Urgent Repair Requests Opened in December 2002 (10) | School | Description | Open Date |
| Duke Ellington School | FM-200221842 12/2/02 (Ellington) Hot method floor tile removal AMP 231 and AMP 302. 1. Asbestos assessment required. Second floor - room 203 The steps entering into the room is broken and need repair. Asbestos Code A - Abated and cleared for repairs on 12-16-02 (LM) per Leroy Minton Jr. confirmation. Safety Office (202) 576-8962. | December 2, 2002 |
| Cook J.F. Elementary School | FM-200222051 12/4/02 (Cook, J.F.) !!!URGENT!!! 1st Floor/Hallway and Classroom #306 Wires protruding from plastic covering (conduit) on side of walls in hallway, and classroom #306. | December 4, 2002 |
| Seaton Elementary School | FM-200222108 12/4/02 Seaton Second floor - room 204 teachers lounge Outlet is not working, wiring is very old. New outlets only work for a short time. Please check breakers. Need outlet for soda machine. Urgent | December 4, 2002 |
| Duke Ellington School | FM-200222090 12/4/02 (Ellington) In theater, back stage at the right a electrical socket is not working. Asbestos Code A-clear for repair by DCPS on 12-09-02 Safety Charles Buchanan Howard James 202-282-05662 Jone Walker 202-342-7589 | December 4, 2002 |
| Smothers ES | FM-200222103 12/4/02 (Smothers) !!!VERY URGENT!!! Replace 15amp fuse box with 30amp breaker panel for exterior lighting. Fuses keep blowing out. | December 4, 2002 |
| Beers Elementary School | FM-200222194 12/9/02 (Beers) Book Room: Principal is requesting additional outlets to be installed in the book room; book room is in use. (Please survey) Asbestos Code A - Clear for repairs on 12/17/02. DCPS Safety - Leroy Minton Jr. (RG 12/18/02) | December 9, 2002 |
| John Burroughs ES | FM-200222563 563 12/13/02 Burroughs First floor - Ms. Jelks room Remove pole from ceiling. It is hanging off from wall. Asbestos Code A - Clear for repairs on 12/17/02. DCPS Safety - Leroy Minton Jr. (RG 12/18/02) | December 13, 2002 |
| Turner Elementary School | FM-200222675 12/17/02 Turner First floor - hallway O.S. Replace panic bar next to 101 with panic bar key lock. (old side) Asbestos Code A - Cleared for repairs on 01-17-03 by Leroy Minton Jr. (LM/01-17-03) Safety Office (202) 576-8962. | December 17, 2002 |
| Backus Middle School | FM-200222869 12/19/02 (Backus) !!!VERY URGENT!!! 3rd floorl, Girls Gym locker room: Hand basin sink stopped with tar in the waste line, needs to be check out. | December 19, 2002 |
| Turner Elementary School | FM-200223331 12/30/02 (Turner) !!!URGENT!!! Old building/3rd Floor: Repair door handle lock to boys restroom door that leads too outside. (Exit door insecure) Also, the following rooms need servicing: Rooms #203, 210, 211. | December 30, 2002 |
Routine Repair Requests Opened in December 2002 (51) | School | Description | Open Date |
| Duke Ellington School | FM-200221841 12/2/02 (Ellington) 1. Asbestos assessment required. Second floor - room 205 The desk cabinet are broken, the door has come off, and some parts are expose need repair. | December 2, 2002 |
| Duke Ellington School | FM-200221848 12/2/02 (Ellington) 1. Asbestos assessment required. First floor - theater Plaster is falling from the ceiling in the theater on the chairs in the front row at the left side. Asbestos/Lead Code A-clear for repair by Horne Engineer Edward Rodriguez on 12/05/02 DCPS Charles Buchanan | December 2, 2002 |
| Hart Middle School | FM-200221852 12/2/02 Hart Room 319 1) Replace outside window in room 319. | December 2, 2002 |
| Benning Elementary School | FM-200221811 1 12/2/02 Benning Kitchen - Main office area Kitchen sink heating wire need replaceing for heating water. | December 2, 2002 |
| Benning Elementary School | FM-200221821 12/2/02 Benning Kitchen The walk-in box was removed, Need to repair the area were the walk-in was. Need floor tile and walls sealed. Lead & Asbestos Code A - Clear for repairs on12/03/02. Horne Engineering - Tony Marcolin (RG 12/04/02) | December 2, 2002 |
| Browne Junior High School | FM-200221856 12/2/02 Browne South tunnel Survey and correct problem with water leaking from outside into bldg. tunnell and from tunnel to step landing leading to cafeteria. | December 2, 2002 |
| Patterson ES | FM-200221795 200221795 12/2/02 Patterson, W.B. Third floor - entrance to boys room Replace light holder / tombstone. | December 2, 2002 |
| Benjamin Banneker Academic HS | FM-200221874 12/2/02 Banneker First floor - gym floor Screen floors for up-coming basketball season. | December 2, 2002 |
| Park View ES | FM-200221825 12/2/02 Parkview Break-In !!! First Floor - Room 102 1) Replace window... | December 2, 2002 |
| Duke Ellington School | FM-200221835 12/2/02 Ellington, Duke Second floor - hallway The back hallway has peeling paint falling from the walls. Asbestos/Lead Code A-clear for repair by Horne Engineer Edward Rodriguez on 12/05/02 DCPS Charles Buchanan | December 2, 2002 |
| Lafayette Elementary School | FM-200221901 901 12/3/02 Lafayette Gym Check lights some work at times and some do not, but all never worked since we installed new bulbs back in May. Mercury vapor lights and cherry picker is needed. | December 3, 2002 |
| Cardozo High School | FM-200221932 12/3/02 Cardozo Roof -over girls gym Repair roof drain, drain holding water on roof that is leaking into girls gym. Tried taege plunger no results. Repair roof over girls gym. | December 3, 2002 |
| Shaw JHS | FM-200221892 12/3/02 Shaw Basement area 1) Hallway leading to band area ceiling is leaking. Asbestos Code A - Clear for repairs on 12/06/02. Horne Engineering - Bipin Nanavaty (RG 12/09/02) | December 3, 2002 |
| Shaw JHS | FM-200221893 12/3/02 Shaw First floor I.S.S. door is broken room 15. | December 3, 2002 |
| Hart Middle School | FM-200222083 12/4/02 Hart Room 130 First Floor Fan Coil (Heating Unit) Repair: Heated water is not passing thru three way valve to the coil. I'm requesting that the unit be straight piped to coil. *The pneumatis system does not work here, the valvew is worked manually. | December 4, 2002 |
| Cardozo High School | FM-200222094 12/4/02 Cardozo Ground floor room 3 Remove existing lineum vnyl sheeting flooring, replace with carpet. Asbestos Code A - Clear for repairs on 12/06/02. Horne Engineering - Tony Marcolin (12/09/02) | December 4, 2002 |
| Cardozo High School | FM-200222095 12/4/02 Wilson, J.O. Ground floor room 3 Remove existing floor outlets they are very unsafe. Replace existing outlets. Asbestos Code A - Clear for repairs on 12/06/02. Horne Engineering - Tony Marcolin (RG 12/12/02) | December 4, 2002 |
| Stanton Elementary School | FM-200222027 12/4/02 (Stanton) First floor - boys bathroom Light fixtures need to be repaired. | December 4, 2002 |
| Nalle Elementary School | FM-200222618 12/4/02 (Nalle) The roof design has caused the traps for the train to shut down because of the granules washing into the trap. Because of the problem with the roof the auditoriun ceiling leaks and the cafeteria ceiling leaks. Account #: 288 Asbestos Code A-clear for repair by Harne Engineer Edward Rodriguez on 12/19/02 DCPS Charles E. Buchanan | December 4, 2002 |
| Woodson High School | FM-200222117 12/5/02 Woodson Boiler Room Boiler #1 Need feed water pump check. Pump leaking. | December 5, 2002 |
| Turner Elementary School | FM-200222138 12/6/02 Turner First Floor - First Floor Custodial Closet down to Basement 1) One hole has to be drilled from the Custodial Closet on the First Floor down to the Custodial Office. Poc - James Taylor- 442-5533 | December 6, 2002 |
| Spingarn High School | FM-200222140 12/6/02 Spingarn Rooms - 311,317 and 319 1) Repair roof leaks. | December 6, 2002 |
| Beers Elementary School | FM-200222196 12/9/02 (Beers) Cafeteria: Paint peeling in different area's; plastering and painting needed. Asbestos Code A - Clear for repairs on 12/09/02. Horne Engineering - Bipin Nanavaty (RG 12/13/02) | December 9, 2002 |
| Eastern High School | FM-200222253 12/9/02 Eastern Mechanical Room Sub Basement Furnish and install (2) ea. Motors for air handlers in gym. These units provide heat to the gym. InfoL General Electric Model: 5KCR 49W9A HP1-1/2 Volts 115/230 RPM 1750 Mode J | December 9, 2002 |
| Walker-Jones EC | FM-200222210 12/9/02 Walker-Jones Second floor - Open space Replace carpet in four (4) offices on open space area. Carpet on site. Asbestos Code A - Clear for repairs on 12/10/02. Horne Engineering -Donald Maglienti (RG 12/12/02) | December 9, 2002 |
| Slowe Elementary School | FM-200222285 12/10/02 Slowe First and second floor Rooms 122, 210 and 211 Replace radiator covers. | December 10, 2002 |
| Wilkinson ES | FM-200222312 12/10/02 Wilkinson Second floor - 181-girls bathroomand 180 boys bathroom Need to repair or replace hand dryer on wall. | December 10, 2002 |
| Cardozo High School | FM-200222359 12/10/02 (Cardozo) 1. Asbestos assessment required. Ground Floor/Classroom #3-Ms. Adams: Remove existing 9 X 9 floor tile with carpet for this computer lab. Asbestos Code A-clear for repair by Horne Engineer Sheryll James DCPS Charles Buchanan | December 10, 2002 |
| Eastern High School | FM-200222360 12/10/02 Eastern Basement - B-11 Chemical Lab Repair or replace sink leaking, and faucet needs to be repair or replace. | December 10, 2002 |
| Coolidge High School | FM-200222384 12/11/02 Coolidge Room #228 & #225 Replace univent motors in classroom #228 and #225, motors are not working. | December 11, 2002 |
| Reed LC | FM-200222391 12/11/02 Reed Gym and Women Locker Asbestos assessment required A plumber is needed to determine why water leaks onto gym floor when the showers are used in the women locker. Asbestos Code A - Clear for repairs on 12/11/02. Horne Engineering - Donald Maglienti (RG 12/12/02) | December 11, 2002 |
| Gibbs Elementary School | FM-200222410 12/12/02 First Floor - Main Lobby and Cafeteria - Roof Leak Second Request was called in on 2-20-07 Ceiling tiles are starting to fall | December 12, 2002 |
| Gage-Eckington ES | FM-200222468 M-200222468 12/12/02 Gage-Eckington Kitchen Wali-in boxes door hard to open and close. | December 12, 2002 |
| Shaw JHS | FM-200222403 12/12/02 Shaw Boiler Room Boiler #1 need burner adjusted. | December 12, 2002 |
| Cardozo High School | FM-200222397 12/12/02 Cardozo S.H.S. Boiler room Asbestos assessment may be required Replace ruptured 2 1/2 " galvaninzed pipe and tee on the domestic hot water pipe, this pipe supplies water to the south west side of the building. Asbestos Code A - Clear for repairs on 12/20/02. Horne Engineering - Troy Wilcome (RG 12/23/02) | December 12, 2002 |
| Shepherd ES | FM-200222510 12/13/02 Shepherd Second floor - New wing Roof leaking from second floor down to the first floor storage, nearest to the library. | December 13, 2002 |
| Eastern High School | FM-200222501 12/13/02 Eastern Roof - Gym 1) Repair roof leaks in several locations. | December 13, 2002 |
| Thomas Elementary School | FM-200222558 12/13/02 Thomas Second floor - old and new wing Please install water cooler in the second floor corridor in both new and old wing they do not have working water fountains. | December 13, 2002 |
| Watkins Elementary School | FM-200222566 12/13/02 Watkins Second floor - room 216 Door is very hard to open, required two or three person to open door. Should there be and emergency students and teacher could be trapped. Please send someone to repository fix door. | December 13, 2002 |
| Aiton Elementary School | FM-200222486 12/13/02 AITON Music room-Mech room Check RAF will not engage/run. | December 13, 2002 |
| Thomas Elementary School | FM-200222600 12/16/02 Thomas Third floor -room 304 Plaster has falling because of roof leak. Please plaster and paint. Lead & Asbestos Code A - Clear for repairs on 12/16/02. Horne Engineering - Edward Rodriguez (RG 12/18/02) | December 16, 2002 |
| Browne Junior High School | FM-200222633 12/16/02 Browne Weight Room Air handler units in weight room need pulley and belts. (2 units) | December 16, 2002 |
| Amidon Elementary School | FM-200222736 12/17/02 (Amidon) 1. Asbestos assessment required. 1st Floor/Boys restroom: Repair hole in plaster ceiling which was caused by a water leak that has been repaired. Asbestos Code A-clear for repair by Horne Engineer Bipin Nanavaty DCPS Charles Buchanan on 12/20/02 Lead Code A-clear for repair by Horne Engineer Sheryll James DCPS Charles Buchanan on 12/20/02 | December 17, 2002 |
| Thomas Elementary School | FM-200222691 12/17/02 Thomas Third floor - roof Repair roof over room 304. Water has leaked threw and knocked plaster out of ceiling. | December 17, 2002 |
| Stevens Elementary School | FM-200222700 12/17/02 Stevens Room 3 Scrape and repair peeling paint on wall. | December 17, 2002 |
| Ketcham Elementary School | FM-200222781 12/18/02 (Ketcham) 1. Asbestos assessment required. Cafeteria: I am requesting that door in cafeteria, leading to playground area be repaired. Door will not close on automatically, therefore, unable to secure door. Asbestos Code A-clear for repair 01/14/03 Charles Buchanan | December 18, 2002 |
| Wilkinson ES | FM-200222805 12/18/02 (Wilkinson) 1st Floor/122 corridor: Electrical panel box inside breaker #29, needs repair or replaced. Breakers will not reset. (#12 & 29) | December 18, 2002 |
| Spingarn High School | FM-200223081 12/23/02 Spingarn Repair shaft to four Air Handle Units in west tunnel. | December 23, 2002 |
| Eastern High School | FM-200223137 12/26/02 Eastern Roof Leaking in the following areas: 1) Gym Area 2) First Floor - Auditoriun Stage 3) Classroom 153 ( ceiling) 4) Third Floor - 337 - office and classroom 5) Corridor across from room 330 - Leaking from lights. | December 26, 2002 |
| Ferebee-Hope Elementary School | FM-200223384 12/31/02 Ferebee-Hope Pump Room Basement Mechanical Maintenance Shop repair float switch on condensate pump swimming pool (Heating Pool) | December 31, 2002 |
| Emery Elementary School | FM-200223379 12/31/02 Emery Boiler Room Check Boiler #2, When Boiler goes off on pressure, the alarm comes on. Have to keep resetting Boiler. | December 31, 2002 |