Urgent Repair Requests Opened in April 2003 (12)
| School |
Description |
Open Date |
| Cardozo High School |
FM-200228251 4/3/03 Cardozo URGENT Ground hall Furnish and install electrical gang box receptacles at four (4) locations for security metal detectors and x-ray machines. Locatios: Northwest hall # 6, southwest hall by # 10, southeast hall by # 15 and northwest hall by # 9 two (2) duplex receptacles each. |
April 3, 2003 |
| Cardozo High School |
FM-200228256 4/3/03 Cardozo URGENT First floor by room 109 REplace non working panic bar. |
April 3, 2003 |
| Cardozo High School |
FM-200228255 4/3/03 Cardozo URGENT Ground floor lobby doors Repair metal gate doors. Code A - Clear for repairs on 04/03/03. DCPS Safety - Richard Gibson (RG) |
April 3, 2003 |
| Cardozo High School |
FM-200228252 4/3/03 Cardozo URGENT All exterior doors Replace pad locks and slide bolts. 1. Padlocks, master lock, Long shackley keyed a like (20) 2. Padlocks, master lock, keyed alike 1KA-2246 (20) 3. Slide bolts, large (24) 4. Screws, mounting box. |
April 3, 2003 |
| Johnson JHS |
FM-200228391 4/7/03 Johnson - URGENT Exterior grounds Unstop outside drain of library on patio. Basement is floded due to this drain. |
April 7, 2003 |
| Stanton Elementary School |
FM-200228441 4/8/03 Stanton Third floor hallway Electrical box is hanging from the wall. URGENT |
April 8, 2003 |
| Cook J.F. Elementary School |
FM-200228632 4/10/03 (Cook, J.F.) !!!VERY URGENT!!! 3rd Floor/Room #306: Wall socket pulled from wall; socket hanging, from loose wires. |
April 10, 2003 |
| Slowe Elementary School |
FM-200228643 4/11/03 Slowe Boiler room (URGENT) Repair ruptured 3/4" copper line over top of the condensate ,line is leaking onto the electrical conduit line. |
April 11, 2003 |
| Powell Elementary School |
FM-200328968 4/23/03 The circuit breakers in the lunch room need to be replace because there are too many bad breakers int the circuit breaker box and most of the lights and outlets are wired on 1 breaker and microphone and lights are on 1 breaker can't cut the mic off without cuttting the lights off. Asbestos Code A - Clear for repairs on 04/23/03. DCPS Safety - Richard Gibson (RG0 |
April 23, 2003 |
| West Elementary School |
FM-200329039 4/24/03 West Exterior Learning center exit door stairs going to kindergarten exterior steel plate edges are missing. Need to be replaced. Do have some on hand. Safety violation. August 26, 2004: Staff has made inquiry reference this repair (Ms. J.) |
April 24, 2003 |
| Beers Elementary School |
FM-200329062 4/25/03 Beers Outside the bldg. Outside of cafeteria light fixtures need to be repaired and outside of fall out shelter light fixtures need to be replaced or repaired and other areas outside by exit doors. Principal request urgent. |
April 25, 2003 |
| Turner Elementary School |
FM-200329266 4/30/03 TURNER !!!VERY URGENT!!! Repair/replace window a/c unit principal's office, room 217, 211 and room 300. Spot cooler room 311. August 28, 2003: Principal made inquiry regarding this repair today. She states, "this is an emergency situation, as students are returning to school in a few days" |
April 30, 2003 |
Routine Repair Requests Opened in April 2003 (50)
| School |
Description |
Open Date |
| Bruce-Monroe Elementary School |
FM-200228020 4/1/03 Bruce-Monroe Staff restroom center (203) and first floor women restroom in lobby Ceiling need to be plastered and painted. Asbestos Code A - Clear for repairs on 04/02/03. Horne Engineering - Bipin Nanavaty (RG 04/03/03) |
April 1, 2003 |
| Smothers ES |
FM-200228059 4/1/03 Smothers Third floor boys bathroom Two 6" holes in wall need to be plaster, patch and painted. Lead & Asbestos Code A - Clear for repairs on 04/02/03. Horne Engineering - Edward Rodriguez (RG 04/02/03) |
April 1, 2003 |
| Bunker Hill Elementary School |
FM-200228068 4/1/03 BUNKER-HILL Second Floor - Restroom 1. Repair ( 3 ) stall doors in the girls restroom . |
April 1, 2003 |
| Marshall Educational Center |
FM-200228060 0228060 4/1/03 Marshall, T. Second floor Dr. Diya Roof is leaking very badly needs repairs. |
April 1, 2003 |
| Aiton Elementary School |
FM-200228170 4/2/03 Aiton Outside front of bldg. The gutter in the front of building is down.. Gutter on site. |
April 2, 2003 |
| Wilson High School |
FM-200228207 4/3/03 Wilson, W. First, second, third and basement floors Replacement bubblers for coolers on second floor near eom 208, third floor near room 308 and basement near book room. Repair coolers basement near kitchen first floor near library. |
April 3, 2003 |
| Thomas Elementary School |
FM-200228303 4/4/03 (Thomas) Health Code Violation: Kitchen area: Provide adequate lighting in dry food storage. |
April 4, 2003 |
| Johnson JHS |
FM-200228293 4/4/03 Johnson Cafeteria area Wall outlet plug need a electrician to come out live wire hanging. |
April 4, 2003 |
| Wilson High School |
FM-200228337 4/4/03 Woodrow Wilson Pool Room First Floor 1. Back wash filters 2. Add chemical 3. Add water 4.Adjust heat transfer 5. Fill out log 6. Check with contractor |
April 4, 2003 |
| Ferebee-Hope Elementary School |
FM-200228340 4/4/03 Ferebee Hope Pool Room First Floor 1. Check all chemical level 2. Added chemcials 3. Added water 4. Adjust heat transfer 5. Fill out log 6. Back wash filter 7. Check heat at exchange and in pool 8. Communciated with contractor |
April 4, 2003 |
| Garfield ES |
FM-200228419 4/7/03 (Garfield) 2nd Floor/Room #2C: Top window has fallen down behind bottom window; unable to lift both windows. (Very cold air coming in) Asbestos Code A - Clear for repairs on 04/08/03. Horne Engineering - Bipin Nanavaty (RG 04/10/03) |
April 7, 2003 |
| Wilkinson ES |
FM-200228360 4/7/03 (Wilkinson) Basement - 2 boiler room Two (2) drains need to be unclogged. |
April 7, 2003 |
| Patricia R Harris Ed Center |
FM-200228377 4/7/03 Harris, P.R. Third floor - 329 Mr. Brakeway Door is split into and needs to be replaced. ASAP Asbestos Code A - Clear for repairs on 04/08/03. Horne Engineering - Troy Wilcome (RG 04/10/03) |
April 7, 2003 |
| Eastern High School |
FM-200228402 4/7/03 (Eastern) 3rd Floor/Rooms #153, 337, Office, & Auditorium: Roof leaking through-Out the building. |
April 7, 2003 |
| Adams Elementary School |
FM-200228459 4/8/03 (Adams) Asbestos Assessment Required. 3rd Floor/Room #305: Ceiling falling due to previous leak. Asbestos Code A - Clear for repairs on 04/09/03. Horne Engineering - Roger Kager (RG 04/10/03) |
April 8, 2003 |
| Wilkinson ES |
FM-200228435 4/8/03 Wilkinson First floor - 101 principal office Need to replace flourescent light fixture. Keep going off and on. Asbestos Code A - Clear for repairs on 04/10/03. Horne Engineering - Bipin Nanavaty (RG 04/11/03) |
April 8, 2003 |
| Benjamin Banneker Academic HS |
FM-200228444 4/8/03 Banneker Third floor - Stairwell roof or upper wall is leaking on the southwest stairwell. Work has been done in tjis area before in the past.Roof leaks when it rains. Closet floods in side the building, The closet is located by the exit door / where the trash dumpsters are on the in side of the building. |
April 8, 2003 |
| Draper Elementary School |
FM-200228426 4/8/03 Draper Install six (6) vent covers that are missing from exterior of building. Two vent covers are missing from the right side of front entrance and four vents are missing from the side rear of building. NOTE: Animals crawl into vent openings and die which causes fowl odor. |
April 8, 2003 |
| Benjamin Banneker Academic HS |
FM-200228443 4/8/03 Banneker Basement - Utility closet Roof leaks when it rains. Closet floods in side the building, The closet is located by the exit door / where the trash dumpsters are on the in side of the building. |
April 8, 2003 |
| Powell Elementary School |
FM-200228639 4/8/03 (Powell) ROOM 105, CEILING AND WALL NEED PLASTERING REPAIR. Asbestos Assessment Required. Room 105 ceiling and side wall near teacher's desk is coming down need to be check for asbesto ASAP. Asbestos Code A - Clear for repairs on 04/14/03. Horne Engineering - Sheryll James (RG 04/16/03) |
April 8, 2003 |
| Savoy Elementary School |
FM-200228494 4/9/03 Savoy Third floor room 306 maintenance office New electrical outlets standard 110 volts, three (3) are needed. 240 volts for air conditioner is also needed (21000 btu). Asbestos Code A - Clear for repairs on 04/10/03. Horne Engineering - Sheryll James (RG 04/11/03) |
April 9, 2003 |
| Brent Elementary School |
FM-200228521 4/9/03 Brent First floor Main Office / Principal Office/ Counselor Office/Health Suite Have walls painted in the following areas: Main Office , Counselor Office, Principal Office and Health Suite . Asbestos/Lead Code A-clear for repair by Horne engineer on 4/04/03 Charles Buchanan DO NOT SCRAPE CHIP OR PEEL ANY OF HIS PAINT SURFACE REPAINT OVER ONLY |
April 9, 2003 |
| Eastern High School |
FM-200228502 4/9/03 Eastern Armory basement Repair or replace two (2)panic bars on door it is broken. Replace door chek bathroom door boys across from room 241. |
April 9, 2003 |
| Eastern High School |
FM-200228503 4/9/03 Eastern Cafeteria Replace ballasts in ceiling lights. Need scafold high lights. |
April 9, 2003 |
| Payne Elementary School |
FM-200228501 4/9/03 Payne Second and third floor boys bathroom Repair or replace flush valves on first commode, no water pressure. |
April 9, 2003 |
| Gage-Eckington ES |
FM-200228584 4/10/03 (Gage-Eckington) Second floor multi service center There is a light in room 2 that need some repair, work we have replaced the ends but that did not work. |
April 10, 2003 |
| Ballou Senior High School |
FM-200228597 4/10/03 Ballou Stay Stairwell N When it rains, water comes in on the landing. This makes taht side of landing entry unsafe. Between floors B-1 and sub basement. |
April 10, 2003 |
| Meyer Elementary School |
FM-200228635 4/10/03 (Meyer) Asbestos Assessment Required. 1st Floor/Teachers lounge: Paint teachers lounge; need permit for school maintenance staff. Lead & Asbestos Code A - Clear for repairs on 04/14/03. Horne Engineering - Edward Rodriguez (RG 04/15/03) |
April 10, 2003 |
| River Terrace ES |
FM-200228684 0228684 4/11/03 Correct cause of inoperative reset controls for pnuematic heating H/W temps are excessive and accuator not operable for heat exchanger. |
April 11, 2003 |
| Payne Elementary School |
FM-200228672 4/11/03 Payne First Floor Hallway By Main Office Upgrade lights. |
April 11, 2003 |
| Wilkinson ES |
FM-200228717 4/14/03 Wilkinson Basement boiler room general storage Need to install sump pump, Water is leaking from wall in corner. |
April 14, 2003 |
| Ferebee-Hope Elementary School |
FM-200228787 4/15/03 Ferebee-Hope Ground floor - D building family services Plumbing , to replace delany type flush valve to sloan type toilet, inoperable. |
April 15, 2003 |
| Ferebee-Hope Elementary School |
FM-200228786 4/15/03 Ferebee-Hope Second floor - D building computer room -1 Asbestos assessment ceiling tile and above. Survey to install eight (8) outlets for computers. Computer sets are in the middle of the floor. Asbestos Code A - Clear for repairs on 04/16/03. Horne Engineering - Troy Wilcome (RG 04/17/03) |
April 15, 2003 |
| Patricia R Harris Ed Center |
FM-200228769 4/15/03 (Harris, P.R.) Ground Floor/Room #6: Partitions have fallen in gym, and big gym restrooms. Please respond as soon as possible. Asbestos Code A - Clear for repairs on 04/17/03. Horne Engineering - Troy Wilcome (RG 04/18/03) |
April 15, 2003 |
| Patricia R Harris Ed Center |
FM-200228753 4/15/03 Harris, P.R. First, second and third floor, The whole building In restrooms, classrooms, stairwells, hallways and teachers store rooms, the ballast need to be changed. Please respond ASAP |
April 15, 2003 |
| Park View ES |
FM-200228824 4/16/03 (Parkview) Gymnasium: Repair breach in wall, and ceiling. Asbestos Code A - Clear for repairs on 04/16/03. Horne Engineering - Sharon Voss (RG 04/17/03) |
April 16, 2003 |
| Garfield ES |
FM-200228877 4/18/03 Garfield First floor custodial closet 1.) Snake out slop sink , that was snake out before but ha re-occured. Girls bathroom, first floor , new wing. 2.) Unstop third sink, first floor wing health suite main building (real sink). 3.) Unstop real sink, main bldg. 4.) Room 1-G main bldg. snake out toilet. |
April 18, 2003 |
| Woodson High School |
FM-200328962 4/22/03 (Woodson, H.D.) Cafeteria: Pipe leaking in the ceiling. Asbestos Code A - Clear for repairs on 04/23/03. Horne Engineering - Bipin Nanavaty (RG 04/25/03) |
April 22, 2003 |
| Cardozo High School |
FM-200328975 4/23/03 Cardozo Room #310 Replace electrical toggle switch for window air conditioner, 230 volts. |
April 23, 2003 |
| Ronald H. Brown MS |
FM-200329021 4/24/03 Brown, Ron (Roper) Requesting ceiling tiles for replacement in the following: 1.) Cafeteria / lunch room areas 9x9's. 2.) Auditorium 9x9. Asbestos assessment required. Code A - Clear for repairs on 04/25/03. Horne Engineering - Sheryll James (RG 04/28/03) |
April 24, 2003 |
| Gage-Eckington ES |
FM-200329092 4/25/03 (Gage-Eckington) |
April 25, 2003 |
| Kenilworth ES |
FM-200329069 9069 4/25/03 Kenilworth Exterior of bldg. Repair / replace down spouts (2). |
April 25, 2003 |
| Beers Elementary School |
FM-200329063 4/25/03 Beers Bldg. 2 Shelf fallout shelter plumbing is needed. Sink needs repairing and Principal is asking restroom to be place there. |
April 25, 2003 |
| West Elementary School |
FM-200329094 4/25/03 (West) 1st Floor/Learning center #1: Seal cracks between bricks that separating from the window. |
April 25, 2003 |
| Bunker Hill Elementary School |
FM-200329127 4/28/03 (Bunker Hill) Cafeteria stairwell Repair hole in coil on wall mounted convector, water running down stairs, causing a slipping hazard. Repaired some months back started leaking again. |
April 28, 2003 |
| Horace Mann Elementary School |
FM-200329259 4/30/03 Mann First floor room 104 Repair damaged plaster on west wall between windows. Lead & Asbestos Code A - Clear for repairs on 04/30/03. Horne Engineering - Edward Rodriguez (RG 05/01/03) |
April 30, 2003 |
| Horace Mann Elementary School |
FM-200329261 4/30/03 Mann Multi purpose room T part in ceiling is about to fall. Ceiling tile on first floor hallway corner piece of tile need replacing also. Asbestos Code A - Clear for repairs on 04/30/03. Horne Engineering - Philp Connolly (RG 05/01/03) |
April 30, 2003 |
| Rudolph Elementary School |
FM-200329255 4/30/03 Rudolph Cap off leaking water line. |
April 30, 2003 |
| Garnet-Patterson MS |
FM-200329264 4/30/03 Garnet-Patterson Room 200 Please install 220 volts electrical line and receptical for window a/c unit in room 200 Asbestos Code A - Clear for repairs on 04/30/03. Horne Engineering - Edward Rodriguez (RG 05/01/03) |
April 30, 2003 |
| Horace Mann Elementary School |
FM-200329260 4/30/03 Mann Second floor ESL # 204 Repair peeling paint and plaster in ceiling in southeast corner of classroom. Lead & Asbestos Code A - Clear for repairs on 04/30/03. Horne Engineering - Edward Rodriguez (RG 05/01/03) |
April 30, 2003 |