Routine Repair Requests Opened in January 2004 (84) | School | Description | Open Date |
| John Burroughs ES | FM-200342185 1/2/04 Burroughs Exterior 1) Provide one standard and one van accessible parking spaces with signage that are conpliant to ADA guidelines. Designate accessible parking spaces near driveway. | January 2, 2004 |
| Marshall Educational Center | FM-200342179 1/2/04 Marshall Pool Area Check chemicals Check temperature Check bathroom toilet | January 2, 2004 |
| Simon Elementary School | FM-200442218 1/5/04 SIMON 2ND & 3RD FL. HALLWAYS, ROOMS 214, 312, LUNCH ROOM REPAIR/REPLACE UNIVENT MOTORS. NAME OF MOTOR: SUPER-SILENT, SIZE 6, TYPE - IS, RPM 775, VOLTS, 120, AMPS .2.5, FREQUENCY 60, B.F. STURTERANT CO. DIVISION OF WESTINGHOUSE ELECTRIC. NEED SHOP TO DO THE WORK. | January 5, 2004 |
| Cardozo High School | FM-200442211 1/5/04 (Cardoza) 3rd Floor/Northeast Stairwell: Fluorescent light fixtures defective, no lights. | January 5, 2004 |
| Slowe Elementary School | FM-200342197 1/5/04 Slowe Exterior 1) Increase width of existing walkway from the public sidewalk to existing ramp. The width of the new sidewalk shall exceed 60" clearance to permit successful turning by wheelchair bound pedestrians. Provide handrails as required by ADA guidelines. | January 5, 2004 |
| Ferebee-Hope Elementary School | FM-200442300 1/6/04 (Ferebee-Hope) 1st Floor C-Hall/Near Boiler Room: Replace broken windows. | January 6, 2004 |
| Ferebee-Hope Elementary School | FM-200442299 1/6/04 (Ferebee-Hope) 1st Floor/Tennis and Handball Outside Grounds: Remove Graffito. | January 6, 2004 |
| Bruce-Monroe Elementary School | FM-200442275 1/6/04 Bruce-Monroe Boiler Room Boiler #3 Repair automatic water feeder. | January 6, 2004 |
| Johnson JHS | FM-200442253 1/6/04 Johnson - Early Childhood Attic - Landing leading to Roof 1) Repair or replace door leading to roof. Asbestos Code A - Clear for repairs on 01/06/04. Horne Engineering - Bipin Nanavaty (RG 01/08/04) | January 6, 2004 |
| Tubman Elementary School | FM-200442288 1/6/04 Tubman Boiler Room Replace faulty OS&Y valve, approxmately 5" on side of Hot Water Heating circulating pump #2. Valve has broken and will not close. | January 6, 2004 |
| Spingarn High School | FM-200442305 1/6/04 (Spingarn) Basement/ROTC Supply Room: Repair or replace wall socket in supply room, basement floor. Code A-clear for repair by DCPS Charles Buchanan on 01/07/04 | January 6, 2004 |
| Macfarland Middle School | FM-200442368 1/6/04 (Macfarland) servay and repair magnetic bars on exteria doors. The alarm system will not set unless you bypass these areas Asbestos Code A - Clear for repairs on 01/22/04. Horne Engineering - Sheryll James (RG 01/23/04) | January 6, 2004 |
| John Burroughs ES | FM-200442248 1/6/04 Burroughs Boiler room Reconnect Drain under back flow valve, located in the ceiling. | January 6, 2004 |
| Ketcham Elementary School | FM-200442304 1/6/04 (Ketcham) Front Entrance Door: Repair or replace door; unable to secure or close. Code A-clear for repair by DCPS Charles Buchanan on 01/07/04 | January 6, 2004 |
| Tyler Elementary School | FM-200442326 1/7/04 Tyler Kitchen Replace faucet with faucet with cut off valves. | January 7, 2004 |
| Coolidge High School | FM-200442333 1/7/04 Coolidge Boiler Room Replace leaking mechanical seal on shipco vacuum pump motor on #2 low psi return pump in Boiler Room. Frame: N145JM Motor Magnetek RPM-3450/2850 Cat 159 Part-8-184968-01 Volts-200-230/460 Amps 6.25 PH_3 Asbestos Code A - Clear for repairs on 03/23/04. Horne Engineering - Bjarne Smith (RG 04/08/04) | January 7, 2004 |
| Cardozo High School | FM-200442359 1/7/04 Cardozo Fan Room Repair leaking flanges on steam supply pipes- sizes are approximate 1-14 inch dia., 1-10 inch dia. | January 7, 2004 |
| Shaed Elementary School | FM-200442395 1/8/04 Shaed First floor boys and girls restroom !. Repair one bradley basin in boys room that does not come on. Repair one bradley basin in girls room that does not come on. | January 8, 2004 |
| Ferebee-Hope Elementary School | FM-200442386 1/8/04 Ferebee-Hope First floor computer room Repair or replace two receptacles , one double and one four plug. | January 8, 2004 |
| Park View ES | FM-200442407 1/8/04 PARKVIEW boiler room / mechanical room Repair busted heating coil on AHU. Coil has been isolated. Unit serves the auditorium | January 8, 2004 |
| Amidon Elementary School | FM-200442382 1/8/04 AMIDON principal office Check unit heater in principal office,main office and health suite , electronic valves will not open. | January 8, 2004 |
| Brent Elementary School | FM-200442406 1/8/04 (Brent) All Purpose Room: Paint is peeling off, needs too be re-painted. Lead & Asbestos Code A - Clear for repairs on 01/12/04. Horne Engineering - Edward Rodriguez (RG 01/13/04) | January 8, 2004 |
| West Elementary School | FM-200442425 1/8/04 (West) 1st Floor/Learning Center, Left Side: Check, and repair lights that will not come on inside of area where children hang their coats. | January 8, 2004 |
| Stanton Elementary School | FM-200442397 1/8/04 Stanton Rooms 309, 211 and 109 The above rooms are still cold. the kids are freezing. Need heat in them. | January 8, 2004 |
| Francis Junior High School | FM-200442404 1/8/04 (Francis) Asbestos Assessment Required. 2nd Floor/Girls Restroom: Replaster left side of the restroom over top commode. Asbestos Code A - Clear for repairs on 01/08/04. Horne Engineering - Philp Connolly (RG 01/12/04) | January 8, 2004 |
| West Elementary School | FM-200442436 1/9/04 West First floor Kitchen door (exit) need repairing. Asbestos Code A - Clear for repairs on 01/12/04. SEE LINKED DOCUMENTS Horne Engineering - Philp Connolly (RG 01/13/04) | January 9, 2004 |
| Aiton Elementary School | FM-200442574 1/12/04 (Aiton) 1st Floor/Cafeteria: Replace three (3) broken window panes. | January 12, 2004 |
| Beers Elementary School | FM-200442480 1/12/04 Beers Auditorium Repair or replace Air handler motor in the auditorium on the left side and repair air handler motor on the right side motor is locked up. THERE IS NO CURRENT GOING TO THE THE UNIT. | January 12, 2004 |
| Davis Elementary School | FM-200442541 1/12/04 Davis Basement new wing hallway by exit door Install 9x9 white tiles in hallway by exit door, old tiles was removed by abatement teen in 03. Asbestos Code A - Clear for repairs on 01/13/04. Horne Engineering - Sheryll James (RG 01/14/04) | January 12, 2004 |
| Johnson JHS | FM-200442495 1/12/04 Johnson Stairwell 3 between 1 and 2 1) Ceramic tile wall coming away from the wall and crumbing. Need to be replaed with 4 inch cinder blocks. Asbestos Code A - Clear for repairs on 01/13/04. Horne Engineering - Sheryll James (RG 01/14/04) | January 12, 2004 |
| Ludlow-Taylor ES | FM-200442518 1/12/04 Ludlow-Taylor Boiler Room Replace starter on Dunham bush chiller. Starter is burnt up. | January 12, 2004 |
| Roosevelt High School | FM-200442564 1/12/04 (Roosevelt) 2nd Floor/Boys Bathroom: Replace ceramic wall tile that was never completed by ADA Contractor. (Grounds) Asbestos Code A - Clear for repairs on 01/13/04. Horne Engineering - Tony Marcolin (RG 01/14/04) | January 12, 2004 |
| Wilson High School | FM-200442531 1/12/04 Wilson, W. Third floor room 318 Repair or replace damaged door - vandalism. Asbestos Code A - Clear for repairs on 01/12/04. Horne Engineering - Philp Connolly (RG 01/13/04) | January 12, 2004 |
| Woodson High School | FM-200442482 1/12/04 Woodson H.D Auditorium Adjust or repair the pneumatic system for the auditorium heating fans. there is no heat. | January 12, 2004 |
| West Elementary School | FM-200442632 1/13/04 West Boiler Room Check domestic hot water heater, No hot water in Building. | January 13, 2004 |
| Draper Elementary School | FM-200442624 1/13/04 Draper Basement cafeteria storage room in kitchen Repair HAZARDOUS storage room in kitchen leaking water from ceiling. Ceiling is drooping downward possibly from the weight of the water on roof. Outside drain on roof of cafeteria is stopped up. Cafeteria ceiling is flaking and wet. May fall in. | January 13, 2004 |
| Terrell Mc ES | FM-200443317 1/13/04 (Terrell, M.C.) Asbestos Assessment Required. Remove old carpet and replace with tiles because this room is being used as an eating area by the Special Education Center. The existing floor covering is moldy, and so much ground in filth that it is beyond cleaning and is coming up from the floor. It has become a health hazard for students and adults that have to use the room daily. Asbestos Code A - Clear for repairs on 03/09/04. Horne Engineering - Sheryll James (RG 03/11/04) | January 13, 2004 |
| Bancroft Elementary School | FM-200442710 1/14/04 (Bancroft) Ground Floor/custodians office Seal wall and floor in tunnel leading to Mt. Pleasant Street. Asbestos Code A - Clear for repairs on 01/15/01. Horne Engineering - Tony Marcolin (RG 01/20/04) | January 14, 2004 |
| Bancroft Elementary School | FM-200442712 1/14/04 (Bancroft) Ground floor exterior of bldg. Secure or replace all downspouts around bldg, especially in front of auditorium. | January 14, 2004 |
| Ferebee-Hope Elementary School | FM-200442704 1/14/04 Ferebee-Hope First floor family child service Replace 75 pieces ceiling tiles. (Missing and stained from flood, some have mold on them). Asbestos Code A - Clear for repairs on 01/16/04. Horne Engineering - Edward Rodriguez (RG 01/20/04) | January 14, 2004 |
| Payne Elementary School | FM-200442674 1/14/04 Payne Multi-purpose room Asbestos abatement required. Repair or replace motors for the air handlers in the multi-purpose room ,(possible start capacitor) Asbestos Code A - Clear for repairs on 08/08/04. Horne Engineering - Sheryll James (RG 04/23/04) | January 14, 2004 |
| Wilson High School | FM-200442696 1/14/04 Wilson, W. Second floor room 200 Classroom door need some adjustments - the door can not be cured properly-needs a locksmith. Asbestos Code A - Clear for repairs on 01/16/01. Horne Engineering - Tony Marcolin (RG 01/20/04) | January 14, 2004 |
| Thomas Elementary School | FM-200442718 1/14/04 N. THOMAS Boiler room Furnish HVAC shop with materials to repair boilers # 1 and 2 | January 14, 2004 |
| Horace Mann Elementary School | FM-200442782 1/15/04 Mann Repair roof leak over entrance to community center. | January 15, 2004 |
| John Burroughs ES | FM-200442813 1/15/04 (Burroughs) 1st Floor/Classroom/Ms. Brown: Window broken, unable to close. | January 15, 2004 |
| Bruce-Monroe Elementary School | FM-200442786 1/15/04 Bruce-Monroe Lunch/ Multi-Purpose Room Repair or replace Air handler unit and squirrel cage, cage has collapse in Lunch/ Multi-purpose room. No heat in Area. | January 15, 2004 |
| Meyer Elementary School | FM-200442864 1/16/04 Meyer Boiler room Replace 1" line , valve and couplin on the drain lin behind the #2 boiler . | January 16, 2004 |
| Takoma Educational Center | FM-200442836 1/16/04 TAKOMA Mech room # 11 third floor Repair rupture heat coil on air handler unit #13 located in mech room # 11 third floor. Leak is isolated. | January 16, 2004 |
| Johnson JHS | FM-200442838 1/16/04 Johnson Jr. Rooms 103, Office- B-Wing, Main office Need electrician to identify circuits for rooms 103, B-Wing office, Main office so Boiler Plant operator can replace the motors. Asbestos Code A - Clear for repairs on 01/21/04. Horne Engineering - Edward Rodriguez (RG 01/22/04) | January 16, 2004 |
| Nalle Elementary School | FM-200442872 1/16/04 Nalle Room #117,#134,#224 and #211 Replace pneumatic control valve and coil on the heating unit in room #117; #224; #134 and #211 | January 16, 2004 |
| Ferebee-Hope Elementary School | FM-200442855 1/16/04 Ferebee-Hope First floor Cafeteria Repair or replace two receptacles, two double. Asbestos Code A - Clear for repairs on 01/21/04. Horne Engineering - Troy Wilcome (RG 01/22/04) | January 16, 2004 |
| Gibbs Elementary School | FM-200442898 1/17/04 Gibbs Boiler room Abestos assessment may be required Retube # 1 and 2 boilers COB: Carnal Bradley@202-438-7437 Asbestos Code A - Clear for repairs on 03/22/04. Horne Engineering - Bipin Nanavaty (RG 03/24/04) | January 17, 2004 |
| Stanton Elementary School | FM-200442899 1/17/04 Stanton Annex Boiler room Exploratory Required Repair ruptured steam line in the ceiling over top of # 2 boiler Asbestos Code A - Clear for repairs on 01/20/04. Horne Engineering - Tony Marcolin (RG 01/20/04) | January 17, 2004 |
| Rudolph Elementary School | FM-200442976 1/20/04 Rudolph Basement/Boiler Room Repair or replace expansion tank, has holes in it. Leaking at the bottom. | January 20, 2004 |
| Garfield ES | FM-200442989 1/20/04 Garfield Boiler Room Repair heat pump in room 108, on/off switch not operating. Mod.# FH884389 Ser.# A231H15DADVL BTU-C-14100 | January 20, 2004 |
| Ferebee-Hope Elementary School | FM-200442970 1/20/04 Ferebee-Hope First floor Principals office Electrical: Survey to find eo=lectrical recepticals. | January 20, 2004 |
| Ferebee-Hope Elementary School | FM-200442969 1/20/04 Ferebee-Hope First floor C-building music room Electrical: install six (6) recepticals in C building music room. Teacher has to run extention cord and surge protector into surge protector, to reach the students. | January 20, 2004 |
| Ferebee-Hope Elementary School | FM-200442968 1/20/04 Ferebee-Hope First floor B-building music room Electrical survey to find out why outlets are not working. | January 20, 2004 |
| Rudolph Elementary School | FM-200442936 1/20/04 Rudolph Boiler Room Replace relief valve on Hot Water System, valve is leaking. | January 20, 2004 |
| Draper Elementary School | FM-200442961 1/20/04 Draper Roof leak third floor Roof leaking on third floor hall, and room 304. | January 20, 2004 |
| Stuart-Hobson Middle School | FM-200442942 1/20/04 Stuart-Hobson SWecond floor girl bathroom A toilet was leaking and the ceiling in the second floor bathroom has come in. Please repair ceiling. Asbestos Code A - Clear for repairs on 01/21/04. Horne Engineering - Edward Rodriguez (RG 01/22/04) | January 20, 2004 |
| Woodson High School | FM-200442950 1/20/04 Woodson AHU/Auditorium Mechanical Room Repair or replace leaking 1 1/2" steam trap in air handle unit auditorium | January 20, 2004 |
| Reed LC | FM-200443008 1/21/04 Reed Second floor Ms. Pollard room near stairwell #1 Survey and re-glaze one (1) large lexan glass window to prevent rain and cold air from entering the room. Window is loose and could possible fall due to the wind. | January 21, 2004 |
| Birney Elementary School | FM-200443022 1/21/04 Birney Air Handler over the stage left side Repair ruptured coil in the air handler on the left side onf the stage, the heeds to be moved so that the motor can be replaced. | January 21, 2004 |
| Patricia R Harris Ed Center | FM-200443025 1/21/04 Harris, P.R. First floor kitchen storage Replace or repair electrical light sockets, single pole light switches and power back to storage rooms in kitchen on the 1st floor by stairway # 4. Asbestos Code A - Clear for repairs on 01/21/04. Horne Engineering - Bipin Nanavaty (RG 01/22/04) | January 21, 2004 |
| Shepherd ES | FM-200443107 1/22/04 Shepard Boiler room Furnish Honeywell Modulating Motor Mod.# 9174C1025 90 sec. strock Time sec 30 VA 27 Volts 120 Cycle 50/60 | January 22, 2004 |
| West Elementary School | FM-200443111 1/22/04 West Chiller Overhaul 1) Relocate or replace the existing tower and replace the piping. Poc - Jay Dolphin - 202-576-3364 or 202-409-0770. Asbestos Code A - Clear for repairs on 03/17/04. Horne Engineering - Edward Rodriguez (RG 03/23/04) | January 22, 2004 |
| Stanton Elementary School | FM-200443152 1/23/04 Stanton First floor room 106 Need replastering and painting also cabinet need to be painted in room and light need to be fixed. Lead & Asbestos Code A - Clear for repairs on 01/29/04. Horne Engineering - Philp Connolly (RG 01/30/04) | January 23, 2004 |
| Cook J.F. Elementary School | FM-200443169 1/23/04 (Cook, J.F.) 1st Floor/Nurse Suite: Ballast burned out in this area. | January 23, 2004 |
| Brightwood Elementary School | FM-200443160 3160 1/23/04 Brightwood First floor room 104R Repair a broken glass window. | January 23, 2004 |
| Patricia R Harris Ed Center | FM-200443167 1/23/04 Harris, P.R. Pre-Kgn area Repair door frame and check on entrance doors. Framing came apart and hit a child in the face. Asbestos Code A - Clear for repairs on 01/23/04. Horne Engineering - Sheryll James (RG 01/23/04) | January 23, 2004 |
| Bunker Hill Elementary School | FM-200443204 1/24/04 Bunker Hill Stairway (Middle Wing) Replace missing coil for convector on stairway between lot and 2nd floor. | January 24, 2004 |
| Deal Junior High School | FM-200443211 1/24/04 Deal Classroom #224 Repair or replace broken steam trap on univent. (No Heat in this room.) | January 24, 2004 |
| Horace Mann Elementary School | FM-200443216 1/25/04 Mann 1ST Trailer/Outside Classroom Replace (2) electric heater. Heater will not start. Volt -208/240 HZ 50/60 Watt 3000/4000 | January 25, 2004 |
| Horace Mann Elementary School | FM-200443214 1/25/04 Mann 1 ST New Addition Hallway Replace (2) electric heater. Heater will not start. Volt -208/240 HZ 50/60 Watt 3000/4000 | January 25, 2004 |
| Bunker Hill Elementary School | FM-200443251 1/27/04 Bunker-Hill Boiler Room Correct Problem that's causing Boiler #2 (old Boiler) to vibrate badly. When burner go into main flame. Note: Possible damper control problems. Urgency !!! | January 27, 2004 |
| Eastern High School | FM-200443280 1/28/04 EASTERN SHS Room 144/B78 Replace 8' (ft) of 1" condensate pipe in Rm 144/B78. The riser is leaking betwenn floors. Leak can not be isolated | January 28, 2004 |
| Woodson High School | FM-200443290 1/28/04 Woodson H.D. Mechanical room in the rear of the auditorium Repair the chill water cooling coil ,the coil is ruptured. | January 28, 2004 |
| Garfield ES | FM-200443366 1/29/04 Garfield By cafeteria Girls bathroom by cafeteria floor tile needs to be repaired or replaced due to water damage. There is a big hole in the middle of the room. Asbestos Code A - Clear for repairs on 01/30/04. Horne Engineering - Edward Rodriguez (RG 02/02/04) | January 29, 2004 |
| John Burroughs ES | FM-200443324 1/29/04 Burroughs Boiler room Repair domestic hot water heater in the boiler room.( No hot water.) | January 29, 2004 |
| Eastern High School | FM-200443405 1/30/04 (Eastern) Gym: Repair electrical shortage in basketball score board. It is necessary to have scoreboard function for game activity. | January 30, 2004 |
| Gibbs Elementary School | FM-200443415 1/30/04 (Gibbs) Small Playground: Overhang is falling outside the exit door, near kitchen. (Very danagerous) Asbestos Code A - Clear for repairs on 02/0/204. Horne Engineering - Bipin Nanavaty (RG 02/03/04) | January 30, 2004 |
| Coolidge High School | FM-200443397 1/30/04 (Coolidge) Frank Williams Activity Center: Replace all hardware on exterior and entrance doors through-out the building. This repair is needed due to the vandalism, and theft in this area. Asbestos Code A - Clear for repairs on 01/30/04. Horne Engineering - Tony Marcolin (RG 02/02/04) | January 30, 2004 |
| Nalle Elementary School | FM-200443454 1/31/04 Nalle Room #234 Abestos assessment required on room #234 Replace pneumatic control valve and coil on the heating unit in room #234. | January 31, 2004 |