FM-200338412 10/2/03 Stuart-Hobson Urgent First floor # 3 and # 4 stairwell Railing on wall piece with bolts that holds the rail on the wall is missing top of stairwell, also railing bolt are very loose, can not tighten them. This is a safety hazard due to students having to go up and down stairswell to class. Asbestos Code A - Clear for repairs on 10/03/03. Horne Engineering - Richard Byrd (RG 10/08/03) |
October 2, 2003 |
| Lafayette Elementary School |
FM-200338537 10/6/03 (Lafayette) !!!URGENT!!! Asbestos Assessment Required. Roof Aea: Repair flashing on roof, above team #3. (Slate Roof) Asbestos Code A - Clear for repairs on 10/07/03. Horne Engineering - Roger Kager (RG 10/09/03) |
October 6, 2003 |
| Ferebee-Hope Elementary School |
FM-200338624 10/7/03 (Ferebee-Hope) !!!URGENT!!! Asbestos Assessment Required. Ground Floor/Main Office: Repair or replace four (4) tube light fluorescent light fixtures, sparks, and smoke shooting from lamp holder. Asbestos Code A - Clear for repairs on 10/10/03. Horne Engineering - Troy Wilcome (RG 10/31/03) |
October 7, 2003 |
| Reed LC |
FM-200338592 10/7/03 Reed. Marie First and ground floor rec. office and rec room Replace two (2) exit doors door knob due to vandalism. Note: (can not open doors). Safety and fire code violation. Asbestos Code A - Clear for repairs on 10/07/03. Horne Engineering - Philp Connolly (RG 10/09/03) |
October 7, 2003 |
| Stuart-Hobson Middle School |
FM-200338633 10/8/03 Stuart-Hobson Boiler room and tunnel Repair or rplace lights in the boiler room and tunnel area,the engineer can not provide service to these areas in the dark. This is a safety hazzard. Asbestos Code A - clear for repairs on 10/10/03. Horne Engineering - Bipin Nanavaty (RG 10/22/03) |
October 8, 2003 |
| Stanton Elementary School |
FM-200338702 10/9/03 (Stanton) !!!URGENT!!! Asbestos Assessment Required. Through-Out the Building: Room # A-8: Replace window, replace window in A-1, replace glass in room #309, and stairwell near room #303, and #306. Replace glass in exit door window in the anex. (Water comes in when it rains) Asbestos Code A - Clear for repairs on 10/09/03. Horne Engineering - Philp Connolly (RG 10/10/03) |
October 9, 2003 |
| Kimball Elementary School |
FM-200338754 10/9/03 (Kimball) !!!VERY URGENT!!! Asbestos Assessment Required. Middle Wing/2nd Floor: Roof leaking down on 2nd floor hallway. Asbestos Code A - Clear for repairs on 10/24/03. Horne Engineering - Tony Marcolin (RG 10/27/03) |
October 9, 2003 |
| Brent Elementary School |
FM-200338759 10/10/03 Brent Boiler room URGENT Replace Aquastat on the domestic hot water tank, aquastat set at 130 degree,and the temperture will rise to 170 degrees .(safety Hazzard) Need the electrician to rewire new Hot water heater ,from splice box to heater. |
October 10, 2003 |
| Cook J.F. Elementary School |
FM-200338978 10/15/03 (Cook, J.F.) !!!VERY URGENT!!! 1st Floor/Back Exterior Door: Please repair broken (inoperable) exterior door that needs to be re-lined in order to secure. Fire department damaged door due to fire in the building. |
October 15, 2003 |
| Bunker Hill Elementary School |
FM-200338972 10/15/03 Bunker Hill URGENT Second floor Boys toilet (west wing) Replace / repair 3 leaking urinals, only one out of four is working. One (1) commode will not flush. |
October 15, 2003 |
| Shaw JHS |
FM-200339017 10/15/03 (Shaw) URGENT: Lights and light covers needs to be repaired or replaced. SAFETY HAZARD!!!! Asbestos Code A - Clear for repairs on 10/17/03. Horne Engineering - Bipin Nanavaty (RG 10/21/03) |
October 15, 2003 |
| Langdon Elementary School |
FM-200339232 10/21/03 (Langdon) !!!VERY URGENT!!! 2nd Floor/Boys Bathroom: Sparks coming from light switch when turned on; boys bathroom, and classrooms are on same circuit, there are no lights in classrooms. *** THIS WORK ORDER BELONGS TO THE ELECTRICAL DEPARTMENT ******** |
October 21, 2003 |
| Beers Elementary School |
FM-200339196 10/21/03 Beers Outside rear of bldg. Store closet where lawn mowers and gas stores do to that a hole is in the ceiling. Fumes is going up to the classrooms, smell is heavy. URGENT Asbestos Code A - clear for repairs on 10/21/03. Horne Engineering - Troy Wilcome (RG 10/22/03) |
October 21, 2003 |
| Orr Elementary School |
FM-200339425 10/24/03 (Orr) !!!VERY URGENT!!! 1st Floor/In Front of Custodial Office: Valve exposed in ceiling, leaking profusely; the force of the water has caused the ceiling tile to come down. |
October 24, 2003 |
| Leckie Elementary School |
FM-200339580 10/28/03 Leckie First floor kitchen Remove plug from floor it is a safety hazard. Asbestos Code A - Clear for repairs on 10/29/03. Horne Engineering - Bipin Nanavaty (RG 10/30/03) |
October 28, 2003 |
| Hart Middle School |
FM-200339611 10/28/03 Hart First Floor - Stairwell 8 and 9 1) Repair broken marble stone steps. Steps are a safety hazard.!! Already been cleared - FM-200201112 |
October 28, 2003 |
Routine Repair Requests Opened in October 2003 (66)
| School |
Description |
Open Date |
| Gage-Eckington ES |
FM-200338357 10/1/03 Gage-Eckington Outside roof Top of roof has to be repaired due to water leaking inside causing damage to ceiling, ceiling tile and lights, etc...... |
October 1, 2003 |
| Gage-Eckington ES |
FM-200338356 10/1/03 Gage-Eckington Throughout bldg. Ballasts are needed in the entire bldg. Several lights are having this problem. Asbestos Code A - Clear for repairs on10/02/03. Horne Engineering - Tony Marcolin (RG 10/03/03) |
October 1, 2003 |
| Gage-Eckington ES |
FM-200338358 10/1/03 Gage-Eckington Second floor kitchen Have several lights out due to the need of balasts, Three over steam table. Asbestos Code A - Clear for repairs on10/02/03. Horne Engineering - Tony Marcolin (RG 10/03/03) |
October 1, 2003 |
| Ludlow-Taylor ES |
FM-200338380 10/1/03 (Ludlow-Taylor) 3rd Floor/Room #304; Replace wire mesh glass, kicked out by student. |
October 1, 2003 |
| Langdon Elementary School |
FM-200338425 10/2/03 Langdon First Floor - Boiler Room 1) Re-hang exterior entrance door to Boiler Room. Asbestos Code A - Clear for repairs on 10/03/03. Horne Engineering - Troy Wilcome (RG 10/08/03) |
October 2, 2003 |
| Cook J.F. Elementary School |
FM-200338419 10/2/03 Cook, J.F. Second floor library Repair plastered ceiling and paint. Lead & Asbestos Code A - Clear for repairs on 10/03/03. Horne Engineering - Edward Rodriguez (RG 10/08/03) |
October 2, 2003 |
| Terrell Mc ES |
FM-200338452 10/2/03 (Terrell, M.C.) Sink needs repairing - unable to hold water and pipe needs to be unclogged. |
October 2, 2003 |
| Backus Middle School |
FM-200338404 10/2/03 Backus Boiler Room Boiler #3 Remove two 3/4" plugs from cross tee at top of water column 10/02/2003 08:14 BLK - |
October 2, 2003 |
| Stuart-Hobson Middle School |
FM-200338407 10/2/03 Stuart-Hobson First floor auditorium Exit door leading out from the auditorium, top vertical rod is broken off from push bar. This need immediate attention, also this is considered a fir code violation. Asbestos Code A - Clear for repairs on 10/03/03. Horne Engineering - Richard Byrd (RG 10/08/03) |
October 2, 2003 |
| Eastern High School |
FM-200338416 10/2/03 Eastern B-43 Replace wire mesh glass in room B-43, due to breakin. |
October 2, 2003 |
| Ballou Senior High School |
FM-200338506 10/5/03 Ballou Computer Lab-211 Replace (1) one A/C window unit. Information: Emerson ser.# CF3496040664; BTU. 18000/ 17500 |
October 5, 2003 |
| Wilkinson ES |
FM-200338627 10/7/03 Wilkinson Second floor 187 bookroom Need to repair ceiling from water damaged. Asbestos Code A - Clear for repairs on 10/09/03. Horne Engineering - Philp Connolly (RG 10/10/03) |
October 7, 2003 |
| Hart Middle School |
FM-200338575 10/7/03 Hart Front Entrance 1) Re-wire outside light. |
October 7, 2003 |
| Wilkinson ES |
FM-200338626 10/7/03 Wilkinson Second floor 187 bookroom Two (2) flourescent fixtures need repairing. Cgange bulbs will not light up or come on. Asbestos Code A - Clear for repairs on 10/09/03. Horne Engineering - Philp Connolly (RG 10/10/03) |
October 7, 2003 |
| Reed LC |
FM-200338591 10/7/03 Reed. Marie Exterior steps near music room Replace missing step guards or exterior steps (a total of two (2)) Asbestos Code A - Clear for repairs on 10/07/03. Horne Engineering - Philp connolly (RG 10/09/03) |
October 7, 2003 |
| Ketcham Elementary School |
FM-200338610 10/7/03 Ketcham North stairwell Requesting repairs of doors, for it is in violation of fire code f343.5. Asbestos Code A - clear for repairs on 10/10/03. Horne Engineering - Troy Wilcome (RG 10/22/03) |
October 7, 2003 |
| Turner Elementary School |
FM-200338734 10/9/03 Turner Replace broken glass in door of room 303 (117/8x35) |
October 9, 2003 |
| Eastern High School |
FM-200338717 10/9/03 Eastern All floors Fire extinguisher doors and display Furinish the following wire mesh glass to replace vandalize ones. 1) 5ea. 48"x13x1/4" 2) 14ea. 26"x3"x14" 3) 3ea. 57"x49"x1/4" 4) 7ea. 27-1/2"x7"x1/4". Fire Code Violations!! |
October 9, 2003 |
| Francis Junior High School |
FM-200338737 7 10/9/03 Francis First floor hall Outside of room 107 6" drain line cracked. When it rain outside flood first floor hall outside of room 105 every time. |
October 9, 2003 |
| Walker-Jones EC |
FM-200338680 10/9/03 Walker-Jones Assess the interior walls of Walker Jones Elementary School walls for lead based paint. Note to appear on the work request: This is an elementary school. We need comprehensive information of lead based paint on the surface and underneath layers of paint in the lower parts of the walls accessible to the children. POC : Dr. Rahimi Saeed Rahimi; Ph.D. DCPS Industrial Hygienist 202 576 6020 Lead & Asbestos Code A - clear for repairs on 10/14/03. Horne Engineering - Edward Rodriguez (RG 10/22/03) |
October 9, 2003 |
| Hart Middle School |
FM-200338687 10/9/03 Hart Basement - New Wing Hall and B-35 1) Replace 55 pieces of missing or broken 9x9 floor tiles in hall. 2) Replace 96 pieces of missing or broken 9x9 floor tile in classroom B-35. Asbestos Code A - Clear for repairs on 10/09/03. Horne Engineering - Bipin Nanavaty (RG 10/10/03) |
October 9, 2003 |
| Birney Elementary School |
FM-200338716 10/9/03 Birney Second floor room 223 Outlets in wall need to be replace. It is broken teacher can not be use.(2 broken outlet plugs) ASAP Asbestos Code A - clear for repairs on 10/10/03. Horne Engineering - Troy Wilcome (RG 10/22/03) |
October 9, 2003 |
| Wilson High School |
FM-200338726 10/9/03 (Wilson, W.) Asbestos Assessment Required. 3rd Floor/Room #318: Install (16) new outlets with circuits, and dedicated electrical service with receptacle. Asbestos Code A - clear for repairs on 10/14/03. Horne Engineering - Bipin Nanavaty (RG 10/22/03) |
October 9, 2003 |
| Wilson High School |
FM-200338731 10/9/03 (Wilson, W.) Asbestos Assessment Required. 3rd Floor/Room #318: Install 220-V window a/c unit that is on-site. with receptacle. |
October 9, 2003 |
| Cook J.F. Elementary School |
FM-200338688 10/9/03 Cook, J.F. Boiler Room Area Repair or replace motor on condensate return tank pump #2 is not operating. Volts: 200-230 Amps: 2.8 S.F. 2.8 Part #135800 Manu: Centry Cat: H 155 HP: 1/2 |
October 9, 2003 |
| Hart Middle School |
FM-200338775 10/10/03 Hart Basement - B-14 E 1) Change 6 incandescent light fixtures with fluorescent light fixtures. Asbestos Code A - clear for repairs on 10/10/03. Horne Engineering - Philp Connolly (RG 10/22/03) |
October 10, 2003 |
| Barnard Elementary School |
FM-200338781 1 10/10/03 Barnard Boiler Room Asbestos assessment required Survey and take steps to install a city water line with bib hose type faucet so that water side of boilers can be clean, Non-exist. |
October 10, 2003 |
| Cook J.F. Elementary School |
FM-200338822 10/12/03 Cook, J.F. Boiler Room Boiler #1 flame failure. |
October 12, 2003 |
| Cardozo High School |
FM-200338835 10/12/03 Cardozo S.H.S. Boiler room Replace 2 1/2 " vlave on domestic hot water pipe. |
October 12, 2003 |
| Garfield ES |
FM-200338859 10/14/03 Garfield First floor hallway (old wing) Repair wall above and next to window that is separating. The separation has caused a large crack in the plaster wall. Please expedite Asbestos Code A - Clear for repairs on 10/15/03. Horne Engineering - Edward Rodriguez (RG 10/22/03) |
October 14, 2003 |
| Coolidge High School |
FM-200338872 10/14/03 Coolidge Boiler Room Replace leaking 3 inch gas valve on gas trane in Boiler #3. Butterfly valve. Flanged 4 Blolt ( Norstroms Mfg.) Asbestos Code A - Clear for repairs on 03/23/04. Horne Engineering - Bjarne Smith (RG 04/08/04) |
October 14, 2003 |
| Garfield ES |
FM-200338857 10/14/03 Garfield Room 2-A Repair holes in newly installed 12x12 floor tile. Scrape loose plaster in storeroom ceiling that was cause by previous roof leak that was repaired and paintes same. Please expedite Asbestos Code A - Clear for repairs on 10/15/03. Horne Engineering - Edward Rodriguez (RG 10/22/03) Lead & Asbestos Code A - Clear for repairs on 08/23/05. Tidewater - Rodney Distance/Philp Connolly(RG 08/25/05) |
October 14, 2003 |
| Stevens Elementary School |
FM-200338944 10/15/03 Stevens Entire building Doors need to be painted throughout the entire building. Lead & Asbestos Code A - Clear for repairs on 10/17/03. Horne Engineering - Edward Rodriguez (RG 10/21/03) |
October 15, 2003 |
| Bowen Elementary School |
FM-200338921 10/15/03 Bowen Boiler room Repair # 2 boiler , will not ignite ,cuts off in flame failure. |
October 15, 2003 |
| Stevens Elementary School |
FM-200338946 10/15/03 Stevens Basement B-2 Art room Need to be painted by volunteers. Permit needed. Lead & Asbestos Code A - Clear for repairs on 10/17/03. Horne Engineering - Edward Rodriguez (RG 10/21/03) |
October 15, 2003 |
| Stevens Elementary School |
FM-200338943 10/15/03 Stevens First floor bathroom room 5 Need new flooring. Asbestos Code A - Clear for repairs on 10/17/03. Horne Engineering - Edward Rodriguez (RG 10/21/03) |
October 15, 2003 |
| Johnson JHS |
FM-200338926 10/15/03 Johnson JHS First Floor thru Forth Floor 1) Remove all bradley basins and install regular sinks with push down faucets fixtures. Students have vandalized all basins. Unable to wash hands. Asbestos Code A - Clear for repairs on 10/16/03. Horne Engineering - Troy Wilcome (RG 10/21/03) |
October 15, 2003 |
| Seaton Elementary School |
FM-200338997 10/16/03 Seaton Library Replace or repair motor to air handle unit: Make Dayton Capacitor start motor; Mod: 6K376K; Volts 115/230 & 110/220; Frame 56; HP-3/4; A-11.35/12.76; PH-1; RPM-1725/1425 MFGB301B Need electrician to check air handle unit, fuse holder missing. |
October 16, 2003 |
| Garfield ES |
FM-200339075 10/17/03 Garfield LL-Kitchen Ballast needed 4 set of lights are not working. (2 bulbs ballast) Code A-clear for repair by DCPS Charles Buchanan on 10/22/03 |
October 17, 2003 |
| Spingarn High School |
FM-200339132 10/20/03 Spingarn Second floor school bank Requesting room 206 ceiling to be painted. Lead & Asbestos Code A - Clear for repairs on 10/21/03. Horne Engineering - Edward Rodriguez (RG 10/22/03) |
October 20, 2003 |
| Whittier Elementary School |
FM-200339202 10/21/03 Whittier Second floor room 211 Replace door closure broken off classroom. Asbestos Code A - Clear for repairs on 10/22/03. Horne Engineering - Bipin Nanavaty (RG 10/27/03) |
October 21, 2003 |
| Stevens Elementary School |
FM-200339261 10/22/03 Stevens Outside cafeteria Flood light needed on wall outside cafeteria area (original fell off). |
October 22, 2003 |
| Seaton Elementary School |
FM-200339258 10/22/03 Seaton Basement Mechanial room and roof Breaker #9 and #10 are still trippin. Two lights on back of building are still not working. |
October 22, 2003 |
| Gage-Eckington ES |
FM-200339284 10/22/03 Gage-Eckington First floor Teacher room 107 Carpenter need ed to fix door. Door will not close unbalance, jam. Need to be secured at all times. Asbestos Code A - Clear for repairs on 10/23/03. Horne Engineering - Tony Marcolin (RG 10/27/03) |
October 22, 2003 |
| Macfarland Middle School |
FM-200339292 10/22/03 (Macfarland) REPAIR MAGNETIC BARS ON RAMP DOOR THE ALARM SYSTEM WILL NOT SET UNLESS YOU BYPASS IT Asbestos Code A - Clear for repairs on 10/23/03. Horne Engineering - Tony Marcolin (RG 10/27/03) |
October 22, 2003 |
| Terrell Mc ES |
FM-200339459 10/23/03 (Terrell, M.C.) Asbestos Assessment Required. Door needs a door closure and to be repaired. This is a fire code violation Asbestos Code A - Clear for repairs on 10/27/03. Horne Engineering - Philp Connolly (RG 10/30/03) |
October 23, 2003 |
| Terrell Mc ES |
FM-200339458 10/23/03 (Terrell, M.C.) Asbestos Assessment Required. Hinge on vault needs fixing or replacing. This is a fire code violation. Asbestos Code A - Clear for repairs on 10/27/03. Horne Engineering - Philp Connolly (RG 10/29/03) |
October 23, 2003 |
| Terrell Mc ES |
FM-200339455 10/23/03 (Terrell, M.C.) Asbestos Assessment Required. Carpet need replacing due to flooding caused by busted drain pipe from roof. Bacteria and mole can/will be a Health hazard to students who lay and sit on floor for classes. Smell can be detected from lobby front door Asbestos Code A - Clear for repairs on 10/27/03. Horne Engineering - Philp Connolly (RG 10/29/03) |
October 23, 2003 |
| Cardozo High School |
FM-200339338 10/23/03 (Cardozo) Asbestos Assessment Required. 2nd Floor/Near Room #207: Repair or replace ceiling, peeling plaster, paint ceiling. Asbestos Code A - Clear for repairs on 10/27/03. Horne Engineering - Edward Rodriguez (RG 10/28/03) |
October 23, 2003 |
| Payne Elementary School |
FM-200339410 10/24/03 Payne First floor kitchen storage Replace bulbs and globes electrib light fixtures, with new fluorescent fixture. Bulbs do not have globes on it. Asbestos Code A - Clear for repairs on 10/27/03. Horne Engineering - Sherryll James (RG 10/28/03) |
October 24, 2003 |
| Seaton Elementary School |
FM-200339414 10/24/03 (Seaton) Asbestos Assessment Required. 1st Floor/Library, Room #103, and #211: Replace electrical outlet; unable to operate computers, and recorders. Code A-clear for repair by DCPS Charles Buchanan on 10/28/03 |
October 24, 2003 |
| Gibbs Elementary School |
FM-200339393 10/24/03 Gibbs First floor kitchen Storage room lock is not working properly so the manager cannot get to the safe. Need repairing or replacing. Kitchen lock need repairing to prevent a break-in. |
October 24, 2003 |
| Coolidge High School |
FM-200339430 10/24/03 Coolidge Boiler Room Replace diffusen assembly, nozzle monarch and burner ring refractory work on Iron Fireman burner to Boiler #2. Boiler inoperable. |
October 24, 2003 |
| Coolidge High School |
FM-200339429 10/24/03 Coolidge Boiler Room Replace leaking Pilot gas solenoid valve, on burner to Boiler #2. ASCO General #K3A432T 9947 Serial # T160928 PSI Max 1/2 Volts 120/60 110/50 Amps 15 Watts 10 |
October 24, 2003 |
| Browne Junior High School |
FM-200339497 10/27/03 Browne Basement - Gym 1) Need ballast and lights replaced in Gym area for volley ball and soon basketball games. An electrician came out to survey last week. Please assist us in getting the ballasts and lights in. |
October 27, 2003 |
| Seaton Elementary School |
FM-200339538 10/27/03 (Seaton) 1st Floor/Cafeteria: Ceiling leak, coming from the roof. Asbestos Code A - Clear for repairs on 10/29/03. Horne Engineering - Edward Rodriguez (RG 10/30/03) |
October 27, 2003 |
| Anacostia Senior High School |
FM-200339551 551 10/27/03 (Anacostia) Gymnasium: Replace six (6) faulty broken door closures. Asbestos Code A - Clear for repairs on 10/29/03. Horne Engineering - Tony Marcolin (RG 10/31/03) |
October 27, 2003 |
| Tyler Elementary School |
FM-200339564 10/28/03 Tyler Boiler Room Boiler #2 replace automatic controls not working. |
October 28, 2003 |
| Lafayette Elementary School |
FM-200339582 10/28/03 Lafayette Gym Roof leaking as you go into gym by water fountain. Top slanted part of roof. |
October 28, 2003 |
| Johnson JHS |
FM-200339594 10/28/03 (Johnson) 4th Floor/Room #422: Replace wire mesh glass in door. (Students Vandalized) |
October 28, 2003 |
| John Burroughs ES |
FM-200339576 576 10/28/03 Burroughs 1st floor nurse office Plaster faling off rain comes through. Lead & Asbestos Code A - Clear for repairs on 10/29/03. Horne Engineering -Edward Rodriguez (RG 10/30/03) |
October 28, 2003 |
| Park View ES |
FM-200339588 10/28/03 (Parkview) Outside: Down spout is backed up, and leaking in-to the building. |
October 28, 2003 |
| Park View ES |
FM-200339568 10/28/03 Park View Science lab Wall plaster is falling down. Asbestos Code A - Clear for repairs on 10/28/03. Horne Engineering - Edward Rodriguez (RG 10/29/03) |
October 28, 2003 |
| Park View ES |
FM-200339640 10/29/03 Park View First floor room 104 Railing stairway is loose. Asbestos Code A - Clear for repairs on 10/29/03. Horne Engineering - Tony Marcolin (RG 10/30/03) |
October 29, 2003 |
| Ballou Senior High School |
FM-200339635 10/29/03 Ballou Kitchen Install new ice machine. |
October 29, 2003 |
| Bancroft Elementary School |
FM-200339761 61 10/31/03 Bancroft First floor primary (leading to open space) Replace door closure, door is hanging off of hinge and closing to fast. Asbestos Code A - Clear for repairs on 10/03/03. Horne Engineering - Troy Wilcome (RG 11/04/03) |