Open Repair Requests in May 2004

Open Repairs Summary

  • Urgent Requests
    16
  • Routine Requests
    104
  • Total Requests
    120

Detailed Reports

Urgent Repair Requests Opened in May 2004 (16)
School Description Open Date
Rudolph Elementary School FM-200447406 5/3/04 Rudolph Urgent !!!!! Be advised that the Rudolph School was surveyed on 4-28-04 with emphasis defective doors. The following doors were found to have either already caused injury or otherwise defective: 1.Entrance door to room 108-Check needs to be replaced; (teacher Beverly Williams-Adewoyin was injured) 2.Corridor Door to new wing near 114-Defective hinge; 3.Main entrance Door- Won't close tightly; 4.Kitchen Screen Door-Won't close tightly & screen is torn; 5.Egress Door From Auditorium-Defective closer; 6.Egress Door (corridor) near auditorium-Defective panic device; 7.Corridor Door near 218 A-Missing pull handle; The "sweep speed" of most doors cited here (e.g. doors are closing too fast) appears to be due to faulty interior door checks which should be replaced with overhead closers; Asbestos Code A - Clear for repairs on 05/03/04. Horne Engineering - Sheryll James (RG 05/04/04) May 3, 2004
Hine JHS FM-200447413 5/3/04 (Hine) !!!URGENT!!! First Floor/Girls restroom Repair panic bar device lock will open. Asbestos code A - Clear for repairs on 05/04/04. Horne Engineering - Bipin Nanavaty (RG 05/05/04) May 3, 2004
Hine JHS FM-200447416 5/3/04 (Hine) !!!URGENT!!! Second Floor/stairwell # 3 by room 222 Replace metal step tread. Asbestos code A - Clear for repairs on 05/04/04. Horne Engineering - Bipin Nanavaty (RG 05/05/04) May 3, 2004
Bowen Elementary School FM-200447581 5/5/04 (Bowen) !!!VERY URGENT!!! 3rd Floor/Back Landing Stairways: Repair steps on stairway, metal plate has come up from several steps. (Very dangerous to walk) Asbestos Code A - Clear for repairs on 05/07/04. Horne Engineering - Tony Marcolin (RG 05/10/04) SEE LINKED DOCUMENTS May 5, 2004
Walker-Jones EC FM-200447544 5/5/04 Walker-Jones boiler room Replace safety valve on # 1 boiler May 5, 2004
Wilkinson ES FM-200447655 5/7/04 (Wilkinson) !!!VERY URGENT!!! 2nd Floor/Learning Center #1: Repair or replace electrical outlet in Ms. Semerly's classroom; sparks are present when in use. May 7, 2004
Eastern High School FM-200447770 5/11/04 Eastern - B-42 and 327 Repair wooden floor and replace damage floor tile due to pipe repair and water damage. Replace damage floor tile in room 327. Floor is damage badly can be a safety hazard flooring is weak. Asbestos Code A - Clear for repairs on 05/11/04. Horne Engineering - Ed Rodriguez (RG 05/12/04) May 11, 2004
Gage-Eckington ES FM-200447757 5/11/04 Gage-Eckington URGENT Throughout bldg. Several lights are shortage out they have screwa in the bulbs in the ceiling tile. Electrician is needed. Trouble with vision in corridor (Due to water leak). Asbestos Code A - Clear for repairs on 05/12/04. Horne Engineering - Bipin Nanavaty (RG 05/13/04) May 11, 2004
Ferebee-Hope Elementary School FM-200447910 5/13/04 (Ferebee-Hope) !!!EMERGENCY!!! 3rd Floor/Boys Bathroom: Remove, and replace broken urinal. (Students could sustain injury from broken porcelain. May 13, 2004
Johnson JHS FM-200447896 5/13/04 (Johnson) !!!VERY URGENT!!! Main Entrance/Front of Building: Strip that holds window glass in place has been removed; appears that vandals trying to enter. This is a safety hazard, as glass could fall, and injure staff/students. May 13, 2004
Coolidge High School FM-200448005 5/17/04 Coolidge Room #113 Install on site window A/C unit in classroom window. Iron grate needs to be cut and support brackets need to be fabricated by welders. (1) 12,000 BTU's unit on site. Provide electrical up-grade Urgent !!!!! May 17, 2004
Turner Elementary School FM-200448025 5/17/04 (Turner) !!!VERY URGENT!!! Asbestos Assessment Required. Principal's Office: Carpet need to be replaced "as soon as possible; carpet is rotten, and giving off a foul odor through-out the building". Problem due to back-up sewage leaking into the Principal office and causing a health problem. HA 050 Floor tile tan 12x12 floor tile with brown dark and beige. Beige HA 051 Floor mastic Code A-clear for repair by DCPS Charles Buchanan on 5/19/04 May 17, 2004
Hine JHS FM-200448390 5/24/04 (Hine) !!!URGENT!!! VANDALISM 3rd Floor/Room #307: Replace wire mesh glass damaged by vandals. May 24, 2004
Gibbs Elementary School FM-200448480 5/25/04 (Gibbs) !!!URGENT!!! 1st Floor/Main Office: Airconditioner leaking, and flooding the floor. May 25, 2004
Wilson J. O. ES FM-200448585 5/28/04 Wilson, J.O. First floor all purpose room Repair or replace 3x5 cover to return air system. (Safety ) located in the front of stage. May 28, 2004
Gage-Eckington ES FM-200448582 5/28/04 Gage-Eckington Urgent First floor Room 130 Door will not close, panic bar is off and door will not close or lock. It is a security risk. Asbestos Code A - Clear for repairs on 06/03/04. Horne Engineering - Tony Marcolin ( RG 03/06 ) May 28, 2004

Routine Repair Requests Opened in May 2004 (104)
School Description Open Date
Hyde Elementary School FM-200447433 5/3/04 Hyde Boiler room Water is coming from somewhere in the boiler room and causing a flood. A engineer was here this morning. May 3, 2004
Tyler Elementary School FM-200447421 5/3/04 Tyler First floor room 112 Replace bubbler. May 3, 2004
Stanton Elementary School FM-200447430 5/3/04 Stanton Third floor room 308 The ceiling is leaking. May 3, 2004
Slowe Elementary School FM-200447398 5/3/04 Slowe Second floor room 210 Roof need repairing in hallway by room 210. May 3, 2004
Murch Elementary School FM-200447404 5/3/04 Murch Repair plumbing fixtures. May 3, 2004
Ludlow-Taylor ES FM-200447401 5/3/04 Ludlow-Taylor Roof Roof drain line leaking into 209. May 3, 2004
Tubman Elementary School FM-200447446 5/4/04 Tubman EMERGENCY Ground floor boiler room Busted pipe in ceiling. Water is leaking on boiler causing damage to insulation. # Masonary need to repair cinder block wall. Asbestos Code A - Clear for repairs on 05/20/04. Horne Engineering - Edward Rodriguez (RG 05/20/04) May 4, 2004
Park View ES FM-200447468 5/4/04 Park View Second floor exhibit hall Floor tile cracking and need to be replace. Asbestos Code A - Clear for repairs on 05/06/04. Horne Engineering - Bipin Nanavaty (RG 06/06/04) May 4, 2004
Park View ES FM-200447467 5/4/04 Park View Basement library and room 102 Hole in ceilings that were leaking need to be replaster. Asbestos Code A - Clear for repairs on 05/05/04. Horne Engineering - Bipin Nanavaty (RG 05/06/04) May 4, 2004
Eastern High School FM-200447445 5/4/04 Eastern Room 152, 153, 150 and 154 Replace windows double pane in classrooms (3) additional windows were broken this weekend 5/1/04. 1. Plus wire mesh windows for classrooms. 2. Replace windows with window guard on annex, windows if possible they break windows every weekend. 3. Rooms 152 and 153 has holes straight thru windows - water coming in when it rains. May 4, 2004
Eastern High School FM-200447447 5/4/04 Eastern Auditorium room 152 stadium back across from B-35 and gym hallway Repair or replace down spouts and roof leaks in above locations wall are damage and getting worse. 1. Down spouts on back of school, 17th St. side of bldg. 2. Repair roof leak in boys bathroom in stadium - damaging ceiling. May 4, 2004
Takoma Educational Center FM-200447568 5/5/04 Takoma School Mark baseball field for game May 5, 2004
Ludlow-Taylor ES FM-200447545 5/5/04 Ludlow-Taylor ES room 100 Electrical upgrade is needed 230/208 volts for A/C unit Unit is installed in window. Asbestos Code A - Clear for repairs on 05/06/04. Horne Engineering - Philp Connolly (RG 05/07/04 May 5, 2004
Garrison ES FM-200447547 5/5/04 Garrison library Electrical upgrade is need to install (2)two window A/C units in Library Window units are 18,000 BTU 20 amp 230/208v Asbestos Code A - Clear for repairs on 05/07/04. Horne Engineering - Bjarne Smith (RG 05/07/04 May 5, 2004
Brookland Elementary FM-200447524 5/5/04 Brookland Chiller Furnish supplies to repair chiller. May 5, 2004
Tyler Elementary School FM-200447499 5/5/04 Tyler First floor 1st wing Teacher, boys and girls Need exhaust fans replace. May 5, 2004
Walker-Jones EC FM-200447495 5/5/04 Walker-Jones Boiler Room Install compressor in Boiler room. May 5, 2004
Backus Middle School FM-200447531 5/5/04 REPAIR/REPLACE AIR CONDITIONING UNIT May 5, 2004
River Terrace ES FM-200447543 5/5/04 River Terrace Kitchen Replace defective exhaust fan and motor- Broan mod#507-C 120-V 60HZ 1-5 amp 259 CFM May 5, 2004
Wilson J. O. ES FM-200447575 5/5/04 Wilson, J.O. First, floor Commons areas Remove partitions to the common area. This area is being converted to conference room. Asbestos Code A - Clear for repairs on 05/07/04. Horne Engineering - Sheryll James (RG 05/12/04) May 5, 2004
Gibbs Elementary School FM-200447625 5/6/04 Gibbs Black Top 1) Repaving blacktop area. Work to be done on 5/8/04 - 7am untill 5 PM. May 6, 2004
John Burroughs ES FM-200447593 5/6/04 Burroughs Fiirst floor # 16 A/C unit need repair second request. May 6, 2004
Terrell Mc ES FM-200447603 5/6/04 Terrell, M.C. Boiler Room Replace 3/4" solenoid valve on water link system. May 6, 2004
Takoma Educational Center FM-200447588 5/6/04 Takoma Boiler Room Check domestic hot water heater, no hot water in building. Check circulating pump. May 6, 2004
Miner Elementary FM-200447630 5/7/04 Miner 2003 Roof top Repair rooftop air cooled chiller, off on low oil ( both compressors) May 7, 2004
Thomas Elementary School FM-200447641 5/7/04 Thomas Second and third floor rooms 203, 210 and 305 Survey and repair flourescent lights in the above classrooms. Staff could not repair and the lights are needed for testing. May 7, 2004
Birney Elementary School FM-200447632 5/7/04 Birney Boiler room Check hot water heater,and or pump , low pressure, May 7, 2004
Aiton Elementary School FM-200447640 5/7/04 Aiton A/C need to be replace in the rooms below: 1. second floor book room 2. second floor teacher lounge 3. fourth floor room 405 4. fourth floor room 402 5. fourth floor CIA 403 May 7, 2004
Patricia R Harris Ed Center FM-200447715 5/10/04 Harris, P.R. Water Sampling 1) First Floor Room 104, outlet closest to door when entering Room, In same room as sample 7, 8 and 9. May 10, 2004
Benjamin Banneker Academic HS FM-200447684 5/10/04 NO HOT WATER - HOT WATER HEATER IN BOILER ROOM May 10, 2004
Hart Middle School FM-200447688 5/10/04 (Hart) Install six (6) free standing water coolers through-out the building. May 10, 2004
Reed LC FM-200447738 5/10/04 Reed Basement kitchen Please replace or repair screen on the kitchen screen door. May 10, 2004
Terrell Mc ES FM-200447729 5/10/04 Terrell, M.C. Water Sampling 1) First Floor and Pre- K. May 10, 2004
Turner Elementary School FM-200447680 5/10/04 Turner Unstop air way drain outside boiler room. May 10, 2004
Wilkinson ES FM-200447731 5/10/04 Wilkinson Water Sampling 1) Kindergarten Center First Floor. May 10, 2004
Wilson High School FM-200447733 5/10/04 Wilson, W. Water Sampling 1) Basement Kitchen. May 10, 2004
Eastern High School FM-200447782 5/11/04 Eastern - Gym Furnish and install missing and damaged ceiling tile. Damaged due to volleyball games and vandalism. HA 031 Ceiling Tile Wtile 2' X 4' with fissures and small pinholes (NAD) HA 034 Ceiling Tle While 2' X 4' pinhole Divot Swirl Pattern (NAD) Code A-clear for repair by DCPS Charles Buchanan on 5/17/05 May 11, 2004
John Burroughs ES FM-200447800 5/11/04 Burroughs First floor Nr hallway Paint walls. Lead & Asbestos Code A - Clear for repairs on 05/12/04. Horne Engineering - Edward Rodriguez (RG 05/13/04) SEE LINKED DOCUMENTS May 11, 2004
Gibbs Elementary School FM-200447765 5/11/04 Gibbs Exterior bldg. Remove graffitti from around the building. May 11, 2004
Brent Elementary School FM-200447779 5/11/04 BRENT ES ROOF Repair roof top unit. May 11, 2004
Eaton Elementary School FM-200447778 5/11/04 Eaton Chiller Repair #2 chiller, not working. May 11, 2004
Eastern High School FM-200447758 5/11/04 Eastern Cafeteria doors, Balcony and bathroom door in gym Furnish and install panic bars and missing door knobs. Asbestos Code A - Clear for repairs on 11/21/06. Tidewater - Shamika Parker (RG 11/30/06 ) May 11, 2004
Roosevelt High School FM-200447777 5/11/04 Roosevelt Cooling Tower Repair hold in water pan to cooling tower. There is to holds in pan. See engineer. May 11, 2004
Eastern High School FM-200447767 5/11/04 Eastern B-42 Close hole in wall 2'x20' wall ceiling, plaster wall and ceiling damaged , replacing a metal pipe. HA 003 Plaster while Corridor # 7 outside B-49 (NAD) Code A-clear for repair by DCPS Charles Buchanan on 5/17/05 May 11, 2004
Smothers ES FM-200447789 5/11/04 Smothers One night light fixture is vandalized, (broken) on east side of the bldg., This is one of the lights that is not working at night. May 11, 2004
Woodson High School FM-200447819 5/12/04 Woodson Sr high Boiler room Repair sump pump in the boiler room, unit was installed 5/11/04 May 12, 2004
Lafayette Elementary School FM-200447838 5/12/04 (Lafayette) !!!EMERGENCY!!! HEALTH CODE VIOLATION: Kitchen: Light fixtures in kitchen area must be shielded. May 12, 2004
Deal Junior High School FM-200447885 5/13/04 (Deal) HEALTH CODE VIOLATION: Kitchen: Final warning to remove all peeling paint and plaster in the hallway leading to cafeteria, the service line, and food production areas. Lead & Asbestos Code A - Clear for repairs on 05/13/04. Horne Engineering - Edward Rodriguez (RG 05/14/04) May 13, 2004
Deal Junior High School FM-200447886 5/13/04 (Deal) HEALTH CODE VIOLATION: Kitchen: Repair lights in the dry goods room. Lead & Asbestos Code A - Clear for repairs on 05/13/04. Horne Engineering - Edward Rodriguez (RG 05/14/04) May 13, 2004
Gibbs Elementary School FM-200447905 5/13/04 Gibbs First floor multi-purpose Stained window panes need to be replaced in throughout multipurpose in time for graduation that will be on June 21, 2004. May 13, 2004
Young Elementary School FM-200447917 5/13/04 Young First floor adult room area DUPLICATE Need carpenter to repair exit door in adult class room. It is hard to close and secure in the evening most keep slam it to secure it. Metal door Code A-clear for repair by DCPS Charles Buchanan on 5/18/04 May 13, 2004
Gibbs Elementary School FM-200447962 5/14/04 Gibbs Outside Jersey barriers need repairing on teachers parling lot. May 14, 2004
Whittier Elementary School FM-200447963 5/14/04 Whittier Lower level playground Need new bridge for playground equipment. May 14, 2004
Thomas Elementary School FM-200448003 5/17/04 Thomas First and second floor Survey and replace light fixtures covers. REeplace 6 flourescent light cpvers on first floor in kitchen. May 17, 2004
Thomas Elementary School FM-200447998 5/17/04 Thomas First, second and third floor Survey, plaster and paint the following rooms: Rooms 300, 301, 302, 303, 304, 305, 307 and 309. Rooms 200, 202, 203, 205, 207 and 209. Rooms 100, 101, 102, 103, 104, 105, 106, 107 and 109. Corridors, landings, restrooms counselors suite partitions. Lead & Asbestos Code A - Clear for repairs on 05/18/04. Horne Engineering - Bjarne Smith/Edward Rodriguez (RG 05/19/04) SEE LINKED DOCUMENTS May 17, 2004
Thomas Elementary School FM-200447995 5/17/04 Thomas First floor kitchen and cafeteria Survey and replace 14 sets of flourescent lamp holders. Lampholders are needed to keep kitchen and cafeteria. HEALTH CAFETERIA May 17, 2004
Turner Elementary School FM-200448047 5/18/04 Turner Outside Cafeteria Door and Boiler Room Door 1) Drains are stopped up. May 18, 2004
Ferebee-Hope Elementary School FM-200448034 5/18/04 Ferbee-Hope Boiler room Survey and replace 1" copper pipe and pump housing on the domestic hot water tank. May 18, 2004
Cardozo High School FM-200448063 5/18/04 CARDOZO SHS fan room / fan #2 Repair cutler - hammer motor control A-C magnetic starter. M# 6-111, S# 9586H4847A, Bbul. 9586, 100 - amps, 3-poles, volts - 100, 208-220, 380-440-550. May 18, 2004
Garnet-Patterson MS FM-200448095 5/18/04 Garnett-Patterson School need power wash of bird dropping (pigeon) at the Vermont Ave. entrance of the building. May 18, 2004
Seaton Elementary School FM-200448067 5/18/04 SEATON boiler room Repair / replace bearings on hot/chill water circulating pump motor # 2 Make US electrical motor rpm 1720 mod E 659A shaft end Brg. 6208-2z ID : U05U105R265M opp end Brg. 6206-2z fram: 21st V - 208-230/460 Fl Amp 30.0/27.2/13.6 ph 3; hp 10 May 18, 2004
Seaton Elementary School FM-200448070 5/18/04 SEATON boiler room replace mechanical seals on hot/chill water circulating pump. make: Weinman ser: 178999-2 mod: 464100PI4G-1 Mat. W.P. 175lb GPM:36 FTHD: 6 May 18, 2004
Bruce-Monroe Elementary School FM-200448078 5/18/04 Bruce-Monroe Outside The path side concrete retaining wall is leaning and has dtructural cracks, need repairing. May 18, 2004
Coolidge High School FM-200448137 5/19/04 Coolidge Room #233 Provide one dedicated 115 volts A/C outlet for Vice Principal Office room #233. May 19, 2004
Savoy Elementary School FM-200448105 5/19/04 Savoy Kitchen Air handler unit Repair rusted out drain pan on the air handler unit in the kitchen ,the unit was written up by the Health Inspector. Asbestos Code A - Clear for repairs on 05/19/04. Horne Engineering - Tony Marcolin (RG 05/20/04) May 19, 2004
Ketcham Elementary School FM-200448103 5/19/04 Ketcham Boiler room Repair or replace domestic hot water circulating pump in the boiler room. May 19, 2004
Ketcham Elementary School FM-200448104 5/19/04 Ketcham Boiler room repair or replace broken 2" sump pump discharge line at the back of # 5 boiler in the ceiling over the light fixture. May 19, 2004
Patricia R Harris Ed Center FM-200448230 5/20/04 Harris, P.R. Main floor auditorium Repair the door knob; REstroom in the auditorium lock by stage. Asbestos Code A - Clear for repairs on 05/21/04. Horne Engineering - Philp Connolly (RG 05/24/04) May 20, 2004
Eastern High School FM-200448168 5/20/04 EASTERN SHS Electrical upgrade need to complete installation of window air conditioner (on site) rooms are as follows - room 321, 242, nurse's office, 323, band room, library, and security office. Asbestos Code A - Clear for repairs on 05/20/04. Horne Engineering - Tony Marcolin (RG 05/24/04) May 20, 2004
Bancroft Elementary School FM-200448236 5/20/04 Bancroft EMERGENCY Second floor 123 main bldg. Replace wall receptacle, Your with sparks flying from receptacle. Asbestos Code A - Clear for repairs on 05/21/04. Horne Engineering - Edward Rodriguez (RG 05/24/04) May 20, 2004
Bancroft Elementary School FM-200448237 5/20/04 Bancroft First floor main bldg. Auditorium lavatory Repair or replace partition railing hanging on by two screws. Asbestos Code A - Clear for repairs on 05/21/04. Horne Engineering - Edward Rodriguez (RG 05/24/04) May 20, 2004
Walker-Jones EC FM-200448219 5/20/04 Walker-Jones Outside K Street and playground Repair pole to fence that was damage from tree falling on it. Repair two fences that was cut. May 20, 2004
Walker-Jones EC FM-200448217 5/20/04 Walker-Jones Basement hallway Plaster and paint on ceiling in the hallway area. Asbestos Code A - Clear for repairs on 05/20/04. Horne Engineering - Edward Rodriguez (RG 05/24/04) May 20, 2004
Langdon Elementary School FM-200448170 5/20/04 LANGDON boiler room Replace 3/4" gate valves located on hot and cold supply water in boiler room. Water is needed to wash out boiler and boiler room. May 20, 2004
Spingarn High School FM-200448175 5/20/04 Spingarn Third floor room 314 and outside stadium Need carpenter to repair or replace the siding that holes the glass to the door in place in room 314. Replace doors to storage room that the hurdles are kept in stadium. Asbestos Code A - Clear for repairs on 05/20/04. Horne Engineering - Sheryll James (RG 05/20/04) May 20, 2004
Browne Junior High School FM-200448275 5/21/04 (Browne) !!!VANDALISM!!! Basement Gym/Girls Locker Room: Repair damaged lockers, and replace burned locker doors, hinges, and other parts due to fire. May 21, 2004
Woodson High School FM-200448329 5/23/04 Woodson H.D. Boiler room Repair sump pumps in the boiler room ,pumps are not discharging, 3" of water on the floor. May 23, 2004
Shaed Elementary School FM-200449036 5/23/04 Shaed Boiler Room Unstop floor drain in Boiler Room. Boiler room is flooded. May 23, 2004
Shaed Elementary School FM-200448330 5/23/04 Shaed Boiler room Repair sump pumps in the boiler room , pumps are not discharging, sump pit is full. May 23, 2004
Whittier Elementary School FM-200448369 5/24/04 Whittier First floor Furnish and install (4) new air conditioner for cafeteria. May 24, 2004
Johnson JHS FM-200448342 5/24/04 Johnson Break In !! Front Entrance 1) Replace window in Front Entrance door. May 24, 2004
Deal Junior High School FM-200448366 5/24/04 (Deal) !!!EMERGENCY!!! Asbestos Assessment Required. Principal's Office: Ballast burning in several locations of the above office giving off a very bad chemical smell. 05/24/2004: Call came in at approximately 11:00 p.m. to report the supply line to fixtures are smoking. Asbestos Code A - Clear for repairs on 05/24/05. Horne Engineering - Bjarne Smith (RG 05/25/04) May 24, 2004
Turner Elementary School FM-200448347 5/24/04 Turner Break In !! Second Floor 1) Replace window glass in Asst. Principal's Office. 05/24/2004: Engineer called in approcimately 2:55 p.m. with a concern of the window to be repaired. (At this time no response) May 24, 2004
Young Elementary School FM-200448477 5/25/04 Young C. boiler room Repair A/C unit will not cool reads low evaporator pressure. May 25, 2004
Powell Elementary School FM-200448465 5/25/04 (Powell) On the playground area there are two swings missing that need to be replaced. May 25, 2004
Hine JHS FM-200448470 5/25/04 Hine Room #405 Replace drain pan that has falling apart. Size 61 1/4" X 10" condensation is dripping onto the floor. May 25, 2004
Park View ES FM-200448444 5/25/04 Park View First floor room 102 art room Hole in wall needs to be replaster. Asbestos Code A - Clear for repairs on 05/25/04. Horne Engineering - Tony Marcolin ( RG 05/27/04 ) May 25, 2004
Ketcham Elementary School FM-200448447 5/25/04 Ketcham Door closers need replacing: 1. Under plaza at north stairwell 2. Front door by security desk 3. Screen door in kitchen 4. Exit door in stairwell by cafeteria same door need panic bar replaced 5. Door in north stairwell 2nd floor new wing 6. Door coming off hinges in rooms 209 and 202 Asbestos Code A - Clear for repairs on 05/25/04. Horne Engineering - Sheryll James ( RG 05/27/04 ) May 25, 2004
Draper Elementary School FM-200448443 5/25/04 Draper 9th and Wahler Pl. Install metal frames and brackets for air conditiuoner in the auditorium first floor. May 25, 2004
Powell Elementary School FM-200448461 5/25/04 (Powell) Asbestos Assessment Required. The floor tile in the main office is coming up. The principal would like to have carpet put down not tile. If possible after school let out. Asbestos Code A - Clear for repairs on 05/26/04. Horne Engineering - Edward Rodriguez ( RG 05/27/04 ) SEE LINKED DOCMENTS May 25, 2004
Wilson High School FM-200448500 5/26/04 Wilson, W. Boiler Room Boiler #1 and #3 union iron works high pressure need Boil out. Requested by Boiler Inspector. May 26, 2004
Stanton Elementary School FM-200448509 5/26/04 Stanton Annex Business Manager office, Computer lab office, Room A13 Need Electrical service installed for room A13 for a 24,000 BTUs A/C window unit,unit is on site. Need electrical service installed for computer lab office 13,000 BTUs window unit, unit is on site. Need electrical service installed for the Business Manager's office 25,000 BTU's window unit, unit is on site. May 26, 2004
Simon Elementary School FM-200448501 5/26/04 (Simon) Asbestos Assessment Required. Basement & 3rd Floor: Install one (1) a/c window unit in room #101 (BTU 8,000) Install one (1) a/c unit in the library. (BTU 12, 000) Asbestos Code A - Clear for repairs on 05/27/04. Horne Engineering - Bjarne Smith (RG 06/01/04) May 26, 2004
Eastern High School FM-200448495 5/26/04 Eastern First Floor - Girls Bathroom 1) Repair wall in bathroom - Wall was broken for plumbers to repair leaking line, cinder block and ceramic tile. May 26, 2004
Young Elementary School FM-200448516 5/26/04 (Young) 1st Floor/Auditorium: Hang motion picture projection screen; screen will be used for power point presentation at promotion exercise on June 17, 2004 May 26, 2004
Young Elementary School FM-200448519 5/26/04 (Young) 1st Floor/Auditorium: Asbestos Assessment Required. Survey, repair or replace rear part of stage floor damaged, and buckling due to moisture from basement, and rear wall. (Event to take place on 06/17/2004) Floor was cleared under work request FM-#200122853. May 26, 2004
Tyler Elementary School FM-200448532 5/27/04 Tyler Boiler room No Hot water Replace Domestic Hot water circulating pump Motor, motor will not turn. B&G 1/4 hp 1725 RPM ph.1 Hz 60 115 volts 3.0 amps cont.rating 40 degre c M74799 Thermal prot. M10532 part # May 27, 2004
Bancroft Elementary School FM-200448556 5/27/04 Bancroft EMERGENCY Ground floor cafeteria main bldg. Replace 15-20 ballast (FCV) bad wiring. Asbestos Code A - Clear for repairs on 05/28/04. Horne Engineering - Philp Connolly (RG 06/01/04) May 27, 2004
Bancroft Elementary School FM-200448555 5/27/04 Bancroft Third floor boys bathroom main bldg. Replace trap door. Door not connected to the hinges. Asbestos Code A - Clear for repairs on 05/28/04. Horne Engineering - Philp Connolly (RG 06/01/04) May 27, 2004
Turner Elementary School FM-200448543 5/27/04 Turner School Replace backboard and rims May 27, 2004
Stoddert ES FM-200448548 5/27/04 (Stoddert) 1st Floor/Room #110: Repair a/c unit that is smoking; unit has been turned off. May 27, 2004
Dunbar High School FM-200448552 5/27/04 DUNBAR SHS Asbestos assessment required for areas above ceiling on 1st floor corridor and 5-W. Engineers need to work above ceiling on duct to find problem with air supply. Asbestos Code A - Clear for repairs on 05/28/04. Horne Engineering - Philp Connolly (RG 06/01/04) May 27, 2004
Plummer Elementary School FM-200448575 5 5/28/04 Plummer Room 129 computer Lab Repair or replace (1) 24,000 BTU's window unit in the computer lab room 129, unit does not operate. May 28, 2004
Eastern High School FM-200448588 5/28/04 Eastern Sub basement room outside elevator Replace retaining nuts to (4) light switches at front door or replace the (4) light switches that operates the entire building hallways. May 28, 2004

© The Washington Post Company