| School |
Description |
Open Date |
Close Date |
Time Elapsed |
| Deal Junior High School |
FM-200118320 01 8/24/01 (DEAL) !!!!!EMERGENCY!!!! 2ND FLOOR/BOYS AND GIRLS GYM: ROOF DRAIN STOPPED UP, AND SKY-LIGHT LEAKING IN-TO GYM; CONDITIONS CAUSING GYM FLOORS TO BUCKLE. (THIS IS A BRAND NEW FLOOR) CODE A CLEAR FOR REPAIR HORNE ENG. (RAY AGNANT) 08-24-01. |
August 24, 2001 |
August 24, 2001 |
0 days |
| Deal Junior High School |
FM-200102312 01 8/27/01 (DEAL) 3RD FLOOR/GIRLS GYM: INSPECT ROOF LEAK. WATER COMING IN, RUNNING DOWN THE WALL. |
January 26, 2001 |
August 27, 2001 |
213 days |
| Takoma Educational Center |
FM-200112963 01 8/29/01 TAKOMA THIRD FLOOR HALLWAY (EMERGENCY) 1) REPAIR SHEETROCK CEILING WATER DAMAGE FROM ROOF LEAKS - ONE SECTION HAS FALLEN ASBESTOS CODE A - CLEAR FOR REPAIRS ON 07/12/01. |
June 11, 2001 |
August 29, 2001 |
79 days |
| Bowen Elementary School |
FM-200109782 01 8/31/01 BOWEN ROOF OLD/NEW UNCLOG ALL ROOF DRAINS. WATER BUILDING AROUND THEM IS CAUSING LEAKS IN THE BUILDING AND DAMAGE. PROPERTY DAMAGE HAZARD. |
May 8, 2001 |
August 31, 2001 |
115 days |
| Tubman Elementary School |
FM-200118881 01 9/5/01 (TUBMAN) ROOM 306 ***********EMERGENCY*********** WATER LEAKING FROM ROOF OF CYLINDER BLOCK THEY HAVE HOLES IN THEM AND WHEN IT RAINS WATER IS SEEKING THRU THE INSIDE.***EMERGENCY**** |
August 30, 2001 |
September 5, 2001 |
6 days |
| Ferebee-Hope Elementary School |
FM-200109618 01 9/15/01 FEREBEE-HOPE ROOF COOLING TOWER REPAIR LEAKS ON COOLING TOWER, UNABLE TO HOLD WATER (SEAMS). CHILLER OFF LINE. (ROOFERS) Requester Phone: 645-3094 Requestor Phone: 645-3094 |
April 25, 2001 |
September 15, 2001 |
143 days |
| Merritt Middle School |
FM-200117753 01 9/21/01 MERRITT THROUGHOUT BLDG. ASBESTOS ASSESSMENT REQUIRED REPLACEMENT OF LARGE AMOUNT OF MISSING OR DAMAGED CEILING TILE NEEDED THROUGHOUT BLDG. DUE TO ROOF LEAKS AND OR ROOF DRAIN STOPPAGE. NOTED ON MONITOR INSPECTIO REPORT. ASBESTOS CODE A - CLEAR FOR REPAIRS ASBESTOS CODE A-CLEAR FOR REPAIRS BY 10/13/01 HORNE ENGINEER SHERYLL JAMES |
August 17, 2001 |
September 21, 2001 |
35 days |
| Bell High School |
FM-200119508 01 9/26/01 BELL THIRD (3RD) FLOOR - CORRIDOR 1) ASBESTOS ASSESSMENT REQUIRED. 2) CEILING TILES - 400 SF. DUE TO ROOF LEAKING. ASBESTOS CODE A-CLEAR FOR REPAIR ON 9/14/01 ROGER KAGER OF HORNE ENGINEER |
September 10, 2001 |
September 26, 2001 |
16 days |
| Bell High School |
FM-200119512 01 9/26/01 BELL SECOND (2ND) FLOOR - CLASSROOM #224. 1) ASBESTOS ASSESSMENT REQUIRED. 2) CEILING TILES 45 SF. DUE TO ROOF LEAKING. ASBESTOS CODE A-CLEAR FOR REPAIR ON 9/14/01 ROGER KAGER OF HORNE ENGINEER |
September 10, 2001 |
September 26, 2001 |
16 days |
| Turner Elementary School |
FM-200114991 01 10/17/01 TURNER ROOF, ROOM 304, AND MAIN OFFICE 1) WATER IS STILL LEAKING FROM ROOF DRAIN OVER ROOM 304 IN CEILING NOW LEAKING FROM CEILING INTO MAIN OFFICE ON EQUIPMENT 2) CHECK MAIN OFFICE CEILING 3) POC: AL COLEMAN (202)439-8276 ASBESTOS CODE A - CLEAR FOR REPAIRS ON 11/14/01. HORNE ENGINEERING - RAYMOND AGNANT |
July 10, 2001 |
October 17, 2001 |
99 days |
| Coolidge High School |
FM-200101003 1/01 10/17/01 COOLIDGE 3RD FLOOR AND COACH OFFICE GYM AREA. PLASTER THE CEILING ON 3RD FLOOR, CEILING WAS DAMAGED BY ROOF LEAK, THE ROOF HAS BEEN REPAIRED. FORMERLY - MT-20001294 SENT TO MS. SHEILA HOWARD FOR ASSESSMENT ON 01/11/01 fm-200101008, fm-200101942 Asbestos Code A - Clear for Repair |
January 11, 2001 |
October 17, 2001 |
279 days |
| Merritt Middle School |
FM-200117506 01 10/24/01 MERRITT COMMON AREA ASBESTOS ASSESSMENT REQUIRED ROOF LEAK IN COMMON AREA LOCATED IN CEILING & FRONT OF STEPS FACING MAIN OFFICE. ALL DRAINS WERE CHECKED AND FOUND TO BE CLEAN. THERE MAY BE WATER UNDER THE ROOF FLASHING. DUE TO EXCESSIVE RAIN OR RAIN WATER INSIDE THE AIR CONDITION UNITS. CEILING TILE NEED TO BE REPLACED. ASBESTOS CODE A-CLEAR FOR REPAIRS BY 10/13/01 HORNE ENGINEER SHERYLL JAMES |
August 15, 2001 |
October 24, 2001 |
70 days |
| Kramer Middle School |
FM-200106407 01 10/29/01 KRAMER GYMNASIUM ROOF LEAKING NORTH END. |
March 22, 2001 |
October 29, 2001 |
221 days |
| Dunbar High School |
FM-200101635 01 11/2/01 (DUNBAR) 1) ASBESTOS ASSESSMENT REQUIRED. B-BUILDING, 5TH FLOOR/OPEN SPACE CLASSROOMS: SKYLIGHT LEAKING IN THAT AREA. ALSO, ROOF LEAK IN THE NORTHEAST AND SOUTHEAST SIDE OF BUILDING IN THE GYMNASIUM. CODE A-CLEAR FOR REPAIR BY HORNE ENG 8/9/01. |
January 19, 2001 |
November 2, 2001 |
287 days |
| Stanton Elementary School |
FM-200120982 01 11/6/01 (STANTON) ASBESTOS ASSESSMENT REQ. PLASTER IN THE DINIG ROOM AREA IN THE CAFETERIA IS FALLING FROM A WATER LEAK WE ARE HAVING. NEED TO BE PLASTERED AGAIN. ROOF NEEDS ATTENTION. ASBESTOS CODE A-CLEAR FOR REPAIRS ON 10/19/01 BY HORNE ENGINEER : EDWARD RODRIGUEZ |
October 4, 2001 |
November 6, 2001 |
33 days |
| Kramer Middle School |
FM-200112399 01 11/13/01 KRAMER ROOF 1) PUMP WATER OFF ROOF 2) REMOVE WATER FROM ROOF TOP WATER LEAKING INTO THE FOLLOWING AREAS: GIRLS LOCKER ROOM, GYM ON GIRLS SIDE BY GOAL POST, WATER SPLASHING FROM ACUTTLE BOX DOWN WALL CAUSING PLASTER TO PEEL FROM WALLS AND CEILINGS ASBESTOS CODE A -CLEAR FOR REPAIRS ON 08/13/01. HORNE ENGINEERS |
June 5, 2001 |
November 13, 2001 |
161 days |
| Backus Middle School |
FM-200119506 01 11/16/01 BACKUS GYMNASIUM 1) ASBESTOS ASSESSMENT REQUIRED. 2) ROOF LEAKING. DAMAGE DUE TO SEEPAGE. NOTE: ROOF WAS REPAIRED BY CONTRACTOR IN JUNE 2001. ASBESTOS CODE A-CLEAR FOR REPAIR ON 9/13/01. HORNE ENGINEER SAM EBRAHIM |
September 10, 2001 |
November 16, 2001 |
67 days |
| Backus Middle School |
FM-200120625 01 11/16/01 (BACKUS) ROOF TOP/ROOM #209: !!!EMERGENCY!!! ROOF TOP LEAKING DOWN IN-TO ROOM #209, STORAGE ROOM. LOOKS LIKE OIL FROM COMPRESSOR. PER AL. COLEMAN, WILL SURVEY IMMEDIATELY. |
September 27, 2001 |
November 16, 2001 |
50 days |
| Rudolph Elementary School |
FM-200107844 01 12/5/01 (RUDOLPH) (1) ASBESTOS ASSESSMENT REQUIRED. ROOMS #202, #204, #206: ASSESS PLASTER ON WALL FOR REPAIR FROM ROOF LEAK. Code A-clear for repair by Horne Engineer (Sam Ebrahim ) on 3/15/02 (CEB) |
April 9, 2001 |
December 5, 2001 |
240 days |
| Rudolph Elementary School |
FM-200112650 01 12/5/01 RUDOLPH SECOND FLOOR HALLWAY 1) PLASTER FALLING DOWN IN HALLWAY IN OLD SIDE OF BUILDING DUE TO ROOF LEAK - NEED TO BE REPAIRED ASBESTOS CODE A - CLEAR FOR REPAIRS ON 6/11/01 |
June 6, 2001 |
December 5, 2001 |
182 days |
| Langdon Elementary School |
FM-200112243 01 12/5/01 LANGDON SECOND FLOOR BY ROOM 165/2 B CENTER 1) REPAIR LEAKING ROOF IN HALLWAY AND LEARNING CENTER 2 B CENTER ASBESTOS CODE A - CLEAR FOR REPAIRS ON 10/04/01. HORNE ENGINEERING - STEPHEN CALDWELL (RG) |
June 4, 2001 |
December 5, 2001 |
184 days |
| Rudolph Elementary School |
FM-200106119 01 12/5/01 (RUDOLPH) 1. ASBESTOS ASSESSMENT REQUIRED. OUTSIDE ROOM #206: LEAK FROM ROOF, ENTERS FIRE ALARM EQUIPMENT. 2. Asbestos Code A - Clear for Repair ON 03/21/01. |
March 19, 2001 |
December 5, 2001 |
261 days |
| Eliot Junior High School |
FM-200106292 01 12/6/01 ELIOT GIRLS GYMNASIUM ROOF (NEW) IS LEAKING WATER. COMING DOWN IN THE CEILING. PROPERTY DAMAGE HAZARD. ASBESTOS CODE A - ABATED ON 05-05-01(LM) PER LEROY MINTON CONFIRMATION SAFETY OFFICE (202-576-8962) THIS WORK ORDER IS THE SAME AS WO# 200123837 |
March 20, 2001 |
December 6, 2001 |
261 days |
| Walker-Jones EC |
FM-200115804 01 1/2/02 WALKER JONES WATER LEAKING FROM THE ROOF DOWN TO THE AUDITORIUM. THEY ARE HAVING A MEETING TO NIGHT. ISOLATE EMERGENCY!!! ASBESTOS CODE A - CLEAR FOR REPAIRS ON 12/12/01 HORNE ENGINEERING - BILL CAMPION |
July 24, 2001 |
January 2, 2002 |
162 days |
| Orr Elementary School |
FM-200124240 /01 1/9/02 (ORR) 1ST FLOOR/MAIN ENTRANCE LOBBY THERE IS A LEAK IN THE MAIN LOBBY COMING FROM THE ROOF FLASHING. ASBESTOS CODE A-CLEAR FOR REPAIR 12/05/01 BY HORNE ENGINEER: Z MAHNOOD |
November 30, 2001 |
January 9, 2002 |
40 days |
| Wilson J. O. ES |
FM-200127373 02 1/14/02 (WILSON,J.O.) ***URGENT*** 1ST FLOOR ROOF REPAIR ROOF OVER CAFETERIA. LEAKS REPORTED 1/1/02 FROM NEWLY REPAIRED ROOF. |
January 14, 2002 |
January 14, 2002 |
0 days |
| Macfarland Middle School |
FM-200106657 3/26/01 1/24/02 (MACFARLAND) 1. ASBESTOS ASSESSMENT REQUIRED. 3RD FLOOR/BOYS LOCKER ROOM: BREACHES IN CEILING OF BOYS LOCKER ROOM, DUE TO WATER LEAK FROM ROOF. (F-110.0) CODE A - ASBESTOS ABATED ON 9/27/01 (SG) PER SHEILA HOWARD CONFIRMATION. |
March 26, 2001 |
January 24, 2002 |
304 days |
| Bell High School |
FM-200103653 01 1/24/02 (BELL) 1) ASBESTOS ASSESSMENT REQUIRED 2) ROOF TOP 3) WATER LEAKING FROM ROOF IN-TO ELEVATOR. ASBESTOS CODE A - CLEAR FOR REPAIRS ON 05/14/01. |
February 13, 2001 |
January 24, 2002 |
345 days |
| Stanton Elementary School |
FM-200201059 02 1/29/02 (STANTON ANNEX) **URGENT** ASBESTOS ASSESSMENT REQUIRED MAIN BUILDING/ROOF OVER AUDITORIUM AREA THE ROOF OVER THE AUDITORIUM LEAKS & THE WATER IS RUNNING DOWN THE WALL ONTO THE FLOOR--FROM THE AUDITORIUM FLOOR DOWN TO THE CAFETERIA FLOOR. ASBESTOS CODE - A - CLEAR FOR REPAIRS ON 01/15/02 HORNE ENGINEERING - STEPHEN CALDWELL (RG) |
January 15, 2002 |
January 29, 2002 |
14 days |
| Bancroft Elementary School |
FM-200114378 01 1/30/02 BANCROFT ROOF 1) ROOF DRAIN OVER TOP OF BOYS RESTROOM IS DAMAGED CEILING IN BOYS RESTROOM AND AROUND LIGHT FIXTURE WATER LEAKING AROUND ROOF DRAIN CAUSING MAJOR DAMAGE TO CEILING |
June 29, 2001 |
January 30, 2002 |
215 days |
| Murch Elementary School |
FM-200201565 02 1/30/02 (MURCH) ASBESTOS ASSESSMENT REQUIRED ROOFING THROUGHOUT MAIN BUILDING ROOF IS LEAKING WHERE SEAMS OVERLAP THROUGHOUT THE ENTIRE BUILDING (MAIN BLDG). ASBESTOS CODE A-CLEAR FOR REPAIR ON 1/30/02 BY HORNE ENGINEER: SAM EBRAHIM |
January 23, 2002 |
January 30, 2002 |
7 days |
| Simon Elementary School |
FM-200112769 01 2/13/02 SIMON OUTSIDE - ON ROOF WATER IS LEAKING INSIDE THE BUILDING. WATER IS SITTING ON THE ROOF IN A PUDDY, NEED A PUMP TO GET THE WATER. EMERGENCY !!! |
June 7, 2001 |
February 13, 2002 |
251 days |
| Wilson J. O. ES |
FM-200120105 01 2/14/02 (WILSON, J.O.) ASBESTOS ASSESSMENT REQ. 1ST FLOOR/ BOYS AND GIRLS RESTROOM ASSESS, ABATE, AND RESTORE ROOF TOP AND DRAINS. NOTE: DRAIN IS CLOGGED AND ROOF TOP LEAKS INSIDE RESTROOMS. ASBESTOS/LEAD CODE A-CLEAR FOR REPAIR BY 11/01/01 HORNE ENGINEER: BIPIN NANAVARY |
September 18, 2001 |
February 14, 2002 |
149 days |
| Shepherd ES |
FM-200202500 02 2/19/02 (SHEPHERD) EXTERIOR/ROOF ABOVE THE AUDITORIUM THE ROOF IS LEAKING WATER THROUGH THE CEILING OF THE AUDITORIUM ASBESTOS CODE A-CLEAR FOR REPAIR ON 2/06/02 BY HORNE ENGINEER: STEPHEN CALDWELL |
February 5, 2002 |
February 19, 2002 |
14 days |
| Anacostia Senior High School |
FM-200203819 02 3/6/02 (Anacostia) ****Urgent**** Roof above 1st Floor Auditorium Roof drains need to be checked above the 1st floor auditorium area where there is leakage and falling plaster. |
March 4, 2002 |
March 6, 2002 |
2 days |
| Park View ES |
FM-200204355 02 3/27/02 Parkview !!!! Emergency !!!! Classroom #228 Closet ceiling water leaking from the roof. Ceiling tiles are falling down. Safety Hazard. Code A-clear for repair by Horne Egineer on ( Troy Wilcome ) 3/14/02 (CEB) |
March 13, 2002 |
March 27, 2002 |
14 days |
| Eastern High School |
FM-200122805 01 4/11/02 (EASTERN) ASBESTOS ASSESSMENT REQ. FOOTBALL FIELD/ BOYS AND GIRLS RESTROOM REPAIR LEAKING ROOF OVER FIELD RESTROOMS. ASBESTOS CODE A - CLEAR FOR REPAIRS ON 11/21/01. HORNE ENGINEERING - BIPIN NANAVATY (RG) |
November 1, 2001 |
April 11, 2002 |
161 days |
| Hardy Middle School |
FM-200204778 02 4/11/02 (Hardy) ****Urgent**** 1.Asbestos Assessment Required A leak in the roof above the hallway by classroom 315 is causing the ceiling plaster to fall. Once the leak is repaired, it will be necessary to repair the damaged ceiling in this area. Code A-clear for repair by Horne Engineer ( Stephen Caldwell ) 0n 3/22/02 (CEB |
March 20, 2002 |
April 11, 2002 |
22 days |
| Tubman Elementary School |
FM-200119831 01 4/11/02 (TUBMAN) 1. ASBESTOS ASSESSMENT REQUIRED. !!VERY URGENT!! ROOF: WATER LEAKING FROM ROOF, COMING THROUGH CEILING TILE. ASBESTOS CODE A-CLEAR FOR REPAIR 10/12/01 BY HORNE ENGINEER TROY WILCOME |
September 14, 2001 |
April 11, 2002 |
209 days |
| Janney Elementary School |
FM-200117571 01 4/12/02 (JANNEY) EMERGENCY ASBESTOS ASSESSMENT REQ. 3RD FLOOR/ HALLWAY R/R BAD ROOF LEAK ON THE WEST SIDE ROOF,LEAKING VERY BAD ASBESTOS CODE A - CLEAR FOR REPAIRS ON 08/16/01. HORNE ENGINEERS - TROY WILCOME |
August 15, 2001 |
April 12, 2002 |
240 days |
| Duke Ellington School |
FM-200206814 02 4/30/02 Ellington !!! Urgent !!! Second (2nd) Floor - Room #265 Need Roofing crew to Survey roof leak water leaking from curling auto classroom. |
April 29, 2002 |
April 30, 2002 |
1 day |
| Wilson J. O. ES |
FM-200206916 02 5/1/02 2nd Floor Level Roof Rpair rooftop pitch pockets above the library. Water leaks into the library when it rains. POC: William Hinton-Custodial Foreman |
April 30, 2002 |
May 1, 2002 |
1 day |
| Winston EC |
FM-200120452 01 5/10/02 WINSTON ROOF/COOLING TOWER 1. ASBESTOS ASSESSMENT REQUIRED 2. MAKE NECESSARY REPAIRS/ PATCH LARGE HOLE AND RUSTED OUT AREA OF BAC COOLING TOWER THAT IS LEAKING. 3. MAKE REPAIRS TO COOLING TOWER RETURN LINE THAT IS LEAKING. NOTE: CHILLER HAD TO BE TURNED OFF. ASBESTOS CODE A - CLEAR FOR REPAIRS ON 10/22/01. LEROY MINTON - SAFETY (202)576-6691 (RG |
September 25, 2001 |
May 10, 2002 |
227 days |
| Simon Elementary School |
FM-200204761 02 5/10/02 (Simon) **Very Urgent** 1. Asbestos assessment required. Counselor/Room #207: Leak from roof coming through ceiling. Roof drain appears to be stopped up. Code A-clear for repair by Horne Engineer ( Troy Wilcome ) 0n 3/22/02 (CEB |
March 20, 2002 |
May 10, 2002 |
51 days |
| Garnet-Patterson MS |
FM-200207024 02 5/13/02 Garnet-Patterson Boiler room Drain pipe from roof to boiler room has a leak. Water is flooding boiler room office. |
May 2, 2002 |
May 13, 2002 |
11 days |
| Ferebee-Hope Elementary School |
FM-200124420 01 5/24/02 FEREBEE-HOPE ROOF OF FACILITIY COOLING TOWER NEEDS REPLACING. DETERIORATED AND LEAKS BADLY. |
December 4, 2001 |
May 24, 2002 |
171 days |
| Wilkinson ES |
FM-200209598 02 6/14/02 (Wilkinson) !!!Emergency!!! Elevator-108/208: Water leaking from ceiling; appears to be leaking from roof. There is a steady stream of water coming through the light fixtures. |
June 13, 2002 |
June 14, 2002 |
1 day |
| Benjamin Banneker Academic HS |
FM-200210743 02 7/8/02 Banneker Roof Above 3rd Floor Room 312 1. Repair leak in the roof over 3rd-floor room 312, causing the plaster to fall. The leaking occurs during rain. Asbestos/Lead Code A-clear for repair by Horne Engineer ( Edwards Roogriuez )on 07/08/02 DCPS CE Buchanan |
July 3, 2002 |
July 8, 2002 |
5 days |
| Coolidge High School |
FM-200204581 02 7/29/02 (Coolidge) ***Emergency*** 3rd floor/Back hallway: Repair existing leak in ceiling created by roof leak. |
March 18, 2002 |
July 29, 2002 |
133 days |
| Ferebee-Hope Elementary School |
FM-200215598 02 9/3/02 Ferebee-Hope Roof Penthouse 1. Asbestos assessment required. 2. Repair or replace strainer on CHWS line leaking at flange 6 Inch (corrosion). EMERGENCY Asbestos Code A - Clear for repairs on 08/27/02. Horne Engineering - Sharon Voss (RG 08/27/02) |
August 26, 2002 |
September 3, 2002 |
8 days |
| Dunbar High School |
FM-200215562 02 9/9/02 Dunbar Boiler Room/Rooftop Replace leaking tubes in Boilers #1,#2 and #3. Boilers can not be inspected until work is done. |
August 26, 2002 |
September 9, 2002 |
14 days |
| Eastern High School |
FM-200210001 02 9/19/02 (Eastern) !!Emergency!! Armory Sub Basement/Lower Roof Over Armory: Seal leaking skylight, and repair down spouts; rooms are flooded [Rms. 337, hallway across from 330, and the skylight over the armory]. Water is flooding to the point that the areas cannot be clearned up in preparation for school opening; affected areas are growing. |
June 21, 2002 |
September 19, 2002 |
90 days |
| Webb Elementary School |
FM-200218101 02 9/24/02 Webb Roof Above Learning Center II and Counselor's Office Repair roof leak. |
September 23, 2002 |
September 24, 2002 |
1 day |
| Cleveland Elementary School |
FM-200218620 02 10/1/02 (Cleveland/KC. Lewis) 1st Floor - All purpose room Stop roof leak. |
October 1, 2002 |
October 1, 2002 |
0 days |
| Kramer Middle School |
FM-200101127 01 10/10/02 KRAMER ASBESTOS ASSESSMENT THROUGHOUT PLASTER WALLS AND CEILING NOTE: AREAS DAMAGED DUE TO DRAIN STOPPAGE ON ROOF LEAK, DRAIN HAS BEE UNSTOPPED AND ROOF FIXED MT-20001713 ASB MGR. ADDED - ORIGINAL INITIATED 1/12/01 (FJ) ASBESTOS CODE A - CLAER FOR REPAIRS 4/9/01 |
January 12, 2001 |
October 10, 2002 |
636 days |
| Malcolm X ES |
FM-200216339 02 10/10/02 Malcolm X Asbestos Assessment Reqd. 1st Floor Main Office & Lobby [Hallway] Replace ceiling tiles that were damaged by previous roof leak. Asbestos Code A- Clear for repairs on 09/03/02. Horne Engineering - Sam Ebrahim (RG 09/03/02 |
September 3, 2002 |
October 10, 2002 |
37 days |
| Seaton Elementary School |
FM-200209943 02 10/28/02 Seaton ****Urgent**** 1. Asbestos Assessment Reqd. Roof Over 1st Floor All Purpose Room 2. Check roof for standing water that is leaking through to the 1st-floor all purpose room, damaging the ceiling tiles and causing some of them to fall. Repair/remove standing water. 3. Replace damaged and missing ceiling tiles. that are damaged can be replaced. Code A-clear repair byDCPS CE Buchanan on 06/21/02 |
June 20, 2002 |
October 28, 2002 |
130 days |
| Nalle Elementary School |
FM-200216089 02 10/28/02 (Nalle) 1. Asbestos assessment required. Urgent!! Replace toilets in girls'bathrooms and urinals in boy' bathrooms on first and second floors old wing. The toilets and urinals are constantly leaking causing a severe health and safety hazard. Repair exhaust fans on the roof. There is no ventilation in any of the rest rooms. The exhaust fans do not work. This situation compounds the existing health hazard created by the leaking toilets and urinals. Account #: 288 Asbestos Code A - Clear for repairs on 10/25/02. DCPS-Safety - Leroy Minton Jr. (RG 10/28/02) |
July 30, 2002 |
October 28, 2002 |
90 days |
| Ferebee-Hope Elementary School |
FM-200220227 /02 10/31/02 Ferebee-Hope First floor - C-building by custodian closet Roof leaking need repair. |
October 29, 2002 |
October 31, 2002 |
2 days |
| Benning Elementary School |
FM-200220520 02 11/5/02 Benning Third Floor - Roof 1) Roof leak in the open space. |
November 1, 2002 |
November 5, 2002 |
4 days |
| Beers Elementary School |
FM-200222953 /02 1/13/03 (Beers) Building #1/2nd Floor hallway: Water coming from ceiling, through light fixtures. Possible roof leak. |
December 20, 2002 |
January 13, 2003 |
24 days |
| Walker-Jones EC |
FM-200222802 /02 1/13/03 (Walker Jones) !!!VERY URGENT!!! 2nd Floor/Open space library: Roof leaking. Asbestos Code A - Clear for repairs on 01/15/03. Horne Engineering - Roger Kager (RG 01/15/03) |
December 18, 2002 |
January 13, 2003 |
26 days |
| Marshall Educational Center |
FM-200222478 /02 1/14/03 Marshall, Thurgood Stage 3 - second floor Roof is leaking very badly on second floor stage 3 |
December 12, 2002 |
January 14, 2003 |
33 days |
| Wilson J. O. ES |
FM-200206179 02 1/17/03 (Wilson, J.O.) 1. Asbestos assessment required. 1st floor/Kitchen area: Plaster ceiling due to previous roof leaks. Asbestos Code A - Clear for repairs on 04/22/02. Horne Engineering - Troy Wilcome (RG 04/23/02) Lead Based Paint Code A - Clear for repairs on 4/22/02 Horne Engineering, Troy Wilcome (RE) Lead Level 1; No lead based paint impact. |
April 22, 2002 |
January 17, 2003 |
270 days |
| Dunbar High School |
FM-200224252 03 1/23/03 (Dunbar) !!!EMERGENCY!!! 5MW Open space: Water leaking from the roof drain, down in-to light fixtures. Please remove light fixtures. |
January 21, 2003 |
January 23, 2003 |
2 days |
| Dunbar High School |
FM-200222405 /02 1/23/03 Dunbar Boiler Room/Rooftop Boiler #2 Replace leaking tubes. Asbestos Code A - Clear for repairs on 12/20/02. Horne Engineering - Troy Wilcome (RG 12/23/02) |
December 12, 2002 |
January 23, 2003 |
42 days |
| Kimball Elementary School |
FM-200222164 02 1/30/03 Kimball Second floor staff lounge Leak in roof and ceiling plaster falling down. |
December 9, 2002 |
January 30, 2003 |
52 days |
| Smothers ES |
FM-200225974 03 2/26/03 Smothers Third Floor - Roof Leak 1) Please check and repair roof leak on the west side of the building. Asbestos Code A - Clear for repairs on 02/25/03. Horne Engineering - Philp Connolly (RG 02/26/03) |
February 21, 2003 |
February 26, 2003 |
5 days |
| Coolidge High School |
FM-200220735 /02 2/28/03 Coolidge Roof Leak 1) Roof leaking from third floor to ground floor in stairwell and hallways. |
November 12, 2002 |
February 28, 2003 |
108 days |
| Langdon Elementary School |
FM-200124660 /01 3/14/03 (LANGDON) Hot water leaking out of the Boys Bathroom Radiator Trap on the 1st floor (space 68)and the Radiator Trap in the Cafeteria (basement). Requester Phone: (202) 576-6048 Web Form Location ID: 262 Request or Phone: (202) 576-6048 Code A-clear for repair by Horne Engineer ( Sam Ebrahim ) on 4/15/02 Same work order has FM-200122725 Tracking # 10294 The code A was change to a code B for exploratory in Boys Bathroom Radiator Trap on the 1st floor. Fireproofing clean up in AMP rooms 16 and 185/EXP Demo 1st floor Boys Restroom. Envirobate - Charles Crenshaw - 571-436-1150 |
October 29, 2001 |
March 14, 2003 |
501 days |
| Bancroft Elementary School |
FM-200227391 03 3/21/03 (Bancroft) !!!VERY URGENT!!! 2nd Floor/Room #123: Roof leaking between slate and classroom, through ceiling. |
March 20, 2003 |
March 21, 2003 |
1 day |
| Ferebee-Hope Elementary School |
FM-200122728 /01 3/25/03 FEREBEE-HOPE ROOF B. BLDG. 1. ASBESTOS ASSESSMENT REQUIRED. 2. REPLACE DRAIN FLANGE AT COOLING TOWER. ROOF DRAIN LEAKING ON ROOMS BELOW. ASBESTOS CODE A-CLEAR FOR REPAIR ON11/28/01 BY HORNE ENGINEER : TROY WILCOME |
October 31, 2001 |
March 25, 2003 |
510 days |
| Ferebee-Hope Elementary School |
FM-200119659 01 3/25/03 FEREBEE HOPE ROOF PENHOUSE CHILL WATER SUPPLY LINE LEAKING. 6INCH BLACK IRON PIPE. NOTE: WATER SEEPING THROUGH ROOF INTO COMMON AREA. |
September 12, 2001 |
March 25, 2003 |
559 days |
| Eastern High School |
FM-200204771 02 3/26/03 (Eastern) ***Very Urgent*** 1. Asbestos assessment required. 3rd floor/room #337: Leak in office of choir room office ceiling, coming roof. Code A-clear for repair by Horne Engineer ( Sam Ebrahim ) 0n 3/22/02 (CEB |
March 20, 2002 |
March 26, 2003 |
371 days |
| Oyster Elementary School |
FM-200225382 03 3/26/03 Oyster Roof Leaking cooling tower, cooling sealer came off of metal, need resealing. Leaking water out on the roof very bad. |
February 7, 2003 |
March 26, 2003 |
47 days |
| Brent Elementary School |
FM-200210057 02 3/26/03 Brent Roof Top Check roof top A/C unit for leak, coil freezing up. |
June 24, 2002 |
March 26, 2003 |
275 days |
| Eastern High School |
FM-200226744 03 3/27/03 Eastern Female locker room / boiler room Repair roof leak, water coming from roof above boiler room. Leaking badly into locker room. |
March 7, 2003 |
March 27, 2003 |
20 days |
| Benning Elementary School |
FM-200227766 03 4/3/03 Benning Roof Repair leaking city water supply line to cooling tower on roof of building. |
March 27, 2003 |
April 3, 2003 |
7 days |
| Merritt Middle School |
FM-200205393 02 4/8/03 (Merritt) 1st Floor Commons Area at West-end of Building in Front of Stairway Next to Pillar Repair leak from roof, caused by water standing under roofing material and leaking down into area below. |
April 3, 2002 |
April 8, 2003 |
370 days |
| Hine JHS |
FM-200227965 03 5/3/03 Hine Cooling tower- roof top Replace 3"x 4" ruptured coupling on the drain line to the cooling tower, it is leaking just before the stop valve. |
April 1, 2003 |
May 3, 2003 |
32 days |
| Duke Ellington School |
FM-200108117 01 5/5/03 (ELLINGTON) (1) ASBESTOS ASSESSMENT REQUIRED. ROOF: REPLACE SKY-LIGHT IN THE ROOF. GAIN ENTRY TO THE ROOF THROUGH BASEMENT WINDOW. LEAKING IN CLASSROOM AND WEIGHT ROOM, LOCATED IN THE GYM. ASBESTOS CODE A-CLEAR FOR REPAIR 6/9/01 |
April 11, 2001 |
May 5, 2003 |
754 days |
| Wilson J. O. ES |
FM-200329748 03 5/14/03 J.O. Wilson Roof top A/C unit Replace 1" Ruptured PVC drain line on one of three A/C unit on the roof condesation from the unit leak onto the and leaks into the building during operation of the unit. |
May 8, 2003 |
May 14, 2003 |
6 days |
| Merritt Middle School |
FM-200205525 02 5/19/03 (Merritt) Asbestos Assessment Reqd. 1st Floor Commons Area at West-end of Building in Front of Stairway Next to Pillar Replace four sheets of ceiling tile which were damaged & removed to accommodate the repair of a roof leak [refer to FM-200205393]. Asbestos Code A - Clear For Repairs On 04/08/02. DCPS Safety -Richard Gibson |
April 8, 2002 |
May 19, 2003 |
406 days |
| Hardy Middle School |
FM-200206912 02 5/20/03 (Hardy) Caulk around mushrooms nails that hold flashing. A leak in the roof by the window in the Principal office (307 ) is causing the ceiling damage. Once the leak is repaired, it will be necessary to repair the damaged ceiling in this area. |
April 30, 2002 |
May 20, 2003 |
385 days |
| Hendley Elementary School |
FM-200330241 03 5/20/03 Hendley !! EMERGENCY !! Basement - Kitchen 1. Repair major roof leak in the kitchen . |
May 16, 2003 |
May 20, 2003 |
4 days |
| Stoddert ES |
FM-200331213 03 6/9/03 Stoddert Low roof in multi purpose room Roof is leaking where the there is a hole big enough for someone to enter. Need someone to board up the hole until the roof get fix. |
June 4, 2003 |
June 9, 2003 |
5 days |
| Lafayette Elementary School |
FM-200332294 03 7/24/03 Lafayette Team 4 Roof leaking as you walk into the team, area. Slate roof Also leaking down brick wall to the far left in team. |
June 23, 2003 |
July 24, 2003 |
31 days |
| Lafayette Elementary School |
FM-200330050 03 7/24/03 (Lafayette) !!VERY URGENT!!! Main Building/Roof: Roof leaking in-to team (4) down in-to team 2; walls are soaked. Need (2) cases of ceiling tile. Asbestos Code A - Clear for repairs on 05/12/03. Horne Engineering - Troy Wilcome (RG 05/13/03) |
May 12, 2003 |
July 24, 2003 |
73 days |
| Wilson J. O. ES |
FM-200334353 03 8/5/03 (Wilson, J.O. Through-Out the Building: Water running from 3rd floor too the 1st floor; appears to be a roof leak. |
August 5, 2003 |
August 5, 2003 |
0 days |
| Gibbs Elementary School |
FM-200334579 03 8/20/03 (Gibbs) FIRE CODE VIOLATIONS: 1st Floor/Cafeteria: Water leaking in-to electrical appliance. (Roof leak) |
August 6, 2003 |
August 20, 2003 |
14 days |
| Gage-Eckington ES |
FM-200332436 03 8/21/03 Gage Eckington Air Handler #4 On the roof R/R leaking 1/2" line on the top of the air handler |
June 25, 2003 |
August 21, 2003 |
57 days |
| Maury Elementary School |
FM-200330804 03 8/29/03 Maury EMERGENCY Room (6) - Second Floor 1) Replace buckling 12 X 12 floor tile that was damaged by water from roof leaks. Floor tile was replaced last year... Asbestos Code A - Clear for repairs on 05/28/03. Horne Engineering - Roger Kager (RG 05/30/03) |
May 28, 2003 |
August 29, 2003 |
93 days |
| Nalle Elementary School |
FM-200337852 03 10/1/03 Nalle 1) Roof Leak - Room 118 - Old Wing 2) Three ( 3) windows blown out in room 212 and One (1) blown out in room 211. |
September 23, 2003 |
October 1, 2003 |
8 days |
| Tyler Elementary School |
FM-200339763 /03 11/3/03 Tyler First floor roof new wing Repair roof leaks hallway new wing. |
October 31, 2003 |
November 3, 2003 |
3 days |
| Gibbs Elementary School |
FM-200334578 03 2/20/04 (Gibbs) FIRE CODE VIOLATIONS: 3rd Floor: Water leaking in-to electrical appliance. (Roof leak) Room 304 Asbestos Code A - Clear for repairs on 09/15/03. Horne Engineering - Philp Connolly (RG 09/16/03) |
August 6, 2003 |
February 20, 2004 |
198 days |
| Garnet-Patterson MS |
FM-200207055 02 3/1/04 Garnet-Patterson ****Urgent**** Boiler Room The drain pipe is leaking from the roof to the boiler room allowing water to flood the boiler room office. |
May 3, 2002 |
March 1, 2004 |
668 days |
| Dunbar High School |
FM-200224224 03 3/11/04 Dunbar Penthouse Asbestos assessment required Repair leaking roof over classroom. Asbestos Code A - Clear for repairs on 01/23/03. Horne Engineering - Sharon Voss (RG 01/28/03) |
January 21, 2003 |
March 11, 2004 |
415 days |
| Winston EC |
FM-200443312 04 3/22/04 (Winston) Asbestos Assessment Required. Roof: Leaking from the sprinkler system; flooding the back hallway of the 3rd floor. Asbestos Code A - Clear for repairs on 01/29/04. Horne Engineering - Philp Connolly (RG 01/30/04) |
January 28, 2004 |
March 22, 2004 |
54 days |
| Benjamin Banneker Academic HS |
FM-200331733 03 3/22/04 (Banneker) FIRE CODE VIOLATION: 3rd Floor/Room #303: Roof leaking near room #303 Asbestos Code A - Clear for repairs on 06/16/03. Horne Engineering - Roger Kager (RG 06/19/03) |
June 13, 2003 |
March 22, 2004 |
283 days |
| Hart Middle School |
FM-200332266 03 3/25/04 Hart Third Floor 1. Roof leaking on the third floor hallway . |
June 20, 2003 |
March 25, 2004 |
279 days |
| Harris, C.W. ES |
FM-200341742 /03 4/5/04 (Harris, C.W.) HEALTH CODE VIOLATION: Kitchen Restroom: Leaking in toilet room from roof. Asbestos Code A - Clear for repairs on 12/18/03. Horne Engineering - Edward Rodriguez (RG 12/22/03) |
December 17, 2003 |
April 5, 2004 |
110 days |
| Maury Elementary School |
FM-200446202 04 4/13/04 Maury Check west building for roof leaks. |
April 1, 2004 |
April 13, 2004 |
12 days |
| Slowe Elementary School |
FM-200446266 04 4/14/04 (Slowe) !!!VERY URGENT!!! 2nd Floor: Roof leaking in front of Room #210. Asbestos Code A - Clear for repairs on 04/02/04. Horne Engineering - Bjarne Smith (RG 04/06/04) SEE LINKED DOCUMENTS |
April 2, 2004 |
April 14, 2004 |
12 days |
| Eastern High School |
FM-200446875 04 5/4/04 Eastern Stadium girls bathroom Repair roof on stadium girls bathrooms. Roof leak, destroying bathroom ceiling. |
April 20, 2004 |
May 4, 2004 |
14 days |
| Spingarn High School |
FM-200226199 03 6/14/04 Spingarn Leaks thru out building Requesting someone to come out and check the roof for the following leaks: Room 115, 220, 311, 324, 328, 320, 308, 302, 301, 307 and the balcony of the auditorium. |
February 25, 2003 |
June 14, 2004 |
475 days |
| Johnson JHS |
FM-200450669 04 7/27/04 Johnson Rooftop Removal of lock from area leaking to roof, there is no key. Technican must service several aid handle units on the roof. |
July 23, 2004 |
July 27, 2004 |
4 days |
| Gage-Eckington ES |
FM-200451572 04 8/9/04 Gage-Eckington Roof -AHU #2 Repair leaking A/C coil on Air Handler Unit #2. |
August 5, 2004 |
August 9, 2004 |
4 days |
| Winston EC |
FM-200452644 04 8/25/04 Winston Roof 1) Roof leaking , draining down into Special Ed Classroom on 4th floor. Walls and carpet are molding. |
August 13, 2004 |
August 25, 2004 |
12 days |
| Eastern High School |
FM-200453194 04 9/7/04 Eastern Auditorium The roof is leaking. |
August 23, 2004 |
September 7, 2004 |
15 days |
| Harris, C.W. ES |
FM-200454363 04 9/13/04 Harris, CW First floor multi purpose room Roof drain leaking water onto the floor. |
September 10, 2004 |
September 13, 2004 |
3 days |
| Nalle Elementary School |
FM-200453090 04 9/20/04 (Nalle) FIRE CODE VIOLATION: 2nd Floor/Room #235: Roof has water leak. Asbestos Code A - Clear for repairs on 08/27/04. DCPS Safety - Leroy Minton (RG 08/27/04) |
August 20, 2004 |
September 20, 2004 |
31 days |
| Bancroft Elementary School |
FM-200454870 04 9/20/04 Bancroft Bsmnt Library Survey to repair roof causing water to leak onto the carpet causing mildew. |
September 16, 2004 |
September 20, 2004 |
4 days |
| Moten Elementary School |
FM-200449482 04 9/29/04 (Moten) !!!VERY URGENT!!! Asbestos Assessment Required. 4th Floor/Southeast Stairwell: Leaking from roof causing breach in ceiling. (Water flooding the stairwell) Code A - clear for repairs as of 9/1/04 safety Sylvia. |
June 18, 2004 |
September 29, 2004 |
103 days |
| King M L ES |
FM-200455631 04 10/6/04 King Main roof Need to have the main roof repaired or replaced it is leaking. |
September 24, 2004 |
October 6, 2004 |
12 days |
| Gage-Eckington ES |
FM-200455792 04 10/6/04 Gage-Eckington Outside roof Top of roof has to be repaired due to water leaking inside causing damage to ceiling tile and lights, etc...... |
September 27, 2004 |
October 6, 2004 |
9 days |
| Francis Junior High School |
FM-200454397 04 11/30/04 Francis Third floor room 312 Replaster and paint right side of ceiling in the room. Plaster is falling down from old roof leak. |
September 10, 2004 |
November 30, 2004 |
81 days |
| Savoy Elementary School |
FM-200454443 04 11/30/04 Savoy Roof east side Drains on the roof are clogged and leads to leaks from the flashing that brings down ceilings tile in the kitchen and all purpose room. |
September 13, 2004 |
November 30, 2004 |
78 days |
| Amidon Elementary School |
FM-200457328 /04 12/6/04 Amidon Roof top Roof area need to be repaired it leaks in the cafeteria badly and also in the lobby area. |
October 22, 2004 |
December 6, 2004 |
45 days |
| Brent Elementary School |
FM-200457233 /04 12/7/04 (Brent) !!!VERY URGENT!!! Roof leak over auditorium: |
October 21, 2004 |
December 7, 2004 |
47 days |
| Marshall Educational Center |
FM-200454067 04 12/8/04 Marshall Dr. Diya room Repair leaking roof in stage 3 computer lab. |
September 8, 2004 |
December 8, 2004 |
91 days |
| Anacostia Senior High School |
FM-200454186 04 12/8/04 (Anacostia) Leaking from roof in-to the gym hallway. Code A-clear for repair by DCPS Charles Buchanan on 9/13/04 |
September 9, 2004 |
December 8, 2004 |
90 days |
| Marshall Educational Center |
FM-200453978 04 12/9/04 Marshall Third Floor - Restroom 1) Roof Leaking. |
September 7, 2004 |
December 9, 2004 |
93 days |
| Marshall Educational Center |
FM-200453979 04 12/9/04 Marshall Third Floor - Science Lab 1) Roof Leak. |
September 7, 2004 |
December 9, 2004 |
93 days |
| Gage-Eckington ES |
FM-200453968 04 12/10/04 Gage-Eckington First Floor - Boys Bathroom 1) Roof Leak. |
September 7, 2004 |
December 10, 2004 |
94 days |
| Eastern High School |
FM-200453777 04 12/30/04 Eastern Roof annex Repair outside wall of window east side of room 160 to stop leak brick blocks is coming away from wall causing water damage to inside wall. |
September 1, 2004 |
December 30, 2004 |
120 days |
| Young Elementary School |
FM-200456530 04 1/4/05 Young Outside of building Repair roof leaks ove the following areas: Over auditorium over center III over gym passage way PS there leaks are cause damage to ceiling and floors. |
October 6, 2004 |
January 4, 2005 |
90 days |
| Coolidge High School |
FM-200333547 03 2/1/05 Coolidge Third floor rooms 314 and 316 Replace wood floors in classrooms. Floors damage from roof leak. Asbestos Code A - Clear for repairs on 07/22/03. Horne Engineering - Sheryll James (RG 07/24/03) |
July 22, 2003 |
February 1, 2005 |
560 days |
| Shepherd ES |
FM-200501443 05 2/10/05 (Shepherd) Boiler Room: Lower roof drains leaking in boiler room. |
February 9, 2005 |
February 10, 2005 |
1 day |
| Terrell Mc ES |
FM-200443644 04 3/24/05 (Terrell, M.C.) Upper-Ground Cafeteria: Leaking coming from roof drain, running down wall. |
February 3, 2004 |
March 24, 2005 |
415 days |
| Beers Elementary School |
FM-200503115 05 3/28/05 Beers Roof - Building 2 - Boys Bathroom 1) Leaking above slop sink. |
March 23, 2005 |
March 28, 2005 |
5 days |
| Slowe Elementary School |
FM-200452765 04 5/4/05 (Slowe) FIRE CODE VIOLATION: 2nd Floor Hall/Across from Room #211: Ceiling tile missing. Asbestos Code A - Clear for repairs on 08/24/04. DCPS Safety - Leroy Minton Jr. (RG 08/25/04) Note: Roof is still Leaking |
August 17, 2004 |
May 4, 2005 |
260 days |
| Eastern High School |
FM-200330617 03 5/26/05 Eastern Lights in auditorium needs replacing work order in. roof leak in auditorium and armory. |
May 22, 2003 |
May 26, 2005 |
735 days |
| Gibbs Elementary School |
FM-200453256 04 7/13/05 Gibbs First floor cafeteria Ceiling tile is wet from roof leak, need to be replaced or repair.Front door needs repairing. Asbestos Code A - Clear for repairs on 08/26/04. DCPS Safety - Richard Gibson (RG 08/27/04) |
August 24, 2004 |
July 13, 2005 |
323 days |
| Hearst Elementary School |
FM-200103775 01 7/22/05 HEARST 1ST & 2ND FLOOR, ROOF, GUTTERS & WALLS THE ROOF LEAKS INTO ROOM 201 & 099. THERE IS ALSO DAMAGE TO THE WALLS IN THE PRINCIPALS OFFICE (112) AND THE MAIN OFFICE (110). ASBESTOS CODE A - CLEAR FOR REPAIRS ON 12/28/01. HORNE ENGINEERING - BILL CAMPION (RE) |
February 16, 2001 |
July 22, 2005 |
1,617 days |
| Macfarland Middle School |
FM-200101965 1/23/01 7/22/05 MACFARLAND FIRST (1ST) AND SECOND (2ND) FLOOR - ROOF ROOF IS LEAKING WATER IS RUNNING INSIDE THE BUILDING SOME CHILD OR CHILDREN CAN SLIP. THIS A SAFETY CONCERN. |
January 23, 2001 |
July 22, 2005 |
1,641 days |
| Hardy Middle School |
FM-200102367 01 7/22/05 (HARDY) 2ND FLOOR GYM: REPAIR BREECH IN WALLS IN GYM AREA AFTER ROOF LEAK. DRAIN WAS REPAIRED. (FIRE CODE VIOLATION) ASBESTOS CODE A - CLEAR FOR REPAIRS ON 05/23/01. |
January 29, 2001 |
July 22, 2005 |
1,635 days |
| Dunbar High School |
FM-200105115 01 7/22/05 DUNBAR A-BLDG. - MECHANICAL ROOM PLEASE SURVEY & REPAIR ROOF LEAK WHEN IT RAINS., WATER WILL DAMAGE MOTOR FOR AIR HANDLER A-2. THE CEILING HAS SPRAYED ON INSULATION. |
March 6, 2001 |
July 22, 2005 |
1,599 days |
| Nalle Elementary School |
FM-200108269 01 7/25/05 NALLE SECOND (2ND) FLOOR - CLASSROOM 226 PARENT RESOURCE ROOM 1) ASBESTOS ASSESSMENT REQUIRED 2) REPAIR LEAKING ROOF IN THIS CLASS ASBESTOS CODE A - CLEAR FOR REPAIRS ON 04/12/01. |
April 12, 2001 |
July 25, 2005 |
1,565 days |
| King M L ES |
FM-200102643 01 7/25/05 KING KING THIRD (3RD) FLOOR LEAK IN GIRLS RESTROOM ON THE 3RD FLOOR WATER IS FLOODING THE FLOOR. (POSSIBLE ROOF LEAK) MT-20001575 |
January 31, 2001 |
July 25, 2005 |
1,636 days |
| Eastern High School |
FM-200456633 04 7/25/05 Eastern URGENT Sub-basement armory Repair hole in ceiling cause by roof leak- ceiling need to be repaired and painted. Asbestos Code A - Clear for repairs on 10/12/04. DCPS Safety -Leroy Minton Jr.(RG 10/12/04) |
October 8, 2004 |
July 25, 2005 |
290 days |
| Seaton Elementary School |
FM-200106980 01 7/27/05 SEATON ROOF ROOF LEAKING IN ALL PURPOSE ROOM. HEAVY RAIN CODE A - ASBESTOS ABATED ON 7/9/01 (SG) PER LEROY MINTONS CONFIRMATION. |
March 30, 2001 |
July 27, 2005 |
1,580 days |
| Draper Elementary School |
FM-200457099 /04 8/1/05 Draper URGENT Third floor hallway ceiling Leaking ceiling in hallway. Roof drains maybe stopped up. Request all drains be checked and unstopped. |
October 19, 2004 |
August 1, 2005 |
286 days |
| Lafayette Elementary School |
FM-200456987 /04 8/1/05 Lafayette Second floor team 4 Replace ceiling tile due to roof leak. Area size 5'x5' the size 12"x12". Asbestos Code A - Clear for repairs on 10/18/04. DCPS Safety - Richard Gibson (RG) |
October 18, 2004 |
August 1, 2005 |
287 days |
| Roosevelt High School |
FM-200444144 04 8/2/05 Teddy Roosevelt Senior High - 1st Floor - Room 102: Asbestos Assessment Required. Ceiling Tiles in Room 102 show water stains from water falling onto tiles from above. Please check and repair. Suspect plumbing is leaking, or roof is leaking. Asbestos Code A - Clear for repairs on 03/09/04. Horne Engineering - Philp Connolly (RG 03/11/04) |
February 12, 2004 |
August 2, 2005 |
537 days |
| Wilson High School |
FM-200340613 /03 8/2/05 (Wilson, W.) Asbestos Assessment Required. Library/Roof: Loose flashing on the top of library building, causing leaks in classrooms #141 & 142 |
November 21, 2003 |
August 2, 2005 |
620 days |
| Wilson High School |
FM-200219785 /02 8/2/05 Wilson, W.) !!!URGENT!!! Third floor hallway Repair roof leaks in the third floor hallway near classroom 301. Asbestos Code A - Clear for repairs on 10/23/02. Horne Engineering - Troy Wilcome (RG 10/25/02) |
October 22, 2002 |
August 2, 2005 |
1,015 days |
| Wilson High School |
FM-200219786 /02 8/2/05 Wilson, W.) !!!URGENT!!! First floor room 232 and library Repair roof leaks in the bandroom 232 and also the library. Asbestos Code A - Clear for repairs on 10/23/02. Horne Engineering - Troy Wilcome (RG 10/25/02) |
October 22, 2002 |
August 2, 2005 |
1,015 days |
| Eastern High School |
FM-200342025 /03 8/3/05 Eastern Exterior - Boiler Room - Service Driveway To Boiler Room. 1) Remove existing asphalt paving located above the engineer lunch room/ storage room, located in the boiler room. Install new vapor barrier/ waterproofing membrane and repave drive-way. Presently the area is leaking into the rooms below the service driveway. |
December 23, 2003 |
August 3, 2005 |
589 days |
| Eastern High School |
FM-200500448 05 8/4/05 EASTERN RESTROOM B94 ROOF LEAK Asbestos Code A - Clear for repairs on 06/29/05. Tidewater - Kenny Long (RG 07/12/05) |
January 14, 2005 |
August 4, 2005 |
202 days |
| Eastern High School |
FM-200453195 04 8/4/05 Eastern EERGENCY Room 37 The roof is leaking inside the halls. |
August 23, 2004 |
August 4, 2005 |
346 days |
| Eastern High School |
FM-200450768 04 8/4/05 Eastern Stadium girls bathroom Repair roof leak - destorying bathroom ceiling. |
July 26, 2004 |
August 4, 2005 |
374 days |
| Macfarland Middle School |
FM-200456128 04 8/4/05 (Macfarland) REPAIR LEAK OVER COMMODE IN GIRLS LOCKER ROOM FROM ROOF |
September 28, 2004 |
August 4, 2005 |
310 days |
| Macfarland Middle School |
FM-200338338 03 8/4/05 (Macfarland) Asbestos Assessment Required. repair roof leaks in girls and boy gyms. |
September 16, 2003 |
August 4, 2005 |
688 days |
| Macfarland Middle School |
FM-200216073 02 8/4/05 MacFarland ****Urgent**** 2nd Floor Level Roof over West Hallway by Room 209 Roof is leaking from the drain over the above area. The water is going down through to the 2nd & 1st floors. |
August 28, 2002 |
August 4, 2005 |
1,072 days |
| Eastern High School |
FM-200331892 03 8/4/05 Eastern Boys bathroom stadium Repair roof leak in stadium boys bathroom. Leaking in corner near entrance by urinals. Roof is flat rrof. cCeiling need repairing after roof repair. |
June 16, 2003 |
August 4, 2005 |
780 days |
| Eastern High School |
FM-200219511 /02 8/4/05 (Eastern) !!!URGENT!!! Annex roof across from Room #159: Problems with Roof leaks, and down spouts through-out the building; see engineer for exact locations, cafeteria, and Nurses office. Also, repair flashing. |
October 16, 2002 |
August 4, 2005 |
1,023 days |
| Eastern High School |
FM-200226477 03 8/4/05 EASTERN First floor - Gymnasium 1. Roof leak has damaged ceiling tile. Replace ceiling tile inside of gym . Appoximate - 30 pieces . Asbestos Code A - Clear for repairs on 02/28/03. Horne Engineering - Roger Kager (RG 03/05/03) |
March 4, 2003 |
August 4, 2005 |
884 days |
| Eastern High School |
FM-200503515 05 8/4/05 (Eastern) "Emergency" Asbestos Assessment Required. First floor, Room 153/Third floor, Room 327/Armory. Repair roof leaks safety hazzard-dangerous ceiling room 153 and 327. Repair roof leak around skylight in armory. Asbestos Code A - Clear for repairs on 07/29/05. Tidewater - Kenny Long (RG 07/12/05) |
April 4, 2005 |
August 4, 2005 |
122 days |
| Hendley Elementary School |
FM-200330327 03 8/11/05 Hendley third floor teacher bathroom Repair roof leak. |
May 19, 2003 |
August 11, 2005 |
815 days |
| Hendley Elementary School |
FM-200444842 04 8/11/05 Hendley Roof leak in the kitchen storage room area, everytime it rains and floods. Asbestos Code A - Clear for repairs on 03/05/04. Horne Engineering - Bipin Nanavaty (RG 03/09/04) |
March 4, 2004 |
August 11, 2005 |
525 days |
| Burrville Elementary School |
FM-200331883 03 9/9/05 Burrville First floor book room Storm drain leaking from roof. |
June 16, 2003 |
September 9, 2005 |
816 days |
| Oyster Elementary School |
FM-200458305 /04 10/3/05 Oyster Fourth floor room 407 Water is leaking from ceiling. I think its from the roof, it happen only when it rain hard. |
November 16, 2004 |
October 3, 2005 |
321 days |
| Oyster Elementary School |
FM-200223365 /02 10/3/05 (Oyster) Repair leaking roof Asbestos Code A- Cleared for repairs on12-23-03 by Leroy Minton Jr (LM/01-15-04) Safety Office. 202-576-8962. |
November 19, 2002 |
October 3, 2005 |
1,049 days |
| Oyster Elementary School |
FM-200456346 04 10/3/05 Oyster Fourth floor room 407 R/R bad roof leak in room 407. Ceiling, wall and floor tile is being damage. |
October 1, 2004 |
October 3, 2005 |
367 days |
| Ross Elementary School |
FM-200443637 04 10/6/05 Ross EMERGENCY Room 207 Roof is leaking in room 207, second floor, where ther is a lot of computers and other electrical equipment. |
February 3, 2004 |
October 6, 2005 |
611 days |
| Brent Elementary School |
FM-200502020 05 10/13/05 BRENT Multi-Purposes Rm Roof Leaking Asbestos Code A - Clear for repairs on 03/14/05. DCPS Safety - Leroy Minton Jr. (RG 03/14/05) |
February 25, 2005 |
October 13, 2005 |
230 days |
| Brent Elementary School |
FM-200503510 05 10/13/05 Brent Third Floor Hallway near Room 302 and Auditorium 1) Roof Leaking. |
April 4, 2005 |
October 13, 2005 |
192 days |
| Brent Elementary School |
FM-200500738 05 10/13/05 Brent Room 307 There is a roof leak. |
January 24, 2005 |
October 13, 2005 |
262 days |
| Brent Elementary School |
FM-200220451 /02 10/13/05 Brent Third floor - rooms 305 and 307 Roof leaks down into class rooms. |
October 31, 2002 |
October 13, 2005 |
1,078 days |
| Brent Elementary School |
FM-200456403 04 10/13/05 Brent Fisrt floor auditorium and corridor Leaking from roof. (repair) |
October 4, 2004 |
October 13, 2005 |
374 days |
| Brent Elementary School |
FM-200447557 04 10/13/05 Brent First floor auditorium Roof leaking. |
May 5, 2004 |
October 13, 2005 |
526 days |
| Horace Mann Elementary School |
FM-200458025 04 10/13/05 Mann Entrance To Community Center Repair roof leak over Entrance to the Community Center Plaster is falling off the wall. Repair plaster and replace the down spout on outside wall. Asbestos Code A - Clear for repairs on 11/09/04. DCPS Safety - Leroy Minton Jr. (RG 11/09/04) |
November 8, 2004 |
October 13, 2005 |
339 days |
| Brent Elementary School |
FM-200228415 03 10/13/05 Brent Third floor room 313 Ceiling is leaking, please repair roof. |
April 7, 2003 |
October 13, 2005 |
920 days |
| Brent Elementary School |
FM-200502343 05 10/13/05 Brent Multi-Purpose room The roof is leaking again, The roofers came out Friday and Monday to patch the roof, but ot is still leaking. |
March 8, 2005 |
October 13, 2005 |
219 days |
| Young Elementary School |
FM-200226944 03 10/15/05 Young First floor gym passage way Repair leak on lower roof, over gym passage way. |
March 12, 2003 |
October 15, 2005 |
948 days |
| Young Elementary School |
FM-200452840 04 10/15/05 Young First floor auditorium left rear ceilinf Repair roof leak over auditorium. Heavy rains makes plaster fall from the inside. |
August 18, 2004 |
October 15, 2005 |
423 days |
| Wilson J. O. ES |
FM-200223620 03 10/17/05 (Wilson, J.O.) 3rd floor/Rooms #300 & 317: Repair roof leaks over the rooms #300, & 317. |
January 7, 2003 |
October 17, 2005 |
1,014 days |
| Wilson J. O. ES |
FM-200219551 /02 10/17/05 Wilson, J.O. Teachers restroom (old side) Repair or replace ceiling due to roof leak. Restroom has been closed down for safety reasons, Urgent. Asbestos Code A - Cleared for repairs on 10-17-02 (LM / 10-18-02) Leroy Minton Jr. Safety Office 202-576-8962. |
October 17, 2002 |
October 17, 2005 |
1,096 days |
| Wilson J. O. ES |
FM-200222381 /02 10/17/05 Wilson, J.O. First Floor - Kitchen 1) Roof leak in Kitchen ceiling. |
December 11, 2002 |
October 17, 2005 |
1,041 days |
| Webb Elementary School |
FM-200220986 /02 10/19/05 Webb First Floor - Lower Roof 1) Leaking in Main Storage Room. |
November 14, 2002 |
October 19, 2005 |
1,070 days |
| Orr Elementary School |
FM-200335549 03 10/19/05 (Orr) !!!EMERGENCY!!! Roof leak through-out the building. (The Mayor of D.C. will visit the school on Tuesday, September 02, 2003) |
August 18, 2003 |
October 19, 2005 |
793 days |
| Benning Elementary School |
FM-200216541 02 10/20/05 Benning Asbestos Assessment Reqd. Lunchroom Ceiling in the lunchroom is leaking oil, which may be coming from the roof. Asbestos Code A - Clear for repairs on 09/05/02. DCPS Safety - Leroy Minton Jr. (RG 09/06/02) |
September 4, 2002 |
October 20, 2005 |
1,142 days |
| Bruce-Monroe Elementary School |
FM-200445081 04 10/21/05 Bruce Monroe First and third floor Roof top / east west stairway Drains on the east/west stairway are stopped by debris or dirt. Stairway roof top is slanted at this time when we have heavy rain the stairway leaks. It has cause the ceiling to fall in causes the stairway to flood into leaving center, water has cause ASBESTOS floor tile to buckle and come up off the floor. Asbestos Code A - Clear for repairs on 04/27/04. Horne Engineering - Ray Agnant (RG 04/29/04) |
March 9, 2004 |
October 21, 2005 |
591 days |
| Bruce-Monroe Elementary School |
FM-200445041 04 10/21/05 (Bruce-Monroe) !!!VERY URGENT!!! Roof: Unstop roof drains filled with dirt, and debris, water leaking inside. |
March 9, 2004 |
October 21, 2005 |
591 days |
| Barnard Elementary School |
FM-200458029 04 10/24/05 Barnard Hallway classroom area The ceiling tile near the 2nd fire extinguisher is wet. "This is an indication of a duct leak or a roof leak. Please give this matter immediate attentiom. |
November 8, 2004 |
October 24, 2005 |
350 days |
| Maury Elementary School |
FM-200330825 03 10/24/05 Maury First Floor - Room #2 (old bldg) 1. Plaster south and east walls that were damaged by water from roof leak . Asbestos Code A - Clear for repairs on 05-29-03 by Ed Rodrigues (LM/05-28-03) Safety Office 202-576-8962 |
May 29, 2003 |
October 24, 2005 |
879 days |
| Montgomery ES |
FM-200330330 03 10/24/05 Montgomery, Scott First floor multi purspose room 1 Repair roof leaking water is running down shortening out the electricity. |
May 19, 2003 |
October 24, 2005 |
889 days |
| Maury Elementary School |
FM-200330803 03 10/24/05 Maury EMERGENCY Room (2) - Old Building 1) Replace carpeting that was damaged by water from roof leaks. Asbestos Code A - Clear for repairs on 05-28-03 by Ed Rodrigues (LM/05-28-03) Safety Office 202-576-8962 |
May 28, 2003 |
October 24, 2005 |
880 days |
| Orr Elementary School |
FM-200514596 /05 10/26/05 Orr Emergency First Floor-Cafeteria Entrance Roof Leak over top of light fixtures. |
October 25, 2005 |
October 26, 2005 |
1 day |
| Orr Elementary School |
FM-200513832 /05 11/1/05 (Orr) "Emergency" Fourth floor, Library. Repair roof and ceiling in library. Note: The ceiling has fallen, due to leak. Asbestos Code A - Clear for repairs on 10/12/05. Tidewater - Tony Marcolin (RG 10/13/05) |
October 13, 2005 |
November 1, 2005 |
19 days |
| Adams Elementary School |
FM-200226095 03 11/2/05 (Adams) !!!VERY URGENT!!! 3rd Floor/Room #201, 301, 302, & 305: Leaking from ceiling, and around windows. (Roof drain, stopped up) |
February 24, 2003 |
November 2, 2005 |
982 days |
| Jefferson JHS |
FM-200112826 01 11/8/05 JEFFERSON THIRD FLOOR # STAIRS AND HALL 1) REPAIR ROOF LEAK TYPE OF ROOF - A FRAME, TILE |
June 7, 2001 |
November 8, 2005 |
1,615 days |
| Jefferson JHS |
FM-200340495 /03 11/9/05 (Jefferson) 1st Floor/Counselor's Office: Roof leaking in near window. |
November 19, 2003 |
November 9, 2005 |
721 days |
| Jefferson JHS |
FM-200444389 04 11/9/05 (Jefferson) Asbestos Assessment Required. Roof leaking ceiling fell down on stage, due to snow and Ice on roof, still waiting for someone to fix has been look at more then once. No response. Account #: Asbestos Code A - Clear for repairs on 03/11/04. Horne Engineering - Philp Connolly (RG 03/11/04) |
February 10, 2004 |
November 9, 2005 |
638 days |
| Jefferson JHS |
FM-200340379 /03 11/9/05 (Jefferson) ROOF leaking over GYM and Auditorium need to be repaired. Asbestos Code A - Clear for repairs on 11/18/03. Honre Engineering - Troy Wilcome (RG 11/19/03) |
November 17, 2003 |
November 9, 2005 |
723 days |
| Jefferson JHS |
FM-200337806 03 11/9/05 (Jefferson) Asbestos Assessment Required. 1st Floor/Auditorium Stage: Roof leaking, water running down in the auditorium, on to the floor. Also, roof leaking in stairwell #1, & 2, causing plaster to fall from the ceiling. Lead & Asbestos Code A - Clear for repairs on 09/24/03. Horne Engineering - Edward Rodriguez (RG 09/29/03) |
September 22, 2003 |
November 9, 2005 |
779 days |
| Raymond Elementary School |
FM-200453061 04 11/14/05 Raymond URGENT Outside roof The outside roof is leaking into the library area causing damage to the computers and teaching supplies. |
August 20, 2004 |
November 14, 2005 |
451 days |
| Jefferson JHS |
FM-200452864 04 11/14/05 Jefferson Outside roof Roof need to be replace on building. Leaking bad. |
August 18, 2004 |
November 14, 2005 |
453 days |
| Gage-Eckington ES |
FM-200110973 5/24/01 11/14/05 GAGE-ECKINGTON FIRST (1ST) FLOOR - OPEN SPACE RESTRAP CONDUIT THAT DROPED WHEN CEILING FELL DURING ROOF LEAKAGE. EMERGENCY!! |
May 24, 2001 |
November 14, 2005 |
1,635 days |
| Raymond Elementary School |
FM-200455453 04 11/14/05 Raymond Outside (parking lot area) There is a tree on the school ground area growing over the fence on to a home owners roof. It is causing a leaking damage to their roof. This is a safety and potential health hazard, it need to be cut down. |
September 22, 2004 |
November 14, 2005 |
418 days |
| Anacostia Senior High School |
FM-200204646 02 11/14/05 (Anacostia) 2nd floor/ Hall southwing Repair roof leak. Water Draining down to floor. Water leak has caused safety hazard. |
March 19, 2002 |
November 14, 2005 |
1,336 days |
| Anacostia Senior High School |
FM-200219801 /02 11/15/05 Anacostia Second floor slate roof Send roofer to investigate and necessary repairs. Building has identifies six (6) leaks with serious plaster damage to third floor classrooms. Asbestos Code A - Clear for repairs on 10/25/02. Horne Engineering - Troy Wilcome (RG 10/28/02) |
October 22, 2002 |
November 15, 2005 |
1,120 days |
| Harris, C.W. ES |
FM-200443709 04 11/18/05 (Harris, C.W.) Asbestos Assessment Required. 1st Floor/Custodian Office: ceiling leaking in custodial office, and peeling plaster; suspicious of roof leak. Water running down the side of wall. Lead & Asbestos Code A - Clear for repairs on 02/04/04. Horne Engineering - Edward Rodriguez (RG 02/06/04) |
February 5, 2004 |
November 18, 2005 |
652 days |
| Harris, C.W. ES |
FM-200443909 04 11/18/05 (Harris, C.W.) Room 207, hallway, 6th and 4th grade hallway Roofs are leaking. |
February 10, 2004 |
November 18, 2005 |
647 days |
| Harris, C.W. ES |
FM-200341588 /03 11/18/05 (Harris, C.W.) 1st Floor/All Purpose Room: Leaking from roof, drains are stopped up. Asbestos Code A - Clear for repairs on 12/16/03. Horne Engineering - Bjarne Smith (RG 12/17/03) |
December 15, 2003 |
November 18, 2005 |
704 days |
| Harris, C.W. ES |
FM-200222414 /02 11/18/05 (Harris, C.W.) !!!VERY URGENT!!! 2nd Floor Hallway: Water leaking from roof down in-to 2nd floor hallway. At the time of the snow and ice this week, the area was leaking profusely. |
December 12, 2002 |
November 18, 2005 |
1,072 days |
| Harris, C.W. ES |
FM-200222402 /02 11/18/05 Harris, C.W, Second Floor 1) Roof leaking. |
December 12, 2002 |
November 18, 2005 |
1,072 days |
| Kenilworth ES |
FM-200222401 /02 11/18/05 Kenilworth Room 216 and 215 1) Roof leaking. |
December 12, 2002 |
November 18, 2005 |
1,072 days |
| Harris, C.W. ES |
FM-200222438 /02 11/18/05 (Harris, C.W.) !!!VERY URGENT!!! First floor - custodial office Roof is leaking. |
December 12, 2002 |
November 18, 2005 |
1,072 days |
| Harris, C.W. ES |
FM-200226016 03 11/18/05 (Harris, C.W.) 3/4 - Wing/Kitchen: Roof leaking in the above area, custodial office, and kitchen. |
February 21, 2003 |
November 18, 2005 |
1,001 days |
| Duke Ellington School |
FM-200459937 /04 11/21/05 ELLINGTON RMS. 251/250A/250 REPAIR LEAKING ROOF. |
December 21, 2004 |
November 21, 2005 |
335 days |
| Merritt Middle School |
FM-200333587 03 11/22/05 Merritt First Floor - Main Office 1. Repair roof leak in the principal's office . Asbestos Code A - Clear for repairs on 07/23/03. Horne Engineering - Sheryll James (RG 07/24/03) |
July 22, 2003 |
November 22, 2005 |
854 days |
| Randle-Highlands ES |
FM-200505808 05 11/22/05 Randle-Highlands Gym Area Repair Roof Leak |
May 20, 2005 |
November 22, 2005 |
186 days |
| Randle-Highlands ES |
FM-200509303 05 11/28/05 Randle-Highlands Gym Area Roof Repair Roof Leak Asbestos Code A - Clear for repairs on 08/03/05. Tidewater - Carlos Vera (RG 08/09/05) |
August 2, 2005 |
November 28, 2005 |
118 days |
| Macfarland Middle School |
FM-200207016 02 11/28/05 MacFarland !!! Emergency !!! Second (2nd) Floor 1. Classroom #203 Roof leaking water from the drain pipes. 2. Classroom #213 Roof leaking water from the drain pipes. |
May 2, 2002 |
November 28, 2005 |
1,306 days |
| Brent Elementary School |
FM-200514270 /05 11/29/05 (Brent) First floor, Lunch Room & Hallway. Roof is leaking, ceiling tile fell and insulation is hanging down. Also there is a leak in front of the security desk, near exit doors. Asbestos Code A - Clear for repairs on 10/26/05. Tidewater - Kenny Long (RG 10/28/05) SEE ASSESSMENTS |
October 22, 2005 |
November 29, 2005 |
38 days |
| Whittier Elementary School |
FM-200335643 03 11/30/05 (Whittier) FIRE CODE VIOLATION: 3rd Floor: Due to roof leak, ceiling needs repair. Asbestos Code A - Clear for repairs on 08/19/03. Horne Engineering - Roger Kager (RG 08/20/03) |
August 18, 2003 |
November 30, 2005 |
835 days |
| Anacostia Senior High School |
FM-200446352 04 12/6/05 Anacostia Roof gym bldg. 2nd floor Roof / roof capping leaking onto floor from cylinder block wall. |
April 5, 2004 |
December 6, 2005 |
610 days |
| Anacostia Senior High School |
FM-200227199 03 12/6/05 Anacostia First floor - gym Repair gym floor due to leaking roof in several places. Asbestos Code A - Clear for repairs on 03/19/03. Horne Engineering - Sharon Voss (RG 03/20/03) |
March 18, 2003 |
December 6, 2005 |
994 days |
| Bell High School |
FM-200447740 04 12/6/05 Bell Need a roofer or a pipe/thermal for room 307. There is a leak is still coming from the ceiling. Help is needed as soon as possible, please. |
May 10, 2004 |
December 6, 2005 |
575 days |
| Bell High School |
FM-200458950 04 12/6/05 Bell Very urgently need a roofer for the roof leak that is in the hallway by the woodshop. |
December 2, 2004 |
December 6, 2005 |
369 days |
| Bell High School |
FM-200506606 05 12/6/05 Bell Lower Roof Unstop roof drain near cooling tower. Note:Water leaking in building. Urgent !!!!! |
June 10, 2005 |
December 6, 2005 |
179 days |
| Anacostia Senior High School |
FM-200333290 03 12/6/05 Anacostia Roof Investigate and make necessary repairs to roof that leaks in home economics; South wing stairs by Northwest stairs by 4 slate roof. Roof over fan room. gutter on slate roof outside band room and boys and girls lavatory. |
July 16, 2003 |
December 6, 2005 |
874 days |
| Anacostia Senior High School |
FM-200227205 03 12/6/05 Anacostia First floor over 401 Repair leakinf roof. |
March 18, 2003 |
December 6, 2005 |
994 days |
| Anacostia Senior High School |
FM-200227204 03 12/6/05 Anacostia Third floor main roof Investigate and make necessary repairs to roof that leaks in the hall , rooms 307, 306, 201 and 105. |
March 18, 2003 |
December 6, 2005 |
994 days |
| Anacostia Senior High School |
FM-200227201 03 12/6/05 Anacostia Second floor hall, rooms 231 anf 2000 Repair leaking roof, these are computer rooms. |
March 18, 2003 |
December 6, 2005 |
994 days |
| Anacostia Senior High School |
FM-200226911 03 12/6/05 ANACOSTIA !! URGENT !! Gym Reinstall roof capping, roof leaking. |
March 12, 2003 |
December 6, 2005 |
1,000 days |
| Anacostia Senior High School |
FM-200222477 /02 12/6/05 Anacostia First floor - gym investigate and make usual repairs to roof. Roof leaks above score board. |
December 12, 2002 |
December 6, 2005 |
1,090 days |
| Anacostia Senior High School |
FM-200452155 04 12/8/05 Anacostia Gym entrance first floor Investigate and make necessary repair to roof. Water is leaking thru concrete. |
August 11, 2004 |
December 8, 2005 |
484 days |
| Reed LC |
FM-200337616 03 12/14/05 Reed, Marie Roof Northeast side Need to move the dirt from planter from the balcony. Call came in today, 09/12/2003: Water leaking from roof drains down on porch. The main entrance front door is affected by this leaking. |
September 16, 2003 |
December 14, 2005 |
820 days |
| Burrville Elementary School |
FM-200226109 03 12/21/05 Burrville First floor - book room Roofing leaking. |
February 24, 2003 |
December 21, 2005 |
1,031 days |
| Reed LC |
FM-200452587 04 12/27/05 Reed, Marie FIRE CODE VIOLATION: First floor Roof leak damage in Rec. office. |
August 13, 2004 |
December 27, 2005 |
501 days |
| Browne Junior High School |
FM-200457282 /04 12/27/05 (Browne) FIRE CODE VIOLATION: 3rd Floor/Across from Room #301: Evidense of roof leak on wall. HA 005 Plaster white wall & ceiling plaster No Asbestos HA 705 Brown Coat with 005 No Asbestos HA 073 Plaster white patches on plaster area No Asbestos HA 089 Plaster white Decorative ornate plaster panels No Asbestos Code A-clear for repair by DCPS Charles Buchanan on 11/7/04 |
October 21, 2004 |
December 27, 2005 |
432 days |
| Browne Junior High School |
FM-200457287 /04 12/27/05 (Browne) FIRE CODE VIOLATION: 3rd Floor/Next to Girls Bathroom: Evidence of roof leak on wall. HA 005 Plaster white wall and ceiling plaster No Asbestos HA 705 Brown Coat with 005 No Asbestos Code A-clear for repair by DCPS Charles Buchanan on 11/7/04 |
October 21, 2004 |
December 27, 2005 |
432 days |
| Webb Elementary School |
FM-200456241 04 12/27/05 Webb Fire Code Violation First floor Cafeteria ceiling breached and the roof leaks. |
September 30, 2004 |
December 27, 2005 |
453 days |
| Spingarn High School |
FM-200455279 04 12/27/05 Spingarn Fire Code Violation First floor Evidence of roof leak in auditorium. |
September 21, 2004 |
December 27, 2005 |
462 days |
| Spingarn High School |
FM-200455262 04 12/27/05 Spingarn Fire Code Violation Second floor Roof leak from classroom overhead leaking into room 220 causing falling plaster and damage light fixtures. |
September 21, 2004 |
December 27, 2005 |
462 days |
| Spingarn High School |
FM-200455194 04 12/27/05 Spingarn Fire Code Violation Third floor Damage to room 320, caused by roof leak.. Asbestos Code A - Clear for repairs on 08/15/05. Tidewater - Paul Berman (RG 08/16/05) (SEE ASSESSMENTS) |
September 20, 2004 |
December 27, 2005 |
463 days |
| Sousa Middle School |
FM-200454756 04 12/27/05 Sousa FIRE CODE VIOLATION Basement Evidence of roof leak in hall back of cafeteria.. |
September 14, 2004 |
December 27, 2005 |
469 days |
| Sousa Middle School |
FM-200454712 04 12/27/05 Sousa FIRE CODE VIOLATION Third floor Evidence of roof leak in ceiling, girls bathroom. |
September 14, 2004 |
December 27, 2005 |
469 days |
| Sousa Middle School |
FM-200454707 04 12/27/05 Sousa FIRE CODE VIOLATION Third floor Evidence of roof leak in ceiling, Room 304. |
September 14, 2004 |
December 27, 2005 |
469 days |
| Sousa Middle School |
FM-200454700 04 12/27/05 Sousa FIRE CODE VIOLATION Third floor Evidence of roof leak in stairwell # 316.. |
September 14, 2004 |
December 27, 2005 |
469 days |
| Smothers ES |
FM-200456185 04 12/27/05 Smothers Fire Code Violation Third floor Evidence of roof leak in stairwell across from boys bathroom. Asbestos Code A - Clear for repairs on 10/06/03. DCPS Safety - Leroy Minton (RG 10/07/04) |
September 30, 2004 |
December 27, 2005 |
453 days |
| Smothers ES |
FM-200456184 04 12/27/05 Smothers Fire Code Violation Third floor Evidence of roof leak inside boys bathroom. Asbestos Code A - Clear for repairs on 10/06/03. DCPS Safety - Leroy Minton (RG 10/07/04) |
September 30, 2004 |
December 27, 2005 |
453 days |
| Smothers ES |
FM-200456178 04 12/27/05 Smothers Fire Code Violation Third floor Evidence of roof leak in ceiling, room 303. Asbestos Code A - Clear for repairs on 10/06/03. DCPS Safety - Leroy Minton (RG 10/07/04) |
September 30, 2004 |
December 27, 2005 |
453 days |
| Peabody Elementary School |
FM-200225939 03 12/27/05 Peabody THIRD FLOOR ROOMS 11 & 12 1) Repair roof leaks , ceiling needs to be plaster. Asbestos/Lead Code A-clear for repair by Horne Engineering Edward Rodriguez on 02/26/03 DCPS Charles E Buchanan |
February 19, 2003 |
December 27, 2005 |
1,042 days |
| Brookland Elementary |
FM-200450322 04 12/27/05 (Brookland) FIRE CODE VIOLATION: Asbestos Assessment Required. Note: The above inspector's investigation reveals, school is experiencing a lot of ceiling leakage due to the large a/c unit on the roof. The leaking is heavy around piping, under a/c unit on roof, down through the ceiling to the 3rd, and 2nd floors of the schools. Asbestos Code A - Clear for repairs on 07/21/04. ( Repair of a/c unit ONLY ) DCPS Safety - Ricardo Eley (RG 07/22/04) DO NOT WORK ON CEILING |
July 15, 2004 |
December 27, 2005 |
530 days |
| Reed LC |
FM-200452588 04 12/27/05 Reed, Marie FIRE CODE VIOLATION: First floor Roof leak damage in auditorium throughout. |
August 13, 2004 |
December 27, 2005 |
501 days |
| School WW High School |
FM-200216297 02 1/30/06 School w/o Walls Basement - Boys Restroom 1) Ceiling collaped due to roof leak. Asbestos Code A-clear for repair by Horne Engineer Sam Ebrahim On 9/05/02 DCPS Charles E. Buchanan |
September 3, 2002 |
January 30, 2006 |
1,245 days |
| Brightwood Elementary School |
FM-200114716 01 1/30/06 BRIGHTWOOD FIRST FLOOR OLD ANNEX SIDE ROOM 101 1) ROOF LEAKING CAUSING TILE TO FALL IN ROOM 101 ASBESTOS CODE A - CLEAR FOR REPAIRS ON 07/19/01. |
July 5, 2001 |
January 30, 2006 |
1,670 days |
| Brightwood Elementary School |
FM-200217487 02 1/30/06 Brightwood Roof Leak Third Floor - Room 305 1) Water is entering the room from the roof. |
September 13, 2002 |
January 30, 2006 |
1,235 days |
| Brightwood Elementary School |
FM-200330502 03 1/30/06 (Brightwood) !!!URGENT!!! 1st Floor/Cafeteria: Roof leak in cafeteria, east stairwell. Water falls on personnel as they are walking down the stairwell. Asbestos Code A - Clear for repairs on 05/22/03. Horne Engineering - Philp Connolly (RG 05/22/03) |
May 21, 2003 |
January 30, 2006 |
985 days |
| Brightwood Elementary School |
FM-200332670 03 1/30/06 Brightwood !! Emergency !! First Floor - #100R . 1. Replace wet ceiling tile in the classroom leak from roof . Asbestos Code A - Clear for repairs on 06/30/03. Horne Engineering - Sharon Voss (RG 06/30/03) |
June 30, 2003 |
January 30, 2006 |
945 days |
| Brightwood Elementary School |
FM-200336733 03 1/30/06 Brightwood EMERGENCY Room 309 Roof is leaking. |
September 3, 2003 |
January 30, 2006 |
880 days |
| Brightwo |