Urgent Repair Requests Opened in November 2002 (26)
| School |
Description |
Open Date |
| Reed LC |
FM-200220534 11/1/02 Reed, Marie Kitchen Repair or replace the grease trap due to corrosin. " URGENT " |
November 1, 2002 |
| Woodson High School |
FM-200220562 0220562 11/1/02 (Woodson, H.D.) !!!URGENT!!! Ground Floor/Cafeteria: Pipe leaking from ceiling, slow drip; installation on pipes. Asbeatos Code A - Clear for repairs on 11/04/02. Horne Engineering - Edward Rodriguez (RG 03/06/01) |
November 1, 2002 |
| Stanton Elementary School |
FM-200220678 11/12/02 (Stanton) !!!VERY URGENT!!! Outside drain: Staff is unable to walk through. (Near canopy) 11/13/02, approx. 9:40 a.m., engineer reported conditions has become worse due to the continued rain. |
November 12, 2002 |
| Duke Ellington School |
FM-200220872 11/13/02 Wilson, W. First floor - Kitchen Install new floor inside walk-in box. (Sheet metal personnel needed.) Asbestos Code A - Clear for repairs on 04/29/03. DCPS Safety - Leroy Minton Jr. (RG 04/29/03) |
November 13, 2002 |
| Cook J.F. Elementary School |
FM-200221093 11/15/02 (Cook, J.F.) !!!VERY URGENT!!! Auditorium: Two (2) exit lights out. Balcolny: One (1) exit light out. Lights were broken out with a ball, and were shooting sparks. |
November 15, 2002 |
| Patricia R Harris Ed Center |
FM-200221055 11/15/02 Harris, P.R. Kitchen area Baseboard has come away fromwall this is concrete tile baseboard and it need to be replaced A.S.A.P. Asbestos Code A - Clear for repairs on 11/19/02. DCPS Safety - Leroy Minton Jr. (RG 11/19/02) |
November 15, 2002 |
| Patricia R Harris Ed Center |
FM-200221054 11/15/02 Harris, P.R. Kitchen area Concrete floor has come up in one of the refrigerators. Please respon A.S.A.P. Asbestos Code A - Clear for repairs on 11/19/02. DCPS Safety - Leroy Minton Jr. (RG 11/19/02) |
November 15, 2002 |
| Hine JHS |
FM-200221060 11/15/02 Hine Second floor - Recreation office Damage ceiling tile, possible mold present. Remove peeling paint from ceiling. Asbestos/Lead Code A-clear for repair by Horne Engineer Edward Rodriguez DCPS Safety on 11/21/02 Charles E. Buchanan |
November 15, 2002 |
| Thomas Elementary School |
FM-200221196 11/18/02 Thomas First floor - Kitchen managers office Survey and plaster hole in the ceiling. Asbestos Code A - Clear for repairs on 11/19/02. DCPS Safety - Leroy Minton Jr. (RG 11/19/02) |
November 18, 2002 |
| Patterson ES |
FM-200221143 200221143 11/18/02 Patterson Second floor Paint restrooms (mens) near doors # 5 and 3. Permit was not issued. Asbestos/Lead Code A-clear for repair by Horne Engineer Edward Rodriguez DCPS Safety on 11/21/02 Charles E. Buchanan |
November 18, 2002 |
| Cardozo High School |
FM-200221239 11/19/02 Cardozo By girls gym rear steps- south east side Repair plaster walls and ceiling that has fallen from roof leak. Asbestos Code A-clear for repair by Horne Engineer Sheryll James DCPS Safety on 11/21/02 Charles E. Buchanan |
November 19, 2002 |
| Garfield ES |
FM-200221269 11/19/02 Garfield LL1- Auditorium Pillars need to be plastered and painted in auditorium looks bad. Asbestos/Lead Code A-clear for repair by Horne Engineer Edward Rodriguez DCPS Safety Charles E. Buchanan on 11/26/02 |
November 19, 2002 |
| Cardozo High School |
FM-200221256 11/19/02 Cardozo Hall east side Repair plaster wall that has an indention and cracks thru plaster. Asbestos Code A-clear for repair by Horne Engineer Sharon Voss DCPS Safety on 11/21/02 Charles E. Buchanan |
November 19, 2002 |
| Duke Ellington School |
FM-200221445 11/20/02 Ellington, Duke Basement level The pipes are peeling in the hallway by the R St. entrance. Asbestos/Lead Code A-clear for repair by Horne Engineer Sheryll James/ Edward RodriguezDCPS Safety Charles E. Buchanan on 11/26/02 |
November 20, 2002 |
| Park View ES |
FM-200221457 11/20/02 Park View Lower level floor above cafeteria at rear entrance Reclose / repair concrete floor where opening was made to repair steam leak (which has been completed). Please Expedite Asbestos Code A-clear for repair by DCPS Safety Charles E. Buchanan on 11/25/02 |
November 20, 2002 |
| Park View ES |
FM-200221456 11/20/02 Park View Lower level above cafeteria at rear entrance Restore / repair plaster and tile wall in hallway that was opened to repair steam leak (which has been completed). Please Expedite Asbestos Code A-clear for repair by DCPS Safety Charles E. Buchanan on 11/25/02 |
November 20, 2002 |
| Duke Ellington School |
FM-200221415 11/20/02 Ellington, Duke Sub-basement gym The floor in gym is buckling and needs repair or need a new floor. Asbestos Code A-clear for repair by Horne Engineer Sheryll James DCPS Safety Charles E. Buchanan on 11/26/02 |
November 20, 2002 |
| Duke Ellington School |
FM-200221416 11/20/02 Ellington, Duke Sub-basement gym Paint peeling from the walls in the staircase leading down to the gym. Asbestos/Lead Code A-clear for repair by Horne Engineer Sheryll James/ Edward Rodriguez DCPS Safety Charles E. Buchanan on 11/26/02 |
November 20, 2002 |
| Duke Ellington School |
FM-200221419 11/20/02 Ellington, Duke Basement dance studio Paint peeling from the wall in the girls dressing room. Need painting. Asbestos/Lead Code A-clear for repair by Horne Engineer Edward Rodriguez/ Sheryll James DCPS Safety Charles E. Buchanan on 11/26/02 |
November 20, 2002 |
| Duke Ellington School |
FM-200221421 11/20/02 Ellington, Duke Sub-basement dance studio Dance rails are down and need to be mounted in dance studio (2) two. Asbestos Code A- Cleared for repairs on 04-19-03 by Leroy Minton Jr (LM/01-15-04) Safety Office. 202-576-8962. |
November 20, 2002 |
| Duke Ellington School |
FM-200221425 11/20/02 Ellington, Duke Sub-basement dance studio Walls are peeling paint and plaster need repair. Asbestos/Lead Code A-clear for repair by Horne Engineer Edward Sheryll James DCPS Safety Charles E. Buchanan on 11/26/02 |
November 20, 2002 |
| Duke Ellington School |
FM-200221431 11/20/02 Ellington, Duke Basement - Nurse's office The office walls and ceiling needs painting, because the walls and ceiling are peeling. Asbestos/Lead Code A-clear for repair by Horne Engineer Edward Rodriguez DCPS Safety Charles E. Buchanan on 11/26/02 |
November 20, 2002 |
| Duke Ellington School |
FM-200221433 11/20/02 Ellington, Duke Basement - hallways The hallways need to be painted. Asbestos/Lead Code A-clear for repair by Horne Engineer Sheryll James/ Edward Rodriguez DCPS Safety Charles E. Buchanan on 11/26/02 |
November 20, 2002 |
| Draper Elementary School |
FM-200221621 11/25/02 (Draper) 1. Asbestos assessment required. Staircase #2/Window area: Plaster around window is crumbling off and peeling; replastering and painting needed. Lead Code A - clear for repairs as of 12/3/02 by Horne Engineers Tony Mareclin Asbestos Code A- clear for repairs also. DCPS safety Sylvia Grimes. Asbestos Code A-clear for repair by Horne Engineer Tony Mareclin on 12/04/02 DCPS Charles Buchanan |
November 25, 2002 |
| Nalle Elementary School |
FM-200223017 11/26/02 (Nalle) Kitchen has improper lighting because the ballasts are out. Ceiling is falling in storage area and food prep area. Grease trap needs to be snaked out. Asbestos Code A - Cleared for repairs on 05-08-03 by Leroy Minton Jr. (LM/05-08-03) Safety Office 202-576-8962. |
November 26, 2002 |
| Seaton Elementary School |
FM-200221669 11/26/02 (Seaton) 1st Floor/Boys bathrooms, exterior door sills. Re-inforce door sill, and door is not closing properly. Asbestos Code A - Cleared for repairs on 12-12-02 (LM/ 12-12-02) Leroy Minton Jr. Safety Office (202) 576-8962. |
November 26, 2002 |
Routine Repair Requests Opened in November 2002 (68)
| School |
Description |
Open Date |
| Bruce-Monroe Elementary School |
FM-200220518 11/1/02 Bruce-Monroe Throughout - First, second and third floor Secure windows throughout bldg. |
November 1, 2002 |
| Park View ES |
FM-200220529 11/1/02 (Park View) Hallway leading to cafeteria stairs: Make necessary repairs to stop water from leaking from ceiling, just inside of exit door leading to parking lot. Note: Water could be condensation, but origin is undetectable. !!!Please expedite!!! |
November 1, 2002 |
| Shaed Elementary School |
FM-200220480 11/1/02 Outside Outside light has fallen off of wall. |
November 1, 2002 |
| Eastern High School |
FM-200220593 11/1/02 Eastern Green House Basement Repair (2) Gas Heaters in the green house they are inoperable. |
November 1, 2002 |
| Ferebee-Hope Elementary School |
FM-200220592 11/1/02 Ferebee-Hope Main Roof Pent House Repair or replace flance around floor drain. Water leaking on the top 4th floor. |
November 1, 2002 |
| Bruce-Monroe Elementary School |
FM-200220721 11/12/02 Bruce-Monroe Fourth floor - Stairways (South) Ceiling is peeling - Plaster and paint. Week of 11/4/02-11/8/02 FM-200220812 Asbestos/Lead Code A-clear for repair by Horne Engineer Edward Rodriguez on 11/12/02 DCPS Charles E Buchanan |
November 12, 2002 |
| West Elementary School |
FM-200220698 11/12/02 West First, second and third floor Need asbestos check to remove light fixtures in library, cafeteria and main hallway by main office. Asbestos Code A - Clear for repairs on 11/14/02. Horne Engineering - Sharon Voss (RG 11/15/02) |
November 12, 2002 |
| Payne Elementary School |
FM-200220681 11/12/02 Payne First floor - Kitchen Remove loose and falling plaster from ceilings to eliminate hazard condition. Asbestos Code A-clear for repair by Horne Engineer Edward Rodriguez on 11/15/02 DCPS Charles E. Buchanan |
November 12, 2002 |
| Cardozo High School |
FM-200220633 11/12/02 Cardozo Fan room Replace 3/4" ruptured galvanized domestic cold water line in the middle fan room. there is no insulation on the line. Asbestos Code A - Clear for Repair on 11/06/02 Horne Engineering - Roger Kager ( RG 11/07/02 ) |
November 12, 2002 |
| Wilkinson ES |
FM-200220740 11/12/02 Wilkinson First floor 50 kgn room gym area Need to replace eight (8) pieces of wore out tile near door exit. Week of 11/4/02-11/8/02 FM-200220898 Asbestos Code A-clear for repair by Horne Engineer Philip connolly on 11/13/02 DCPS Charles E Buchanan |
November 12, 2002 |
| Woodson High School |
FM-200220641 11/12/02 H.D Woodson Pool Pump Room Pool R/R condensate return pumps. Boilers are not getting it's return water back, water is dumping on the floor |
November 12, 2002 |
| Eastern High School |
FM-200220689 11/12/02 Eastern Greenhouse Repair and replace leaking lexan panes-due to weather that is warped. Leaking when raining to condusive for teaching when leaking water. |
November 12, 2002 |
| Slowe Elementary School |
FM-200220877 11/13/02 Slowe Old side Paint stairwell walls. |
November 13, 2002 |
| Davis Elementary School |
FM-200220905 11/13/02 Davis Second floor - Teacher's lounge Remove old peeling plaster and paint and repair paint over stove and sink. Asbestos/Lead Code A-clear for repair by Horne Engineer Edward Rodriguez on 11/15/02 DCPS Charles E. Buchanan |
November 13, 2002 |
| Draper Elementary School |
FM-200220812 11/13/02 Draper Cafeteria Ceiling plaster loose and falling in area. HA 005 (NO ASBESSTOS) Plaster White Room 17 HA 705 (NO ASBESTOS) Brown Coat Room 24 Asbestos Code A-clear for repair by Charles E. Buchanan on 11/14/02 DCPS Charles E. Buchanan |
November 13, 2002 |
| Garfield ES |
FM-200220828 11/13/02 Garfield Outside main bldg. Gutters on the alley side of the building needs to be replace. |
November 13, 2002 |
| Ludlow-Taylor ES |
FM-200220853 11/13/02 Ludlow-Taylor First floor - day care Replace ballast and light covers. Day care was cited by monitors on 11/8/02 for compliance. Will return in 30 days. |
November 13, 2002 |
| Meyer Elementary School |
FM-200220899 11/13/02 Meyer Basement - Ceiling tile is [eeling off in classroom and the children is playing with it, some of them is putting in their mouth. This is an emergency. Asbestos/Lead Code A-clear for repair by Horne Engineer Edward Rodriguez on 11/15/02 DCPS Charles E. Buchanan |
November 13, 2002 |
| Shaw JHS |
FM-200220887 11/13/02 Shaw Roof Unstop roof drains: main area and the other over top of the garage. Mr. Thomas can show the areas that are stopped up. |
November 13, 2002 |
| Shaw JHS |
FM-200223513 11/13/02 (Shaw) 1. Asbestos assessment required. Basement Corridor towards the Band Room: Ceiling is leaking and tile is falling. Band Room: Ceiling is leaing and tile is falling. Tile needs to be replaced. Entrance to the garage: Ceiling is leaking. Entered request previously. Pleae provide feedback. Account #: 423 Requester Phone: 202-673-7203 Web Form Location ID: 423 Asbestos Code A - Clear for repairs on 03/06/03. Horne Engineering - Troy Wilcome (RG 03/07/03) |
November 13, 2002 |
| Slowe Elementary School |
FM-200220875 11/13/02 Slowe First and Second floor rooms 122-210-211 Replace radiator covers. |
November 13, 2002 |
| Spingarn High School |
FM-200220839 11/13/02 Spingarn Kitchen Add light fixtures for more light. |
November 13, 2002 |
| Turner Elementary School |
FM-200220806 11/13/02 (Turner) 3rd floor/Storage rooms: Make keys to storage rooms in side of rooms #314-A. |
November 13, 2002 |
| Wilson High School |
FM-200220858 11/13/02 Wilson, W. First floor - Room 125,- Main office and 103 Install new carpet inside the above areas. Carpet needs replacement due to age and is very unsafe. |
November 13, 2002 |
| Wilson High School |
FM-200220869 11/13/02 Wilson, W. Library Install (5) five A.C. units inside this library. At present there are 100 computers inside this room. |
November 13, 2002 |
| Wilson High School |
FM-200221008 11/14/02 Wilson, W. Kitchen 1) Change existing lights inside of kitchen. 15 - Flouresent 10 - Hood light covers 1 - Storage room light. |
November 14, 2002 |
| Ferebee-Hope Elementary School |
FM-200220979 11/14/02 Ferebee-Hope Kitchen Lights need florescent lamp holders (clips) 10 needed and repaired. |
November 14, 2002 |
| Turner Elementary School |
FM-200220936 11/14/02 (Turner) Ground floor Kitchen/Cafeteria: Both large double sinks with 3" drain pipes are leaking on floor; one of them was repaired several times but continues to leak, leaving the floor wet and slippery. |
November 14, 2002 |
| Eastern High School |
FM-200221003 11/14/02 Eastern Girls Bathroom - Field 1) Repair damaged ceiling inside of this restroom. ( Football Playoffs ) Asbestos Code A- clear for repairs as of 11/18/02 by Horne Engineers Troy Wilcome. |
November 14, 2002 |
| Janney Elementary School |
FM-200221066 11/15/02 Janney First floor - Maint. office Electrician: Lavatory in custodian office needs an exhaust fan. New windows were installed and they did not replace the old window with that opens. |
November 15, 2002 |
| Ketcham Elementary School |
FM-200221059 11/15/02 Ketcham Front of building Repairguttering atop of building, It has a hole in it which leaks onto the porch over the arch at entrance of the building. In turn leaks through the bricks in the arch. |
November 15, 2002 |
| Thomas Elementary School |
FM-200221202 11/18/02 Thomas First floor - Pre-school area Survey sockets and repair power in the electrical sockets keeps jumping off and on without tripping the circuit breakers. |
November 18, 2002 |
| Cook J.F. Elementary School |
FM-200221159 11/18/02 (Cook, J.F.) Auditorium: During after/care activities, ball hit lights, three (3) lights are not working. |
November 18, 2002 |
| Wilkinson ES |
FM-200221233 11/18/02 Wlikinson First floor - 100-main office Need to replace flourescent light fixture (1). Keep going off and on. |
November 18, 2002 |
| Truesdell Elementary |
FM-200221180 11/18/02 Truesdell Replace broken down spouts on the rear of the building. |
November 18, 2002 |
| Eastern High School |
FM-200221224 11/18/02 Eastern Mechanical room Repair roof leak above mechanical room third floor. Possible gutter replacement is needed. This should be expeditiously to stop further damage to auditorium. |
November 18, 2002 |
| Rudolph Elementary School |
FM-200221183 11/18/02 Rudolph Lunch Room First Floor Replace univent motor in the lunch room. Motor will run and then cut off. Motor don't have a Nomenclature * No Informantion On Motor* |
November 18, 2002 |
| Cardozo High School |
FM-200221253 11/19/02 Cardozo Roof - rear steps by girls gym southeast side Repair roof leak that deteriorated plaster walls and ceiling causing plaster to fall. |
November 19, 2002 |
| Duke Ellington School |
FM-200221318 11/19/02 Ellington Kitchen 1) Repair floor in freezer / and or refrigerator. |
November 19, 2002 |
| Eastern High School |
FM-200221284 11/19/02 Eastern Cafeteria, gym corridor, locker room Furnish and install water fountains in areas listed above. There is no working water fountains in cafeteria area. Gym water fountain water has a bad taste, warm water. Water fountain in sub basement locker room area-fountain are cut-off because of lead and porcelain water fountain. Two (20 cafeteria two (2) gym corridor and locker room corridor. |
November 19, 2002 |
| Deal Junior High School |
FM-200223411 11/19/02 (Deal) REPAIR PEELING PAINT AND PLASTER IN MANAGERS OFFICE, LOCKER ROOM AND THROUGHOUT KITCHEN FACILITY. HEALTH CODE VIOLATION. Lead & Asbestos Code A - Clear for repairs on 03/05/03. Horne Engineering - Edward Rodriguez (RG 03/06/03) |
November 19, 2002 |
| Spingarn High School |
FM-200221349 11/19/02 Spingarn Basement barber shop Requesting additional outlets to hook up barbers equipment. |
November 19, 2002 |
| Spingarn High School |
FM-200221352 11/19/02 Spingarn Basement room 25 Requesting additional outlets for computers. |
November 19, 2002 |
| Ferebee-Hope Elementary School |
FM-200221251 11/19/02 Ferebrr-Hope D-building head start area Furnish and install three (3) water fountains / water coolers. |
November 19, 2002 |
| West Elementary School |
FM-200221245 11/19/02 West Back and front of building Need exterior light covers so people can not break light bulbs around kindergarten play area and rear exit, also a metal sheilds or wire cover. |
November 19, 2002 |
| Garfield ES |
FM-200221268 11/19/02 Garfield D wing - demountable room 107 Roof leaking in room 107 causing ceiling tiles to fall and soaking carpet. Asbestos Code A - Clear for repairs on 08/31/05. Tidewater - Tony Marcolin (RG 09/01/05) |
November 19, 2002 |
| Benjamin Banneker Academic HS |
FM-200221400 00 11/20/02 Banneker Boiler Room Near Custodian Office Ground Floor Repair or replace defective solenoid valve to condensate tank. Boilers are running out off water. Hand feeding boiler at this time. |
November 20, 2002 |
| Draper Elementary School |
FM-200221378 11/20/02 Draper Kitchen Plaster and paint peeling over food prep area and in store room. Lead & Asbestos Code A - Clear for repairs on 11/20/02. Horne Engineering - Edward Rodriguez (RG 11/21/02) |
November 20, 2002 |
| Duke Ellington School |
FM-200221414 11/20/02 Ellington, Duke Sub-basement gym The skylight in the gym weight room leaks and the window pane do not fix the fixture. |
November 20, 2002 |
| Duke Ellington School |
FM-200221428 11/20/02 Ellington, Duke Basement - room 11 Light fixture does not have a covers. Light bulbs are expose. |
November 20, 2002 |
| Duke Ellington School |
FM-200221422 11/20/02 Ellington, Duke Sub-basement dance studio The sky light windows are broken or crack. Need to be repaired. Boy dressing area. |
November 20, 2002 |
| Woodson High School |
FM-200221386 11/20/02 Woodson , H.D. First Floor - Girls Restroom Third Floor - Cosmetology Class 1) Re-install (2) sinks that are presently off of the wall. Asbestos Code A - Clear for repairs on 11/2/02. Horne Engineering - Bipin Nanavaty (RG 11/22/02) |
November 20, 2002 |
| Davis Elementary School |
FM-200221398 11/20/02 Davis Basement - maintenance supervisor office Old light fixture have a short in it. Remove old fixture and replace with a fluorescent tube fixture. Asbestos Code A - Clear for repairs on 11/20/02. Horne Engineering - Bipin Nanavaty (RG 11/22/02) |
November 20, 2002 |
| Benjamin Banneker Academic HS |
FM-200221468 68 11/21/02 Banneker Third floor Above ceiling in hall 300/305 Roof is leaking, the plaster is falling in chunk's. Soon to become a hole in the roof. |
November 21, 2002 |
| Coolidge High School |
FM-200221465 11/21/02 Coolidge Roof Leak 1) Roof leaking in room 304 and 320. |
November 21, 2002 |
| Simon Elementary School |
FM-200221500 11/21/02 Simon Basement - Boys restroom Hole in wall under sink. Wall tile Asbestos Code A - Clear for repairs on 11/22/02. Horne Engineering - Sheryll James (RG 11/25/02 |
November 21, 2002 |
| Green Elementary School |
FM-200221508 11/21/02 Green Outside main entrance Repair lights outside main entrance. Lights will not come on. |
November 21, 2002 |
| Duke Ellington School |
FM-200221610 11/25/02 (Ellington) 1. Asbestos assessment required. 2nd Floor/Mens restroom: Paint falling from the ceiling. Lead & Asbestos Code A - Clear for repairs on 11/26/02. Horne Engineering - Edward Rodriguez\Bipin Nanavaty (RG 12/04/02) |
November 25, 2002 |
| Duke Ellington School |
FM-200221613 11/25/02 (Ellington) 1. Asbestos assessment required. 2nd Floor/Room #262-A: Plaster and paint, falling from the ceiling. Lead & Asbestos Code A - Clear for repairs on 11/26/02. Horne Engineering - Edward Rodriguez\Bill Nanavaty (RG 12/04/02) |
November 25, 2002 |
| Duke Ellington School |
FM-200221603 11/25/02 (Ellington) 1. Asbestos assessment required. 2nd Floor/Room #254-A: Peeling paint falling from wall. Lead & Asbestos Code A - Clear for repairs on 11/26/02. Horne Engineering - Edward Rodriguez\Bipin Nanavaty (RG 12/05/02) |
November 25, 2002 |
| Duke Ellington School |
FM-200221599 11/25/02 (Ellington) 3rd Floor/Near nurse's office: The window in the 3rd floor landing has a cracked window pane. |
November 25, 2002 |
| Stanton Elementary School |
FM-200221623 11/25/02 (Stanton) 2nd Floor/Teachers lounge-Kitchen: No electrical power in that room; need electrical power for refrigerator and soda machines. |
November 25, 2002 |
| Seaton Elementary School |
FM-200221645 11/25/02 (Seaton) 1. Asbestos assessment required. 1st Floor/1st hall near ESL room. Rod to fire door is broken, repair or replace. (Door has panic bar) Asbestos Code A - Clear for repairs on 11/26/02. Horne Engineering - Philp Connolly (RG 12/04/02) |
November 25, 2002 |
| Duke Ellington School |
FM-200221600 11/25/02 (Ellington) 1. Asbestos assessment required. 3rd Floor hallway: Paint peeling from the wall outside of room #317. Asbestos/Lead Code A-clear for repair by Horne Enggineer: Edward Rodriguez on 12-06-02 DCPS Charles Buchanan |
November 25, 2002 |
| Benjamin Banneker Academic HS |
FM-200221628 11/25/02 (Banneker) Team locker room: Paint locker room; paint is badly needed. (Girls and boys) Lead & Asbestos Code A - Clear for repairs on 04/17/03. Horne Engineering - Edward Rodriguez (RG 04/17/03) |
November 25, 2002 |
| Cardozo High School |
FM-200221629 11/25/02 (Cardoza) Team locker room: Paint locker room; paint is badly needed. (Girls and boys) Lead & Asbestos Code A - Clear for repairs on 04/17/03. Horne Engineering - Edward Rodriguez (RG 04/18/03) |
November 25, 2002 |
| Wilson High School |
FM-200221632 11/25/02 (Wilson, W.) Team locker room: Paint locker room; paint is badly needed. (Girls and boys) Lead & Asbestos Code A - Clear for repairs on 04/17/03. Horne Engineering - Edward Rodriguez (RG 04/18/03) |
November 25, 2002 |
| Brent Elementary School |
FM-200221666 11/26/02 (Brent) 3rd Floor/Room #309: Need two windows the same size in Ms. Jackson. 60 X 78" |
November 26, 2002 |