Open Repair Requests in April 2004

Open Repairs Summary

  • Urgent Requests
    12
  • Routine Requests
    73
  • Total Requests
    85

Detailed Reports

Urgent Repair Requests Opened in April 2004 (12)
School Description Open Date
Park View ES FM-200446527 4/8/04 Parkview Boiler Room Unstop floor drain in boiler in front of condensate return pumps. Engineer attempted to unstop with negative results. Urgent !!!!! April 8, 2004
Eliot Junior High School FM-200446784 4/12/04 (Eliot) !!!VERY URGENT!!! Asbestos Assessment Required. Please arrange to remove clogged drained existing sink ( remove complete sink) from the room # 202 of Eliot JHS. Asbestos Code A - Clear for repairs on 04/19/04. Horne Engineering - Tony Marcolin (RG 04/21/04) April 12, 2004
Eastern High School FM-200446879 4/20/04 Eastern Room 152 Replace windows double pane. Security risk-safety hazard. April 20, 2004
Turner Elementary School FM-200446902 4/20/04 (Turner) !!!VERY URGENT!!! New Building/1st & 2nd Floor Repair broken return pipes on univent in room #113; leaking through floor, and damaging ceiling tile in room #213, causing it to fall. (Need pipes repaired ASAP) April 20, 2004
Turner Elementary School FM-200446974 4/22/04 Turner Boiler room Repair or replace bearing and shaft on the sewage ejector pump #2. April 23, 2004: Engineer called in to report that the problem is causing back ups in other areas with flooding. (VERY URGENT) April 22, 2004
Shaw JHS FM-200447034 4/23/04 (Shaw) !!!VERY URGENT!!! Basement/Cafeteria: Carousel has a total of three (3) motors; all are not working due too electrical problem. (Making a humming sound) April 23, 2004
Thomas Elementary School FM-200447143 4/26/04 Thomas Boiler Room Repiar or replace stand-by pumps and condenser pumps to run A/C unit. Asbestos Code A - Cleared for repairs on 05/17/04 by Cheryl James, Horne Engineering (LM/05-17-04) Safety Office. 202-576-8962. April 26, 2004
Gibbs Elementary School FM-200447171 4/26/04 Gibbs First and third floor custodian closets Doors are falling off need replacing or repairing. Safety hazard Asbestos Code A - Clear for repairs on 04/26/04. Horne Engineering - Ed Rodriguez (RG 04/27/04) April 26, 2004
Wilson J. O. ES FM-200447236 4/27/04 (Wilson) !!!URGENT!!! Asbestos Assessment Required. Furnish, and install window airconditioner units for summer school program: Old Side, 1st, 2nd , 3rd floor health suite, conference office, Teahers lounge, prep room, and room #303. (See custodian for other location) 2nd Floor, room #201 & 202. Asbestos Code A - Clear for repairs on 04/28/04. Horne Engineering - Tony Marcolin (RG 04/29/04) April 27, 2004
Meyer Elementary School FM-200447291 4/28/04 (Meyer) !!!VERY URGENT!!! Asbestos Assessment Required. Ground,1st, and 2nd Floor:l We are in need of cooling units, and/or fans in the following rooms: 203, 204, 205, 211, 213, 215, 216, 217, 218, 224, 225, #3, #2, and #102. Asbestos Code A - Clear for repairs on 04/29/04. Horne Engineering - Bipin Nanavaty (RG 04/30/04) April 28, 2004
Wilson High School FM-200447256 4/28/04 Wilson, W. Boiler Room Asbestos assessment required on pipe and tank Replace serval sections of deteriorated 2 1/2" black iron pipe to condensate tanks on 2nd level of Boiler Room. Asbsesos Code A cleared for repairs 12/03/04 DCPS Safety R. Edwards (R. Edwards 12/29/04 April 28, 2004
Eastern High School FM-200447334 4/29/04 Eastern Hallway by B-27 and armory by B-35 Repair wall due to vandalism in hallway by B-27 wall is unstable, students tear it up everytime they walk by. Submitted request for repair of ceiling by B-35 and armory. All location are safety hazard. Asbestos Code A - Clear for repairs on 04/30/04. Horne Engineering - Bipin Nanavaty (RG 05/04/04) April 29, 2004

Routine Repair Requests Opened in April 2004 (73)
School Description Open Date
Maury Elementary School FM-200446203 4/1/04 Maury Grounds Repave parking lot and playground area. April 1, 2004
Garnet-Patterson MS FM-200446211 4/1/04 Garnet- Petterson Third floor attic roof leak Assessment and Abatement design Ceiling leaking hole in ceiling. Assess spray on material in attic and design abatement so that hole can be fixed. Asbestos Code A - Clear for repairs on 04/05/04. Horne Engineering - Philp Connolly (RG 04/23/04) SEE LINKED DOCUMENTS April 1, 2004
Gage-Eckington ES FM-200446208 4/1/04 (Gage-Eckington) Asbestos Assessment Required. Cafeteria: Water leaking from roof causing ceiling tile too fall. Code A- clear for repairs as 4/1/04 by Horne Eng. April 1, 2004
Duke Ellington School FM-200446230 4/1/04 (Ellington) 3rd Floor/Band Room: Roof leak causing plaster to fall. Asbestos Code A - Clear for repairs on 04/02/04. Horne Engineering - Tony Marcolin (RG 04/06/04) April 1, 2004
Maury Elementary School FM-200446198 4/1/04 Maury Point up bricks around east and west building. April 1, 2004
Walker-Jones EC FM-200446192 4/1/04 Walker-Jones First floor auditorium Install projector screen, need to hang from the ceiling and electrical conections needs to be made. Asbestos Code A - Clear for repairs on 04/02/04. Horne Engineering - Sheryll James (RG 04/06/04) April 1, 2004
Gage-Eckington ES FM-200446345 4/5/04 Gage-Eckington First floor room 103 Ceiling tile fell in room 103 through the advice of Mr. Peters, field representive he advise not to touch the material until check for asbestos. We need your assistant as soon as possible. Asbestos Code A - Clear for repairs on 04/05/04. Horne Engineering - Bjarne Smith (RG 04/07/04) April 5, 2004
Ludlow-Taylor ES FM-200446334 4/5/04 Ludlow-Taylor Stairway 1 and 2 Replace 1 cap on banister on stairway 1 and 2. April 5, 2004
Ferebee-Hope Elementary School FM-200446399 4/6/04 Ferebee-Hope First floor B-building rec gameroom Roof leaking (water damage to floor tile). April 6, 2004
Walker-Jones EC FM-200446447 4/7/04 Walker Jones Break-In !!! Exterior Side Entrance 1) Replace broken plexiglass on the side entrance door near the parking lot near clinic. 2) Repair side bolts that are broken on front entrance doors and doors leading to clinic on second floor. April 7, 2004
Cardozo High School FM-200446432 4/7/04 Cardozo First floor health suite Replace wood door that is splitting around lock cylinder. Door can not be secured because of damage that has been done. Door size 79x35 5/16x1 3/4 inches. Asbestos Code A - Clear for repairs on 04/08/04. Horne Engineering - Tony Marcolin (RG 04/13/04) April 7, 2004
Cardozo High School FM-200446435 4/7/04 Cardozo Ground floor tunnel Replace deteriorated 2 1/2 inch galvanized domestic hot water pipes and tee. April 7, 2004
Cardozo High School FM-200446436 4/7/04 Cardozo Third floor room 313 Repair electrical wiring for flourescent light fixtures. Some of the lightd will not stay on. April 7, 2004
Barnard Elementary School FM-200446427 7 4/7/04 Barnard Boiler Room Repair or replace computer system to Boilers, computer is down, (signal shows EMS) April 7, 2004
Young Elementary School FM-200446450 4/7/04 Young Room #107, 2nd floor #189 and #180 1st floor Remove old pneumatic valves from thesearea's rooms #107, 2nd floor #189 and #180 1st floor Lunch room center unit. April 7, 2004
Gibbs Elementary School FM-200446442 4/7/04 Gibbs First floor cafeteria Ceiling leaking in cafeteria also missing ceiling tile. April 7, 2004
Patricia R Harris Ed Center FM-200446445 4/7/04 Harris, P.R. / Patterson, W.B. Ground floor exterior door stairwell 4 Replace or repair panic bar broke off. Asbestos Code A - Clear for repairs on 04/09/04. Horne Engineering - Sheryll James (RG 04/13/04) April 7, 2004
Patricia R Harris Ed Center FM-200446449 4/7/04 Harris, P.R. Door next to the elevator at the back of bldg. This door will not close on its own, you have to go on the outside and push the door close so that we can put on the locks. The slide bolt will not go into the lock so we can lock it. Asbestos Code A - Clear for repairs on 04/09/04. Horne Engineering - Sheryll James (RG 04/13/04) April 7, 2004
Seaton Elementary School FM-200446519 4/8/04 (Seaton) Asbestos Assessment Required. 1st Floor/Door Near Room #113: Door frame has pulled away from wall, causing door to over-lap. Asbestos Code A - Clear for repairs on 04/09/04. Horne Engineering - Bjarne Smith (RG 04/14/04) SEE LINKED DOCUMENTS April 8, 2004
Spingarn High School FM-200446494 4/8/04 Spingarn Roof Spingarn Senior High School Roof Repair Scope of Work The Scope of Work involves furnishing of materials, equipments, and labor to repair the ridge cap over the Gymnasium roof and reline the gutter on the Benning Road side of the building at Spingarn Senior High School, located on 2500 Benning Rd., N. E., Washington D.C. 20002. Demolition Remove all debris from inside of the existing gutter located on the Benning Road side of the building and prime all surfaces of the gutter to hallow to receiver the new cured neoprene lining. (Approximate 400 lin. Ft.) Remove approximately 50 linear feet of damaged metal ridge cop locater on the North Eastern side of the building adjacent to the gym roof. Installation Install 400 lin. Ft. of cured neoprene to re-lined existing gutters located on the Benning side of the building. . Replace existing 50 lin. Ft. of ridge cap with 24-gage stainless steel. (Fully solder at all). Contractor shall make repairs according to the Roofing Industrial Standard. Is mandatory that the contractors visit the site prior to submittal of cost proposal The Contractor shall be responsible to obtain all permits The roof is approximately 60 ft above grade April 8, 2004
Gibbs Elementary School FM-200446511 4/8/04 (Gibbs) !!!VANDALISM!!! Asbestos Assessment Required. 2nd Floor/Room #207: Replace shattered door glass. April 8, 2004
Gibbs Elementary School FM-200446514 4/8/04 (Gibbs) !!!VANDALISM!!! Asbestos Assessment Required. 3rd Floor/Room #306: Replace shattered door glass. April 8, 2004
Park View ES FM-200446522 4/8/04 Parkview Boiler Room Repair or replace hot water circulating pump #2. Pump is leaking very badly because of leaking seals. April 8, 2004
Woodson High School FM-200446487 4/8/04 Woodson Library Repair or replace heating and cooling univent in Library. Name Nelson Air; Model - SCASRTRXR2QV4-82 cONTROL - 219114; Part -1; Volt - 120; AMPS - 1.1; Freq -60 Unit is rusted out and falling apart. April 8, 2004
Marshall Educational Center FM-200446573 4/9/04 T. Marshall, Service Pool water, Back wash tank, pull streamer/. tub motors, check chemical levels, add water ad chemical. Record in log./Completed as above. April 9, 2004
Dunbar High School FM-200446561 4/9/04 Dunbar Through -out 1) Furnish 45 pieces of wire glass. Sizes as following: a) 24" long 9" wide - 15 pieces b) 13" long 9" wide - 15 pieces C) 36" long 6 7/8" wide - 15 pieces Staff will install glass. April 9, 2004
Ludlow-Taylor ES FM-200446576 4/9/04 (Ludlow-Taylor) Asbestos Assessment Required. Roof Area: Install eletrical outlet on roof near cooling tower. (Engineers request) Asbestos Code A - Clear for repairs on 04/13/04. Horne Engineering - Tony Marcolin (RG 04/15/04) April 9, 2004
Stanton Elementary School FM-200446615 4/12/04 Stanton Annex room A-12 and A-9 Need ballasts put in. Need 4way ballasts. Asbestos Code A - Clear for repairs on 04/13/04. Horne Engineering - Bjarne Smith (RG 04/14/04) April 12, 2004
Truesdell Elementary FM-200446689 4/13/04 3rd Floor Hallway: Replace valves on mop sink that will not hold. April 13, 2004
Macfarland Middle School FM-200446646 4/13/04 Maury Outdoors Install metal cage around generator. (fabricate) April 13, 2004
Gibbs Elementary School FM-200446648 4/13/04 Gibbs First floor cafeteria 1) Repair or Replace spot light for stage, it do not work. April 13, 2004
Watkins Elementary School FM-200446742 4/14/04 Watkins Volunteers will maintain the school gardens as needed, frpm 10:00 to 13:00. April 14, 2004
Davis Elementary School FM-200446718 4/14/04 Davis First floor boys bathroom by 117 Need plummer to install sink back on wall and replace damage faucet, sink keep falling off wall. Back of sink is damage . April 14, 2004
Ferebee-Hope Elementary School FM-200446719 4/14/04 Ferebee-Hope Boiler Room Replace pump in Boiler room, Boiler room is flooded. April 14, 2004
Watkins Elementary School FM-200446743 4/14/04 Watkins Volunteers will maintain the school gardens 4/17/04 thru Aug 31, 2004. April 14, 2004
Garfield ES FM-200446750 4/15/04 Garfield Boiler Room Replace one leaking tube in Breeching Area as mark. Length of tube = 77 1/2" X 1 1/2" Dia. April 15, 2004
Thomas Elementary School FM-200446747 4/15/04 Naval Thomas Rear of building play ground Relpace burnt-out LED automatic cooling tower fan controls. Asbestos Code A - Clear for repairs on 05/17/04. Horne Engineering - Sheryll James (RG 05/19/04) April 15, 2004
Cardozo High School FM-200446771 4/15/04 CARDOZO boiler room Furnish materials to repair domestic hot water heaters. 2 motors and 2 couplings are needed. S# 1695041 Bell and Gossett, Pump - 60, 1-1/2 A7AB, pump cap, 40 gpm, 50ft, 1 hp, 1800 rpm, B & G AC motor, 1 hp, 1700 rpm, 208-230/460-V., 60hz, 3-ph, 3.8-4.0/2.0 amps., fr 143 TZ, part # M98551. April 15, 2004
Ferebee-Hope Elementary School FM-200446751 4/15/04 Ferbee-Hope Mechanical Room D Building 2nd Fl. Survey and repair pneumatic system to the air handler units for D1 , D2 , and D3 , R/R control actuator and dampers. April 15, 2004
Patricia R Harris Ed Center FM-200446748 4/15/04 Harris, P.R. Boiler Room Survey, repair or replace condesate dryer to air compressor. Air compressor not working. Name: Arrow Pneumatics Inc. Model # A-25 Serial #2902 HP-1/3 Volt-115/1 L.R.A= 35.0 Charge= R-12 19 oz. April 15, 2004
King M L ES FM-200446791 4/16/04 King, M.L. First floor boys bathroom Need to have floor tile replace around a trap door. Asbestos Code A - Clear for repairs on 04/16/04. Horne Engineering - Roger Kager (RG 04/16/04) April 16, 2004
Bunker Hill Elementary School FM-200446786 4/16/04 Bunker Hill Boiler Room Repair or replace condensate tank pump control, not working properly. April 16, 2004
Patricia R Harris Ed Center FM-200452743 4/19/04 Harris, P.R. Cooling Tower - Main Roof Cooling tower be replace do to rusting and corrosion of interial. Also request that tower support frame be sandblasted and coated with a rust proof paint. April 19, 2004
Whittier Elementary School FM-200446837 4/19/04 Whittier Third floor room 302 Replace or repair ceiling in room 304 due to leaking roof, plaster falling. Health hazard to students and satff. Please expide. Asbestos Code A - Clear for repairs on 04/20/04. Horne Engineering - Bipin Nanavaty (RG 04/20/04) April 19, 2004
Shaed Elementary School FM-200446842 4/19/04 Shaed First floor kitchen Replace outlet to plug in milk box. April 19, 2004
Walker-Jones EC FM-200446832 4/19/04 Walker-Jones Overhang rear of building between school and clinic Asbestos assessment is necessary for pipe insulation. Repair leak on heating /cooling supply line. Leak can not be secured This is a duplicate of FM-200446725 (RG) April 19, 2004
Stanton Elementary School FM-200446851 4/20/04 Stanton Annex Room 813, Business office,and the computer Lab Survey to see if annex electrical system will support window A/C unit , and install electrical lines for the units. Install window A/C unit in room 813 (24000 BTUs) , Business office (24000 BTUs) , Computer Lab 15,000 BTUs) unit are on site. Asbestos Code A - Clear for repairs on 04/20/04. Horne Engineering - Sheryll James (RG 04/21/04) April 20, 2004
Wilkinson ES FM-200446880 4/20/04 Wilkinson Outside around building Need to replace (60) lighting fixtures they are not working (very dark in area). April 20, 2004
Eastern High School FM-200446877 4/20/04 Eastern Greenhouse Repair exit door leading to greenhouse - Door need securing, we need some kind of barrier to prevent vandals from climbing across wall to entering greenhouse. Asbestos Code A - Clear for repairs on 04/20/04. Horne Engineering - Bipin Nanavaty (RG 04/21/04) April 20, 2004
Eastern High School FM-200446874 4/20/04 Eastern Across from B-37 across from 153 Furnish and install broken face bowl in bathrooms in annex and custodial closet SIMC across from B-37. April 20, 2004
Wilkinson ES FM-200446882 4/20/04 Wilkinson First floor walls and side walk outside Need steam clean to remove vandalism marks and stains. April 20, 2004
West Elementary School FM-200447010 4/22/04 West Boiler Room Repair or replace condensor pump. Pump runs for 30 minutes then shut off. Engineer has to reset pump for it to start again. Pump is under contract. April 22, 2004
Walker-Jones EC FM-200447031 4/23/04 Walker-Jones Chill water return line pressure gauge broke off from well. Well needs to be reamed out. April 23, 2004
Shaw JHS FM-200447083 4/23/04 Shaw First floor main office Replace 2 outlets - sparks when you use it. April 23, 2004
Adams Elementary FM-200447099 4/25/04 REPAIR/REPLACE HEATING/COOLING COIL April 25, 2004
Woodson High School FM-200447133 4/26/04 Woodson Room #209 Reconnect condensate return to unit in room #209. April 26, 2004
Hine JHS FM-200447146 4/26/04 Hine Boiler Room repair or replace condensor pump for cooling tower, inoperable. April 26, 2004
Hart Middle School FM-200447163 4/26/04 Hart Room - 134 1) Poor lighting in this classroom-contractors never completed work. April 26, 2004
Hart Middle School FM-200447127 4/26/04 Hart Room 134 need someone to come and put a window in. There is testing today. EMERGENCY April 26, 2004
Eastern High School FM-200447122 4/26/04 Eastern 1) Repair leaking flush valves in all stalls. April 26, 2004
Browne Junior High School FM-200447145 4/26/04 Browne Boiler Room Check multi stack for operation. There is no power coming to them engineer was unable to get unit started. April 26, 2004
Smothers ES FM-200447173 4/26/04 Smothers Exterior Twenty five (25')mfeet long by two (2')feet concrete retaining wall is deteriorating on west side of the building at Clay Street and 44th St. April 26, 2004
Johnson JHS FM-200447266 4/27/04 (Johnson) 1) Water leaking inside walk-in refrigerator. April 27, 2004
Kenilworth ES FM-200447263 4/27/04 (Kenilworth) Asbestos Assessment Required. This room has been converted to a Computer Lab, therfore we need to add more electrical outlets to the room. Asbestos Code A - Clear for repairs on 02/23/06. Tidewater Shamika Parker (RG 02/24/06) SEE ASSESSMENTS April 27, 2004
Cardozo High School FM-200447280 4/28/04 Cardozo Ground floor tunnel Replace 3/4 inch galvanized pipe and valve- no water supply to health unit bathrooms sinks and water cooler, Domestic cold water supply pipe. Emergency needed for health services. April 28, 2004
Cardozo High School FM-200447278 4/28/04 Cardozo First floor room 123 Replace deteriorating wood door and frame. Asbestos Code A - Clear for repairs on 04/29/04. Horne Engineering - Bipin Nanavaty (RG 04/30/04) April 28, 2004
Shaw JHS FM-200447296 4/28/04 Shaw Exterior Grounds 1) Weeding , mulching and trash pick-up. April 28, 2004
Shepherd ES FM-200447276 4/28/04 Shepherd All Floors 1) Breaches thru out the buildng, need to be repaired. Asbestos Code A - Clear for repairs on 04/29/04. Horne Engineering - Bpin Nanavaty (RG 04/30/04) April 28, 2004
Ferebee-Hope Elementary School FM-200447336 4/29/04 Ferebee-Hope First floor B-Building hall between the gym and cafeteria Hole in widow rain comes in building. April 29, 2004
Hine JHS FM-200447345 4/29/04 Hine Upper level Boiler Room Repair or replace chill water regulator on #2 Chiller. No data. April 29, 2004
Cardozo High School FM-200447319 4/29/04 Cardozo Second floor room 214 Replace or repair door frame, metal frame door can not close securely. Asbestos Code A - Clear for repairs on 04/29/04. Horne Engineering - Edward Rodriguez (RG 04/30/04) April 29, 2004
Garrison ES FM-200447378 78 4/30/04 (Garrison) HEALTH CODE VIOLATION: Asbestos Assessment Required. Kitchen: Repair or replace floor in walk-in freezer, rusted and in dis-repair. Asbestos Code A - Clear for repairs on 05/03/04. Horne Engineering - Sheryll James (RG 05/04/04) April 30, 2004
Benning Elementary School FM-200447371 4/30/04 Benning Clogged back drain on the playground near field. April 30, 2004