Open Repair Requests in December 2003

Open Repairs Summary

  • Urgent Requests
    6
  • Routine Requests
    54
  • Total Requests
    60

Detailed Reports

Urgent Repair Requests Opened in December 2003 (6)
School Description Open Date
Turner Elementary School FM-200340919 12/1/03 (Turner) !!!VERY URGENT!!! Ground Floor/Lobby: Replace auditorium door that has fallen off the hinges; heavy wooden door is damaged beyond repair, and we are unable to secure it. Code A-clear for repair by DCPS Charles Buchanan on 12/02/03 02/03/2004: A call of concern came in today. December 1, 2003
Merritt Middle School FM-200341220 12/8/03 (Merritt) !!!URGENT!!! 3rd Floor/Gym: Replace carpet west side of gym; carpet smells of mildew, and please replace the floor tiles. Code A-clear for repair by DCPS Charles Buchanan on 12/09/03 December 8, 2003
Whittier Elementary School FM-200341254 12/9/03 Whittier First floor room 102 old side Survey ceiling in room has a hole in ceiling size of a quarter with white powder substance coming out. Asbestos Code A - Clear for repairs on 12/10/03. Horne Engineering - Bjarne Smith (RG 12/10/03) ( If Celling is open to determine soure of water leakage and has insulation on pipe STOP work and contact DCPS Safety Office ) December 9, 2003
Stanton Elementary School FM-200341442 12/11/03 Stanton Urgent First Floor 1.) Repair - Water leaking from the light fixture in room 106. December 11, 2003
Hine JHS FM-200341558 12/12/03 (Hine) 3b wing-Replace broken fire safety glass in gym door. December 12, 2003
Stuart-Hobson Middle School FM-200341514 12/12/03 Stuart-Hobson No. 3 stairwell Bolts came out the railing inside of wall, coming down the stairwell. Custodian had to the railing down due to safety of students. This need attention. Asbestos Code A - Clear for repairs on 12/15/03. Horne Engineering - Troy Wilcome (RG 12/17/03) December 12, 2003

Routine Repair Requests Opened in December 2003 (54)
School Description Open Date
Takoma Educational Center FM-200340881 12/1/03 Takoma When heavy rain storm, rain comes through windows wetting teachers materials and children clothing. December 1, 2003
Walker-Jones EC FM-200340879 12/1/03 Walker-Jones Second floor open space Replace broken window in open space area. Size 79 1/4 4 52 December 1, 2003
Tyler Elementary School FM-200340860 12/1/03 Tyler Parking lot Need security light install. December 1, 2003
Slowe Elementary School FM-200340875 12/1/03 Slowe First floor room 102 Room needs tv bracket install near cable line outlet. December 1, 2003
Wilson High School FM-200340885 12/1/03 Wilson, W. Basement cafeteria Repair or replace (2) two eating tables in cafeteria. December 1, 2003
Ferebee-Hope Elementary School FM-200340866 12/1/03 Ferebee-Hope First floor Room 107 (Ms. Kittrell) Replace flush valve on toilet. December 1, 2003
Ferebee-Hope Elementary School FM-200340867 12/1/03 Ferebee-Hope First floor Auditorium Survey to see why emergency lights are not working. December 1, 2003
Bancroft Elementary School FM-200340982 12/2/03 (Bancroft) Main Building 3rd Floor/221: Replace doors that are swinging open, and will not lock properly. Code A-clear for repair by DCPS Charles Buchanan on 12/3/03 December 2, 2003
Aiton Elementary School FM-200340934 12/2/03 Aiton Boiler room Boiler #1 off on flame failure, will not start. December 2, 2003
Shaed Elementary School FM-200340980 12/2/03 (Shaed) 1st Floor/cafeteria: Skylight windows need to be caulked; water comes in window when it rains. December 2, 2003
Bowen Elementary School FM-200340943 12/2/03 Bowen Inside the gym in front of two doors The floor is busted up inside the gym doors. Asbestos Code A - Clear for repairs on 12/04/03. Horne Engineering - Sheryll James ( RG 12/11/03 ) December 2, 2003
Slowe Elementary School FM-200340944 12/2/03 Slowe Boiler Room Check pilot on hot water heater, pilot keeps going off. December 2, 2003
Roosevelt High School FM-200341011 011 12/3/03 Roosevelt Mechanical Room B55 Pneumatic valve would not close in mechanical room B55. No heat on one side of Building. December 3, 2003
Smothers ES FM-200341026 12/3/03 (Smothers) Exterior: Five (5) night lights are not working, three (3) in front of building, and two (2) on the inside of the building. (Photo cell is being vandalized) December 3, 2003
Shaw JHS FM-200341002 12/3/03 Shaw Basement kitchen Repair ceramic tile floor. Tiles are bowing. Asbestos Code A - Clear for repairs on 12/04/03. Horne Engineering - Troy Wilcome ( RG 12/05/03 ) December 3, 2003
Johnson JHS FM-200341015 12/3/03 (Johnson) 2nd Floor/Classroom #213: Large window broken. December 3, 2003
Johnson JHS FM-200341097 12/4/03 (Johnson Jr.) !!EMERGENCY!!! 1st Floor/Gym Boys locker room: Repair grate that blowed off roof. December 4, 2003
Ballou Senior High School FM-200341202 12/8/03 Ballou Repair leaking sink in child care center. December 8, 2003
Johnson JHS FM-200341201 12/8/03 Johnson Fourth and first floor gym area Fire exit doors Door glasses are broken need to be replace. December 8, 2003
Wilkinson ES FM-200341228 12/8/03 (Wilkinson) 1st Floor/Gym Lobby: Check four (4) or five (5) fluorescent light fixtures that was water damaged. December 8, 2003
Reed LC FM-200341193 12/8/03 Reed, Marie Second floor learning Ctr. #1 and special Ed Survey and repair roof leak. December 8, 2003
Reed LC FM-200341195 12/8/03 Reed, Marie Second floor Mr. Ferguson, Ms. Sherrod, Mrs. Barbozu and Mrs. Cockburn Please re-caulk classrooms windows to prevent water from entering rooms when it rain. December 8, 2003
Eliot Junior High School FM-200341177 12/8/03 Eliot Boys lavatory Repair falling plaster and paint from ceiling. Lead & Asbestos Code A - Clear for repairs on 12/09/03. Horne Engineering - Edward Rodriguez (RG 12/10/03) December 8, 2003
Thomas Elementary School FM-200341203 12/8/03 (Thomas) Basement Tunnel: Survey tunnel so leak can be found, and repaired. December 8, 2003
Slowe Elementary School FM-200341207 12/8/03 Slowe First floor kitchen Kitchen need ceiling plaster and painted, plaster is falling. Lead & Asbestos Code A - Clear for repairs on 12/08/03. Horne Engineering - Edward Rodriguez ( RG 12/09/03 ) December 8, 2003
Duke Ellington School FM-200341292 12/9/03 Ellington Room #2 Survey and install some type of heating unit to properly heat this area. Note: Room was divided into two section with no heating unit on this side. Urgency!!!! December 9, 2003
Coolidge High School FM-200341264 12/9/03 (Coolidge) Asbestos Assessment Required. New Gym: Remount existing equipment in gym. (Basket Ball Goal Base) Code A-clear for repair by DCPS Charles Buchanan on 12/10/03 December 9, 2003
Eastern High School FM-200341575 12/9/03 (Eastern) Window in kitchen cannot be opened. Slated for installation of window air conditioner unit. Please contact Quinten Washington, Project Manager, Planning Design and Construction, at (202) 576-5593, or quinten.washington@k12.dc.us Renovation program for Special Education. December 9, 2003
Ferebee-Hope Elementary School FM-200341406 12/10/03 FereBee -Hope Exterior 1.) Replace three bulbs on the roof outside lights on top of family service office, by the parking lot at the back. Note: The bulbs are on site - ( see head custodian Mrs. Alston ) December 10, 2003
Woodson High School FM-200341333 12/10/03 Woodson Purchase Furnish 40 medium base light bulbs for Pool Areas Sylvania 100 (H38AY or H3B AY 100/C) High Intensity Discharge Lamps (Metal Halide) December 10, 2003
Patricia R Harris Ed Center FM-200341360 12/10/03 (Harris, P.R.) Basement/Pre-K Area: Furnish six (6) heaters to help heat the kindergarten area. December 10, 2003
Ballou Senior High School FM-200341455 12/11/03 Ballou Armory Area (Ceiling) Repair ruptured domestic cold water supply line 3/4". Note: No installation on pipe also ruptured line due to vandalism. December 11, 2003
Turner Elementary School FM-200341494 12/12/03 Turner Fire Code Second floor new bldg. Replace door closurer on exit door across from boys restroom broken. Code A-clear for repair by DCPS Charles Buchanan on 12/16/03 December 12, 2003
Ferebee-Hope Elementary School FM-200341542 12/13/03 Ferebee Hope Boiler Room Basement Boiler #2 I.D. Fan needs to be repair or replace. Condensate pump needs to be repaired or replace. Boiler will not operate. December 13, 2003
Ferebee-Hope Elementary School FM-200341543 12/13/03 Ferebee Hope Boiler Room Basement Boiler #1 will not operate in high fire. Modutrol motor and cam needs to be replace. December 13, 2003
Marshall Educational Center FM-200341547 12/14/03 Marshall Boiler Room Repair or replace the pneumatic control system December 14, 2003
Turner Elementary School FM-200341609 12/15/03 (Turner) Asbestos Assessment Required. New Side/1st, 2nd, & 3rd: Need paint for painting girls, and boys restrooms. Lead & Asbestos Code A - Clear for repairs on 12/16/03. Horne Engineering - Edward Rodriguez (RG 12/17/03) December 15, 2003
Wilson High School FM-200341557 12/15/03 Wilson, W. Exterior Repair or replace the downspouts throughout the building. December 15, 2003
Gibbs Elementary School FM-200341663 12/16/03 Gibbs Health suite first floor Broken window needs repairing or fixed. December 16, 2003
Gibbs Elementary School FM-200341664 12/16/03 Gibbs Kgn 103, cafeteria and kitchen Ceilings are leaking. December 16, 2003
Bancroft Elementary School FM-200341683 12/16/03 Bancroft First floor auditorium (main bldg) Install 120V outlet. sparks flying out of outlet. Asbestos Code A - Clear for repairs on 12/18/03. Horne Engineering - Bjarne Smith (RG 12/22/03) December 16, 2003
Park View ES FM-200341625 12/16/03 Park View Boiler Room Make necessary repairs to condensate control panel. Asbestos Code A - Clear for repairs on 03/18/04. Horne Engineering - Tony Marcolin (RG 03/22/04) December 16, 2003
Eastern High School FM-200341792 12/18/03 Eastern Sub -B mechanical room Repair Malfunction in gas mechenism on Booster heater for domestic hot water in gym. December 18, 2003
Eastern High School FM-200341790 12/18/03 Eastern First floor room 154 Repair roof leak above room 154. Ceiling plaster is already falling. December 18, 2003
Ketcham Elementary School FM-200341974 12/22/03 (Ketcham) 2nd Floor/Boys Restroom: Partitions in boys bathroom, on 2nd floor, falling; believed to have been torn from wall. Asbestos Code A - Clear for repairs on 12/22/03. Horne Engineering - Tony Marcolin (RG 01/06/04) December 22, 2003
Gibbs Elementary School FM-200341955 12/22/03 (Gibbs) 1st Floor/Hall: Ceiling leaking from roof, and smelling of mildew. Asbestos Code A - Clear for repairs on 12/23/03. Horne Engineering - Philp Connolly (RG 01/06/04) December 22, 2003
Gibbs Elementary School FM-200341957 12/22/03 (Gibbs) 2nd Floor/Room #207: Repair or replace classroom door glass. December 22, 2003
Ludlow-Taylor ES FM-200341972 12/22/03 Ludlow-Taylor Boiler room Repair 3/4" copper line on the Dometic hot water heater circulation pump inlet line. December 22, 2003
Turner Elementary School FM-200342067 12/24/03 Turner Ground Floor - Cafeteria 1) Exhaust fan over stove in kitchen is not working properly, causing carbon monoxide to excape when stove is being used. December 24, 2003
Ballou Senior High School FM-200342109 12/29/03 Ballou Auto Shop (Ceiling) Replace (1) one AHU motor in ceiling of auto shop. Information: Magnetek Century Motor; Cat. H582 Part 10-151351-03 HP-3/4 RPM 1725 Volt 230/460 Fr.HA56 Amps-2.5-2.6/1.3 HZ 60 Serial # BP8-20 December 29, 2003
Ferebee-Hope Elementary School FM-200342106 12/29/03 Ferebee-Hope Boiler Room Boiler #2 Repair or replace self-aligning ball bearing pillow block on I.D. Fan. December 29, 2003
Cardozo High School FM-200342156 12/31/03 Cardozo Fan Room Re-anchor fan #7 motor to cement base. December 31, 2003
Johnson JHS FM-200342150 12/31/03 Johnson Boiler Room Check domestic hot water heater, not working, no hot water in building. December 31, 2003
Cardozo High School FM-200342157 12/31/03 Cardozo Fan Room Survey and make repairs to fan motor bearings as needed, grinding from front shaft bearings on all heating fans- total of seven (7). December 31, 2003

© The Washington Post Company