Urgent Repair Requests Opened in May 2002 (14)
| School |
Description |
Open Date |
| Benning Elementary School |
FM-200207027 7 5/2/02 (Benning) !!!Very Very Urgent!!! Playground: Stopped up drains on playground #1 & 2: Approximately 6 inches of water present. |
May 2, 2002 |
| Cook J.F. Elementary School |
FM-200207405 7405 5/8/02 Cooke, J.F. !!! Urgent !!! 1. Asbestos Assessment Required. 2. Roof is leaking and donot know where the water is coming from. It is leaking down in the Cafeteria ceiling. Asbestos Code A - Clear for repairs on 05/08/02. Horne Engineering - Stephen Caldwell (RG 05/09/02) |
May 8, 2002 |
| Cardozo High School |
FM-200207574 5/10/02 Cardozo ****Urgent**** 1. Asbestos Assessment Reqd. Sub-basement Armory Furnish & install electrical service in storage room for computer connections--using extension cord. Code A-clear for repair by Horne Engineer ( Sam Ebrahim ) on 05/14/02 |
May 10, 2002 |
| Turner Elementary School |
FM-200207567 5/10/02 Turner ****Urgent*** 1. Asbestos Assessment Reqd. Need touch-up painting done on afeteria walls & stairwells leading to the cafeteria, in time for important visitors coming to the school. [Mr. Chase will do the painting if Mr. Moody's shop can provide the paint.] Code A-clear for repair by Horne Engineer ( Stephen Caldwell ) on 05/13/02 |
May 10, 2002 |
| Cardozo High School |
FM-200207572 5/10/02 Cardozo 1. Asbestos Assessment Reqd. 3rd Floor Room 302 [Band Room] Survey and assess for replacement of metal door & frame and locks. Both door and frame have been damaged, and the lock is sticking. and lock cylinder has been tampered with and needs replacement. Asbestos Code A - Clear for repairs on 05/16/02. DCPS Safety - Leroy Minton Jr. (RG 05/16/02) |
May 10, 2002 |
| Cardozo High School |
FM-200207573 5/10/02 Cardozo ****Urgent**** 1. Asbestos Assessment Reqd. Basement Auto Shop Furnish & install electrical service in storage room for computer connections--using power strip through the door opening. Code A-clear for repair by Horne Engineer ( Sam Ebrahim ) on 05/14/02 |
May 10, 2002 |
| Cardozo High School |
FM-200207576 5/10/02 Cardozo ****Urgent**** 1. Asbestos Assessment Reqd. Basement Tunnel by Parking Lot 1. Furnish & install a new metal door and frame for basement tunnel exterior door entrance [will need new heavy-duty security locks]. The old door, lock and door-frame has been damaged, and the frame is no longer firmly connected to the brick wall--it is out of square, making the door hard securely lock the door. Asbestos Code A - Clear for repairs on 05/16/02. DCPS Safety - Leroy Minton Jr. (RG 05/16/02) |
May 10, 2002 |
| Langdon Elementary School |
FM-200209572 2 5/15/02 Langdon Asbestos Assessment Required. Entrance Door (20th Street) is broken. Door is hanging off of its hinges. Safety Hazard. Asbestos Code A - Cleared for repairs on 04-28-03 by Leroy Minton Jr. (LM/04-08-03) the Safety Office 202-576-8962. |
May 15, 2002 |
| Langdon Elementary School |
FM-200209573 3 5/15/02 Langdon Asbestos Assessment Required Sink is broken off the wall in the boys bathroom (near Room 126); Montessori Wing. Asbestos Code A - Cleared for repairs on 04-28-03 by Leroy Minton Jr. (LM/04-08-03) the Safety Office 202-576-8962. Health and Safety Hazard |
May 15, 2002 |
| Thomas Elementary School |
FM-200208300 5/23/02 Thomas 1. Asbestos Assessment Reqd. 2nd Floor New Wing Repair or replace partition door for privacy. Asbestos Code A - Clear for repairs on 06/05/02. DCPS Safety - Leroy Minton Jr. (RG 06/06/02) |
May 23, 2002 |
| Patricia R Harris Ed Center |
FM-200208269 5/23/02 Harris,P.R. 1. Asbestos Assessment Reqd. Building Exterior Install two new flood lights around the back of the building on both of the playground areas--the P.R. Harris and W.B. Patterson side of the building. Asbestos Code A - Clear for repairs on 05/30/02. DCPS Safety - Leroy Minton Jr. (RG) |
May 23, 2002 |
| Watkins Elementary School |
FM-200208647 7 5/29/02 Watkins Throughout Entire Building Install power to Air Conditioner Units and repair the panel boxes. Safety Hazard. |
May 29, 2002 |
| Langdon Elementary School |
FM-200210829 9 5/30/02 (Langdon) ***URGENT*** Brand new Air Conditioner Units in Rooms: 198 & 128 do not work. |
May 30, 2002 |
| Bowen Elementary School |
FM-200208742 5/31/02 (BOWEN) ****Very Urgent**** Exterior/Roof Section Over Cafeteria There is water standing and leaking from the area of roof over the cafeteria. The problem is ongoing and needs to be addressed so the large pieces of falling plaster ceiling in the cafeteria can be repaired [Ref: FM-200124473]. |
May 31, 2002 |
Routine Repair Requests Opened in May 2002 (46)
| School |
Description |
Open Date |
| Eastern High School |
FM-200206998 5/2/02 Eastern Exterior 1) Need catch basins snaked out and cleaned out. |
May 2, 2002 |
| Brent Elementary School |
FM-200206992 5/2/02 Brent Boiler room entrance Unstop floor drain at entrance to boiler room. Area is flooded. |
May 2, 2002 |
| Duke Ellington School |
FM-200206995 5/2/02 Ellington !!! Emergency !!! Sub-Basement - Gymnasium Sky light leaking in Coach Office and in Weight Room. |
May 2, 2002 |
| Roosevelt High School |
FM-200207012 012 5/2/02 Roosevelt Outside courtyard 1) Need plumber to unstop strom drain in court yard. |
May 2, 2002 |
| Tyler Elementary School |
FM-200207046 5/3/02 Tyler Lower Level Roof Unstop roof drain above the kitchen. Water is leaking into the cafeteria manager's office. |
May 3, 2002 |
| Benjamin Banneker Academic HS |
FM-200207068 68 5/3/02 Banneker Roof Above Room 305 The roof is leaking above room 305 on the 3rd floor [the problem was looked at, but no one returned]. |
May 3, 2002 |
| Garfield ES |
FM-200207051 51 5/3/02 Garfield New Wing/Outside Demountables Three [3] wall pac 175 exterior lights need to be replaced due to vandalism. |
May 3, 2002 |
| Slowe Elementary School |
FM-200207085 5/3/02 Slowe 2nd Floor Teachers Lounge Install a compressor for A/C unit; compressor is on-site. POC: Lewis |
May 3, 2002 |
| Maury Elementary School |
FM-200207060 5/3/02 Maury Roof Over1st Floor East Multi-Purpose Room Repair leak on the roof over the multi-purpose room. |
May 3, 2002 |
| Powell Elementary School |
FM-200209122 5/3/02 Powell Air conditioner in (room# 201) power will not stay on, power trips in the main panel box. This problem did not happen last year may the air conditioner need to be service. |
May 3, 2002 |
| Wilson High School |
FM-200207104 5/3/02 Wilson,W. Asbestos Assessment Reqd. 2nd & 3rd Floors/Rooms 225, 313 & 326 through 328 Remove electrical outlets from the classroom floors. Asbestos Code A - Clear for repairs on 05/07/02. Horne Engineering - Sharon Voss (RG 05/08/02) |
May 3, 2002 |
| Duke Ellington School |
FM-200207061 5/3/02 Ellington Second (2nd) and Third (3rd) Floor 1. Lead and Asbestos Assessment Required. 2. Plaster Ceiling in Room #265. 3. Plaster Ceiling in Room #306. Code A-clear for repair by Horne Engineer ( Bipin Nanavaty ) on 05/03/02 Lead Based Paint Code A - Clear for repairs on 5/08/02 Lead level 1; No lead based paint to be impacted Horne Engineering - Bipin Nanavaty (RE - 5/08/02) |
May 3, 2002 |
| Eastern High School |
FM-200207165 5/6/02 Eastern 1. Asbestos Assessment Reqd. Room 221 Install electrical outlet to support a/c in room 221. Asbestos Code A - Clear for repairs on 05/07/02. Horne Engineering - Sam Ebrahim (RG 05/08/02) |
May 6, 2002 |
| Draper Elementary School |
FM-200207232 5/6/02 Draper 1. Asbestos Assessment Reqd. 1st & 2nd Floors, Rooms 110, 203 & 213 Replace split and broken doors which no longer lock in rooms 110, 203 & 213. Asbestos Code A - Clear for repairs on 05/08/02. Horne Engineering - Sam Ebrahim (RG 05/09/02) |
May 6, 2002 |
| Ferebee-Hope Elementary School |
FM-200207236 5/6/02 Ferebee-Hope Ground Floor Family Service's Kitchen Repair or replace hood range fan over the stove. The fan is inoperable. |
May 6, 2002 |
| Thomas Elementary School |
FM-200207153 5/6/02 Thomas Boiler Room Refurbish condensate system. |
May 6, 2002 |
| Wilson High School |
FM-200207248 5/6/02 Wilson,W. 1. Asbestos Assessment Reqd. 1st Floor Doors Leading into the Auditorium Repair or replaced cracked, damaged doors leading into the auditorium--they can't be secured properly. Asbestos Code A - Clear for repairs on 5/8/02 Horne Engineering - Sharon Voss (RE - 5/08/02) |
May 6, 2002 |
| Hyde Elementary School |
FM-200207275 5/7/02 Hyde 1. Cafeteria - #07 2. Main Offfice - #106 3. Old Custiodial Office - #B-8A Asbestos Assessment Required. Install Air Conditioner unit. (Unit is on Site) Code A clear for repairs as 5/9/02 horne engineers Voss. |
May 7, 2002 |
| Ludlow-Taylor ES |
FM-200207252 0207252 5/7/02 Ludlow-Taylor 1. Asbestos Assessment Reqd. 1st, 2nd & 3rd Floors/Rooms 100, 200, 300 & 302. 2. Install outlets in the rooms listed above to deliver power to the newly installed window a/c units. POC: Edward Thornton Asbestos Code A - Clear for repairs on 05/08/02. Horne Engineering - Bipin Nanavaty (RG 05/09/02) |
May 7, 2002 |
| Reed LC |
FM-200207254 5/7/02 Reed 1. Asbestos Assessment Reqd. 2nd Floor Male Restrooms in Centers 1 & 2 Reattach partitions to the wall in the 2nd floor male restrooms [centers 1 & 2]. Asbestos Code A - Clear for repairs on 5/8/02 Horne Engineering - Sheryll James (RE - 5/8/02) |
May 7, 2002 |
| Turner Elementary School |
FM-200207422 5/8/02 Turner All Floors [Panel Boxes Throughout] Need locks installed on all electric panel boxes throughout the school. Unauthorized persons keep turning the switches in the panel boxes off. |
May 8, 2002 |
| Park View ES |
FM-200207411 5/8/02 Park View Outside Gutters & Drains Unstop all hubs & downspouts around the building. |
May 8, 2002 |
| Ferebee-Hope Elementary School |
FM-200207371 5/8/02 Ferebee-Hope Ground Floor/Family Services Corridor Replace two [2] exit lights. |
May 8, 2002 |
| Turner Elementary School |
FM-200207423 5/8/02 Turner 1. Asbestos Assessment Reqd. 3rd Floor Exit Door/Old Wing 2. Install pull handle on exit door across from room 309. Code A clear for repairs as of 5/9/02 Horne Engineer Bipin Nanavaty. |
May 8, 2002 |
| Ketcham Elementary School |
FM-200207438 8 5/9/02 Ketcham 1st, 2nd & 3rd Floors Boys' & Girls' Restrooms 1. 1st floor girls' restroom: Replace one broken commode. 2. 2nd & 3rd floors boys' restrooms: Replace one removed wall-mounted urinal in each. POC: Wadsworth |
May 9, 2002 |
| Ketcham Elementary School |
FM-200207436 6 5/9/02 Ketcham 1. Asbestos Assessment Reqd. 2nd Floor Rooms 202 & 204 2. Realign doors to close properly. POC: Wadsworth Asbestos Code A - Clear for repairs on 5/09/02 Horne Engineering, Phillip Connolly (RE - 5/09/02) |
May 9, 2002 |
| Turner Elementary School |
FM-200207441 5/9/02 Turner All Floors [Panel Boxes Throughout] Need locks installed on all electric panel boxes throughout the school. Unauthorized persons keep turning the switches in the panel boxes off. |
May 9, 2002 |
| Ketcham Elementary School |
FM-200207442 2 5/9/02 Ketcham 1st Floor & Ground Floor Replace door closures at the stairwell near room 104 and the door to the cafeteria. POC: Wadsworth |
May 9, 2002 |
| Ketcham Elementary School |
FM-200207440 0 5/9/02 Ketcham 1. Asbestos Assessment Reqd. 2nd Floor Restroom in Teachers' Lounge Replace missing partition door. POC: Wadsworth Asbestos Code A - Clear for repairs 5/09/02 Horne Engineering, Phillip Connolly (RE - 5/09/02) |
May 9, 2002 |
| Cardozo High School |
FM-200207575 5/10/02 Cardozo Basement, Ground, 1st & 2nd Floors: Basement hallway, ground floor hallway, 1st floor auditorium, cafeteria & room 321-A. 1. Replace door closers that are damaged and worn in the areas listed above. |
May 10, 2002 |
| Coolidge High School |
FM-200207599 99 5/13/02 Coolidge Boiler room Troubleshoot and repair A.O. Smith hot water heater. Unit will not maintain flame long enough to heat the water. |
May 13, 2002 |
| Reed LC |
FM-200207616 5/13/02 Reed Chiller room Repair condenser pump, pump keep blowing fuses. |
May 13, 2002 |
| Wilson High School |
FM-200207605 5/13/02 Wilson,W. 1. Asbestos Assessment Reqd. 2nd Floor Rooms 210 & 228 2. Remove electrical outlets from the floor and install outlets into the walls. Code A-clear for repair by Horne Engineer ( Stephen Caldwell ) on 05/14/02 |
May 13, 2002 |
| Turner Elementary School |
FM-200207651 5/14/02 Turner 1. Asbestos Assessment Reqd. 2nd Floor Room 205 2. Install new security doors in Room 205. This room is needed to house technical equipment for the summer. POC: Ms. Parker, Principal. Code A-clear for repair by Horne Engineer ( Philip Connolly ) on 05/15/02 |
May 14, 2002 |
| Seaton Elementary School |
FM-200207761 5/15/02 Seaton 1. Asbestos Assessment Reqd. 1st, 2nd & 3rd Floors 2. There appear to be structural cracks in the following areas [please survey]: Kindergarten classroom; nurse's office; library; rooms 202 & 205; boys restroom; rooms 107, 111, 208, 210 & 211, 215; 300, 302, 303, 305, 307, 308, 310 & 312. 3. The 2nd floor appears to be sinking towards 10th street. Code A-clear for repair by Horne Engineer ( Sam Ebrahim ) on 5/16/02 |
May 15, 2002 |
| Simon Elementary School |
FM-200207740 5/15/02 Simons School (boiler room) Replace motor (#1 sump pump) Marathon - model-3VC14517DR5341-AB P, Ph - 3, HZ - 60, Hp - 2, RPM -1740, V-208/230/406, Code - K , cat #C122 |
May 15, 2002 |
| Park View ES |
FM-200207783 5/15/02 Park View Exit Door Newton Street Exit Door The mullion on the Newton Street exit door is broken, and is not catching on the bottom of the door. |
May 15, 2002 |
| Patricia R Harris Ed Center |
FM-200208062 5/20/02 Harris,P.R. Lights Over Exit Doors in Stairways & Auditorium Replace lights over entrance door, door in stairways #7 & 8, and the auditorium side door #7. |
May 20, 2002 |
| Powell Elementary School |
FM-200209635 5/21/02 (Powell) 1. Asbestos assessment required. Rooms 105,107 first floor and 203,205, also, health suite, second floor need security doors because doors are very weak and need replaced. Asbestos Code A - Clear for repairs on 04/29/03. Horne Engeering - Sharon Voss (RG 04/30/03) |
May 21, 2002 |
| Rudolph Elementary School |
FM-200208177 7 5/22/02 Rudolph 1st fl. Health suite Repair or replace air condition unit that will not run. Unit has electric at outlet. (Unit is new) Fredrick, BTU 28,000, volts 230/208, model # SL 28J30A-1 |
May 22, 2002 |
| Slowe Elementary School |
FM-200208231 5/22/02 Slowe All Areas Throughout the Building 66 ballasts throughout the building need to be replaced in time for the summer-school session, as follows: Room 122 (6), Room 126 (20), Room 211 (2), Room 100 (2), Library (10), Second Floor -Old Wing Boys and Girls Restrooms (5), Second Floor -Hallway (5), Kitchen (6). POC: Lewis James |
May 22, 2002 |
| Patricia R Harris Ed Center |
FM-200208268 5/23/02 Harris,P.R. 1. Asbestos Assessment Reqd. Building Exterior Install two new 175W wall-pack lights at the entrance to stairways #7 & 8. Asbestos Code A - Clear for repairs on 06/04/02. Horne Engineering - Donald Maglienti (RG) |
May 23, 2002 |
| West Elementary School |
FM-200208298 5/23/02 West Building Exterior/Back Parking Lots A truck backed into the building and there are fallen bricks that need to be replaced in that area and at the rear exit by the computer lab. |
May 23, 2002 |
| Aiton Elementary School |
FM-200208601 5/29/02 Ait;on Building Exterior/Roof The siding has come loose on the front of the building exterior. POC: Muriel Myers |
May 29, 2002 |
| Garnet-Patterson MS |
FM-200208688 208688 5/30/02 Garnet-Patterson 1. Asbestos Assessment Reqd. 2nd Floor Teachers' Lounge 2. Repair area of loose plaster from around the entrance door frames of the lavatory. Asbestos & Lead Code A - Clear for repairs on 05/31/02. Horne Engineering - Sharon Voss\Stephen Caldwell (RG 06/03/02) |
May 30, 2002 |
| Eliot Junior High School |
FM-200208758 5/31/02 Eliot 2nd Floor, Rooms 207, 208, 210 & Teachers' Lounge The circuit breaker supporting the above listed areas tripped to the "off" position and power has been lost--can not restore power and breaker will not stay in "on" position. |
May 31, 2002 |