, RETURN AIR FANS, DOMESTIC HOT WATER HEATERS, EXHAUST FANS, UNIT VENTILATORS, ELECTRIC HEATERS, COOLING TOWERS AND UNSTOP DRAINS. CODE A CLEAR FOR REPAIR AS OF 4/21/01 |
April 18, 2001 |
September 21, 2001 |
156 days |
| Horace Mann Elementary School |
FM-200108724 01 9/21/01 MANN 1. ASBESTOS ASSESSMENT REQUIRED IN ORDER TO RECEIVE WORK PERMIT. 2. PERFORM ON GOING REPAIRS TO HVAC EQUIPMENT SUCH AS: BURNERS, BOILER AUXILARY EQUIPMENT, CONDENSATE/CIRCULATING PUMPS, PNUEMATIC CONTROLS, COMPRESSORS, CHILLERS, ROOFTOP AC UNITS, WINDOW AC UNITS, SUMP PUMPS, AIR HANDLER UNITS, RETURN AIR FANS, DOMESTIC HOT WATER HEATERS, EXHAUST FANS, UNIT VENTILATORS, ELECTRIC HEATERS, COOLING TOWERS AND UNSTOP DRAINS. CODE A - CLEAR FOR REPAIR. AS OF 4/19/01. |
April 19, 2001 |
September 21, 2001 |
155 days |
| Brightwood Elementary School |
FM-200108717 01 9/21/01 BRIGHTWOOD 1. ASBESTOS ASSESSMENT REQUIRED IN ORDER TO RECEIVE WORK PERMIT. 2. PERFORM ON GOING REPAIRS TO HVAC EQUIPMENT SUCH AS: BURNERS, BOILER AUXILARY EQUIPMENT, CONDENSATE/CIRCULATING PUMPS, PNUEMATIC CONTROLS, COMPRESSORS, CHILLERS, ROOFTOP AC UNITS, WINDOW AC UNITS, SUMP PUMPS, AIR HANDLER UNITS, RETURN AIR FANS, DOMESTIC HOT WATER HEATERS, EXHAUST FANS, UNIT VENTILATORS, ELECTRIC HEATERS, COOLING TOWERS AND UNSTOP DRAINS. ASBESTOS CODE A - CLEAR FOR REPAIRS ON 04/19/01. |
April 19, 2001 |
September 21, 2001 |
155 days |
| Garfield ES |
FM-200108720 01 9/21/01 GARFIELD 1. ASBESTOS ASSESSMENT REQUIRED IN ORDER TO RECEIVE WORK PERMIT. 2. PERFORM ON GOING REPAIRS TO HVAC EQUIPMENT SUCH AS: BURNERS, BOILER AUXILARY EQUIPMENT, CONDENSATE/CIRCULATING PUMPS, PNUEMATIC CONTROLS, COMPRESSORS, CHILLERS, ROOFTOP AC UNITS, WINDOW AC UNITS, SUMP PUMPS, AIR HANDLER UNITS, RETURN AIR FANS, DOMESTIC HOT WATER HEATERS, EXHAUST FANS, UNIT VENTILATORS, ELECTRIC HEATERS, COOLING TOWERS AND UNSTOP DRAINS. |
April 19, 2001 |
September 21, 2001 |
155 days |
| Houston Elementary School |
FM-200108675 01 9/21/01 HOUSTON 1. ASBESTOS ASSESSMENT REQUIRED IN ORDER TO RECEIVE WORK PERMIT. 2. PERFORM ON GOING REPAIRS TO HVAC EQUIPMENT SUCH AS: BURNERS, BOILER AUXILARY EQUIPMENT, CONDENSATE/CIRCULATING PUMPS, PNUEMATIC CONTROLS, COMPRESSORS, CHILLERS, ROOFTOP AC UNITS, WINDOW AC UNITS, SUMP PUMPS, AIR HANDLER UNITS, RETURN AIR FANS, DOMESTIC HOT WATER HEATERS, EXHAUST FANS, UNIT VENTILATORS, ELECTRIC HEATERS, COOLING TOWERS AND UNSTOP DRAINS. CODE A CLEAR FOR REPAIRS AS OF 4/20/01 |
April 18, 2001 |
September 21, 2001 |
156 days |
| Davis Elementary School |
FM-200108670 01 9/21/01 DAVIS 1. ASBESTOS ASSESSMENT REQUIRED IN ORDER TO RECEIVE WORK PERMIT. 2. PERFORM ON GOING REPAIRS TO HVAC EQUIPMENT SUCH AS: BURNERS, BOILER AUXILARY EQUIPMENT, CONDENSATE/CIRCULATING PUMPS, PNUEMATIC CONTROLS, COMPRESSORS, CHILLERS, ROOFTOP AC UNITS, WINDOW AC UNITS, SUMP PUMPS, AIR HANDLER UNITS, RETURN AIR FANS, DOMESTIC HOT WATER HEATERS, EXHAUST FANS, UNIT VENTILATORS, ELECTRIC HEATERS, COOLING TOWERS AND UNSTOP DRAINS. CODE A CLEAR FOR REPAIR AS OF 4/21/01 |
April 18, 2001 |
September 21, 2001 |
156 days |
| Bunker Hill Elementary School |
FM-200108668 01 9/21/01 BUNKER HILL 1. ASBESTOS ASSESSMENT REQUIRED IN ORDER TO RECEIVE WORK PERMIT. 2. PERFORM ON GOING REPAIRS TO HVAC EQUIPMENT SUCH AS: BURNERS, BOILER AUXILARY EQUIPMENT, CONDENSATE/CIRCULATING PUMPS, PNUEMATIC CONTROLS, COMPRESSORS, CHILLERS, ROOFTOP AC UNITS, WINDOW AC UNITS, SUMP PUMPS, AIR HANDLER UNITS, RETURN AIR FANS, DOMESTIC HOT WATER HEATERS, EXHAUST FANS, UNIT VENTILATORS, ELECTRIC HEATERS, COOLING TOWERS AND UNSTOP DRAINS. CODE A CLEAR FOR REPAIR AS OF 4/21/01 |
April 18, 2001 |
September 21, 2001 |
156 days |
| Gibbs Elementary School |
FM-200108674 01 9/21/01 GIBBS 1. ASBESTOS ASSESSMENT REQUIRED IN ORDER TO RECEIVE WORK PERMIT. 2. PERFORM ON GOING REPAIRS TO HVAC EQUIPMENT SUCH AS: BURNERS, BOILER AUXILARY EQUIPMENT, CONDENSATE/CIRCULATING PUMPS, PNUEMATIC CONTROLS, COMPRESSORS, CHILLERS, ROOFTOP AC UNITS, WINDOW AC UNITS, SUMP PUMPS, AIR HANDLER UNITS, RETURN AIR FANS, DOMESTIC HOT WATER HEATERS, EXHAUST FANS, UNIT VENTILATORS, ELECTRIC HEATERS, COOLING TOWERS AND UNSTOP DRAINS. CODE A - CLEAR FOR REPAIR AS OF 4/20/01 |
April 18, 2001 |
September 21, 2001 |
156 days |
| Peabody Elementary School |
FM-200108656 01 9/21/01 PEABODY 1. ASBESTOS ASSESSMENT REQUIRED IN ORDER TO RECEIVE WORK PERMIT. 2. PERFORM ON GOING REPAIRS TO HVAC EQUIPMENT SUCH AS: BURNERS, BOILER AUXILARY EQUIPMENT, CONDENSATE/CIRCULATING PUMPS, PNUEMATIC CONTROLS, COMPRESSORS, CHILLERS, ROOFTOP AC UNITS, WINDOW AC UNITS, SUMP PUMPS, AIR HANDLER UNITS, RETURN AIR FANS, DOMESTIC HOT WATER HEATERS, EXHAUST FANS, UNIT VENTILATORS, ELECTRIC HEATERS, COOLING TOWERS AND UNSTOP DRAINS. CODE A - CLEAR FOR REPAIR AS OF 4/19/01. |
April 18, 2001 |
September 21, 2001 |
156 days |
| Jessie LaSalle Elementary |
FM-200108723 /01 9/21/01 LASALLE 1. ASBESTOS ASSESSMENT REQUIRED IN ORDER TO RECEIVE WORK PERMIT. 2. PERFORM ON GOING REPAIRS TO HVAC EQUIPMENT SUCH AS: BURNERS, BOILER AUXILARY EQUIPMENT, CONDENSATE/CIRCULATING PUMPS, PNUEMATIC CONTROLS, COMPRESSORS, CHILLERS, ROOFTOP AC UNITS, WINDOW AC UNITS, SUMP PUMPS, AIR HANDLER UNITS, RETURN AIR FANS, DOMESTIC HOT WATER HEATERS, EXHAUST FANS, UNIT VENTILATORS, ELECTRIC HEATERS, COOLING TOWERS AND UNSTOP DRAINS. |
April 19, 2001 |
September 21, 2001 |
155 days |
| Seaton Elementary School |
FM-200108684 01 9/21/01 SEATON 1. ASBESTOS ASSESSMENT REQUIRED IN ORDER TO RECEIVE WORK PERMIT. 2. PERFORM ON GOING REPAIRS TO HVAC EQUIPMENT SUCH AS: BURNERS, BOILER AUXILARY EQUIPMENT, CONDENSATE/CIRCULATING PUMPS, PNUEMATIC CONTROLS, COMPRESSORS, CHILLERS, ROOFTOP AC UNITS, WINDOW AC UNITS, SUMP PUMPS, AIR HANDLER UNITS, RETURN AIR FANS, DOMESTIC HOT WATER HEATERS, EXHAUST FANS, UNIT VENTILATORS, ELECTRIC HEATERS, COOLING TOWERS AND UNSTOP DRAINS. CODE A CLEAR FOR REPAIR AS OF 4/20/01 |
April 18, 2001 |
September 21, 2001 |
156 days |
| Eaton Elementary School |
FM-200108672 01 9/21/01 EATON 1. ASBESTOS ASSESSMENT REQUIRED IN ORDER TO RECEIVE WORK PERMIT. 2. PERFORM ON GOING REPAIRS TO HVAC EQUIPMENT SUCH AS: BURNERS, BOILER AUXILARY EQUIPMENT, CONDENSATE/CIRCULATING PUMPS, PNUEMATIC CONTROLS, COMPRESSORS, CHILLERS, ROOFTOP AC UNITS, WINDOW AC UNITS, SUMP PUMPS, AIR HANDLER UNITS, RETURN AIR FANS, DOMESTIC HOT WATER HEATERS, EXHAUST FANS, UNIT VENTILATORS, ELECTRIC HEATERS, COOLING TOWERS AND UNSTOP DRAINS. CODE A CLEAR FOR REPAIR AS OF 4/21/01 |
April 18, 2001 |
September 21, 2001 |
156 days |
| Tyler Elementary School |
FM-200108810 01 9/21/01 TYLER 1. ASBESTOS ASSESSMENT REQUIRED IN ORDER TO RECEIVE WORK PERMIT. 2. PERFORM ON GOING REPAIRS TO HVAC EQUIPMENT SUCH AS: BURNERS, BOILER AUXILARY EQUIPMENT, CONDENSATE/CIRCULATING PUMPS, PNUEMATIC CONTROLS, COMPRESSORS, CHILLERS, ROOFTOP AC UNITS, WINDOW AC UNITS, SUMP PUMPS, AIR HANDLER UNITS, RETURN AIR FANS, DOMESTIC HOT WATER HEATERS, EXHAUST FANS, UNIT VENTILATORS, ELECTRIC HEATERS, COOLING TOWERS AND UNSTOP DRAINS. CODE A - CLEAR FOR REPAIR AS OF 4/20/01. |
April 20, 2001 |
September 21, 2001 |
154 days |
| Brent Elementary School |
FM-200108716 01 9/21/01 BRENT 1. ASBESTOS ASSESSMENT REQUIRED IN ORDER TO RECEIVE WORK PERMIT. 2. PERFORM ON GOING REPAIRS TO HVAC EQUIPMENT SUCH AS: BURNERS, BOILER AUXILARY EQUIPMENT, CONDENSATE/CIRCULATING PUMPS, PNUEMATIC CONTROLS, COMPRESSORS, CHILLERS, ROOFTP AC UNITS, WINDOW AC UNITS, SUMP PUMPS, AIR HANDLER UNITS, RETURN AIR FANS, DOMESTIC HOT WATER HEATERS, EXHAUST FANS, UNIT VENTILATORS, ELECTRIC HEATERS, COOLING TOWERS AND UNSTOP DRAINS. ASBESTOS CODE A - CLEAR ON 04/19/01. |
April 19, 2001 |
September 21, 2001 |
155 days |
| John Burroughs ES |
FM-200108718 01 9/21/01 BURROUGHS 1. ASBESTOS ASSESSMENT REQUIRED IN ORDER TO RECEIVE WORK PERMIT. 2. PERFORM ON GOING REPAIRS TO HVAC EQUIPMENT SUCH AS: BURNERS, BOILER AUXILARY EQUIPMENT, CONDENSATE/CIRCULATING PUMPS, PNUEMATIC CONTROLS, COMPRESSORS, CHILLERS, ROOFTOP AC UNITS, WINDOW AC UNITS, SUMP PUMPS, AIR HANDLER UNITS, RETURN AIR FANS, DOMESTIC HOT WATER HEATERS, EXHAUST FANS, UNIT VENTILATORS, ELECTRIC HEATERS, COOLING TOWERS AND UNSTOP DRAINS. ASBESTOS CODE A - CLEAR FOR REPAIRS ON 04/19/01. |
April 19, 2001 |
September 21, 2001 |
155 days |
| Savoy Elementary School |
FM-200108683 01 9/21/01 SAVOY 1. ASBESTOS ASSESSMENT REQUIRED IN ORDER TO RECEIVE WORK PERMIT. 2. PERFORM ON GOING REPAIRS TO HVAC EQUIPMENT SUCH AS: BURNERS, BOILER AUXILARY EQUIPMENT, CONDENSATE/CIRCULATING PUMPS, PNUEMATIC CONTROLS, COMPRESSORS, CHILLERS, ROOFTOP AC UNITS, WINDOW AC UNITS, SUMP PUMPS, AIR HANDLER UNITS, RETURN AIR FANS, DOMESTIC HOT WATER HEATERS, EXHAUST FANS, UNIT VENTILATORS, ELECTRIC HEATERS, COOLING TOWERS AND UNSTOP DRAINS. CODE A CLEAR FOR REPAIRS AS OF 4/20/01 |
April 18, 2001 |
September 21, 2001 |
156 days |
| Ludlow-Taylor ES |
FM-200108677 01 9/21/01 LUDLOW-TAYLOR 1. ASBESTOS ASSESSMENT REQUIRED IN ORDER TO RECEIVE WORK PERMIT. 2. PERFORM ON GOING REPAIRS TO HVAC EQUIPMENT SUCH AS: BURNERS, BOILER AUXILARY EQUIPMENT, CONDENSATE/CIRCULATING PUMPS, PNUEMATIC CONTROLS, COMPRESSORS, CHILLERS, ROOFTOP AC UNITS, WINDOW AC UNITS, SUMP PUMPS, AIR HANDLER UNITS, RETURN AIR FANS, DOMESTIC HOT WATER HEATERS, EXHAUST FANS, UNIT VENTILATORS, ELECTRIC HEATERS, COOLING TOWERS AND UNSTOP DRAINS. CODE A CLEAR FOR REPAIR AS OF 4/20/01 |
April 18, 2001 |
September 21, 2001 |
156 days |
| Aiton Elementary School |
FM-200108665 01 9/21/01 AITON 1. ASBESTOS ASSESSMENT REQUIRED IN ORDER TO RECEIVE WORK PERMIT. 2. PERFORM ON GOING REPAIRS TO HVAC EQUIPMENT SUCH AS: BURNERS, BOILER AUXILARY EQUIPMENT, CONDENSATE/CIRCULATING PUMPS, PNUEMATIC CONTROLS, COMPRESSORS, CHILLERS, ROOFTOP AC UNITS, WINDOW AC UNITS, SUMP PUMPS, AIR HANDLER UNITS, RETURN AIR FANS, DOMESTIC HOT WATER HEATERS, EXHAUST FANS, UNIT VENTILATORS, ELECTRIC HEATERS, COOLING TOWERS AND UNSTOP DRAINS. CODE A CLEAR FOR REPAIR AS OF 4/21/01 |
April 18, 2001 |
September 21, 2001 |
156 days |
| Clark Elementary School |
FM-200108719 01 9/21/01 CLARK 1. ASBESTOS ASSESSMENT REQUIRED IN ORDER TO RECEIVE WORK PERMIT. 2. PERFORM ON GOING REPAIRS TO HVAC EQUIPMENT SUCH AS: BURNERS, BOILER AUXILARY EQUIPMENT, CONDENSATE/CIRCULATING PUMPS, PNUEMATIC CONTROLS, COMPRESSORS, CHILLERS, ROOFTOP AC UNITS, WINDOW AC UNITS, SUMP PUMPS, AIR HANDLER UNITS, RETURN AIR FANS, DOMESTIC HOT WATER HEATERS, EXHAUST FANS, UNIT VENTILATORS, ELECTRIC HEATERS, COOLING TOWERS AND UNSTOP DRAINS. ASBESTOS CODE A - CLEAR FOR REPAIRS ON 04/19/01. |
April 19, 2001 |
September 21, 2001 |
155 days |
| Oyster Elementary School |
FM-200108655 01 9/21/01 OYSTER 1. ASBESTOS ASSESSMENT REQUIRED IN ORDER TO RECEIVE WORK PERMIT. 2. PERFORM ON GOING REPAIRS TO HVAC EQUIPMENT SUCH AS: BURNERS, BOILER AUXILARY EQUIPMENT, CONDENSATE/CIRCULATING PUMPS, PNUEMATIC CONTROLS, COMPRESSORS, CHILLERS, ROOFTOP AC UNITS, WINDOW AC UNITS, SUMP PUMPS, AIR HANDLER UNITS, RETURN AIR FANS, DOMESTIC HOT WATER HEATERS, EXHAUST FANS, UNIT VENTILATORS, ELECTRIC HEATERS, COOLING TOWERS AND UNSTOP DRAINS. |
April 18, 2001 |
September 21, 2001 |
156 days |
| Rudolph Elementary School |
FM-200108682 01 9/21/01 RUDOLPH 1. ASBESTOS ASSESSMENT REQUIRED IN ORDER TO RECEIVE WORK PERMIT. 2. PERFORM ON GOING REPAIRS TO HVAC EQUIPMENT SUCH AS: BURNERS, BOILER AUXILARY EQUIPMENT, CONDENSATE/CIRCULATING PUMPS, PNUEMATIC CONTROLS, COMPRESSORS, CHILLERS, ROOFTOP AC UNITS, WINDOW AC UNITS, SUMP PUMPS, AIR HANDLER UNITS, RETURN AIR FANS, DOMESTIC HOT WATER HEATERS, EXHAUST FANS, UNIT VENTILATORS, ELECTRIC HEATERS, COOLING TOWERS AND UNSTOP DRAINS. CODE A CLEAR FOR REPAIR AS OF 4/20/01 |
April 18, 2001 |
September 21, 2001 |
156 days |
| Tubman Elementary School |
FM-200108809 01 9/21/01 TUBMAN 1. ASBESTOS ASSESSMENT REQUIRED IN ORDER TO RECEIVE WORK PERMIT. 2. PERFORM ON GOING REPAIRS TO HVAC EQUIPMENT SUCH AS: BURNERS, BOILER AUXILARY EQUIPMENT, CONDENSATE/CIRCULATING PUMPS, PNUEMATIC CONTROLS, COMPRESSORS, CHILLERS, ROOFTOP AC UNITS, WINDOW AC UNITS, SUMP PUMPS, AIR HANDLER UNITS, RETURN AIR FANS, DOMESTIC HOT WATER HEATERS, EXHAUST FANS, UNIT VENTILATORS, ELECTRIC HEATERS, COOLING TOWERS AND UNSTOP DRAINS. CODE A - CLEAR FOR REPAIRS AS OF 4/20/01. |
April 20, 2001 |
September 21, 2001 |
154 days |
| Simon Elementary School |
FM-200108687 01 9/21/01 SIMON 1. ASBESTOS ASSESSMENT REQUIRED IN ORDER TO RECEIVE WORK PERMIT. 2. PERFORM ON GOING REPAIRS TO HVAC EQUIPMENT SUCH AS: BURNERS, BOILER AUXILARY EQUIPMENT, CONDENSATE/CIRCULATING PUMPS, PNUEMATIC CONTROLS, COMPRESSORS, CHILLERS, ROOFTOP AC UNITS, WINDOW AC UNITS, SUMP PUMPS, AIR HANDLER UNITS, RETURN AIR FANS, DOMESTIC HOT WATER HEATERS, EXHAUST FANS, UNIT VENTILATORS, ELECTRIC HEATERS, COOLING TOWERS AND UNSTOP DRAINS. CODE A CLEAR FOR REPAIRS AS OF 4/20/01 |
April 18, 2001 |
September 21, 2001 |
156 days |
| Winston EC |
FM-200119577 01 9/24/01 WINSTON 4TH BOILER ROOM 1. ASBESTOS ASSESSMENT REQUIRED. 2. INVESTIGATE AND MAKE CORRECTIVE MEASURES TO STOP WATER FROM AN UNKNOWN SOURCE FROM BACKUP INTO ELECTRICAL PANEL IN 4TH FLOOR BOILER ROOM LEVEL.ASBESTOS CODE A - CLEAR FOR REPAIRS ON 09/19/01. HORNE ENGINEER STEPHEN CALDWELL |
September 10, 2001 |
September 24, 2001 |
14 days |
| Lincoln Middle School |
FM-200100828 01 9/24/01 LINCOLN BOILER ROOM CALIBRATE #1 BOILER BURNER. HC-20000847 |
January 11, 2001 |
September 24, 2001 |
256 days |
| Walker-Jones EC |
FM-200120474 01 9/25/01 WALKER/JONES BOILER ROOM REPAIR BOILER #1  BURNERS, WILL NOT START. (OPEN LIMIT D8) WP-200108690 |
September 25, 2001 |
September 25, 2001 |
0 days |
| Sousa Middle School |
FM-200114913 01 9/25/01 SOUSA BASEMENT BOILER ROOM DUE TO FAILURE OF D.C. INSPECTION, REQUESTING FOR BURNER MECHANIC TO REPAIR AND ADJUST OIL BURNERS ON ALL (3) THREE BOILERS. BOILER SHOW VISIBLE SIGNS OF OVER HEATING, IMPROPER COMBUSTION AND HOT SPOTS. WP-200108891 |
July 9, 2001 |
September 25, 2001 |
78 days |
| Sousa Middle School |
FM-200119002 01 9/25/01 SOUSA BOILER ROOM BOILER #2 WILL NOT FIRED OFF DUE TO FLAME FAILURE. |
September 4, 2001 |
September 25, 2001 |
21 days |
| King M L ES |
FM-200108824 01 9/26/01 KING 1. ASBESTOS ASSESSMENT REQUIRED IN ORDER TO RECEIVE WORK PERMIT. 2. PERFORM ON GOING REPAIRS TO HVAC EQUIPMENT SUCH AS: BURNERS, BOILER AUXILARY EQUIPMENT, CONDENSATE/CIRCULATING PUMPS, PNUEMATIC CONTROLS, COMPRESSORS, CHILLERS, ROOFTOP AC UNITS, WINDOW AC UNITS, SUMP PUMPS, AIR HANDLER UNITS, RETURN AIR FANS, DOMESTIC HOT WATER HEATERS, EXHAUST FANS, UNIT VENTILATORS, ELECTRIC HEATERS, COOLING TOWERS AND UNSTOP DRAINS. CODE A - CLEAR FOR REPAIRS AS OF 4/20/01 |
April 20, 2001 |
September 26, 2001 |
159 days |
| Kramer Middle School |
FM-200108869 01 9/26/01 KRAMER 1. ASBESTOS ASSESSMENT REQUIRED IN ORDER TO RECEIVE WORK PERMIT. 2. PERFORM ON GOING REPAIRS TO HVAC EQUIPMENT SUCH AS: BURNERS, BOILER AUXILARY EQUIPMENT, CONDENSATE/CIRCULATING PUMPS, PNUEMATIC CONTROLS, COMPRESSORS, CHILLERS, ROOFTOP AC UNITS, WINDOW AC UNITS, SUMP PUMPS, AIR HANDLER UNITS, RETURN AIR FANS, DOMESTIC HOT WATER HEATERS, EXHAUST FANS, UNIT VENTILATORS, ELECTRIC HEATERS, COOLING TOWERS AND UNSTOP DRAINS. ASBESTOS CODE A - CLEAR FOR REPAIRS ON 04/20/01. |
April 20, 2001 |
September 26, 2001 |
159 days |
| Terrell Mc ES |
FM-200108841 01 9/26/01 M.C. TERRELL 1. ASBESTOS ASSESSMENT REQUIRED IN ORDER TO RECEIVE WORK PERMIT. 2. PERFORM ON GOING REPAIRS TO HVAC EQUIPMENT SUCH AS: BURNERS, BOILER AUXILARY EQUIPMENT, CONDENSATE/CIRCULATING PUMPS, PNUEMATIC CONTROLS, COMPRESSORS, CHILLERS, ROOFTOP AC UNITS, WINDOW AC UNITS, SUMP PUMPS, AIR HANDLER UNITS, RETURN AIR FANS, DOMESTIC HOT WATER HEATERS, EXHAUST FANS, UNIT VENTILATORS, ELECTRIC HEATERS, COOLING TOWERS AND UNSTOP DRAINS. CODE A CLEAR FOR REPAIRS AS OF 4/20/01 |
April 20, 2001 |
September 26, 2001 |
159 days |
| Terrell Mc ES |
FM-200106890 01 9/26/01 M.C. TERRELL BOILER ROOM ASBESTOS ASSESSMENT REQUIRED FOR NEW BURNER. 1) CHECK BURNER RING AND BURNER CONE. CONTACT CURTIS EMERSON OFFICE 202-698-1753 CELL 202-438-7434 Requester Phone: 698-1752 ASBESTOS CODE A - CLEAR FOR REPAIRS ON 04/06/01. |
March 29, 2001 |
September 26, 2001 |
181 days |
| Lafayette Elementary School |
FM-200109189 01 9/26/01 LAFAYETTE BOILER ROOM REPAIR TWO DOMESTIC AND TWO HEATING CIRCULATIUNG PUMPS, APPEARS TO BE A PROBLEM WITH STARTER CONTROLS. CITED BY HEALTH DEPT. ON 4-26-01 WITH A 24 HOUR WINDOW TO MAKE CORRECTION. NO DOMESTIC HOT WATER. |
April 26, 2001 |
September 26, 2001 |
153 days |
| Langdon Elementary School |
FM-200108825 01 9/26/01 LANGDON 1. ASBESTOS ASSESSMENT REQUIRED IN ORDER TO RECEIVE WORK PERMIT. 2. PERFORM ON GOING REPAIRS TO HVAC EQUIPMENT SUCH AS: BURNERS, BOILER AUXILARY EQUIPMENT, CONDENSATE/CIRCULATING PUMPS, PNUEMATIC CONTROLS, COMPRESSORS, CHILLERS, ROOFTOP AC UNITS, WINDOW AC UNITS, SUMP PUMPS, AIR HANDLER UNITS, RETURN AIR FANS, DOMESTIC HOT WATER HEATERS, EXHAUST FANS, UNIT VENTILATORS, ELECTRIC HEATERS, COOLING TOWERS AND UNSTOP DRAINS. CODE A - CLEAR FOR REPAIRS AS OF 4/20/01 |
April 20, 2001 |
September 26, 2001 |
159 days |
| Young Elementary School |
FM-200108849 01 9/26/01 YOUNG 1. ASBESTOS ASSESSMENT REQUIRED IN ORDER TO RECEIVE WORK PERMIT. 2. PERFORM ON GOING REPAIRS TO HVAC EQUIPMENT SUCH AS: BURNERS, BOILER AUXILARY EQUIPMENT, CONDENSATE/CIRCULATING PUMPS, PNUEMATIC CONTROLS, COMPRESSORS, CHILLERS, ROOFTOP AC UNITS, WINDOW AC UNITS, SUMP PUMPS, AIR HANDLER UNITS, RETURN AIR FANS, DOMESTIC HOT WATER HEATERS, EXHAUST FANS, UNIT VENTILATORS, ELECTRIC HEATERS, COOLING TOWERS AND UNSTOP DRAINS. CODE A CLEAR FOR REPAIRS AS OF 4/20/01 |
April 20, 2001 |
September 26, 2001 |
159 days |
| Jessie LaSalle Elementary |
FM-200112298 01 9/26/01 LASALLE BOILER ROOM CHECK BOILER #2. IT WILL NOT FIRE OFF. BURN WILL NOT PURGE MOTOR WILL START ONLY. WP-200108723 |
June 4, 2001 |
September 26, 2001 |
114 days |
| Jessie LaSalle Elementary |
FM-200117162 01 9/26/01 LASALLE BOILER ROOM REPAIR OR REPLACE BURNER ON BOILER #2. WILL NOT LITE OFF. WP-200108723 |
August 13, 2001 |
September 26, 2001 |
44 days |
| Leckie Elementary School |
FM-200108826 01 9/26/01 LECKIE 1. ASBESTOS ASSESSMENT REQUIRED IN ORDER TO RECEIVE WORK PERMIT. 2. PERFORM ON GOING REPAIRS TO HVAC EQUIPMENT SUCH AS: BURNERS, BOILER AUXILARY EQUIPMENT, CONDENSATE/CIRCULATING PUMPS, PNUEMATIC CONTROLS, COMPRESSORS, CHILLERS, ROOFTOP AC UNITS, WINDOW AC UNITS, SUMP PUMPS, AIR HANDLER UNITS, RETURN AIR FANS, DOMESTIC HOT WATER HEATERS, EXHAUST FANS, UNIT VENTILATORS, ELECTRIC HEATERS, COOLING TOWERS AND UNSTOP DRAINS. CODE A - CLEAR FOR REPAIRS AS OF 4/20/01 |
April 20, 2001 |
September 26, 2001 |
159 days |
| Takoma Educational Center |
FM-200119331 01 9/26/01 TAKOMA BOILER ROOM SEND SOMEONE OUT TO INSPACT GAS LINE TO BOILER #1. NOTE: GAS COMPANY WAS CALLED BY HEAD CUSTODIAN FOR A SMELL OF GAS IN BOILER ROOM AND GAS COMPANY PUT A TAAG ON GAS LINE. WP-200108805 |
September 6, 2001 |
September 26, 2001 |
20 days |
| Leckie Elementary School |
FM-200114569 01 9/26/01 LECKIE BOILER ROOM REPAIR OR REPLACE STANDBY PUMP CONTROL STARTER MAKING LOUD NOISE. WP-200108826 |
July 2, 2001 |
September 26, 2001 |
86 days |
| Amidon Elementary School |
FM-200108815 01 9/26/01 AMIDON 1. ASBESTOS ASSESSMENT REQUIRED IN ORDER TO RECEIVE WORK PERMIT. 2. PERFORM ON GOING REPAIRS TO HVAC EQUIPMENT SUCH AS: BURNERS, BOILER AUXILARY EQUIPMENT, CONDENSATE/CIRCULATING PUMPS, PNUEMATIC CONTROLS, COMPRESSORS, CHILLERS, ROOFTOP AC UNITS, WINDOW AC UNITS, SUMP PUMPS, AIR HANDLER UNITS, RETURN AIR FANS, DOMESTIC HOT WATER HEATERS, EXHAUST FANS, UNIT VENTILATORS, ELECTRIC HEATERS, COOLING TOWERS AND UNSTOP DRAINS. CODE A - CLEAR FOR REPAIRS AS OF 4/20/01 |
April 20, 2001 |
September 26, 2001 |
159 days |
| Burrville Elementary School |
FM-200108816 20/01 9/26/01 BURRVILLE 1. ASBESTOS ASSESSMENT REQUIRED IN ORDER TO RECEIVE WORK PERMIT. 2. PERFORM ON GOING REPAIRS TO HVAC EQUIPMENT SUCH AS: BURNERS, BOILER AUXILARY EQUIPMENT, CONDENSATE/CIRCULATING PUMPS, PNUEMATIC CONTROLS, COMPRESSORS, CHILLERS, ROOFTOP AC UNITS, WINDOW AC UNITS, SUMP PUMPS, AIR HANDLER UNITS, RETURN AIR FANS, DOMESTIC HOT WATER HEATERS, EXHAUST FANS, UNIT VENTILATORS, ELECTRIC HEATERS, COOLING TOWERS AND UNSTOP DRAINS. CODE A - CLEAR FOR REPAIRS AS OF 4/20/01 |
April 20, 2001 |
September 26, 2001 |
159 days |
| Browne Junior High School |
FM-200108852 01 9/26/01 BROWNE 1. ASBESTOS ASSESSMENT REQUIRED IN ORDER TO RECEIVE WORK PERMIT. 2. PERFORM ON GOING REPAIRS TO HVAC EQUIPMENT SUCH AS: BURNERS, BOILER AUXILARY EQUIPMENT, CONDENSATE/CIRCULATING PUMPS, PNUEMATIC CONTROLS, COMPRESSORS, CHILLERS, ROOFTOP AC UNITS, WINDOW AC UNITS, SUMP PUMPS, AIR HANDLER UNITS, RETURN AIR FANS, DOMESTIC HOT WATER HEATERS, EXHAUST FANS, UNIT VENTILATORS, ELECTRIC HEATERS, COOLING TOWERS AND UNSTOP DRAINS. ASBESTOS CODE A - CLEAR FOR REPAIRS ON 04/20/01. |
April 20, 2001 |
September 26, 2001 |
159 days |
| Thomas Elementary School |
FM-200108846 01 9/26/01 THOMAS 1. ASBESTOS ASSESSMENT REQUIRED IN ORDER TO RECEIVE WORK PERMIT. 2. PERFORM ON GOING REPAIRS TO HVAC EQUIPMENT SUCH AS: BURNERS, BOILER AUXILARY EQUIPMENT, CONDENSATE/CIRCULATING PUMPS, PNUEMATIC CONTROLS, COMPRESSORS, CHILLERS, ROOFTOP AC UNITS, WINDOW AC UNITS, SUMP PUMPS, AIR HANDLER UNITS, RETURN AIR FANS, DOMESTIC HOT WATER HEATERS, EXHAUST FANS, UNIT VENTILATORS, ELECTRIC HEATERS, COOLING TOWERS AND UNSTOP DRAINS. CODE A CLEAR FOR REPAIRS AS OF 4/20/01 |
April 20, 2001 |
September 26, 2001 |
159 days |
| Lincoln Middle School |
FM-200108873 01 9/26/01 LINCOLN 1. ASBESTOS ASSESSME |