Open Repair Requests in February 2005

Open Repairs Summary

  • Urgent Requests
    31
  • Routine Requests
    110
  • Total Requests
    141

Detailed Reports

Urgent Repair Requests Opened in February 2005 (31)
School Description Open Date
Smothers ES FM-200501095 2/1/05 Smothers First floor boys lavatory One toilet stall door hinge is broken need repairing. Asbestos Code A - Clear for repairs on 02/01/05. DCPS Safety - Richard Gibson (RG 02/01/05) February 1, 2005
Eastern High School FM-200501167 2/3/05 Eastern Across from B-79 Replace leaking or cracked urinal in boys. Leaking creates a safety hazard on floor. February 3, 2005
Takoma Educational Center FM-200501222 2/4/05 (Takoma) !!!URGENT!!! Asbestos Assessment required. Outside Balcolny from 3rd Floor Teachers Lounge: Needs major over-haul; bricks needs pointed, cracks running through-out the area which has caused much damage to room #169. This area has been serveyed many times, and service has not been rendered. Asbestos Code A - Clear for repairs on 04/21/05. DCPS Safety - Leroy Minton Jr. (RG 04/21/05) February 4, 2005
Takoma Educational Center FM-200501214 2/4/05 (Takoma) !!!URGENT!!! Asbestos Assessment required. Please review floor plans for areas that are in need of ballast work, 277 volts: 1st Floor - Room #2, 68, 32, 65, & 45. 2nd Floor - Room #113 -AB, 126, 124 ABC, 167, 160, & 169. 3rd Floor - Room #183 AB, 184, 235, 187,195, 193 ABC, 226 ABC 217, ABC 235, &212. Asbestos Code A - Clear for repairs on 03/14/05. DCPS Safety - Leroy Minton Jr. (RG 03/15/05) February 4, 2005
Takoma Educational Center FM-200501215 2/4/05 (Takoma) !!!URGENT!!! Asbestos Assessment required. Please review floor plans for areas in need of roofing repairs through-out the building: 1st Floor: Gym #101 #65. 2nd Floor area:113 ABC, 112, 172, 169, 138, & 143. 3rd Floor area 208 balcony, area 196ACD, 226 ABC, 217 ABC. Asbestos Code A - Clear for repairs on 03/14/05. DCPS Safety - Leroy Minton Jr. (RG 03/15/05) February 4, 2005
Takoma Educational Center FM-200501221 2/4/05 (Takoma) !!!URGENT!!! Asbestos Assessment required. Please review floor plans for areas in need of plumbing repairs through-out the building: Gym #97: 1st Floor #11, 16, 20, 33, 38, 68, & 59. 2nd Floor #127128, & 148, 3rd Floor #200, 199, 222, & 221 Asbestos Code A - Clear for repairs on 03/14/05. DCPS Safety - Leroy Minton Jr. (RG 03/15/05) February 4, 2005
Park View ES FM-200501294 2/7/05 Park View Boiler Room Repair Boiler #2 has closed fuel valve, will not start. Keep going into safety. February 7, 2005
Patricia R Harris Ed Center FM-200501399 2/8/05 (Harris, P.R.) HEALTH CODE VIOLATION: Kitchen: Repair all leaking faucets at compartment sinks. Asbestos Code A - Clear for repairs on 02/08/05. DCPS Safety - Richard Gibson (RG) February 8, 2005
Takoma Educational Center FM-200501345 2/8/05 (Takoma) !!!URGENT!!! First floor room 65 Ceiling is leaking in auditorium damaging hardwood floor on stage. The floor is buckling up due to roof leak. February 8, 2005
Patricia R Harris Ed Center FM-200501393 2/8/05 (Harris, P.R.) HEALTH CODE VIOLATION: Kitchen: Provide a door for stall in ladies room. Asbestos Code A - Clear for repairs on 02/08/05. DCPS Safety - Richard Gibson (RG) February 8, 2005
Walker-Jones EC FM-200501392 2/8/05 Walker Jones Boiler Room/Generator Room/Entrance to Tunnel Area. Furnish and install locking mechanism on enterior door (Key alike) and pull handles. These areas must be secured properly. Urgent !!!!! Code A-claer for repair by DCPS Charles Buchanan on 2/16/05 February 8, 2005
Ferebee-Hope Elementary School FM-200501455 2/9/05 Ferebee-Hope Fourth fl Girls Bathroom Repair sinks & Remount to Wall Asbestos Code A - Clear for repairs on 02/10/05. DCPS Safety - Richard Gibson (RG) February 9, 2005
Garnet-Patterson MS FM-200501511 2/10/05 (Garnett-Patterson) !!!VERY URGENT!!! Room #104/Parents Center: Sink removed, was not capped off properly, water, and rusted color solution running out. February 10, 2005
Macfarland Middle School FM-200501592 2/11/05 Mac Farland Tunnel North & South Asbestos assessment required 1.Repair leaking steam near water meter size 1" 2.Repair leaking steam line, approx. 3/4"-1" Code A-clear for repair by DCPS Safety Charles Buchanan on 2/10/06 February 11, 2005
Ballou Senior High School FM-200501669 2/14/05 (Ballou) Asbestos Assessment Required. replace entry door,vandalized by students,no privacy for femal use(urgent)south end of building. Code A-clear for repair by DCPS Charles Buchanan on 3/9/05 February 14, 2005
Nalle Elementary School FM-200501640 2/15/05 Nalle Main Building - Second Floor - Room - 217 1) Roof was repaired, but never came back to plaster. 12x12 ceiling tile is falling. Asbestos Code A - Clear for repairs on 04/21/05. DCPS Safety - Leroy Minton Jr. (RG 04/21/05) February 15, 2005
Thomas Elementary School FM-200501708 2/16/05 Thomas Roof Area above Rm 301 Roof Leaking 02/16/2005 16:37 OB - Asbestos Code A - Clear for repairs on 03/14/05. DCPS Safety - Leroy Minton Jr. (RG 03/14/05) February 16, 2005
Seaton Elementary School FM-200501673 2/16/05 Seaton First floor 009 Tile on bathroom floor in pre-k room, children are pulling up ceramic tile. Safety has alredy been out. HA 009 Tile grout gray with muitti Colored smal floor tile No Asbestos Code A-clear for repair by DCPS Charles Buchanan on 2/17/05 February 16, 2005
Cardozo High School FM-200501781 2/18/05 (Cardozo) HEALTH CODE VIOLATION: (EMERGENCY) Kitchen: Replace light bulbs, and light switches where needed. Pay attention to cooking, and walk-in freezer. Asbestos Code A - Clear for repairs on 02/22/05. DCPS Safety - Richard Gibson (RG) February 18, 2005
Dunbar High School FM-200501797 2/20/05 Dunbar ( High School Bathroom Survey Report ) First Floor Custodial Room - Repair Ceiling Fifth Floor Boys Restroom - Repair Hole In Wall Fourth Floor Girls Restroom - Paint Lobby Women Restroom - Repair Wall and Ceiling - Paint Asbestos Code A - Clear for repairs on 03/14/05. DCPS Safety - Leroy Minton Jr. (RG 03/14/05) February 20, 2005
Eastern High School FM-200501813 2/22/05 Eastern High School - Bathroom Survey Basement Girls Restroom - Replace Stall Door Third Floor - Girls - Replace Missing Stall Door - Second Floor - Boys Restroom - Replace Missing Stall Door Asbestos Code A - Clear for repairs on 02/22/05. DCPS Safety - Richard Gibson (RG) February 22, 2005
Marshall Educational Center FM-200501821 2/22/05 Marshall !!!VERY URGENT!!! Boiler room Replace relief valve on # 1and two boiler. Valve will not hold. February 22, 2005
Dunbar High School FM-200501899 2/23/05 Dunbar ( High School Bathroom Survey Report ) Third Floor - East Area - Replace Ceiling Tile Girls Locker Room - Replace Ceiling Tile Third Floor - Boys Restroom - Replace Ceiling Missing Tile Second Floor - Boys Restroom - Replace Missing Ceiling Tile First Floor Parent Center - Replace Missing Ceiling Tile Boys Ground Floor - Replace Ceiling Tile Asbestos Code A - Clear for repairs on 02/23/05. DCPS Safety - Richard Gibson (RG) February 23, 2005
Tyler Elementary School FM-200501929 2/23/05 Tyler Wing Area- Boys Restroom Remount Urinals to the wall Asbestos Code A - Clear for repairs on 02/24/05. DCPS Safety - Richard Gibson (RG) February 23, 2005
Tyler Elementary School FM-200501951 2/23/05 Tyler Bookroom Repair Ceiling Asbestos Code A - Clear for repairs on 02/25/05. DCPS Safety - Leroy Minton Jr. (RG 02/25/05) February 23, 2005
Anacostia Senior High School FM-200501972 2/24/05 ANACOSTIA SHS boiler room URGENT HOT!!!!! Hand feeding - Boiler # 1 replace or repair feed water regulator. Only one boiler in operation. February 24, 2005
Turner Elementary School FM-200501994 2/25/05 Turner First Floor Oldside H.W. Put a door stop behind exit door next to boys restroom; door has knocked the pipe loose with securitylines in it and has shorten out the security alarm system. Asbestos Code A - Clear for repairs on 03/14/05. DCPS Safety - Leroy Minton Jr. (RG 03/14/05) February 25, 2005
Coolidge High School FM-200502015 2/25/05 Coolidge Gym Replace light ballast, fuses to 10 light fixtures. Asbestos Code A - Clear for repairs on 03/04/05. DCPS Safety - Charles Buchanan (RG 03/04/05) February 25, 2005
Turner Elementary School FM-200501990 2/25/05 Turner Repair ceiling in boys restroom and custodian office, that have been waiting to be repaired for the last three years. Asbestos Code A - Clear for repairs on 03/14/05. DCPS Safety - Leroy Minton Jr. (RG 03/14/05) February 25, 2005
Turner Elementary School FM-200501978 2/25/05 Federick Douglass Earley Learning Center behind Turner Room # 2 Re-finish drywall around sprinkler head in the closet. Asbestos Code A - Clear for repairs on 04/21/05. DCPS Safety - Leroy Minton Jr. (RG 04/21/05) February 25, 2005
Garfield ES FM-200502038 2/28/05 Garfield Boiler Room Replace relief valve on domestic hot water heater. Regtrol 3/4" 114XL, set pressure 150 PSI up to 210 degree max. 100,000 BTU's Watts-Regtrol. No hot water in building. Urgent !!!!! February 28, 2005

Routine Repair Requests Opened in February 2005 (110)
School Description Open Date
Leckie Elementary School FM-200501081 2/1/05 (Leckie) 1) Loading dock area needs repaved, standing water. February 1, 2005
Coolidge High School FM-200501059 2/1/05 Coolidge Through - out - Stairwells/ Corridors 1) Paint and Plaster as needed in corridors and stairwells. Asbestos Code A - Clear for repairs on 06/28/05. Tidewater - Tony Marcolin (RG 07/06/05) February 1, 2005
Walker-Jones EC FM-200501080 2/1/05 Walker-Jones Rooftop Unit (Exhaust Fans) Repair or replace rooftop exhaust fans, Have (7) seven units, but only (1) unit working. February 1, 2005
Spingarn High School FM-200501103 2/1/05 Spingarn First floor room 115 and third floor room 320 A plasterer is needed to fix ceiling that was damage from a water leak above and roof leak. Code A-clear repair by DCPS Charles Buchanan on 2/14/05 February 1, 2005
Shepherd ES FM-200501057 2/1/05 SHEPHERD ES main office Repair rupture coil in main office February 1, 2005
Beers Elementary School FM-200501054 2/1/05 Beers Auditorium Repair or replace bearing assembly on (2) two air handler units in Auditorium. February 1, 2005
Marshall Educational Center FM-200501071 2/1/05 Marshall Boiler Room Repair or replace the starter and on contact to the unit #2 air compresser. It has not ran in 5 years, no one came back to finish working on it. February 1, 2005
Marshall Educational Center FM-200501072 2/1/05 Marshall Pool Area Mechanical Room Repair or replace the heaters and on contacts to the air handler unit #9, it will not start, it sparks. February 1, 2005
Young Elementary School FM-200501104 2/1/05 Young Main office and stairway across from main office Repair or replace light fixture in rear. Light bulb will not stay in place when put in. February 1, 2005
Coolidge High School FM-200501144 2/2/05 Coolidge First floor health suite 110A Provide dedicated 115 volts electrical outlet and line to power window A/C unit. February 2, 2005
Ballou Senior High School FM-200501204 2/2/05 Furnish and install two(2)light kits in entry doors of the library with guards for safty. Asbestos Code A - Clear for repairs on 10/20/05. Tidewater - Rodney Distance (RG 10/25/05) February 2, 2005
Amidon Elementary School FM-200501118 2/2/05 Amidon Boiler Room Repair Boiler , new side gas valve, will not open. February 2, 2005
Gage-Eckington ES FM-200501188 2/3/05 Gage-Eckington First floor 117 primary side Room 117 have two areas that leaks water, the water have cause a ceiling damage, the room have light problems. February 3, 2005
Ballou Senior High School FM-200501201 2/3/05 replace egress doors to court yard,damage occured from outside sources. Asbestos Code A - Clear for repairs on 10/20/05. Tidewater - Rodney Distance (RG 10/25/05) February 3, 2005
Bowen Elementary School FM-200501176 2/3/05 Bowen Kitchen Storage Room Repair leaking coil in Kitchen storage room on air handler unit. February 3, 2005
Ronald H. Brown MS FM-200501193 2/3/05 BROWN, RON (ROPER) RM. 302 Broken Window February 3, 2005
Coolidge High School FM-200501175 2/3/05 Coolidge Room #118/B Replace motor to univent in classroom #118/B. Herman Nelson; model #101DJ; HP 1 1/2; V 115 Amps 1.7 .85; Cycle 60; Rpm 720 PH 1; Drive coupling February 3, 2005
Dunbar High School FM-200501165 2/3/05 Dunbar 2B and 5W Computer lab Furnish A/C unit to provide cooling for lab and install in 2B. Furnish window AC unit and power in 5W. February 3, 2005
Eastern High School FM-200501170 2/3/05 Eastern Auditorium Repair roof leak above stage and paint plaster after repair of leak need light replaceing in auditorium - repair 5 lights above stage where speaker talks. SUPT. Conference being held at EASTERN JANUARY 18, 2004. February 3, 2005
Woodson High School FM-200501185 2/3/05 Woodson Auditorium Mechanical Room Repair or replace Electrical controls for motor to the condensate return tank in the mechanical room rear stage area. February 3, 2005
Clark Elementary School FM-200501202 2/4/05 Clark Throughout Building Furnish materials for work to be done by techician. GE Motor; 3134; HP-1/8; HZ 60/50 V-115 A 2.00 5SCP39KGB9095 RPM 700 February 4, 2005
Murch Elementary School FM-200501200 2/4/05 Murch Boiler Room Repair or replace leaking circulating pumps for domestic hot water February 4, 2005
Patricia R Harris Ed Center FM-200501225 2/4/05 Harris P. R. Main Office Rm 207 No Power February 4, 2005
Patricia R Harris Ed Center FM-200501226 2/4/05 Harris P. R. Ground Fl. Stairway Replace Glass in Fire Door and Thru-out Building Code A-clear for repair by DCPS Charles Buchanan on 02/9/05 February 4, 2005
Nalle Elementary School FM-200501228 2/4/05 Nalle Auditurium Paint & Plaster Ceiling HA 005 Plaster White No Asbestos HA 063 Brown Coat With HA 005 No Asbestos HA 068 Plaster White Plaser Patch No Asbestos HA 011 Plaster White Decorative Wall Border No Asbestos HA 064 Brown Coat With HA 011 Code A-clear for repair by DCPS Charles Buchanan on 02/9/05 February 4, 2005
Beers Elementary School FM-200501205 2/4/05 Beer Auditorium Repair or replace duck work on air handler unit in Auditorium area right hand side. February 4, 2005
Kelly Miller MS FM-200501212 501212 2/4/05 Miller Front Entrance Mark Area for Parking Lot February 4, 2005
Drew Elementary School FM-200501198 2/4/05 DREW ES Furnish material for PM to HVAC Motor G.E. 3134 model: 5KCP39KGB909 S 1/8 hp v 115 rpm 700 hz 60/50 amp 2.00 McQuay bearing kit - GCF1876K Coupling kit GCA500015A February 4, 2005
Benning Elementary School FM-200501218 2/4/05 Benning First Fl. Restroom Repair mixing Valve. February 4, 2005
Gibbs Elementary School FM-200501197 2/4/05 Gibbs First Floor - Cafeteria 1) Roof leak. February 4, 2005
Slowe Elementary School FM-200501240 2/6/05 SLOWE ES room 125 Flush clogged fan coil for proper water circulation. February 6, 2005
Slowe Elementary School FM-200501243 2/6/05 SLOWE ES room 214 Fabricate 5 - 5-1/2" x 5-1/2" fan coil unit vent grills to replace missing and damaged ones February 6, 2005
Wilson J. O. ES FM-200501254 2/6/05 Wilson, J.O. Boiler Room Replace Love Joy Bushing on house pump #3 near sump pump. February 6, 2005
Wilson High School FM-200501247 2/6/05 WILSON SHS pool pump room Repair hole in 4" welet cap. February 6, 2005
Whittier Elementary School FM-200501244 2/6/05 WHITTIER ES All purpose room Replace defective shaft bearings on air handler unit # 2. February 6, 2005
Watkins Elementary School FM-200501237 2/6/05 Watins Boiler Room Repair or replace circulating pumps #1-#2, making loud noise, possible bearing going bad. February 6, 2005
Walker-Jones EC FM-200501238 2/6/05 Walker-Jones room 311 Replace defective on/off switch to control fan coil motor unit. February 6, 2005
Eastern High School FM-200501308 2/7/05 Eastern Roof armory roof Furnish and install (4)ea. York day/night timers for roof top night lights. Existing ones are 7 day timers and are not operable. February 7, 2005
Tyler Elementary School FM-200501283 2/7/05 Tyler First wing teachers, boys and girls Need exhaust fan replace. February 7, 2005
Young Elementary School FM-200501307 2/7/05 Young First floor Auditorium Repair or replace wood floor, seat can not be secure to floor. Code A-clear for repair by DCPS Charles Buchanan on 2/11/05 February 7, 2005
Gibbs Elementary School FM-200501305 2/7/05 Gibbs Third floor room 304 Window broken need replacing, this presents a heating challage in this cold weather. February 7, 2005
Garnet-Patterson MS FM-200501323 2/8/05 Garnet-Patterson Room 212 Requesting a Plummer to unstop a sink. In house could not unstop the sink. The problem is on the other side of the brick wall.repair or replace the hydraulics on the entrance door. ASAP February 8, 2005
Garnet-Patterson MS FM-200501322 2/8/05 Garnet-Patterson Cafeteria Requesting a carpenter to repair or replace the hydraulics on the entrance door. ASAP February 8, 2005
Garnet-Patterson MS FM-200501321 2/8/05 Garnet-Patterson Boiler room Requesting a electrican to repair the lights. ASAP February 8, 2005
Eastern High School FM-200501333 2/8/05 Eastern Basement lobby and corridor Plaster holes in lobby area and basement floor corridor. Vandals broke holes in walls. Repair ceiling in armory ROTC rooms. HA 003 Plaster White (AMP SB-18) No Asbestos HA 703 Brown Coat with HA 003 (AMP SB-18) No Asbestos Code A-claer for repair by DCPS Charles Buchanan on 2/16/05 February 8, 2005
Beers Elementary School FM-200501326 2/8/05 Beers Auditorium Engineers request repair / replace heating vent, the right side. February 8, 2005
Thomas Elementary School FM-200501480 2/9/05 Thomas Second fl. Rm 206 Plaster and Paint celing Lead & Asbestos Code A - Clear for repairs on 07/22/05. Tidewater - Rodney Distance/Kenny Long (RG 08/16/05) February 9, 2005
Patricia R Harris Ed Center FM-200501446 2/9/05 Harris, P.R. Please survey areas for ceiling tile installation so that the proper amount of hardware can be ordered. The ten cases of tile are at the site the staff will install tile. February 9, 2005
Kramer Middle School FM-200501438 2/9/05 Kramer Mens bathroom Need a plummer, water is leaking from somewhere. February 9, 2005
Ferebee-Hope Elementary School FM-200501457 2/9/05 Ferebee-Hope First fl. Boys Restroom Replace Faucet Repair sinks & Remount to Wall February 9, 2005
Browne Junior High School FM-200501429 2/9/05 Browne Boiler Room Repair or replace Heating/hot water circulating pump down. February 9, 2005
Park View ES FM-200501526 2/10/05 PARK VIEW Otis Place St. Side of Building fFalling Down Spoute Drain Loose from Building February 10, 2005
Payne Elementary School FM-200501486 2/10/05 Payne Room 207 Restore electrical service to univent in room 207 February 10, 2005
Payne Elementary School FM-200501580 2/10/05 Payne Auditorium Repair leaking line on univent in auditorium. February 10, 2005
Dunbar High School FM-200501514 2/10/05 Dunbar Front door It has come off the hinges. February 10, 2005
Wilson J. O. ES FM-200501679 2/10/05 (Wilson, J.O.) Asbestos Assessment Required. Iron door that is used to cover the oil pipe on the Principals parking lot need to be reweld. EMERGENCY Code A-clear for repair by DCPS Charles Buchanan on 9/15/05 February 10, 2005
Patricia R Harris Ed Center FM-200501598 2/14/05 Harris, P.R. Second floor Floor in ladies restroom need to be repaired (tile floor). HA 005 Tile Grout Groy No Asbestos Code A-clear for repair by DCPS Charles Buchanan on 1/17/06 February 14, 2005
Duke Ellington School FM-200501616 2/14/05 Ellington Auditorium House Lights not working properly February 14, 2005
Bowen Elementary School FM-200501639 2/15/05 Bowen First Floor Learning Center II and Second Floor Learning Center III 1) Light switch is broken, both Centers have ( 3 ) way switches. February 15, 2005
Murch Elementary School FM-200501664 2/16/05 (Murch) 1st Floor/Room #106: Broken window, appears to have been damaged by shooting object. February 16, 2005
Miner Elementary FM-200501668 2/16/05 Miner First floor 151 and 138 Two (2) TV mounts to be installation in the ceiling. Code A-clear for repair by DCPS Charles Buchanan on 2/17/05 February 16, 2005
Turner Elementary School FM-200501660 2/16/05 Turner Recreation Storage Room Repair or replace domestic hot water supply line (hot) leaking in recreation storage room located in lunch room. February 16, 2005
Hendley Elementary School FM-200501691 2/16/05 (Hendley) Asbestos Assessment Required. Through-Out the Building: Ballast are needed in supply room, basement, incinerator room. All area's will fit on this request, over 30 areas need ballast replaced. Code A-clear for repair by DCPS Charles Buchanan on 2/22/05 February 16, 2005
Cardozo High School FM-200501667 2/16/05 Cardozo Sub Basement - Fan Room 1) Repair or replace domestic cold water valve, valve stuck in close postition, stem just turns. Needed for Kitchen - Part of old repair: Valve is on copper pipe, appox. size 1 1/2 inch. February 16, 2005
Murch Elementary School FM-200501675 2/16/05 Murch Attachments to gutter need to be repair. February 16, 2005
Gibbs Elementary School FM-200501744 2/17/05 Gibbs Bookroom /Second fl. Repair Roof HA 003 Plaster off white /tan ceiling No Asbestos HA 703 Brown Coat with ...HA 003 No Asbestos Code A-clear for repair by DCPS Charles Buchanan on 3/10/05 February 17, 2005
Francis Junior High School FM-200501721 2/17/05 Francis Second floor west hallway Outside room 203 replace broken windows panes (6). February 17, 2005
Francis Junior High School FM-200501719 2/17/05 Francis First floor library, main office and boy s gym Replace broken windows panes in each above places (6 ea.). February 17, 2005
Eliot Junior High School FM-200501711 2/17/05 ELIOT Gym Replace Motor for Heating unit: Baldor: Cat.No. M3556, Spec. 35H876-1272 Frame 56/56H Ser. F793 HP 1 TE Volts 208-230/460 Amps. 3.6-3.4/1.7 RPM 1140 Hz 60 Ser F.1.15 Ph 3 Des B Class B Code G Nema nom. Eff. 75.5% P.F 69% Rating 40 C AMB-CONT. February 17, 2005
Leckie Elementary School FM-200501724 2/17/05 Leckie Thoughout building All teachers restrooms need upgrading, located on all floors. Total of five in all. To have taller commodes, handicap bars to accommodate the older teachers and our handicap teachers. February 17, 2005
Park View ES FM-200501726 2/17/05 PARK VIEW Cafe Area Univent Leaking from the Ceiling on to tables February 17, 2005
Coolidge High School FM-200501737 2/17/05 Coolidge ( High School Bathroom Survey Report ) Throughout Building - Repair All Urinals Ground Floor - Girls - Repair Sink Girls Gym Restroom - Repair faucets and Repair Water Coolers Boys Gym Restroom - Repair Urinals and Repair Water Closets Men's ( Handicapp) - Repair Urinal Boy's Locker Room - Repair Sink and Repair Faucets Nurse's Suite - Men's Room - Replace Handle Kit First Floor - Womens - Replace Water Closet Second Floor - Men's Restroom - Repair Sink, Faucets,Urinals and Replace Water Closets. February 17, 2005
Turner Elementary School FM-200501727 2/17/05 TURNER First fl. Rm 100 (OLD SIDE) Peeling paint in Rm February 17, 2005
Dunbar High School FM-200501748 2/18/05 Dunbar ( High School Bathroom Survey Report ) Teacher's Restroom - Repair Flush Valve Fifth Floor - Girls Restroom - East and West - Repair Toilet Diaphram Forth Floor - M.E. Area Girls - Repair Toilet Diaphram Forth Floor W - Area Boys - Repair Bradley Basins,Replace Toilet Diaphram Second Floor - Counselor Suite - Repair Sink and Faucet Main Office - No Cold Water Lobby - Boys - Urinal Stopped Up and Need Urinal Diaphram Business Suite - Repair Stopped Up Toilet and Need Flush Valve Girls Gym Hallway - Repair Brabley Basin and Repair Toilet First Armory - Girls Restroom - Repair Toilet and Repair Sink First Floor - Teachers Restroom - No Cold Water First Floor - Girls Restroom - Repair Bradley Basin First Floor - Custodial Room - Repair Urinal Cafeteria - Men's - Repair Sink Fifth Floor - Boys Restroom - Repair Bradley Basins,Water Closet and Urinal February 18, 2005
Murch Elementary School FM-200501753 2/18/05 Murch Kaufman wing Repair or replace the tiles in the hallway HA 001 Floor Tile Orange 12" X 12" With Specks No Asbestos HA 002 Floor Tile Red 12" X 12" With OPrange and Yellow Specks No Asbesetos HA 003 Floor Tile Yellow 12" X 12" Gold and Brown Specks No asbestos HA 017, HA 018, HA 019, Floor Mastic No Asbestos Ha 006 Baseboard Mastic Yellow/Tan Cove Base Adhesive No Asbestos Code A-clear for repair by DCPS Charles Buchanan on 3/4/05 February 18, 2005
Dunbar High School FM-200501749 2/18/05 Dunbar ( High School Bathroom Survey Report ) Forth Floor - Boys Restroom - Repair Urinal Third Floor - Boys Restroom - Repair Urinal Third Floor - Girls Restroom - Repair Toilet Business Suite - Repair Faucet - No Water Business Suite - Men's - Repair Bradley Basin Ground Floor - Boys - Repair Sink and Faucet Ground Floor - Girls - Repair Faucet and Repair Sink First Floor - Physical Ed - Repair Urinal Custodial - Girls Restroom - Repair Water Closet and Repair Toilet February 18, 2005
Eastern High School FM-200501775 2/18/05 Eastern ( High School Bathroom Survey Report ) First Floor - Boys Restroom - Install Water Closet Seat First Floor - Girls Restroom - Replace (1) Faucet and Install Water Closet Seat First Floor Annex - Girls Restroom - Install (1) Sink With Faucet and Unclog Water Closet First Floor Annex - Boys Restroom - Repair (3) Sets Of Faucets ( loose), Replace (1) Urinal Flush Valve and Unclog (1) Water Closet Gym - Girls Restroom - Repair (1) Set Of Faucet and Replace (1) Water Closet Seat Room B-115 - Handicapp Toilet - Replace All Fixtures Gym Boys Restroom - Repair (1) Set Of Faucets and Unclog (1) Urinal Basement Girl's Restroom - Install (1) Sink With Faucets and Replace (2) Faucet Sets Basement Boys Restroom - Replace (2) Faucet Sets, Install New Urinal and Re-Hang (1) Urinal February 18, 2005
Wilson High School FM-200501800 2/20/05 Wilson, W. ( High School Bathroom Survey Report ) Second Floor - Boys Restroom - Peeling Plaster Third Floor - Boys Restroom - Peeling Plaster Gym Girls Restroom - Breach Wall To Repair Cold Water On Sink First Floor Girls Restroom - Paint Walls and Ceiling Second Floor - Girls Restroom - Re-Plaster Ceiling and Walls Plaster HA-005 and asscciated brown coat HA 705 have both tasted negative Code A-clear for repair by DCPS Charles Buchanan on 3/7/05 February 20, 2005
Anacostia Senior High School FM-200501803 2/20/05 Anacostia ( High School Bathroom Survey Report ) First Floor - Gym Boys - Hole In The Wall Near Entrance HA 019 Plaster white wall plaster NO Asbestos HA 104 Brown coat with HA 019 No Asbestos Code A-clear for repair by DCPS Charles buchanan on 3/1/05 February 20, 2005
Ballou Senior High School FM-200501792 2/20/05 Ballou ( High School Bathroom Survey Report ) First Floor Horse ( Boys) - Install ( 4 ) New Faucets and Handicapp Stall First Floor North Wing ( Boys ) - Install ( 4 ) New Faucets First Floor North Wing ( Girls ) - Install ( 4 ) New Faucets and Install New Water Closets Ballou A Second Floor Girls - Install (1) New Faucet Set and Repair (3) Water Closets First Floor Girls - Install New Faucets and Repair Water Closets Flush Valves February 20, 2005
Eastern High School FM-200501790 2/20/05 Eastern ( High School Bathroom Survey Report ) Third Floor Boys - Replace Faucets,Replace Urinals - HCFV Leaks and Replace F.C. on Water Closets Third Floor Girls - Water Closet Stooped Up Third Floor Boys - Replace Faucets, Replace Urinals, and Water Closet needs Flush Valve Second Floor Boys - Replace Faucets and Water Closet Clogged Second Floor Girls Restroom - Replace Faucet Second Floor Boys Restroom - Replace (2) Faucets Second Floor Girls Restroom - Replace (2) Faucets First Floor Girls Restroom - Replace (2) Water Closet Flush Valves February 20, 2005
Duke Ellington School FM-200501799 2/20/05 Ellington ( High School Bathroom Survey Report ) Second Floor Womens Restroom - Ceiling Needs To Be Repaired Second Floor Dressing Room - Ceiling Needs To Be Painted Mens Restroom - 206C - Repair Ceiling Ladies Room - 118 D - Repair Wall/ Flaking Plaster Girl Restroom Studio A - Repair Ceiling Above Toilets Code A-clear for repair by DCPS Charles Buchanan on 3/7/05 February 20, 2005
Anacostia Senior High School FM-200501791 2/20/05 Anacostia ( High School Bathroom Survey Report ) Upper Level Girls Restroom - Install (2) Faucets and Install Sink Upper Level Boys Restroom - Install (1) Hand Sink With Faucets Third Floor Boys Restroom - Repair Leaking Traps Third Floor Girls Restroom - Replace Handicap Faucets and Install New Toilet Seat Second Floor Boys Restroom - Replace Faucets in H.C. Lavatory and Replace Flush Valves Second Floor Girls Restroom - Install New Sets Of Faucets First Floor Boys Restroom - Replace Handicap Faucets and Replace Urinal Flush Valves First Floor Girls Restroom - Replace Sink With Faucets and Install Faucets First Floor Boys Restroom - Install P Trap First Floor Gym Girls - Install Faucets February 20, 2005
Benjamin Banneker Academic HS FM-200501843 2/22/05 BANNEKER boiler room Repair rupture line in tunnel area, 1" x 3/4" x 3/4" February 22, 2005
Shepherd ES FM-200501850 2/22/05 SHEPHERD ES Auditorium Replace (2) two pneumatic valves on air handler unit in auditorium. February 22, 2005
Shepherd ES FM-200501840 2/22/05 SHEPHERD ES Install three way valves on univent first floor hot water side. February 22, 2005
Slowe Elementary School FM-200501806 2/22/05 Slowe Room 125 The ceiling fell and the rack is broke. Asbestos Code A - Clear for repairs on 06/15/05. Tidewater - Rodney Distance (RG 06/17/05) February 22, 2005
Tubman Elementary School FM-200501866 2/22/05 TUBMAN Thur-out Building Replace Light fixture Ballasts February 22, 2005
Gage-Eckington ES FM-200501863 2/22/05 GAGE-ECKINGTON Main Lobby Auditoruim Door Repair Panic Bar February 22, 2005
Tyler Elementary School FM-200501867 2/22/05 TYLER Thru-out Building Install Locks on panel Box February 22, 2005
Kelly Miller MS FM-200501841 501841 2/22/05 KELLY MILLER GYM -(Welder) Fabricate, and install (4) four return air ducts size 73-3/4" x 37-1/2" paint each cover white. February 22, 2005
Ballou Senior High School FM-200501816 2/22/05 Ballou High School - Bathroom Survey First Floor - Horseshoe ( Boys) - Install Privacy Partition First Floor - North Wing - Girls - Install Stall Door Ballou A First Floor Boys Locker Room - Install New Stall Door and Hardware HA 017 Tile Grout grey No Asbestos Code A-clear for repair by Charles Buchanan on 3/3/05 February 22, 2005
Woodson High School FM-200501873 2/23/05 Woodson SHS Basement - Filtration Room 1) Replace Sump Pump. February 23, 2005
Tyler Elementary School FM-200501954 2/23/05 Tyler Wing Area Hallway Repair Roof Leak February 23, 2005
Shepherd ES FM-200501967 2/24/05 SHEPHERD Boiler RM. Replace Two Inch Pnuematic Valve February 24, 2005
Maury Elementary School FM-200502019 2/25/05 MAURY Rm 7 Roof Leaking HA 003 Ceiliing tile white 2' X 4' with pinholes No Asbestos HA 006 Plaster white No Asbestos HA 706 brown Coat with ... HA 003 No Asbestos Code A-clear for repair by DCPS Charles Buchanan on 3/10/05 February 25, 2005
Marshall Educational Center FM-200502006 2/25/05 Marshall Boiler Room Repair or replace relief valve on Boiler #2 February 25, 2005
Eliot Junior High School FM-200502018 2/25/05 ELIOT Rm 311 Ceiling Tile Falling In to Room HA 012 Ceiling tile white 1' X 1' with fissures No Asbestos Code A-clear for repair by DCPS Charles Buchanan on 3/17/05 February 25, 2005
Whittier Elementary School FM-200502010 2/25/05 Whittier Parking lot side Replace broken glass. February 25, 2005
Turner Elementary School FM-200501980 2/25/05 Federick Douglass Earley Learning Center behind Turner Lobby Repair drywall ceiling (3"x7") need painting. Lead & Asbestos Code A - Clear for repairs on 01/17/06. Tidewater - Roger Small (RG 01/18/06) February 25, 2005
Ferebee-Hope Elementary School FM-200502011 2/25/05 Ferebee-Hope Pent House Mech. Room Repair steam cool or air handler #A1. See engineer. February 25, 2005
Ferebee-Hope Elementary School FM-200502009 2/25/05 Ferebee-Hope Pent House 1- Furnish and install (1) steam trap, Each on air handler #1 and #2. Type sazco 3/4" Ft-15, WP -15 2- Also install (4 steam traps) 1 1/2", FT-15 Sarco WP - 15 See engineer. February 25, 2005
Ketcham Elementary School FM-200502002 2/25/05 KETCHAM New Wing Area Repair Broken Windows HA 060 Window Glaze Gray No Asbestos Code A-Clear for repair by DCPS Charles Buchanan on 4/4/05 February 25, 2005
Walker-Jones EC FM-200501986 2/25/05 Walker Jones Replace defective freeze-stat on unit ventalutor. (First unit on the right) February 25, 2005
Patricia R Harris Ed Center FM-200501988 2/25/05 Harris, P.R. Second floor P.R. elem side survey ASAP Fior plumbing, Electric thru out classrooms, bathrooms, hallways and stairways. Code A-clear for repair by DCPS Charles Buchanan on 1/17/06 February 25, 2005
Meyer Elementary School FM-200502044 2/28/05 Meyer Remove graffitti off of (2) Dumpsters. February 28, 2005
Browne Junior High School FM-200502077 2/28/05 BROWNE Ground fl. New Gym Area Replace Wire Mesh Window in office Door Code A-clear for repair by DCPS Charles Buchanan on 3/17/05 February 28, 2005
Birney Elementary School FM-200502030 2/28/05 BIRNEY ES hallway old side Furnish for replacement of (14) defective fan coil unit motor for each floor on old side of building. Rooms 115, 203, 221, 301, 302, 304, new side 3rd floor hallway, Old side two each floor hallway - 1st, 2nd, and third floors, cafeteria. February 28, 2005
Coolidge High School FM-200502066 2/28/05 Coolidge Boiler Room Provide materials to be used for pipe repairs ( Copper Sweated). 6- 3/4" Gate valves 6- 3/4" Unions 6- 3/4 90 Elbows February 28, 2005
Thomas Elementary School FM-200502043 2/28/05 Thomas First floor kitchen storage room Survey snd repair and paint ceiling. Plaster falls daily from the ceiling. Health Code Violation HA 001 Plaster white Plaster from original construction No Asbestos HA 701 Brown Coat with ... HA 001 No Asbestos Code A-clear for repair by DCPS Charles Buchanan on 4/07/05 February 28, 2005