Urgent Repair Requests Opened in March 2002 (12)
| School |
Description |
Open Date |
| Shepherd ES |
FM-200204105 05 3/7/02 (Shepherd) ROOM 105 NEED LIGHT SLEEVES OVER T-8 FOUR FOOT FLUORESCENT TUBES. Lead & Asbestos Code A - Clear For Repairs On 03/12/02. DCPS-Safety Richard Gibson (RG 03/12/02) |
March 7, 2002 |
| Eastern High School |
FM-200204079 3/7/02 (Eastern) Asbestos Assessment Reqd. - Stairwells [All] Repair or replace existing handrails, where they are either loose or missing. Missing hand rails are on site. Asbestos Code A & Lead Code B 02/20/02 Do not scrape, chip, peel, or weld any of this paint surface. Horne Engineering - Richard Byrd (RG 06/11/02) Same as FM-200203111 Asbestos Code A - Cleared for repairs on 02-20-02 by Leroy Minton Jr (LM/01-13-04) Safety Office 202-576-8962. ( Lead-Based Paint noted, but no scraping involved/needed) |
March 7, 2002 |
| Shepherd ES |
FM-200204157 57 3/7/02 (Shepherd) 1. Asbestos assessment required. ROOM 105 REPOSTS A/C CIRCIUT TRIPS WHEN TEACHER'S LOUNGE A/C IS ON Asbestos Code A - Clear for repairs on 05/16/02. DCPS Safety - Leroy Minton Jr. (RG 05/17/02) |
March 7, 2002 |
| Eastern High School |
FM-200204187 3/11/02 (Eastern) 1. Asbestos assessment required. Ground floor/room #08-B: Plaster and paint ceiling across from room #08-B. (Safety hazard, urgent) Code A-clear for repair by Horne Engineer ( Sharon Voss ) on 3/15/02 (CEB) |
March 11, 2002 |
| Shepherd ES |
FM-200204222 22 3/11/02 Shepherd Boiler room Remove and replace existing outside door of boiler room. This is an old wooden door covered with tine. This door is very poor security. Replace door with new metal door for better security. Asbestos Code A - Clear for repairs on 06/07/02. DCPS Safety - Leroy Minton Jr. (RG 06/10/02) |
March 11, 2002 |
| Walker-Jones EC |
FM-200204397 204397 3/13/02 (Walker-Jones) Asbestos assessment req. 1st floor/ by the pre-k Doors-Exit doors are hard to open and close. Door out of alignment. (Safety Hazards) Asbestos Code A - Clear for repairs on 05/14/02. DCPS Safety - Ronald Edwards (RG 05/15/02) |
March 13, 2002 |
| Johnson JHS |
FM-200204558 8 3/18/02 (Johnson) Asbestos Assessment Required Basement Near Cafeteria Replace missing glazed block near univent in hallway [safety hazard]. Repair missing glaze block near univen in hallway. Code A-clear for repair by Horne Engineer ( Z Mahmood ) on 3/19/02 (CEB |
March 18, 2002 |
| Wilkinson ES |
FM-200204724 724 3/19/02 (Wilkinson) Asbestos Assessment Required 2nd Floor Room 184 [Girls Restroom] Survey, replace or repair cap to the Bradley Basin head. Asbestos Code A - Clear For Repairs On 03/23/02. DCPS Safety - Ronald Edwards (RG 03/25/02) |
March 19, 2002 |
| Spingarn High School |
FM-200204739 3/19/02 (Spingarn) Urgent 1. Asbestos assessment required. 1st Floor auditorium: Repair existing roof leak; water has badly damaged ceiling inside the auditorium. Code A-clear for repair by Horne Engineer ( Z Mahmood ) on 3/25/02 (CEB) |
March 19, 2002 |
| Shepherd ES |
FM-200205105 3/22/02 (Shepherd) 1. Asbestos assessment required. Shepherd Multipurpose Rm. Repair or replace electrical receptacle mounted in floor. Code A clear for repairs on 04/02/02 Contact DCPS Safety - Leroy Minton Jr. before proceeding with actual work. Safety Office : 202 576-6691 - Desk 202 438-9097 - Cell |
March 22, 2002 |
| Eastern High School |
FM-200204931 3/26/02 Eastern Choral Rehearsal Room and Adjoining Office 1. Asbestos Assessment Required. 2. Approximately 100 square feet of plaster damage from previously leaking roof, could be replaced with plaster under layment board and 1/8" skin coat. Scaf- folding required because damage is on upper portion of walls. Damaged plaster will continue to flake and fall off wall, harming computer equipment and putting particles in the air. Safety Hazard. Asbestos Code A - Clear For Repairs On 03/26/02. Horne Engineering - Troy Wilcome (RG 03/27/02) |
March 26, 2002 |
| Wilson High School |
FM-200205125 3/29/02 (Wilson,W.) Asbestos Assessment Required 3rd Floor Classroom 311 Repair or replace cracked door which cannot be properly secured. Asbestos code A - Clear for repairs on 04/05/02. DCPS Safety - Ronald Edwards (202) 576-6693 (RG 04/08/02 ) |
March 29, 2002 |
Routine Repair Requests Opened in March 2002 (31)
| School |
Description |
Open Date |
| Eaton Elementary School |
FM-200203804 3/4/02 EATON FIRST (1ST), SECOND (2ND) AND THIRD (3RD) REPLACE BROKEN AND BOWED WINDOWS. |
March 4, 2002 |
| Park View ES |
FM-200203964 3/6/02 (Parkview) Asbestos assessment req. LL./ Auditorium Repair or replace auditorium seats. Entire row fell while students were seated on them. Code-A clear for repiar by Horne Engineer ( Z Mahmood ) 3/07/02 CEB |
March 6, 2002 |
| Shepherd ES |
FM-200204240 3/7/02 Shepherd playground outside flood fixture filled with water;disconnect at feed. EMERGENCY tripping circuit for all lights at playground. |
March 7, 2002 |
| Shepherd ES |
FM-200204479 3/7/02 (Shepherd) 1. Asbestos assessment required. ROOM 102 CRACKING FLOOR-FM200102908(FLOOR:CODE A-NO ASBESTOS IMPACT,2/19/02 WALL NEEDS REPAIR (assess wall) Same as work order fm-200102908 -(RG 05/10/02) Asbestos code A - Clear for repairs on 6/11/02 Assessment of wall only DCPS Ronald Edwards, (RE - 6/11/02) |
March 7, 2002 |
| Shepherd ES |
FM-200204407 3/7/02 (Shepherd) 1. Asbestos assessment required. ROOMS 100,101,202,208,AND 216 DEFECTIVE 4-TUBE ELECTRONIC BALLASTS Code A-clear for repair by Honre Engineer ( Troy Wilcome ) on 4/04/02 |
March 7, 2002 |
| Savoy Elementary School |
FM-200204116 3/8/02 (Savoy) Asbestos Assessment Required. 3rd floor/ room 306 Need new electrical outlets in the office. (4) outlets. |
March 8, 2002 |
| Wilson High School |
FM-200204106 4106 3/8/02 (Wilson, W.) Asbestos assessment req. 2nd floor/ Custodians Closet Defective door does not work properly. Needs to be repaired or replaced. Asbestos Code A - Cleared for repairs on 03/11/02 by Horne Engineering Phillip Connally (RE-03/11/02) |
March 8, 2002 |
| Garfield ES |
FM-200204133 33 3/8/02 (Garfield) 2nd floor/ Gilrs Bathroom Light fixture in bathroom went completely out. Changed all bulbs and it is still not working. Dont have a ballast. |
March 8, 2002 |
| Amidon Elementary School |
FM-200204147 3/8/02 (Amidon) 1st floor/ Gym Need an electrician to come and upgrade the lights in the gym because of poor lighting in that area. |
March 8, 2002 |
| Stanton Elementary School |
FM-200204089 3/8/02 (Stanton Annex) Asbestos Assessment Required Main Building & Annex Building Install electrical outlets in all classrooms in the main & annex buildings. Asbestos Code A - Clear For Repairs On 03/08/02. Horne Engineering - Stephen Caldwell (RG 03/11/02) |
March 8, 2002 |
| Savoy Elementary School |
FM-200204117 3/8/02 (Savoy) 3rd floor/ room 300-323 Need new electrical outlets upgrade for excess to computers in each classroom. Total of 16 rooms, 4 outlets per room. |
March 8, 2002 |
| Woodson High School |
FM-200204148 0204148 3/8/02 (Woodson, H.D.) Asbestos assessment req. 4th and ground floor/ Lobby girls and boys restroom Install sink back to wall supply line. Leaking and p-trap commode broken at the base. Code A-clear for repair by Horne Egineer on ( Stephen Caldwell ) 3/14/02 (CEB) |
March 8, 2002 |
| Duke Ellington School |
FM-200204345 345 3/13/02 (Ellington) Asbestos Assessment Required 1st Floor Above Door To Room 117 Repair sheet rock, which is damaged and cracking over the door to room 117. Code A-clear for repair by Horne Egineer on ( Z Mahmood ) 3/14/02 (CEB) |
March 13, 2002 |
| Benjamin Banneker Academic HS |
FM-200204434 34 3/14/02 (Banneker) 1st Floor Gymnasium & Basement Dining Room Replace gymnasium window, which was vandalized. The windows in the basement teachers dining room are off track, as are many other windows throughout the building. |
March 14, 2002 |
| Beers Elementary School |
FM-200204411 3/14/02 (Beers) 2nd floor/ Exit lights bldg. #3 (2) two exit lights are out in the doorway and stairway, please repair or replace. |
March 14, 2002 |
| Gibbs Elementary School |
FM-200204513 3/15/02 (Gibbs) Asbestos Assessment Required 3rd Floor Practice Room 119 There is leaking through the ceiling of Practice Room 119, resulting from a fan cover missing on the roof allowing water to come in. POC: Mr. Manigan Code A-clear for repair by Horne Engineer ( Sheryll James ) 0n 3/20/02 (CEB) |
March 15, 2002 |
| Savoy Elementary School |
FM-200204608 3/18/02 (Savoy) 1st Floor Lobby Trophy Case Replace three (3) pieces of glass which are missing [poses a security problem]. |
March 18, 2002 |
| Cardozo High School |
FM-200204622 3/18/02 (Cardozo) Asbestos Assessment Required Ground, 1st, 2nd & 3rd Floor Hallways Repair holes left in the walls, resulting from excavating for the water fountains coolers: Ground floor by room 10 1st floor by room 120 2nd floor by room 222 3rd floor by room 318 POC: Mr. Dobbs Code A-clear for repair by Horne Engineer ( Stephen Caldwell ) 0n 3/20/02 (CEB) Note: A DUPLICATE work order was created under number FM-200512900 and another DUPLICATE request was resubmitted on 1-16-07 |
March 18, 2002 |
| Cardozo High School |
FM-200204623 3/18/02 (Cardozo) Roof Over 3rd Floor Room 314 Repair leak, leaking through the ceiling below into Room 314 and seeping around the electric light fixtures. Code A-clear for repair by Horne Engineer ( Stephen Caldwell ) 0n 3/20/02 (CEB) |
March 18, 2002 |
| Cardozo High School |
FM-200204638 3/19/02 (Cardoza) **Emergency** Sub-basement/Boiler room office: Repair or replace busted 2 1/2 galvanized copper pipe in the boiler room office; boiler room office is flooded. |
March 19, 2002 |
| Eastern High School |
FM-200204707 3/19/02 (Eastern) Asbestos assessment req. Ground floor/ Dance Studio Replace broken mirror in dance studio (2) two pieces each. Code A-clear for repair by Horne Engineer ( Bipin Nanavaty ) 0n 3/20/02 (CEB) |
March 19, 2002 |
| Eastern High School |
FM-200204642 3/19/02 (Eastern) Asbestos Assessment Required Install additional lighting in the cafeteria area [need 2-tube flourescent fixtures] where lighting is now poor. Code A-clear for repair by Horne Engineer ( Bipin Nanavaty ) 0n 3/20/02 (CEB) |
March 19, 2002 |
| Bowen Elementary School |
FM-200204728 3/19/02 (Bowen) 1st Floor Storage Closet Remove smoking light fixture [bulb was removed and switch disengaged]. |
March 19, 2002 |
| Ferebee-Hope Elementary School |
FM-200204697 204697 3/19/02 (Ferebee-Hope) Outside front of building school sign Electrical: Sign not lighting up. |
March 19, 2002 |
| Ferebee-Hope Elementary School |
FM-200204695 204695 3/19/02 (Ferebee-Hope) Football Field Replace covers on (8) eight pole lights. |
March 19, 2002 |
| Park View ES |
FM-200204762 3/20/02 (Parkview) Replace exterior windows throughout the building. |
March 20, 2002 |
| Gibbs Elementary School |
FM-200204785 3/20/02 Gibbs Main roof Repair or replace exhaust fan and missing hood for boys and girls restrooms. Water leaks into bldg. Fan locked because of rust. Fabricate missing hood for exhaust fan. |
March 20, 2002 |
| Shaw JHS |
FM-200204811 3/21/02 Shaw Boiler room and engineers office 1. Asbestos assessment required. 2. Lead paint assessment required. 3. Plaster and patch ceiling area over boilers 1, 2, 3, #1 convecter and in engineers office. "Fire Code Violation" Code A-clear for repair by Horne Engineer ( Edward Rodriguez ) 0n 3/22/02 (CEB |
March 21, 2002 |
| Benning Elementary School |
FM-200204872 2 3/22/02 Benning Repair drain on the roof which has a crack in it, allowing water to leak through to the ceiling lights on the floor below. POC: Mrs. Lloyd |
March 22, 2002 |
| West Elementary School |
FM-200204954 3/26/02 (West) 1. Asbestos assessment required. 1. Pre-K playground/roof: Roof need to be inspected, some of the shingles are hanging off. Code A-clear for repair by Honre Engineer (Sheryll James ) on 4/08/02 CEB |
March 26, 2002 |
| Garfield ES |
FM-200205059 59 3/28/02 (Garfield) ***Emergency*** Lower level/auditorium: Wasteline in auditorium needs to be repaired; water leaking onto the floor. Code A-clear for repair by Horne Engineer ( Stephen Caldwell ) on 4/01/02 (CEB) |
March 28, 2002 |