Open Repairs Summary

  • Urgent Requests
    36
  • Routine Requests
    248
  • Total Requests
    284

Detailed Reports

Urgent Repair Requests Opened in May 2006 (36)
School Description Open Date
Deal Junior High School FM-200621996 5/1/06 1st Floor- Near Room 111 Replace safety glass (wire mesh) in transom above exterior door. Section of glass is out- 59.5 x 17.5 May 1, 2006
Barnard Elementary School FM-200622078 5/2/06 Barnard Boiler Room Repair or replace hot water heater #1, unit will not reset or start. (Problem coming from stack, water coming from rain, stack has no sheild on roof.) Urgent !!!!! May 2, 2006
Cardozo High School FM-200622187 5/2/06 3RD FLOOR, 306. URGENT- REPLACE OLD WOOD DOOR AND FRAME THAT IS DETERIORING-FRAME IS SPLITING AND HAS BEEN PIECED TOGETHER.CLASSROOM IS USED AS A COMPUTER ROOM . Asbestos Code A - Clear for repairs on 5/05/06. Tidewater - Tony Marcolin (RG 05/10/06) May 2, 2006
Barnard Elementary School FM-200622067 5/2/06 Barnard Roof - Stack or Chimney Provide sheild for stack exhaust. Rain is damage flue pipe and also shorted out hot water heater #1 Urgent !!!!! May 2, 2006
Brookland Elementary FM-200622108 5/2/06 Brookland Boiler Room Repair or replace domestic hot water tanks A.O.Smith 50 gallon tanks. There are two tanks leaking from bottom. Urgent !!!! May 2, 2006
Ferebee-Hope Elementary School FM-200622173 5/3/06 FEREBEE-HOPE boiler room URGENT Building has no windows Repair or replace chiller. Continuously shuting down on low evaporator refrigerate temperature. May 3, 2006
Shaw JHS FM-200622207 5/3/06 URGENT:Repair or replace broken drain line under middle sink near garbage disposal. May 3, 2006
Shaw JHS FM-200622208 5/3/06 URGENT:Students restroom repair or replace faucet and toilet. May 3, 2006
Maury Elementary School FM-200622188 5/4/06 Maury Room #12 (New Building) Repair or replace heat pump window unit need to have the blower motor. Blower not working. Urgent !!!! May 4, 2006
Cleveland Elementary School FM-200622185 5/4/06 Cleveland Boiler Room Repair or replace leaking 3" hot water supply line over top of boiler #2 up in ceiling. Urgent !!!!! May 4, 2006
Wilson J. O. ES FM-200622206 5/4/06 Tiles in room 215A are buckling. The tiles are damp, every few minutes you can hear water but you can not see the water running or dripping. Investigate and make all the necessary repairs. Asbestos Code C - on 5/08/06. Tidewater - Tony Marcolin (RG 05/10/06) Asbestos Code A - Cleared and abated on 08/27/06 per Goel Construction Services (LM-08/29/06) Safety Office. 202-576-8962 May 4, 2006
Benning Elementary School FM-200622230 5/5/06 Benning Roof- Cooling tower URGENT!!!!!!!!!!! Caulk interior of cooling with silicone caulking ,(the seams where the sump strainers are located) May 5, 2006
Brookland Elementary FM-200622457 5/11/06 Brookland Ground Level and 1st Floor Asbestos assessment required Remove insolation on in-line strainers to air handler and /or ceiling mounted cooling unit. Appears to have flow problems. Approx. (2) units on ground level (15) units on 1st floor. Urgent !!!! Asbestos Code A - Clear for repairs on 05/12/06 Tidewater - Kenny Long (RG 05/15/06) May 11, 2006
School WW High School FM-200622710 5/15/06 First Floor/Principal's Office. URGENT! Health issue. Install seven ac-window units with trays and legs and lexan. May 15, 2006
Shaw JHS FM-200622782 5/15/06 URGENT:Two drains stopped up by kettle area causing standing water. Health code violation!!!! May 15, 2006
Eaton Elementary School FM-200622765 5/16/06 Eaton Boiler Room Repair or replace circulating pump for HVAC . MFR= Armstrong- Mod - 4030 Serial-104210 HP 1.5 RPM 1750 Pump size 2D. Motor MFR- Morathon MOD - LVC145TTDR7926ACW Type - TDR Volts - 200; Amps 5.5 Phase 3 RPM-1745 Cy 60 Urgent !!!!! May 16, 2006
Patricia R Harris Ed Center FM-200622751 5/16/06 First Floor-Auditorium: Survey and repair auditorium seats. Remove sharp edges on arm rest. A student got hurt May 16, 2006
Patricia R Harris Ed Center FM-200622689 5/16/06 Harris, P.R. Boiler Room Upgrade lighting system from murcury vapor lighting to flourscent lamp tubes. Present lighting system does not provide proper lighting in the Boiler Room. Electric survey is needed. Safety Hazard. May 16, 2006
Green Elementary School FM-200622771 5/16/06 Green Boiler Room Repair or replace sump pump in Boiler Room. Boiler Room is flooded. Urgent !!!!! May 16, 2006
School WW High School FM-200622723 5/16/06 Second Floor/Room 208. URGENT! Health issue. Install seven ac-window units with trays and legs and lexan. May 16, 2006
School WW High School FM-200622724 5/16/06 Third Floor/Room 303. URGENT! Health issue. Install seven ac-window units with trays and legs and lexan. May 16, 2006
School WW High School FM-200622729 5/16/06 Third Floor/Room 306. URGENT! Health issue. Install seven ac-window units with trays and legs and lexan. May 16, 2006
School WW High School FM-200622733 5/16/06 Third Floor/Room 308. URGENT! Health issue. Install seven ac-window units with trays and legs and lexan. May 16, 2006
School WW High School FM-200622730 5/16/06 Third Floor/Room 307. URGENT! Health issue. Install seven ac-window units with trays and legs and lexan. May 16, 2006
Gage-Eckington ES FM-200622831 5/17/06 Gage Eckington Roof Repair or replace inoperable solenoid valve on supply line to cooling tower. Hand feeding tower. Urgent !!!! May 17, 2006
Beers Elementary School FM-200622810 5/17/06 1st Floor- Cafeteria: Need Birck Masons to re-patch the hole where lockers were removed. Asbestos Code A - Clear for repairs on 05/17/06. DCPS Safety - Richard Gibson (RG 05/17/06) May 17, 2006
Orr Elementary School FM-200622797 5/17/06 Orr Boiler Room Unstop floor drain behind Boiler #1. So Boiler can be drained and cleaned. Urgent !!!!! May 17, 2006
Anacostia Senior High School FM-200623077 5/18/06 Repair gymnasium bleachers Asbestos Code A - Clear for repairs on 05/25/06 DCPS Safety - Richard Gibson (RG) May 18, 2006
Ketcham Elementary School FM-200623007 5/19/06 Ketcham Boiler room Replace safety valve on boiler # 3 Name: Conbraco Size: 1-1/4 X 1-1/2" 15 psi 1200/lbs. Hr. 13-213 May 19, 2006
Kramer Middle School FM-200623049 5/19/06 Safety Blue Paint B OY 4/48 E 8Y 18/48 D OY 2/48 Classroom doors, exit doors, and corridor doors need to be painted. Lead Code A - Clear for repairs on 06/20/06. Tidewater - Roger Small (RG 06/22/06) SEE ASSESSMENTS May 19, 2006
Turner Elementary School FM-200623248 5/24/06 Replace rugs in rooms; 100, 101, 102, 103, Main Office & Principal's Office - Due To A Flood On Monday, Also 105, 107, & 109 - The Smell Is Making People Sick (Health Hazard) Asbestos Code D on 05/24/06 Tidewater - Henry Addison (RG 05/24/06) Asbestos Code A - Abated and cleared fpr repairs on 10/23/06 per Goel confirmation (LM/10-23-06) Safety Office. 202-576-8962. May 24, 2006
Raymond Elementary School FM-200623306 5/25/06 Raymond Boiler Room Repair or replace heating /cooling house circulating pump, that leaking badley (stand by) when in operation. Urgent !!!! May 25, 2006
Clark Elementary School FM-200623354 354 5/25/06 Outside- Kansas Ave. Side (near lobby door) The column is breaking and pieces of it are falling. Very Urgent!!!! May 25, 2006
Takoma Educational Center FM-200623380 5/25/06 1st Floor- Room 65 Replace ceiling tile because of roof leaks. Asbestos Code A - Clear for repairs on 05/30/06. DCPS Safety - Richard Gibson (RG) May 25, 2006
Browne Junior High School FM-200623341 5/25/06 3rd Floor- West Hallway by room 307 Repair/replace or reanchor 1900 Box (white receptacle) that fell from the wall. Safety Hazard May 25, 2006
Gage-Eckington ES FM-200623418 5/26/06 2nd Floor- Boys Bathroom The window's plexi-glass is falling out. Asbestos Code A - Clear for repairs on 05/31/06. Tidewater - Samuel May (RG 06/01/06) Mr. A Thomas @ 671-1160 faxed over a second request on 7/20/06, Note: (Dangerous) Kids are able to fall out of the window if they just happen to touch the window. May 26, 2006

Routine Repair Requests Opened in May 2006 (248)
School Description Open Date
Brookland Elementary FM-200622006 5/1/06 1st Floor- Main Office The sink is broken and needs to be fixed. May 1, 2006
Marshall Educational Center FM-200621967 5/1/06 Thurgood Marshall Roof- Mechanical room Repair or replace drain line on stage #3 air handler unit , leaking from the drain pan. May 1, 2006
McKinley Technology High FM-200622045 5/1/06 Install Washer and Dryer in the Green House Area May 1, 2006
Reed LC FM-200622062 5/1/06 Ground- Recreation Game Room/Office Door knob/hardware needs to be replaced on the exit door. May 1, 2006
Reed LC FM-200622059 5/1/06 Ground- Recreation Game Room/Office Door knob/hardware needs to be replaced on the exit door. May 1, 2006
River Terrace ES FM-200621969 5/1/06 RIVER TERRACE Computer Lab Furnish and install one 24,000 BTU window a/c unit to replace existing inoperable unit. May 1, 2006
Ketcham Elementary School FM-200621960 5/1/06 Ketcham Boiler Room All (6) six feed water pumps and motors needs to be replace, leaking badly. Century A/C motor A.O. Smith Cat. #H155 Part # 8-187147-20 Type SC HP-1/2 HZ 60-50 Amp 2.6 Time Cont Code M May 1, 2006
Benjamin Banneker Academic HS FM-200621990 5/1/06 First Floor-Boy's Side, Gym: Replace missing muller that is needed to lock the center pole in place so the locker room can be locked. May 1, 2006
Benjamin Banneker Academic HS FM-200621994 5/1/06 Second Floor-Library door is off track, door can't be locked. May 1, 2006
Benjamin Banneker Academic HS FM-200621995 5/1/06 Third Floor-Rm. 311: Repair or replace the lock on the door so the room can be secured. May 1, 2006
Beers Elementary School FM-200621997 5/1/06 1st Floor- Cafeteria/Kitchen The paint is peeling in the kitchen, storage room, and restroom of kitchen. Lead & Asbestos Code A - Clear for repairs on 5/09/06. Tidewater - Roger Small (RG 05/10/06) SEE ASSESSMENTS May 1, 2006
Cardozo High School FM-200621999 5/1/06 Third Floor-Room 312A: Repair or replace the door lock so that the classroom can be secured. May 1, 2006
Gage-Eckington ES FM-200622007 5/1/06 First Floor-No exit light in rm. 106 May 1, 2006
Backus Middle School FM-200622011 5/1/06 BACKUS Main Office Furnish and install one of each 25,000btu window a/c unit and one 25,000 dual temperature window a/c /heat pump for main office. May 1, 2006
Wilkinson ES FM-200622086 5/2/06 Playground Area The back-board and rims need to be replaced (the set is attached). May 2, 2006
Wilkinson ES FM-200622087 5/2/06 2nd Floor- Room 135 and Stariwell Exit Door #3 The 2 doors need to be repaired. They will not close properly and slam too hard. May 2, 2006
Malcolm X ES FM-200622064 5/2/06 Malcolm X Roof -Cooling Tower 4th Floor Roof Survey and construct drain line with a 2"drain valve that will extend to the roof drain drain to prevent water from leaking down in classrooms on the 4th floor when draining cooling tower. *Existing PVC piping was damaged during replacement of drain valve. May 2, 2006
Park View ES FM-200622104 5/2/06 First floor, Auditorium. Please assess walls in auditorium for lead based paint. Lead & Asbestos Code A - Clear for repairs on 05/02/06. Tidewater - Roger Small (RG 05/03/06) May 2, 2006
Ludlow-Taylor ES FM-200622083 5/2/06 Repair or replace the bad switch in rm. 203 one set of the lights don't work. May 2, 2006
Thomson Elementary School FM-200622107 0622107 5/2/06 Outside The hooks need to be replaced on the flag pole rope. The flag cannot be raised or lowered. May 2, 2006
Davis Elementary School FM-200622119 5/2/06 1st Floor- Auditorium Two outlets are needed. May 2, 2006
Davis Elementary School FM-200622118 5/2/06 1st Floor- Rooms 101 & 115 Electrical outlets are needed. May 2, 2006
Murch Elementary School FM-200622135 5/2/06 1st & 2nd Floors Replace wax gasket in Boys & Girls Bathroom Clean out sink drains in May 2, 2006
Thomson Elementary School FM-200622110 0622110 5/2/06 1st Floor- Principal's Office The locks need to be changed. They need a secure testing facility. May 2, 2006
McKinley Technology High FM-200622116 5/2/06 McKinley Boiler Room Provide scope to purchase and install and each booster heaters to maintain hot water temperature levels for holding tanks, supplying the main building and also the gym. May 2, 2006
Turner Elementary School FM-200622098 5/2/06 1st Floor- Exit Door (Breezeway) & Room 115 Repair broken door closures. May 2, 2006
Wilkinson ES FM-200622081 5/2/06 Playground/Stairwell Tree branches need to be trimmed. The students cannot get up the stairwell on the playground. May 2, 2006
Clark Elementary School FM-200622072 072 5/2/06 Kansas Ave. Side Exit Door-Need key made so the door can be locked. May 2, 2006
Ross Elementary School FM-200622175 5/3/06 Basement First urinal in the boy's restroom needs to be repaired. May 3, 2006
Merritt Middle School FM-200622155 5/3/06 3rd Floor- Girl's Bathroom The sink is broken off of the wall. May 3, 2006
Merritt Middle School FM-200622156 5/3/06 3rd Floor- Boy's & Girl's Bathroom Both bathrooms need locks. May 3, 2006
Wilson High School FM-200622153 5/3/06 Wilson, W. Throughout Building Survey and provide scope of work for independent heating of domestic hot water to Gym, Library and Main Building. May 3, 2006
Bancroft Elementary School FM-200622159 5/3/06 Outside near Cafeteria The steps and platform entrance to cafeteria need to be torn down and replaced. May 3, 2006
Cardozo High School FM-200622143 5/3/06 First Floor-Handicap Door Can't Be Secured, The Center Piece And Bottom Piece Is Broken. May 3, 2006
Spingarn High School FM-200622148 5/3/06 Outside- Stadium Door needs to be replaced; materials cannot be secured. May 3, 2006
Emery Elementary School FM-200622200 5/3/06 Men bathroom across from the main office staff and students are getting locked in bathroom .Door knob is off. May 3, 2006
Emery Elementary School FM-200622204 5/3/06 Sink in classroom leaking from elbow.(Elbow rusted ) May 3, 2006
Ferebee-Hope Elementary School FM-200622166 5/3/06 Ferebee Hope Boiler Room Repair coupling on #1 Chill water pump. Leaking. May 3, 2006
Garnet-Patterson MS FM-200622160 5/3/06 Asbestos & Lead Assessment Required. Scope of Work: Electrical upgrade to existing power panels to accommodate the additional power requirements for existing and new window air conditioners in classrooms. Asbestos Code A - Clear for repairs on 12/01/06. Tidewater - Philp Connolly (RG 01/16/07) SEE LINKED DOCUMENTS May 3, 2006
Hart Middle School FM-200622177 5/3/06 Third floor, Rooms 314, 318 and 319. Need keys made for the following rooms so that the teachers can access these classrooms 314, 318 and 319. May 3, 2006
Ballou Senior High School FM-200622165 5/3/06 Ballou Boiler Room Install (1) one domestic hot water heater, Boiler Note: The removal of condemn Boiler #4 is required for the new Hot Water Boiler (Heater), Piping and platform is in place. May 3, 2006
Wilkinson ES FM-200622178 5/4/06 Wilkinson BOILERROOM Asbestos assessment required. Replace (2) 6" Butterfly valves for the stand-by pump the is used for the condenser pump.The main condenser pump is down(FM-200332649) May 4, 2006
Kramer Middle School FM-200622190 5/4/06 3rd Floor- Room 317 Floor socket needs to be repaired. May 4, 2006
Brookland Elementary FM-200622193 5/4/06 3rd Floor- Boys Bathroom The flush valves are leaking on two toilets. May 4, 2006
Bunker Hill Elementary School FM-200622226 5/5/06 Repair or replace lighting on the second floor-east wing. May 5, 2006
Bancroft Elementary School FM-200622239 5/5/06 Men's Bathroom Change light socket, sparks are flying from outlet receptacle. May 5, 2006
Webb Elementary School FM-200622229 5/5/06 1st Floor- Kitchen Screen on door that leads to exit needs to be repaired/replaced. May 5, 2006
Bancroft Elementary School FM-200622240 5/5/06 2nd Floor- Room 121 (Main Building) The light fixture is falling down from the ceiling. May 5, 2006
Benning Elementary School FM-200622247 5/5/06 Benning Boiler room Restore power to chiller control panel, no power to oil sump heaters. May 5, 2006
Woodson High School FM-200622237 5/5/06 Woodson,H.D. Boiler room Repair domestic hot water heater # 1 , and #2 will not ignite. May 5, 2006
Dunbar High School FM-200622283 5/8/06 Dunbar Boiler room Pelace leaking coil in air handler unit # 6, can not be repaired. May 8, 2006
Marshall Educational Center FM-200622342 5/8/06 The roof is leaking in one the labs. May 8, 2006
Wilson J. O. ES FM-200622328 5/8/06 2nd Floor- Room 215 The radiator needs to be fixed; it is leaking and making the floor tile buckle. May 8, 2006
Deal Junior High School FM-200622334 5/8/06 Asbestos Assessment Required. Basement floor, Kitchen Area. Upgrade lighting in kitchen, the existing fixtures are outdated and lack covers. Asbestos Code A - Clear for repairs on 05/24/06 Tidewater - Henry Addison (RG 05/25/06) SEE ASSESSMENTS May 8, 2006
Brookland Elementary FM-200622300 5/8/06 3rd Floor- Boys Bathroom 2 Toilets are leaking 2nd Floor- Girls Bathroom 3 Toilets are leaking. May 8, 2006
Thomas Elementary School FM-200622325 5/8/06 Thomas Boiler Room Replace two defective Butterfly Isolation valves for stand-by pump. Valve size is (six) 6 " May 8, 2006
Thomas Elementary School FM-200622327 5/8/06 Thomas Boiler Room Repair leaking mechanical seal on Stand-by pump. May 8, 2006
Jefferson JHS FM-200622405 5/9/06 1st Floor- Hallway Metal rail is broken off of walls. Asbestos Code A - Clear for repairs on 05/12/06 Tidewater - Kenny Long (RG 05/15/06) May 9, 2006
Woodson High School FM-200622350 5/9/06 Install 1 AC unit in the Barber Shop. May 9, 2006
Savoy Elementary School FM-200622385 0622385 5/9/06 First Floor-Boy's & Girl's Restroom (north end of building): 2 Toilets are stopped up, tried plunging but did not succeed. May 9, 2006
Savoy Elementary School FM-200622387 0622387 5/9/06 Repair or replace the exterior lighting of the building, there is a total of 30 out. May 9, 2006
Kelly Miller MS FM-200622354 5/9/06 Gym-Install cages under light fixtures May 9, 2006
Turner Elementary School FM-200622409 5/9/06 1st Floor- Main Office Sink is clogged; sewer debris is also coming up. May 9, 2006
Kelly Miller MS FM-200622352 5/9/06 First Floor-Kitchen: Repair the pipe leak under the dish washing sink. May 9, 2006
Kelly Miller MS FM-200622351 5/9/06 First Floor-Kitchen: Need to have pipe under cooking streamer moved back, because it's causing a problem for the school cook. May 9, 2006
Eliot Junior High School FM-200622349 5/9/06 Install A/C units in rooms 309,311,312,313,314,315 and 316. A/C units on site. Electricians need to provide electrical service for A/C units (seven total) May 9, 2006
Brookland Elementary FM-200622374 5/9/06 2nd Floor and Ground Floor- Girl's Bathrooms There is no water. May 9, 2006
Davis Elementary School FM-200622373 5/9/06 First Floor-Rm. 105: Install a switch for AC Unit. Teacher cant reach switch on the unit because it's too high. May 9, 2006
Savoy Elementary School FM-200622380 0622380 5/9/06 First Floor-Kitchen: Double sink next to the back door need to have strainers replaced in both wells and it is also clogged, tried to use a plunge and nothing happened. May 9, 2006
Savoy Elementary School FM-200622382 0622382 5/9/06 First Floor: 4 ballasts are blown in the Main Office, 1 ballasts blown at the south end of the hallway, 1 ballast blown in room 117, 1 ballast blown in room 114, 1 ballast blown in room 110, and 2 ballast blown in Vestible between 117C & 117D May 9, 2006
Ronald H. Brown MS FM-200622676 5/9/06 Asbestos Assessment Required. Peeling and scaling paint is falling from celing in storeroom area. Shelves in need of painting. Lead & Asbestos Code A - Clear for repairs on 06/08/06. Tidewater - Roger Small/Shamika Parker (RG 06/20/06) May 9, 2006
Merritt Middle School FM-200622445 5/10/06 3rd Floor- Boys Bathroom Door will not lock or unlock properly. May 10, 2006
West Elementary School FM-200622431 5/10/06 Ground Floor- Main Office Principals restroom needs a new faucet. May 10, 2006
Thomas Elementary School FM-200622412 5/10/06 Thomas Boiler room Replace 1-1/4" ASCO solenoid dump valve on the modular chiller, valve stuck open position May 10, 2006
Terrell Mc ES FM-200622684 5/10/06 At M. C. Terrell ES - broken tree limb need to be cut down completely before it fall on a vehicle causing much damage. May 10, 2006
Terrell Mc ES FM-200622683 5/10/06 At M. C. Terrell ES - tree has fallen on fence and needs to be cut off. May 10, 2006
Brookland Elementary FM-200622455 5/10/06 3rd Floor- Boys & Girls Bathrooms Water Basin is broken. May 10, 2006
Merritt Middle School FM-200622444 5/10/06 1st Floor- Counselor's Office A key is needed for the main office. May 10, 2006
West Elementary School FM-200622434 5/10/06 Ground Floor- Pre Kindergarten Boys and Girls restroom sinks are clogged. May 10, 2006
West Elementary School FM-200622439 5/10/06 1st Floor- Boys Restroom near gym Toilets are not working and water will not stop running. Parts are missing, one is clogged, and sewage gas is coming through drain. May 10, 2006
West Elementary School FM-200622440 5/10/06 Ground Floor- Girls & Boys Bathrooms Both bathrooms need handicap faucets. May 10, 2006
Shaed Elementary School FM-200622441 5/10/06 Shaed Boiler room Replace broken 3/4" PVC line to the chemical feeder for the boiler. May 10, 2006
Horace Mann Elementary School FM-200622448 5/10/06 First Floor-Water Fountain, Water no water is coming from it-Check and repair. May 10, 2006
Hine JHS FM-200622419 5/10/06 1st Floor- Room 107 Replace wall receptacle. May 10, 2006
Janney Elementary School FM-200622411 5/10/06 Janney Boiler room Repair or replace sump pump , unit has power but will not run. May 10, 2006
Amidon Elementary School FM-200622430 5/10/06 1st & 2nd Floors- Bathrooms Toilet and urinal bowls need to be repaired. May 10, 2006
Kramer Middle School FM-200622416 5/10/06 Third Floor-Rm. 317: Repair exposed wires and remove electric outlets on the floor. May 10, 2006
Amidon Elementary School FM-200622426 5/10/06 2nd Floor- Stairway Corridor Ceiling needs to be repaired. There are holes in it from the flood. Asbestos Code A - Clear for repairs on 05/23/06. Tidewater - Shamika Parker (RG 05/24/06) May 10, 2006
Amidon Elementary School FM-200622425 5/10/06 1st & 2nd Floors- Gym Area Bradley basins need to be repaired in the boys and girls bathrooms. May 10, 2006
Peabody Elementary School FM-200622435 5/10/06 Basement- Cafeteria Paint is chipping from overhead steam lines. It needs to be removed and re-painted. Lead Code A - Clear for repairs on 05/25/06. Tidewater - Roger Small (RG 05/30/06) May 10, 2006
Merritt Middle School FM-200622446 5/10/06 3rd Floor- Girls Bathroom Door will not lock or unlock properly. May 10, 2006
Barnard Elementary School FM-200622533 5/11/06 Second Floor-Media Area: There is an electrical problem and it's effecting the network (everything keeps cutting off). Check and Repair Note: It's not the network, it's an electrical problem May 11, 2006
Adams Elementary FM-200622531 5/11/06 Second Floor-Phisical ED Office:Repair or replace the lock on door, there is equipment in the room and the area can't be secured. May 11, 2006
Eastern High School FM-200622481 5/11/06 Stairwells throughout the Buidling Paint and plaster stairwells. Lead & Asbestos Code A - Clear for repairs on 06/06/06. Tidewater - Shamika Parker (RG 06/20/06) SEE ASSESSMENTS May 11, 2006
West Elementary School FM-200622493 5/11/06 Outside Column- Near the Pre-K side of building Wall needs to be re-bricked. There was a busted pipe inside and plumbers needed to fix it. May 11, 2006
Hart Middle School FM-200622468 5/11/06 1st Floor- Cafeteria Sink and floor drain are clogged May 11, 2006
Hart Middle School FM-200622470 5/11/06 1st Floor- Boys Bathroom Replace and rehang urinal. There is a hole in the wall from when a previous plumber removed the urinal and never reinstalled a new one. May 11, 2006
Eastern High School FM-200622482 5/11/06 Basement- Girls Bathroom (across from room B-77) Furnish and install partitions. May 11, 2006
Cardozo High School FM-200622540 5/11/06 Sub-Basement- West Fan Room There is a stopped up drain that is part of the science lab drainage. May 11, 2006
Ronald H. Brown MS FM-200622499 5/11/06 Second Floor-Poor lighting in stairwell #1 May 11, 2006
Leckie Elementary School FM-200622593 5/12/06 Leckie Boiler Room Main Condensate tank line behind ground floor univent coils near wall needs to be unclogged continuiusly backs up causing water on classroom floor. Classrooms: #14;#21;#30;#24 Approx. Size 1-1/2" May 12, 2006
Hine JHS FM-200622628 5/12/06 First floor, Teachers' Lounge. Repair or Replace faulty electrical light switch. May 12, 2006
Hearst Elementary School FM-200622606 5/12/06 Roof Area Between First & Second Floor. Unclog exterior roof drain water is backing up through the wall. May 12, 2006
Tubman Elementary School FM-200622607 5/12/06 Second (2nd) Floor - Corridor Paint Window guard. Area is accessible from small roof. May 12, 2006
Eastern High School FM-200622602 5/12/06 Water leaking from Roof, down through Auditorium,to Stage, down to Cafeteria.. Roof Drains may be stopped up. Possibility of mold growing in Roof area, maybe asbestos..causing damage to auditorium floor. Asbestos Code A - Clear for repairs on 05/25/06. Tidewater - Thomas Johnson (RG 05/30/06) May 12, 2006
Shaed Elementary School FM-200622677 5/15/06 Replace the steps tred in both stairways from the ground floor up to the third floor. Asbestos Code A - Clear for repairs on 05/18/06. Tidewater - Thomas Johnson (RG 05/22/06) May 15, 2006
Walker-Jones EC FM-200622653 5/15/06 Ceiling Leak On First Floor In The Main Lobby Asbestos Code A - Clear for repairs on 05/16/06 Tidewater - Henry Addison (RG 05/16/06) May 15, 2006
Shaw JHS FM-200622638 5/15/06 First Floor-Rm.149 (Computer Lab): Ubstakk 1 18,000 BTU Window A/C Unit. Note: A/C on site May 15, 2006
Smothers ES FM-200622656 5/15/06 1st Floor- Boys Bathroom There is a busted pipe under the sink (drain pipe). No water is leaking. May 15, 2006
McKinley Technology High FM-200622659 5/15/06 Basement Level, Boiler Room. Replace leaking mechanical seal to primary boiler pump # 1. May 15, 2006
McKinley Technology High FM-200622661 5/15/06 Basement Level, Boiler Room. Replace defective DDC control actuator valve does'nt obey open command. Unit modle name Belimo Boiler # 4 May 15, 2006
Patterson ES FM-200622647 5/15/06 Paint room#115 and Stairwell on the 1st Floor near the elevator. Lead Code A - Clear for repairs on 07/03/06. Tidewater - Roger Small (RG 07/05/06) May 15, 2006
Truesdell Elementary FM-200622660 5/15/06 Boiler Room The light fixture is rusted and hanging from the ceiling wires. A new light fixture is needed. Asbestos Code A - Clear for repairs on 05/17/06. Tidewater - Shamika Parker (RG 05/18/06) May 15, 2006
Benjamin Banneker Academic HS FM-200622643 5/15/06 Basement-Kitchen: Court Yard Door Need To Be Replaced Because Door Is Coming Off The Hedges-Door 2 Exit Screen/Wood Door Needs To Be Replaced In Kitchen These Door- Are Old Wood And Out Dated And Need To Be Changed Out. Asbestos Code A - Clear for repairs on 05/17/06. Tidewater - Shamika Parker (RG 05/18/06) May 15, 2006
Bancroft Elementary School FM-200622727 5/16/06 Breech in the across from rm. 122 Asbestos Code A - Clear for repairs on 05/18/06. Tidewater - Kenny Long (RG 05/22/06) May 16, 2006
Browne Junior High School FM-200622766 5/16/06 Brown Center - Third Floor-Hallway: Secure electricity outlet back to wall properly hanging off wall by room 307 May 16, 2006
Hart Middle School FM-200622714 5/16/06 15 balances burnt out in the auditorium also some balances burnt out in the Main Office. May 16, 2006
Hart Middle School FM-200622712 5/16/06 Replace the sink and cabinet in the kitchen area of Rm. B14-E, the sink is rusted and the cabinet is broken with peeling paint. Asbestos Code A - Clear for repairs on 05/19/06. Tidewater - Kenny Long (RG 05/22/06) May 16, 2006
Turner Elementary School FM-200622695 5/16/06 First Floor-Main Office: Service the A/C unit's in the main office and the principal office. May 16, 2006
Hart Middle School FM-200622709 5/16/06 Paint all doors in the Rec. Area, B13-I, B13-F & B13-J Lead Code A - Clear for repairs on 06/13/06. Tidewater - Roger Small (RG 06/14/06) SEE ASSESSMENTS May 16, 2006
Bancroft Elementary School FM-200622726 5/16/06 Breech in the ceiling stairwell above office Asbestos Code A - Clear for repairs on 05/18/06. Tidewater - Kenny Long (RG 05/22/06) May 16, 2006
Hart Middle School FM-200622706 5/16/06 Five lockers are coming out of the wall in front of room 316; Repair Asbestos Code A - Clear for repairs on 05/19/06. Tidewater - Kenny Long (RG 05/22/06) SEE ASSESSMENTS May 16, 2006
Aiton Elementary School FM-200622772 5/16/06 Rooftop Exhaust fan is making a loud noise. Fan may be bent. May 16, 2006
Gibbs Elementary School FM-200622757 5/16/06 1st & 2nd Floor- Boys & Girls Bathrooms Restrooms need light covers fabricated or fixtures; there is a risk for burn. Ballasts maybe? May 16, 2006
Bancroft Elementary School FM-200622738 5/16/06 Light fixture defective in stairwell outside of 221 May 16, 2006
Bancroft Elementary School FM-200622737 5/16/06 Breech in wall stairwell outside of 221 Asbestos Code A - Clear for repairs on 05/18/06. Tidewater - Kenny Long (RG 05/22/06) May 16, 2006
Bancroft Elementary School FM-200622734 5/16/06 Breech in wall near rm. 200B Asbestos Code A - Clear for repairs on 05/18/06. Tidewater - Kenny Long (RG 05/22/06) May 16, 2006
Bancroft Elementary School FM-200622725 5/16/06 Breeches in ceiling-Rm. 120 Note: 4 Ceiling tiles missing Asbestos Code A - Clear for repairs on 05/18/06. Tidewater - Kenny Long (RG 05/22/06) May 16, 2006
Gage-Eckington ES FM-200622700 5/16/06 First Floor-Kindergarten Class: The Toilets In The Class Are Not Working. May 16, 2006
Woodson High School FM-200622774 5/16/06 Woodson Auditorium/Pent House Repair or replace rupture cooling coils in Auditorium and Penthouse. No air conditions. May 16, 2006
Kenilworth ES FM-200622851 5/17/06 2nd & 3rd Floors- Rooms 213 & 312 Install wire mesh glass in doors Asbestos Code A - Clear for repairs on 05/18/06. Tidewater - Kenny Long (RG 05/22/06) May 17, 2006
Ballou Senior High School FM-200622785 5/17/06 Ballou Rooftop Southwest Corner Service Trane fresh air return and cooling unit. Info: Trane ser# T03J58991 Note: Unit is locked out. May 17, 2006
Ballou Senior High School FM-200622786 5/17/06 Ballou Boys Locker Room Replace two (2) 3" gate valves on the domestic hot water and cold feed water supply line. Note: Loosing domestic hot water daily. May 17, 2006
Ballou Senior High School FM-200622788 5/17/06 Ballou Science Labs #104;#105;A106 NO HEAT Repair three (3) Heating/Cooling (Split System) univents. Note: Units are blowing out fuses. Info: Package Terminal A/C /Heating pump in room #104 Mod #PTEC15020DA MFG# P1242401R Ser. #AO2COO839 Cooling BTU 14200 Cooling Amps 5.9 Room #105 Ser. # A02COO840 Same info.,Mod.# Etc. Room #A106 Ser. #A02Coo842 Same info. Mod.# Etc. May 17, 2006
Ballou Senior High School FM-200622838 5/17/06 Ballou Mechanical An Tech. Area/A39/A41 Repair and service heat pump FCU B-1 Note: Unit not cooling also fire alarm system is connected to heat- pump unit. Info: American Standard Trane Mod. #TWEO90A300EA sER. #3381X7N5N May 17, 2006
Barnard Elementary School FM-200622868 5/17/06 1st Floor- Cafeteria The hot table and cool table (used to hold food for lunch) are not working properly. May 17, 2006
Browne Junior High School FM-200622893 5/17/06 Basement Level, Kitchen Area. Replace ballasts in light fixtures in kitchen. May 17, 2006
Coolidge High School FM-200622865 5/17/06 Ground Floor- Sheridan Street Side (Cafeteria) A cage needs to be built to enclose a new condensing unit and refrigerator. Please see supervisor for exact location for cages. May 17, 2006
Hine JHS FM-200622791 5/17/06 Hine Through-out Asbestos assessment required for univents, air handlers, and component replacement. Remove all insulation from the supply and return lines, valves, strainers,fittings and pipng to univents, air handlers,and other heating and air conditioning equipment ( from ftting to fitting). Asbestos "Code A" clear for repairs on 07/12/06. Tidewater - Tony Marcolin (RG 07/17/06) May 17, 2006
Malcolm X ES FM-200622877 5/17/06 Second Floor-Boy's Restroom: Repair or replace the urinal that is out of service. May 17, 2006
Malcolm X ES FM-200622880 5/17/06 Playground Side/Parking Lot Area-Unstop drain, Standing water May 17, 2006
Powell Elementary School FM-200622919 5/17/06 On the 2nd floor in the teacher's lounge the sink near the stove needs a washer because we don't have any washers plus you have to cut off the main water line to the building because there is no cut off line near the sink. May 17, 2006
Whittier Elementary School FM-200622884 5/17/06 1st Floor- Steps Leading to the Boiler Room Repair 2" waste line in stairway. May 17, 2006
Wilkinson ES FM-200622881 5/17/06 2nd Floor- Girls Bathroom Radiator needs to be repaired/replaced. It is coming of the wall, also need an radiator cover on it due to kids might get burn by it May 17, 2006
Wilson High School FM-200622794 5/17/06 Entrance coming up steps into the building on the stadium side - Handrail down, sharp edges. May 17, 2006
Seaton Elementary School FM-200622940 5/18/06 Playground Replace rims and backboads on the basketball courts. May 18, 2006
Johnson JHS FM-200622911 5/18/06 Basement - Kitchen - Repair or replace leaking pot sink faucets. May 18, 2006
Whittier Elementary School FM-200622977 5/18/06 Basement-16: Replace the fire mesh door glass Asbestos Code A - Clear for repairs on 05/23/06 Tidewater - Kenny Belton (RG 05/25/06) May 18, 2006
Patricia R Harris Ed Center FM-200622932 5/18/06 2nd Floor- Boys Restroom Remount sink to wall; bracket needs to be replaced. Asbestos Code A - Clear for repairs on 05/19/06. Tidewater - Kenny Long (RG 05/22/06) May 18, 2006
Anacostia Senior High School FM-200623080 5/18/06 Repair seating in auditorium May 18, 2006
Shaed Elementary School FM-200622945 5/18/06 Asbestos Assessment Required. Second floor, Rooms 22A. Replace ceiling tiles (1 X 1) due to pipe that burst, need tiles & tracks. Asbestos Code A - Clear for repairs on 05/19/06. Tidewater - Roger Small (RG 05/22/06) May 18, 2006
Shaed Elementary School FM-200622952 5/18/06 Asbestos Assessment Required. Ground floor, Skills Rooms 1. Replace ceiling tiles (1 X 1) due to pipe that burst. Asbestos Code A - Clear for repairs on 05/19/06. Tidewater - Roger Small (RG 05/22/06) May 18, 2006
Shaed Elementary School FM-200622954 5/18/06 Asbestos Assessment Required. First floor, Special Education Room. Replace ceiling tiles (1 X 1) due to pipe that burst. Asbestos Code A - Clear for repairs on 05/19/06. Tidewater - Roger Small (RG 05/22/06) May 18, 2006
Ketcham Elementary School FM-200623006 5/19/06 Ketcham Boiler room Replace leaking sections in the # 3 boiler. May 19, 2006
Powell Elementary School FM-200623090 5/19/06 On the front of the building roof top there is a hole that needs to be patch up. May 19, 2006
Ferebee-Hope Elementary School FM-200623020 5/19/06 Check the electrical outlets in the Art Room on the Fourth Floor, sparks are coming from it. May 19, 2006
Ketcham Elementary School FM-200623004 5/19/06 Ketcham Boiler room 1. Need welder to help remove cross tees and or plugs from boilers 1,2,3,4,and 5 boilers. 2. Please extend blow down lines to drains from low water cut off , automatic water feeder on boilers # 1,2,3,4,and 5 . This needed for boiler inspections. May 19, 2006
Kenilworth ES FM-200623024 5/19/06 1st Floor Storage Room 2nd Floor- Speech Room Repair light fixtures May 19, 2006
Browne Junior High School FM-200623037 5/19/06 Basement- Kitchens Light fixtures need ballasts. May 19, 2006
Browne Junior High School FM-200623019 5/19/06 Rm. 114-Need Door Handle, Kids are getting stuck in the room. May 19, 2006
Orr Elementary School FM-200623029 5/19/06 3rd Floor- Boys Bathroom Sink needs to be remounted. May 19, 2006
Cleveland Elementary School FM-200623042 5/19/06 Ground Floor & 3rd Floor- Stairwell Walls Both the North and South stairwells need to be repainted. Asbestos Code A - Clear for repairs on 05/30/06. Tidewater - Roger Small (RG 05/31/06) SEE ASSESSMENTS May 19, 2006
Wilkinson ES FM-200623038 5/19/06 Second Floor-Near Ms. Bibbins Rm.-Fire alarm pull station, key broke off, need to be replaced. May 19, 2006
Cleveland Elementary School FM-200623040 5/19/06 Ground, 1st, 2nd, & 3rd- All Hallways All hallways need to be repainted throughout the building. Asbestos Code A - Clear for repairs on 05/30/06. Tidewater - Roger Small (RG 05/31/06) SEE ASSESSMENTS May 19, 2006
Thomas Elementary School FM-200623022 5/19/06 1st Floor- Principal's Office Window guard needs to be welded on both sides. May 19, 2006
Stuart-Hobson Middle School FM-200623033 5/19/06 2nd Floor- Boys Bathroom Urinal on 3rd floor was stopped up, causing an overflow. It is causing the ceiling to leak badly in the 2nd Floor Boys Bathroom. Ceiling has peeling paint and it is spreading. Asbestos Code A - Clear for repairs on 05/22/06 Tidewater - Samuel May (RG 05/25/06) May 19, 2006
Eliot Junior High School FM-200623021 5/19/06 Second Floor-Hallway: Electrical Circuit Breaker Blew Out And Half The Hallway Has No Electricity. May 19, 2006
Cleveland Elementary School FM-200623041 5/19/06 Outside- Roof The roof needs to be repaired to prevent future leaks. Tile is bulking. May 19, 2006
Cleveland Elementary School FM-200623039 5/19/06 Ground- School Store An outlet needs to be installed for dryer to work. May 19, 2006
Wilson J. O. ES FM-200623043 5/19/06 Survey 6 Exhaust fans on the roof and repair as needed. May 19, 2006
Lincoln Middle School FM-200623065 5 5/22/06 Bell Lincoln Multi-Cultural MS and HS .3101 16th Street, N.W. Carpentry 1. Install telephone bracket 36 AFF ( verify placement on site) on west wall in Daycare Headstart Room E 123A. Telephone and bracket are located on site and are required to provide full telephone coverage for the Daycare Center. 2. Install continuous hinge dutch wooden door in masonry doorway to Daycare Toilet Room E 122C. Field verify height of door. Install pinch-proofing material for hinges. May 22, 2006
Barnard Elementary School FM-200623085 5/22/06 Network is shutting down. May 22, 2006
Reed LC FM-200623092 5/22/06 1st Floor- Principal's Office Restroom Replace 1 deck mounted faucet, trap, & drain. The faucet runs nonstop and the drain line is leaking. May 22, 2006
River Terrace ES FM-200623099 5/22/06 Rooftop Repair/replace access door to roof. There is a defective arm/hinge that prevents the door from remaining open. May 22, 2006
River Terrace ES FM-200623100 5/22/06 1st Floor- Food Service Kitchen Repair/replaster ceilings and walls in kitchen. Asbestos Code A - Clear for repairs on 05/24/06 Tidewater - Henry Addison (RG 05/25/06) May 22, 2006
Lincoln Middle School FM-200623066 6 5/22/06 Bell Lincoln Multi-Cultural MS and HS .3101 16th Street, N.W. Plumbing 1. Connect Whitehall 110 gallon, stationary whirlpool tubs (whirlpool cut sheets available from M. Wallace) to existing valves in Training Rooms D 218 (1 tub) and E 212 (2 whirlpool tubs). Tubs are stored on stored on site. 2. Connect icemaker machines to existing piping 1 ea in Rooms B 106, B 208, E 212 and E 218. Icemakers are stored on site. 3. Connect undercounter refrigerators to existing piping in Science Lab Prep Rooms (1 ea) A161, A239, A 38, A435, C140, C228, C324. Refrigerators are stored on site. May 22, 2006
Birney Elementary School FM-200623093 5/22/06 Outside- In Front of the Main Office Bush/Tree needs to be cut & trimmed. May 22, 2006
Bancroft Elementary School FM-200623103 5/22/06 Outside of Library Repair gate; it is dragging the ground and cannot be closed. May 22, 2006
Turner Elementary School FM-200623097 5/22/06 Ground Floor- Cafeteria & Kitchen Repair ceiling in cafeteria & kitchen from flood damage. Asbestos Code A - Clear for repairs on 05/23/06. Tidewater - Henry Addison (RG 06/13/06) May 22, 2006
Wilson High School FM-200623109 5/23/06 Wilson, W Across from Music Room Remove radiator and install small univent removed from room #151 May 23, 2006
Hart Middle School FM-200623122 5/23/06 Replace door glass in the following areas, Gym Auditorium, and Stairwell #9 Asbestos Code A - Clear for repairs on 05/30/06. Tidewater - Samuel May (RG 05/31/06) May 23, 2006
Spingarn High School FM-200623200 5/23/06 First Floor Health Suite. Treatment Area Girls side, Ceiling paint is peeling and falling. Ceiling is plaster and approximately 15 feet high. Scrape and Paint ceiling. Lead & Asbestos Code A - Clear for repairs on 06/12/06. Tidewater - Roger Small (RG 06/13/06) SEE ASSESSMENTS May 23, 2006
Wilson High School FM-200623108 5/23/06 Wilson, W Gym-Room #151 Remove small univent and install univent (on site) in order to provide sufficient heating room #151 durning incumbent weather. May 23, 2006
Young Elementary School FM-200623149 5/23/06 Kitchen, Exit Door (Loading Doc)- Repair or replace door hardware, bolts are missing and there is fear of the door falling May 23, 2006
Draper Elementary School FM-200623238 5/24/06 Second Floor-Breach in ceiling in storage room #205 Asbestos Code A - Clear for repairs on 05/24/06 Tidewater - Carlos Vera (RG 05/25/06) May 24, 2006
Randle-Highlands ES FM-200623304 5/24/06 1st Floor- Room 2106 Electronic hand-basin is running non-stop. May 24, 2006
Gibbs Elementary School FM-200623300 5/24/06 1st- 3rd Floors- Hallways The water coolers are not working; they were leaking, so they were shut off. May 24, 2006
Gibbs Elementary School FM-200623298 5/24/06 1st Floor- Room 122 The ceiling needs to be repaired because of water leaks. Asbestos Code A - Clear for repairs on 05/25/06. Tidewater - Thomas Johnson (RG 05/30/06) May 24, 2006
Gibbs Elementary School FM-200623291 5/24/06 2nd Floor- Girls Restroom Commode is running nonstop. May 24, 2006
Gibbs Elementary School FM-200623290 5/24/06 3rd Floor- Boys & Girls Restroom Commode is running nonstop. May 24, 2006
Gibbs Elementary School FM-200623289 5/24/06 1st Floor- Restroom in Kitchen Commode is running nonstop. May 24, 2006
Shaed Elementary School FM-200623256 5/24/06 1st Floor- Kitchen Replace outlet for lunch counter machine. May 24, 2006
Gage-Eckington ES FM-200623302 5/24/06 First & Second Floor/Boy's & Girl's Restroom - Replace flush valves due to wear and tear-Will not flush properly, unable to change/none on site. May 24, 2006
Simon Elementary School FM-200623275 5/24/06 1st Floor- Boys Restroom Remount sink;a child was sitting on it and broke it from the wall. When using the other basins, water comes from this pipe causing a flood. There is no water in this bathroom at all; it was shut off. May 24, 2006
Simon Elementary School FM-200623276 5/24/06 1st Floor- Auditorium Doors Doors are being replaced and need locks installed (metal doors). Old locks are still on hand. May 24, 2006
Draper Elementary School FM-200623270 5/24/06 Basment/Breach in custodian closet Asbestos Code A - Clear for repairs on 05/24/06 Tidewater - Carlos Vera (RG 05/25/06) May 24, 2006
Draper Elementary School FM-200623231 5/24/06 Third Floor - Falling plaster & cracks in the ceiling in storage room across from room #300 Asbestos Code A - Clear for repairs on 05/24/06 Tidewater - Carlos Vera (RG 05/25/06) May 24, 2006
Thomas Elementary School FM-200623240 5/24/06 First Floor-Rm. 100/Health Suite: Survey and install devider so the health suite can be in compliance with NASN Standards. Asbestos Code A - Clear for repairs on 05/25/06. Tidewater - Thomas Johnson (RG 05/30/06) SEE ASSESSMENTS May 24, 2006
Benning Elementary School FM-200623283 5/24/06 Rooftop Exhaust fans are not working. May 24, 2006
Benning Elementary School FM-200623281 5/24/06 Rooftop There is a clogged drain on the rooftop near the kitchen. May 24, 2006
Wilson High School FM-200623251 5/24/06 WILSON, W Replace leaking section of two inch black iron pipe and two inch welded elbow to condensation return line in pump room. May 24, 2006
Young Elementary School FM-200623279 5/24/06 1st Floor Repair/replace door closures on the following doors: - Kindergarten Entrance Door - Hallway Door near Main Office May 24, 2006
McKinley Technology High FM-200623384 5/24/06 PLEASE RE-KEY DOOR LOCKS INSTALLED BY ARMY CORP OF ENG. May 24, 2006
Shaed Elementary School FM-200623331 5/25/06 1st Floor- Girls Dressing Room Replace 6x6 tiles and track. Asbestos Code A - Clear for repairs on 05/30/06. Tidewater - Samuel May (RG 05/31/06) May 25, 2006
Benning Elementary School FM-200623332 5/25/06 Cafeteria 30 wheels are needed for lunchroom tables. May 25, 2006
Benning Elementary School FM-200623333 5/25/06 Rooftop TV cable needs to be tacked down. May 25, 2006
Takoma Educational Center FM-200623381 5/25/06 1st Floor- Room 65 Please install additional lighting on the stage for the Graduation Ceremony. May 25, 2006
Ballou Senior High School FM-200623417 5/25/06 furnish and install new locks as follow:1.athletic office 2.training rm.3.equipment rm. 4.training storage rm., key to bldg.master with pass key for certain employees. May 25, 2006
Shaw JHS FM-200623356 5/25/06 Repair/replace flush valve. Also unclog floor drain in kitchen. May 25, 2006
Garfield ES FM-200623374 5/25/06 Lower Level- Pump Room near Cafeteria Sump Pump is needed in the window well, outside of the pump room. May 25, 2006
Benning Elementary School FM-200623345 5/25/06 2nd Floor- Custodian Closet The hot water is running nonstop. The cut-off valve is not working. The water is running at a light- medium flow. May 25, 2006
Backus Middle School FM-200623353 5/25/06 3rd Floor- Girls Bathroom (in gym) A broken cut-off valve is leaking down to the kitchen from the gym. It is destroying the ceiling. May 25, 2006
Gage-Eckington ES FM-200623359 5/25/06 First Floor-Boy's Restroom, Urinals need to be snaked, when flushed one side runs in the next toilet. May 25, 2006
Garfield ES FM-200623365 5/25/06 Outside lights are in need of bulbs. Many are either blown out, or not working because of vandalism. May 25, 2006
Backus Middle School FM-200623361 5/25/06 3rd Floor- Room 316 Repair the window frame. Asbestos Code A - Clear for repairs on 05/31/06. Tidewater - Samuel May (RG 06/01/06) May 25, 2006
Merritt Middle School FM-200623376 5/25/06 Asbestos Assessment Required. First Floor, East & West Lobby Stairwell. Remount both handrails that were broken off the wall ASAP!!!. Asbestos Code A - Clear for repairs on 05/31/06. Tidewater - Kenny Long(RG 06/01/06) May 25, 2006
Garfield ES FM-200623412 5/26/06 Main Bldg./Second Floor - Walls and trim needs to be painted, also stairways . Lead Code A - Clear for repairs on 06/13/06. Tidewater - Roger Small (RG 06/22/06) May 26, 2006
Benning Elementary School FM-200623434 5/26/06 Entire Interior of Building. No lights throughout building/power outage. Note: This is as a result of "Pepco" working on a blown transformer. May 26, 2006
Garfield ES FM-200623413 5/26/06 Outside lights are in need of bulbs, lots of light bulbs are blown out or broken due to vandalism. May 26, 2006
Garfield ES FM-200623414 5/26/06 In Back Of The Demandables (outside) - Bricks are coming off the wall, in need of repair. May 26, 2006
Cook J.F. Elementary School FM-200623424 5/26/06 Playground There is a crack in the exterior wall (brick) below a window (and directly above an exit door). There is a stone that is being held in by this cracked brick, possibly sliding out. Please survey AS SOON AS POSSIBLE. May 26, 2006
Browne Junior High School FM-200623415 5/26/06 1st Floor- Room 124 The sink is leaking on the floor. May 26, 2006
Marshall Educational Center FM-200623453 5/30/06 1st Floor- Stage 1 The faucet in Mrs. Reid room needs to be replaced. The water is leaking on the floor. May 30, 2006
Bruce-Monroe Elementary School FM-200623436 5/30/06 Check and repair AC Unit, there is no air. May 30, 2006
Patterson ES FM-200623449 5/30/06 Cafeteria - 9 double pane windows are broken (outer glass) May 30, 2006
Patterson ES FM-200623540 5/30/06 Through-Out Entire Building, All Restroom. No running water in restrooms. Note: Malfunctioning sensors on faucets. May 30, 2006
Watkins Elementary School FM-200623501 5/30/06 Throughout the Building There are approx. 19 a/c units that are not working. 200-203, 215, 216, 210, 301, 304, 305, 303, 314, 315, 316, 401, 402, 405, 406, 410 May 30, 2006
Woodson High School FM-200623498 5/30/06 A/C unit is not working. May 30, 2006
Park View ES FM-200623549 5/30/06 Outside Drains On Cafeteria Side Are Clogged. May 30, 2006
Noyes Elementary School FM-200623557 5/30/06 A-Wing/Room 133 - Door Falling Off The Hinges EMERGENCY May 30, 2006
Ludlow-Taylor ES FM-200623577 5/31/06 Third Floor-Hallway/Due to a water leak in the ceiling, ceiling tiles are falling and water is leaking into the light fixture. Note: The leak is coming from the cooling tower. Asbestos Code A - Clear for repairs on 05/31/06. Tidewater - Carlos Vera (RG 06/01/06) May 31, 2006
Cardozo High School FM-200623597 5/31/06 Basement- Eastside/Rear Steps (near boys gym) The students pulled down a pipe. It is hanging in the hallway and down the steps. May 31, 2006
Cardozo High School FM-200623598 5/31/06 Basement- Eastside/Rear Steps (near boys gym) The students pulled down some electrical wires. The live wires are hanging in the hallway and down the steps. May 31, 2006
Kelly Miller MS FM-200623574 5/31/06 Kelly Miller Room A104 1st Floor Repair inoperable ceiling univent motor, nuit shorted out due to faulty installation of controls. May 31, 2006
Cardozo High School FM-200625681 5/31/06 First Floor/Room 109, Survey and transfer the window air conditioner from rm. 109 to rm. 105. May 31, 2006
Park View ES FM-200623608 5/31/06 1st Floor- Outside of the Cafeteria The outside drain is backed up. It needs to be snaked out. When it rains again, the water will enter and flood the cafeteria. May 31, 2006
Park View ES FM-200623580 5/31/06 1st Floor- Auditorium Window units (3) need to be installed. They have the units on hand already. May 31, 2006
Shaw JHS FM-200623631 5/31/06 Stairwell 2/Not Illuminated May 31, 2006
Spingarn High School FM-200623582 5/31/06 3rd Floor- Rooms 15 & 17 Spot Cooler needs a dedicated circuit (lines) for each spot cooler. The breaker trips every time the spot coolers are turned on. These are handicapped children. May 31, 2006
Davis Elementary School FM-200623651 5/31/06 1st Floor- Auditorium Install 20 amp plugs for window a/c units. Two on each side. Asbestos Code A - Clear for repairs on 06/01/06. Tidewater - Samuel May (RG 06/02/06) May 31, 2006
Ludlow-Taylor ES FM-200623575 5/31/06 Third Floor-Hallway/Ceiling tiles are falling and water is leaking into the light fixture - Note: the water is coming from the cooling tower/check and make repairs. May 31, 2006
Duke Ellington School FM-200623594 5/31/06 Ellington Principals Office and Room #104 Correct excessive vibration on both units both unit provide heating and cooling for areas. May 31, 2006
Ludlow-Taylor ES FM-200623576 5/31/06 Third Floor-Hallway/Due to a water leak in the ceiling, ceiling tiles are falling and water is leaking into the light fixture. Note: the leak is coming from the cooling tower May 31, 2006
Davis Elementary School FM-200623654 5/31/06 1st & 2nd Floors- Hallways (new wing) Upgrade floor panel box that supplies power to the classroooms. When the a/c's are on, the breaker continuously trips. May 31, 2006
Davis Elementary School FM-200623652 5/31/06 1st Floor- Rooms 101 & 115 Install 20 amp plugs for window a/c units. Asbestos Code A - Clear for repairs on 06/01/06. Tidewater - Samuel May (RG 06/02/06) May 31, 2006
Bowen Elementary School FM-200623650 5/31/06 Second floor, Main Office. Assess & Repair circuit breaker that continuously trips. May 31, 2006
Marshall Educational Center FM-200623655 5/31/06 Balcony of Gymnasium. Repair broken window, there is no way to secure this area. May 31, 2006
Cook J.F. Elementary School FM-200623590 5/31/06 3rd Floor- Room 301 The breaker trips everytime the a/c is powered on. May 31, 2006