Urgent Repair Requests Opened in October 2002 (30)
| School |
Description |
Open Date |
| Ballou Senior High School |
FM-200218640 10/1/02 (Ballou) Ground floor - Locker room Repair holes in block wall far left side of the room. Asbestos Code A - Cleared for repairs on 10-02-02 (LM/10-02-02) Leroy Minton Jr. Safety Office (202-) 576-8962. |
October 1, 2002 |
| Cook J.F. Elementary School |
FM-200218629 10/1/02 (Cook, J.F.) !!!URGENT!!! 1. Asbestos assessment required. 1st Floor/Room #105: Repair or replace door frame that has broken away from door hinges. Asbestos Code A - Clear for repairs on 10/02/02. Horne Engineering - Bipin Nanavaty (RG 10/02/02) |
October 1, 2002 |
| Draper Elementary School |
FM-200218680 10/2/02 Draper Outside Unstop all drains on the outside of the building. Asbestos Code A - Clear for repairs on 10/08/02. DCPS Safety - Leroy Minton Jr. (RG 10/10/02) |
October 2, 2002 |
| Draper Elementary School |
FM-200218679 10/2/02 Draper Replace eighty (80) ceiling tiles that are broken and loose. Room 109 - 12 pieces Room 108 - 10 pieces Room 110 Room 111 - 15 pieces Main office - 14 pieces Hall near side door - first floor - 7 pieces Asbestos Code A - Clear for repairs on 03/10/03. DCPS Safety - Richard Gibson (RG 03/10/03) |
October 2, 2002 |
| Wilson High School |
FM-200218798 10/3/02 Wilson, W. Second floor - Room 214 Repair or replace defective classroom door. Can't be secured properly. Asbestos Code A - Clear for repairs on 10/11/02. DCPS Safety - Leroy Minton Jr. (RG 10/16/02) |
October 3, 2002 |
| Amidon Elementary School |
FM-200218783 10/3/02 Amidon Boys and gym bathrooms Need someone to please come out to replaster the ceiling in boys restroom by the main office have a hole in ceiling and in the gym teachers bathroom bathroom, the ceiling is falling down. Asbestos Code A - Clear for repairs on 10/09/02. DCPS Safety - Leroy Minton Jr. (RG 10/10/02) |
October 3, 2002 |
| Kimball Elementary School |
FM-200218842 2 10/4/02 Kimball First floor - Principal's office Install three outlets for new camera system for safety of the school. |
October 4, 2002 |
| Stanton Elementary School |
FM-200219160 10/9/02 Stanton - T-5 !!Urgent!!! Cover missing oven electrical box across from room 208. |
October 9, 2002 |
| Ballou Senior High School |
FM-200219123 10/9/02 Ballou Stadium - Boy restroom Replace two cracked commodes inside this restroom. This will be site for inter-high playoffs. Asbestos Code A - Clear for repairs on 10/11/02. DCPS-Safety - Leroy Minton Jr. (RG 10/15/02) |
October 9, 2002 |
| Spingarn High School |
FM-200219151 10/9/02 Spingarn Third floor - Room 301 - Algebra class Install two (ea) lines 210 volts for A/C units in window in room 301. Unit not properly connected and tripping breakers. Room has 70amp main breaker with spares. Asbestos Code A - Clear for repairs on 10/10/02. DCPS Safety - Leroy Minton Jr. (RG 10/11/02) |
October 9, 2002 |
| King M L ES |
FM-200219245 10/10/02 (King) !!!VERY URGENT!!! 1st Floor Hallway: The outside lights surrounding the building is malfunctioning. In order to display outside lights, the lights in the 1st floor hallway will have to remain on. Due to the break-ins at this school, and other schools in the area, the lights exposes to much inside the building, however, ("we need the lighting in the outside area".) |
October 10, 2002 |
| Eliot Junior High School |
FM-200219290 10/11/02 Eliot Rooms 200, 201, 300, 301, 309 and 310 Repair or replace skylights. Skylights leak causes plaster to flake in the above classrooms. This is a safety hazard. Skylights in room 200 has a hole. Asbestos Code A-clear for repair by Horne Engineer Edward Rodriguez on 10/15/02 DCPS Charles E. Buchanan |
October 11, 2002 |
| Eliot Junior High School |
FM-200219289 10/11/02 Eliot Throughout building Repair or replace windows throughout building. Windows cannot be opened or they will not stay open. This is a safety hazard. Asbestos Code A - Clear for repairs on 10/11/02. Horne Engineering - Edward Rodriguez (RG 10/23/02) |
October 11, 2002 |
| Bruce-Monroe Elementary School |
FM-200219371 219371 10/11/02 Bruce Monroe Old Building Tunnel Basement Restore electrical service to lighting in tunnel area. Note: engineer cannot work on small boiler properly Asbestos Code A - Cleared for repairs on 04-28-03 by Leroy Minton Jr. (LM/04-08-03) the Safety Office 202-576-8962. |
October 11, 2002 |
| Patricia R Harris Ed Center |
FM-200219278 10/11/02 Harris, P.R. Ed Center First floor - room 207 Front door to class rooms Ms. Folonider need new door. (35 7/8x 78 5/8) Asbestos Code A - Clear for repairs on 10/15/02. DCPS Safety - Leroy Minton Jr. (RG 10/16/02) |
October 11, 2002 |
| Hart Middle School |
FM-200219489 10/16/02 (Hart) !!!VERY URGENT!!! 1. Asbestos assessment requied. New wing/2nd floor-Room #226: Sink in science lab, Ms. Lucas class, drain trap needs to be clean. Chemical traps for purification/sewage gases backing up. Staff has become nauseated inhaling the gases. Asbestos Code A - Clerard for repairs on (10-23-02 / LM) Leroy Minton Jr. Safety Office 202-576-8962. Asbestos Code A-clear for repair by DCPS Safety Charles E. Buchanan on 12/12/02 Small Acid Neutralization tank under Lab sink in Science class room 226 Lab need repair to stop odor. |
October 16, 2002 |
| West Elementary School |
FM-200219519 10/16/02 (West) !!!URGENT!!! 1st Floor Basement/Pre-K and learning center: Repair roof in the above locations. While raining, the roof leaks very badly. |
October 16, 2002 |
| Ludlow-Taylor ES |
FM-200219516 10/16/02 (Ludlow-Taylor) !!!URGENT!!! 1st Floor/Small roof: Leaking over exit leading to playground. |
October 16, 2002 |
| Turner Elementary School |
FM-200219458 10/16/02 (Turner) !!!VERY URGENT!!! New building/1st Floor back stairwell: Frame and plexi-glass has come loose over the top of exit door; area is deteriorating and falling apart. Water comes through, and floods the back stairwell. |
October 16, 2002 |
| Seaton Elementary School |
FM-200219674 10/18/02 Seaton First floor - storage vault and bookroom vault Water damage and peeling paint. Please scrape, plaster and paint. Health and safety hazard. Urgent Asbestos/Lead code A-clear for repair by Horne Engineer Edward Rodriguez on 10/21/02 DCPS Charles E. Buchanan |
October 18, 2002 |
| Slowe Elementary School |
FM-200219689 10/18/02 Slowe First floor - room 101,100, 102 and 104 Replace doors in the above classrooms. Asbestos Code A - Cleared for repairs on 10-23-02 (LM 10/24/02) Leroy Minton Jr. Safety Office 202-576-8962. |
October 18, 2002 |
| Eastern High School |
FM-200219784 10/22/02 (Eastern) !!!URGENT!!! Repair roof leak - overhead stage area leaking badly. Asbestos Code A - Clear for repairs on 10/22/02. Horne Engineering - Sharon Voss (RG 10/25/02) |
October 22, 2002 |
| Green Elementary School |
FM-200219954 10/24/02 Green Urgent!!! Repair and replace handrail on the third floor steps way. Asbestos Code A-clear for repair by DCPS on DCPSS Charles Buchanan |
October 24, 2002 |
| Watkins Elementary School |
FM-200219959 10/24/02 Watkins First floor Installed need six slide bolts for door in lobby and on W street to secure building. Asbestos Code A - Clear for repairs on 09/30/03. DCPS Safety - Leroy Minton Jr. (RG 10/01/03) |
October 24, 2002 |
| Gibbs Elementary School |
FM-200220072 10/25/02 Gibbs Third floor - Room 304 Repair in the wall. Asbestos Code A - Clear for repairs on 10/28/02. DCPS Safety - Leroy Minton Jr. (RG 10/29/02) |
October 25, 2002 |
| Wilkinson ES |
FM-200220082 10/25/02 (Wilkinson) 1st Floor/Room #192: Need outlets to use computer in the Pre-K. Asbestos Code A - Clear for repairs on 10/28/02. DCPS Safety - Leroy Minton Jr. (RG 10/29/02) |
October 25, 2002 |
| Ketcham Elementary School |
FM-200220033 10/25/02 Ketcham Second floor corridor (old wing) Requseting that door be repaired, for it does not close at all. (stairwell door) Asbestos Code A - Cleared on 03-13-03 by Leroy Minton Jr (LM) Safety Office 202-576-8962. |
October 25, 2002 |
| Turner Elementary School |
FM-200220160 10/28/02 Turner First floor - Boys restroom old bldg. Repair falling and peeling ceiling plaster over window. Safety Hazard Asbestos/Lead Code A-clear for repair by Horne Engineer Eward Rodriguez on 10/31/02 DCPS Charles E. Buchanan |
October 28, 2002 |
| Wilson High School |
FM-200220332 10/30/02 Woodrow Wilson Main Building Girls Locker Room Asbestos Assestment Required Repair leaking heating line in gilrs locker room ceiling and wall Asbestos Code A - Abated and cleared for repairs on 10-31-02 (LM/11-19-02) per Leroy Minton confirmation. Safety Office 202-576-8962. |
October 30, 2002 |
| Turner Elementary School |
FM-200220368 10/31/02 (Turner) !!!URGENT!!! 1. Asbestos assessment required. Exterior grounds: Repair exterior lights on building roof, and outside exit doors, that have blown out and shot out. |
October 31, 2002 |
Routine Repair Requests Opened in October 2002 (87)
| School |
Description |
Open Date |
| Simon Elementary School |
FM-200218744 10/2/02 (Simon) 1. Asbestos assessment required. 1st Floor/Main office:l Additional outlets needed in main office for A/C units, computers, and P.A. system, also, the principal's office next to the main office. Asbestos Code A-clear for repair by Horne Engineer Sharon Voss on 10/08/02 DCPS Charles E. Buchanan |
October 2, 2002 |
| Simon Elementary School |
FM-200218742 10/2/02 (Simon) 1. Asbestos assessment required. 2nd Floor/Rooms #208 & 209: Additional sockets needed in the following rooms: Computer lab in room #208 and A.C. units to be installed also, in room #209. Asbestos Code A-clear for repair by Horne Engineer Sharon Voss on 10/08/02 DCPS Charles E. Buchanan |
October 2, 2002 |
| Simon Elementary School |
FM-200218740 10/2/02 (Simon) 1. Asbestos assessment required. All Floors/Through-out: Electrical ballast needs replacement; estimated about (30) ballast needed to complete this task. Asbestos Code A-clear for repair by Horne Engineer Sharon Voss on 10/08/02 DCPS Charles E. Buchanan |
October 2, 2002 |
| Smothers ES |
FM-200218701 01 10/2/02 Smothers Ground outside Half of night lights are out, at front of bldg., N.E. side of bldg and new side of the bldg. |
October 2, 2002 |
| Wilkinson ES |
FM-200218695 695 10/2/02 Wilkinson Second floor - 181 near boys bathroom Need to replace about 20 to 30 floor tile. Damage from water leak. Asbestos Code A-clear for repair by Horne Engineer Sheryll James on 10/08/02 DCPS Charles E. Buchanan |
October 2, 2002 |
| Cardozo High School |
FM-200218762 10/3/02 Cardozo Stadium Furnish and install locks for electric panels for outside lighting and score board. |
October 3, 2002 |
| Plummer Elementary School |
FM-200218801 1 10/3/02 Plummer 1) Third Floor Boys Restroom - Replace (6) missing stall doors and hardware. 2) First Floor Girls Bathroom - Replace (1) miissing stall door and hardware. 3) Replace missing hardware on stall doors in various Restrooms throught out the building where needed. |
October 3, 2002 |
| Bowen Elementary School |
FM-200218871 10/4/02 (Bowen) 1. Asbestos assessment required. 3rd Floor/Room #205: Wall in the area over ceiling and walk entersect), outlet fell down and there is no power to outlet. Asbestos Code A - Clear for repairs on 10/08/02. Horne Engineering - Troy Wilcome (RG 10/09/02) |
October 4, 2002 |
| Wilkinson ES |
FM-200218999 10/7/02 Wilkinson - T-5 Second floor - Room one forty six Learning center I Need to replace wall outlet in space H (Robinson) area. Sink anchor to wall. Asbestos Code A - Clear for repairs on 10/15/02. Horne Engineering - Sheryll James (RG 10/16/02) |
October 7, 2002 |
| Wilson High School |
FM-200218909 10/7/02 Wilson,W. Asbestos Assessment Reqd. First and second floor - Teacher lounge Paint Asbestos Code A-clear for repair by Horne Engineer Edward Rodriguez on 10/08/02 DCPS Charles E. Buchanan |
October 7, 2002 |
| Amidon Elementary School |
FM-200218904 10/7/02 (Amidon) Playground/Parking lot: Need someone to come out to unclog the drains; they are clogged up badly. When raining, the playground and parking lot floods. |
October 7, 2002 |
| Wilkinson ES |
FM-200218996 996 10/7/02 Wilkinson Second floor - Sixty four Learning center II Need to replace wall outlets in space F, G, I, J and K Khalid, Simon Forschner area. Asbestos Code A-clear for repair by Horne Engineer Sheryll James on 10/09/02 DCPS Charles E. Buchanan |
October 7, 2002 |
| Ferebee-Hope Elementary School |
FM-200219024 10/8/02 (Ferebee-Hope) 1. Asbestos assessment required. 1st Floor/Outside loading dock: Survey to replace metal sliding door. Asbestos Code A-clear for repair by Charles E. Buchanan on 10/08/02 DCPS Charles E. Buchanan |
October 8, 2002 |
| Wilkinson ES |
FM-200219049 10/8/02 Wilkinson - T-5 First floor Kgn Area Need to wall outlet replace in Mrs. Garneett area and Mrs. Bivens are. Asbestos Code A-clear for repair no 10/10/02 DCPS Charles E. Buchanan |
October 8, 2002 |
| Spingarn High School |
FM-200219067 10/8/02 Spingarn Third to First Floor - 300 Mental Health Suite 1) Install (2) cables fromm room 300 ( mental health office on the 3rd floor to the telephone closet in the printing classroom. Eight (8) holes need to be drilled. One hole coming out of room 300 ,a hole going into the storage room and then (1) hole going down through the floor to the 1st floor. One hole coming out of the storage room and (1) hole going into the printing shop,and (1) hole through office to telephone equipment . Need (1) hole going down through the 3rd floor to the (2nd) floor closet, and (1) hole down to the (1st) floor closet. Damon Copeland - 442-5533 Verizon Asbestos Code A-clear for repair by Horne Engineer Troy Wilcome on 10/10/02 DCPS Charles E. Buchanan |
October 8, 2002 |
| King M L ES |
FM-200219071 10/8/02 King, M.L. Jr. Throughout building We need to have hand (40) rails sand and refinish throughout building. Asbestos Code A-clear for repair by Horne Engineer Bipin Nanavaty on 10/10/02 DCPS Charles E. Buchanan |
October 8, 2002 |
| Eliot Junior High School |
FM-200219095 10/9/02 Replace mechanical seals on # 1 and # 2 condensate vacuum pumps. |
October 9, 2002 |
| Ballou Senior High School |
FM-200219167 10/9/02 Ballou Cosmotology lab Install new equipment inside this lab. New equipment for lab is on site. |
October 9, 2002 |
| Walker-Jones EC |
FM-200219152 10/9/02 (Walker Jones) 1. Asbestos assessment required. Basement/Kitchen) Large breach in wall; water coming from the base of the wall. Asbestos Code A - Clear for repairs on 10/09/02. Horne Engineering - Edward Rodriguez (RG 10/10/02) |
October 9, 2002 |
| Cardozo High School |
FM-200219171 10/9/02 Cardozo Dugout - indoor track Replace motor for exhaust to visitor side of dugout. Marathon s#57711, HP 1 1/2, voltage 208-220-440, ampere 4.4-2.2-4.8-2.4 PH-3, CY. 60-50, frame 184, RPM-1745-1455 |
October 9, 2002 |
| Ballou Senior High School |
FM-200219129 10/9/02 Ballou Locker room Shower not working. |
October 9, 2002 |
| Amidon Elementary School |
FM-200219147 10/9/02 Amidon Cafe / Gym Need someone to come out to replace the bathroom petitions. They are rusted out and have sharp edges. They are not safe for the kids to be around, could cause a very serious health problem. Please Expedite |
October 9, 2002 |
| Walker-Jones EC |
FM-200219154 10/9/02 (Walker Jones) 1. Asbestos assessment required. Basement/Kitchen) Water coming from the base of a wall breach. Asbestos Code A - Clear for repairs on 10/09/02. Horne Engineering - Edward Rodriguez (RG 10/10/02) |
October 9, 2002 |
| Reed LC |
FM-200219177 10/9/02 Marie H. Reed L. C Roof Roof Above Cooling Tower Replace (2) two pillow block bearings for kitchen exhaust fan. Name i Seal Master, 1 - 7/16, NP23. Bearing has started making wearing noise. |
October 9, 2002 |
| Young Elementary School |
FM-200219192 10/10/02 Young First and second floor Main Office, Center II and III Request for ballasts through out building. Areas are very dark. Ballast Number 277 volt Asbestos Code A-clear for repair by Horne Engineer Troy Wilcome on 10/15/02 DCPS Charles E. Buchanan |
October 10, 2002 |
| Draper Elementary School |
FM-200219298 10/11/02 Draper 1) Repair roof leak that causes water to leak into the cafeteria/kitchen. |
October 11, 2002 |
| Eliot Junior High School |
FM-200219282 10/11/02 Eliot Outside - Front entrance Repair or replace panels in entrance in front of building. Panel are dry rotten and split. Needs to be replace and repainted. Lead Code-B Abatement Requared Asbestos Code-A clear for repair by Horne Engineer Edward Rodriguez on 10/28/02 DCPS Charles E. Buchanan |
October 11, 2002 |
| Eliot Junior High School |
FM-200219287 10/11/02 Eliot Playground Unstop drain on playground, drain cannot be seen because of grass and dirt that has flowed during any rain. |
October 11, 2002 |
| Hyde Elementary School |
FM-200219331 10/11/02 Hyde Basement Boiler Room Repair or replace defective programmer on boiler #1. Wiill not operate burner on boiler. Boiler #2. is operational. |
October 11, 2002 |
| Eliot Junior High School |
FM-200219285 10/11/02 Eliot Sub basement Repair or replace bradley basins in multi purpose boys and girls lavatories. Basins are working. Asbestos Code A-clear for repair by Horne Engineer Edward Rodriguez on 10/15/02 DCPS Charles E. Buchanan |
October 11, 2002 |
| Bunker Hill Elementary School |
FM-200219308 19308 10/11/02 Bunker Hill Basement 1) Replace cracked boiler sections as per attached scope of work. |
October 11, 2002 |
| Shaw JHS |
FM-200219325 10/11/02 Shaw Basement - Kitchen 1) Repair cuarry tile in back of drain over top of kettles. Drains were unstopped. Health Code Violation Asbestos Code A - Clear for repairs on 10/16/02. Horne Engineering - Roger Kager (RG 10/16/02) |
October 11, 2002 |
| Montgomery ES |
FM-200219305 -200219305 10/11/02 (Montgomery) Roof to 2nd floor: Stairwells filled with water, leaking from roof drain; water is running over the flashing. |
October 11, 2002 |
| Davis Elementary School |
FM-200219423 10/15/02 Davis Outside roof - Vent cover over auditorium Repair roof leak, it is leaking from vent cover over auditorium. Asbestos Code A-clear for repair on 10/16/02 by DCPS Charles E. Buchanan |
October 15, 2002 |
| Patricia R Harris Ed Center |
FM-200219367 10/15/02 P.R. Harris First Floor - Food Lab 1) Lights wont come on ,switch keeps popping off. |
October 15, 2002 |
| Meyer Elementary School |
FM-200219571 10/15/02 (Meyer) Room 229 and 205 Two windows were broken over the weekend, need to repair as soon as possible. It is very unsafe. |
October 15, 2002 |
| Adams Elementary School |
FM-200219421 10/15/02 Adams Leaking wall in center stairwell. Leaking classroom on third floor room 310 sky light when it rain Asbestos Code A - Clear for repairs on 10/16/02. Horne Engineering - Edward Rodriguez (RG 10/17/02) |
October 15, 2002 |
| Johnson JHS |
FM-200219418 10/15/02 Johnson Basement area near cafeteria Roof leak affecting area below. Asbestos Code A - Clear for repairs on 10/16/02. Horne Engineering - Sheryll James (RG 10/17/02) |
October 15, 2002 |
| Wilkinson ES |
FM-200219419 10/15/02 Wilkinson - T-5 Second floor - 173 coat area Need to replace flourescent light fixture. Ballast started burning. Asbestos Code A - Clear for repairs on 10/16/02. Horne Engineering - Sheryll James (RG 10/17/02) |
October 15, 2002 |
| Wilkinson ES |
FM-200219420 10/15/02 Wilkinson _ T-5 Second floor stair #4 Door closet need replace right side going down loose from frame of door. Asbestos Code A - Clear for repairs on 10/16/02. Horne Engineering - Sheryll James (RG 10/17/02) |
October 15, 2002 |
| West Elementary School |
FM-200219453 10/16/02 West Learning center and back stairwell Learning center and back stairwell by gym roof leaks and ceiling tile is falling. Roof was installed four years ago call the corp eng. Asbestos Code A - Clear for repairs on 10/18/02. Horne Engineering - Edward Rodrigue (RG 10/21/02) |
October 16, 2002 |
| Johnson JHS |
FM-200219510 10/16/02 Johnson Exterior - patio Caulk patio off of second floor on the outside. Rain is entering thru walls / ceiling down in hallway leading to cafeteria. |
October 16, 2002 |
| Johnson JHS |
FM-200219512 10/16/02 Johnson Roof Caulk skylights water is leaking around frame entering building. Flooding stairwell and corridor. |
October 16, 2002 |
| Park View ES |
FM-200219465 10/16/02 (Parkview) Room #228/Through-out: Variety of leaks in the building, some are recurring; see principal, Charles harden for exact locations for leaks and flooding. |
October 16, 2002 |
| Wilson High School |
FM-200219502 10/16/02 Wilson,W. First, second and third floor and basement Paint handrailing in all stairways. Lead Code B Asbestos Code A - Clear for repairs on 10/17/02. Horne Engineering - Edward Rodriguez (RG 10/21/02) |
October 16, 2002 |
| Wilson High School |
FM-200219504 10/16/02 Wilson,W. First floor rooms 123 and 123A Painting walls in offices and in bathrooms. Paint handrailing in all stairways. Lead & Asbestos Code A - Clear for repairs on 10/17/02. Horne Engineering - Edward Rodrigue (RG 10/21/02) |
October 16, 2002 |
| Nalle Elementary School |
FM-200219528 10/17/02 J.C. Nalle boiler room 1. Replace (2) two gate valves (1) one 90 degree elbow and union on hot water heater located in boiler room. |
October 17, 2002 |
| Aiton Elementary School |
FM-200219549 10/17/02 Aiton Fourth floor - Rooms 407 and 408 Roof is leaking in rooms 407 and 408. Asbestos Code A - Clear for repairs on 10/16/02. Horne Engineering - Philp Connolly (RG 10/21/02) |
October 17, 2002 |
| Bruce-Monroe Elementary School |
FM-200219534 219534 10/17/02 Unstop Floor drains in back of the boilers. |
October 17, 2002 |
| Hendley Elementary School |
FM-200219676 6 10/18/02 Hendley Lobby ceiling have a very bad leak every time it rains. Location over the window in the lobby. Also the audittorium have a leak, as soon as you walk through the door, every time it rain. |
October 18, 2002 |
| Davis Elementary School |
FM-200219695 10/18/02 Davis Outside - roof flood lights and exterior lights Need nine (9) photo cells installed in new flood and exterior lights. |
October 18, 2002 |
| Slowe Elementary School |
FM-200219688 10/18/02 Slowe First and Second floor - room 122, 210 and 211 Replace radiator covers. |
October 18, 2002 |
| Park View ES |
FM-200219697 10/18/02 Park View 1) Make necessary repairs to the rea door of the building, which has to be pulled hard or slammed to close all the way, from the inside of the building. Security Hazard. |
October 18, 2002 |
| Langdon Elementary School |
FM-200219705 5 10/21/02 Repair Lochinvar domestic hot water heater in the boiler room, will not ignite |
October 21, 2002 |
| Shepherd ES |
FM-200219709 10/21/02 Shepherd Second Floor - Room 204 1) Paint Classroom. Asbestos code A-clear for repair by Horne Engineer Edward Rodriguez on 10/21/02 DCPS Charles E. Buchanan |
October 21, 2002 |
| Stanton Elementary School |
FM-200219848 10/22/02 Stanton Corridoers Entrance to Parking Replace defective stop valve on radiator |
October 22, 2002 |
| Cook J.F. Elementary School |
FM-200219815 10/22/02 Cook, J.F. Third floor - room 307 Scrape and remove peeling paint from the ceiling. Lead & Asbestos Code A - Clear for repairs on 10/23/02. Horne Engineering - Edward Rodriguez (RG 10/25/02) |
October 22, 2002 |
| Eastern High School |
FM-200219895 10/23/02 Eastern Repair and install broken windows thru out building. Winows broken are listed below and number broken: Rooms 238-1 " 243-1 " 229-1 " 225-1 " 224-1 - bullet holes " 221-1 - bullet holes " 250-1 " 249-1 " 345-1 " 150-22 " 167-1 " 151-5 " 152-4 " 154-3 " B-42-2 " B-37-3 |
October 23, 2002 |
| Thomas Elementary School |
FM-200219920 10/23/02 (Nevel) Thomas Boiler Room P.M Multi Stack |
October 23, 2002 |
| Bruce-Monroe Elementary School |
FM-200219921 219921 10/23/02 Bruce Monroe Boiler Room P.M Multi Stack |
October 23, 2002 |
| Wilkinson ES |
FM-200219919 10/23/02 Wilkerson Boiler Room P.M Multi Stack |
October 23, 2002 |
| Wilkinson ES |
FM-200219862 10/23/02 Wilkinson First floor 33 stairway Kgn area Need to replace forty (40) pieces of tile wore out. Asbestos Code A - Clear for repairs on 10/25/02. Horne Engineering - Troy Wilcome (RG 10/28/02) |
October 23, 2002 |
| Cook J.F. Elementary School |
FM-200219929 10/23/02 (Cook, J.F.) Repair lock on breaker box. |
October 23, 2002 |
| Walker-Jones EC |
FM-200219906 10/23/02 Walker Jones Boiler Room P.M Chiller |
October 23, 2002 |
| Eastern High School |
FM-200219897 10/23/02 Eastern Kitchen storage Paint storage room and supply paint to this site. Four-five gallons- green DC-47. |
October 23, 2002 |
| Eaton Elementary School |
FM-200219944 10/24/02 Eaton Boiler Room - Electric Room Replace boiler emergency switch contactors coil powered for Boilers #1 and #2 30 Amps; made by Cutler-Hammer; No C25DND330; Volts 104-120; 50-60 HZ; 3Ls Work Not Completed |
October 24, 2002 |
| Coolidge High School |
FM-200219972 10/24/02 Coolidge Boiler Room Replace leaking 3" inch. hand operated gas valve on #3 boiler gas train line. Note: Gas Leak |
October 24, 2002 |
| Tubman Elementary School |
FM-200220073 10/25/02 (Tubman) Kitchen/Lunchroom: Peeling paint was observed over the serving area where food is prepared in the kitchen location. Asbestos/Lead Code A-clear for repair by Horne Engineer Donald Magleinti on 10/30/02 DCPS Charles E. Buchanan |
October 25, 2002 |
| Cook J.F. Elementary School |
FM-200220048 10/25/02 Cook, H.D. Right side of the stage An the back stage there is paint peeling falling from ceiling. Lead & Asbestos Code A - Clear for repairs on 10/28/02. Horne Engineering - Edward Rodriguez (RG 10/29/02) |
October 25, 2002 |
| Ballou Senior High School |
FM-200220115 10/28/02 Ballou Room 101,102 , 103, and 314 First Floor Reconnect electrical service to univents. (No heat in areas) Note: Contractors were working in the area which may have had an effect on units. |
October 28, 2002 |
| Woodson High School |
FM-200220190 0220190 10/29/02 (Woodson, H.D.) 5th Floor/Room #502 & Cafeteria: Repair or replace service line from sink leaking, also, supply line leaking in cafeteria ceiling. |
October 29, 2002 |
| Park View ES |
FM-200220209 10/29/02 Park View The following classrooms need windows glazed replaced in the following. Room 103 4 Room 102 7 Room 104 8 Room 229 9 Exhibit hall 11 |
October 29, 2002 |
| Ferebee-Hope Elementary School |
FM-200220225 10/29/02 Ferebee-Hope First floor - Kitchen Kitchen needs painting. Asbestos/Lead Code A-clear for repair by Horne Engineer Edward Rodriguez on 10/31/02 DCPS Charles E. Buchanan |
October 29, 2002 |
| Ferebee-Hope Elementary School |
FM-200220224 10/29/02 Ferebee-Hope First floor - Kitchen Plaster cracks in ceiling. Asbestos Code A-clear for repair by Horne Engineer Edward Rodriguez on 10/31/02 DCPS Charles E. Buchanan |
October 29, 2002 |
| Young Elementary School |
FM-200220231 10/29/02 Young Outside - Front Entrance Need carpenters to survey and repair front wooden panels. Wooden poles are rotten and badly need of repair. |
October 29, 2002 |
| Beers Elementary School |
FM-200220239 10/29/02 Beers First floor - bldg. 1 Rear exit door by library leading to playground, outside light need light cover and electrical work please survey. |
October 29, 2002 |
| Langdon Elementary School |
FM-200220335 5 10/30/02 Langdon Exterior of bldg. Unclog exterior drains. Water is running off into the boiler room. |
October 30, 2002 |
| Hendley Elementary School |
FM-200220348 8 10/30/02 Hendley Third Floor - Room 302 Roof Leak |
October 30, 2002 |
| Johnson JHS |
FM-200220387 10/31/02 Johnson Outside - Teacher entrance (Jasper St.) Outside drain is clogged up. |
October 31, 2002 |
| Johnson JHS |
FM-200220390 10/31/02 Johnson First floor - Auditorium area Roof leak, which has damage the plaster ceiling. |
October 31, 2002 |
| Amidon Elementary School |
FM-200220458 10/31/02 Amidon Rear - Second and Third floor Windows need replacing in rear of bldg. between second and third floors stairway landing. |
October 31, 2002 |
| Johnson JHS |
FM-200220373 10/31/02 Johnson First floor - Gymasium area Electrician need to come out and check lights that not working in gym. Basketball season getting ready to start. **** Assess and create design for (abatement certified electricians) to replace lamps and ballast in the gymnasium attic **** Asbestos Code A - Clear for repairs on 01/28/03. Horne Engineering - Troy Wilcome ( RG 01/30/03) This area is considered a Routine Maintenance area. The ballast junction boxes are positioned near the attic access door. Asbestos (sprayed-on duct) fire proofing is ~ 8 -10 feet from the ballast staton and should not interfere with repairs. The electricians should work within 3' of the ballast work stations and should avoid the the imediate area of fire proofing. R. Edwards 03/06/03 |
October 31, 2002 |
| Thomas Elementary School |
FM-200220430 10/31/02 Thomas First floor kitchen Plaster and replace wall tile. |
October 31, 2002 |
| Shepherd ES |
FM-200223806 10/31/02 (Shepherd) TIGHTEN ALL CEILING FAN BLADES THROUGHOUT BUILDING |
October 31, 2002 |
| Patricia R Harris Ed Center |
FM-200220384 10/31/02 Harris, P.R. Ground floor - Primary Gym Install lights in primary gym on the ground floor by stairway #1. Maintenance worker in the bldg. have no way of putting lights in. To high up in ceiling. |
October 31, 2002 |
| Bruce-Monroe Elementary School |
FM-200220422 220422 10/31/02 Bruce Monroe Repair/Replace defective shaft on AHU No 1. Jones and Woods Inc - 202-529-6434 Asbestos Code A - Clear for repairs on 11/04/02. Horne Engineering - Sharon Voss (RG 12/06/02) |
October 31, 2002 |
| Johnson JHS |
FM-200220375 10/31/02 Johnson First floor - Teacher lounge Need electrician to come out and change outlet for new copier machine. |
October 31, 2002 |