Routine Repair Requests Opened in March 2003 (73) | School | Description | Open Date |
| Green Elementary School | FM-200226537 3/4/03 Green Second floor Library Repair or replace windows. | March 4, 2003 |
| Shepherd ES | FM-200226501 3/4/03 Shepherd First floor new wing Roof leak nearest to teacher bathroom, need to be repair. | March 4, 2003 |
| Woodson High School | FM-200226512 3/4/03 Woodson, H.D. First floor greenhouse Make necessary roof repairs. Approximately twelve (12) sections of lexan along with metal support brackets have warped or fallen out as a result of the snow storm, and now exposed to the element of nature. | March 4, 2003 |
| Deal Junior High School | FM-200226504 3/4/03 Deal Second and third floor Rooms 302, 202, 200 and 214 Repair / replace hinges. Doors do not close or secure properly. Asbestos Code A - Clear for repairs on 03/03/03. Horne Engineering -Bipin Nanavaty (RG 03/05/03) | March 4, 2003 |
| Eastern High School | FM-200226487 3/4/03 EASTERN First Floor - Exit Door . 1. Repair and or replace panic bar on the rear exit door near room B -49. Asbestos Code A - Clear for repairs on 03/04/03. Horne Engineering - Roger Kager (RG 03/05/03) | March 4, 2003 |
| Wilson High School | FM-200226518 3/4/03 W. WILSON First Floor - Pool Lobby 1. Replace skylight over top of exit door. Asbestos Code A - Clear for repairs on 03/05/03. Horne Engineering - Tony Marcolin (RG 03/06/03) | March 4, 2003 |
| Langdon Elementary School | FM-200226473 3/4/03 Langdon Boiler room Repair Domestic Hot water heater ignite ,Lochinvar hot water boiler | March 4, 2003 |
| Takoma Educational Center | FM-200226584 3/5/03 Takoma Second floor yellow team throughout Repair window over coat rack. Water seeps in window causing students book bags and coats to get wet. Classroom 113 A, B and C Classroom 124 A, B and C | March 5, 2003 |
| Langdon Elementary School | FM-200226553 3/5/03 LANGDON Ground floor - Boiler Room 1. Repair hot water tank . Note : hot water heater was shut off by Washington Gas , due to gas leak.) | March 5, 2003 |
| Takoma Educational Center | FM-200226578 3/5/03 Takoma Gym Repair falling flashing grom gym on the outside doors of restrooms. The flashing is in reuseable condition, needs to be rehang dur to appearance and water that leaks downside of doors damaging the tile on floor. | March 5, 2003 |
| Takoma Educational Center | FM-200226580 3/5/03 Takoma Throughout building Plastering is needed throughout building.They have been inspected for asbestos. The following rooms: Rooms 56,28, 82, 83 and 84 on first floor. Rooms 147, 128 and 169 on second floor. Rooms 226, 235, 183 and 187 on third floor. Asbestos Code A - Clear for repairs on 03/06/03 Horne Engineer - Edward Rodriguez (RG 05/19/03) | March 5, 2003 |
| Bunker Hill Elementary School | FM-200226586 26586 3/5/03 Bunker Hill First floor auditorium hallway Repair hole in wall below convector. Asbestos Code A - Clear for repairs on 03/06/03. Horne Engineering - Philp Connolly (RG 03/07/03) | March 5, 2003 |
| Payne Elementary School | FM-200226608 3/5/03 Payne Classroom 130 Repair/Replace unitvent motor in classroom 130. Westing House, HP 1/4 - 1/2, RPM 1725/1140, AMP 4.6/8.6, HP 1. | March 5, 2003 |
| Payne Elementary School | FM-200226611 3/5/03 Payne Kindergarden Repair/Replace univent motor in classroom kindergarden. Westing House, HP 1/4-1/2, RPM 1725/1140,AMP 4.6/8.6, HP 1. | March 5, 2003 |
| Takoma Educational Center | FM-200226579 3/5/03 Takoma Second floor - room 169 Repair window ciels, the windows has benn replace but water continues to come inside damaging the plaster and carpet. | March 5, 2003 |
| River Terrace ES | FM-200226640 0226640 3/6/03 River Terrace boiler room Make necessary corrections to boilers out on flame failure. | March 6, 2003 |
| Woodson High School | FM-200226633 3/6/03 H.D. Woodson Boiler Room Repair/Replace burned out univent motor in classroom ,on the second floor. | March 6, 2003 |
| Ferebee-Hope Elementary School | FM-200226673 3/6/03 Ferebee-Hope Boiler Room Repair/Replace Sewage Ejector Pump. | March 6, 2003 |
| Meyer Elementary School | FM-200226631 3/6/03 Meyer Boiler Room Repair/Replace burned out ID fan motor on boiler #2. | March 6, 2003 |
| Park View ES | FM-200226648 3/6/03 Park View Room 228 repair roof leak in coat closet. Water was dripping in area where phone equipment is located. Equipment has been push away from leak. Asbestos Code A - Clear for repairs this area was assess on 03/14/02 under FM-200204355. Horne Engineering - Troy Wilcome (RG 04/15/03) | March 6, 2003 |
| Woodson High School | FM-200226704 3/7/03 WOODSON CHECK FOR LEAD BASE PAINT IN THE KITCHEN AREA . Lead & Asbestos Code A - Clear for repairs on 03/07/03. Horne Engineering - Edward Rodriguez (RG 03/10/03) | March 7, 2003 |
| Reed LC | FM-200226727 3/7/03 Marie Reed Pool Pump Room Ground Floor Replace a broken Ralachem Corporation Chlorinator that is used to add cehmicals into pool H2O. (Chemical Feeder) Model# RC500SC, Serial# AC300, Volts 120, Hertz 50/60, AMPS 2.5, Max Head Pressure 30, Norman at H1 setting 80 GPD, (OLA Chemical ) I am hand feeding chemicals into H2O) | March 7, 2003 |
| Tyler Elementary School | FM-200226719 3/7/03 Tyler Second and third floor stairway 10th St. Need to be plaster in stairwell. Lead & Asbestos Code A - Clear for repairs on 03/07/03. Horne Engineering - Edward Rodriguez (RG 03/10/03) | March 7, 2003 |
| Tyler Elementary School | FM-200226736 3/7/03 TYLER ROOF 1. Please rehang medal door . Asbestos Code A - Clear for repairs on 03/10/03. Horne Engineering - Donald Maglienti (RG 03/11/03) | March 7, 2003 |
| Woodson High School | FM-200226703 3/7/03 WOODSON REPAIR URINALS , SINK THAT ARE NOT WORKING. Asbestos Code A - Clear for repairs on 03/10/03. Horne Engineering - Tony Marcolin (RG 03/11/03) | March 7, 2003 |
| Woodson High School | FM-200226702 3/7/03 WOODSON REPAIR AND REMOVE FLOOR TILE AMP AREA 102. Asbestos Code A - Clear for repairs on 03/10/03. No floor tiles was observed in stated work area. Horne Engineering - Tony Marcolin (RG 04/08/03) | March 7, 2003 |
| Johnson JHS | FM-200226817 3/10/03 JOHNSON F irst Floor - Hallway Near Gym 1. Two windows (wire mesh) glass need to be replaced. Asbestos code A-clear for repair by DCPS Charles Buchanan on 04/03/03 | March 10, 2003 |
| Johnson JHS | FM-200226823 3/10/03 JOHNSON Fourth Floor - Near Classroom #423 1. The panel cover is missing off of the electrical box in the hallway. Please repair. | March 10, 2003 |
| Johnson JHS | FM-200226815 3/10/03 JOHNSON OUTSIDE - NEAR THE LIBRARY 1. Exterior patio drain is clogged and need to be unclogged. | March 10, 2003 |
| Johnson JHS | FM-200226816 3/10/03 JOHNSON F irst Floor - Gym Area 1. Two windows in the gym are broken and need to be replaced. It is very cold in the gym. code A-clear for repair by DCPS Charles Buchanan on 4/02/03 | March 10, 2003 |
| Hine JHS | FM-200226834 3/11/03 Hine Boiler Room Furnish and install 6" pressure gauge scale 0 - 60 PSI on Boiler #2. | March 11, 2003 |
| Thomas Elementary School | FM-200226836 3/11/03 THOMAS boiler room Replace relief valve to domestic hot water heater. Watts - regulator Size 3/4in Serial No. 88420 Set 125lbs model - M3 BTU/Hr. 2,070,000 No. 174A | March 11, 2003 |
| Terrell Mc ES | FM-200226861 3/11/03 (Terrell, M.C.) 3rd Floor/Roof: Roof drain clogged, 12 to 8 inches of water on the roof, that has started to enter the building, by way of the window frame. The top of the window frame has began to fall because of the water weight on the roof. | March 11, 2003 |
| Kramer Middle School | FM-200226896 3/12/03 Kramer First floor and basement Throughout cafeteria Window screens needs repair or replaced, ASAP Birds entering, kids throwing trash out. | March 12, 2003 |
| Clark Elementary School | FM-200226935 3/12/03 Clark E.S Boiler Room R/R leaking 2" inch. black pipe discharge line on sump pump. Leaking badly when in operation | March 12, 2003 |
| Wilson High School | FM-200226972 3/13/03 (Wilson, W.) 1st Floor/Music room: Replace or replace door in storage room; door is cracked, and we are unable to secure.This room is used to house uniforms, and band equipment. Asbestos Code A-clear for repair by DCPS charles Buchanan on 3/19/03 | March 13, 2003 |
| West Elementary School | FM-200227037 3/13/03 (West) 1st Floor/Cafeteria: Breaker is not working, it popped two (2) light bulbs, and shorted out the others. | March 13, 2003 |
| Shaw JHS | FM-200227102 3/14/03 Shaw Roof Unstop drain over stairwell #9. Setting water is deteriorate ceiling and walls in stairwell #9. | March 14, 2003 |
| Payne Elementary School | FM-200227125 3/14/03 PAYNE First Floor - Lobby And Hallway 1. The roof is leaking near the cafeteria in the hallway , need to be repaired. Asbestos Code A - Clear for repairs on 03/18/03. Horne Engineering - Roger Kager (03/19/03) | March 14, 2003 |
| Wilson J. O. ES | FM-200227160 227160 3/17/03 J.O.WILSON First & Second Floor - Corridor ( Old Side ) 1. Assess , abate and restore wall mounted water coolers . NOTE: Third floor water cooler needs electrical services. Installation of water coolers needs filters and replacement . Asbestos Code A - Clear for repairs on 03/18/03. Horne Engineering - Edward Rodriguez (03/19/03) | March 17, 2003 |
| Coolidge High School | FM-200227245 3/18/03 Coolidge Boiler Room Replace motor to Gym convertor heating system. Maraton electric 1755-RPM, volts-200, Fr-256T,SHF-309,60-HZ, NEMA-87.5, AMP-59,Max cap-KVAR-8.0, PH-3,Mod> #PA265, Type TDR,Duty cont. HP-20, Des-B, Code G, Corr AMP-50. | March 18, 2003 |
| Wilson High School | FM-200227184 3/18/03 Wilson,W Boiler Room Repair and repair no. 2 sump pump for boiler room, Sump pump does not remove waste fromsump pump area. | March 18, 2003 |
| Hart Middle School | FM-200227210 3/18/03 HART !! EMERGENCY !! Basement Level - old Wing Toddler Boys Restroom Across from the Infant Care Center . 1. Replace light fixture that fell from the ceiling inside the toddler boys restroom and repair the ceiling as well . NOTE: This particular restroom is used for the toddlers that attend the infant center . Asbestos Code A - Clear for repairs on 03/18/03. Horne Engineering - Sharon Voss (RG 03/18/03) | March 18, 2003 |
| Eliot Junior High School | FM-200227246 3/18/03 (Eliot) Asbestos Assessment Required. Kitchen: Paint kitchen ceiling, walls windows, office, lockers, restroom, doors, and trim. Lead & Asbestos Code A - Clear for repairs on 03/19/03. Horne Engineering - Edward Rodriguez (RG 03/20/03) | March 18, 2003 |
| Patricia R Harris Ed Center | FM-200227260 3/18/03 Harris, P.R. Auditorium first floor Repair or replace lights in auditorium. Most of the lights are burned out. Stage lights are 150 watts spots, auditorium lights 150 watts spot, around auditorium wall 75 watts spots and hallway 75 spots. | March 18, 2003 |
| Patricia R Harris Ed Center | FM-200227231 3/18/03 Harris, P.R. First floor room 205 - food lab Repair or replace faucets and remove broken stem coupling on H.W. line where washing machine use to be. Can not turn on hot water west side of food lab. These parts are leaking. | March 18, 2003 |
| Benjamin Banneker Academic HS | FM-200227198 3/18/03 Banneker First floor main office/Principal office Basement - Music room Light fixture broken electrician is needed - fixture wil not come on. Ballasts has been check in music room it is on. | March 18, 2003 |
| Davis Elementary School | FM-200227297 3/19/03 (Davis) New wing-Basement/Boys bathroom: Furnish and install a new sink in boys bathroom, a child broke the old sink off the wall. | March 19, 2003 |
| Meyer Elementary School | FM-200227356 3/20/03 (Meyer) Basement/Bomb shelter: Install wooden ramp, and handrails to assist students entering the bomb shelter. Lead & Asbestos Code A - Clear for repairs on 03/24/03. Horne Engineering - Edward Rodriguez (RG 03/25/03) | March 20, 2003 |
| Whittier Elementary School | FM-200227384 3/20/03 (Whittier) 1st Floor/Assist Principal's office: #7 breaker is not working, please repair. | March 20, 2003 |
| Savoy Elementary School | FM-200227428 3/21/03 Savoy First and second floor Rooms 202, 206, 216, 112, hallway and vestibule Need ballasts replaced in the above rooms, ballasts are no longer working and need replacing. Asbestos Code A - Clear for repairs on 03/24/03. Horne Engineering - Roger Kager (RG 03/25/03) | March 21, 2003 |
| Maury Elementary School | FM-200227403 3/21/03 MAURY !! EMERGENCY !! First And Second Floor - North Side Of The Building . Please check and repair roof leak on flat roof , north side of the building as you approach west building . Asbestos Code A - Clear for repairs on 03/24/03. Horne Engineering - Edward Rodriguez (RG 03/25/03) | March 21, 2003 |
| Takoma Educational Center | FM-200227425 3/21/03 Takoma Outside Repair flashing that is hanging down off the theater. Flashing in hanging due to bad weather. To prevent watar from seeping through windows and seal in various area of the building damaging carpet, tiule, paint and etc..... | March 21, 2003 |
| Takoma Educational Center | FM-200227426 3/21/03 Takoma Gym 176 stairwell Repair leaking windows on stairwell due to bad Weather. The rain is coming in damaging the tile in area. | March 21, 2003 |
| Powell Elementary School | FM-200227556 3/24/03 (Powell) Roof is leaking coming through ceiling tile on 2fl near room 211. Asbestos Code A - Clear for repairs on 03/25/03. Horne Engineering - Sharon Voss (RG 03/28/03) | March 24, 2003 |
| Patricia R Harris Ed Center | FM-200227503 3/24/03 Harris, P.R. - EMERGENCY Main floor - Kitchen area Emergency ballance replacement and plumbing work see inspection. This work must be done in 24 hours. The repair of garbage disposal and the ballances. | March 24, 2003 |
| Backus Middle School | FM-200227526 3/24/03 (Backus) Second floor cafeteria One A/C unit is inoperable. Other need to be serviced before heat arrives. | March 24, 2003 |
| Davis Elementary School | FM-200227547 3/24/03 Davis Second floor landing vent cover by room 204 It leaks when it rain. Repair | March 24, 2003 |
| Davis Elementary School | FM-200227505 3/24/03 (Davis) 2nd Floor/Stairway near room #214 & 200: Room #200, and 2nd floor stairway outside bricks need to be pointed. Location has been marked off where water comes through wall. | March 24, 2003 |
| Stanton Elementary School | FM-200227518 3/24/03 Stanton Annex/Main Building Exterior Area Unstop outside drain between annex and main building also point-up bricks on main building exterior wall. Water is settling over the drain and entering the building at the switch gear panels. | March 24, 2003 |
| Ludlow-Taylor ES | FM-200227606 3/25/03 Ludlow-Taylor Boiler room Replace domestic hot water circulating pump and motor, located by the pipe tunnel door. 3/4" inlet 3/4'" outlet | March 25, 2003 |
| Marshall Educational Center | FM-200227621 0227621 3/25/03 Marshall, T. Sagety Hazard Basement level - pool All Metal frames, Bannister have rusted badly. Remove or replace. Asbestos Code A - Clear for repairs on 03/26/03. Horne Engineering - Sharon Voss (RG 03/27/03) | March 25, 2003 |
| Tubman Elementary School | FM-200227586 3/25/03 (Tubman) 1st Floor/East Corridor: Replace door closer on hall entrance door. Asbestos Code A - Clear for repairs on 03/26/03. Horne Engineering - Donald Maglienti (RG 03/26/03) | March 25, 2003 |
| Gibbs Elementary School | FM-200227664 3/26/03 Gibbs First floor cafeteria Lights are out, need a scaffold to change bulbs. | March 26, 2003 |
| Beers Elementary School | FM-200227671 3/26/03 Beers Building # 2 Shelf fallout shelter plumbing is needed. Sink needs repair and principal is asking restroom to be place there. Asbestos Code A - Clear for repairs on 03/26/03. Horne Engineering - Troy Wilcome (RG 03/27/03) | March 26, 2003 |
| Patterson ES | FM-200227758 200227758 3/27/03 Patterson, W.B. Main entrance Exterior door jammed. To hard to push open. | March 27, 2003 |
| Eastern High School | FM-200227753 3/27/03 Eastern Lobby stairwell Repair or re-enforce brass rail on marble steps leading to first floor. The rail is missing brass screws and marble steps need to be repaired. Rail is very loose. | March 27, 2003 |
| Brookland Elementary | FM-200227859 859 3/28/03 Brookland All Roof Top Exhaust Fans In Labatory All Roof Top Exhaust Fans I | March 28, 2003 |
| Slowe Elementary School | FM-200227845 3/28/03 Slowe First floor Defective foor hardware exit door. | March 28, 2003 |
| Walker-Jones EC | FM-200227951 3/31/03 WALKER-JONES Ground - First Floors 1. Paint Cafeteria walls ,doors , handrails and stair risers . 2. Paint exterior front doors and handrails . Lead Code A - Clear for repairs on 04/01/03. Horne Engineering - Edward Rodriguez (RG 04/02/03) | March 31, 2003 |
| Langdon Elementary School | FM-200227911 3/31/03 Langdon Boiler room Replace solenoid makeup valve on the condensate return tank in the boiler room, valve is not holding , and the boiler is filling up with water. | March 31, 2003 |
| Gibbs Elementary School | FM-200227912 3/31/03 Gibbs First floor Asst. principal Re-install exit because it was installed improperly, also need a exit sign put in. | March 31, 2003 |
| Watkins Elementary School | FM-200227928 3/31/03 WATKINS First And Second Floors - Through Out . Check For P C B'S 1. Install ballasts through out the building . . Code B for PCB | March 31, 2003 |