Urgent Repair Requests Opened in April 2005 (39) | School | Description | Open Date |
| Eastern High School | FM-200503495 4/1/05 (Eastern) Asbestos Assessment Required First floor/Room 154. Rebuild window ledges with concrete in classrooms, because air, bugs etc. are getting into the classroom. Asbestos Code A - Cleared for repairs on 04/12/05. DCPS Safety - Leroy Minton Jr. (RG 04/12/05) | April 1, 2005 |
| Murch Elementary School | FM-200503540 4/4/05 ( MURCH ) First, Second Floor, and Auditorium 1) Repair the wall tile. HA 002 Tile grout off white with 4" X 4" cermaic walltile No Asbestos HA 019 Plaster white decorative plaster border No Asbestos HA 001 Plaster/skimcoat No Asbestos HA 791 Brown Coat with HA 001 No Asbestos Code A-clear for repair by DCPS Safety Charles Buchanan on 2/10/06 | April 4, 2005 |
| Patricia R Harris Ed Center | FM-200503546 4/4/05 (Harris. P.R.) "Emergency" First floor. Need electrical outlets or power pole with outlets. Installed by main front entrance for security cameras ,computer, and metal detector. Note: Please install as soon as possible for the security of students, teachers and in-house staff. Asbestos Code A - Clear for repairs on 04/21/05. DCPS Safety - Leroy Minton Jr. (RG 04/21/05) | April 4, 2005 |
| Johnson JHS | FM-200503565 4/5/05 (Johnson) Second, Third and Fourth floors. Replace broken windows in rooms 226, 315 and 413. Code A- clear for repairs as of 4/15/05 Sylvia Grimes safety | April 5, 2005 |
| Nalle Elementary School | FM-200503638 4/6/05 (Nalle) !!!URGENT!!! Asbestos Assessment Required. Falling plaster, making an inconvenience to those who work in the area. Affecting the following rooms: #104,106, 107, 108. 109, 112, and 113, #202, 203, 204, 205, 206, 207, 208, 209, 212, and 214, and library. Asbestos Code A - Clear for repairs on 01/10/06. DCPS SAFETY - Leroy Minton Jr. - (RG 01/10/06) | April 6, 2005 |
| Shaw JHS | FM-200503640 4/6/05 (Shaw) !!!URGENT!!! 2nd Floor: Circuit breakers should be replaced in the following rooms: 7th grade house, 8th grade house, and 9th grade house. | April 6, 2005 |
| Kramer Middle School | FM-200503759 4/8/05 ( KRAMER ) URGENT!!!! Second Request First Floor - Room 105 Parent Center 1) Water is backing out of sink drain. | April 8, 2005 |
| Duke Ellington School | FM-200503799 4/11/05 Ellington Photo Lab Asbestos assessment required for surrounding floor tile and pipe insulation. Excavation of floor may be necessary. Investigate and repair steam leak coming into Photo Lab via pipe chase. Code A-clear for repair by DCPS Charles Buchanan on 4/25/05 IF excavation is needed call Safety Office 202 576 8962 | April 11, 2005 |
| Davis Elementary School | FM-200503807 4/11/05 ( DAVIS ) Second Floor - New wing bricks courtyard 1) Safety hazard for children outside bricks need to be pointed when it rain water comes through the wall and go down the steps. | April 11, 2005 |
| Plummer Elementary School | FM-200503999 4/13/05 ( PLUMMER ) Third Floor - Hallway 1) Paint stained ceiling tile Asbestos Code A - Clear for repairs on 04/14/05. DCPS Safety - Richard Gibson (RG) | April 13, 2005 |
| Truesdell Elementary | FM-200503966 4/13/05 ( TRUESDELL ) Throughout Building 1) Replace center bar on exterior doors. Asbestos Code A - Clear for repairs on 04/13/05. DCPS Safety - Richard Gibson (RG) | April 13, 2005 |
| Brookland Elementary | FM-200504041 4/14/05 (Brookland) !!!VERY URGENT!!! Asbestos Assessment Required. Cafeteria Area. Paint Black steps in cafeteria due mayor's visit . Asbestos Code A - Clear for repairs on 04/19/05. DCPS Safety - Leory Minton Jr.(RG 04/19/05) Note: This needs to be done before May 2, 2005. | April 14, 2005 |
| Langdon Elementary School | FM-200504063 4/14/05 (Langdon) "Urgent" Exterior. Unclog roof drain, it is causing ceiling damage to health suite. | April 14, 2005 |
| Plummer Elementary School | FM-200504131 4/15/05 ( PLUMMER ) Third Floor - South East side by steps 1) Paint or replace 20 stained 12x15 ceiling tile. Asbestos Code A - Clear for repairs on 04/18/05. DCPS Safety - Richard Gibson (RG) | April 15, 2005 |
| Plummer Elementary School | FM-200504180 4/18/05 ( PLUMMER ) First Floor - Room 37 1) Replace hinges on door, it's hard to close. Asbestos Code A - Clear for repairs on 04/19/05. DCPS Safety - Leroy Minton Jr. (RG) | April 18, 2005 |
| Terrell Mc ES | FM-200504734 4/18/05 (Terrell, M.C.) On large playground at the fence line remove stomps with sharp stakes that are growing in the fence. These need to be removed by the roots. This is a safety hazard for students. | April 18, 2005 |
| Terrell Mc ES | FM-200504732 4/18/05 (Terrell, M.C.) Urgent! Large and small Stomps & Stalks sticking out of the ground need to be removed. This is a safety hazard for children since all children play on the playground. Some child is destined to get hurt because of these conditions. | April 18, 2005 |
| Young Elementary School | FM-200504259 4/19/05 ( YOUNG ) Through out the building 1) Install blast, there are approximately fifty out in each center, three in the main office area, and three in the adult class room area. DUPLICATE REQUEST - FM-200219192 Asbestos Code A - Clear for repairs on 04/19/05. DCPS Safety - Leory Minton Jr.(RG 04/19/05) | April 19, 2005 |
| Wilkinson ES | FM-200504264 4/19/05 ( WINKINSON ) First Floor - Kidnergarden Area 1) Repair or Replace water cooler. Asbestos Code A - Clear for repairs on 04/26/05. DCPS Safety - Richard Gibson (RG) | April 19, 2005 |
| Cardozo High School | FM-200504253 4/19/05 (Cardozo) remove 2 old air conditioners that are no longer cooling and install 2 new air conditioners that are on site-electrical service in place. Asbestos Code A - Clear for repairs on 04/19/05. DCPS Safety - Richard Gibson (RG) | April 19, 2005 |
| Ketcham Elementary School | FM-200504363 4/20/05 ( KETCHAM ) Fist and Second Floor corridors, Rooms -A and B-100, 102, 103, 104, 105, 106, 202, 203, 204, 205, Basement near Cafeteria, Stairwells, and the Old counselor's Office on the second floor. 1) Repaint all areas. Asbestos Code A - Clear for repairs on 04/21/05. ( NO sanding or scraping of Wood Windows ((TAN ) ) DCPS Safety - Richard Gibson (RG) | April 20, 2005 |
| Benjamin Banneker Academic HS | FM-200504323 4/20/05 Banneker HEALTH CODE VIOLATION: 1) Cracked ceiling and walls/ tiles need to be repaired. Asbestos Code A - Clear for repairs on 05/25/05. DCPS Safety - Leroy Minton Jr. (RG 05/25/05) | April 20, 2005 |
| Birney Elementary School | FM-200504347 4/20/05 ( BIRNEY ) URGENT!!!!! Outside Grounds 1) Replace loose bricks outside near exit 4, back of assembly hall. ( Loose bricks are at the top of the building)about 25 to 30 feet high. | April 20, 2005 |
| Shaw JHS | FM-200504349 4/20/05 ( SHAW ) "Urgent" First Floor - Auditorium 1) Abatement needed for wall, (want mural to be hung for dedication). Note: Installation is 04/21/05. Asbestos Code A - Clear for repairs on 04/21/05. DCPS Safety - Ricardo Eley (RG 04/21/05) | April 20, 2005 |
| Shaw JHS | FM-200504353 4/20/05 ( SHAW ) URGENT!!!! First Floor - Auditorium 1)Service the light system, some lights do not work. | April 20, 2005 |
| Spingarn High School | FM-200504310 4/20/05 ( SPINGARN ) Third Floor - Stairway #4 1) Repair or Replace door, it slams when shut. Asbestos Code A - Clear for repairs on 04/20/05. DCPS Safety - Leory Minton Jr.(RG 04/20/05) | April 20, 2005 |
| John Burroughs ES | FM-200504500 4/21/05 ( BURROUGHS ) Asbestos Assessment Required Lower Level - Maintenance Storage 1) Install outlet. (4 tube triadelectronic balance B432I120RH-A imput-120 volts 60 universal) Lead & Asbestos Code A - Clear for repairs on 04/21/05. DCPS Safety - Richard Gibson(RG) | April 21, 2005 |
| West Elementary School | FM-200504492 4/21/05 ( WEST ) Roof 1) Repair Roof, it's leaking on the stairway by the gym. Asbestos Code A - Clear for repairs on 05/25/05. DCPS Safety - Leroy Minton Jr. (RG 05/25/05) | April 21, 2005 |
| Plummer Elementary School | FM-200504427 4/21/05 ( PLUMMER ) Third Floor - Room 217 1) Paint ceiling tile, ( six 12x12 ceiling tile stained ). Lead & Asbestos Code A - Clear for repairs on 04/21/05. DCPS Safety - Richard Gibson(RG) | April 21, 2005 |
| Plummer Elementary School | FM-200504421 4/21/05 ( PLUMMER ) Third Floor - Boys Restroom 1) Repair hole in the wall. Asbestos Code A - Clear for repairs on 04/21/05. DCPS Safety - Richard Gibson (RG) | April 21, 2005 |
| Plummer Elementary School | FM-200504442 4/21/05 ( PLUMMER ) Second Floor - Teachers Lounge 1) Replaster the ceiling. Asbestos Code A - Clear for repairs on 04/21/05. DCPS Safety - Richard Gibson(RG) | April 21, 2005 |
| Truesdell Elementary | FM-200504614 4/22/05 ( TRUESDELL ) Fist Floor - Annex Boys Restroom 1) Water is leaking from the wall in between urinal when ever flushed. Asbestos Code A - Clear for repairs on 05/25/05. DCPS Safety - Leroy Minton Jr. (RG 05/25/05) | April 22, 2005 |
| Turner Elementary School | FM-200504673 4/25/05 (Turner) "Urgent" Ground, Kitchen/Cafeteria area. Repair or Replace automatic switch to sump pump, currently it is not working causing water to back up. | April 25, 2005 |
| Brookland Elementary | FM-200504668 4/25/05 Brookland 1st floor Mrs. Pender , Before and after care center 1) Replace 3' of 2" , 3/4" , 1-1/2" Thermo insulation on the supply line of unit in the ceiling. 2) Replace 1' of 1" supply insulation, elbow, union , pneumatic valve. Asbestos Code A - Clear for repairs on 04/27/05 by Leroy Minton Jr. to install missing ceiling tiles. DCPS Safety - Richard Gibson (RG) Please Note: Most of the white, 2' x 4' ceiling tiles throughout this facility are asbestos containing, However, the white, 2' x 4' ceiling tiles that need to be replaced are non-asbestos containing as they have been replaced not so long ago, apparently due to same same water damage/leaks in the past. Only replace the missing ceiling tiles. The ceiling tiles in the Before & After Care Center have all been previously replaced and are non-sabestos containing. Any questions see Mr. Bibs, the building custodian. (Leroy Minton Jr.) | April 25, 2005 |
| Kimball Elementary School | FM-200504696 4/25/05 ( KIMBALL ) URGENT!!!!! Bathroom and kitchen 1) Need new lights. | April 25, 2005 |
| Brookland Elementary | FM-200504630 4/25/05 Brookland Ground Floor Before and after care center Check duct work and pipe insulation mold spores. Asbestos Code A - Clear for repairs on 04/27/05 by Leroy Minton Jr. to install missing ceiling tiles. DCPS Safety - Richard Gibson (RG) | April 25, 2005 |
| Marshall Educational Center | FM-200504783 4/27/05 Marshall , T Roof top Replace the sheet metal cover on the outer frame on the # 1 air handler unit. ( for Stage # 2) Asbestos Code A - Clear for repairs on 05/02/05. DCPS Safety - Richard Gibson (RG) | April 27, 2005 |
| Shepherd ES | FM-200504858 4/28/05 ( SHEPHERD ) URGENT!!!!! First Floor - Room 217 1) Install a dedicated curcit line for window A/C unit in the computer lab | April 28, 2005 |
| Kramer Middle School | FM-200504860 4/28/05 ( KRAMER ) URGENT!!! Outside - Front of Building (under office window) 1) Repair the hole in the ground, it's sinking in. | April 28, 2005 |
Routine Repair Requests Opened in April 2005 (126) | School | Description | Open Date |
| Eastern High School | FM-200503502 4/1/05 (Eastern) Room 154. Install appropriate electrical service to accommodate an air conditioner. Note: Room 154 will be housing a year round program (Friendship House- Program). | April 1, 2005 |
| Deal Junior High School | FM-200503481 4/1/05 (Deal) Asbestos Assessment Required. First floor/Nurse's Suite. Repaint nurse's suite, the paint is peeliling and chipping also the pipes are rusting. AMP HA 001 Plaster white Plaster construction No Asbestos HA 117 Brown Coat ..with HA 001 No Asbestos Code A-clear for repair by DCPS Charles Buchanan on 4/12/05 | April 1, 2005 |
| Eastern High School | FM-200503486 4/1/05 Eastern Roof Top 1) Install electric service, meter and D.S. run conduit to existing equipment. Poc - Sprint Inc - Josh Levy - 410-210-1114 | April 1, 2005 |
| Eastern High School | FM-200503498 4/1/05 (Eastern) Marble Stairwell/Overhead Auditorium. Furnish and install fluroscent lights overhead stairwell by main office. Furnish and install lights in auditorium. Note: School staff are not equipped with appropriate tools to change bulbs, the locations are to high. | April 1, 2005 |
| Duke Ellington School | FM-200503491 4/1/05 Ellington Roof Top 1) Run wiring to existing equipment cabinet on roof and electrical equipment in Basement. Poc - Sprint Inc - Josh Levy - 410-210-1114 | April 1, 2005 |
| Jessie LaSalle Elementary | FM-200503535 4/4/05 La Salle Exterior Grounds Repair holes arround the large Drain & Near Dumpster and Cafeteria Ect... | April 4, 2005 |
| Terrell Mc ES | FM-200503509 4/4/05 Terrell, M.C. Boiler room Replace ruptured tubes in # 2 boiler , fire box is filled with water, engineer will drain firebox. | April 4, 2005 |
| Wilkinson ES | FM-200503532 4/4/05 Wilkinson Library Woman's Restroom Replace Flush Valves | April 4, 2005 |
| Brent Elementary School | FM-200503506 4/4/05 Brent Tunnel by custodian,s office Asbestos assesment required. Repair ruptured hot water heating line in the tunnel. HA 062 Tar paper on pipe insulation Black tar Paper on Fiberglass on pipe insulation (No Asbestos) HA 063 Cementitious Fitting off White 12" O.D. 12" Fitting with Fitings Pipe Insulation (No Asbestos) HA 064 Sealant (General) White end Cap Sealant on Fiberglass Pipe insulation (No Asbestos) HA 014 Ceiling tile white 2 X 4 textured with large and small random pinholes Yes Asbestos Code A-clear for repair by DCPS Charles Buchanan on 4/12/05 | April 4, 2005 |
| Marshall Educational Center | FM-200503587 4/5/05 ( MARSHAL ) Entrance to Roof Repair or Replace door leading to roof by fan room. Code A-clear for repair by DCPS charles Buchanan on 4/14/05 | April 5, 2005 |
| Johnson JHS | FM-200503566 4/5/05 (Johnson) Asbestos Assessment Required . Auditorium. Remove water damaged carpet and 9 x 9 tiles under carpet. There is no 9 X 9 asbestos floor tile under carpet in Auditoruim. Code A-clear for repair by DCPS Charles Buchanan on 5/ 17 / 05 | April 5, 2005 |
| Duke Ellington School | FM-200503548 4/5/05 Ellington Boiler Room Boiler #4 leaking from section | April 5, 2005 |
| Davis Elementary School | FM-200503616 4/6/05 (Davis) Asbestos Assessment Required. Basement/Maintenance Sup. Office: Remove old light fixtures, and replace with fluorescent tube fixture. Old light fixtures has shorted out. HA 001 Plaster white No Asbestos HA 701 Brown Coat with HA 001 Code A-clear for repair by DCPS Charles Buchanan on 4/15/05 | April 6, 2005 |
| Benning Elementary School | FM-200503618 4/6/05 (Benning) Outside, Playground Area by Football Field. Unstop (2) storm drains near football field. Note: Water is currently standing. | April 6, 2005 |
| Bruce-Monroe Elementary School | FM-200503599 4/6/05 Bruce Monroe - Open Space 1. Replace belts and check for opening the outside air dampers for fresh air. | April 6, 2005 |
| Smothers ES | FM-200503646 4/6/05 (Smothers) 2nd Floor Hallways: Broken water fountain near room #201 | April 6, 2005 |
| Davis Elementary School | FM-200503630 4/6/05 ( DAVIS ) Outside - Roof on small playground 1) Remove flood light from the side of the building and install it on the roof. | April 6, 2005 |
| Cook J.F. Elementary School | FM-200503625 4/6/05 (Cook, J.F.) Asbestos Assessment Required. Third floor/ Auditorium Balcony. Repair leaking roof drain. HA 015 Plaster Ceiling No Asbestos HA 016 Plaster Walls No Asbestos HA 716 Brown Coat with HA 015 & 016 Code A-clear for repair by DCPS Charles Buchanan on 4/15/05 | April 6, 2005 |
| Tubman Elementary School | FM-200503596 4/6/05 Tubman Boiler room Asbestos assessment required on the ceiling Repair ruptured domestic line lecking thruogh the ceiling over the # 2 boiler Repair was complete by DCPS repairmen. | April 6, 2005 |
| Roosevelt High School | FM-200503669 4/7/05 Roosevelt Tunnel Repair or replace several corroded pipes approx. 40 ft. replaced in tunnel | April 7, 2005 |
| Browne Junior High School | FM-200503715 4/7/05 (Browne) New Wing/1st Floor/Room #137: Need a door handle. Code A-clear for repair by DCPS charles Buchanan on 4/14/05 | April 7, 2005 |
| Truesdell Elementary | FM-200503680 4/7/05 Truesdell Boiler Room Repair or replace domestic hot water heater, no hot water in Building. | April 7, 2005 |
| Thomas Elementary School | FM-200503659 4/7/05 Thomas,N. Boiler room Unclog sump well discharge line, sump water discharge water is re-circulating back into well thruogh a vent line. | April 7, 2005 |
| Thomas Elementary School | FM-200503658 4/7/05 Thomas, N Rooftop over cafeteria Replace dome exhaust for the cafeteria store room ( unit # 1) size 19 1/4" X 19 1/4" base dimensions. | April 7, 2005 |
| Thomas Elementary School | FM-200503657 4/7/05 Thomas, N Rooftop over cafeteria Replace or replace torn vibration elimanator on #3 exhaust fan duct. | April 7, 2005 |
| Woodson High School | FM-200503702 4/7/05 (Woodson, H.D.) Throughout site/Univents. Survey and replace insulation on AC lines. Code A-clear for repair by DCPS charles Buchanan on 4/14/05 | April 7, 2005 |
| Woodson High School | FM-200503700 4/7/05 (Woodson, H.D.) Various Classrooms. Repair or Replace univens. | April 7, 2005 |
| Woodson High School | FM-200503693 4/7/05 Woodson Pump Room Repair or replace pump. Pump room is flooded. | April 7, 2005 |
| Roosevelt High School | FM-200503678 4/7/05 Roosevelt B15 Repair or replace converter in B15 changed | April 7, 2005 |
| Roosevelt High School | FM-200503676 4/7/05 Roosevelt Repair or replace pump to DA tanks installed | April 7, 2005 |
| Roosevelt High School | FM-200503675 4/7/05 Roosevelt Repair or replace several univent motors replaced | April 7, 2005 |
| Roosevelt High School | FM-200503666 4/7/05 Roosevelt B55 Repair or replace pneumatic valves on B55 repaired adjusted | April 7, 2005 |
| Roosevelt High School | FM-200503664 4/7/05 Roosevelt B15 Repair or replace hot water circulating pump in B15 (replaced) | April 7, 2005 |
| Kimball Elementary School | FM-200503692 4/7/05 Kimball Boiler Room Repair or replace sump pump. Boiler room is flooded. | April 7, 2005 |
| Kimball Elementary School | FM-200503698 4/7/05 Kimball Hallway by Library Replace valve in ceiling of hallway near Library. Valve is leaking and corrisoned | April 7, 2005 |
| Adams Elementary | FM-200503735 4/8/05 ( ADAMS ) EMERGENCY!!!! Third Floor - Boys Restroom 1) Repair ceiling, it's about to fall. | April 8, 2005 |
| Ballou Senior High School | FM-200503749 4/8/05 Ballou Boiler Room Replace (1) one fire tube on Boiler #2. Information: Pacific Steel hot water: Model #122040 | April 8, 2005 |
| Gibbs Elementary School | FM-200503725 4/8/05 Gibbs Boiler room Repair domestic hot water heater, burner got wet from flood 4/7/05 | April 8, 2005 |
| Ferebee-Hope Elementary School | FM-200503785 4/8/05 Outside - Entrance to filter room 1) Furnish the industrial mechanic department with a sewer vacuum pump to clean air way. | April 8, 2005 |
| Tubman Elementary School | FM-200503740 4/8/05 Tubman Room 117 Repair or replace 2" leaking valve on the supply side of the heating unit, cannot isolate unit, | April 8, 2005 |
| Ferebee-Hope Elementary School | FM-200503782 4/8/05 ( FEREBEE-HOPE ) Ground Floor - Womens Restroom (child and family services) 1) Replace broken adult toilet, cracked toilet cause flooding. Code A-clear for repair by DCPS Charles Buchanan on 4/12/05 | April 8, 2005 |
| Reed LC | FM-200503781 4/8/05 ( MARIE REED ) First Floor - Cafeteria and Conference Room 1) Clean the exterior side of twenty large windows. 2) Remove pigeon dropping from the window ledge. ( These windows do not open, a lift will be needed ) | April 8, 2005 |
| Thomas Elementary School | FM-200503773 4/8/05 Thomas Cafeteria Repair Water entering building through Univent | April 8, 2005 |
| Takoma Educational Center | FM-200503727 4/8/05 Tokoma Mech. Room AHU #13 Type air handler unit trane 13 Repair or replace rupture heating and cooling coil in new unit. | April 8, 2005 |
| Browne Junior High School | FM-200503818 4/11/05 ( BROWNE ) Gym - Roof 1) In the new gym is a roof leak, in the gym area in the ceiling. Code A-clear for repair by DCPS Charles Buchanan on 1/13/06 | April 11, 2005 |
| Truesdell Elementary | FM-200503808 4/11/05 ( TRUESDELL ) Throughout the building 1) Have fifty or more lights out, most of the ballasts ate electronic start 120 volts, there are a few ballasts that are rapid start 120 volts, and advanced start 120 volts, need fifty 2- lite electronic ballasts. 2) Unsure of proper description send an electrician | April 11, 2005 |
| Hart Middle School | FM-200503893 4/12/05 (Hart) Cafeteria: Install wall hung cooler, main hall, also, install two (2) free standing coolers in cafeteria. | April 12, 2005 |
| Anacostia Senior High School | FM-200503857 4/12/05 Anacostia 1) Replace filters on water coolers throught-out Building. | April 12, 2005 |
| Ferebee-Hope Elementary School | FM-200503858 4/12/05 Ferebee-Hope Community Center 1) Replace water fountain. | April 12, 2005 |
| Hart Middle School | FM-200503864 4/12/05 Hart Basement Hallway near the Wood Shop in the Tunnel 1) The grease trap pipe was repaired near lockers, now the smell has come back. Need to survey again to see if the pipe has busted again in another location. | April 12, 2005 |
| Backus Middle School | FM-200503886 4/12/05 Backus Room #204 Repair or replace rupture coil on heating unit. Can not be isolated. | April 12, 2005 |
| Ronald H. Brown MS | FM-200503980 4/13/05 ( BROWN ) (Asbestos Assessment Required) Third Floor - Corridor 1) Repair light fixtures, furnish and install (11) lamp ballasts. | April 13, 2005 |
| Browne Junior High School | FM-200503987 4/13/05 ( BROWNE ) ( Special Ed ) (Asbestos Assessment Required) Third Floor - Rooms 302, 303, 304, 305, 308, 310, and 311 1) Repair door frame, door hits frame when being closed. Code A-clear for repair by DSCPS Charles Buchanan on 5/10/05 | April 13, 2005 |
| Green Elementary School | FM-200503948 4/13/05 (Green) Outside/West Building Exit. Repair or Replace light over exit door at west end of building landing to playground. Cover and bulb were broken by vandals. | April 13, 2005 |
| Shaed Elementary School | FM-200503935 4/13/05 Shaed Boiler Room Repair or replace sump pump in Boiler Room. Water in elevator. | April 13, 2005 |
| Anacostia Senior High School | FM-200504257 4/14/05 (Anacostia) Replace (8) twenty amp breakers in the gymanasium and new building | April 14, 2005 |
| Garfield ES | FM-200504081 4/14/05 Garfield Library Hallway Repair Leaking Pipe | April 14, 2005 |
| Webb Elementary School | FM-200504039 4/14/05 (Webb) Asbestos Assessment Required . First floor , Head Start Office. Need Installation of applicable electrical outlets and installation of (2) A/C window units into windows. Note: The (2) A/C are already on the premises. AMP 312 (Room 149) HA 742 Window cauk gray Yes for Asbestos Code B-clear for repair by DSCPS Charles Buchanan on 5/9/05 | April 14, 2005 |
| Eaton Elementary School | FM-200504022 4/14/05 Eaton Boiler Room Repair or replace starter switch on #2 chiller compressor will not start. Type, Trane A/C unit. Information on page 2 for chiller compressor. | April 14, 2005 |
| Ferebee-Hope Elementary School | FM-200504067 4/14/05 Ferebee-Hope Boiler Room Unstop Boiler Room floor drain. | April 14, 2005 |
| Ballou Senior High School | FM-200504004 4/14/05 Ballou Cafetera Replace 3/4" and 1/4" hot water feedwater supply line on univent # 2 .(copper+ black pipe) Heating. | April 14, 2005 |
| Garfield ES | FM-200504078 4/14/05 Garfield Roof Area Rm 205 Repair Roof | April 14, 2005 |
| Hendley Elementary School | FM-200504114 4/15/05 ( HENDLEY ) EMERGENCY!!!! Outside 1) Drain on six street side of school is stopped up, the water is spreading on the grass and has a bad odor. | April 15, 2005 |
| Eastern High School | FM-200504121 4/15/05 ( EASTERN ) Basement - Rooms B78, B70, and B42 1) Repair breakers for classrooms, five breakers in all rooms are shorted out. | April 15, 2005 |
| Gage-Eckington ES | FM-200504111 4/15/05 ( GAGE-ECKINGTON ) First Floor - Primary/Intermediate side 1) Repair six large high intensity discharge lamps 40 watts, making a loud buzzing sound. 2) Repair light switch, (on intermediate side) it's broken, six lights will not come on. | April 15, 2005 |
| Anacostia Senior High School | FM-200504195 4/18/05 Anacostia Boiler Room Installation of domestic gas hot water heater. Present condition allow for water to be heated only by Boiler Operation. | April 18, 2005 |
| Peabody Elementary School | FM-200504137 7 4/18/05 Peabody Outside lights Check and repair outside lights in the back ,on the side , and in the front of the building. | April 18, 2005 |
| Eastern High School | FM-200504177 4/18/05 Eastern - Front Entrance Rewire Front Entrance Lights to a New Switch. | April 18, 2005 |
| Bruce-Monroe Elementary School | FM-200504170 4/18/05 Bruce-Monroe Boiler Room Repair or replace 3/4" nipple on strainer section of Multi-stack. Leaking badly (Black pipe). | April 18, 2005 |
| Kenilworth ES | FM-200504207 4/18/05 (Kenilworth) Asbestos Assessment Required. First floor, Room 147. Remove floor tile and replace with carpet. HA 019 Floor tile light gray 9 X 9 with white & black Assumed tobe Asbestos HA 020 Floor Mastic With .... HA 019 Assumed tobe Asbestos Code B Asbestos Code A - Clear for repairs on 02/13/06. Tidewater - Kenny Long (RG 02/15/06) SEE ASSESSMENTS | April 18, 2005 |
| Plummer Elementary School | FM-200504269 4/19/05 ( PLUMMER ) Third Floor - Room 202 1) Repair or Replace broken A.C. unit. | April 19, 2005 |
| Beers Elementary School | FM-200504226 4/19/05 Beers Boiler room Repair or replace DHW circulating pump in the boiler room. | April 19, 2005 |
| Browne Junior High School | FM-200504237 4/19/05 Browne Basement New Gym Repair ceiling, Tar and Gravel leaking onto floor Area Code A-clear for repair by DCPS Charles Buchanan on 5/2/05 | April 19, 2005 |
| Kimball Elementary School | FM-200504258 4/19/05 ( KIMBALL ) Outside 1) Furnish flag pole rope. | April 19, 2005 |
| Ferebee-Hope Elementary School | FM-200504331 4/20/05 ( FEREBEE-HOPE ) First Floor - Green Hall 1) Repair roof, it's leaking. | April 20, 2005 |
| Ferebee-Hope Elementary School | FM-200504273 4/20/05 Ferebee-Hope Roof, Cooling tower Reconnect 8" schedule 80 PVC condenser line on the cooling tower, line has seperated from from the connection. | April 20, 2005 |
| Murch Elementary School | FM-200504361 4/20/05 ( MURCH ) White Traylor 1) Replace flourescent lights. | April 20, 2005 |
| Ludlow-Taylor ES | FM-200504277 4/20/05 Ludlow-Taylor Roof top by the cooling tower Install electrical ground fault receptical by the cooling tower . | April 20, 2005 |
| Backus Middle School | FM-200504333 4/20/05 ( BACKUS ) Second Floor - Rooms 209, 206C, 204, and 202 Science Room 1) Need to have A/C serviced. | April 20, 2005 |
| Ketcham Elementary School | FM-200504364 4/20/05 ( KETCHAM ) Outside - The Large Playground 1) Repair or Replace the asphalt surface. | April 20, 2005 |
| Marshall Educational Center | FM-200504312 4/20/05 ( THURGOOD MARSHALL ) Through out the building 1) Replace lights, (15 case-U-Tube, 120-Flood lights, 10-ballast 120 Code B-clear for repair by DSCPS Charles Buchanan on 5/9/05 | April 20, 2005 |
| Brookland Elementary | FM-200504301 4/20/05 BROOKLAND roof Repair / replace inoperable roof exhaust fan unit motors | April 20, 2005 |
| John Burroughs ES | FM-200504478 4/21/05 ( BURROUGHS ) Lower Level - Maintenance Office 1) Replace broken window. | April 21, 2005 |
| Plummer Elementary School | FM-200504435 4/21/05 ( PLUMMER ) Third Floor - Girls Restroom 1) Replace/Repair broken faucet. | April 21, 2005 |
| Shaed Elementary School | FM-200504477 4/21/05 SHEAD roof cooling tower Replace 2" nipple on drain line that is cross threaded. | April 21, 2005 |
| Plummer Elementary School | FM-200504428 4/21/05 ( PLUMMER ) Third Floor - Girls Restroom 1) Replace flush valve (3). | April 21, 2005 |
| Kimball Elementary School | FM-200504376 4/21/05 Kimball Playground 1) Fill in big hole on playground. Student fell in hole.. | April 21, 2005 |
| John Burroughs ES | FM-200504374 4/21/05 Burroughs Boiler Room Replace 1 1/2" valve and nipple on Boiler #2. | April 21, 2005 |
| Browne Junior High School | FM-200504418 4/21/05 Browne Boiler Room Replace two circulating pumps in Boiler Room. | April 21, 2005 |
| Wilkinson ES | FM-200504486 4/21/05 ( WILKINSON ) Second Floor - Mrs. Faulkner Room 1) Repair radiator or convector cover, it's loose from the wall | April 21, 2005 |
| Slowe Elementary School | FM-200504375 4/21/05 Slowe Boiler Room Repair or replace mechanical seals on all (6) six condensate return motors. Make: Century AO Smith , Cat. #H155, Serial #BW7-185, type SC, Frame K56J, HP 1/2, PH 3, HZ 60/50 RPM 3450/2850, SF 1.60, Volt 208-230/460, Amps SF 2.6/1.3, Part # B-187147-20 | April 21, 2005 |
| Ferebee-Hope Elementary School | FM-200504454 4/21/05 Ferebee Hope 4th Floor Tower Replace 1 1/2-2" chill water. Line on ceiling univent. (Corrosion) | April 21, 2005 |
| Duke Ellington School | FM-200504378 4/21/05 Ellington Boiler Room Repair 3/4" leaking line on pump #3 on A/C unit. Also repair 6" flange on line on chill water side. Replace 1/2" nipple on 4" condenser line on cooling tower. | April 21, 2005 |
| Patterson ES | FM-200504582 200504582 4/22/05 (Patterson, W.B.) Exterior Grounds. Remove (Margue) school sign from 4600 Livingston Rd. P.R. Harris and put sign at new building. | April 22, 2005 |
| Kimball Elementary School | FM-200504619 4/22/05 (Kimball) Asbestos Assessment Required. Middle wing/Special Education office. Repair ceiling. AMP 91B HA 012 Plaster white No Asbestos AMP 67 HA 012 Plaster white No Asbestos AMP 71 HA 712 Brown Coat with HA 012 No Asbestos Code A-clear for repair by DCPS Charles Buchanan on 1/12/06 | April 22, 2005 |
| Ballou Senior High School | FM-200504578 4/22/05 Ballou Boiler Room Replace or repair leaking rolairtrol air seperator tank also. Install 3/4" gate valve on the air seperator supply line for new chemical. Injection system. (Heating & cooling) Note: Tri-con chemical- treatment for system also abatement needed for fiberglass & rubber installation. Information: Air seperator ID tag rusted beyond recognition. | April 22, 2005 |
| Kimball Elementary School | FM-200504616 4/22/05 (Kimball) Throughout the whole building. Replace light ballasts through out the whole building. | April 22, 2005 |
| Shaw JHS | FM-200504587 4/22/05 Shaw Boiler Room Repair and replace domestic hot water heater in Boiler Room. | April 22, 2005 |
| Anacostia Senior High School | FM-200504519 4/22/05 Anacostia Boiler Room Replace feed water tank, leaking at the bottom. | April 22, 2005 |
| Anacostia Senior High School | FM-200504515 4/22/05 Anacostia Boiler Room Replace air flow switch on Boiler #1, will not light off. | April 22, 2005 |
| Dunbar High School | FM-200504591 4/22/05 ( DUNBAR ) B2 Level - Kitchen 1) Repair the freezer lighting, it's shorted out, (there is water in the power switch box). | April 22, 2005 |
| Turner Elementary School | FM-200504664 4/25/05 (Turner) Second foor and Third floor. Second floor boys' restroom, first toilet stopped up (old side) also girls' restroom (new side) first toilet stopped up. Third floor girls' restroom (old side) last toilet stopped up and (new side) girls' restroom fourth toilet stopped up. | April 25, 2005 |
| Kimball Elementary School | FM-200504711 4/25/05 (Kimball) Basement/First floor. Repair leak in basement hallway (South Wings). Repair leak on first floor by main office (South Wing). HA 012 Plaster White Noasbestos HA 712 Brown Coast No Asbestos HA 001 Ceiling tile White 1 X 1 No Asbestos Code A-clear for repair by DCPS Charles Buchanan on 1/12/06 | April 25, 2005 |
| Johnson JHS | FM-200504656 4/25/05 (Johnson) Auditorium. Repair Lighting staff are unable to get lights to come on. Note: Need to prepare for program on 04/26/05. | April 25, 2005 |
| Kimball Elementary School | FM-200504701 4/25/05 ( KIMBALL ) Through out the whole building 1) Install latches on all restroom stall doors | April 25, 2005 |
| Orr Elementary School | FM-200504662 4/25/05 Orr Throughout Building Repair or replace exhaust fans throughout Building. | April 25, 2005 |
| Brookland Elementary | FM-200504638 4/25/05 Brookland 3rd floor center 1, 3rd floor center 2 ,2nd floor center 2 1) Repair 3/4"copper line on drip pan. Center 1 3rd floor unit 4 2) Replace missing coil and drip pan ( 7-1/2' X 6" ) Center 2 3rd floor unit 4 3) Replace missing coil and drip pan ( 7-1/2' X 6" ) Center 2 2nd floor unit 3 4) Replace leaking pneumatic control valve on unit int office kitchen . | April 25, 2005 |
| Davis Elementary School | FM-200504706 4/25/05 ( DAVIS ) First Floor - Main Office 1) Cover exposed wires in the main office near the entrance wall. | April 25, 2005 |
| Brookland Elementary | FM-200504633 4/25/05 Brookland Center 1 3rd Floor, Center 2 , 2nd floor, Pre K , Office Kitchen, 1) Replace rusted out drip pan on unit 2 center 1 3rd floor( 7-1/2' X 6") 2) Replace rusted out door on unit 3 center 1 3rd floor (7' X 3' ) 3) Replace rusted out drip pan on unit 2 center 2 2nd floor ( 7-1/2' X 6") 4) Replace rusted out door on unit 29 center 2 2nd floor (7' X 3') 5) Replace missing drip pan on unit 2 Pre K room 1st floor (5' X 7" ) 6) Replace drip pan in office kitchen unit ( 24" X 4" X 2") | April 25, 2005 |
| Turner Elementary School | FM-200504663 4/25/05 (Turner) Second floor/Old & New Side, Boys' Restrooms. Repair or Replace control valve water runs onto floor, urinal next to window (Old Side) ; Water is coming up out of toilet where spud is located and running onto restroom floor (New Side) . | April 25, 2005 |
| Spingarn High School | FM-200504727 4/26/05 Main Office and Room #207 - Repair block wall | April 26, 2005 |
| Ballou Senior High School | FM-200504743 4/26/05 Ballou Boiler Room Repair crack on the rear boiler shell of Boiler #2. Information: Pacific Steel Hot Water Boiler Mod. #122040 Note: Installation has to be tested and removed. | April 26, 2005 |
| Beers Elementary School | FM-200504766 4/26/05 (Beers) HEALTH CODE VIOLATION: Kitchen: Replace missing light cover in kitchen. | April 26, 2005 |
| Bunker Hill Elementary School | FM-200504724 4/26/05 Bunker Hill Boiler Room Check feed water pump in Boiler Room. Pump is making a noise. | April 26, 2005 |
| Ballou Senior High School | FM-200504740 4/26/05 Ballou Boiler Room Refractory work needed on entire interior of Boiler #1, including burner hub. Information: Pacific Steel Hot- Water Boiler. | April 26, 2005 |
| Merritt Middle School | FM-200504758 4/26/05 Merritt First / Second/ and Third fl . Boys Restrooms Remove Carpet from fn front of Restroom Doors Asbestos Code A - Clear for repairs on 10/28/05. Tidewater - Philp Connolly (RG 10/28/05) | April 26, 2005 |
| Benning Elementary School | FM-200504712 4/26/05 Benning Roof-Cooling Tower Replace PVC drain line on cooling tower. | April 26, 2005 |
| Marshall Educational Center | FM-200504782 4/27/05 Marshall ,T Boiler room eplace leaking tube in the # 1 boiler. | April 27, 2005 |
| Marshall Educational Center | FM-200504781 4/27/05 Marshall, T Boiler room Replace the bearing on the air handler for the gym #8 | April 27, 2005 |
| Johnson JHS | FM-200504800 4/27/05 (Johnson) First floor/Auditorium. Replace light bulbs in auditorium for upcoming assembly, the ceiling is to high for the staff to reach it. Note: Need a cherry picker. | April 27, 2005 |
| Orr Elementary School | FM-200504854 4/28/05 Orr Roof top Need the electrician to restore the electrical service to the exhaust fans on the roof top | April 28, 2005 |
| Savoy Elementary School | FM-200504851 4/28/05 Savoy Roof- cooling tower Repair or replace cracked manifold for spray nozzels in the cooling tower. Evapco: Model # AT8-93 | April 28, 2005 |
| Eastern High School | FM-200504881 4/28/05 ( EASTERN ) Basement Floor - Rooms B78, B77, B74, B70, B09, B11, B14, and B12 1) Furnish and install five wash stations in all classrooms. HA 003 Plaster White No Asbestos HA 703 Brown Coat No Asbestos HA 001 Floor Tile Tan 12 X 12 With White & Black Speck No Asbestos HA 002 Floor Mastic No Asbestos Code A-clear for repair by DSCPS Charles Buchanan on 5/10/05 | April 28, 2005 |
| Hyde Elementary School | FM-200504931 4/29/05 ( HYDE ) Outside - Playground 1) Repair basket ball court, it's leaning over like it's going to fall. | April 29, 2005 |
| Hyde Elementary School | FM-200504932 4/29/05 ( HYDE ) Outside - Stairs that lead to the Cafereria 1) Repair concrete steps, it's crumbling. | April 29, 2005 |
| Cardozo High School | FM-200505024 4/29/05 (Cardozo) Asbestos Assessment Required. sub-basement,boiler room office-replace deterioring and leaking galvanized domestic hot water pipes that are appox. 2-1/2inch dia.,pipes are spraying water,flooding boiler room office. Asbestos Code A - Clear for repairs on 10/20/05. Tidewater - Phlp Connolly (RG 10/21/05) | April 29, 2005 |