Open Repair Requests in April 2002

Open Repairs Summary

  • Urgent Requests
    12
  • Routine Requests
    39
  • Total Requests
    51

Detailed Reports

Urgent Repair Requests Opened in April 2002 (12)
School Description Open Date
Backus Middle School FM-200205529 4/8/02 Backus 1. Asbestos Assessment Reqd. 1st Floor Boiler Room 2. Install an outlet to support the new sump pump [will have to use an extension cord otherwise]. 3. Reanchor the ceiling lights which have broken supports. 4. Repair light which is hanging from several exposed wires. These problems could precipitate safety issues. Code A-clear for repair by Honre Engineer (Stephen Caldwell ) on 4/09/02 CEB April 8, 2002
Savoy Elementary School FM-200205707 4/11/02 (Savoy) ****Urgent**** 1st Floor All Purpose Room There was a release of a white, powdery substance resulting from the mobile basketball court falling against the wall in the center of the stage, knocking a large piece out of the wall. Code A-clear for repair by Honre Engineer ( Z Mahmood) on 4/12/02 CEB April 11, 2002
Seaton Elementary School FM-200205907 4/16/02 Seaton ****Urgent**** All Floors Throughout Building The water pressure is low all through the building. Need plumbers to check out & remedy problem. April 16, 2002
Powell Elementary School FM-200206032 4/18/02 (Powell) ***Very Urgent*** 2nd floor: Problem with circuit breaker, power is intermitting in the following rooms: #203, 205, 209, & 211. It is very warm and humid in those rooms; unable to use fans. April 18, 2002
Hine JHS FM-200206216 4/22/02 Hine First (1st) FLoor -- Girls Restroom 1. Asbestos Assessment Requried. 2. Repair Ceiling - Falling plaster. Safety Hazard. Code A-clear for repair by Horne Engineer by ( Troy Wilcome ) on 4/24/02 ( CEB ) April 22, 2002
Turner Elementary School FM-200206432 4/24/02 (Turner) ***Very Urgent*** Outside exit door ceiling roof: Roof leak, Concrete coming apart and falling in custodial office; Code A-clear for repair by Horne Engineer by ( Sheryll James ) on 4/25/02 ( CEB ) April 24, 2002
Wilkinson ES FM-200206632 632 4/25/02 Wilkinson ****Urgent**** 2nd Floor/Passageway near Mechanical Room Twp [2] flourescent light fixtures need replacement or repair. In-house staff replaced one flourescent bulb and the fixtures itself sparked. April 25, 2002
Amidon Elementary School FM-200206638 4/25/02 Amidon Boiler Room ,classrooms and offices ACM and Lead Abatement. 1) Demolition of boilers and all associated equipment,piping and electrical to same equipment. Change steam traps and valves inside classrooms and offices. Install new boilers,equipment,lights,electrical panels,doors and windows. Plumbing,sinks,hot water heaters and drain. Paint mechanical rooms. New controls,insulation and concrete pads. Poc: Matt Murry - 301-252-5521 Mike Williams - Jacobs Engineering. Permit allowed to be issued, DCPS Safety has evaluated the asbestos abatement scope of work (DCPS Safety-Sheila R.Howard (04-30-02) April 25, 2002
Bunker Hill Elementary School FM-200206799 06799 4/29/02 ****Urgent**** Outside/Metal Shed Furnish and install a lock on the outside shed where lawn mowers are stored. Shipment of new equipment is expected shortly. April 29, 2002
Amidon Elementary School FM-200206764 4/29/02 Amidon ****Urgent**** 1st Floor Multi-purpose Room A leak from the roof, over the multi-purpose room, is flooding the floor. Code A - Clear for repairs on 04-29-02 by Horne Engineering / Bipin Nanavarty. Leroy Minton Jr. Safety Office 202-576-8962. April 29, 2002
Amidon Elementary School FM-200206839 4/30/02 ****Urgent**** 1. Asbestos Assessment Reqd. 1st Floor Multi-Purpose Room, Gymnasium & Lobby 2. Patch holes in the ceiling. When it rains or storms, there is flooding from the water coming in through the holes. Code A-clear for repair by Horne Engineer by ( Z Mahmood ) on 4/26/02 ( CEB ) Lead Based Paint Code A - Clear for repairs on 5/7/02 Lead level 1; No lead based paint to be impacted Horne Engineering - Bipin Nanavaty (RE - 5/08/02) April 30, 2002
Amidon Elementary School FM-200206929 4/30/02 Through-out building: Please upgrade and/or check electricity in building for installation of our air conditioners that are on-site. Asbestos Code A - Clear for repairs on 05/01/02. DCPS Safety - Ronald Edwards (RG 05/02/02) April 30, 2002

Routine Repair Requests Opened in April 2002 (39)
School Description Open Date
Beers Elementary School FM-200205297 4/2/02 (Beers) 1. Asbestos assessment required. Buildings #1, 1st floor. Bldg #3, 2nd floor: Upgrade electrical in computer rooms; everything is constantly turning off and on. Computer class is having a hard time conducting class because of this situation, please survey. Code a-clear for repair bby Horne Engineer ( Sharon Voss ) on 4/15/02 April 2, 2002
Johnson JHS FM-200205399 9 4/3/02 (Johnson) 1. Asbestos assessment required. Day care office: Remove metal consol next to the security office close to entrance of drive-way that has wires; a medical clinic is housed in that office. Code A-clear for repair by Honre Engineer ( Philip Connolly ) on 4/08/02 April 3, 2002
Shepherd ES FM-200205508 4/5/02 (Shepherd) 2nd Floor Room 208/Old Wing Replace missing light covers & one lens cover in 2nd floor room 208 in the old wing. April 5, 2002
Roosevelt High School FM-200205505 505 4/5/02 Roosevelt 1 Asbestos Assessment Reqd. 1st & 2nd Floor Boys & Girls Restrooms 2. Repair/replace wall tiles in the 1st floor girls restroom. 3. Repair hole in the wall behind the hand-basin in the 2nd floor boys restroom. Code A-clear for repair by Honre Engineer ( Sam Ebrahim ) on 4/09/02 CEB April 5, 2002
Shepherd ES FM-200205507 4/5/02 (Shepherd) Asbestos Assessment Reqd. 2nd Floor Room 202/Old Wing Repair damaged plaster on the north wall. Code A-clear for repair by Honre Engineer ( Sharon Voss ) on 4/09/02 CEB April 5, 2002
Ferebee-Hope Elementary School FM-200205611 4/9/02 Ferbee Hope Pool Office/ Closet Furnish materials to replace water regulator 1", to supply water to pool. Valve is bad. Work can be done in house. April 9, 2002
Powell Elementary School FM-200205621 4/9/02 Powell Boiler room Repair or replace pneumatic control valve on steam line that controls the heat to the old side of the bldg., located above the boiler. Valve is in the close position. April 9, 2002
Shepherd ES FM-200205696 4/10/02 Shepherd Second (2nd) Floor - Classroom #208 1. Asbestos Assessment Required. 2. Repair deteriorating plaster wall in classroom closet. Code A-clear for repair by Honre Engineer ( Bipin Nanavaty) on 4/12/02 CEB Lead Code A-clear for repair by Horne Engineer ( Bipin Nanavatyt ) on 4/16/02 ( CEB ) April 10, 2002
Bunker Hill Elementary School FM-200205730 05730 4/11/02 Bunker Hill First (1st) Floor - Main Office 1. Asbestos Assessment Required. 2. Please repair breach in Ceiling in Principals Office. (Plaster) Code A-clear for repair by Horne Engineer ( Philip Connolly) on 4/15/02 Do not scrape chip or peel any of this paint surface re-paint over only. April 11, 2002
Beers Elementary School FM-200205831 4/15/02 Beers Second (2nd) Floor - Building 1- Room #229 Replace Ballast. (Room is Dark) April 15, 2002
Duke Ellington School FM-200205776 776 4/15/02 Ellington Exterior Grounds 1) Repair chair, some of the wood need to be replaced and the chair needs to be painted. April 15, 2002
Duke Ellington School FM-200205777 777 4/15/02 Ellington Exterior Grounds - Flag Pole 1) Need help from ground crew to un-tangle the rope at the top of the flag pole. April 15, 2002
Ferebee-Hope Elementary School FM-200205879 4/16/02 Ferebee-Hope Under pool - pump room Repair leaks on 6" line where PVC chemical feed lines enter main pool water supply. April 16, 2002
Ferebee-Hope Elementary School FM-200205877 4/16/02 Ferebee-Hope Swimming pool office Replace or repair float control to pool fill up center. April 16, 2002
Ferebee-Hope Elementary School FM-200205876 4/16/02 Ferebee-Hope Swimming pool office Replace one magnatrol control valve (type 12A44W) on main water supply line. April 16, 2002
Ferebee-Hope Elementary School FM-200205860 4/16/02 Ferebee-Hope Swimming pool office Replace one 2" main water supply line valve on main. April 16, 2002
Ferebee-Hope Elementary School FM-200205859 4/16/02 Ferebee-Hope Swimming pool office Replace one 2" by-pass valve on main water supply line. April 16, 2002
Ferebee-Hope Elementary School FM-200205858 4/16/02 Ferebee-Hope Replace two 3/4" supply vavles on main water supply to pool. April 16, 2002
Langdon Elementary School FM-200205938 8 4/17/02 Langdon Roof area Make repairs to (2) heating & cooling units. April 17, 2002
Eastern High School FM-200205999 4/18/02 Eastern Ground Floor - Old Woodshop 1) Paint walls and install (2) a/c units. Xmas in April , a non profit group will do the work Lead Code A - Lead leavel 1- No Lead Based Paint Impact Clear for Repairs on 4/19/02 Horne Engineering - Edwards Rodriguez (RE) Asbestos Code A - Clear for repairs on 4/119/02 Horne Engineering - Edwards Rodriguez (RE) April 18, 2002
Shepherd ES FM-200206135 4/19/02 Shepherd Second (2nd) Floor - Classroom #202 Replace Discolored Panes in Four (4) Windows. April 19, 2002
Gibbs Elementary School FM-200206238 4/22/02 Gibbs Third (3rd) FLoor - Classroom #312-A 1. Asbestos Assessment Required. 2. Install Three (3) Wall outlets. Storage Room is being converted into Classroom. Asbestos Code A - Clear for rpairs on 4/23/02 Horne Engineering-Phillip Connolly (RE) April 22, 2002
Young Elementary School FM-200206236 4/22/02 Young Boiler room Emergency Replace (6") six inch round duct exhaust from hot water heater. Fumes are being released into building. Unit has been cut off. Jones and Wood Inc - Edward Brent - 202-529-6434 April 22, 2002
Reed LC FM-200206361 4/23/02 (Reed) 1. Asbestos assessment required. 1st floor/early childhood: Install exit lights near two (2) exit doors. (Total of (2) lights) Asbestos Code A - Clear for repairs on 05/28/02. Horne Engineering - Sheryll James (RG 05/29/02) April 23, 2002
Aiton Elementary School FM-200206507 4/24/02 Aiton 4th Floor Computer Lab [Rm. 403] Need electrician to check for overload. When the window A/C units are turned on, the circuit breaker trips. April 24, 2002
Cook J.F. Elementary School FM-200209111 9111 4/24/02 J.F. Cooke Boiler room Electrician needs to hard wire sump pump. April 24, 2002
Bunker Hill Elementary School FM-200206509 06509 4/24/02 (Bunker-Hill) 2nd floor/room #229: Please repair or replace inoperable window A/C unit. (Bad compressor) April 24, 2002
Turner Elementary School FM-200206665 4/25/02 (Turner) "As soon as possible" 1. Asbestos assessment required. Through-out building: Repair peeling and falling plaster in the following rooms; #101, 109, boys restroom, old building 1st floor. Girls restroom, 1st floor new building, and room #303 old building. Code A-clear for repair by Horne Engineer by (Bipin Nanavaty ) on 4/26/02 ( CEB ) April 25, 2002
Merritt Middle School FM-200206753 3 4/26/02 1. Asbestos Assessment Reqd. 3rd Floor Boys Gym Toilet 2. Replace damaged floor tiles at the base of the wall of the toilet on the right side of restroom. Asbestos Code A - Clear for repairs on 05/01/02. Horne Engineering - Bipin Nanavaty (RG 05/01/02) April 26, 2002
Murch Elementary School FM-200206720 4/26/02 Murch Throughout Entire Building First (1st) and Second (2nd) Floor All Classrooms needs to be rekeyed and set on Master too. Many keys in use. BSM will be provided memo from Principal. A April 26, 2002
Thomas Elementary School FM-200206697 4/26/02 Navel Thomas Boiler room lavatory Replace waste line flange and commode - boiler room lavatory. Commode was removed during previous unclogging of sewerline. April 26, 2002
Park View ES FM-200206836 4/29/02 1. Asbestos assessment required. 2nd floor hallway/near boys restroom and rm. #227: Windows broken in both rooms. Code A-clear for repair by Horne Engineer by (Sherlly James) on 5/02/02( CEB ) April 29, 2002
Young Elementary School FM-200206821 4/29/02 1st Floor Auditorium Repair/replace dimmer switch in the auditorium. April 29, 2002
Hart Middle School FM-200206804 4/29/02 1st floor hallways/old wing: one (1) panel blown. Old building/3rd floor: three (3) panels blown. 2nd floor: Four (4) panels blown. 2nd floor/new wing: Three (3) panels blown April 29, 2002
Stevens Elementary School FM-200206873 3 4/30/02 3rd Floor Room #34 Window A/C is not working. April 30, 2002
Reed LC FM-200206867 4/30/02 1. Asbestos Assessment Reqd. Ground Floor Gymnasium Area 2. Realign one [1] door near the PE teacher's office 3. realign two [2] doors in the gym hallway 4. Furnish and install one [1] door closure on exit door in gym hallway Asbestos Code A - Clear for repairs on 04/30/02. Horne Engineering -Philp Connolly (RG 05/01/02) April 30, 2002
Garnet-Patterson MS FM-200206923 206923 4/30/02 1. Asbestos Assessment Reqd. 2nd Floor Room 214 2. Plaster ceiling needs repair due to water damage. Asbestos Code A - Clear for repairs on 05/01/02. Horne Engineering - Sharon Voss (RG 05/02/02) April 30, 2002
Patricia R Harris Ed Center FM-200206872 206872 4/30/02 1. Asbestos assessment required. Hallways and stairwells/1st, 2nd & 3rd floors: Need ballast replaced through-out the building. Boys and girls gym, hallway, & cafeteria. Asbestos Code A - Clear for repairs on 04/30/02. Horne Engineering - Stephen Caldwell (RG 05/01/02) April 30, 2002
Brookland Elementary FM-200206920 920 4/30/02 Health Code: (Health Code) Kitchen: Repair faucet at two (2) compartment sink and hand sink in toilet room. April 30, 2002