Open Repair Requests in February 2003

Open Repairs Summary

  • Urgent Requests
    10
  • Routine Requests
    68
  • Total Requests
    78

Detailed Reports

Urgent Repair Requests Opened in February 2003 (10)
School Description Open Date
Eastern High School FM-200225272 2/5/03 (Eastern) !!!URGENT!!! 1st Floor/Auditorium stage: Flood lights smoking while in use, unable to use stage lights February 5, 2003
Gage-Eckington ES FM-200225197 2/5/03 Gage-Eckington Outside - Backside Need light replace . Teacher and staff are in danger. To high up for staff. Asbestos Code A-clear for repair by DCPS on 03/05/03 Charles Buchanan February 5, 2003
Browne Junior High School FM-200225620 2/11/03 Browne URGENT First floor - hallway Repair fire doors near room 102,110 and 113. Doors will not close. Asbestos Code A - Clear for repairs on 02/14/03. Horne Engineering - Tony Marcolin (RG 02/19/03) February 11, 2003
Plummer Elementary School FM-200225829 9 2/14/03 PLUMMER BOILER ROOM NO HOT WATER TO KITCHEN - URGENT 1. Asbestos assessment required for pipe insulation. 2. Repair ruptured pipe on domestic hot water from hot water heater. Asbestos Code A clear for repairs 2/14/03 DCPS Safety R. Edwards (RE) February 14, 2003
Gibbs Elementary School FM-200226014 2/21/03 (Gibbs) !!!URGENT!!! 1st Floor/Room #103: Ceiling leak, possible leak from the roof that is steady dripping. February 21, 2003
Payne Elementary School FM-200225978 2/21/03 Payne !! URGENT !!! All Floors 1) Replace fuse electrical panel (guts) with circuit breaker panels . February 21, 2003
Stanton Elementary School FM-200226097 2/24/03 (Stanton) !!!VERY URGENT!!! Breeze-way: Pump water from the area, and clean drains. February 24, 2003
Eastern High School FM-200226122 2/24/03 (Eastern) !!!URGENT!!! Basement/Hallway near B-35 Roof leaking through ceiling also, leaking in closet of B-14. February 24, 2003
Truesdell Elementary FM-200226057 2/24/03 Truesdell First floor girls room Please modify existing girls room partition / stall to accommodate handicapped girl that was injured by vehicle last September. This student walks with the assistance of a walker and also a wheelchair. Asbestos Code A - Clear for repairs on 02/25/03. Horne Engineering - Edward Rodriguez (RG 02/26/03) February 24, 2003
Beers Elementary School FM-200226168 2/25/03 Beers Auditorium Electrical sockets and poles are hanging from wall. Six (6) lights features are not working in auditorium hallway and stairway. Principal is having black tie affair March seventh. Urgent February 25, 2003

Routine Repair Requests Opened in February 2003 (68)
School Description Open Date
Benjamin Banneker Academic HS FM-200225082 2/3/03 Banneker Basement - Music room Electrician is needed for light fixtures in music room / fixture has a shortage in it. February 3, 2003
Draper Elementary School FM-200225118 2/3/03 (Draper) 3rd Floor: Roof leaking in the following rooms: #300, 301, & 315. February 3, 2003
Johnson JHS FM-200225124 2/3/03 Johnson Third and fourth floor Repair or install dedicated breakers to support the a/c units because breakers are tripping in the following rooms, when the a/c is on. Rooms 302, 303, 315, 401, 402 and 404. The high heat is affecting staff that is working in those areas. Asbestos Code A-clear for repair by DCPS on 3/6/03 Charles Buchanan February 3, 2003
Wilson High School FM-200225055 2/3/03 Wilson,W Pool Filtration Room Replace burnt out Baldor Industrial Three Phase Pit pump motor: Cat No.- JMM3610T, SPEC.-35M205T123, Fr-182JM, Ser.F998, HP-3, V-208-230/480, aMP-8,1-7, 6/3.8, RPM-3450, HZ-60, PH-3, V-208-230/480, Amp-8.1-7.6/3.8, RPM-3450, HZ-60,PH-3, Class-F, Des-B, Code-K & Rating-40C AMB-Cont. February 3, 2003
Wilson High School FM-200225053 2/3/03 Wilson,W Pool Mechanical Room Replace inoperable and leaking Bell & Gussett Pool water circulating pump to no.2 dehumidification unit. ITT Industries; part no.-903585, model -SVA48T17D163D P. FR-48Y PH-3, Type-TS, AMB-40, INS-B3. Duty -Cont., DES-B, HP-1, HZ-60, RPM-1750, V-208-480, FLA-3,4-3.4/1.7, SF-1.25,SFA-3.8-3.8/1.9 & Code -L. February 3, 2003
Kramer Middle School FM-200225158 2/4/03 Kramer, MS Exterior Repair drain on roof. Water damage on auditorium walls (inside walls) ASAP February 4, 2003
Backus Middle School FM-200225136 2/4/03 Backus Room 202 Need concrete or metal pour in a hole before laying tile. A little girls leg went through the hole. The hole came from and electrical outlet. Class room 202 HA 016 floor mastic with HA 015 NAD HA 015 floor tile white 12" X 12" with pink white specks NAD Class Room 203 A HA floor tile Broown 9" X 9" with white streaks Replase electrical floor plate in room 203 A. Do not detrurb the 9" X 9" floor tile when replasing electrical floor plate. If 9" X 9" floor tile need to detrurb Call the Asbestos Office 202 576-8962 Asbestos Code A-clear for repair by DCPS on 03/05/03 Charles Buchanan February 4, 2003
Ludlow-Taylor ES FM-200225209 2/5/03 Ludlow-Taylor Third floor landing Replace broken door closure stairway # 2. February 5, 2003
Terrell Mc ES FM-200225452 2/5/03 (Terrell, M.C.) Roof leaks in the classroom area. February 5, 2003
Thomas Elementary School FM-200225362 2/6/03 Thomas Second Floor - 203 1) Please perform assessment - AMP 119 and 203. Ten (10) pieces 12x12 floor tile. Code A- clear for repairs as of 2/6/03 Sylvia Grimes. February 6, 2003
John Burroughs ES FM-200225298 298 2/6/03 Burroughs First floor book room Cracked window pane. May be a rock that someone threw. February 6, 2003
Wilkinson ES FM-200225367 2/6/03 Wilkinson First floor - 50-Kgn. Bivens classroom Need to install vent 12x12 in ceiling. Vent system is missing. Asbestos Code A - Clear for repairs on 02/07/03. Horne Engineering - Bipin Nanavaty (RG 02/11/03) February 6, 2003
Wilson High School FM-200225378 2/6/03 Woodrow Wilson Auditorium Removed a bad motor and remounted a new motor February 6, 2003
Wilson High School FM-200225335 2/6/03 Wilson, W Gym Building,- Room #151 Replace two (2) high-low speed control switches to univent motors; MCF-610000-000, V-120, Amps-60 max & 5173-202. February 6, 2003
Stuart-Hobson Middle School FM-200225317 2/6/03 Stuart-Hobson Second floor - annex hall Pipe in ceiling is leaking down on hall and plaster is also falling from ceiling. Lead & Asbestos Code A - Clear for repairs on 02/07/03. Horne Engineering - Edward Rodriguez (RG 02/11/03) February 6, 2003
Eastern High School FM-200225448 2/6/03 (Eastern) INSTALL CEILING LIGHT FIXTURE COVERS IN SMALL STORE ROOM. HEALTH CODE VIOLATION. February 6, 2003
Payne Elementary School FM-200225383 2/7/03 Payne Cafeteria Replace motor of Air Handle Unit over cafeteria. Century motor, frame no. 866, model SCM83DK39P, HP-1/2- 22, SER.#A63, RPM-1750, Volt 220, Code H, PH 3, Amp 1.A-1 February 7, 2003
Beers Elementary School FM-200225400 2/7/03 Beers First , Second and Third Floor - Stairwells 1) Paint all hall steps. Lead & Asbestos Code A - Clear for repairs on 02/11/03. Horne Engineering - Edward Rodriguez (RG 02/12/03) February 7, 2003
Meyer Elementary School FM-200225380 2/7/03 Meyer Boiler room control pannel Replace defective control pannel coil for # 2 boiler February 7, 2003
Macfarland Middle School FM-200225463 25463 2/10/03 MacFarland Roof Fabricate a roof hatch four (4) feet long 39 1/2 wide. The hatch was lost lost doing a abesto removal job. February 10, 2003
Garfield ES FM-200225462 2/10/03 Garfield Second floor - new wing boys room Replace four broken supply lines ti sinks. Asbestos Code A - Clear for repairs on 02/27/03. Horne Engineering - Tony Marcolin (RG 03/03) February 10, 2003
Garfield ES FM-200225460 2/10/03 Garfield Cafeteria and boys room by cafeteria Repair or replace upright water fountain in cafeteria by kitchen. Snake out two (2) urinals in boys room near cafeteria. Please expedite February 10, 2003
Takoma Educational Center FM-200225534 2/11/03 Takoma Boiler Room P.M Chiller February 11, 2003
Terrell Mc ES FM-200225544 2/11/03 M.C Terrell Boiler Room P.M Chiller February 11, 2003
Backus Middle School FM-200225608 2/11/03 Backus First and,Second and third floor The hallway ceiling tile need to be replace on each floor. Fire code violation. Asbestos Code A - Clear for repairs on 02/13/03. Horne Engineering - Edward Rodriguez (RG 02/14/03) February 11, 2003
Browne Junior High School FM-200225616 2/11/03 Browne Throughout building Replace ceramic tile throughout building. February 11, 2003
Browne Junior High School FM-200225617 2/11/03 Browne First floor room 107 main office Replace floor tile in main office, tile is broken and crack. Asbestos Code A - Clear for repairs on 02/14/03. Horne Engineering - Tony Marcolin (RG 02/19/03) February 11, 2003
Bruce-Monroe Elementary School FM-200225587 2/11/03 Bruce Monroe Boiler Room P.M Chiller February 11, 2003
Johnson JHS FM-200225549 2/11/03 Johnson Fourth floor - room 412 Wire mesh glass need to be replace / student vandalized. February 11, 2003
Tyler Elementary School FM-200225563 2/11/03 Tyler Boiler Room P.M Chiller February 11, 2003
Reed LC FM-200225509 2/11/03 Reed Boiler Room Repair or replace 6" flue pipe from hot water heater located in boiler room. February 11, 2003
Turner Elementary School FM-200225603 2/11/03 (Turner) Throughout bldg. Plaster ceilings ; room 109 boys restroom old side, first floor room 100 girls restroom new side, first floor wall under windows room 305 and 307; ceilings rooms 204, 202, 205, 201, 200 and 203. Lead & Asbestos Code A - Clear for repairs on 02/13/03. Horne Engineering - Edward Rodriguez (RG 02/14/03) February 11, 2003
Cardozo High School FM-200225553 2/11/03 Cardozo Sub-basement - Armory Repair floor surface that has deteriorated, cement and wood floor. Asbestos Code A - Clear for repairs on 02/20/03. Horne Engineering - Bipin Nanavaty (RG 02/21/03) February 11, 2003
Stanton Elementary School FM-200225614 2/11/03 Stanton Auditorium stage lights are not working and audtorium ceiling lights are not bright need more lights. February 11, 2003
Truesdell Elementary FM-200225547 2/11/03 (Truesdell) Annex/2nd Floor girls restroom: Low water pressure in bradley basin. February 11, 2003
Shaed Elementary School FM-200225656 2/12/03 Shaed Boiler Room Basement Furnish HVAC Shop with (3) 5" OSAY Valve and gasket. To replace valve that is letting hot water go into chiller Note: Asbestos assessment needed on insulation Asbestos Code A - Clear for repairs on 04/22/03. Horne Engineering - Bipin Nanavaty (RG 04/23/03) February 12, 2003
Patricia R Harris Ed Center FM-200225717 2/12/03 (Harris, P.R./Patterson) 3rd Floor/Boys restroom: Sink has been pulled off wall. Staff has shut the water off, and sink has been removed. Please replace sink. Asbestos Code A - Clear for repairs on 02/13/03. Horne Engineering - Sharon Voss (RG 02/14/03) February 12, 2003
Eastern High School FM-200225809 2/13/03 (Eastern) Furnish and install boys urinal in stadium bathroom. Repair leaking pipe in wall behind face bowl in girls stadium bathroom in corner on Constitution Ave. side due to vandalism. Asbestos Code A - Clear for repairs on 02/14/03. Horne Engineering - Sharon Voss (RG 02/19/03) February 13, 2003
Duke Ellington School FM-200225812 2/13/03 Ellington, Duke First floor Back stage There is a leak coming from the roof and ceiling that need repair in the back stage area. February 13, 2003
Bruce-Monroe Elementary School FM-200225761 2/13/03 Bruce-Monroe Second floor Custodial closet Replace service sink in learning center # 202. Service sink has a hole in procelain causing damage to ceiling belowit water damage. This is an emergency action. February 13, 2003
Green Elementary School FM-200225845 2/14/03 Green First floor kitchen Repair two (2) breaches in wall, walls are ceramic tile. Asbestos Code A - Clear for repairs on 02/19/03. Horne Engineering - Sharon Voss (RG 02/20/03) February 14, 2003
Reed LC FM-200225911 2/14/03 Reed, Marie Roof top 18th St. side of building Re-attach roof top flashing to building. February 14, 2003
Cardozo High School FM-200225827 2/14/03 Cardozo Fan room Survey and replace fan motor and or bearings to motor. February 14, 2003
Stanton Elementary School FM-200225872 2/14/03 Stanton Boiler Room Repair/Replace leaking automatic water feeder on boiler #3 February 14, 2003
Eastern High School FM-200226000 2/21/03 (Eastern) Through-Out: Roof leaking in-to the following area's: Auditorium stage, and gym ceiling. February 21, 2003
Stevens Elementary School FM-200226111 2/24/03 Stevens Outside / Rear building Drain pipes and gutters are coming from roof of building need to be secured. Asbestos Code A - Clear for repairs on 02/26/03. Horne Engineering - Tony Marcolin (RG 02/27/03) February 24, 2003
Winston EC FM-200226096 2/24/03 (Winston) Garage/Generator room: Water seeping through the walls from the outside, into the electrical room. Please respond as soon as possible, the water has flooded around the electrical outlets. February 24, 2003
Stevens Elementary School FM-200226115 2/24/03 Stevens Third floor room 31 southside of building Window is leaking. February 24, 2003
Montgomery ES FM-200226120 -200226120 2/24/03 Scott Montgomery Auditorium, right side facing stage Replace 1" shaft in Air Handler Unit, bearings were replaced this season by contractors and the shaft was overlooked. Asbestos Code A - Clear for repairs on 03/20/04. Horne Engineering - Bjame Smith (RG 03/23/04) February 24, 2003
Hine JHS FM-200226106 2/24/03 (Hine) Roof: Unstop drains in roof areas: 1. Main lobby/Gym: 3 to 4 inches of water present. 2. Leaking in room #403; bubbling under the roof tile (Ceiling tile wet) 3. Teachers dining room: Tile is wet. 4. Over hang at top of principals office. February 24, 2003
Watkins Elementary School FM-200226084 2/24/03 Watkins Fourth floor - flat roof Require flat roof check due to several top floor classroom ceiling. Water leaking on both sides of hallway. Hallway fallen ceiling tiles from water drainage. February 24, 2003
Deal Junior High School FM-200226179 2/25/03 Deal JHS Boiler Room Area Basement Paint Asbestos Assessment Required Correct peeling and falling paint chip problem this could creat unsafe situation Lead & Asbestos Code A - Clear for repairs on 02/26/03. Horne Engineering - Sharon Voss (RG 02/27/03) February 25, 2003
Gibbs Elementary School FM-200226172 2/25/03 Gibbs First floor - cafeteria Windows broken out need a glazer come out to repair. February 25, 2003
Simon Elementary School FM-200226133 2/25/03 Simon Boiler Room Repair or replace sump pump in Boiler Room February 25, 2003
Walker-Jones EC FM-200226210 2/25/03 Walker - Jones Frist Floor - Exit door 1. Need to be repaired so that door can open properly. Asbestos Code A - Clear for repairs on 02/26/03. Horne Engineering - Tony Marcolin (RG 02/27/03) February 25, 2003
Dunbar High School FM-200226283 2/26/03 Dunbar Pool Roof Outside Asbestos Assestment Required Pool roof leaking needs to be checked Asbestos Code A - Clear for repairs on 02/27/03. Horne Engineering - Edward Rodriguez (RG 03/05/03) February 26, 2003
Eastern High School FM-200226276 2/26/03 Eastern Room 153 Ceiling need repairing and fixing. Furnish and install floor tile due to roof leak in ceiling. Tile is buckling on floor. February 26, 2003
Hine JHS FM-200228782 2/26/03 (Hine) Mechanical room over gym Doors not closing and door frame need brickwork sbestos Code A - Clear for repairs on 04/21/03. Horne Engineering - Sheryll James (RG 04/23/03) February 26, 2003
Wilkinson ES FM-200226273 2/26/03 Wlikinson First floor 72 gymnasium Gym floor need repair. Water damage from roof leak. 40 pieces. February 26, 2003
Hine JHS FM-200228784 2/26/03 (Hine) Asbestos Assessment Required. Floor 1st Exterior door to cafeteria by parking lot-Door not close properly Asbestos Code A - Clear for repairs on 04/21/03. Horne Engineering - Sheryll James (RG 04/23/03) February 26, 2003
Hine JHS FM-200228783 2/26/03 (Hine) Floor 3rd Gym-Two exits lights not working February 26, 2003
Cook J.F. Elementary School FM-200228780 2/26/03 (Cook, J.F.) REQUEST FOR THE INSTALLATION OF ELECTRIC CEILING FRONT PROJECTION SCREEN. SPECIFICATIONS: HEIGHT - 9 FEET WIDTH - 12 FEET February 26, 2003
Spingarn High School FM-200226357 2/27/03 Spingarn Basement - custodian and records bathroom Requesting plaster to be fix ceilings in both areas. February 27, 2003
Hyde Elementary School FM-200226311 2/27/03 Hyde Boiler Room Repair or replace solenoid valve for Boiler #2. This valve feed water to the Boiler. February 27, 2003
Horace Mann Elementary School FM-200226350 2/27/03 Mann Second floor - Special ed class Repair peeling paint and plaster ceiling. Approx. 5'x5'. Lead & Asbestos Code A - Clear for repairs on 02/28/03. Horne Engineering - Edward Rodriguez (RG 03/04/03) February 27, 2003
Hyde Elementary School FM-200226312 2/27/03 Hyde Boiler Room Repair or replace condensate pump controller and pumps,. A) Controller, not working properly B) Pump #1, inoperable C) Pump #2, seal leaking badly February 27, 2003
Gage-Eckington ES FM-200226319 2/27/03 First ,Second and Third Floors - Outlets Throughout the Building. 1.We have fourteen outlets that need to be repaired or replaced . February 27, 2003
Gage-Eckington ES FM-200226320 2/27/03 GAGE-ECKINGTON First Floor - Main Enterance Door. 1.The door keep getting stuck please repair . Asbestos Code A - Clear for repairs on 02/27/03. Horne Engineering - Roger Kager (RG 02/28/03) February 27, 2003

© The Washington Post Company